State

Categories

Sub Categories

Click Here to Find Current Projects

List of Electrical installation Projects


MOURA COAL OPERATIONS
New project of Mining - Subcontracts (Electrical installation) project at Dawson Highway, Moura, QLD 4718. Moura Coal Mining is located 1hr 40m inland from Gladstone and Rockhampton. Moura has a township of some 2,200 people. The mine currently produces 5.5mt of clean coal per annum with an increase targeted. All services are currently contractor provided. Click for more details...

EASTERN GOLDFIELDS - NICKEL/GOLD
Mining - Subcontracts (Electrical installation) project In The Kalgoorlie-Boulder Council Area of Mines - Gas-Fired Power Stations (4) type. 4 x 40 megawatt power stations to be built to supply electricity to the Company's Mt Keith, Leinster & Kambalda nickel operations. In addition, a new power station is to be installed at the Kalgoorlie nickel smelter. Proposals will utilise gas from the Pilbara-Goldfields pipeline which is due to deliver gas July/August 1996. 200mm diameter spur lines will be constructed to the gas pipeline & a transmission line will connect Mt Keith & Leinster sites. Waste heat from the turbines is to be used at the nickel processing plants. Lateral line of 7.6 km with a 500m easement is planned for Mt Keith. Click for more details...

JUNDEE - GOLD
Private ownership Mining - Subcontracts (Electrical installation) project In The Wiluna Council Area for New development. A 10 mW plant is currently envisaged. Contract to involve all construction requirements. Supply & installation of transformers, generator sets, cables & associated equipment included in this tender. Click for more details...

NELSON POINT - IRON ORE
Nelson Point - Iron Ore is currently at the Construction stage, valued at about $ 250000 it is Works for the automation of dumper No: 1 to include programme logic controls, lighting, ladder racks, cable, limit switches & positioners. Additional definition to be attached to the scope of works. Click for more details...

PREMIER COAL OPERATIONS
Mining - Subcontracts (Electrical installation) project In The Collie Council Area of Private ownership. Switchgear, transformers, above & below ground cabling & associated electrical services required for 132 kV - 22 kV substation. Project to be commissioned in January 1996. Click for more details...

PARKESTON POWER STATION
Private ownership Mining - Subcontracts (Electrical installation) project In The Kalgoorlie-Boulder Council Area for New development. Project to include mechanical/structural, pipework & pumps. Tender also involves some tankage & fire protection services. Click for more details...

EWINGTON 2 COAL OPERATIONS
Currently at the Construction stage In Collie is a project estimated to be $ 350000. This project Supply & delivery of equipment to new mining operations. Click for more details...

EWINGTON 2 COAL OPERATIONS
Crusher Fabrication project at For site 8 km east of, Collie, WA 6225 In The Council Area Of Collie of Private. Contract to mainly involve structural steelwork for supply & delivery of crusher facility for new coal mines. Delivery scheduled for March 1996. Click for more details...

JUNDEE - GOLD
Mine - Electrical Package - Borefield Installation New project In The Wiluna Council Area. Tender to involve generators, telemetry, switchboards & reticulation for new borefield development. Click for more details...

YABULU NICKEL REFINERY EXTENSION - MHP RECEIVAL/TREATMENT FACILITIES CONTRACT
New project of Mining - Subcontracts (Electrical installation) project at Refinery site at, Yabulu, QLD 4818. Contract package 4 involves a MHP leach area, ammonical solvent extraction area and a stripping stills and gas absorption area. This package involves construction on top of concrete, structural, mechanical, piping, electrical, instrumentation and controls for what are generally hydrometallurgical facilities. The contract involves both greenfield and brownfield work. The MHP Receival & Treatment Facilities include container storage and unloading and primary and secondary leaching facilities. The intermediate product (MHP) from Ravensthorpe will be received at Yabulu where it will be stockpiled in a weatherproof environment prior to feeding into a two stage leaching process. New material handling equipment will be constructed to process the additional MHP. Extension of the existing utilities plant will be required to provide additional power, steam and process gases. This includes a package plant for nitrogen generation by the pressure swing absorption process. Anhydrous ammonia will be imported to supplement ammonia currently produced on site. Click for more details...

RAVENSTHORPE NICKEL PROJECT - ELECTICAL INSTALLATION
Mining - Subcontracts (Electrical installation) project at Via, Ravensthorpe, WA 6346 for New. Electrical installation for an ore preperation and beneficiation plant. Click for more details...

PARKESTON POWER STATION
Private ownership Mining - Subcontracts (Electrical installation) project In The Kalgoorlie-Boulder Council Area for New development. Contract to involve erection of two gas turbine generator sets. The new 75 megawatt power station is to utilise 2 x LM6000 aero engine derivative gas turbine units. First engine scheduled for operation in January 1996 with the second unit due mid 1996. Click for more details...

BARNEY POINT COAL TERMINAL UPGRADING - STAGE 2
Mining - Subcontracts (Electrical installation) project In The Gladstone Regional Council Area of Private ownership. To include both mechanical and electrical installation. Click for more details...

NEW BENDIGO GOLD PROJECT - KANGAROO FLAT MINE - RESOURCE
Mining - Subcontracts (Electrical installation) New project at via, Bendigo, VIC 3550. This type is Operating Mine with Private ownership. The plant is currently treating low-grade ore which was stockpiled during mining operations in 2006/2007. The first ore parcel from Gill reef is planned to be processed in late June, with trial gold production ramping up during the September 2008 quarter. Click for more details...

MONTO MINERALS INDUSTRIAL MINERALS PROJECT - WET SEPERATION PLANT
Mining - Subcontracts (Electrical installation) project for New development. Wet Seperation Plant that will constructed next to the existing pilot plant. The plant will use non chemical seperation using gravity and magnetics. Plant is expected to process 142,000 tonnes in 2007 and 232,000 tonnes in 2008. Click for more details...

ALCOA OF AUSTRALIA - AREA K PROJECT
Private ownership Mining - Subcontracts (Electrical installation) project In The Kwinana Council Area for Subcontract development. This electrical subcontract package includes electrical services for the infrastructure of the tailings work. Click for more details...

ARDLETHAN TIN OPERATIONS - PREPARATION/TREATMENT EQUIPMENT SUPPLY
A project in the NSW Within Coolamon. Includes mobile preparation & treatment equipment to be located close to the excavator. Ore is placed in a stockpile & a loader working continuously will feed the ore into the feeder-hopper of the scrubber-trommel. More water will be added so that the undersize can be pumped through in-line jigs which will be located within boom of the trommel unit. Some tin concentrate will be recovered in the in-line pressure jigs. The finer tin particles will be picked up in a spiral plant. Click for more details...

MILLMERRAN POWER STATION
Private ownership Mining - Subcontracts (Electrical installation) project In The Toowoomba Regional Council Area for New development. Above ground mine infrastructure to include electrical, mechanical, sewerage & water treatment systems, storage & amenities. Contract period 14 weeks approx. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION
A project in the NT Within East Arnhem Shire. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. All new process areas will be concrete bunded with sumps installed. Stormwater drainage and utilities will be extended to all new areas and facilities. The existing sewerage treatment facility will be upgraded by the addition of separate reticulation and package sewerage plants. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

DARWIN EAST ARM WHARF - FIRE PROTECTION
Mining - Subcontracts (Electrical installation) New project at East Arm Wharf, Darwin, NT 0800. This type is Fire Protection-Design/Supply/Install/Commission Fire Fighting Equipment with Private ownership. Design, supply, install and commissioning of a fully operational wharf-based fire protection system for bulk liquid vessel loading and unloading operations. Click for more details...

LIDDELL POWER STATION - POWER SUPPLY CONTRACT
Mining - Subcontracts (Electrical installation) project for New development. The work covered by this specification consist of three items. Firstly to supply, install, terminate at both ends and commission a new three phase and neutral power supply from the 1/2 415v Ash and Dust 415v Switchboards to the remote Dump valves 415v Switchboard. Supply and install, at the Remote Dump Valves 415v Switchboard, three new isolating fuses on both power supply circuits. Supply and install cable tray and repair bund. Secondly to supply, install and terminate fibre optic cable from the 3/4 Ash and Dust Switch Room to the Remote Dump Valves switch Room. The commissioning will will be done by others. Thirdly supply and install a new telephone communication cable from the 3/4 Ash and Dust Switch Room to the Remote Dump valves Switch Room for termination by others. Click for more details...

CURRAGH NORTH COAL PROJECT - ELECTRICAL PACKAGES FOR SHUTDOWN
Mining - Subcontracts (Electrical installation) project In The Central Highlands Regional Council Area of Private ownership. The shutdown is planned for October 2005. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - PORT/AREA C - VVVF LV
Mining - Subcontracts (Electrical installation) project In The Port Hedland Council Area of Variable Voltage Variable Frequency System/ Low Voltage type. Variable Voltage Variable Frequency System - Low Voltage Click for more details...

COMALCO WEIPA OPERATIONS - SHIPLOADER
Mining - Subcontracts (Electrical installation) project for New development. Ship Loader project involves the strengthening and extending the existing Lorim Point wharf, the installation of new conveying system and ship loader machine and dredging work. Click for more details...

GLENNIES CREEK WASTE COAL MINE GAS POWER STATION
Private ownership Mining - Subcontracts (Electrical installation) project In The Singleton Council Area for New development. To construct 12 MW waste coal gas power stationcomprising a plant, a gas pipe distribution network and electrical transmission lines. The gas will be sourced from surface head wells draining the gas from an advancing longwall operation and will transported by polyethene pipe to the power station. The power station will comprise GE Jenbacher 320 spark ignition engines, gas handling systems, high voltage transformers and full automated control rooms. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - SITE WIDE POWER SYSTEMS UPGRADE
Private ownership Mining - Subcontracts (Electrical installation) project In The Mackay Regional Council Area for New development. Site wide power systems upgrade. Most of the work will be electrical installation. Click for more details...

DAVYHURST GOLD PROJECT - GOLD MILL REFURBISHMENT
Mining - Subcontracts (Electrical installation) New project at 80 Km North west of, Kalgoorlie, WA 6430. This type is Gold Mill Refurbishment with Private ownership. The 1.2 Mtpa mill was purchased from Croseus mining and remains in good condition. Work on the tanks and concrete pillars will be the focus of the work. Click for more details...

KESTREL COAL UNDERGROUND EXTENSION PROJECT - COAL HANDLING & PREPARATION PLANT UPGRADE
Mining - Subcontracts (Electrical installation) project for Addition development. Upgrade to existing coal wash plant to increase production from 1000t/h to 1400t/h. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - MOUNT WHALEBACK ELECTRICAL WORK PACKAGE 4N15
Mining - Subcontracts (Electrical installation) project at Newman Hub, Newman, WA 6753 of Electrical Work type of New development. Removal of existing 66kv & 11 kv overhead power-line. Construction of a 66 kv substation buried 66 kv cable, to supply the substation and re-establish the 66 kv and 11kv loop. 6.6kv ring will be established to link each of the switch rooms. Large motors will be 6.6 kv. Click for more details...

KING ISLAND SCHEELITE PROJECT - ELECTRICAL FOR PROCESSING FACILITY
Mining - Subcontracts (Electrical installation) New project at Near, Grassy, TAS 7256. This type is Electrical - For Processing Facility with Private ownership. For the provision of electrical installation for the processing facility. Click for more details...

MURRAY BASIN STAGE 2 - KWR MINERAL SANDS PROJECT - ELECTRICAL FOR WET CONCENTRATOR
A project in the VIC Within Mildura. For the provision of electrical works for the wet concentrator. Click for more details...

MURRAY BASIN STAGE 2 - KWR MINERAL SANDS PROJECT - ELECTRICAL FOR WHIMS BUILDING
Electrical - For Whims Building New project In The Mildura Council Area. For the provision of electrical works & instrumentation for the wet high intensity magnetic separators building. Click for more details...

MURRAY BASIN STAGE 2 - KWR MINERAL SANDS PROJECT - ELECTRICAL FOR PRECONCENTRATOR PLANT
Currently at the Planning stage In Mildura is a project estimated to be $ 1200000. This project For the provision of electrical works for the preconcentrator plant. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - EXPORT SHIPPING FACILITIES
Mining - Subcontracts (Electrical installation) project for New development. Design & construction of a 168m long jetty, loading platform & berth for vessels with capacities from 125,000cu m (285m long) up to 220,000cu m (315m long) exporting liquefied natural gas (LNG) & 20,000-80,000cu m capacity for exporting liquid petroleum gas (LPG). Contract to include the procurement, fabrication, construciton & commissioning of the structural, mechanical & electrical components of the combined Marine Facilities. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT STAGE 1 - CAR DUMPER SMP
Cape Lambert Port B (Clb) Development Stage 1 - Car Dumper Smp is currently at the Construction stage, valued at about $ 10000000 it is Structural, mechanical & piping for the screen house & car dumper. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT STAGE 1 - E & I CONTRACT
Electrical & Instrumentation project at Port Walcott 40km east of, Karratha, WA 6714 In The Council Area Of City Of Karratha of Private. Supply & installation of the electrical & instrumentation package. Click for more details...

PILBARA IRON ORE EXPANSION - ELECTRICAL & INSTRUMENTATION FRAMEWORK AGREEMENT
Mining - Subcontracts (Electrical installation) project In The Various Council Area of Electrical & Instrumentation Package type. Southern Cross Electrical Engineering with 5 year preferred electrical & instrumentation contractor status for the program to expand capacity to 333 million tonnes per annum (Mtpa). Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND - CONSTRUCT IN-SITU CONCRETE - OILY WATER & STORMWATER SUMP/POND
Both on & off, Barrow Island, WA 6712 Has Greater Gorgon Gas Project - Civils & Underground - Construct In-Situ Concrete - Oily Water & Stormwater Sump/Pond currently at Construction stage. For the construction of in-situ concrete for oily water & storm water sump/pond. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - ONSHORE LNG PLANT - ISBL ELECTRICAL & INSTRUMENTATION INSTALLATION
Isbl Electrical/Instrumentation Installation project at Vicinity of, Onslow, WA 6710 in the Mining - Subcontracts (Electrical installation). For the provision of ISBL electrical and instrumentation installation. Click for more details...

