EASTERN GOLDFIELDS - NICKEL/GOLD
Mining - Subcontracts (Electrical installation) project In The Kalgoorlie-Boulder Council Area of Mines - Gas-Fired Power Stations (4) type. 4 x 40 megawatt power stations to be built to supply electricity to the Company's Mt Keith, Leinster & Kambalda nickel operations. In addition, a new power station is to be installed at the Kalgoorlie nickel smelter. Proposals will utilise gas from the Pilbara-Goldfields pipeline which is due to deliver gas July/August 1996. 200mm diameter spur lines will be constructed to the gas pipeline & a transmission line will connect Mt Keith & Leinster sites. Waste heat from the turbines is to be used at the nickel processing plants. Lateral line of 7.6 km with a 500m easement is planned for Mt Keith. Click for more details...

NIMARY - GOLD
New project of Mining - Subcontracts (Electrical installation) project at 40 km northeast of, Wiluna, WA 6646. Reinforced wall required for the run-of-mine/stockpile & crusher/feeder areas. Work to include backfill, embankments & installation of components (steelwork). 2 additional zones of mineralisation have been located close to the run-of-mine pad site (Nimsix & Nimseven). Encouraging drill results include 14m (from 31m) grading 18.93gpt gold (Nimseven). Click for more details...

GRIFFIN OIL & GAS OPERATIONS - GRIFFIN VENTURE
Mining - Subcontracts (Electrical installation) project In The Fremantle Council Area of Floating Production Vessel - Electrical & Instrumentation (Maintenance) type. Main component of contract is to provide instrumentation services for process area refit. Upgrade of some electricals & lighting also anticipated. Click for more details...

BIG BELL GOLD OPERATIONS
30 km northwest of, Cue, WA 6640 Has Big Bell Gold Operations currently at Construction stage. Contract to provide services for the 300m deep shaft. Work includes access ways, piping & electrical requirements & all associated design & fabrication work. Click for more details...

EWINGTON 2 COAL OPERATIONS
Currently at the Construction stage In Collie is a project estimated to be $ 350000. This project Supply & delivery of equipment to new mining operations. Click for more details...

EWINGTON 2 COAL OPERATIONS
Crusher Fabrication project at For site 8 km east of, Collie, WA 6225 In The Council Area Of Collie of Private. Contract to mainly involve structural steelwork for supply & delivery of crusher facility for new coal mines. Delivery scheduled for March 1996. Click for more details...

GREENBUSHES TANTALUM OPERATIONS
Mining - Subcontracts (Electrical installation) project In The Manjimup Council Area of Treatment Plant - Upgrade type. Secondary plant wet recovery circuit to be upgraded. Main components to involve mechanical, piping & electrical services. Click for more details...

YABULU NICKEL REFINERY EXTENSION - MHP RECEIVAL/TREATMENT FACILITIES CONTRACT
New project of Mining - Subcontracts (Electrical installation) project at Refinery site at, Yabulu, QLD 4818. Contract package 4 involves a MHP leach area, ammonical solvent extraction area and a stripping stills and gas absorption area. This package involves construction on top of concrete, structural, mechanical, piping, electrical, instrumentation and controls for what are generally hydrometallurgical facilities. The contract involves both greenfield and brownfield work. The MHP Receival & Treatment Facilities include container storage and unloading and primary and secondary leaching facilities. The intermediate product (MHP) from Ravensthorpe will be received at Yabulu where it will be stockpiled in a weatherproof environment prior to feeding into a two stage leaching process. New material handling equipment will be constructed to process the additional MHP. Extension of the existing utilities plant will be required to provide additional power, steam and process gases. This includes a package plant for nitrogen generation by the pressure swing absorption process. Anhydrous ammonia will be imported to supplement ammonia currently produced on site. Click for more details...

RAVENSTHORPE NICKEL PROJECT - ELECTICAL INSTALLATION
Mining - Subcontracts (Electrical installation) project at Via, Ravensthorpe, WA 6346 for New. Electrical installation for an ore preperation and beneficiation plant. Click for more details...

KANOWNA BELLE GOLD OPERATIONS
Addition project of Mining - Subcontracts (Electrical installation) project at 16 km northeast of, Kalgoorlie, WA 6430. Stage 3A is to involve a portal development & a decline from below the open pit floor (approximately 220m from surface). Mining to a depth of 360m will involve vertical haulage shaft & long-hole open stoping mining methods. The resource below 200m has been divided into two main categories. From 200m to 360m a total of 3.6mt grading 7.2gpt gold is estimated. Between 360m and 800m an inferred resource of 3.85mt at 5.5gpt gold has been estimated. Ore production is due to start in 1998 for a mine life of approximately 16 years at a rate of 1mtpa-1.25mtpa. Drilling to test mineralisation from 650m to 1,000m demonstrated encouraging widths and grades with best results including 27.5m (from 1,008m) grading 10.1gpt gold. Mining & haulage expected to utilise inhouse resources. Ore will be processed through the Joint Venture's refractory plant at Kanowna Belle. The decline is expected to extend to 760m to allow additional exploration & ore definition work to be conducted. This contract will include diamond drilling (28,000m), raise boring (1,400m) & decline (9,000m). Associated electricals to also form part of this tender. Click for more details...

KALGOORLIE NICKEL SMELTER
A project in the WA Within Kalgoorlie-Boulder. Construction of approximately 2,200 sq m of new administration buildings & a control centre required. Some refurbishment works & all associated services included in this tender. Award anticipated late October 1995. Click for more details...

PLUTONIC GOLD MINE
Currently at the Construction stage In Meekatharra is a project estimated to be $ 20000000. This project This 20 megawatt gas-fired power station is a complete turnkey contract. Project will involve a 20 km spur line, gas metering & construction of a new power station. Associated civils & electrical services are included in contract. Click for more details...

NEW BENDIGO GOLD PROJECT - KANGAROO FLAT MINE - RESOURCE
Mining - Subcontracts (Electrical installation) New project at via, Bendigo, VIC 3550. This type is Operating Mine with Private ownership. The plant is currently treating low-grade ore which was stockpiled during mining operations in 2006/2007. The first ore parcel from Gill reef is planned to be processed in late June, with trial gold production ramping up during the September 2008 quarter. Click for more details...

GRANNY SMITH GOLD OPERATIONS
Structural/Mechanical Package - Tailings Retreatment project at 20 km southeast of, Laverton, WA 6440 In The Council Area Of Laverton of Private. Supply & erect pumps, pipework, structural & mechanical packages for new retreatment facility. Tender expected to include mill installation & associated electrical services. Overall project to process carbon-in-pulp tailings through a retreatment circuit consisting of a cyclone desliming circuit. Slime overflow to go to tailings, whilst the underflow will go over a series of gravity concentrators. Resulting concentrate to then be leached (4 hours). Plant throughput of about 550tph of ore to produce 12t-15t of finer product is envisaged. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION
A project in the NT Within East Arnhem Shire. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. All new process areas will be concrete bunded with sumps installed. Stormwater drainage and utilities will be extended to all new areas and facilities. The existing sewerage treatment facility will be upgraded by the addition of separate reticulation and package sewerage plants. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

RAVENSWOOD GOLD OPERATIONS - SARSFIELD
Mining - Subcontracts (Electrical installation) project at via, Ravenswood, QLD 4816 for New. The crushing circuit from the now-closed Kidston gold mine is being relocated to Sarsfield. Click for more details...

KOGAN CREEK POWER PROJECT - ELECTRICAL INSTALLATION/WORKSHOP
South of, Brigalow, QLD 4412 Has Kogan Creek Power Project - Electrical Installation/Workshop currently at Construction stage. Erection of 1 Siemens Steam Turbine, 1 Siemens Generator THDF 125/67, Condenser, Tanks, Pumps, Compressors, Assembly of Workshop and Store, Electrical and I & C installation Click for more details...

DARWIN EAST ARM WHARF - FIRE PROTECTION
Mining - Subcontracts (Electrical installation) New project at East Arm Wharf, Darwin, NT 0800. This type is Fire Protection-Design/Supply/Install/Commission Fire Fighting Equipment with Private ownership. Design, supply, install and commissioning of a fully operational wharf-based fire protection system for bulk liquid vessel loading and unloading operations. Click for more details...

LIDDELL POWER STATION - POWER SUPPLY CONTRACT
Mining - Subcontracts (Electrical installation) project for New development. The work covered by this specification consist of three items. Firstly to supply, install, terminate at both ends and commission a new three phase and neutral power supply from the 1/2 415v Ash and Dust 415v Switchboards to the remote Dump valves 415v Switchboard. Supply and install, at the Remote Dump Valves 415v Switchboard, three new isolating fuses on both power supply circuits. Supply and install cable tray and repair bund. Secondly to supply, install and terminate fibre optic cable from the 3/4 Ash and Dust Switch Room to the Remote Dump Valves switch Room. The commissioning will will be done by others. Thirdly supply and install a new telephone communication cable from the 3/4 Ash and Dust Switch Room to the Remote Dump valves Switch Room for termination by others. Click for more details...

TANNA COAL TERMINAL - ELECTRICAL CABLES
Mining - Subcontracts (Electrical installation) project In The Gladstone Regional Council Area of State ownership. Supply and delivery of 'Electrical Cables' for works associated with the expansion at RG Tanna Coal Terminal. Click for more details...

RAVENSTHORPE NICKEL PROJECT - ELECTRICAL INSTALLATION OF WATER SYSTEM
Mining - Subcontracts (Electrical installation) project for New development. Electrical and instrumentation installation of water systems. Click for more details...

MOUNT NORMA LEACH VAT NUMBER FIVE
Mining - Subcontracts (Electrical installation) project In The Cloncurry Shire Council Area of Private ownership. Construction will comprise earthworks, lining of the vats, filters, electrical installation, crushing and loading of the vats. The vat is to contain 30,000 tonnes of high leach copper oxide. Click for more details...

IRON ORE RAPID GROWTH PROJECT 3 - AREA C - SAMPLE PREP/LAB EQUIPMENT
Private ownership Mining - Subcontracts (Electrical installation) project In The East Pilbara Council Area for New development. Supply and Insall SAMPLE PREPERATION & LABORATORY EQUIPMENT. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C/PORT - ELECTRICAL/CONTROLS
Near, Newman, WA 6753 Has Iron Ore Rapid Growth 3 Project - Area C/Port - Electrical/Controls currently at Construction stage. Area C Electrical and Controls. Click for more details...

GLENNIES CREEK WASTE COAL MINE GAS POWER STATION
Private ownership Mining - Subcontracts (Electrical installation) project In The Singleton Council Area for New development. To construct 12 MW waste coal gas power stationcomprising a plant, a gas pipe distribution network and electrical transmission lines. The gas will be sourced from surface head wells draining the gas from an advancing longwall operation and will transported by polyethene pipe to the power station. The power station will comprise GE Jenbacher 320 spark ignition engines, gas handling systems, high voltage transformers and full automated control rooms. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - SITE WIDE POWER SYSTEMS UPGRADE
Private ownership Mining - Subcontracts (Electrical installation) project In The Mackay Regional Council Area for New development. Site wide power systems upgrade. Most of the work will be electrical installation. Click for more details...

DAVYHURST GOLD PROJECT - GOLD MILL REFURBISHMENT
Mining - Subcontracts (Electrical installation) New project at 80 Km North west of, Kalgoorlie, WA 6430. This type is Gold Mill Refurbishment with Private ownership. The 1.2 Mtpa mill was purchased from Croseus mining and remains in good condition. Work on the tanks and concrete pillars will be the focus of the work. Click for more details...

CHINCHILLA COAL SEAM GAS & UNDERGROUND COAL GASIFICATION PROJECT - STAGE 2 - ELECTRICAL FOR LABORATORY
Capowie, 16 Mile Hall Rd, Hopeland via, Chinchilla, QLD 4413 Has Chinchilla Coal Seam Gas & Underground Coal Gasification Project - Stage 2 - Electrical For Laboratory currently at Construction stage. For the larger mine site laboratory. Click for more details...

KING ISLAND SCHEELITE PROJECT - ELECTRICAL FOR PROCESSING FACILITY
Mining - Subcontracts (Electrical installation) New project at Near, Grassy, TAS 7256. This type is Electrical - For Processing Facility with Private ownership. For the provision of electrical installation for the processing facility. Click for more details...

LAKE VERMONT COAL PROJECT - ELECTRICAL FOR COAL PREPARATION PLANT
Approx 15 km north east of, Dysart, QLD 4745 Has Lake Vermont Coal Project - Electrical For Coal Preparation Plant currently at Construction stage. For a 4 Mpta plant. Click for more details...

WORSLEY ALUMINA EFFICIENCY/GROWTH PROJECT - ELECTRICAL BULK MATERIALS
Worsley Alumina Efficiency/Growth Project - Electrical Bulk Materials is currently at the Tenders & Building stage, valued at about $ 500000 it is For the supply of electrical bulk materials. Click for more details...

WORSLEY ALUMINA EFFICIENCY/GROWTH PROJECT - ANNUBAR FLOW ELEMENT
Annubar Flow Element - Supply Of project at 15km Southeast of, Collie, WA 6225 In The Council Area Of Collie of Private. For the supply of a annubar flow element. Click for more details...

MURRAY BASIN STAGE 2 - KWR MINERAL SANDS PROJECT - LOW VOLTAGE - FOR MINESITE
Currently at the Planning stage In Mildura is a project estimated to be $ 1200000. This project For the provision of various low voltage installations for the minesite. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT STAGE 1 - CAR DUMPER SMP
Cape Lambert Port B (Clb) Development Stage 1 - Car Dumper Smp is currently at the Construction stage, valued at about $ 10000000 it is Structural, mechanical & piping for the screen house & car dumper. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - MINOR PRECAST CONCRETE WORKS
A project in the WA Within Ashburton. For the provision & installation of minor precast concrete works (including concrete, steel reinforcing, embedded materials, & anchor bolts where necessary). Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - CONSTRUCTION OF IN-SITU CONCRETE - MR & PR STRUCTURES
New project of Mining - Subcontracts (Electrical installation) project at Both on & off, Barrow Island, WA 6712. For the construction of reinforced concrete base & foundations, columns, table tops, pedestals & plinths that includes cast-in items, holding down blots, plates, angles, steel columns openings & box-outs for shear keys in tops of pedestals. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - SUPPLY & INSTALL HDPE LINER
Mining - Subcontracts (Electrical installation) project at Both on & off, Barrow Island, WA 6712 for New. For the supply & installation of the HDPE liner. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - MANHOLE STEEL COVERS (GATIC)
Mining - Subcontracts (Electrical installation) project at Both on & off, Barrow Island, WA 6712 of Manhole Steel Covers type of New development. For the provision of various types, classes & sizes of steel manhole metal covers & frames. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - CONSTRUCTION OF IN-SITU CONCRETE
Currently at the Construction stage In Ashburton is a project estimated to be $ 1500000. This project For the construction of in-situ concrete. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - ONSHORE LNG PLANT - ISBL ELECTRICAL & INSTRUMENTATION INSTALLATION
Isbl Electrical/Instrumentation Installation project at Vicinity of, Onslow, WA 6710 in the Mining - Subcontracts (Electrical installation). For the provision of ISBL electrical and instrumentation installation. Click for more details...

PILBARA IRON ORE EXPANSION - ELECTRICAL & INSTRUMENTATION FRAMEWORK AGREEMENT
Mining - Subcontracts (Electrical installation) project for New development. Preferred electrical & instrumentation (E & I) contractor status for 5 years in the program to expand capacity to 353 million tonnes per annum (Mtpa). To include early contractor involvement. Click for more details...

PILBARA IRON ORE EXPANSION - SMP FRAMEWORK AGREEMENT
Mining - Subcontracts (Electrical installation) project at via, Karratha, WA 6714 for New. Preferred structural, mechanical & piping (SMP) contractor status for 5 years in the program to expand capacity to 353 million tonnes per annum (Mtpa). To include early contractor involvement. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - STORAGE & FIELD ERECTED CONDENSATE TANKS - LIGHTNING PROTECTION
Mining - Subcontracts (Electrical installation) project In The Ashburton Council Area of Lightning Protection type. For the provision of lightning protection. Click for more details...

GROSVENOR COAL PROJECT - ELECTRICAL TRANSMISSION SYSTEMS
A project in the QLD Within Isaac Regional. A contract including design, engineering, testing & project commissioning for electrical transmission equipment & systems. Supply of a 66kV substation, power & distribution transformers, 15 modular pre-fabricated switchrooms equipped with medium-voltage switchgear along with low voltage motor control centres, power quality systems & multi-drive variable speed drives. Supply also of an automation system to integrate & control all processes & power systems to enhance productivity. Click for more details...

BHP BILLITON MOOKA CAR REPAIR WORKSHOP
Bhp Billiton Mooka Car Repair Workshop is currently at the Construction stage, valued at about $ 30000000 it is Contract for the construction of a maintenance workshop & warehouse. To include process equipment installation as well as rail & infrastructure components including roads, track, signalling & communications electrical engineering. Water supply. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - ELECTRICAL INSTALLATION SERVICES
Private ownership Mining - Subcontracts (Electrical installation) project In The Gladstone Regional Council Area for New development. A subcontract for electrical installation services. Click for more details...

QCLNG OPERATIONS - INSTRUMENTATION MAINTENANCE
Mining - Subcontracts (Electrical installation) New project at Bowen & Surat Basins, ., QLD 4999. This type is Instrumentation Maintenance with Private ownership. A service agreement for the provision of maintenance services for gas field instrumentation assets. Click for more details...

BHP BILLITON NICKEL WEST MECHANICAL & ELECTRICAL SERVICES
Mining - Subcontracts (Electrical installation) project at Various mines, ., WA 6999 for New. For the provision of a three year maintenance services to cover both mechanical & electrical services across all of BHP Billiton Nickel West's operations in Western Australia. Click for more details...

HAY POINT COAL TERMINAL EXPANSION - HPX3 PROJECT - ONSHORE TERMINAL UPGRADE ELECTRICAL & MECHANICAL CONTRACT & EXTENSION
Electrical/Mechanical - Contract New & Extn project at Offshore & 1175, 1395 Hay Point Rd, Hay Point, QLD 4740 in the Mining - Subcontracts (Electrical installation). For the provision of new & extended electrical & mechanical work, onshore & offshore. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - ONSHORE & INFRASTRUCTURE - PINDAN - ELECTRICAL WORKS
Mining - Subcontracts (Electrical installation) Renovations, Refurbishments etc. project at Barrarda Estate, Onslow, WA 6710. This type is Electrical Works with Private ownership. For the installation of mains cables from street to house, connection of AC & HWS for 50 modular houses. Includes excavation & backfill. Click for more details...