State

Categories

Sub Categories

Click Here to Find Current Projects

List of Docks & piers, wharves, boat ramps Projects in WA


ESPERANCE FORESHORE
Foreshore - Coastal Engineering Services For Foreshore Redevelopment Renovations, Refurbishments etc. project In The Esperance Council Area. Proposed upgrade to foreshore at Esperance may include relocation of tourist bureau & relocation of Tanker Jetty. Click for more details...

GERALDTON PORT ENHANCEMENT PROJECT
Pile Driving At Berth 6 project at Port of, Geraldton, WA 6530 In The Council Area Of City Of Greater Geraldton of State. Works comprise driving of approximately 275 off 31OUC118 piles in calcarenite at berth face in 9 m water. Click for more details...

DAMPIER PORT BULK LIQUIDS BERTH (BLB) PROJECT
Private ownership Civil Engineering (Docks & piers, wharves, boat ramps) project In The City Of Karratha Council Area for Addition development. Additional facilities to be constructed to enable accommodation of increased port traffic to service new fertiliser & gas to liquids projects on Burrup Peninsula. New multi-user bulk cargo export berth is being constructed to service liquids tankers & bulk solid cargo vessels. Dredging work of up to 4.5 million cu m of sediments is also being undertaken. Click for more details...

ELIZABETH QUAY - PERTH WATERFRONT (PERTH CITY FORESHORE) - PUBLIC REALM & INLET
Waterfront - Redevelopment - Design & Construct project at Foreshore btwn Barrack & William Sts, Perth, WA 6000 In The Council Area Of Perth of State. Construction of a 2.8 ha inlet that will bring the river back to near its original shore line. The inlet will be surrounded by landscaped terraces, boardwalks & promenades. It is proposed to remove a section of Riverside Dr & some changes may be made to existing roads to create more pedestrian-friendly routes. Significant work may be done on road re-alignment, drainage & dredging. The inlet, designed to reflect the historical characteristics of Perth Port, will have room for public boat mooring facilities. At the centre of the new inlet will be an island. Potential land use mix may include 15,000 sqm of office space, 36,000 sqm of retail, 1700 apartments, 220 hotel & short stay accommodation rooms & land at the foot of William St has been set aside for a significant public building to be 9,000 sqm in area likely to be a National Centre for Indigenous Art & Culture. Event spaces may include a public square next to the Esplanade train station, the promenade, the island & a new road which can be closed to accommodate events. Works may also include a swimming pool. Click for more details...

BUNBURY WATERFRONT PROJECT - TIMBER JETTY
Civil Engineering (Docks & piers, wharves, boat ramps) project In The Bunbury Council Area of Local Govt ownership. Refurbishment of timber jetty to include deconstruction/demolition & removal of deteriorated sections of jetty. Click for more details...

PORT OF ESPERANCE
Port Of Esperance is currently at the Construction stage, valued at about $ 12000000 it is Design & construction of storage shed of approximately 210 m in length x 74 m width & 30 m in height, conveyors of approximately 600 m in length, truck loading facility, berth hoppers & other associated works. Storage facility will have capacity to store 120,000 tonnes of sulphur. Click for more details...

FREMANTLE FISHING BOAT HARBOUR - MEMORIAL JETTY
Private ownership Civil Engineering (Docks & piers, wharves, boat ramps) project In The Fremantle Council Area for New development. It is proposed to develop 14 m long memorial jetty to commemorate pioneers of fishing industry in Fremantle. Jetty is to be constructed on site of original jetty at Fishing Boat Harbour. Click for more details...

VASSE AND WONNERUP WATERWAYS - MARINE FLOODGATES
New project of Civil Engineering (Docks & piers, wharves, boat ramps) project at Vasse & Wonnerup Estuaries via Layman Rd & Floodgate Rd, Wonnerup, WA 6280. It is proposed to construct two new floodgates of concrete & steel in waterways of Vasse & Wonnerup Estuaries. New floodgates will be built in close proximity to existing timber floodgates, which have reached end of their design life. Existing timber floodgates to be kept operational while new work is being built. Generally scope of works shall comprise construction & commissioning of replacement floodgates, along with completion of all interfaces between new & existing elements. It includes civil, electrical, instrumentation, mechanical, telemetry & structural works. Scope includes, but is not necessarily limited to design & construction of temporary works such as coffer dams & dewatering facilities so that works can be undertaken in dry conditions; design & construction of measures to limit environmental impacts such as turbidity, odour & noise (it is envisaged that turbidity control measures will include detention basin, clearwater discharge facilities & silt curtains); demolition of remnants of Old Ballarat Railway Bridge & extraction of any associated timber piles that conflict with proposed position of cut-off sheet piles on new floodgates (this work includes backfilling of each extraction site); excavation, disposal & earth filling for floodgates & abutments; supply & installation of permanent sheet piling, cast in-situ reinforced concrete, pre-cast culverts, revetment mattresses, fibreglass stopboards & associated works; supply & installation of mechanical, electrical instrumentation & telemetry works for monitoring & actuation of floodgates; removal & modification of existing stainless steel flap gates from old timber structures & mounting on new structures; road & drainage works; testing & commissioning of new floodgates; demolition of old floodgates, including preservation of south abutment & infill wall of Wonnerup Floodgates. Click for more details...

PORT DENISON LOBSTER FACILITY
Civil Engineering (Docks & piers, wharves, boat ramps) New project at Reserve 41089 McIntyre Cove (lot 547), Port Denison, WA 6525. This type is Live Lobster Holding Facility with Private ownership. Live lobster holding facility, maritime classroom annex, boat pens, fuel berth & car parking. FLOOR AREA: 1,000 - 15,000 sq m. Click for more details...

PALM BEACH JETTY
Civil Engineering (Docks & piers, wharves, boat ramps) project In The Rockingham Council Area of Jetty - Demolition type. The works will be located at the Palm Beach Jetty, Rockingham. The works comprise the demolition & removal of the jetty & the jetty head. Click for more details...

AUSTRALIAN MARINE COMPLEX WHARF DEVELOPMENT - PHASE 1A
East Berth - Extensions New project In The Cockburn Council Area. Works comprise of construction of extensions to East Berth (formerly 3,000 T loadout wharf) within common user facility located in Henderson (Cockburn Sound), extensions include piling, crane pads, electrical & hydraulic services, walkways & mooring & berthing capabilities. Click for more details...

RIVERTON BRIDGE CAFE/KIOSK/ECO EDUCATION CENTRE**DOUBLE REPORT REFER ID 770574***
Local Govt ownership Civil Engineering (Docks & piers, wharves, boat ramps) project In The Canning Council Area for New development. Replacement of existing small kiosk on site & construction of new cafe/kiosk, education centre & floating landing facility. Click for more details...

SHIRE OF DENMARK - PEACEFUL BAY FINGER JETTY
Finger Jetty project at Peaceful Bay Rd, Peaceful Bay, WA 6333 in the Civil Engineering (Docks & piers, wharves, boat ramps). Work to include the construction of a finger jetty at Peaceful Bay. Click for more details...

LAKE JUALBUP - IMPROVEMENTS
Civil Engineering (Docks & piers, wharves, boat ramps) project at Bnd by Herbert Rd Excelsior & Evans Sts & Lake Av, Shenton Park, WA 6008 for Renovations, Refurbishments etc.. Tenders were invited from consultants to prepare feasibility study for lake design at Lake Jualbup, maintaining lake & its surrounds in its current setting with permanent water & if that is not feasible, other options to maintain permanent water on a lesser scale & to investigate whether aquatic ecosystem can be developed within such design. Total area of Lake Jualbup Reserve (parkland vested in City of Subiaco) is 8.92 ha incorporating seasonal water body of 2.34 ha. Water compensating basin (lake) is Water Corporation registered asset & declared main drain & Water Corporation is resposible for management & protection of compensating basin. Lake receives & discharges drainage waters as well as ground water flow. Click for more details...

KWINANA BULK JETTY - BERTH NO. 3
Pipeline & Changeover Manifold - Installation Supply & Install project In The Kwinana Council Area. Works to comprise of installation of new pipeline & changeover manifold at Kwinana Bulk Jetty, Berth No. 3. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - SITE LV ELECTRICAL & CONTROL WORKS (LS)
Civil Engineering (Docks & piers, wharves, boat ramps) project at Geraldton Port, Marine Terrace, Geraldton, WA 6530 of Site Lv Electrical & Control Works (Ls) type of New development. Site LV Electrical & Control Works (LS). Low voltage reticulation, controls and ancillary supply and installation throughout the material handling systems. Click for more details...

ELLAM STREET JETTY REPAIRS
Civil Engineering (Docks & piers, wharves, boat ramps) project at 7 Ellam St, South Perth, WA 6151 of Jetty - Maintenance & Construction Services type of Renovations, Refurbishments etc. development. Works comprise supply of labour, materials & equipment required to perform maintenance cleaning & painting with local structural upgrading of heavy lift jetty. In addition to this supply & install counter-levered walkway. Click for more details...

ABROLHOS ISLANDS PELSAERT GROUP - NAVIGATIONAL AIDS
Civil Engineering (Docks & piers, wharves, boat ramps) project for Supply & Install development. Supply & installation of navigational aids for Abrolhos Islands Pelsaert Group. Click for more details...

ROWLEY SHOALS MARINE PARK - VESSELL MOORINGS
Currently at the Construction stage In Offshore is a project estimated to be $ 1000000. This project Installation of vessel swing morrings at Clerke & Imperieuse Reefs, Rowley Shoals Marine Park. Click for more details...

HILLARYS & FREMANTLE BOAT HARBOURS
Civil Engineering (Docks & piers, wharves, boat ramps) project In The Various Council Area of State ownership. Department is planning pen replacement program for both harbours over next 5 years on basis of Design & Construct Contract. Works to comprise of but not limited to: - Design of new floating pen berthing system; - Demolition & removal of existing infrastructure (fixed & floating); - Piling for new pen system; - Installation of new floating pontoon pen berthing system; - Installation of services & - Selected landside & edge infrastructure. Department is seeking suitably qualified & experienced piling contractors to be short listed & nominated as preferred sub-contractors under Head Contractor for Design & Construct Contract. Click for more details...

WOODMAN POINT RECREATIONAL BOATING PRECINCT
Civil Engineering (Docks & piers, wharves, boat ramps) project In The Cockburn Council Area of State ownership. Works to comprise development of Woodman Point Recreational Boating Precinct & includes construction of four lane boat ramp & two holding jetties, mooring fence & floating pontoon jetty. Construction includes associated roads, car park, rock revetments, drainage & minor works. Click for more details...

FREMANTLE WATER POLICE
Walkway/Wave Breakers project at Harvest Rd, Fremantle, WA 6160 In The Council Area Of Fremantle of State. Works to comprise refurbishment of wave breakers & installation of walkway as per specifications & drawings. Click for more details...

CARNARVON FASCINE REVITALISATION PROJECT - FINAL STAGE
Civil Engineering (Docks & piers, wharves, boat ramps) project at Carnarvon Fascine from cnr Robinson St & Olivia Tce to cnr West St, Carnarvon, WA 6701 of Fascine - Upgrade - Design & Construct type of New development. Works to include the design & construction of the final stage of the revitalisation project of the Carnarvon Fascine from the cnr of Robinson St & Olivia Tce through to the cnr of West St comprising of: construction of new recreational jetty structures, enhancement of the waterfront area to include soft & hard landscaping, recreation furniture, restoration of the existing T jetty & provision of car parking. Click for more details...

STARVATION BAY BOAT RAMP
Civil Engineering (Docks & piers, wharves, boat ramps) project at East of Hopetoun Starvation Bay, Hopetoun, WA 6348 for New. Works to comprise construction of a boat ramp to replace the existing one. Click for more details...

CITY OF SOUTH PERTH REDMOND RESERVE PLANT OPERATOR
Civil Engineering (Docks & piers, wharves, boat ramps) project at Redmond Reserve within the city, South Perth, WA 6151 of Revetment Wall type of New development. May include construction of revetment wall. Click for more details...

EXMOUTH BOAT HARBOUR
Civil Engineering (Docks & piers, wharves, boat ramps) project at Within Exmouth Boat Harbour, Murat Rd, Exmouth, WA 6707 of Floating Mooring Pens - Design & Construction type of New development. To include the construction of floating mooring pens. Click for more details...

BLACKWOOD RIVER NATIONAL PARK CHAPMAN BROOK DAY USE FACILITIES REDEVELOPMENT
Civil Engineering (Docks & piers, wharves, boat ramps) Renovations, Refurbishments etc. project at Warner Glen Recreaton site, Warner Glen, WA 6288. This type is Pedestrian Access/Canoe Launching Facilities with State ownership. Works to comprise redevelopment of Chapman Brook day use facilities that includes construction of river access pathways, canoe launching facilities, steps & retainer walls at Warner Glen Recreation site, Warner Glen. Click for more details...

BUSSELTON JETTY ROCK ABUTMENT WORKS
Local Govt ownership Civil Engineering (Docks & piers, wharves, boat ramps) project In The Busselton Council Area for New development. Works to comprise of Rock Abutment Works to Busselton Jetty. Click for more details...

CASCADES LOOKOUT PLATFORMS & DECKS
Currently at the Construction stage In Manjimup is a project estimated to be $ 400000. This project Works to include the construction of 2 stainless steel framed decks with connecting steps, also to include works comprising of fabrication, pile driving, onsite welding & erection of balustrading, total of frame: 78sqms. Construction of two (2) adjoining concrete platforms, works to include site preparation, forming & placing/finishing concrete & fixing of balustrade post, total area: 52.5sqms Click for more details...

BUNBURY PORT AUTHORITY BERTH 3
Civil Engineering (Docks & piers, wharves, boat ramps) project In The Bunbury Council Area of Berth 3 - Repairs type. Works to include provision of Berth 3 Dolphin repairs comprising of coring 12 x 350mm diameter holes through the concrete dolphins, installation of 6 sleeves & replacement of 6 fenders. Click for more details...

THE WYNDHAM COMMUNITY JETTY
Civil Engineering (Docks & piers, wharves, boat ramps) project In The Wyndham-E Kimberley Council Area of Local Govt ownership. Works to comprise design & construction of 'The Wyndham Community Jetty'. Click for more details...

BUSSELTON JETTY REFURBISHMENT WORKS
Currently at the Construction stage In Busselton is a project estimated to be $ 500000. This project Works to comprise Busselton Jetty refurbishment completion works. Click for more details...

WYNDHAM PORT - JETTY CATHODIC PROTECTION
A project in the WA Within Wyndham-E Kimberley. Works to include upgrade of the port comprising of a new Cathodic Protection system with remote anodes to be installed in the sea bed in place of the existing distributed anode system mounted on the steel piles, replacement of transformer-rectifier units (TRUs), installation of all related cabling, all connections to the existing structure, repairs or installation to permanent reference electrodes & installation of test points. Click for more details...

MONKEY MIA JETTY REPLACEMENT
Jetty - Replacement - Demolition, Design & Construct project at Monkey Mia Jetty near Dolphin Resort, approx 25 km west of, Denham, WA 6537 In The Council Area Of Shark Bay of Local Govt. To replace the existing jetty, works to include the demolition, design & construction of the jetty located near the Monkey Mia Dolphin Resort. The jetty will measure 54m in length & 3.5m wide. Click for more details...

DUNSBOROUGH BOAT RAMP
A project in the WA Within Busselton. May include the upgrading of the existing jetty to a multi-use jetty. Click for more details...

DEEP WATER POINT JETTY
Local Govt ownership Civil Engineering (Docks & piers, wharves, boat ramps) project In The Melville Council Area for Renovations, Refurbishments etc. development. To include the demolition and replacement of the existing jetty and to include the addition of a handrail. The jetty will be wider and raised to avoid being under water at high tide. Click for more details...

CITY OF BUSSELTON ABBEY BEACH BOAT RAMP
Civil Engineering (Docks & piers, wharves, boat ramps) project at At Abbey Beach via, Busselton, WA 6280 for New. Design & construction of the Abbey Beach Boat Ramp. Click for more details...

ABROLHOS ISLANDS GROUP - RAT ISLAND JETTY REPLACEMENT
Jetty - Replacement project at Rat Island within the Abrolhos Islands Group, ., WA 6999 in the Civil Engineering (Docks & piers, wharves, boat ramps). Works to include the re-construction of a jetty to access an existing pontoon & associated work. Click for more details...

VICTORIA QUAY - INNER HARBOUR - BERTHS E & D FENDER SYSTEM
Civil Engineering (Docks & piers, wharves, boat ramps) project for Renovations, Refurbishments etc. development. Works to include the construction & upgrading of the fendering system for Berths E & D (part of) & associated works at Victoria Quay - The Inner Harbour at Fremantle. Click for more details...

BUNBURY PORT AUTHORITY - OUTER HARBOUR - BERTHS 1 & 2
Berths 1 & 2 - Structural Remediation Works - Design & Construct project at Bunbury Port, Casuarina Dr, Bunbury, WA 6230 in the Civil Engineering (Docks & piers, wharves, boat ramps). Works to include the design & construction for the Structural Remediation works to be done for Berths 1 & 2 at the Outer Harbour at Bunbury Port. Click for more details...

LAKE RICHMOND - PEDESTRIAN BOARDWALK
Currently at the Construction stage In Rockingham is a project estimated to be $ 339000. This project Works to include all designs, builders licence, labour, materials, equipment & services for the excavation, construction & commissioning of the pedestrian boardwalk. The boardwalk will be approx 2000mm wide x 120 metres long. Click for more details...

MIDDLETON BEACH STAIRS
Middleton Beach Stairs is currently at the Construction stage, valued at about $ 195000 it is Upgrading of stairs located at Middleton Beach. Works to include demolition of the existing stairs, reinforcing concrete works for the stairs, retaining walls & installation of handrails & tactile paving. Click for more details...

OCEAN REEF BOAT HARBOUR CIVIL WORKS
Ocean Reef Boat Harbour Civil Works is currently at the Construction stage, valued at about $ 725000 it is Works to include the construction of 6 piled floating jetties & the demolition of the existing jetties. Click for more details...

GERALDTON PORT AUTHORITY - BERTH 4 TRAIN UNLOADER VAULT CONCRETE REMEDIATION WORKS
Civil Engineering (Docks & piers, wharves, boat ramps) project In The City Of Greater Geraldton Council Area of State ownership. To include concrete remediation works of the Train Unloader Vault located on Berth 4 on the south western end along the rail line parallel to the line running with Ian Bogle Rd. The works to be carried out in 2 stages with Stage 1 to include the consultant completing a review of the past condition reports with a visit to inspect the site & assess the vault condition & Stage 2 to include supply, delivery & installation of the remedial works. Click for more details...

TANTABIDDI BOAT RAMP EXMOUTH
Civil Engineering (Docks & piers, wharves, boat ramps) project In The Exmouth Council Area of Local Govt ownership. Works to include the dredge & repair revetment at the Tantabiddi Boat Ramp Exmouth. Click for more details...

BUSSELTON JETTY - MARINE BERTHING FACILITY
Civil Engineering (Docks & piers, wharves, boat ramps) project In The Busselton Council Area of Local Govt ownership. Works to include the construction of a new 15m jetty, to be used as a marine berthing facility. Click for more details...

PENGUIN ISLAND BOARDWALK REALIGNMENT
Civil Engineering (Docks & piers, wharves, boat ramps) project In The Rockingham Council Area of Boardwalk - Supply & Install type. Works to include the demolition & removal of a section of the existing boardwalk from the area south of the beach that is prone to erosion & supply & construction of approx 120m of boardwalk on Penguin Island. Click for more details...

FISHMARKET RESERVE BOAT RAMP
Civil Engineering (Docks & piers, wharves, boat ramps) project at Fishmarket Reserve, Lot 190 Swan St, Guildford, WA 6055 for New. Works to include the installation of a new concrete boat ramp on the existing ramp at Fishmarket Reserve to comprise of removal & disposal of existing rock pitching, supply & installation of a new concrete boat ramp, supply & installation of limestone rock pitching, reinstatement of turf, boulders & sign posts. Click for more details...

SORRENTO BEACH ENCLOSURE
Support Piles - Supply & Install New project In The Joondalup Council Area. Works to include the supply & installation of piles to support a swimming enclosure. Click for more details...

THE BOARDWALK REPAIRS & REMEDIAL WORKS STAGE 2
Civil Engineering (Docks & piers, wharves, boat ramps) project at Dundus Point, Majestic Cl, Applecross, WA 6153 for New. Repair & Remedial Works to the Boardwalk at Dundas Point Majestic Close Applecross - Stage 2 Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect