State

Categories

Sub Categories

Click Here to Find Current Projects

List of Drifts, ventilator shafts, portals, shotcreting, declines Projects in New South Wales


HILLGROVE GOLD/ANTIMONY OPERATIONS - BRACKINS SPUR
Resource - Gold/Antimony project at Hillgrove, north east of, Armidale, NSW 2350 in the Mining - Infrastructure (Drifts, ventilator shafts, portals, shotcreting, declines). Mine output has increased by 30% over the previous quarter. This increase was principally from the Metz operation. Brackins Spur will provide an additional ore source during the September 2001 quarter. The output of this mine will be significantly lower in antimony than the ore currently mined, but will contain a higher gold grade. Click for more details...

AUSTAR COAL OPERATIONS EXPANSION
Mining - Infrastructure (Drifts, ventilator shafts, portals, shotcreting, declines) project In The Cessnock Council Area of Operating Mine - Extn - Stage 3 type. For longwall extraction from panels A1 & A2 using a new method of longwall mining known as longwall top caving. For the construction and operation of some additional surface infrastructure including a larger capacity ventilation fan, downcast shaft, substation, nitrogen injection plant, tube bundle shed, and diesel storage and dispatch system, and for the upgrading of some existing surface infrastructure including the water treatment plant, and the water reticulation and pumping system. Click for more details...

WEST WALLSEND COLLIERY - LACHLAN LEASES
West Wallsend Colliery - Lachlan Leases is currently at the Construction stage, valued at about $ 600000 it is Includes civil work, brick building, mechanical work erecting fan on site and associated steel work. Click for more details...

COORANBONG COLLIERY - MANDALONG MINE PROJECT
Shaft Sinking - No 1 & No 2 project at South west of, Morisset, NSW 2264 in the Mining - Infrastructure (Drifts, ventilator shafts, portals, shotcreting, declines). Ventilation shafts - one 3 metre diameter, one 6 metre diameter (Raisebore). Two mine shafts from the surface to the West Wallarah seam at the the Mandalong project site located at Mandalong NSW. Click for more details...

ULAN COAL MINE CONTINUED OPERATIONS PROJECT - ULAN WEST UNDERGROUND
Private ownership Mining - Infrastructure (Drifts, ventilator shafts, portals, shotcreting, declines) project In The Mid Western Regional Council Area for New development. Extension of underground mining operations in a location west of the existing Ulan No 3 underground mine & north of the recently closed open cut pit. To operate for 21 years using the retreat longwall method with a panel width of up to 400m. Access to the Ulan West operations to be via a series of portals to be constructed within the vicinity of the existing open cut pit. New surface facilities to be constructed around the entrance to include ventilation, power & water management facilities & a small temporary coal stockpile. An access ramp will also accommodate an overland conveyor out of the mine. Ancillary facilities to include a steel framed, concrete walled bathhouse along with other demountable buildings for workshops & administration purposes. Some temporary structures may also be installed during construction. Click for more details...

NARRABRI UNDERGROUND JOINT VENTURE COAL OPERATIONS- STAGE 2 EXPANSION - VENTILATION SHAFT
Private ownership Mining - Infrastructure (Drifts, ventilator shafts, portals, shotcreting, declines) project In The Narrabri Council Area for New development. Construction of a 5m diameter ventilation shaft with 3 fans. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect