State

Categories

Sub Categories

Click Here to Find Current Projects

List of Dredging, Pile driving, Sand mining, Section dredging Projects


DOUGLAS MINERAL SANDS PROJECT
Secondary Processing Plant (Msp) For Heavy Minerals project at 6 km south of, Hamilton, VIC 3300 in the Mining - Earthworks/Civil Engineering (Dredging, Pile driving, Sand mining, Section dredging). The Mineral Separation Plant ("MSP") for processing mine concentrates. The capacity has been almost doubled from 30 tonnes to 55 tonnes per hour. Click for more details...

HAZELWOOD COAL OPERATIONS
A project in the VIC Within La Trobe. The upgrades will take place as part of the transfer to the West Field. Click for more details...

WIM 150 MINERAL SANDS PROJECT
A project in the VIC Within Horsham. The WIM 150 deposit contains approximately five million tonnes of zircon and preliminary analysis suggest that production of 140,000 tonnes of zircon per annum could be possible. The project is positioned near rail and other infrastructure. Click for more details...

YOGANUP 215 STRAND EXTENSION - MINERAL SANDS RESOURCE
Resource - Mineral Sands project at 11 Km South South East of, Capel, WA 6271 In The Council Area Of Capel of Private. Resource estimate is 40,000 tonnes of Heavy Mineral Concentrate. Click for more details...

NELSON POINT - IRON ORE
A project in the WA Within Port Hedland. Contract to provide freshwater recovery & thickener pile foundations for site operations. Service order arrangements to apply for this work which is due for completion 6 May 1996. Click for more details...

NORTHPARKES MINES - TAILINGS DAM EARTHWORKS
New project of Mining - Earthworks/Civil Engineering (Dredging, Pile driving, Sand mining, Section dredging) project at Bogin Road Via, Parkes, NSW 2870. Project will involve the excavation, movement and placing of an estimated 600,000 cubic metres of clay and rock. Earthworks involving the raising the height of an existing tailings storage facility. Click for more details...

WAROONA MINERAL SANDS PROJECT - RESOURCE
Mining - Earthworks/Civil Engineering (Dredging, Pile driving, Sand mining, Section dredging) project for New development. Current mineable reserve is approx 8.4 million tonnes with an average grade of 10.2% heavy mineral. The mine will process 2,600,000 tonnes of ore per annum. Major work will comprise stripping of the overburden, upgrading and relocation of a wet concentrator plant and nfrastructure. Development will comprise topsoil stripping, overburden removal, installation of drainage and noise bunds, hauls roads, offices, workshops, construction of a clean water dam and associated infrastructure. Associated infrastructure will include in pit hoppers, conveyors, wet screening plant comprising a double deck screen and scrubber, pumps and pipes. A concentrator will be transferred from Capel and it will have the capacity to produce 250 tonnes per hour of HMC ore. The ore when processed will be transported to the North Capel seperation plant. Click for more details...

HAZELWOOD POWER SUCTION DREDGING OF ASH POND
Mining - Earthworks/Civil Engineering (Dredging, Pile driving, Sand mining, Section dredging) project In The La Trobe Council Area of Suction Dredging type. For the provision of suction dredging of ash from Hazelwood Ash Pond. Click for more details...

RAPID GROWTH 6 IRON ORE PROJECT - POINT NELSON DREDGING
Dredging/Reclamation/Piling project at Nelson Point & Lumsden Point, Port Hedland, WA 6721 In The Council Area Of Port Hedland of Private. Dredging of 6 million cubic metres of material between Nelson & Burgess Points adjacent BHP Billiton's existing berths in Port Hedland Inner Harbour. To provide 2 new berth pockets & upgrade the existing departure channel & swing basin to accommodate vessels up to 250,000DWT. Spoil removed by a Backacter dredge to be placed offshore near the existing Spoil Ground I. Material removed by a Cutter Suction dredge to be sent by floating, submerged & onshore pipeline for placement in an area of over 200ha between Lumsden Point & the light industrial area of Wedgefield. Construction of a perimeter bund using 250,000cu m of fill for an initial 5m height then dredge material to be used to take it up to 9m. Construction also of a 60m approx wide corridor to carry 2 x 900mm diameter pipelines. Driving of marine piles for future wharf construction. Click for more details...

AMRUN (SOUTH OF EMBLEY) BAUXITE PROJECT - DREDGING
Mining - Earthworks/Civil Engineering (Dredging, Pile driving, Sand mining, Section dredging) project In The Weipa Shire Council Area of Private ownership. For the provision of dredging works for the following locations: Hey River Terminal, Humbug Terminal, Amrun Export Terminal, Berth pocket, & Wharf area. The scope is fully inclusive of all requirements to complete the works in accordance with the contract including mobilisation, any temporary works & navigation aids, any requirements to comply with quarantine or other statutory conditions, & demobilisation. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect