State

Categories

Sub Categories

Click Here to Find Current Projects

List of Earthworks/general civil Projects in NSW


SNAPPER MINERAL SANDS PROJECT - OVERBURDEN REMOVAL
Currently at the Construction stage In Wentworth is a project estimated to be $ 5000000. This project Contract for initial overburden removal in the mineral sands project. Click for more details...

WILPINJONG COAL OPERATIONS EXPANSION
A project in the NSW Within Mid Western Regional. A project at the existing open-cut mine to expand Run-of-Mine (RoM) coal production from 13million tonnes per annum (Mtpa) to 15Mtpa for 12Mtpa per annum of washed & unwashed product coal to be railed to domestic power customers & a port for export. To involve a 7m extension to the coal handling & preparation plant (CHPP) building to accommodate a capacity increase to 1200tonnes per hour (tph). Associated upgrading of the coal handling & stockpiling system to include an additional ROM hopper with associated sizing station & raw coal conveyor & stacker plus an additional product coal stockpile with associated stacking conveyor & reclaim conveyor. Other work to include minor earthworks, conveyors, transfer stations & relocation of site roads. Click for more details...

INTEGRA COAL OPERATIONS - OPEN CUT EXTENSION PROJECT
Currently at the Construction stage In Singleton is a project estimated to be $ 10000000. This project Extension further south of the existing South Pit (247ha). Trucks & shovel/excavators to access 30million tonnes (Mt) of Run-of-Mine (RoM) coal at a rate of 2.3-4.2Mtpa to give a Life-of-Mine (LoM) of 9 years. Associated infrastructure to include relocation of power lines & telecommunications in the proposed open cut area. Construction of temporary haul roads & surface water management structures. Installation of tansportable site office, crib room & bathhouse. Installation of a transportable, above ground equipment refuelling station. Click for more details...

PINE DALE COAL OPERATIONS - YARRABOLDY EXTENSION
Currently at the Construction stage In Lithgow is a project estimated to be $ 1400000. This project Further operations at the former Yarraboldy open cut pit to extract 800,000t approx of coal over a 3 year period. To commence with construction of an amenity bund prior to 2 years of open cut mining followed by 6 months of final rehabilitation works (minimally backfill/ reshaping/ revegetating of 10.3ha). Construction also of internal roads & a new intersection with the existing private coal haul road crossing. Decommissioning of the existing crushing facility & construction of new plant along with a crushing, stockpiling & maintenance area in the Extension. Click for more details...

MAULES CREEK COAL PROJECT - BULK EARTHWORKS
New project of Mining - Earthworks/Civil Engineering (Earthworks/general civil) project at 20km approx northeast of, Boggabri, NSW 2382. Bulk earthworks for the Mine Industrial Area (MIA), Coal Handling & Preparation Plant (CHPP) & Run-Of-Mine (ROM) stockpile as well as dams (1 x 200ML & 1 x 120ML raw water dams; 1 x 400ML & 1 x 150ML mine water dams plus 3 sedimentation dams). Click for more details...

HERA-NYMAGEE GOLD PROJECT - EARTHWORKS
Private ownership Mining - Earthworks/Civil Engineering (Earthworks/general civil) project In The Cobar Council Area for New development. Major earthworks including the tailings storage facility (TSF) & surface dams. Click for more details...

MOUNT ARTHUR COAL OPERATIONS - WATER NETWORK UPGRADE
Mining - Earthworks/Civil Engineering (Earthworks/general civil) New project at Denman Rd cnr Thomas Mitchell Dr 5km south of, Muswellbrook, NSW 2333. This type is Earthworks/Piping with Private ownership. Supply & installation of 25km of poly pipe. Relocation of pumps & pontoons & associated earthworks. Click for more details...

RIXS CREEK COAL OPERATIONS - RAIL LOOP & LOADING FACILITY
Currently at the Construction stage In Singleton is a project estimated to be $ 57000000. This project Construction of a 5.6km long rail loop off the Main Northern Rail Line. Product coal to travel from the existing coal handling & processing plant (CHPP) by overland conveyor & transfer by a stacker conveyor to a 350,000t clean coal stockpile in the centre of the loop. Loading via a reclaim tunnel under the stockpile by conveyor to a 2000t surge bin located above the loop for loading trains. Peak construction workforce of 70 expected. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect