State

Categories

Sub Categories

Click Here to Find Current Projects

List of Earthworks/general civil Projects in QLD


MILLENNIUM COAL OPERATIONS EXPANSION
via Peak Downs Hwy 16km southwest of, Coppabella, QLD 4741 Has Millennium Coal Operations Expansion currently at Construction stage. A project to expand the 2million tonnes per annum (Mtpa) operations to 5.5Mtpa Run-of-Mine (ROM) coal for 3.6Mtpa product coal for up to 16 years. Development of the new Mavis Pit by contract mining comprising conventional open-cut truck & excavator terrace mining. Possibility of minor upgrade & a new ROM stockpile at the existing coal handling & preparation plant (CHPP). Temporary waste rock emplacements prior to likely ultimate disposal in the Millennium Pit void. Construction of haul roads across New Chum Creek & possible alteration of the Millennium/Poitrel access road. Establishment of a 2km long drainage system along the northern boundary of the new pit as well as 15 new sediment dams. The expansion project to involve 160 employees & contractors in addition to the existing 220 person workforce. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - GAS PIPELINE
Mining - Earthworks/Civil Engineering (Earthworks/general civil) project at From south of MILES to, Curtis Island, QLD 4680 for New. Part of a coal seam gas (CSG) to liquefied natural gas (LNG) project with Origin Energy responsible for developing CSG gas fields & transmission pipeline, ConocoPhillips responsible for developing a LNG processing plant & their joint venture company Australia Pacific LNG responsible for the export facilities. A 42 inch (1070mm) diameter, high pressure main pipeline to commence east of Wandoan at its junction with a 44km lateral pipeline from gas developments at Condabri & a 38km lateral from Woleebee gas developments south of Miles. To travel 362km underground with a marine crossing at The Narrows between Kangaroo Island & Port Curtis Island to finish at the LNG plant near Laird Point. Inlet stations to allow for insertion of cleaning & inspection equipment to be constructed at the start of the Condabri & Woleebee laterals & at their intersection a 0.5ha APLNG hub comprising the inlet station for the main pipeline, isolation valves & connections for future compression to also be constructed. Development of up to 5 x 15-20ha laydown areas to receive materials (Miles, Wandoan, Theodore, Biloela, Gladstone areas). 3 temporary accommodation camps each up to 15ha & operating for 3-7 months to be relocated along the pipeline route as required. Camps to include sleeping quarters for up to 1100 personnel, laundries, catering, medical centre, recreational facilities (eg gymnasium, cinema, reading room, sports grounds), diesel generators for power & package sewerage plants. Click for more details...

DAISY STREET WORKERS ACCOMMODATION & TOWNHOUSES - CIVIL WORKS
Mining - Earthworks/Civil Engineering (Earthworks/general civil) New project at Daisy St (Lot 3 SP197442), Miles, QLD 4415. This type is Civil Works - For Accommodation Village with Private ownership. Civil works, including road widening & reticulation of services, for a workers' accommodation village to cater for up to 340 people. Click for more details...

GOONYELLA RIVERSIDE BROADMEADOW COAL OPERATIONS EXPANSION - OPEN CUT EXTENSION
Operating Mine - Extn - Open Cut project at 30km north of, Moranbah, QLD 4744 in the Mining - Earthworks/Civil Engineering (Earthworks/general civil). Contract for extension of the existing open cut to provide access to underground works. To include 8million cu m of earthworks & 12,000cu m of concrete works. Construction of associated infrastructure including access roads, dams & drainage, conveyor footings & gates. Click for more details...

MORANBAH REGION EXPANSION PROJECT - CIVIL WORKS PACKAGES
Private ownership Mining - Earthworks/Civil Engineering (Earthworks/general civil) project In The Isaac Regional Council Area for New development. Packages to include site wide pioneering earthworks, road, drainage & civil works (C001). Bulk earthworks (cut & cover) from the mining infrastructure area (MIA) to the run-of-mine (ROM) area (C002) & from the ROM area to the train load out (C003). The co-disposal dam wall (C004). Supply of gravel (C005); crush rock backfill (C006); precast concrete pipes, boxes & headwalls (C007); high density polyethylene (HDPE) liners (C008) & geogrids (C009). Construction of warehouse & workshop building (C010); bathhouse & administration building (C011) & roadways & carparks in the MIA (C013). Spillway (C014). Supply of concrete (C015); fuel handling equipment (C016); lube handling equipment (C017); tanks (C020); hydrants & hose reels (C021); sewage treatment plant (C022); potable water treatment plant (C023) & fencing (C024). Design & construction of gas drainage plant & booster station (C025) along with supply of vacuum pumps (C029); surface reticulation piping (C030); underground reticulation piping (C031) & installation of the surface & underground reticulation system (C032). Mine cooling system (C026); stone dust system (C027) & diesel & lubrication supply (C028). Click for more details...

MOUNT ISA MINES NO.7 TAILINGS DAM EXTENSION
Private ownership Mining - Earthworks/Civil Engineering (Earthworks/general civil) project In The Mt Isa City Council Area for New development. Increase in No. 7 tailings dam capacity by raising external walls. To include 5/7 East Embankment & Toe Berm (26,070sq m fill), the 5/7 West Embankment & Toe Berm (59,250sq m fill) & the West Embankment (21,100sq m fill). Click for more details...

WIGGINS ISLAND RAIL PROJECT (WIRP) - STAGE 1 CIVIL WORKS
via, Gladstone, QLD 4680 Has Wiggins Island Rail Project (Wirp) - Stage 1 Civil Works currently at Construction stage. Civil works associated with Stage 1 of the rail project from the Bowen & Surat Basins to Wiggins Island. To include the Balloon Loop & Dingo to Blackwell duplication. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - GAS PIPELINE - CONCRETING
Mining - Earthworks/Civil Engineering (Earthworks/general civil) project at From south of MILES to, Curtis Island, QLD 4680 for New. Subcontracts for laying of concrete hardstands for vehicle washdown facilities at laydowns supporting construction of the APLNG pipeline. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - LNG PLANT - CIVIL & CONCRETE WORKS
New project of Mining - Earthworks/Civil Engineering (Earthworks/general civil) project at South of Laird Point, Curtis Island, QLD 4680. Civil & concrete services associated with installation of 2 x 160,000 cubic metre capacity liquefied natural gas (LNG) tanks. Click for more details...

GROSVENOR COAL PROJECT - ROM STOCKPILE CIVIL WORKS
Currently at the Construction stage In Isaac Regional is a project estimated to be $ 10000000. This project Civil works for the run-of-mine (ROM) stockpile & crushing area. Click for more details...

BOWEN BASIN ACCOMMODATION VILLAGE PACKAGES
Currently at the Tenders & Building stage In Various is a project estimated to be $ 10000000. This project Packages for supplier & construction involvement in The Mac's Developed-Owned-Operated accommodation village projects in the Bowen Basin (non-mining sites). To include civil site & road works, accommodation village transportable buildings as well as on site construction of kitchen/dining rooms, taverns, administration & retail facilities. Click for more details...

DUGALD RIVER BASE METAL PROJECT BULK EARTHWORKS
Bulk Earthworks project at Off the Burke Developmental Rd 85km NE of, Mount Isa, QLD 4825 In The Council Area Of Mt Isa City of Private. For the provision of bulk earthworks. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - COMPRESSION STATIONS ECI CONTRACT
Mining - Earthworks/Civil Engineering (Earthworks/general civil) project In The Western Downs Regional Council Area of Compression Stations - Early Contractor Involvement type. Contract for the early civil site works (bulk earthworks, piling & concrete foundations) & front end planning work for 5 x compression stations & a central processing plant at the Woleebee Creek block southwest of Wandoan & 3 field compression stations & a central processing plant at the Bellevue block east of Miles. Click for more details...

LEICHHARDT CCGT POWER STATION
Private ownership Mining - Earthworks/Civil Engineering (Earthworks/general civil) project In The Mt Isa City Council Area for New development. EPC turnkey contract including engineering, procurement & construction of a 80MW combined cycle gas turbine (CCGT) power station to act as back up to the 240MW Diamantina Power Station currently under construction. To include design & procurement of the dual fuel Rolls Royce Trent 60 WLE gas turbine generator & associated electrical & mechanical equipment, footings, structural & drainage work, assembly & installation of the main generation unit & balance of plant. Associated cabling & switchgear, telecommunications, instrument control & switchyard connections. Commissioning & operational handover. Click for more details...

SONOMA COAL OPERATIONS - CREEK DIVERSION
Diversion Channel/Dams New project In The Whitsunday Regional Council Area. Extension of the northern reach of the open-cut pit of the Sonoma Coal Mine by diversion of Coral Creek. To include formation of a 1390m long channel to replace a 1280m section of the existing creek & diversion dams. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT EARTHWORKS
Well Head Siteworks/Roadworks project at Surat Basin via, Miles, QLD 4415 In The Council Area Of Western Downs Regional of Private. A 3 year contract for earthworks. To include clearing, grading & building well sites & roads. Click for more details...

BYERWEN COAL PROJECT - SITE CIVIL EARTHWORKS
Collinsville Elphinstone Rd, Wollombi Rd, 20km West of, Glenden, QLD 4743 Has Byerwen Coal Project - Site Civil Earthworks currently at Construction stage. For the provision of site civil earthworks. Click for more details...

AMRUN (SOUTH OF EMBLEY) BAUXITE PROJECT - BULK EARTHWORKS
40km SW of, Weipa, QLD 4874 Has Amrun (South Of Embley) Bauxite Project - Bulk Earthworks currently at Construction stage. For the provision of Bulk Earthworks package including the clearing, grubbing, mass earthworks & drainage & pavement development of eighteen (18) major facilities across twenty-four (24) separate construction areas on the South of Embley Project. The earthworks requirements are as follows: Clearing, grubbing & topsoil stripping at nominated areas at the Process Plant Site. Construction of an unlined 5 ML sedimentation pond. Construction of nine (9) sealed light vehicle roads. Construction of three (3) unsealed heavy vehicle roads. Construction of four (4) earthworks foundation pads for conveyors. Construction of seven (7) earthworks hardstand & building platforms. Construction of a 230ML, in ground water treatment/harvesting unlined pond. Construction of an earthen dump station ramp & reinforced earth wall designed for HV dump trucks to unload into the dump hopper. Clearing & topsoil stripping of the ROM stockpile area for ore to be dumped & rehandled by mine haul trucks. Construction of a stockpile pad & machine berms for the stacking & reclaiming of product bauxite including stockpile drainage to direct stockpile runoff to the north & south sedimentation ponds. Construction of a 110ML unlined sedimentation pond designed to treat runoff directed to the north from the product stockpile including inlet & outlet drainage works. Construction of a 120ML unlined sedimentation pond designed to treat runoff directed to the south from the product stockpile including inlet & outlet drainage works. Click for more details...

AMRUN (SOUTH OF EMBLEY) BAUXITE PROJECT - HEY RIVER/BOYD ROAD & BULK EARTHWORKS
A project in the QLD Within Weipa Shire. The works include but are not limited to: Clearing & grubbing. Topsoil stripping, temporary & permanent stockpiling. Ground surface treatment. Earthworks. Pavements & bitumen sealing. Topsoil & grass seeding to completed earthworks. Road furniture & pavement delineation. Process & firewater pipes including flanges & end capping. Erosion protection at spillway & inlet. Testing of any pipes in accordance with AS4041. Click for more details...

NEW ACLAND COAL OPERATIONS EXPANSION STAGE 3 (NACO3) - ONSITE ROAD CONSTRUCTION
Private ownership Mining - Earthworks/Civil Engineering (Earthworks/general civil) project In The Toowoomba Regional Council Area for New development. For the construction of onsite roads. To include: MIA Northern Access Road ? Approximately 2km sealed private access road to the mine industrial area (MIA) car park; TLF Southern Access Road & laydown Pad ? Approximately 2.5km private access road to the new train load-out facility; & Ancillary onsite roads ? a number of sealed & unsealed roads to be constructed on the mine site allowing access to new mining areas & internal product coal haulage. Click for more details...

BAUXITE HILLS BAUXITE DSO PROJECT - SITE ESTABLISHMENT
A project in the QLD Within Mapoon Shire. For the provision of site establishment. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect