List of Drifts, ventilator shafts, portals, shotcreting, declines Projects in WA


MUNGARI EAST GOLD PROJECT - FROGS LEG - UNDERGROUND INFRASTRUCTURE
New project of Mining - Infrastructure (Drifts, ventilator shafts, portals, shotcreting, declines) project at 20 km west of, Kalgoorlie, WA 6430. Significant diamond assay results include: 13m at 11.36g/t gold; 16m at 9.8g/t gold; 3m at 31.94g.t gold; & 9m at 10.94g/t gold. Click for more details...

MIITEL NICKEL OPERATIONS - SOUTH MIITEL
Mining - Infrastructure (Drifts, ventilator shafts, portals, shotcreting, declines) project In The Coolgardie Council Area of Private ownership. An initial Probale Ore Reserve resource estimate of 376,000 tonnes @ 2.6% for 9,790 tonnes of nickel. Development work will comprise an extension to the existing Miitel decline and the excavation of a ventilation shaft to the surface. The mining method will be mechanised flat back cut and fill. Click for more details...

COSMOS NICKEL OPERATIONS - COSMOS DEEPS/ILLIAS
Mining - Infrastructure (Drifts, ventilator shafts, portals, shotcreting, declines) project for New development. Ilias decline. Click for more details...

DEFLECTOR COPPER GOLD PROJECT - UNDERGROUND DEVELOPMENT
A project in the WA Within City Of Greater Geraldon - Mullewa. Investigation of a decline from the base of the Central pit, allowing Central & West lodes to be mined concurrently. Click for more details...

COYOTE UNDERGROUND DEVELOPMENT PROJECT - STAGE 1 - GOLD RESOURCE
Mining - Infrastructure (Drifts, ventilator shafts, portals, shotcreting, declines) project at Tanami Region WA- Northern Territory border south east of, Halls Creek, WA 6770 of Underground Development type of New development. The mining of Pit 2 is progressing well with a 120 tonne excavator being used to mine waste and a smaller excavator bgeing used to selectively mine ore thereby minimising dilution. With the increased ore grade and high recoveries being achieved in the modified treatment plant, the highest level of gold production to date has been 34kgs of bullion being poured. Click for more details...

PROSPERO/TALPINOS PROJECT - NICKEL RESOURCE
A project in the WA Within Leonora. Total Resource estimate is 1,330,000 tonnes @ 5.95% for 79,200 Ni. This comprises measured resources of 416,000 tonnes @ 6.39% for 26,600 tonnes of Ni, Indicated resources of 470,000 tonnes @ 6.42% for 30,200 tonnes of Ni and Inferred resources of 445,000 tonnes @ 5.03% for 22,400 tonnes of Ni. Talpinos has a resource estimate of 142,000 tonnes @ 7.4% for 10,500 Ni. Feasibility study on the development of the deposit includes geotechnical drilling, hydrogeological investigations, infill drilling to upgrade the resource estimate to a reserve. Mine development will include box cut excavation and associated waste dump, laydown area and decline development. A new haul road and service corridor linking the development to the exisiting Cosmo mine and concentrator will be constructed. A tailings storage facility, evaporation ponds, ventilation rises and secondary egress shafts will also be constructed. Click for more details...

CENTRAL NORSEMAN GOLD OPERATIONS - RESOURCE
Resource -Gold project at 30 Km North of, Norseman, WA 6443 In The Council Area Of Dundas of Private. Norseman gold operation comprises two underground mines, Harlequin, Bullen, various open pits and the Phoenix mill treatment plant. The Davyhurst gold operation has been sold to Monarch Resources. Mining is to continue at all operations and various infrastructure projects will be undertaken. At Harlequin the mine ventilation system and the surface workshop will be upgraded in preparation for long term mining at the Harlequin decline. The Phoenix mill treatment plant will undergo maintenance of the crusher, ball and SAG mill and the installation of new ore feeders. A new tailings storage facility designed to provide 10 years storage will be developed. A major upgrade to the power distribution network will be undertaken. Lastly the single person quarters at Norseman will be upgraded and refurbished. Click for more details...

ARGYLE DIAMOND OPERATIONS - UNDERGROUND INFRASTRUCTURE CONTRACT
110 Km South South West of, Kununurra, WA 6743 Has Argyle Diamond Operations - Underground Infrastructure Contract currently at Construction stage. Work comprises 30 kilometres of underground development work with all the associated infrastructure needed for a block cave mine. More specifically the contractor will construct two underground crusher chambers, undertake vertical development and do initial cave draw production. As part of the underground expansion the existing tailings dam will be expanded. Click for more details...

MCMAHON PROJECT - NICKEL RESOURCE
Resource - Nickel New project In The Coolgardie Council Area. The project contains a currently delineated Mineral Resource of 373 650 tonnes at a grade of 4.1% nickel, for 15 180 tonnes of contained nickel metal. Approximately half this Resource has been placed into the initial ore reserves. The remainder of the Mineral Resource requires further drilling, and this will be carried out from underground as development progresses. The development require the extension of the existing McMahon decline and associated ventilation system. This will provide access to the ore bodies and, importantly, will also open up additional areas for underground exploration. Mining will take place via mechanised slot stoping methods as well as traditional Kambalda-style airleg slot-and-rill stoping, with an expected production rate of approximately 10 000 tonnes of ore per month at full production. Click for more details...

ROY HILL IRON ORE PROJECT - INFRASTRUCTURE - PORT HEDLAND INFRASTRUCTURE CONSTRUCTION
Lot 4 Clark St, Port Hedland, WA 6721 Has Roy Hill Iron Ore Project - Infrastructure - Port Hedland Infrastructure Construction currently at Construction stage. For the provision of infrastructure construction. Click for more details...