DIAMANTINA CCGT POWER STATION - ELECTRICAL PACKAGE
Mining - Subcontracts (Electrical installation) project at Diamantina Developmental Rd, Mount Isa, QLD 4825 of Electrical Package type of New development. Electrical work for the power station & ancillary buildings. Click for more details...

GREATER GORGON GAS PROJECT - MECHANICAL ELECTRICAL & INSTRUMENTATION - GROUTING SUBCONTRACT
A project in the WA Within Ashburton. For the provision of the grouting subcontract. Click for more details...

DIAMANTINA CCGT POWER STATION - ELECTRICAL & INSTRUMENTATION
A project in the QLD Within Mt Isa City. A contract involving installation, commissioning, service & maintenance of electrical instrumentation along with heating,ventilation & air conditioning (HVAC), fire protection & occupant warning systems works. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - STORAGE & FIELD ERECTED CONDENSATE TANKS - LIGHTNING PROTECTION
Mining - Subcontracts (Electrical installation) project In The Ashburton Council Area of Lightning Protection type. For the provision of lightning protection. Click for more details...

GROSVENOR COAL PROJECT - ELECTRICAL TRANSMISSION SYSTEMS
A project in the QLD Within Isaac Regional. A contract including design, engineering, testing & project commissioning for electrical transmission equipment & systems. Supply of a 66kV substation, power & distribution transformers, 15 modular pre-fabricated switchrooms equipped with medium-voltage switchgear along with low voltage motor control centres, power quality systems & multi-drive variable speed drives. Supply also of an automation system to integrate & control all processes & power systems to enhance productivity. Click for more details...

BHP BILLITON MOOKA CAR REPAIR WORKSHOP
Bhp Billiton Mooka Car Repair Workshop is currently at the Construction stage, valued at about $ 30000000 it is Contract for the construction of a maintenance workshop & warehouse. To include process equipment installation as well as rail & infrastructure components including roads, track, signalling & communications electrical engineering. Water supply. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - ELECTRICAL INSTALLATION SERVICES
Private ownership Mining - Subcontracts (Electrical installation) project In The Gladstone Regional Council Area for New development. A subcontract for electrical installation services. Click for more details...

MINING AREA C (MAC) FUEL FACILITIES EXPANSION
Concreting/Piping/Electrical project at off the Great Northern Hwy via, Newman, WA 6753 In The Council Area Of East Pilbara of Private. Expansion of existing fuel dispensing facilities including for low voltage & power house. Click for more details...

QCLNG OPERATIONS - WELL SITE CONTROLS INSTRUMENTATION & AUTOMATION
A project in the QLD Within Various. For the provision of well site controls, instrumentation & automation services. Click for more details...

BHP BILLITON NICKEL WEST MECHANICAL & ELECTRICAL SERVICES
Mining - Subcontracts (Electrical installation) project at Various mines, ., WA 6999 for New. For the provision of a three year maintenance services to cover both mechanical & electrical services across all of BHP Billiton Nickel West's operations in Western Australia. Click for more details...

AMRUN (SOUTH OF EMBLEY) BAUXITE PROJECT - EXPORT FACILITY
Mining - Subcontracts (Electrical installation) project for New development. Construction of an Export Facility, including: Jetty (nom. 270m long) & tug berths, Wharf (nom. 624m long) & dolphins, Shiploader Feed Conveyor & Navigation Aids. The scope of works includes: Shop detailing, fabrication & supply of structural steel & precast concrete roadway decking. Supply of electrical & instrumentation & controls bulks, piping, & miscellaneous mechanical equipment. Supply of construction plant & equipment including offshore craneage. Construction management services. Mobilisation & demobilisation. Transportation of plant & equipment to & from project marshalling yard in Cairns. Design, supply & installation of temporary works including: cyclone moorings & tie-downs for vessels & equipment, temporary access platforms & supports. Installation of permanent plant equipment (SMP&E), including conveyor alignment & belt-pulling & splicing. Application & repair, as necessary, of protective coatings, isolating systems, bonding connections. Provision for diving services. Compliance with environmental approval including required marine fauna observations. Noise monitoring. All validation & verification activities including testing & survey. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect