State

Categories

Sub Categories

Click Here to Find Current Projects

List of Electrical installation Projects


AUGUSTA/COSTERFIELD PROCESSING FACILITY
Currently at the Construction stage In Greater Bendigo is a project estimated to be $ 10000000. This project Development comprises the modification and and refurbishment of the existing Costerfield CIL plant and the construction of a new crushing/processing plant. Work comprises earthworks; contract project management, layout and design drafting for various sections of the plant; sourcing, inspecting and acquiring various items of second hand equipment; design of main and distribution switchboards, current limiting device and main switch for installation adjacent to transformer substation reserve; refurbishment of float cells, Knelson concentrators and process circuit pumps. Click for more details...

LADY ANNIE/MOUNT KELLY COPPER PROJECT - PROCESSING FACILITY
New project of Mining - Subcontracts (Electrical installation) project at Adjacent to Lady Loreta Mine 140 Km North West of, Mount Isa, QLD 4825. To construct a 1900 tpa copper SXEW plant and heap leach. Total copper recovery is expected to be 89% of the ore processed. Click for more details...

BLACKWATER/COMET CHPP PROJECT
Coal Handling & Preparation Plant project at Via, Blackwater, QLD 4717 In The Council Area Of Central Highlands Regional of Private. Comet CPP project. Raw coal and product coal areas included. The new facility will be located adjacent to the current Blackwater North preparation plant and will replace the high cost North, South and Thermal Coal Plants. Click for more details...

JUNDEE - GOLD
Private ownership Mining - Subcontracts (Electrical installation) project In The Wiluna Council Area for New development. A 10 mW plant is currently envisaged. Contract to involve all construction requirements. Supply & installation of transformers, generator sets, cables & associated equipment included in this tender. Click for more details...

NIMARY - GOLD
New project of Mining - Subcontracts (Electrical installation) project at 40 km northeast of, Wiluna, WA 6646. Reinforced wall required for the run-of-mine/stockpile & crusher/feeder areas. Work to include backfill, embankments & installation of components (steelwork). 2 additional zones of mineralisation have been located close to the run-of-mine pad site (Nimsix & Nimseven). Encouraging drill results include 14m (from 31m) grading 18.93gpt gold (Nimseven). Click for more details...

BIG BELL GOLD OPERATIONS
30 km northwest of, Cue, WA 6640 Has Big Bell Gold Operations currently at Construction stage. Contract to provide services for the 300m deep shaft. Work includes access ways, piping & electrical requirements & all associated design & fabrication work. Click for more details...

TELFER GOLD OPERATIONS
Addition project of Mining - Subcontracts (Electrical installation) project at Site operations via, Telfer, WA 6762. Airfield lighting required for new sealed airstrip extending over 200 m with a width of 30 m. Overall project includes a small terminal & a new refuelling facility. Click for more details...

PARKESTON POWER STATION
Private ownership Mining - Subcontracts (Electrical installation) project In The Kalgoorlie-Boulder Council Area for New development. Project to include mechanical/structural, pipework & pumps. Tender also involves some tankage & fire protection services. Click for more details...

MOUNT TODD GOLD MINE
Mining - Subcontracts (Electrical installation) project In The Katherine Town Council Area of Private ownership. Contract to provide a 32 megawatt gas turbine power facility for mine expansion. Click for more details...

YABULU NICKEL REFINERY EXTENSION - MHP RECEIVAL/TREATMENT FACILITIES CONTRACT
New project of Mining - Subcontracts (Electrical installation) project at Refinery site at, Yabulu, QLD 4818. Contract package 4 involves a MHP leach area, ammonical solvent extraction area and a stripping stills and gas absorption area. This package involves construction on top of concrete, structural, mechanical, piping, electrical, instrumentation and controls for what are generally hydrometallurgical facilities. The contract involves both greenfield and brownfield work. The MHP Receival & Treatment Facilities include container storage and unloading and primary and secondary leaching facilities. The intermediate product (MHP) from Ravensthorpe will be received at Yabulu where it will be stockpiled in a weatherproof environment prior to feeding into a two stage leaching process. New material handling equipment will be constructed to process the additional MHP. Extension of the existing utilities plant will be required to provide additional power, steam and process gases. This includes a package plant for nitrogen generation by the pressure swing absorption process. Anhydrous ammonia will be imported to supplement ammonia currently produced on site. Click for more details...

KALGOORLIE NICKEL SMELTER
A project in the WA Within Kalgoorlie-Boulder. Construction of approximately 2,200 sq m of new administration buildings & a control centre required. Some refurbishment works & all associated services included in this tender. Award anticipated late October 1995. Click for more details...

BARNEY POINT COAL TERMINAL UPGRADING - STAGE 2
Mining - Subcontracts (Electrical installation) project In The Gladstone Regional Council Area of Private ownership. To include both mechanical and electrical installation. Click for more details...

MONTO MINERALS INDUSTRIAL MINERALS PROJECT - WET SEPERATION PLANT
Mining - Subcontracts (Electrical installation) project for New development. Wet Seperation Plant that will constructed next to the existing pilot plant. The plant will use non chemical seperation using gravity and magnetics. Plant is expected to process 142,000 tonnes in 2007 and 232,000 tonnes in 2008. Click for more details...

OAKY CREEK COAL OPERATIONS - OAKY NO 1
Oaky creek via, Tieri, QLD 4709 Has Oaky Creek Coal Operations - Oaky No 1 currently at Construction stage. A change to thin-seam mining with the south-east extension will necessitate new longwall equipment and an upgrade of the trunk conveyor system. Trunk belt capacity is likely to be expanded from 3,500 tonnes per hour to 4,5000 tonnes per hour. Oaky Creek Coal collectively produces 7 million tonnes a year export coking coal from underground longwall operations. Expressions of Interest were sought for the services of a suitably experienced Contractor to provide the following services and works for the installation of an Underground Conveyor System: civil works; structural steel and fabrication works; installation of structure and belt; project management and supervision; electrical works. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION
A project in the NT Within East Arnhem Shire. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. All new process areas will be concrete bunded with sumps installed. Stormwater drainage and utilities will be extended to all new areas and facilities. The existing sewerage treatment facility will be upgraded by the addition of separate reticulation and package sewerage plants. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

KOGAN CREEK POWER PROJECT - ELECTRICAL INSTALLATION/WORKSHOP
South of, Brigalow, QLD 4412 Has Kogan Creek Power Project - Electrical Installation/Workshop currently at Construction stage. Erection of 1 Siemens Steam Turbine, 1 Siemens Generator THDF 125/67, Condenser, Tanks, Pumps, Compressors, Assembly of Workshop and Store, Electrical and I & C installation Click for more details...

TANNA COAL TERMINAL - ELECTRICAL CABLES
Mining - Subcontracts (Electrical installation) project In The Gladstone Regional Council Area of State ownership. Supply and delivery of 'Electrical Cables' for works associated with the expansion at RG Tanna Coal Terminal. Click for more details...

MOUNT NORMA LEACH VAT NUMBER FIVE
Mining - Subcontracts (Electrical installation) project In The Cloncurry Shire Council Area of Private ownership. Construction will comprise earthworks, lining of the vats, filters, electrical installation, crushing and loading of the vats. The vat is to contain 30,000 tonnes of high leach copper oxide. Click for more details...

MONTO MINERALS INDUSTRIAL MINERALS PROJECT - FELDSPAR WASH PLANT
Feldspar Wash Plant New project In The North Burnett Regional Council Area. Development comprises the construction of a treatment facility that will comprise a hot acid leach plant and associated equipment. The ore will be shipped from the mine to the feldspar plant at Dakiel Railroad Station where it will be loaded and sent to Gladstone and then be shipped to Brisbane. Click for more details...

MOUNT ISA MINE UNDERGROUND HIGH VOLTAGE RETICULATION SYSTEM PROJECT
Mining - Subcontracts (Electrical installation) project for New development. Electrical upgrades and installation works for the high voltage reticulation system for 2007 and 2008. Click for more details...

IRON ORE RAPID GROWTH PROJECT 3 - AREA C - SAMPLE PREP/LAB EQUIPMENT
Private ownership Mining - Subcontracts (Electrical installation) project In The East Pilbara Council Area for New development. Supply and Insall SAMPLE PREPERATION & LABORATORY EQUIPMENT. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C/PORT - ELECTRICAL/CONTROLS
Near, Newman, WA 6753 Has Iron Ore Rapid Growth 3 Project - Area C/Port - Electrical/Controls currently at Construction stage. Area C Electrical and Controls. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C - STOCKYARD MACHINES
Mining - Subcontracts (Electrical installation) project In The East Pilbara Council Area of Stockyard Machines - Upgrade type. Area C Upgrade of Stockyard Machines. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - PORT/AREA C - VVVF LV
Mining - Subcontracts (Electrical installation) project In The Port Hedland Council Area of Variable Voltage Variable Frequency System/ Low Voltage type. Variable Voltage Variable Frequency System - Low Voltage Click for more details...

COMALCO WEIPA OPERATIONS - SHIPLOADER
Mining - Subcontracts (Electrical installation) project for New development. Ship Loader project involves the strengthening and extending the existing Lorim Point wharf, the installation of new conveying system and ship loader machine and dredging work. Click for more details...

DAVYHURST GOLD PROJECT - GOLD MILL REFURBISHMENT
Mining - Subcontracts (Electrical installation) New project at 80 Km North west of, Kalgoorlie, WA 6430. This type is Gold Mill Refurbishment with Private ownership. The 1.2 Mtpa mill was purchased from Croseus mining and remains in good condition. Work on the tanks and concrete pillars will be the focus of the work. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - VSD
New project of Mining - Subcontracts (Electrical installation) project at Geraldton Port, Marine Terrace, Geraldton, WA 6530. Manufacture VSD's. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - MOUNT WHALEBACK ELECTRICAL WORK PACKAGE 4N15
Mining - Subcontracts (Electrical installation) project at Newman Hub, Newman, WA 6753 of Electrical Work type of New development. Removal of existing 66kv & 11 kv overhead power-line. Construction of a 66 kv substation buried 66 kv cable, to supply the substation and re-establish the 66 kv and 11kv loop. 6.6kv ring will be established to link each of the switch rooms. Large motors will be 6.6 kv. Click for more details...

CHINCHILLA COAL SEAM GAS & UNDERGROUND COAL GASIFICATION PROJECT - STAGE 2 - ELECTRICAL FOR LABORATORY
Capowie, 16 Mile Hall Rd, Hopeland via, Chinchilla, QLD 4413 Has Chinchilla Coal Seam Gas & Underground Coal Gasification Project - Stage 2 - Electrical For Laboratory currently at Construction stage. For the larger mine site laboratory. Click for more details...

KING ISLAND SCHEELITE PROJECT - ELECTRICAL FOR PROCESSING FACILITY
Mining - Subcontracts (Electrical installation) New project at Near, Grassy, TAS 7256. This type is Electrical - For Processing Facility with Private ownership. For the provision of electrical installation for the processing facility. Click for more details...

WORSLEY ALUMINA EFFICIENCY/GROWTH PROJECT - WEIGHING INSTRUMENTS
15km Southeast of, Collie, WA 6225 Has Worsley Alumina Efficiency/Growth Project - Weighing Instruments currently at Tenders & Building stage. For the supply of weighing instruments. Click for more details...

WORSLEY ALUMINA EFFICIENCY/GROWTH PROJECT - SWITCHYARD SUBSTATION & TRANSMISSION EQUIPMENT
Switchyard/Substation & Transmission Equipment - Supply Of New project In The Collie Council Area. For the supply of switchyard/substation and transmission equipment. Click for more details...

MURRAY BASIN STAGE 2 - KWR MINERAL SANDS PROJECT - LOW VOLTAGE - FOR MINESITE
Currently at the Planning stage In Mildura is a project estimated to be $ 1200000. This project For the provision of various low voltage installations for the minesite. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - EXPORT SHIPPING FACILITIES
Mining - Subcontracts (Electrical installation) project for New development. Design & construction of a 168m long jetty, loading platform & berth for vessels with capacities from 125,000cu m (285m long) up to 220,000cu m (315m long) exporting liquefied natural gas (LNG) & 20,000-80,000cu m capacity for exporting liquid petroleum gas (LPG). Contract to include the procurement, fabrication, construciton & commissioning of the structural, mechanical & electrical components of the combined Marine Facilities. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT STAGE 1 - E & I CONTRACT
Electrical & Instrumentation project at Port Walcott 40km east of, Karratha, WA 6714 In The Council Area Of City Of Karratha of Private. Supply & installation of the electrical & instrumentation package. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - CONSTRUCTION OF IN-SITU CONCRETE - MR & PR STRUCTURES
New project of Mining - Subcontracts (Electrical installation) project at Both on & off, Barrow Island, WA 6712. For the construction of reinforced concrete base & foundations, columns, table tops, pedestals & plinths that includes cast-in items, holding down blots, plates, angles, steel columns openings & box-outs for shear keys in tops of pedestals. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND - CONSTRUCT IN-SITU CONCRETE - OILY WATER & STORMWATER SUMP/POND
Both on & off, Barrow Island, WA 6712 Has Greater Gorgon Gas Project - Civils & Underground - Construct In-Situ Concrete - Oily Water & Stormwater Sump/Pond currently at Construction stage. For the construction of in-situ concrete for oily water & storm water sump/pond. Click for more details...

GREATER GORGON GAS PROJECT - CIVILS & UNDERGROUND SERVICES - CONSTRUCTION OF IN-SITU CONCRETE
Currently at the Construction stage In Ashburton is a project estimated to be $ 1500000. This project For the construction of in-situ concrete. Click for more details...

PILBARA ELECTRICAL INFRASTRUCTURE REPLACEMENT PROJECT
Mining - Subcontracts (Electrical installation) project at Tom Price, Paraburdoo & Channar Mines via, Dampier, WA 6713 for New. Major upgrades to electrical & control systems infrastructure at Rio Tinto Pilbara mines including Tom Price, Paraburdoo & Channar. Click for more details...

GREATER GORGON GAS PROJECT - MECHANICAL ELECTRICAL & INSTRUMENTATION - GROUTING SUBCONTRACT
A project in the WA Within Ashburton. For the provision of the grouting subcontract. Click for more details...

DIAMANTINA CCGT POWER STATION - ELECTRICAL & INSTRUMENTATION
A project in the QLD Within Mt Isa City. A contract involving installation, commissioning, service & maintenance of electrical instrumentation along with heating,ventilation & air conditioning (HVAC), fire protection & occupant warning systems works. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - STORAGE & FIELD ERECTED CONDENSATE TANKS - LIGHTING POLES & ACCESSORIES
Mining - Subcontracts (Electrical installation) project at Vicinity of, Onslow, WA 6710 of Lighting Poles/Accessories type of New development. For the provision of lighting poles & accessories. Click for more details...

GROSVENOR COAL PROJECT - ELECTRICAL TRANSMISSION SYSTEMS
A project in the QLD Within Isaac Regional. A contract including design, engineering, testing & project commissioning for electrical transmission equipment & systems. Supply of a 66kV substation, power & distribution transformers, 15 modular pre-fabricated switchrooms equipped with medium-voltage switchgear along with low voltage motor control centres, power quality systems & multi-drive variable speed drives. Supply also of an automation system to integrate & control all processes & power systems to enhance productivity. Click for more details...

LEICHHARDT CCGT POWER STATION
Private ownership Mining - Subcontracts (Electrical installation) project In The Mt Isa City Council Area for New development. EPC turnkey contract including engineering, procurement & construction of a 80MW combined cycle gas turbine (CCGT) power station to act as back up to the 240MW Diamantina Power Station currently under construction. To include design & procurement of the dual fuel Rolls Royce Trent 60 WLE gas turbine generator & associated electrical & mechanical equipment, footings, structural & drainage work, assembly & installation of the main generation unit & balance of plant. Associated cabling & switchgear, telecommunications, instrument control & switchyard connections. Commissioning & operational handover. Click for more details...

BHP BILLITON MOOKA CAR REPAIR WORKSHOP
Bhp Billiton Mooka Car Repair Workshop is currently at the Construction stage, valued at about $ 30000000 it is Contract for the construction of a maintenance workshop & warehouse. To include process equipment installation as well as rail & infrastructure components including roads, track, signalling & communications electrical engineering. Water supply. Click for more details...

MINING AREA C (MAC) FUEL FACILITIES EXPANSION
Concreting/Piping/Electrical project at off the Great Northern Hwy via, Newman, WA 6753 In The Council Area Of East Pilbara of Private. Expansion of existing fuel dispensing facilities including for low voltage & power house. Click for more details...

QCLNG OPERATIONS - INSTRUMENTATION MAINTENANCE
Mining - Subcontracts (Electrical installation) New project at Bowen & Surat Basins, ., QLD 4999. This type is Instrumentation Maintenance with Private ownership. A service agreement for the provision of maintenance services for gas field instrumentation assets. Click for more details...

BHP BILLITON NICKEL WEST MECHANICAL & ELECTRICAL SERVICES
Mining - Subcontracts (Electrical installation) project at Various mines, ., WA 6999 for New. For the provision of a three year maintenance services to cover both mechanical & electrical services across all of BHP Billiton Nickel West's operations in Western Australia. Click for more details...

HAY POINT COAL TERMINAL EXPANSION - HPX3 PROJECT - ONSHORE TERMINAL UPGRADE ELECTRICAL & MECHANICAL CONTRACT & EXTENSION
Electrical/Mechanical - Contract New & Extn project at Offshore & 1175, 1395 Hay Point Rd, Hay Point, QLD 4740 in the Mining - Subcontracts (Electrical installation). For the provision of new & extended electrical & mechanical work, onshore & offshore. Click for more details...

AMRUN (SOUTH OF EMBLEY) BAUXITE PROJECT - EXPORT FACILITY
Mining - Subcontracts (Electrical installation) project for New development. Construction of an Export Facility, including: Jetty (nom. 270m long) & tug berths, Wharf (nom. 624m long) & dolphins, Shiploader Feed Conveyor & Navigation Aids. The scope of works includes: Shop detailing, fabrication & supply of structural steel & precast concrete roadway decking. Supply of electrical & instrumentation & controls bulks, piping, & miscellaneous mechanical equipment. Supply of construction plant & equipment including offshore craneage. Construction management services. Mobilisation & demobilisation. Transportation of plant & equipment to & from project marshalling yard in Cairns. Design, supply & installation of temporary works including: cyclone moorings & tie-downs for vessels & equipment, temporary access platforms & supports. Installation of permanent plant equipment (SMP&E), including conveyor alignment & belt-pulling & splicing. Application & repair, as necessary, of protective coatings, isolating systems, bonding connections. Provision for diving services. Compliance with environmental approval including required marine fauna observations. Noise monitoring. All validation & verification activities including testing & survey. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect