State

Categories

Sub Categories

Click Here to Find Current Projects

List of Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer Projects


TAMALA PARK LANDFILL SITE
New project of Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project at Lot 17 Marmion Av, Tamala Park, WA 6030. Works comprise construction of Stage 2A (north) landfill. Stage 2A covers about 9 ha & construction is expected to be completed by February 2004. Click for more details...

ULLADULLA LANDFILL REUSE
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project In The Shoalhaven Council Area of Local Govt ownership. Proposed extraction of landfill gas from Ulladulla closed landfill, pipework. Click for more details...

BIOWISE COMPOSTING FACILITY
A project in the WA Within Kwinana. It is proposed to construct two underground storage tanks for storage of grease trap waste for incorporation into existing BioWise waste composting process. Tanks to have capacity of 16,000 l. Click for more details...

CLYDE WASTE TRANSFER TERMINAL
Private ownership Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project In The Auburn Council Area for New development. Construction & operation of a rail/road municipal waste transfer terminal & associated facilities. Municipal waste will be brought to the site by road, compacted & filled into special containers within the proposed building for transfer to rail. Click for more details...

WICKHAM WASTE TRANSFER STATION
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) New project at Pt Reserve 34631, Point Samson Roebourne Rd (former speedway site, mid-way btwn Wickham & Roebourne), Wickham, WA 6720. This type is Concrete Works For Waste Transfer Station with Local Govt ownership. Provision of concrete works for Wickham Waste Transfer Station, form supply & pour. Contract length: approximately 6 weeks. Click for more details...

TAREN POINT WASTE RECYCLING FACILITY
A project in the NSW Within Sutherland. Proposed construction of a waste recycling facility. Click for more details...

WOY WOY WASTE FACILITY
Gatehouse/Weighbridge project at Lot 1 Nagari Rd (DP654885) Woy Woy Landfill site, Woy Woy, NSW 2256 In The Council Area Of Gosford of Local Govt. Construction of gatehouse & weighbridge. The works include: construction of a 26 sq m building with masonry walls & colorbond steel roof comprising office/kitchen/toilet facilities. Construction of concrete foundations for weighbridge. Supply & installation of a 60t weighbridge together with the transfer of control systems of the existing weighbridge to the new facility. Construction of external concrete paving & ramp. Click for more details...

TAMALA PARK LANDFILL SITE
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project In The Wanneroo Council Area of State 2b Landfill type. Development of Stage 2B landfill site. Click for more details...

GREENENVIRO TECHNOLOGIES - WASTE TO ENERGY PLANT
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project for New development. It was proposed to develop 25 tpd waste to energy plant at Mungari Industrial Park. Click for more details...

RANDWICK CITY COUNCIL RECYCLING FACILITY
New project of Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project at 15 Bumborah Point Rd (former Bunnerong Power Station), Matraville, NSW 2036. Construction of a new material recycling facility at a site leased from Sydney Ports Corporation. The new facility will replace Council's existing Yarra Bay Recycling Facility & will cater for handling & processing of green waste, construction & demolition materials & asphalt profilings. The scope of work includes: access road, carpark & hardstand areas; stormwater drainage & treatment devices; swale construction; recycled water storage tank & pumping equipment; weighbridge & shaker pad; maintenance building; electrical, hydraulic & other services; fencing & gates; landscaping. Click for more details...

BUCKETTS WY TRANSFER STATION
Waste Transfer Station New project In The Greater Taree Council Area. Construction of a new waste transfer station. The works generally comprise earthworks, road works & construction of a new transfer station building. Click for more details...

MCCLELLAND DRIVE LANDFILL GAS EXTRACTION
Gas Depots project at McClelland Drive, Frankston, VIC 3199 In The Council Area Of Frankston of Local Govt. Works involve the design, installation, monitoring and operation of a landfill gas extraction and flare system at a former landfill site in McClelland Drive, Frankston. Click for more details...

REGIONAL RESOURCE RECOVERY CENTRE - CANNING VALE
Local Govt ownership Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project In The Canning Council Area for Addition development. Works comprise supply & delivery of compost screening equipment to service SMRC's waste composting facility. Following types of screens are sought for consideration: Trommel screens; vibrating screens. Waste composting facility composts 109,000 tpa of municipal solid waste & equipment will be required to pre-screen compost prior to de-stoning (30 tph) & screen de-stoner rejects (8 tph). Click for more details...

PIPELINE ROAD WASTE & COMPOSTING DEPOT
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project at Secns 149 & 153 Pipeline Rd Hund of Bower (Vol 5908 Fol 977) (24 km approx east of Robertstown) within council of Goyder, South Australia, SA 5999 for New. Establish waste depot & composting works. Click for more details...

ROTTNEST ISLAND - WASTE TRANSFER STATION
2.2km from Rottnest Island main settlement at existing ladnfill site, Rottnest Island, WA 6161 Has Rottnest Island - Waste Transfer Station currently at Tenders & Building stage. Proposed development of waste transfer station on Rottnest Island. Click for more details...

REGIONAL RESOURCE RECOVERY CENTRE - CANNING VALE
Currently at the Planning stage In Canning is a project estimated to be $ 500000. This project Works to comprise of design & construction of extension to existing steel framed Materials Recovery Facility to accommodate plant upgrade. Building extension required is approximately 12 m long x 45 m wide to existing 12 m gable height & includes concrete floor, conveyor pits & 4.8 m high push walls & metal deck. Click for more details...

CHEMSAL CHEMICAL STORAGE & WASTE FACILITY
New project of Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project at 40-48 (Lot 431) Christie St (DP854814), St Marys, NSW 2760. Construction of a waste chemical and storage facility at an existing industrial site. The resource recovery operations will involve the collection of liquid and solid waste chemicals. The proposed facility will have an annual throughput in excess of 5,000 tonnes of waste chemicals. The site currently houses a warehouse building of approx 4,000sq m, this warehouse will house the majority of the storage and treatment operations. Some construction works will be necessary at the site for the establishment of the flammable goods area comprising a processing area, storage area and tank farm. Internal layout of existing warehouse will be modified to include various storage and treatment areas these will include storage areas for packaged goods as well as above ground storage tanks. In addition, the main building will have doors installed in both the eastern & western walls, and all bunding required for storage and loading/unloading areas will be constructed. Some construction works will be necessary for the establishment of the flammable goods area comprising a processing area, storage area and tank farm. The flammable goods area will be constructed of fire rated concrete panels. Click for more details...

BALDIVIS LANDFILL FACILITY - CELL 10
New project of Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project at Millar Rd, Baldivis, WA 6171. Works to comprise of importing, placing & compacting clay for construction of liner & started embankments, placing & compacting sand layer over pvc seal to form underdrainage blanket & installation of sub-surface piping for leachate collection. Click for more details...

PLUMPTON ROAD REFUSE TRANSFER STATION & MATERIALS RECYCLING CENTRE
Private ownership Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project In The Melton Council Area for New development. Proposed construction of a refuse transfer station & materials recycling centre. Rocks etc from building sites to be crushed. Click for more details...

BUTTONDERRY WASTE MANAGEMENT FACILITY
Waste Management Facility project at 850 (Lots 153, 59 & 68) Hue Hue Rd (DP755271), Jilliby, NSW 2259 in the Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer). Construction of a new covered small vehicle transfer facility for small vehicles (loads under 2 tonnes). Widening of incoming road from Hue Hue Rd to the weighbridge. Relocation of office & staff amenities building & associated upgrade of pedestrian connection between the above components. The proposal also provides for relocation of the office & staff facilities, including the provision of a larger room for meetings or for education purposes. A new location for these facilities will be to the south west of the weighbridges. The staff & visitor carpark will be relocated from a site parallel to the incoming weighbridge to an area adjacent to the new office, visitors centre & staff amenities building. Pedestrian links between the new waste transfer facility, existing weighbridges & gatehouse, office & staff amenities & carpark will be provided for sale a& convenient pedestrian movement by staff, visitors & contractors Click for more details...

BYRNES RD LIQUID WASTE RECYCLING FACILITY
Currently at the Construction stage In Wagga Wagga is a project estimated to be $ 200000. This project Construction of a Liquid Waste Recycling Facility. Click for more details...

BALNARRING ROAD REFUSE DISPOSAL FACILITY
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project In The Mornington Peninsula Council Area of Private ownership. Staged extension of a refuse disposal facility; lining, filling and capping. Click for more details...

KATOOMBA WASTE MANAGEMENT FACILITY
Various Trade Packages New project In The Blue Mountains Council Area. Trade packages for Supply & installation of roof & wall cladding, roof plumbing & rood ventilators (C7-2009) & supply & installation of wall louvres (C8-2009) Click for more details...

YARRAWA RD MATERIALS HANDLING FACILITY
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project In The Liverpool Council Area of Private ownership. Demolition of existing buildings. Construction & operation of a waste transfer station & a materials handling facility comprising new offices/workshop, undercover stockpile bin storage & aggregate recovery processing areas. Construction of 8 covered stockpile bins & 2 open stockpile bins for storage of dry aggregates. The new offices will consist of a 2 storey building containing administration, amenities & lunch rooms. The workshop will contain 3 work bays, welding workshop, store room & compressor room. Truck service workshop to contain 3 work bays, welding workshop, storeroom & compressor room. New security office, dual driveway & drainage system. First floor office 167.40sq m, security shed 18.60sq m, workshop & storage 646.00sq m, stockpile bins 7285.00sq m, lunch room 103.00sq m, amenities 88.80sq m. Colorbond cladding, insulated wall cladding & precast concrete panel walls. Carparking for 39 vehicles. Landscaping. Click for more details...

TEA GARDENS RESOURCE RECOVERY & WASTE TRANSFER STATION
Resource Recovery/Waste Transfer Station/Subdivision project at 556 Myall Wy & 3 Carrapool Pl & Winta Rd, Tea Gardens, NSW 2324 in the Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer). Construction comprises three main elements. The first is the extension of the Tea Gardens Industrial Estate, the second is the new Waste Transfer Station, and the third is the preparation of the new works depot site. The Tea Gardens Industrial Estate involves the extension of one road (Winta Rd) & the construction of another (Transfer Rd) & the creation of 12 industrial subdivision lots (four to be constructed fully with the remaining eight to be constructed to the extent that the continued operation of the existing Council?s Works Depot is not affected). Supporting works includes, but is not limited to: construction of a large open stormwater drainage line; construction of a vacuum sewerage system; extension to the water reticulation supply; extension to the electricity supply & extension to the telecommunications network. Construction of a resource recovery & waste transfer station. The facility will involve the separation of waste into segregated areas for sale, collection for recycling or disposal on the Tuncurry landfill site. The proposed development involves clearing of native vegetation & deviation of a natural waterway. Waste intended for landfill will be compacted & placed in sealed bins. The facility will collect & separate putrescible waste from households, recyclable materials, green waste, scrap metal, construction waste, hazardous goods & medical waste. A tip shop building of 30m x 20m will be established for collection of goods suitable for resale. Reinforced concrete walls, structural steel frame & roof. Bio-retention management system, effluent management system, bitumen flush seal or asphalt to prescribed areas, perimeter fence, compact road base for roadways, parking areas, waste bins & site. Works upon the works depot site will be limited to clearing & grubbing the site; fencing the boundary & construction of utility connections to the nominated point(s). Click for more details...

ALBURY WASTE MANAGEMENT CENTRE
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project for New development. Construction of a gatehouse & awnings at the centre. Construction of an all steel superstructure, office fitout, installation & commission of building services. Click for more details...

TRANSPACIFIC CLEANAWAY LTD
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project at 191-193 Upper California Gully Rd, Eaglehawk, VIC 3556 for Renovations, Refurbishments etc.. Upgrade to existing waste treatment plant. Click for more details...

MITCHELL RESOURCE MANAGEMENT CENTRE
Transfer Station New project In The Act Council Area. Construction of a trommel & sorting station. Ancillary work to comprise construction of screen fencing, alterations to the internal traffic arrangements, erection of battery storage & paint decanting container, erection of a transportable site office & new concrete & asphalt pavements. Colorbond roof, clear vinyl sheeting with zips on openings. Click for more details...

GORDON ROAD WASTE TRANSFER STATION
A project in the WA Within Mandurah. Works to include structural steel repairs at the Gordon Road Waste Transfer Station. Click for more details...

BANNISTER ROAD RECYCLING FACILITY
Bannister Road Recycling Facility is currently at the Construction stage, valued at about $ 200000 it is Works to include addns & altns to the Recycling Facility located on Bannister Rd. Click for more details...

TULLY LANDFILL CELL 1 & 2 CAPPING STAGE 1
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project at 374 Tully Gorge Rd, Tully, QLD 4854 for New. Capping of cells 1 & 2 at Tully Landfill. To include construction of sediment basin to allow for management of storm water on site, construction of perimeter Berm, construction of leachate systems, rehabilitate work areas. Associated civil works. Click for more details...

BUTTONDERRY WASTE MANAGEMENT FACILITY
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project In The Wyong Council Area of Collection Bay - Roof type. Construction of structural steel frame & roof sheeting to collection bays at the Buttonderry Waste Management facility Click for more details...

MERU WASTE DISPOSAL FACILITY
Waste Disposal Facility/Cell 3 project at Located approx 6 km south east of, Meru, WA 6530 in the Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer). Construction of a Cell 3 at the Meru Disposal Facility. Works to include the following: Survey & setting out, mobilisation & demobilisation of all plant & equipment, payment of Building & Construction Industry Training fund Levy, supply of equipment, construction materials, labour & supervision, quality control & assurance, excavtion & backfilling of Cell 3 of the landfill, construction of Cell 3 of the landfill including all cell liners, stormwater drainage, leachate wells, leachate extraction system & stockpiling of excavated soil. Click for more details...

DOUGLAS PARK WASTE DISPOSAL FACILITY
A project in the NSW Within Wollondilly. Construction of a waste disposal facility, transport depot and new earth moving establishment, new land filling operation, new transport terminal. Click for more details...

CLEANAWAY TRANSPORT DEPOT & RESOURCE RECOVERY SYSTEM
Addition project of Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project at 11-26 Reiff St & 630 Dallinger Rd, Lavington, NSW 2641. Conversion of an existing transport depot & warehouse to a transport depot & resource recovery facility. Office administration, staff locker rooms & related amenities. Mechanic's workshop & store rooms. Material recovery facility, garbage truck parking area, garbage truck refuelling station, truck weighbridge, truck wash bay & visitor & staff car parking areas. Click for more details...

BUNDABERG REGIONAL COUNCIL WASTE FACILITY QUNABA WEIGHBRIDGE - STAGE 1
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project In The Bundaberg Regional Council Area of Local Govt ownership. Construction of a weighbridge at the Waste Facility in Qunaba. New access driveway, weighbridge & gatehouse. Weighbridge 60t x 20kg capacity & graduation. reinforced concrete infill weighbridge deck. Fully hot dipped galvanised steel. 6 x 25t CAS WBK load cells. 1 x rinstrum R420-K401 indicator. Eliminator power conditioner. 20m x 3.5m above ground weighbridge foundations with 1m flat & level approaches. Temporary recyclable sales & resource recovery areas. Compacted gravel hardstand. Click for more details...

FIVE ISLANDS RD CYLINDER FILLING & DISTRIBUTION FACILITY
Currently at the Construction stage In Wollongong is a project estimated to be $ 250000. This project Construction of a LPG and cylinder storage distribution facility. Demountable style office building, WC and stairs, loading dock, truck parking bays, cylinder storage bays. Associated carparking and landscaping. Click for more details...

PERISHER VALLEY WASTE TRANSFER STATION
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project at within Kosciuszko National Park, Perisher Valley, NSW 2624 of Waste Transfer Station - Mechanical Ventilation type of New development. Design & construction of mechanical ventilation systems in the waste transfer station Perisher Valley. They include vehicle exhaust from the loading dock areas, ventilation system for new workshop & store area in sub floor & air makeup Click for more details...

STAPYLTON & REEDY CREEK LANDFILLS
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project In The Gold Coast City Council Area of Liner Container Systems For Landfills type. Construction of landfill liner containment systems at Stapylton & Reedy Creek Landfills. Stapylton works include bulk earthworks & subgrade preparation, bund construction. Supply & installation of Geosynthetics materials, HDPE geomembrane & leachate collection pipeworks. Installation of gravel drainage layer & separation geotextile. Reedy Creek works include anchor trench construction & backfill. Supply & installation of Cell 2 geosynthetic materials, HDPE geomembrane, cushion geotextile, leachate drainage gravel. Associated civil works. Click for more details...

NORTH BURNETT COUNCIL DISASTER CO-ORDINATION CENTRE
Disaster Centre New project In The North Burnett Regional Council Area. Construction of a Disaster Management Co-ordination Centre & the design & construction of a Storage/Dispensing Facility for aviation fuel. Click for more details...

BROU & MORUYA WASTE MANAGEMENT FACILITIES
A project in the NSW Within Eurobodalla. Improvements to both Brou Waste Management facility & Moruya Waste management Facility off Yarragee Rd at Moruya. Scope of work at Brou includes: clearing & grubbing of site area, foundation stripping, excavation & preparation, excavations required for haul roads, cut slopes, additional landfill capacity & obtaining suitable earthfill, construction of slope stabilisation, cell floor, geotextile layer, HDPE liner, leachate management & draining layer & surface water control. Scope of work at Moruya includes: Haul roads, high tension electrical protection works, foundation stripping, excavation & preparation, earthworks & compaction, spreading & seeding of topsoil, revegetation, landscaping & re-grading works. Click for more details...

MACLACHLAN AV WASTE MANAGEMENT FACILITY
Waste Management Facility project at 10 (Lot 5) McLachlan Av (DP25667), Artarmon, NSW 2064 in the Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer). Demolition of the existing structures. Construction of a materials recovery and waste transfer facility and associated works, which would be capable of processing/transferring up to 60,000 tonnes per annum of target inert wastes being mainly general solid (non-putrescible) dry waste generated from construction and demolition activities, as well as wastes generated from commercial and industrial premises. The main building complex will include a receiving, sorting and transfer area,office, amenities and lunch room will be located at the eastern portion of the site. The proposal will include an incoming weighbridge and associated office facilities within the building. Masonry walls, prefinished metal wall cladding, prefinished metal roof sheeting. Undercroft carparking for 12 vehicles & located within the building adjacent to the office administration building & 5 additional spaces. Landscaping. Click for more details...

SEBASTOPOL DEPOT DANGEROUS GOODS & HAZARDOUS SUBSTANCES STORAGE & HANDLING FACILITY
Sebastopol Depot Dangerous Goods & Hazardous Substances Storage & Handling Facility is currently at the Construction stage, valued at about $ 500000 it is Construction services of a Dangerous Goods & Hazardous Substances storage & handling facilities at the Department of Environment, Land, Water & Planning Sebastopol Office/Depot. Click for more details...

LEETON LANDFILL & RECYCLING DEPOT
Leeton Landfill & Recycling Depot is currently at the Construction stage, valued at about $ 110000 it is Construct a waste disposal trench at Leeton Landfill & Recycling Depot Click for more details...

OMEO TRANSFER STATION UPGRADE
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project In The East Gippsland Council Area of Local Govt ownership. Omeo transfer station upgrade. Click for more details...

ST MARYS WASTE MANAGEMENT & RECYCLING FACILITY
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project at 25 Dunheved Cct, St Marys, NSW 2760 of Waste Management & Recycling Facility type of Renovations, Refurbishments etc. development. Alterations & additions to an existing waste management and recycling facility including: demolition of an existing shed & amenities/office building. Construction of a new concrete tilt panel & metal clad shed & a new amenities building. Installation of two (2) weighbridges at the entry/exit of the shed. Filling an existing pit within the central portion of the site. Removal of 7 trees. Click for more details...

BUSSELTON WASTE FACILITY TRANSFER STATION
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project In The Busselton Council Area of Local Govt ownership. Works to include the construction of a new Transfer Station at Busselton Waste Facility & will comprise of community recycling drop-off area including a hardstand recycling area, light & heavy vehicle multi-tired drop-off area for putrescible waste including 3 covered bays for general public use & 2 bays for the use of City's kerbside waste collection trucks, stormwater drainage, road access infrastructure & associated services & works. Click for more details...

CO-OPERATIVE STORAGE HANDLING COMPOUND
Storage Compound project at 7059 (Lot 11) Kulin-Lake Grace Road, Lake Grace, WA 6353 in the Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer). Construction of dangerous goods storage compound at a grain handling storage facility. Click for more details...

MACKAY TERMINAL
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project for New development. Proposed construction of storage & handling facility to comprise storage area for bulk liquid petroleum gas & road tankers, workshop area, office, filling, dispatching & refurbishing station for road tankers & liquid petroleum gas cylinders. Car parking for 15 vehicles. Associated landscaping. Click for more details...

BEDFORD STREET LANDFILL VERTICAL EXPANSION
Local Govt ownership Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project In The Toowoomba Regional Council Area for New development. Bedford Street Landfill vertical expansion. To include construction of sediment basin & bio-retention basin, drainage works, erosion & sediment control, diversion of drain to new alignment, installation of full liner & associated civil & construction works. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect