State

Categories

Sub Categories

Click Here to Find Current Projects

List of Docks & piers, wharves, boat ramps Projects in WA


HILLARYS BOAT HARBOUR - E JETTY REPLACEMENT PEN SYSTEM
Civil Engineering (Docks & piers, wharves, boat ramps) Renovations, Refurbishments etc. project at West Coast Dr, Hillarys, WA 6025. This type is Pens - Replacement with State ownership. Demolition of existing floating pen system & design, manufacture & installation of new floating pen system, while retaining the existing piles. Click for more details...

RIVERSIDE GARDENS JETTY
Civil Engineering (Docks & piers, wharves, boat ramps) project for New development. Construction of boat ramp on Swan River. Click for more details...

CHRISTMAS ISLAND - EAST COAST PORT FACILITY
Northeast coast of, Christmas Island, WA 6798 Has Christmas Island - East Coast Port Facility currently at Early Planning stage. Development of additional port facility comprising deepwater mooring point for ships & barge landing at cliff face on northeast coast of Christmas Island. Additional port is required to improve marine access to island when existing port at Flying Fish Cove is unusable due to direction & height of waves (occurring mostly between December & March). Click for more details...

FLAT ROCK BOATING FACILITY (AUGUSTA BOAT HARBOUR) - MARITIME STRUCTURES
Civil Engineering (Docks & piers, wharves, boat ramps) New project at Flat Rock in Flinders Bay, approx 5 km south of, Augusta, WA 6290. This type is Boating Facility - Design & Construct Package with State ownership. Works to include design & construction of the Maritime Structures at the Augusta Boat Harbour creating a protected harbour basin featuring 4 boat launching ramps, 2 boat holding jetties, 40 m service jetty & floating jetty with associated facilities, universal access pontoon, universal access fishing platform, parking for approx 160 cars/trailers & 90 parking bays for only cars, installation of utility svcs & navigation aids which will form Stage 2 of the project. Click for more details...

CANAL ROCKS BOAT RAMP & FINGER JETTY
Off Caves Rd south of, Yallingup, WA 6282 Has Canal Rocks Boat Ramp & Finger Jetty currently at Construction stage. Concrete boat ramp with finger jetty constructed on western side of existing ramp & extended an extra 12 m into sea. Click for more details...

PORT OF GERALDTON - BERTH 4
Western Fillet For Berth project at Berth 4, Port of, Geraldton, WA 6530 in the Civil Engineering (Docks & piers, wharves, boat ramps). Works was to comprise construction of Berth 4 western fillet, consisting of approximately 75 sq m of pre-cast concrete plank supported on steel beams. Click for more details...

SHELLEY-ROSSMOYNE FORESHIRE - FISHING PLATFORMS & JETTY
New project of Civil Engineering (Docks & piers, wharves, boat ramps) project at East of Prisoners Point, Shelley & off Canning River's tributary, Bull Creek, Rossmoyne, WA 6148. It is proposed to construct three fishing platforms east of Prisoners Point, Shelley, off southern foreshore of Canning River & jetty off its tributary Bull Creek, Rossmoyne. Click for more details...

ONE MILE JETTY
Jetty - Renovation project at Annear Pl, Babbage Island, Carnarvon, WA 6701 in the Civil Engineering (Docks & piers, wharves, boat ramps). Conservation work includes replacement of 66 piles at end of jetty, stringers, rails & decking at head & neck of jetty & corrosion protection. Click for more details...

GERALDTON PORT ENHANCEMENT PROJECT
Currently at the Tenders & Building stage In City Of Greater Geraldton is a project estimated to be $ 100000. This project Works comprise protective coatings removal & replacement for Berth No. 6. Click for more details...

BUNBURY PORT AUTHORITY - BERTH 8 WORKS
Bunbury Port, Casuarina Dr, Bunbury, WA 6230 Has Bunbury Port Authority - Berth 8 Works currently at Construction stage. Works to comprise of construction, installation & commissioning of concrete washdown area for Berth 8 at Bunbury Port. Click for more details...

SHIRE OF DERBY/WEST KIMBERLEY - WHARF PRECINCT WORKS
Currently at the Construction stage In Derby-W Kimberley is a project estimated to be $ 295000. This project Works to comprise of construction of structural steelwork at Derby Wharf. Click for more details...

ABROLHOS ISLANDS PELSAERT GROUP - NAVIGATIONAL AIDS
Civil Engineering (Docks & piers, wharves, boat ramps) project for Supply & Install development. Supply & installation of navigational aids for Abrolhos Islands Pelsaert Group. Click for more details...

CITY OF ROCKINGHAM - VAL STREET JETTY
Currently at the Construction stage In Rockingham is a project estimated to be $ 1095000. This project Construction of extension to Val Street Jetty. Click for more details...

SHIRE OF EXMOUTH - BOAT RAMP WORKS (TANTABIDDI)
Local Govt ownership Civil Engineering (Docks & piers, wharves, boat ramps) project In The Exmouth Council Area for New development. Reconstruction of Tantabiddi Boat Ramp in Exmouth to comprise replacement of the single lane boat ramp with a modern 2 lane ramp to accommodate bigger vessels. Works will also include 2 finger jetties to provide a safe passenger transfer point for tourists joining ocean charter vessels or the whale shark experience. Click for more details...

ROWLEY SHOALS MARINE PARK - VESSELL MOORINGS
Currently at the Construction stage In Offshore is a project estimated to be $ 1000000. This project Installation of vessel swing morrings at Clerke & Imperieuse Reefs, Rowley Shoals Marine Park. Click for more details...

AUSTRALIAN MARINE COMPLEX - SERVICES OUTLET PITS
Renovations, Refurbishments etc. project of Civil Engineering (Docks & piers, wharves, boat ramps) project at 124 Quill Wy, Henderson, WA 6166. Rectification works for water damaged services outlet pits include: testing of existing cables within 12 No water damaged services outlet pits, advise Superintendent of results & defects; removal of existing electrical services from 12 No in-ground electrical services pits; dimensioned shop drawing showing all proposed equiptment & cabling complete with dimensions & cable bending radius; supply & installation of new electrical services equipment to 12 No. i-ground electrical services pits. Equipment to suit new installation; report to Superindendent where cabling is found damaged/inappropriate; checking & cleaning of compressed air & gas outlets & pipe work; raising of 12 No services outlet pit lids; sealing of 12 No services outlet pits; supply & installation of inflatable wraparound duct seal system to conduits servicing 12 No services outlet pits; paving around 12 No services outlet pits to new levels; construction of sub-soil cut-off drain around 12 No services outlet pits, including associated personnel access chambers & discharge pipe work; connection of discharge pipe into personnel access chamber, including installation of flap in existing personnel access chamber; pavement construction on line of drainage works; inspection, testing & commissioning; as-constructed documentation; & warranty during Defects Liability Period of 12 months. Click for more details...

EXMOUTH BOAT HARBOUR UPGRADE STAGE 2
Civil Engineering (Docks & piers, wharves, boat ramps) project for Renovations, Refurbishments etc. development. Works to include the first stage of a multi-stage process to undertake Stage 2 - Exmouth Boat Harbour Upgrade Marine Structures & Civil Works. The works are proposed to include Marine Structures: extension of existing service wharf by 94m including construction of a new 40m heavy lift zone for crane lifts; reconfiguration of existing cyclone mooring system to make way for the new wharf extension; construction of 4 new trawler pens & demolition of the existing trawler pens to make way for the new wharf extension. Breakwater works: raising of existing southern breakwater to provide adequate protection to vessels in new trawler pens during storms. Civil works: construction of heavy duty hardstand pavement wharf extension; reconstruction of harbour access road; sealing of fuel farm access road; installation of wharf & hardstand drainage. Services: to new wharf & trawler pens including power, lighting, potable water, fire water & communications; provision for fuel to new wharf (fuel infrastructure is to be provided by others). Stage 1 works which are now complete included the construction of boat pens providing 25 addnl floating boat pens ranging in size from 15 to 25m. Click for more details...

DAMPIER PORT AUTHORITY - ACCESS GATE & MAINTENANCE
Civil Engineering (Docks & piers, wharves, boat ramps) project at Within Dampier Port, Dampier, WA 6713 for New. Works to comprise of supply of Access Gate, maintenance works & number of tendered options including new first aid hut & maintenance of security infrastructure. Click for more details...

PORT HEDLAND PORT AUTHORITY - UTAH POINT PANAMAX BERTH PROJECT
Port Hedland Port Authority - Utah Point Panamax Berth Project is currently at the Construction stage, valued at about $ 20000000 it is Construction of new multi-user Panamax Berth Facility (within area of existing Port Hedland Port referred to as Utah Point) to export iron ore, manganese & chromite. Works consists of construction of 5000 tph travelling shiploader. Click for more details...

PORT HEDLAND PORT AUTHORITY - UTAH POINT PANAMAX BERTH PROJECT
Steel Tube Piling Package - For Berth Facility project at Port Hedland Port, Gilbert St, Port Hedland, WA 6721 in the Civil Engineering (Docks & piers, wharves, boat ramps). Provision of steel tube package for construction of new multi-user Panamax Berth Facility (within area of existing Port Hedland Port referred to as Utah Point) to export iron ore, manganese & chromite. Click for more details...

FREMANTLE PORTS - NORTH QUAY BERTH NO 1
Civil Engineering (Docks & piers, wharves, boat ramps) project In The Fremantle Council Area of State ownership. Works to comprise of installation of new fendering system. Click for more details...

FREMANTLE PORTS - NORTH QUAY BERTH NO 10
Civil Engineering (Docks & piers, wharves, boat ramps) project In The Fremantle Council Area of Berth - Reconstruction - Supply Of Piles type. Works to comprise of reconstruction of North Quay No 10 - supply of 3000 tonnes of tubular steel piling. Click for more details...

SWAN RIVER TRUST ELLAM STREET SLIPWAY
Civil Engineering (Docks & piers, wharves, boat ramps) project at 7 Ellam St, Victoria Park, WA 6100 of Slipway - Refurbish type of Renovations, Refurbishments etc. development. Works to comprise refurbishment of slipway. Click for more details...

KALBARRI LAND-BACKED WHARF
Civil Engineering (Docks & piers, wharves, boat ramps) project at Kalbarri Wharf, Kalbarri, WA 6536 for New. Works to comprise construction of a land-backed wharf in the Murchison River, Kalbarri. Click for more details...

YANCHEP FORESHORE PATHWAY & BOARDWALK
Civil Engineering (Docks & piers, wharves, boat ramps) project for New development. Works to include the design & construction of a foreshore 2.5 m wide pathway & boardwalk connecting Foreshore Vista & Compass Cir. Click for more details...

WEST COAST DRIVE DUAL USE PATH
Civil Engineering (Docks & piers, wharves, boat ramps) project for Addition development. The path stretches 1.8km from The Plaza at the corner of Raleigh Rd, Sorrento, to Beach Rd, Marmion. Works to the path may include maximising the width, predominantly to the east, including but not limited to encroachment & reconfiguration of existing roadway, median strips & eastern verge areas, the upgrade of all beach access steps, paths & ramps within the project area, all external construction materials, including but not limited to handrails, brackets & signage, which must be specified to last at least 15 years in corrosive coastal environment, all plantings & shrubbery within the project area to be local indigenous species, reconfiguration of the sunken path located between Troy Av & Bettles St to include footpath lighting, widening & retaining the dual use path (DUP) to the east & enhance the lookouts to incorporate appropriate predominantly north-south aligned seating. Also to reconfigure The Plaza mixed use precinct site to align the DUP along its current route, construct an elevated boardwalk access to the beach, create a ballooned east-west aligned seating area to the west of the DUP, close the access path situated to the north & remove the fixed shade structure component. To relocate the Ross Av Lookout site to the north of the existing stairs, construct the viewing platform at grade with the DUP & erect a fixed shade structure. Provision has been made in the 2008/2009 budget & future budgets for a six year project to weed, rehabilitate & revegetate the coastal foreshore reserve adjacent to the project area with the objectives to restore its condition. Works may also include provision of a bus bay further to the south of its current locations which would require a higher retaining wall. Click for more details...

SHIRE OF ASHBURTON BOAT RAMPS/PONTOON
Boat Ramps (2)/Pontoon - Construction & Modifications project at Undisclosed within, Onslow, WA 6710 In The Council Area Of Ashburton of Local Govt. Works to involve the construction of a new concrete boat ramp, repair of the existing ramp & modification of an existing pontoon. Click for more details...

PALM BEACH EAST BOAT RAMP
Palm Beach East Boat Ramp is currently at the Construction stage, valued at about $ 548000 it is Works to include demolition & removal of the existing eastern boat ramp & construction of a twin boat launching ramp & a piled holding jetty. Click for more details...

EXMOUTH BOAT HARBOUR
Civil Engineering (Docks & piers, wharves, boat ramps) project at Within Exmouth Boat Harbour, Murat Rd, Exmouth, WA 6707 of Floating Mooring Pens - Design & Construction type of New development. To include the construction of floating mooring pens. Click for more details...

BREAKSEA ISLAND LIGHTHOUSE JETTY
State ownership Civil Engineering (Docks & piers, wharves, boat ramps) project In The Albany Council Area for Renovations, Refurbishments etc. development. Works to include restoration of the existing jetty at the Breaksea Island Lighthouse. Click for more details...

BUNBURY PORT AUTHORITY BERTH 3
Civil Engineering (Docks & piers, wharves, boat ramps) project In The Bunbury Council Area of Berth 3 - Repairs type. Works to include provision of Berth 3 Dolphin repairs comprising of coring 12 x 350mm diameter holes through the concrete dolphins, installation of 6 sleeves & replacement of 6 fenders. Click for more details...

PORT OF WYNDHAM JETTY
Jetty - Refurbishment Of Protective Coatings project at Port of, Wyndham, WA 6740 In The Council Area Of Wyndham-E Kimberley of State. Works to comprise refurbishment of protective coatings for Port of Wyndham Jetty. Click for more details...

ROTTNEST ISLAND T HEAD JETTY
State ownership Civil Engineering (Docks & piers, wharves, boat ramps) project In The Cockburn Council Area for Renovations, Refurbishments etc. development. Works to include the reconstruction or replacement of 4 existing piles & minor works to the jetty. Click for more details...

FREMANTLE PORTS - NORTH QUAY BERTH NO 2
Civil Engineering (Docks & piers, wharves, boat ramps) project In The Fremantle Council Area of Fendering - Upgrade type. To include upgrading of Fendering for Fremantle Ports. Click for more details...

PORT OF WYNDHAM JETTY
Civil Engineering (Docks & piers, wharves, boat ramps) project at Port of, Wyndham, WA 6740 for Renovations, Refurbishments etc.. Construction Management Services for Civil, Port Building, Electrical & Cathodic Protection Works. Click for more details...

DONNELLY LANDING - BOAT LAUNCHING AREA & PATHWAYS
Boat Launching Area/Pathways - Upgrade/Sealing project at 33 km west of, Pemberton, WA 6260 in the Civil Engineering (Docks & piers, wharves, boat ramps). Upgrading & seal of part of Donnelly Landing, comprising upgrading 143 lm of loop to the boat launching area (998 sqm of sealing) & upgrading & sealing 101 lm connector paths. To include clearing, construction of site regrading, soil stabilisation, road pavements, stormwater drainage, sealing & subsidiary works. Click for more details...

PERTH WATERFRONT (PERTH CITY FORESHORE)
Civil Engineering (Docks & piers, wharves, boat ramps) project for New development. Works to include extending Pier No.5 & the addn of 3 new finger jetties to Pier No.1, & the supply & installation of new fuel, water, fire, power & waste services. Click for more details...

ABROLHOS ISLANDS - PUBLIC VESSEL MOORINGS
Civil Engineering (Docks & piers, wharves, boat ramps) project at Abrolhos Islands, 60 km west of Geraldton, ., WA 6999 of Public Vessel Moorings - Supply & Installation type of New development. To include the supply & installation of public vessel moorings. Click for more details...

WALPOLE TOWN JETTY & BOAT RAMPS
A project in the WA Within Manjimup. Works to include design & construction of a floating jetty & 2 launching ramps which will incorporate: demolition of the current existing jetty structure & launch ramp, provide comprehensive design documentations, construct & install a piled floating jetty with access ramp & construct & install 2 launching ramps. Click for more details...

CITY OF BUNBURY - STIRLING STREET FLOATING FINGER JETTY & BOAT LAUNCHING RAMPS
Currently at the Construction stage In Bunbury is a project estimated to be $ 252000. This project Works to include the construction of a floating finger jetty & new concrete boat launching ramps & demolition work to include removal of a section of the existing concrete ramp, to the Stirling St Boat Launching Facility located in the Leschenault Inlet in Bunbury. Click for more details...

STINGRAY WHARF
Addition project of Civil Engineering (Docks & piers, wharves, boat ramps) project at Within Mandurah Entrance Channel, Mandurah, WA 6210. Design & construction of an extension to the existing Stingray Wharf. Click for more details...

PORT HEDLAND PORT AUTHORITY - BERTH 3
Berth 3 - Repairs project at Port Hedland Port, Gilbert St, Port Hedland, WA 6721 In The Council Area Of Port Hedland of State. Works to include repairs to Berth 3 steel structure & tug pen sheet pile wall comprising of repairs to the steelwork, blast & paint. Click for more details...

PORT HEDLAND PORT AUTHORITY - ENGINEERING CONSULTANCY SERVICES PANEL
Port Hedland Port, Gilbert St, Port Hedland, WA 6721 Has Port Hedland Port Authority - Engineering Consultancy Services Panel currently at Planning stage. Engineering Consultants are sought to form an Engineering Services Panel to provide services to the Port Hedland Port Authority. The supply of services will be through a panel arrangement where consultants can provide provision of high level specialist advice and support relevant to Port Hedland Port operations and Port development, including but not limited to: design of marine and other structures, structural design reviews, condition inspection of port facilities, design of civil engineering services, marine engineering, geotechnical and geophysical engineering; corrosion engineering and cathodic protection, mechanical engineering, electrical engineering, coastal engineering, geographic information systems (GIS) and project/contract management services. Click for more details...

PORT HEDLAND PORT AUTHORITY - UTAH POINT - CRIB ROOM FACILITY
Addition project of Civil Engineering (Docks & piers, wharves, boat ramps) project at Finucane Island, end of FMG Rd, Port Hedland, WA 6721. Works to include supply of the Crib Room Facility to be carried out in one stage comprising of: delivery, footing, preparation & placement of the building & to include: supply of the building, materials, labour, insurance, mobilisation, demobilisation, equipment & services design, erection, construction, connection, & commissioning of the building. Click for more details...

RIDLEY PLACE BOAT LAUNCHING FACILITY - PILED FLOATING FINGER JETTY SYSTEMS
Piled Floating Finger Jetties(2) project at Ridley Pl, Australind, WA 6233 in the Civil Engineering (Docks & piers, wharves, boat ramps). Works to include the construction of 2 x Piled Floating Finger Jetty Systems at the Ridley Place Boat Launching Facility. Click for more details...

BUSSELTON JETTY - MARINE BERTHING FACILITY
Civil Engineering (Docks & piers, wharves, boat ramps) project In The Busselton Council Area of Local Govt ownership. Works to include the construction of a new 15m jetty, to be used as a marine berthing facility. Click for more details...

SORRENTO BEACH ENCLOSURE
Support Piles - Supply & Install New project In The Joondalup Council Area. Works to include the supply & installation of piles to support a swimming enclosure. Click for more details...

THE BOARDWALK REPAIRS & REMEDIAL WORKS STAGE 2
Civil Engineering (Docks & piers, wharves, boat ramps) project at Dundus Point, Majestic Cl, Applecross, WA 6153 for New. Repair & Remedial Works to the Boardwalk at Dundas Point Majestic Close Applecross - Stage 2 Click for more details...

CANNING RIVER ECO EDUCATION CENTRE
Civil Engineering (Docks & piers, wharves, boat ramps) project at Kent St & Queens Park Rd, Wilson, WA 6107 for New. Construction of a Boardwalk/Dipping Deck for Canning River Eco Education Centre. Click for more details...

PORT OF BUNBURY - BERTH 8 CV04
Casuarina Dr, Bunbury, WA 6230 Has Port Of Bunbury - Berth 8 Cv04 currently at Construction stage. Refurbishment works to Berth 8 CV04 conveyor gallery, includes supply of services & materials associated with floor & roof purlin remediation works. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect