EP389 GINGIN-1 & RED GULLY-1 OIL & GAS PROJECT
Mining - Earthworks/Civil Engineering (Earthworks/general civil) New project at Straddling Brand Hwy north & south of, Gingin, WA 6503. This type is Resource - Oil/Gas - Onshore with Private ownership. Estimated total potential Recoverable Reserves are 172 to 190 billion cubic feet of gas & over 6 million barrels of oil & condensate. The main objective in the Gingin & Gingin West prospects are fluvial & continental sandstones of the Early Jurassic aged Cattamarra Coal Measures. Porosities in the Gingin-Bootine area vary from 6%-13% with permeabilities up to 112 millidarcies. This gas reservoir quality & the proximity to pipeline infrastructure & the markets makes for robust economics on gas discovery & any developments for natural gas, & also the value added component of generating electricity. Infrastructure to include a 3km export pipeline that will link up to the DBNGP, a gas & condensate plant, 30 man camp & earthworks. Click for more details...

SNAPPER MINERAL SANDS PROJECT - OVERBURDEN REMOVAL
Currently at the Construction stage In Wentworth is a project estimated to be $ 5000000. This project Contract for initial overburden removal in the mineral sands project. Click for more details...

RAPID GROWTH 5 IRON ORE PROJECT - RAIL
Mining - Earthworks/Civil Engineering (Earthworks/general civil) project at Between Port Hedland and, Newman, WA 6753 for New. The works include construction of more than 1 000 camp rooms complete with kitchens and recreation facilities, 1.2 million cubic metres of earthworks, construction of 10 new dual track bridges, laying of all required track to duplicate the existing 200km railway line and installation of 840 km of fibre optic cable. Click for more details...

MIDDLEBACK RANGE OPERATIONS - PROJECT MAGNET PHASE 2 - CIVIL WORKS
Stockpile Pad/Haul Road - For Train Loading Facility project at via Lincoln Hwy 55km north of, Whyalla, SA 5600 in the Mining - Earthworks/Civil Engineering (Earthworks/general civil). Construction of a stockpile pad for a train loading facility. Associated short haul road from Iron Knight Mine. Click for more details...

ICHTHYS GAS FIELD DEVELOPMENT - ONSHORE - MAIN CIVIL WORKS
Main Civil Works project at Blaydin Point via, Darwin, NT 0800 In The Council Area Of Darwin City of Private. The scope of work includes supply, install & warrant of asphalt roadworks. Manufacture, supply, install & warrant steel guardrails together with associated works to all construction zones. Supply & delivery of joint filler & accessories. Supply & delivery of manhole grates & lids. Supply delivery of concrete. Supply & delivery of denso tape. Supply & delivery of precast units/elements. Supply & delivery of UPVC pipe. Click for more details...

WILPINJONG COAL OPERATIONS EXPANSION
A project in the NSW Within Mid Western Regional. A project at the existing open-cut mine to expand Run-of-Mine (RoM) coal production from 13million tonnes per annum (Mtpa) to 15Mtpa for 12Mtpa per annum of washed & unwashed product coal to be railed to domestic power customers & a port for export. To involve a 7m extension to the coal handling & preparation plant (CHPP) building to accommodate a capacity increase to 1200tonnes per hour (tph). Associated upgrading of the coal handling & stockpiling system to include an additional ROM hopper with associated sizing station & raw coal conveyor & stacker plus an additional product coal stockpile with associated stacking conveyor & reclaim conveyor. Other work to include minor earthworks, conveyors, transfer stations & relocation of site roads. Click for more details...

PILBARA 333 IRON ORE OPERATIONS EXPANSION PROJECT
A project in the WA Within Various. A project to increase Pilbara iron operations capacity from 220million tonnes per annum (Mtpa) to 330Mtpa. Improvements at Dampier Port expected to see 225Mtpa capacity by early 2011 & 230Mtpa by mid 2012. Improvements at Cape Lambert Port to include construction of an additional 1.8km, 4 berth jetty & wharf running parallel to the existing Cape Lambert jetty & 4 berth Wharf A. This will give 280Mtpa capacity by the first half of 2014 & 330Mtpa by the first half of 2016. Associated mine development projects to include Hope Downs 4, Marandoo expansions, Nammuldi expansion, Silvergrass, Turee Syncline, Western Turner Syncline & Yandicoogina expansions. Post-2015 mining projects expected to include Bakers South, Beasley River, Bungaroo, Giles, Homestead, Hope Downs 2, 3, 5 & 6, Koodaideri, Shovelanna & Western Range. Project to involve associated supporting infrastructure (rail, water & power) as well as workforce, towns & housing planning. Click for more details...

HOPE DOWNS 4 JOINT VENTURE IRON ORE PROJECT - RAIL SPUR LINE
Rail Spur Line New project In The East Pilbara Council Area. A project to extend the existing Lang Hancock Railway. Construction of a 52km spur line from the new Hope Downs 4 mine to south of the existing Hope Downs 1 Mine to provide connection to rail & port infrastructure. Associated rail bridges over the Weeli Wolli & Coondiner Creeks. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT STAGE 1 - QUARRY & PREPARATORY WORKS
Cape Lambert Port B (Clb) Development Stage 1 - Quarry & Preparatory Works is currently at the Construction stage, valued at about $ 5000000 it is Earthworks associated with a quarry development including preparatory work. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - QUARANTINE & WRAPPING SERVICE
Mining - Earthworks/Civil Engineering (Earthworks/general civil) project In The Ashburton Council Area of Quarantine/Wrapping Service type. For the provision of quarantine & wrapping service. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - STEEL EMBEDMENTS
Greater Gorgon Gas Project - Civils & Underground Services - Steel Embedments is currently at the Construction stage, valued at about $ 500000 it is For the supply of steel embedments. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - TRANSPORTATION & LOGISTICS - PERTH
Mining - Earthworks/Civil Engineering (Earthworks/general civil) New project at Based from, Perth, WA 6000. This type is Transportation/Logistics with Private ownership. For the provision of all necessary equipment, labour & material for the heavy haulage "Transport" operation of Precast Concrete material. Click for more details...

INTEGRA COAL OPERATIONS - OPEN CUT EXTENSION PROJECT
Currently at the Construction stage In Singleton is a project estimated to be $ 10000000. This project Extension further south of the existing South Pit (247ha). Trucks & shovel/excavators to access 30million tonnes (Mt) of Run-of-Mine (RoM) coal at a rate of 2.3-4.2Mtpa to give a Life-of-Mine (LoM) of 9 years. Associated infrastructure to include relocation of power lines & telecommunications in the proposed open cut area. Construction of temporary haul roads & surface water management structures. Installation of tansportable site office, crib room & bathhouse. Installation of a transportable, above ground equipment refuelling station. Click for more details...

GOONYELLA RIVERSIDE BROADMEADOW COAL OPERATIONS EXPANSION - OPEN CUT EXTENSION
Operating Mine - Extn - Open Cut project at 30km north of, Moranbah, QLD 4744 in the Mining - Earthworks/Civil Engineering (Earthworks/general civil). Contract for extension of the existing open cut to provide access to underground works. To include 8million cu m of earthworks & 12,000cu m of concrete works. Construction of associated infrastructure including access roads, dams & drainage, conveyor footings & gates. Click for more details...

MORANBAH REGION EXPANSION PROJECT - CIVIL WORKS PACKAGES
Private ownership Mining - Earthworks/Civil Engineering (Earthworks/general civil) project In The Isaac Regional Council Area for New development. Packages to include site wide pioneering earthworks, road, drainage & civil works (C001). Bulk earthworks (cut & cover) from the mining infrastructure area (MIA) to the run-of-mine (ROM) area (C002) & from the ROM area to the train load out (C003). The co-disposal dam wall (C004). Supply of gravel (C005); crush rock backfill (C006); precast concrete pipes, boxes & headwalls (C007); high density polyethylene (HDPE) liners (C008) & geogrids (C009). Construction of warehouse & workshop building (C010); bathhouse & administration building (C011) & roadways & carparks in the MIA (C013). Spillway (C014). Supply of concrete (C015); fuel handling equipment (C016); lube handling equipment (C017); tanks (C020); hydrants & hose reels (C021); sewage treatment plant (C022); potable water treatment plant (C023) & fencing (C024). Design & construction of gas drainage plant & booster station (C025) along with supply of vacuum pumps (C029); surface reticulation piping (C030); underground reticulation piping (C031) & installation of the surface & underground reticulation system (C032). Mine cooling system (C026); stone dust system (C027) & diesel & lubrication supply (C028). Click for more details...

PINE DALE COAL OPERATIONS - YARRABOLDY EXTENSION
Currently at the Construction stage In Lithgow is a project estimated to be $ 1400000. This project Further operations at the former Yarraboldy open cut pit to extract 800,000t approx of coal over a 3 year period. To commence with construction of an amenity bund prior to 2 years of open cut mining followed by 6 months of final rehabilitation works (minimally backfill/ reshaping/ revegetating of 10.3ha). Construction also of internal roads & a new intersection with the existing private coal haul road crossing. Decommissioning of the existing crushing facility & construction of new plant along with a crushing, stockpiling & maintenance area in the Extension. Click for more details...

WIGGINS ISLAND RAIL PROJECT (WIRP) - STAGE 1 CIVIL WORKS
via, Gladstone, QLD 4680 Has Wiggins Island Rail Project (Wirp) - Stage 1 Civil Works currently at Construction stage. Civil works associated with Stage 1 of the rail project from the Bowen & Surat Basins to Wiggins Island. To include the Balloon Loop & Dingo to Blackwell duplication. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - GRATING & CAST IN ANGLE SUPPLY
Mining - Earthworks/Civil Engineering (Earthworks/general civil) project for New development. For the supply of grating & cast in angle. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - MINOR PRECAST CONCRETE WORKS
A project in the WA Within Ashburton. For the provision & installation of minor precast concrete works (including concrete, steel reinforcing, embedded materials, & anchor bolts where necessary). Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND - CONSTRUCT IN-SITU CONCRETE - OILY WATER & STORMWATER SUMP/POND
Both on & off, Barrow Island, WA 6712 Has Greater Gorgon Gas Project - Civils & Underground - Construct In-Situ Concrete - Oily Water & Stormwater Sump/Pond currently at Construction stage. For the construction of in-situ concrete for oily water & storm water sump/pond. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - SUPPLY & INSTALL HDPE LINER
Mining - Earthworks/Civil Engineering (Earthworks/general civil) project at Both on & off, Barrow Island, WA 6712 for New. For the supply & installation of the HDPE liner. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - MANHOLE STEEL COVERS (GATIC)
Mining - Earthworks/Civil Engineering (Earthworks/general civil) project at Both on & off, Barrow Island, WA 6712 of Manhole Steel Covers type of New development. For the provision of various types, classes & sizes of steel manhole metal covers & frames. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - CONSTRUCTION OF IN-SITU CONCRETE
Currently at the Construction stage In Ashburton is a project estimated to be $ 1500000. This project For the construction of in-situ concrete. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - GAS PIPELINE - CONCRETING
Mining - Earthworks/Civil Engineering (Earthworks/general civil) project at From south of MILES to, Curtis Island, QLD 4680 for New. Subcontracts for laying of concrete hardstands for vehicle washdown facilities at laydowns supporting construction of the APLNG pipeline. Click for more details...

OLYMPIC DAM OPERATIONS OPEN CUT EXPANSION - ACCOMMODATION MODULE INSTALLATION
A project in the SA Within Roxby Downs. A contract for the installation of 960 approx double storey modules with stairs & dumb waiters. To include co-ordination of third party modules' delivery & unloading on site. Detailed excavation of all footings & foundations. Supply & installation of precast footings. Connection to electrical & communication/optic fibre services. Connection to plumbing services (sewer, potable water, grey water, hose reels). Click for more details...

GROSVENOR COAL PROJECT - ROM STOCKPILE CIVIL WORKS
Currently at the Construction stage In Isaac Regional is a project estimated to be $ 10000000. This project Civil works for the run-of-mine (ROM) stockpile & crushing area. Click for more details...

PILBARA IRON ORE EXPANSION - FRAMEWORK AGREEMENT - EASTERN EARTHWORKS
Pilbara Iron Ore Expansion - Framework Agreement - Eastern Earthworks is currently at the Construction stage, valued at about $ 10000000 it is Preferred earthworks contractor status for 5 years in the program to expand capacity to 353 million tonnes per annum (Mtpa). Mines covered include Hope Downs 4, Marandoo, Yandicoogina & Koodaideri. Click for more details...

PILBARA IRON ORE EXPANSION - FRAMEWORK AGREEMENT - WESTERN CIVIL WORKS
Mining - Earthworks/Civil Engineering (Earthworks/general civil) New project at via, Newman, WA 6753. This type is Civil Works - Western Region with Private ownership. Preferred civil works contractor status for 5 years in the program to expand capacity to 353 million tonnes per annum (Mtpa). To include early contractor involvement. Click for more details...

BOWEN BASIN ACCOMMODATION VILLAGE PACKAGES
Currently at the Tenders & Building stage In Various is a project estimated to be $ 10000000. This project Packages for supplier & construction involvement in The Mac's Developed-Owned-Operated accommodation village projects in the Bowen Basin (non-mining sites). To include civil site & road works, accommodation village transportable buildings as well as on site construction of kitchen/dining rooms, taverns, administration & retail facilities. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT STAGE 1 - CAR DUMPER CIVIL WORKS
Mining - Earthworks/Civil Engineering (Earthworks/general civil) project for New development. A project including 480,000cu m of excavation involving drill & blast. Installation of 5500cu m of rock fall netting & cable rock bolts. Bulk earthworks & pavement for the new car dumper access roads. Click for more details...

PORT HEDLAND INNER HARBOUR - BHP BILLITON STOCKYARD EXPANSION CIVIL WORKS
Port Hedland Inner Harbour - Bhp Billiton Stockyard Expansion Civil Works is currently at the Construction stage, valued at about $ 50000000 it is Upgrade of the existing ore blending stockyard at Nelson Point. To include bulk earthworks, stone column ground improvement works, rail, concrete works, piping & instrumentation for dust suppression & road works. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - GROUNDING MATERIAL
Greater Gorgon Gas Project - Lng & Condensate Storage Tanks - Grounding Material is currently at the Construction stage, valued at about $ 2500000 it is For the provision of grounding material. To include: earth cables, bars, connectors & terminals, tool kit, compression tool & dies). Click for more details...

DUGALD RIVER BASE METAL PROJECT BULK EARTHWORKS
Bulk Earthworks project at Off the Burke Developmental Rd 85km NE of, Mount Isa, QLD 4825 In The Council Area Of Mt Isa City of Private. For the provision of bulk earthworks. Click for more details...

ANDY WELL GOLD PROJECT - OPEN PIT MINING
Approx 45km North of, Meekatharra, WA 6642 Has Andy Well Gold Project - Open Pit Mining currently at Construction stage. For the provision of open pit mining and civil earthworks services. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT CIVIL WORKS
A project in the WA Within City Of Karratha. Contract to include the CLB 353 stockyard. Conveyor link & rail formation earthworks. Relocation of water pipelines. Excavation, crushing & screening to produce 1 million tonnes (Mt) of pavement material for the construction of 5km of sealed roads. Click for more details...

LEICHHARDT CCGT POWER STATION
Private ownership Mining - Earthworks/Civil Engineering (Earthworks/general civil) project In The Mt Isa City Council Area for New development. EPC turnkey contract including engineering, procurement & construction of a 80MW combined cycle gas turbine (CCGT) power station to act as back up to the 240MW Diamantina Power Station currently under construction. To include design & procurement of the dual fuel Rolls Royce Trent 60 WLE gas turbine generator & associated electrical & mechanical equipment, footings, structural & drainage work, assembly & installation of the main generation unit & balance of plant. Associated cabling & switchgear, telecommunications, instrument control & switchyard connections. Commissioning & operational handover. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - SEAWATER INTAKE SHAFT CONSTRUCTION
Mining - Earthworks/Civil Engineering (Earthworks/general civil) project In The Ashburton Council Area of Private ownership. For the construction of a seawater intake shaft. Click for more details...

HERA-NYMAGEE GOLD PROJECT - EARTHWORKS
Private ownership Mining - Earthworks/Civil Engineering (Earthworks/general civil) project In The Cobar Council Area for New development. Major earthworks including the tailings storage facility (TSF) & surface dams. Click for more details...

RIO TINTO PILBARA AUTOHAUL RAIL PROJECT ANCILLARY WORKS
Mining - Earthworks/Civil Engineering (Earthworks/general civil) project at Pilbara region, ., WA 6999 for New. A staged project to develop driverless trains on the existing 1500km approx train network linking Pilbara mines with ports through development of centralised servers & onboard equipment fitted to existing trains. To also involve wayside development such as construction of signalling pads & equipment installation, trenching for the installation of new signal cables, construction of permanent access roads & ramps as well as storm water drainage, fencing & gates at level crossings. Click for more details...

OLD PIRATE GOLD PROJECT - TRIAL MINING
Private ownership Mining - Earthworks/Civil Engineering (Earthworks/general civil) project In The Central Desert Shire Council Area for New development. A project based on a Resource Estimate of 1.88 million tonnes at 11.96 g/t gold for 723 800 ounces gold. Trial mining will include the extraction of 10 000 tonnes of gold bearing material, installation of a pilot plant & tailings facility, associated site works & ground water extraction. Pilot plant will include 15tph gravity gold plant including crushers, coarse gold jig, ball mill Knelson gravity concentrator & tabling/gold room. Click for more details...

RIXS CREEK COAL OPERATIONS - RAIL LOOP & LOADING FACILITY
Currently at the Construction stage In Singleton is a project estimated to be $ 57000000. This project Construction of a 5.6km long rail loop off the Main Northern Rail Line. Product coal to travel from the existing coal handling & processing plant (CHPP) by overland conveyor & transfer by a stacker conveyor to a 350,000t clean coal stockpile in the centre of the loop. Loading via a reclaim tunnel under the stockpile by conveyor to a 2000t surge bin located above the loop for loading trains. Peak construction workforce of 70 expected. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT EARTHWORKS
Well Head Siteworks/Roadworks project at Surat Basin via, Miles, QLD 4415 In The Council Area Of Western Downs Regional of Private. A 3 year contract for earthworks. To include clearing, grading & building well sites & roads. Click for more details...

BODDINGTON GOLD OPERATIONS EXPANSION
Operating Mine - Expansion New project In The Boddington Council Area. Life-of-mine (LoM) extension through deepening & widening the Wandoo North & South open pits. To include expansion of the existing & construction of a new 1500 million tonne (Mt) waste rock dump. Construction over 1650ha of a second 1600Mt residue disposal area (RDA) involving decommissioning of an existing water storage dam (D4). Construction of new water storage dams (D5 & D6). Expansion of existing stockpiles including provision of stockpiling any bauxite encountered for third party processing. Associated diversion of Bibbulmun track, roadworks, pipelines/pumping facilities & power lines. Click for more details...

MINING AREA C (MAC) FUEL FACILITIES EXPANSION
Concreting/Piping/Electrical project at off the Great Northern Hwy via, Newman, WA 6753 In The Council Area Of East Pilbara of Private. Expansion of existing fuel dispensing facilities including for low voltage & power house. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - ONSHORE & INFRASTRUCTURE - PINDAN - DETAILED EARTHWORKS & CONCRETE WORKS
Wheatstone Development Project - Onshore & Infrastructure - Pindan - Detailed Earthworks & Concrete Works is currently at the Construction stage, valued at about $ 1000000 it is For the provision of detailed earthworks & concrete works to 50 modular house lots. Estimated 2500m3 of earthworks & 1900m3 of concrete over a 40 week period. Click for more details...

AMRUN (SOUTH OF EMBLEY) BAUXITE PROJECT - HEY RIVER/BOYD ROAD & BULK EARTHWORKS
A project in the QLD Within Weipa Shire. The works include but are not limited to: Clearing & grubbing. Topsoil stripping, temporary & permanent stockpiling. Ground surface treatment. Earthworks. Pavements & bitumen sealing. Topsoil & grass seeding to completed earthworks. Road furniture & pavement delineation. Process & firewater pipes including flanges & end capping. Erosion protection at spillway & inlet. Testing of any pipes in accordance with AS4041. Click for more details...

NEW ACLAND COAL OPERATIONS EXPANSION STAGE 3 (NACO3) - ONSITE ROAD CONSTRUCTION
Private ownership Mining - Earthworks/Civil Engineering (Earthworks/general civil) project In The Toowoomba Regional Council Area for New development. For the construction of onsite roads. To include: MIA Northern Access Road ? Approximately 2km sealed private access road to the mine industrial area (MIA) car park; TLF Southern Access Road & laydown Pad ? Approximately 2.5km private access road to the new train load-out facility; & Ancillary onsite roads ? a number of sealed & unsealed roads to be constructed on the mine site allowing access to new mining areas & internal product coal haulage. Click for more details...

PILGANGOORA LITHIUM PROJECT - SITE ESTABLISHMENT
Mining - Earthworks/Civil Engineering (Earthworks/general civil) New project at 120km South of, Port Hedland, WA 6721. This type is Site Establishment with Private ownership. For the provision of site establishment. Click for more details...

ELLENDALE DIAMOND MINE - TAILINGS STORAGE FACILITY - EROSION REMEDIATION
Erosion Remediation project at Via, Derby, WA 6728 In The Council Area Of Derby-W Kimberley of State. Works to include remediation works on the walls of the main Ellendale Tailings Storage Facility to ensure the facility remains safe & stable. Works will primarily involve placing rock material in areas where significant scour & erosion occurs. Click for more details...

BAUXITE HILLS BAUXITE DSO PROJECT - SITE ESTABLISHMENT
A project in the QLD Within Mapoon Shire. For the provision of site establishment. Click for more details...