EP389 GINGIN-1 & RED GULLY-1 OIL & GAS PROJECT
Mining - Earthworks/Civil Engineering (Earthworks/general civil) New project at Straddling Brand Hwy north & south of, Gingin, WA 6503. This type is Resource - Oil/Gas - Onshore with Private ownership. Estimated total potential Recoverable Reserves are 172 to 190 billion cubic feet of gas & over 6 million barrels of oil & condensate. The main objective in the Gingin & Gingin West prospects are fluvial & continental sandstones of the Early Jurassic aged Cattamarra Coal Measures. Porosities in the Gingin-Bootine area vary from 6%-13% with permeabilities up to 112 millidarcies. This gas reservoir quality & the proximity to pipeline infrastructure & the markets makes for robust economics on gas discovery & any developments for natural gas, & also the value added component of generating electricity. Infrastructure to include a 3km export pipeline that will link up to the DBNGP, a gas & condensate plant, 30 man camp & earthworks. Click for more details...

SNAPPER MINERAL SANDS PROJECT - OVERBURDEN REMOVAL
Currently at the Construction stage In Wentworth is a project estimated to be $ 5000000. This project Contract for initial overburden removal in the mineral sands project. Click for more details...

MILLENNIUM COAL OPERATIONS EXPANSION
via Peak Downs Hwy 16km southwest of, Coppabella, QLD 4741 Has Millennium Coal Operations Expansion currently at Construction stage. A project to expand the 2million tonnes per annum (Mtpa) operations to 5.5Mtpa Run-of-Mine (ROM) coal for 3.6Mtpa product coal for up to 16 years. Development of the new Mavis Pit by contract mining comprising conventional open-cut truck & excavator terrace mining. Possibility of minor upgrade & a new ROM stockpile at the existing coal handling & preparation plant (CHPP). Temporary waste rock emplacements prior to likely ultimate disposal in the Millennium Pit void. Construction of haul roads across New Chum Creek & possible alteration of the Millennium/Poitrel access road. Establishment of a 2km long drainage system along the northern boundary of the new pit as well as 15 new sediment dams. The expansion project to involve 160 employees & contractors in addition to the existing 220 person workforce. Click for more details...

WILPINJONG COAL OPERATIONS EXPANSION
A project in the NSW Within Mid Western Regional. A project at the existing open-cut mine to expand Run-of-Mine (RoM) coal production from 13million tonnes per annum (Mtpa) to 15Mtpa for 12Mtpa per annum of washed & unwashed product coal to be railed to domestic power customers & a port for export. To involve a 7m extension to the coal handling & preparation plant (CHPP) building to accommodate a capacity increase to 1200tonnes per hour (tph). Associated upgrading of the coal handling & stockpiling system to include an additional ROM hopper with associated sizing station & raw coal conveyor & stacker plus an additional product coal stockpile with associated stacking conveyor & reclaim conveyor. Other work to include minor earthworks, conveyors, transfer stations & relocation of site roads. Click for more details...

PILBARA 333 IRON ORE OPERATIONS EXPANSION PROJECT
A project in the WA Within Various. A project to increase Pilbara iron operations capacity from 220million tonnes per annum (Mtpa) to 330Mtpa. Improvements at Dampier Port expected to see 225Mtpa capacity by early 2011 & 230Mtpa by mid 2012. Improvements at Cape Lambert Port to include construction of an additional 1.8km, 4 berth jetty & wharf running parallel to the existing Cape Lambert jetty & 4 berth Wharf A. This will give 280Mtpa capacity by the first half of 2014 & 330Mtpa by the first half of 2016. Associated mine development projects to include Hope Downs 4, Marandoo expansions, Nammuldi expansion, Silvergrass, Turee Syncline, Western Turner Syncline & Yandicoogina expansions. Post-2015 mining projects expected to include Bakers South, Beasley River, Bungaroo, Giles, Homestead, Hope Downs 2, 3, 5 & 6, Koodaideri, Shovelanna & Western Range. Project to involve associated supporting infrastructure (rail, water & power) as well as workforce, towns & housing planning. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT STAGE 1 - QUARRY & PREPARATORY WORKS
Cape Lambert Port B (Clb) Development Stage 1 - Quarry & Preparatory Works is currently at the Construction stage, valued at about $ 5000000 it is Earthworks associated with a quarry development including preparatory work. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - QUARANTINE & WRAPPING SERVICE
Mining - Earthworks/Civil Engineering (Earthworks/general civil) project In The Ashburton Council Area of Quarantine/Wrapping Service type. For the provision of quarantine & wrapping service. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - STEEL EMBEDMENTS
Greater Gorgon Gas Project - Civils & Underground Services - Steel Embedments is currently at the Construction stage, valued at about $ 500000 it is For the supply of steel embedments. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - TRANSPORTATION & LOGISTICS - PERTH
Mining - Earthworks/Civil Engineering (Earthworks/general civil) New project at Based from, Perth, WA 6000. This type is Transportation/Logistics with Private ownership. For the provision of all necessary equipment, labour & material for the heavy haulage "Transport" operation of Precast Concrete material. Click for more details...

INTEGRA COAL OPERATIONS - OPEN CUT EXTENSION PROJECT
Currently at the Construction stage In Singleton is a project estimated to be $ 10000000. This project Extension further south of the existing South Pit (247ha). Trucks & shovel/excavators to access 30million tonnes (Mt) of Run-of-Mine (RoM) coal at a rate of 2.3-4.2Mtpa to give a Life-of-Mine (LoM) of 9 years. Associated infrastructure to include relocation of power lines & telecommunications in the proposed open cut area. Construction of temporary haul roads & surface water management structures. Installation of tansportable site office, crib room & bathhouse. Installation of a transportable, above ground equipment refuelling station. Click for more details...

DAISY STREET WORKERS ACCOMMODATION & TOWNHOUSES - CIVIL WORKS
Mining - Earthworks/Civil Engineering (Earthworks/general civil) New project at Daisy St (Lot 3 SP197442), Miles, QLD 4415. This type is Civil Works - For Accommodation Village with Private ownership. Civil works, including road widening & reticulation of services, for a workers' accommodation village to cater for up to 340 people. Click for more details...

GOONYELLA RIVERSIDE BROADMEADOW COAL OPERATIONS EXPANSION - OPEN CUT EXTENSION
Operating Mine - Extn - Open Cut project at 30km north of, Moranbah, QLD 4744 in the Mining - Earthworks/Civil Engineering (Earthworks/general civil). Contract for extension of the existing open cut to provide access to underground works. To include 8million cu m of earthworks & 12,000cu m of concrete works. Construction of associated infrastructure including access roads, dams & drainage, conveyor footings & gates. Click for more details...

GREATER GORGON GAS PROJECT - DOWNSTREAM - MISCELLANEOUS CIVIL WORKS
A project in the WA Within Ashburton. For the provision of miscellaneous civil works. Click for more details...

MORANBAH REGION EXPANSION PROJECT - CIVIL WORKS PACKAGES
Private ownership Mining - Earthworks/Civil Engineering (Earthworks/general civil) project In The Isaac Regional Council Area for New development. Packages to include site wide pioneering earthworks, road, drainage & civil works (C001). Bulk earthworks (cut & cover) from the mining infrastructure area (MIA) to the run-of-mine (ROM) area (C002) & from the ROM area to the train load out (C003). The co-disposal dam wall (C004). Supply of gravel (C005); crush rock backfill (C006); precast concrete pipes, boxes & headwalls (C007); high density polyethylene (HDPE) liners (C008) & geogrids (C009). Construction of warehouse & workshop building (C010); bathhouse & administration building (C011) & roadways & carparks in the MIA (C013). Spillway (C014). Supply of concrete (C015); fuel handling equipment (C016); lube handling equipment (C017); tanks (C020); hydrants & hose reels (C021); sewage treatment plant (C022); potable water treatment plant (C023) & fencing (C024). Design & construction of gas drainage plant & booster station (C025) along with supply of vacuum pumps (C029); surface reticulation piping (C030); underground reticulation piping (C031) & installation of the surface & underground reticulation system (C032). Mine cooling system (C026); stone dust system (C027) & diesel & lubrication supply (C028). Click for more details...

PINE DALE COAL OPERATIONS - YARRABOLDY EXTENSION
Currently at the Construction stage In Lithgow is a project estimated to be $ 1400000. This project Further operations at the former Yarraboldy open cut pit to extract 800,000t approx of coal over a 3 year period. To commence with construction of an amenity bund prior to 2 years of open cut mining followed by 6 months of final rehabilitation works (minimally backfill/ reshaping/ revegetating of 10.3ha). Construction also of internal roads & a new intersection with the existing private coal haul road crossing. Decommissioning of the existing crushing facility & construction of new plant along with a crushing, stockpiling & maintenance area in the Extension. Click for more details...

MAULES CREEK COAL PROJECT - BULK EARTHWORKS
New project of Mining - Earthworks/Civil Engineering (Earthworks/general civil) project at 20km approx northeast of, Boggabri, NSW 2382. Bulk earthworks for the Mine Industrial Area (MIA), Coal Handling & Preparation Plant (CHPP) & Run-Of-Mine (ROM) stockpile as well as dams (1 x 200ML & 1 x 120ML raw water dams; 1 x 400ML & 1 x 150ML mine water dams plus 3 sedimentation dams). Click for more details...

WIGGINS ISLAND RAIL PROJECT (WIRP) - STAGE 1 CIVIL WORKS
via, Gladstone, QLD 4680 Has Wiggins Island Rail Project (Wirp) - Stage 1 Civil Works currently at Construction stage. Civil works associated with Stage 1 of the rail project from the Bowen & Surat Basins to Wiggins Island. To include the Balloon Loop & Dingo to Blackwell duplication. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - MINOR PRECAST CONCRETE WORKS
A project in the WA Within Ashburton. For the provision & installation of minor precast concrete works (including concrete, steel reinforcing, embedded materials, & anchor bolts where necessary). Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - CONSTRUCTION OF IN-SITU CONCRETE - MR & PR STRUCTURES
New project of Mining - Earthworks/Civil Engineering (Earthworks/general civil) project at Both on & off, Barrow Island, WA 6712. For the construction of reinforced concrete base & foundations, columns, table tops, pedestals & plinths that includes cast-in items, holding down blots, plates, angles, steel columns openings & box-outs for shear keys in tops of pedestals. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND - CONSTRUCT IN-SITU CONCRETE - OILY WATER & STORMWATER SUMP/POND
Both on & off, Barrow Island, WA 6712 Has Greater Gorgon Gas Project - Civils & Underground - Construct In-Situ Concrete - Oily Water & Stormwater Sump/Pond currently at Construction stage. For the construction of in-situ concrete for oily water & storm water sump/pond. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - MANHOLE STEEL COVERS (GATIC)
Mining - Earthworks/Civil Engineering (Earthworks/general civil) project at Both on & off, Barrow Island, WA 6712 of Manhole Steel Covers type of New development. For the provision of various types, classes & sizes of steel manhole metal covers & frames. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - CONSTRUCTION OF IN-SITU CONCRETE
Currently at the Construction stage In Ashburton is a project estimated to be $ 1500000. This project For the construction of in-situ concrete. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - GAS PIPELINE - CONCRETING
Mining - Earthworks/Civil Engineering (Earthworks/general civil) project at From south of MILES to, Curtis Island, QLD 4680 for New. Subcontracts for laying of concrete hardstands for vehicle washdown facilities at laydowns supporting construction of the APLNG pipeline. Click for more details...

OLYMPIC DAM OPERATIONS OPEN CUT EXPANSION - ACCOMMODATION MODULE INSTALLATION
A project in the SA Within Roxby Downs. A contract for the installation of 960 approx double storey modules with stairs & dumb waiters. To include co-ordination of third party modules' delivery & unloading on site. Detailed excavation of all footings & foundations. Supply & installation of precast footings. Connection to electrical & communication/optic fibre services. Connection to plumbing services (sewer, potable water, grey water, hose reels). Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - ONSHORE - ISBL CONCRETE & CIVIL WORKS
Mining - Earthworks/Civil Engineering (Earthworks/general civil) project at Within the vicinity of, Onslow, WA 6710 of Isbl Concrete/Civil Works type of New development. For the provision of ISBL concrete and civil works. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - ONSHORE - OSBL CONCRETE & CIVIL WORKS
Wheatstone Development Project - Onshore - Osbl Concrete & Civil Works is currently at the Construction stage, valued at about $ 5000000 it is For the provision of OSBL concrete and civil works. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - LNG PLANT - CIVIL & CONCRETE WORKS
New project of Mining - Earthworks/Civil Engineering (Earthworks/general civil) project at South of Laird Point, Curtis Island, QLD 4680. Civil & concrete services associated with installation of 2 x 160,000 cubic metre capacity liquefied natural gas (LNG) tanks. Click for more details...

COCKATOO ISLAND IRON ORE OPERATIONS STAGE 4
Cockatoo Island Iron Ore Operations Stage 4 is currently at the Construction stage, valued at about $ 22000000 it is Continuation of open cut operations based on a resource estimate of 1.2 million tonnes (Mt). Construction of a 300m long extension to the existing onshore seawall to enclose a pit enlargement. Associated relocation of surface infrastructure. Click for more details...

PILBARA IRON ORE EXPANSION - FRAMEWORK AGREEMENT - EASTERN EARTHWORKS
Pilbara Iron Ore Expansion - Framework Agreement - Eastern Earthworks is currently at the Construction stage, valued at about $ 10000000 it is Preferred earthworks contractor status for 5 years in the program to expand capacity to 353 million tonnes per annum (Mtpa). Mines covered include Hope Downs 4, Marandoo, Yandicoogina & Koodaideri. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT STAGE 1 - CAR DUMPER CIVIL WORKS
Mining - Earthworks/Civil Engineering (Earthworks/general civil) project for New development. A project including 480,000cu m of excavation involving drill & blast. Installation of 5500cu m of rock fall netting & cable rock bolts. Bulk earthworks & pavement for the new car dumper access roads. Click for more details...

ANDY WELL GOLD PROJECT - OPEN PIT MINING
Approx 45km North of, Meekatharra, WA 6642 Has Andy Well Gold Project - Open Pit Mining currently at Construction stage. For the provision of open pit mining and civil earthworks services. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT CIVIL WORKS
A project in the WA Within City Of Karratha. Contract to include the CLB 353 stockyard. Conveyor link & rail formation earthworks. Relocation of water pipelines. Excavation, crushing & screening to produce 1 million tonnes (Mt) of pavement material for the construction of 5km of sealed roads. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - COMPRESSION STATIONS ECI CONTRACT
Mining - Earthworks/Civil Engineering (Earthworks/general civil) project In The Western Downs Regional Council Area of Compression Stations - Early Contractor Involvement type. Contract for the early civil site works (bulk earthworks, piling & concrete foundations) & front end planning work for 5 x compression stations & a central processing plant at the Woleebee Creek block southwest of Wandoan & 3 field compression stations & a central processing plant at the Bellevue block east of Miles. Click for more details...

WEST ANGELAS IRON ORE OPERATIONS - ACCESS ROAD UPGRADE
Excavation/Embankment Construction/Culverts/Pavement/Floodways project at via, Pannawonica, WA 6716 In The Council Area Of Ashburton of Private. Upgrade of the existing access road between the Great Northern Highway & West Angelas mine. To include 19,000cu m of excavation, 266,000cu m of embankment construction, 5,300m of culverts, 31km of bitumen sealed pavement plus installation of 2 floodways. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - SEAWATER INTAKE STRUCTURE - SUPPLY
On & off, Barrow Island, WA 6712 Has Greater Gorgon Gas Project - Civils & Underground Services - Seawater Intake Structure - Supply currently at Construction stage. For the provision of the seawater intake structure. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - CHEMICAL & ACID RESISTANT COATINGS
Currently at the Construction stage In Ashburton is a project estimated to be $ 5000000. This project For the provision of chemical & acid resistant coatings. Click for more details...

SONOMA COAL OPERATIONS - CREEK DIVERSION
Diversion Channel/Dams New project In The Whitsunday Regional Council Area. Extension of the northern reach of the open-cut pit of the Sonoma Coal Mine by diversion of Coral Creek. To include formation of a 1390m long channel to replace a 1280m section of the existing creek & diversion dams. Click for more details...

RIXS CREEK COAL OPERATIONS - RAIL LOOP & LOADING FACILITY
Currently at the Construction stage In Singleton is a project estimated to be $ 57000000. This project Construction of a 5.6km long rail loop off the Main Northern Rail Line. Product coal to travel from the existing coal handling & processing plant (CHPP) by overland conveyor & transfer by a stacker conveyor to a 350,000t clean coal stockpile in the centre of the loop. Loading via a reclaim tunnel under the stockpile by conveyor to a 2000t surge bin located above the loop for loading trains. Peak construction workforce of 70 expected. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT EARTHWORKS
Well Head Siteworks/Roadworks project at Surat Basin via, Miles, QLD 4415 In The Council Area Of Western Downs Regional of Private. A 3 year contract for earthworks. To include clearing, grading & building well sites & roads. Click for more details...

BHP BILLITON MOOKA CAR REPAIR WORKSHOP CIVIL WORKS
Bhp Billiton Mooka Car Repair Workshop Civil Works is currently at the Construction stage, valued at about $ 31000000 it is A contract to include bulk earthworks, rock excavation & culvert construction together with road construction & sub-ballast capping. Click for more details...

CANNON GOLD PROJECT
A project in the WA Within Kalgoorlie-Boulder. Planned contract mining over 3 years for 484,000t to be treated off site for 68,200 ounces (oz) of gold. Open cut operations followed by underground workings via a portal & decline from the footwall of the open pit. Ore is to be processed at Metals X Ltd Jubilee Mill. Click for more details...

ROY HILL IRON ORE PROJECT - NON-PROCESS INFRASTRUCTURE - MINE SITE HV AREA
Currently at the Construction stage In East Pilbara is a project estimated to be $ 100000000. This project Construction of various non-process infrastructure buildings for the Roy Hill Iron Ore Mine, comprising three main works zones being Mine Services Area, a Gatehouse and Go-Line Facility and to include HV area. Click for more details...

MINING AREA C (MAC) FUEL FACILITIES EXPANSION
Concreting/Piping/Electrical project at off the Great Northern Hwy via, Newman, WA 6753 In The Council Area Of East Pilbara of Private. Expansion of existing fuel dispensing facilities including for low voltage & power house. Click for more details...

BYERWEN COAL PROJECT - SITE CIVIL EARTHWORKS
Collinsville Elphinstone Rd, Wollombi Rd, 20km West of, Glenden, QLD 4743 Has Byerwen Coal Project - Site Civil Earthworks currently at Construction stage. For the provision of site civil earthworks. Click for more details...

AMRUN (SOUTH OF EMBLEY) BAUXITE PROJECT - HEY RIVER/BOYD ROAD & BULK EARTHWORKS
A project in the QLD Within Weipa Shire. The works include but are not limited to: Clearing & grubbing. Topsoil stripping, temporary & permanent stockpiling. Ground surface treatment. Earthworks. Pavements & bitumen sealing. Topsoil & grass seeding to completed earthworks. Road furniture & pavement delineation. Process & firewater pipes including flanges & end capping. Erosion protection at spillway & inlet. Testing of any pipes in accordance with AS4041. Click for more details...

NEW ACLAND COAL OPERATIONS EXPANSION STAGE 3 (NACO3) - ONSITE ROAD CONSTRUCTION
Private ownership Mining - Earthworks/Civil Engineering (Earthworks/general civil) project In The Toowoomba Regional Council Area for New development. For the construction of onsite roads. To include: MIA Northern Access Road ? Approximately 2km sealed private access road to the mine industrial area (MIA) car park; TLF Southern Access Road & laydown Pad ? Approximately 2.5km private access road to the new train load-out facility; & Ancillary onsite roads ? a number of sealed & unsealed roads to be constructed on the mine site allowing access to new mining areas & internal product coal haulage. Click for more details...

YANDICOOGINA IRON ORE OPERATIONS BULK EARTHWORKS & CIVIL WORKS
Bulk Earthworks & Civil Works project at 95km North-west of, Newman, WA 6753 In The Council Area Of East Pilbara of Private. Bulk earthworks & civil works as part of the Yandi Oxbow Project. To include construction of a 4.5km hall road. Construction of a heavy vehicle bridhe over the existing railway. Over 700,000cm embankment construction. Over 3,200 lineal metres of culverts & upgrades, rerouting & extensions to existing light vehicle access roads. Click for more details...

YANDI OXBOW PROJECT (YOP) - BULK EARTHWORKS/CIVIL WORKS
Mining - Earthworks/Civil Engineering (Earthworks/general civil) project for New development. For bulk earthworks & civil works to sustain current production at the Yandi Mine. To include construction of a 4.5km haul road, construction of a heavy vehicle bridge over the existing railway, over 700,000cm of embankment construction, over 3200 lineal metres of culverts & upgrades, re-routing & extensions to existing light vehicle access roads. Click for more details...

PILGANGOORA LITHIUM PROJECT - SITE ESTABLISHMENT
Mining - Earthworks/Civil Engineering (Earthworks/general civil) New project at 120km South of, Port Hedland, WA 6721. This type is Site Establishment with Private ownership. For the provision of site establishment. Click for more details...

BAUXITE HILLS BAUXITE DSO PROJECT - SITE ESTABLISHMENT
A project in the QLD Within Mapoon Shire. For the provision of site establishment. Click for more details...