SNAPPER MINERAL SANDS PROJECT - OVERBURDEN REMOVAL
Currently at the Construction stage In Wentworth is a project estimated to be $ 5000000. This project Contract for initial overburden removal in the mineral sands project. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - GAS PIPELINE
Mining - Earthworks/Civil Engineering (Earthworks/general civil) project at From south of MILES to, Curtis Island, QLD 4680 for New. Part of a coal seam gas (CSG) to liquefied natural gas (LNG) project with Origin Energy responsible for developing CSG gas fields & transmission pipeline, ConocoPhillips responsible for developing a LNG processing plant & their joint venture company Australia Pacific LNG responsible for the export facilities. A 42 inch (1070mm) diameter, high pressure main pipeline to commence east of Wandoan at its junction with a 44km lateral pipeline from gas developments at Condabri & a 38km lateral from Woleebee gas developments south of Miles. To travel 362km underground with a marine crossing at The Narrows between Kangaroo Island & Port Curtis Island to finish at the LNG plant near Laird Point. Inlet stations to allow for insertion of cleaning & inspection equipment to be constructed at the start of the Condabri & Woleebee laterals & at their intersection a 0.5ha APLNG hub comprising the inlet station for the main pipeline, isolation valves & connections for future compression to also be constructed. Development of up to 5 x 15-20ha laydown areas to receive materials (Miles, Wandoan, Theodore, Biloela, Gladstone areas). 3 temporary accommodation camps each up to 15ha & operating for 3-7 months to be relocated along the pipeline route as required. Camps to include sleeping quarters for up to 1100 personnel, laundries, catering, medical centre, recreational facilities (eg gymnasium, cinema, reading room, sports grounds), diesel generators for power & package sewerage plants. Click for more details...

ICHTHYS GAS FIELD DEVELOPMENT - ONSHORE - MAIN CIVIL WORKS
Main Civil Works project at Blaydin Point via, Darwin, NT 0800 In The Council Area Of Darwin City of Private. The scope of work includes supply, install & warrant of asphalt roadworks. Manufacture, supply, install & warrant steel guardrails together with associated works to all construction zones. Supply & delivery of joint filler & accessories. Supply & delivery of manhole grates & lids. Supply delivery of concrete. Supply & delivery of denso tape. Supply & delivery of precast units/elements. Supply & delivery of UPVC pipe. Click for more details...

PILBARA 333 IRON ORE OPERATIONS EXPANSION PROJECT
A project in the WA Within Various. A project to increase Pilbara iron operations capacity from 220million tonnes per annum (Mtpa) to 330Mtpa. Improvements at Dampier Port expected to see 225Mtpa capacity by early 2011 & 230Mtpa by mid 2012. Improvements at Cape Lambert Port to include construction of an additional 1.8km, 4 berth jetty & wharf running parallel to the existing Cape Lambert jetty & 4 berth Wharf A. This will give 280Mtpa capacity by the first half of 2014 & 330Mtpa by the first half of 2016. Associated mine development projects to include Hope Downs 4, Marandoo expansions, Nammuldi expansion, Silvergrass, Turee Syncline, Western Turner Syncline & Yandicoogina expansions. Post-2015 mining projects expected to include Bakers South, Beasley River, Bungaroo, Giles, Homestead, Hope Downs 2, 3, 5 & 6, Koodaideri, Shovelanna & Western Range. Project to involve associated supporting infrastructure (rail, water & power) as well as workforce, towns & housing planning. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT STAGE 1 - QUARRY & PREPARATORY WORKS
Cape Lambert Port B (Clb) Development Stage 1 - Quarry & Preparatory Works is currently at the Construction stage, valued at about $ 5000000 it is Earthworks associated with a quarry development including preparatory work. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - QUARANTINE & WRAPPING SERVICE
Mining - Earthworks/Civil Engineering (Earthworks/general civil) project In The Ashburton Council Area of Quarantine/Wrapping Service type. For the provision of quarantine & wrapping service. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - STEEL EMBEDMENTS
Greater Gorgon Gas Project - Civils & Underground Services - Steel Embedments is currently at the Construction stage, valued at about $ 500000 it is For the supply of steel embedments. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - TRANSPORTATION & LOGISTICS - PERTH
Mining - Earthworks/Civil Engineering (Earthworks/general civil) New project at Based from, Perth, WA 6000. This type is Transportation/Logistics with Private ownership. For the provision of all necessary equipment, labour & material for the heavy haulage "Transport" operation of Precast Concrete material. Click for more details...

INTEGRA COAL OPERATIONS - OPEN CUT EXTENSION PROJECT
Currently at the Construction stage In Singleton is a project estimated to be $ 10000000. This project Extension further south of the existing South Pit (247ha). Trucks & shovel/excavators to access 30million tonnes (Mt) of Run-of-Mine (RoM) coal at a rate of 2.3-4.2Mtpa to give a Life-of-Mine (LoM) of 9 years. Associated infrastructure to include relocation of power lines & telecommunications in the proposed open cut area. Construction of temporary haul roads & surface water management structures. Installation of tansportable site office, crib room & bathhouse. Installation of a transportable, above ground equipment refuelling station. Click for more details...

DAISY STREET WORKERS ACCOMMODATION & TOWNHOUSES - CIVIL WORKS
Mining - Earthworks/Civil Engineering (Earthworks/general civil) New project at Daisy St (Lot 3 SP197442), Miles, QLD 4415. This type is Civil Works - For Accommodation Village with Private ownership. Civil works, including road widening & reticulation of services, for a workers' accommodation village to cater for up to 340 people. Click for more details...

MORANBAH REGION EXPANSION PROJECT - CIVIL WORKS PACKAGES
Private ownership Mining - Earthworks/Civil Engineering (Earthworks/general civil) project In The Isaac Regional Council Area for New development. Packages to include site wide pioneering earthworks, road, drainage & civil works (C001). Bulk earthworks (cut & cover) from the mining infrastructure area (MIA) to the run-of-mine (ROM) area (C002) & from the ROM area to the train load out (C003). The co-disposal dam wall (C004). Supply of gravel (C005); crush rock backfill (C006); precast concrete pipes, boxes & headwalls (C007); high density polyethylene (HDPE) liners (C008) & geogrids (C009). Construction of warehouse & workshop building (C010); bathhouse & administration building (C011) & roadways & carparks in the MIA (C013). Spillway (C014). Supply of concrete (C015); fuel handling equipment (C016); lube handling equipment (C017); tanks (C020); hydrants & hose reels (C021); sewage treatment plant (C022); potable water treatment plant (C023) & fencing (C024). Design & construction of gas drainage plant & booster station (C025) along with supply of vacuum pumps (C029); surface reticulation piping (C030); underground reticulation piping (C031) & installation of the surface & underground reticulation system (C032). Mine cooling system (C026); stone dust system (C027) & diesel & lubrication supply (C028). Click for more details...

PINE DALE COAL OPERATIONS - YARRABOLDY EXTENSION
Currently at the Construction stage In Lithgow is a project estimated to be $ 1400000. This project Further operations at the former Yarraboldy open cut pit to extract 800,000t approx of coal over a 3 year period. To commence with construction of an amenity bund prior to 2 years of open cut mining followed by 6 months of final rehabilitation works (minimally backfill/ reshaping/ revegetating of 10.3ha). Construction also of internal roads & a new intersection with the existing private coal haul road crossing. Decommissioning of the existing crushing facility & construction of new plant along with a crushing, stockpiling & maintenance area in the Extension. Click for more details...

MAULES CREEK COAL PROJECT - BULK EARTHWORKS
New project of Mining - Earthworks/Civil Engineering (Earthworks/general civil) project at 20km approx northeast of, Boggabri, NSW 2382. Bulk earthworks for the Mine Industrial Area (MIA), Coal Handling & Preparation Plant (CHPP) & Run-Of-Mine (ROM) stockpile as well as dams (1 x 200ML & 1 x 120ML raw water dams; 1 x 400ML & 1 x 150ML mine water dams plus 3 sedimentation dams). Click for more details...

MOUNT ISA MINES NO.7 TAILINGS DAM EXTENSION
Private ownership Mining - Earthworks/Civil Engineering (Earthworks/general civil) project In The Mt Isa City Council Area for New development. Increase in No. 7 tailings dam capacity by raising external walls. To include 5/7 East Embankment & Toe Berm (26,070sq m fill), the 5/7 West Embankment & Toe Berm (59,250sq m fill) & the West Embankment (21,100sq m fill). Click for more details...

WIGGINS ISLAND RAIL PROJECT (WIRP) - STAGE 1 CIVIL WORKS
via, Gladstone, QLD 4680 Has Wiggins Island Rail Project (Wirp) - Stage 1 Civil Works currently at Construction stage. Civil works associated with Stage 1 of the rail project from the Bowen & Surat Basins to Wiggins Island. To include the Balloon Loop & Dingo to Blackwell duplication. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - GRATING & CAST IN ANGLE SUPPLY
Mining - Earthworks/Civil Engineering (Earthworks/general civil) project for New development. For the supply of grating & cast in angle. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - CONSTRUCTION OF IN-SITU CONCRETE - MR & PR STRUCTURES
New project of Mining - Earthworks/Civil Engineering (Earthworks/general civil) project at Both on & off, Barrow Island, WA 6712. For the construction of reinforced concrete base & foundations, columns, table tops, pedestals & plinths that includes cast-in items, holding down blots, plates, angles, steel columns openings & box-outs for shear keys in tops of pedestals. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - SUPPLY & INSTALL HDPE LINER
Mining - Earthworks/Civil Engineering (Earthworks/general civil) project at Both on & off, Barrow Island, WA 6712 for New. For the supply & installation of the HDPE liner. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - MANHOLE STEEL COVERS (GATIC)
Mining - Earthworks/Civil Engineering (Earthworks/general civil) project at Both on & off, Barrow Island, WA 6712 of Manhole Steel Covers type of New development. For the provision of various types, classes & sizes of steel manhole metal covers & frames. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - CONSTRUCTION OF IN-SITU CONCRETE
Currently at the Construction stage In Ashburton is a project estimated to be $ 1500000. This project For the construction of in-situ concrete. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - ONSHORE - ISBL CONCRETE & CIVIL WORKS
Mining - Earthworks/Civil Engineering (Earthworks/general civil) project at Within the vicinity of, Onslow, WA 6710 of Isbl Concrete/Civil Works type of New development. For the provision of ISBL concrete and civil works. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - ONSHORE - OSBL CONCRETE & CIVIL WORKS
Wheatstone Development Project - Onshore - Osbl Concrete & Civil Works is currently at the Construction stage, valued at about $ 5000000 it is For the provision of OSBL concrete and civil works. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - LNG PLANT - CIVIL & CONCRETE WORKS
New project of Mining - Earthworks/Civil Engineering (Earthworks/general civil) project at South of Laird Point, Curtis Island, QLD 4680. Civil & concrete services associated with installation of 2 x 160,000 cubic metre capacity liquefied natural gas (LNG) tanks. Click for more details...

COCKATOO ISLAND IRON ORE OPERATIONS STAGE 4
Cockatoo Island Iron Ore Operations Stage 4 is currently at the Construction stage, valued at about $ 22000000 it is Continuation of open cut operations based on a resource estimate of 1.2 million tonnes (Mt). Construction of a 300m long extension to the existing onshore seawall to enclose a pit enlargement. Associated relocation of surface infrastructure. Click for more details...

GROSVENOR COAL PROJECT - ROM STOCKPILE CIVIL WORKS
Currently at the Construction stage In Isaac Regional is a project estimated to be $ 10000000. This project Civil works for the run-of-mine (ROM) stockpile & crushing area. Click for more details...

PILBARA IRON ORE EXPANSION - FRAMEWORK AGREEMENT - EASTERN EARTHWORKS
Pilbara Iron Ore Expansion - Framework Agreement - Eastern Earthworks is currently at the Construction stage, valued at about $ 10000000 it is Preferred earthworks contractor status for 5 years in the program to expand capacity to 353 million tonnes per annum (Mtpa). Mines covered include Hope Downs 4, Marandoo, Yandicoogina & Koodaideri. Click for more details...

PILBARA IRON ORE EXPANSION - FRAMEWORK AGREEMENT - WESTERN CIVIL WORKS
Mining - Earthworks/Civil Engineering (Earthworks/general civil) New project at via, Newman, WA 6753. This type is Civil Works - Western Region with Private ownership. Preferred civil works contractor status for 5 years in the program to expand capacity to 353 million tonnes per annum (Mtpa). To include early contractor involvement. Click for more details...

BOWEN BASIN ACCOMMODATION VILLAGE PACKAGES
Currently at the Tenders & Building stage In Various is a project estimated to be $ 10000000. This project Packages for supplier & construction involvement in The Mac's Developed-Owned-Operated accommodation village projects in the Bowen Basin (non-mining sites). To include civil site & road works, accommodation village transportable buildings as well as on site construction of kitchen/dining rooms, taverns, administration & retail facilities. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT STAGE 1 - CAR DUMPER CIVIL WORKS
Mining - Earthworks/Civil Engineering (Earthworks/general civil) project for New development. A project including 480,000cu m of excavation involving drill & blast. Installation of 5500cu m of rock fall netting & cable rock bolts. Bulk earthworks & pavement for the new car dumper access roads. Click for more details...

PORT HEDLAND INNER HARBOUR - BHP BILLITON STOCKYARD EXPANSION CIVIL WORKS
Port Hedland Inner Harbour - Bhp Billiton Stockyard Expansion Civil Works is currently at the Construction stage, valued at about $ 50000000 it is Upgrade of the existing ore blending stockyard at Nelson Point. To include bulk earthworks, stone column ground improvement works, rail, concrete works, piping & instrumentation for dust suppression & road works. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - GROUNDING MATERIAL
Greater Gorgon Gas Project - Lng & Condensate Storage Tanks - Grounding Material is currently at the Construction stage, valued at about $ 2500000 it is For the provision of grounding material. To include: earth cables, bars, connectors & terminals, tool kit, compression tool & dies). Click for more details...

DUGALD RIVER BASE METAL PROJECT BULK EARTHWORKS
Bulk Earthworks project at Off the Burke Developmental Rd 85km NE of, Mount Isa, QLD 4825 In The Council Area Of Mt Isa City of Private. For the provision of bulk earthworks. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT CIVIL WORKS
A project in the WA Within City Of Karratha. Contract to include the CLB 353 stockyard. Conveyor link & rail formation earthworks. Relocation of water pipelines. Excavation, crushing & screening to produce 1 million tonnes (Mt) of pavement material for the construction of 5km of sealed roads. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - SEAWATER INTAKE SHAFT CONSTRUCTION
Mining - Earthworks/Civil Engineering (Earthworks/general civil) project In The Ashburton Council Area of Private ownership. For the construction of a seawater intake shaft. Click for more details...

HERA-NYMAGEE GOLD PROJECT - EARTHWORKS
Private ownership Mining - Earthworks/Civil Engineering (Earthworks/general civil) project In The Cobar Council Area for New development. Major earthworks including the tailings storage facility (TSF) & surface dams. Click for more details...

RIO TINTO PILBARA AUTOHAUL RAIL PROJECT ANCILLARY WORKS
Mining - Earthworks/Civil Engineering (Earthworks/general civil) project at Pilbara region, ., WA 6999 for New. A staged project to develop driverless trains on the existing 1500km approx train network linking Pilbara mines with ports through development of centralised servers & onboard equipment fitted to existing trains. To also involve wayside development such as construction of signalling pads & equipment installation, trenching for the installation of new signal cables, construction of permanent access roads & ramps as well as storm water drainage, fencing & gates at level crossings. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - CHEMICAL & ACID RESISTANT COATINGS
Currently at the Construction stage In Ashburton is a project estimated to be $ 5000000. This project For the provision of chemical & acid resistant coatings. Click for more details...

SONOMA COAL OPERATIONS - CREEK DIVERSION
Diversion Channel/Dams New project In The Whitsunday Regional Council Area. Extension of the northern reach of the open-cut pit of the Sonoma Coal Mine by diversion of Coral Creek. To include formation of a 1390m long channel to replace a 1280m section of the existing creek & diversion dams. Click for more details...

RIXS CREEK COAL OPERATIONS - RAIL LOOP & LOADING FACILITY
Currently at the Construction stage In Singleton is a project estimated to be $ 57000000. This project Construction of a 5.6km long rail loop off the Main Northern Rail Line. Product coal to travel from the existing coal handling & processing plant (CHPP) by overland conveyor & transfer by a stacker conveyor to a 350,000t clean coal stockpile in the centre of the loop. Loading via a reclaim tunnel under the stockpile by conveyor to a 2000t surge bin located above the loop for loading trains. Peak construction workforce of 70 expected. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT EARTHWORKS
Well Head Siteworks/Roadworks project at Surat Basin via, Miles, QLD 4415 In The Council Area Of Western Downs Regional of Private. A 3 year contract for earthworks. To include clearing, grading & building well sites & roads. Click for more details...

BODDINGTON GOLD OPERATIONS EXPANSION
Operating Mine - Expansion New project In The Boddington Council Area. Life-of-mine (LoM) extension through deepening & widening the Wandoo North & South open pits. To include expansion of the existing & construction of a new 1500 million tonne (Mt) waste rock dump. Construction over 1650ha of a second 1600Mt residue disposal area (RDA) involving decommissioning of an existing water storage dam (D4). Construction of new water storage dams (D5 & D6). Expansion of existing stockpiles including provision of stockpiling any bauxite encountered for third party processing. Associated diversion of Bibbulmun track, roadworks, pipelines/pumping facilities & power lines. Click for more details...

CANNON GOLD PROJECT
A project in the WA Within Kalgoorlie-Boulder. Planned contract mining over 3 years for 484,000t to be treated off site for 68,200 ounces (oz) of gold. Open cut operations followed by underground workings via a portal & decline from the footwall of the open pit. Ore is to be processed at Metals X Ltd Jubilee Mill. Click for more details...

LAKE DISAPPOINTMENT POTASH PROJECT - PILOT POND
Lake Disappointment Potash Project - Pilot Pond is currently at the Construction stage, valued at about $ 5000000 it is For the construction of pilot ponds, test trenches & access causeway. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - ONSHORE & INFRASTRUCTURE - PINDAN - DETAILED EARTHWORKS & CONCRETE WORKS
Wheatstone Development Project - Onshore & Infrastructure - Pindan - Detailed Earthworks & Concrete Works is currently at the Construction stage, valued at about $ 1000000 it is For the provision of detailed earthworks & concrete works to 50 modular house lots. Estimated 2500m3 of earthworks & 1900m3 of concrete over a 40 week period. Click for more details...

BYERWEN COAL PROJECT - SITE CIVIL EARTHWORKS
Collinsville Elphinstone Rd, Wollombi Rd, 20km West of, Glenden, QLD 4743 Has Byerwen Coal Project - Site Civil Earthworks currently at Construction stage. For the provision of site civil earthworks. Click for more details...

AMRUN (SOUTH OF EMBLEY) BAUXITE PROJECT - BULK EARTHWORKS
40km SW of, Weipa, QLD 4874 Has Amrun (South Of Embley) Bauxite Project - Bulk Earthworks currently at Construction stage. For the provision of Bulk Earthworks package including the clearing, grubbing, mass earthworks & drainage & pavement development of eighteen (18) major facilities across twenty-four (24) separate construction areas on the South of Embley Project. The earthworks requirements are as follows: Clearing, grubbing & topsoil stripping at nominated areas at the Process Plant Site. Construction of an unlined 5 ML sedimentation pond. Construction of nine (9) sealed light vehicle roads. Construction of three (3) unsealed heavy vehicle roads. Construction of four (4) earthworks foundation pads for conveyors. Construction of seven (7) earthworks hardstand & building platforms. Construction of a 230ML, in ground water treatment/harvesting unlined pond. Construction of an earthen dump station ramp & reinforced earth wall designed for HV dump trucks to unload into the dump hopper. Clearing & topsoil stripping of the ROM stockpile area for ore to be dumped & rehandled by mine haul trucks. Construction of a stockpile pad & machine berms for the stacking & reclaiming of product bauxite including stockpile drainage to direct stockpile runoff to the north & south sedimentation ponds. Construction of a 110ML unlined sedimentation pond designed to treat runoff directed to the north from the product stockpile including inlet & outlet drainage works. Construction of a 120ML unlined sedimentation pond designed to treat runoff directed to the south from the product stockpile including inlet & outlet drainage works. Click for more details...

YANDICOOGINA IRON ORE OPERATIONS BULK EARTHWORKS & CIVIL WORKS
Bulk Earthworks & Civil Works project at 95km North-west of, Newman, WA 6753 In The Council Area Of East Pilbara of Private. Bulk earthworks & civil works as part of the Yandi Oxbow Project. To include construction of a 4.5km hall road. Construction of a heavy vehicle bridhe over the existing railway. Over 700,000cm embankment construction. Over 3,200 lineal metres of culverts & upgrades, rerouting & extensions to existing light vehicle access roads. Click for more details...

PILGANGOORA LITHIUM PROJECT - SITE ESTABLISHMENT
Mining - Earthworks/Civil Engineering (Earthworks/general civil) New project at 120km South of, Port Hedland, WA 6721. This type is Site Establishment with Private ownership. For the provision of site establishment. Click for more details...

ELLENDALE DIAMOND MINE - TAILINGS STORAGE FACILITY - EROSION REMEDIATION
Erosion Remediation project at Via, Derby, WA 6728 In The Council Area Of Derby-W Kimberley of State. Works to include remediation works on the walls of the main Ellendale Tailings Storage Facility to ensure the facility remains safe & stable. Works will primarily involve placing rock material in areas where significant scour & erosion occurs. Click for more details...

BAUXITE HILLS BAUXITE DSO PROJECT - SITE ESTABLISHMENT
A project in the QLD Within Mapoon Shire. For the provision of site establishment. Click for more details...