State

Categories

Sub Categories

Click Here to Find Current Projects

List of Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer Projects


ULLADULLA LANDFILL REUSE
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project In The Shoalhaven Council Area of Local Govt ownership. Proposed extraction of landfill gas from Ulladulla closed landfill, pipework. Click for more details...

BIOWISE COMPOSTING FACILITY
A project in the WA Within Kwinana. It is proposed to construct two underground storage tanks for storage of grease trap waste for incorporation into existing BioWise waste composting process. Tanks to have capacity of 16,000 l. Click for more details...

TAREN POINT WASTE RECYCLING FACILITY
A project in the NSW Within Sutherland. Proposed construction of a waste recycling facility. Click for more details...

LEAKES ROAD RECYCLING PLANT
Currently at the Planning stage In Melton is a project estimated to be $ 150000. This project Proposed new recycling plant. Click for more details...

GREENENVIRO TECHNOLOGIES - WASTE TO ENERGY PLANT
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project for New development. It was proposed to develop 25 tpd waste to energy plant at Mungari Industrial Park. Click for more details...

CLEANAWAY WASTE TREATMENT FACILITY
Waste Treatment Facility New project In The Canning Council Area. It is proposed to sub-lease portion of Patricks Logistics site (classified as Major Hazardous Facility) to develop waste treatment facility that will handle 1,000 to 1,500 tpa of packaged hazardous waste. Click for more details...

REGIONAL RESOURCE RECOVERY CENTRE - CANNING VALE
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project In The Canning Council Area of Structural Works For Recycling Centre type. Design & construct structural works for waste receival & in-vessel composting facility as part of State-Of-The-Art treatment plant for conversion of most household waste into marketable products. Click for more details...

MOORE ST RECYCLABLE MATERIAL SORTING FACILITY
Currently at the Planning stage In Botany is a project estimated to be $ 5000000. This project Construction & operation of a recyclable materials sorting facility which will process up to 230,000 tonnes per annum of dry recyclable materials such as paper,cardboard, glass, plastic, aluminium & steel collected from the community in eastern & southern Sydney. Construction & operation of a separate paper sorting facility, construction of 2 weighbridges & all necessary infrastructure & modification & extension of an existing building into offices & a community education centre. Click for more details...

BELMONT BUS DEPOT
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) New project at 2 Floraville Rd, Belmont, NSW 2280. This type is Fuel Storage Tank with State ownership. Decommission & removal of existing diesel fuel storage tanks & installation of a new 70,000 litre selfbunded above ground diesel fuel storage tank including pipework & pumps to the existing fuel system at Belmont Bus Depot. Click for more details...

JUBILEE AVE WASTE HANDLING & RECYCLING DEPOT
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project In The Pittwater Council Area of Private ownership. Construction of waste handling & recycling facility including recycling shed, office building & bin storage area. Click for more details...

HENDERSON LANDFILL SITE - CELL 6
New project of Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project at Rockingham Rd, Henderson, WA 6166. Works to comprise of design of Cell 6, at Henderson Landfill Site. Click for more details...

BOTANY INDUSTRIAL PARK HCB STORAGE FACILITIES
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project at 16-20 (Lot 11) Beauchamp Rd (DP1039919), Matraville, NSW 2036 for Addition. Expansion & consolidation of hexachlorobenzene (HCB) storage facilities at Botany Industrial Park. Orica has an ongoing annual program of repackaging any deteriorating drums of HCB into new drums. This process generates waste in the form of crushed drums, crushed pallets and Personal Protective Equipment (PPE). Orica proposes to automate the re-drumming process and provide additional storage facilities. The project consists of the following components: construction of new store J in a new warehouse near the north-western perimeter; construction & operation of 2 re-drumming lines; and construction & operation of a shredding line. Construction materials for store will be reinforced concrete slab floor, steel frame, steel wall sheeting & galvanised steel sheeting roof. The new warehouse will be approx 21m wide & 70m long and will be divided into 2 main sections: the north end will be dedicated to the HCB re-packing plant equipment. This operational area is to be partitioned from the rest of the warehouse. The south end is to be used for storage of drums. This section is known as Store J and is sized to store 4 shipping containers. The 2 ends of the warehouse will be separated by a solid wall. Click for more details...

BUSSELTON WASTEWATER VACUUM PUMPING STATION - NO 19
Pumping Station - Construction - Concrete Sub-Structure New project In The Busselton Council Area. Works to comprise of construction of concrete sub-structure for Busselton Wastewater Vacuum Pumping Station No 19. Pumping station is 12 m x 19 m brick with steel framework building with half of floor 4 m below ground level with concrete floor & walls, located near corner of Glenleigh & Seagrott Rds, Busselton. Click for more details...

MACARTHUR RESOURCE RECOVERY PARK - JACKS GULLY WASTE RECYCLING CENTRE
Currently at the Construction stage In Camden is a project estimated to be $ 50000000. This project The proposal is for the construction of an alternative waste technology facility at the Jacks Gully Recycling Centre to receive, treat and manage municipal waste. The proposal will include: a facility to process up to 90,000 tonnes per annum (tpa) of municipal solid waste known as the ArrowBio plant; a facility to process up to 30,000 tpa of separated organic waste known as the Garden Organics Plant; 2 electricity generators generating 2MW of green electricity for export to the grid; roadworks and paving; associated administrative buildings; and landscaping. Click for more details...

BALDIVIS LANDFILL FACILITY - CELL 10
New project of Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project at Millar Rd, Baldivis, WA 6171. Works to comprise of importing, placing & compacting clay for construction of liner & started embankments, placing & compacting sand layer over pvc seal to form underdrainage blanket & installation of sub-surface piping for leachate collection. Click for more details...

LIGHT HORSE BUSINESS CENTRE
Light Horse Business Centre is currently at the Construction stage, valued at about $ 14000000 it is Construction & operation of a Resource Recovery Facility & a general solid waste (non putrescible) landfill facility including a Material Processing Centre & Waste Transfer Station, designed to facilitate the re-use & rehabilitation of the former Pioneer quarry void to enable the land to be developed for future employment uses. The project will have the capacity to receive up to 2 million tonnes of waste per annum, including inert & solid wastes from construction & demolition, commercial & industrial & green waste clean up; on site waste processing including sorting, screening, sieving, crushing, grinding & composting of green waste; recycling an estimated 50-80% of incoming waste; testing & on site storage/stockpiling of finished products prior to resale; transport of incoming waste to landfill; quarantine & transfer of unacceptable wastes to off-site facility; construction of associated infrastructure, plant & equipment, including upgrade of internal road network & reshaping of earthen amenity berms. Construction of a 2 storey admin facility of 630sq m with ground floor amenities & first floor canteen meeting room, 2 offices, storage & amenities, & a single storey workshop of 1368sq m containing spray booth, fabrication shop, service bay, office & store. Carparking. Click for more details...

WOODLAWN MECHANICAL BIOLOGICAL TREATMENT FACILITY (MBT)
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project at Lots 33-34, 69 & 97, Lot 4 Collector Rd (DP754919, DP830765), Tarago, NSW 2580 of Mechanical Biological Treatment Facility type of New development. Construction of an Mechanical Biologial treatment facility at the Woodlawn Eco-Precinct. Scope of work includes: civil & infrastructure. Major buildings. Site services. Click for more details...

TRADE PLACE RECYCLING DEPOT
Recycling Depot project at 58 Trade Place, Coburg North, VIC 3058 in the Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer). Development and use of the land for the purpose of materials recycling including reduction in car parking. Click for more details...

RED HILL WASTE MANAGEMENT FACILITY LEACHATE POND
Renovations, Refurbishments etc. project of Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project at 1094 Toodyay Rd, Gidgegannup, WA 6083. Works to comprise of remedial works for Class III & Class IV Leachate Pond at Red Hill Waste Management Facility. Click for more details...

BUNGENDORE RESOURCE RECOVERY CENTRE & WASTE TRANSFER STATION
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project for New development. Proposed construction of a Resource Recovery Centre & waste transfer station. The proposed facility will handle up to 9,000m³ of material per year within 10 years & 10,500m³ per year within 20 years. The development will consist of a 240sq m used goods shed; 360sq m shed for materials recovery & recycling; 600sq m shed for waste transfer area shelter & associated carparking for 9 cars; 96sq m plant shed; gatehouse; staff amenities; after hours recycling area & associate carparking for 7 cars; 3 outdoor storage areas with gravel base for green waste, scrap steel & builders waste; drum muster & tyres bin; dead animal pit & staff amenities. Click for more details...

KATOOMBA WASTE MANAGEMENT FACILITY
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project for New development. Trade package for the supply & erection of structural steel. Click for more details...

NUDGEE ROAD RECYCLING VENTING SYSTEM
Venting Systems - For Recycling Plant project at Nudgee Rd, Nudgee, QLD 4014 in the Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer). Supply and Installation of five (5) methane gas passive venting systems. Click for more details...

MURRAY VALLEY HIGHWAY REFUSE TRANSFER STATION
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project In The Campaspe Council Area of State ownership. Buildings, works and use of the land for a refuse transfer station, Murray Valley Highway near O'Dwyer Road, Torrumbarry. Click for more details...

TERMINALS PTY LTD
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project at 40 Wharf Rd, Corio, VIC 3214 for New. Construction of a bulk liquid storage tank for aviation fuel (Avgas). The site is ideally situated to receive and store Avgas because of existing dedicated pipelines, tanker loading gantry and other infrastructure. Terminals is proposing to build a 5000 cubic metre internal floating roof storage tank. Click for more details...

WHYTES GULLY TRANSFER STATION
Waste Transfer Facility project at Whytes Gully Tip, 133 (Lot 2) Reddalls Rd (DP240557), Kembla Grange, NSW 2526 In The Council Area Of Wollongong of Local Govt. Construction of a small vehicle waste transfer facility to replace existing public waste drop off within the Whites Gully landfill for public drop off and sorting. Revolve centre comprises a hardstand area and 3 shelters to be constructed from two second hand shipping containers, a pre fabricated arc roof with pvc covering, pvc backing and a rubber tile floor, recyclable area and a waste transfer station. 1.8m high chain wire security fence. Click for more details...

TERMINALS PTY LTD
Currently at the Planning stage In Greater Geelong is a project estimated to be $ 13000000. This project Construction of bulk storage liquid tanks. Click for more details...

TAMALA PARK WASTE DISPOSAL FACILITY
Capping Works - Stage 2 - Phase 1 - Section 2 project at Off Marmion Av, Tamala Park, WA 6030 in the Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer). Works to include construction of capping works for stage 2, phase 1, section 2, landfill at Tamala Park. Click for more details...

WARRAGAMBA WASTE MANAGEMENT FACILITY
9 Production Av, Warragamba, NSW 2752 Has Warragamba Waste Management Facility currently at Construction stage. Remediation & closure works for Warragamba Landfill. Scope of work includes:earthworks to reshape batters & establish the design profile. Leachate toe drainage. Landfill gas drainage. Capping layers. Stormwater drainage, access roads, fencing & completion works Click for more details...

MORNINGTON PENINSULA SHIRE/LANDFILL FACILITY
A project in the VIC Within Mornington Peninsula. Provision of a landfill facility to receive and dispose of solid inert municipal waste. Click for more details...

EXETER WASTE TRANSFER STATION
Waste Transfer Station - Upgrade And Improvements project at Biloo St, Exeter, TAS 7275 In The Council Area Of West Tamar of Local Govt. Ugrade and improvements to the Exeter Waste Transfer Station located at the end of Biloo Street. Work involves the supply and installation of 6 precast concrete panels, poured insitu concrete top and bottom slab and associated pipe works. Click for more details...

KEW WASTE TRANSFER STATION
Waste Transfer Station New project In The Port Macquarie-Hastings Council Area. Construction of the Kew Waste Transfer Station. Scope of work include: construction of a waste transfer station (WTS) & associated road upgrades of approximately 450 m of Herons Creek Rd from immediately east of the central portion of the WTS site and traversing south. Click for more details...

MAIDA AVENUE MATERIALS RECYCLING FACILITY
Maida Avenue Materials Recycling Facility is currently at the Construction stage, valued at about $ 490000 it is Construction of a materials recycling depot. Click for more details...

LARA WAY MATERIALS RECYCLING FACILITY
A project in the VIC Within Hume. Construction of a materials recycling facility. Click for more details...

WESTWOOD DRIVE MATERIALS RECYCLING FACILITY
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project for New development. Construction of a materials recycling (scrap metals) facility. Click for more details...

WILSON STREET WASTE TREATMENT FACILITY
Private ownership Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project In The Port Hedland Council Area for New development. May include the construction of a waste treatment facility to include a shed approx 363sqm, an office approx 180sqm, 11 car parking bays, reticulated landscaping. Click for more details...

BIRKDALE WASTE TRANSFER STATION LANDFILL REHABILITATION WORKS
Birkdale Waste Transfer Station Landfill Rehabilitation Works is currently at the Construction stage, valued at about $ 5363000 it is Landfill Rehabilitation Works at the Birkdale Waste Transfer Station. Works to include mobilisation & demobilisation, surface water management system construction outside landfill area, leachate management system, landfill cap construction, construction of haul road & hard stand on landfill plateau. Click for more details...

SEBASTOPOL DEPOT DANGEROUS GOODS & HAZARDOUS SUBSTANCES STORAGE & HANDLING FACILITY
Sebastopol Depot Dangerous Goods & Hazardous Substances Storage & Handling Facility is currently at the Construction stage, valued at about $ 500000 it is Construction services of a Dangerous Goods & Hazardous Substances storage & handling facilities at the Department of Environment, Land, Water & Planning Sebastopol Office/Depot. Click for more details...

RESOURCE RECOVERY PARK STAGE 3
Resource Recovery Park Stage 3 is currently at the Construction stage, valued at about $ 250000 it is Concrete bunkers & storage facility. Click for more details...

SHOALHAVEN CITY COUNCIL COMMUNITY RECYCLING CENTRES
New project of Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project at various locations in the Shoalhaven City Council area, Nowra, NSW 2541. Design, approval & construction of 10 new Community Recycling Centres (CRC). Scope of work includes: The West Nowra facility shall be 20m x 6m with a height similar to the adjacent shed (approximately 4.5m); the structure shall be supported by central columns to allow access from both sides, with a 20m x 6m concrete slab designed to withstand wheel loads of a maximum of five tons; the slab should be level with the existing bitumen seal. The nine CRC facilities shall be 8m x 3m & be 3.5m high with a skillion roof; they shall have 3 galvanised 150mm diameter bollards installed to protect the structural columns. Some will be constructed on gravel hardstand with the remainder being constructed on existing bitumen. All structural members are to be hot dipped galvanised. The sites are West Nowra, Huskisson, Ulladulla, Sussex Inlet, Lake Cojola, Bendalong, Berry, Callala, Kangaroo Valley & Kioloa Click for more details...

MELTON CITY WASTE TRANSFER STATION RE-SALE CENTRE EXPANSION
Currently at the Construction stage In Melton is a project estimated to be $ 400000. This project Redevelopment of the Re-Sale Centre within the City of Melton?s Waste Transfer Station. Description of works, to redevelop the Re-Sale Centre, comprising of demolition of some of the existing building & building of an extension to cater for increased through-put of recycled goods. Improve the traffic management of the facility with new surfaced designated parking areas. Click for more details...

CASTLEMAINE WASTE FACILITY LEACHATE DRAINAGE WORKS
Leachate Drainage Works project at Sluicers Rd, Castlemaine, VIC 3450 In The Council Area Of Mount Alexander of Local Govt. The investigation & repair (if required) of the existing leachate collection system & construction of a new sump connection at the Castlemaine Waste Facility. Click for more details...

DUNSBOROUGH WASTE FACILITY - LANDFILL CELL 1
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project for New development. Works to include the construction of Landfill Cell 1 at the Dunsborough Waste Facility to comprise of: associated leachate drainage to be installed & treatment infrastructure. Click for more details...

MORANBAH RESOURCE RECOVERY CENTRE
Thorpe St & 289 Goonyella Rd (Lot 24), Moranbah, QLD 4744 Has Moranbah Resource Recovery Centre currently at Construction stage. Moranbah Resource Recovery Centre upgrade. To include design & construction of a new landfill cell, storm water system, leachate pond, & groundwater system. Construction of a new 6 bay sawtooth configured Refuse Transfer Station with loading ramp, road surfaces, chemical storage facility, bitumen truck stop area, segregated wastes reception bins & surveillance monitoring system. Associated civil & construction works. Click for more details...

JINDABYNE LANDFILL
6013 Kosciuszko Rd, East Jindabyne, NSW 2627 Has Jindabyne Landfill currently at Construction stage. Scope of work includes: capping of first lift & upgrade of leachate system, access roads & stormwater drainage. Click for more details...

CO-OPERATIVE STORAGE HANDLING COMPOUND
Storage Compound project at 7059 (Lot 11) Kulin-Lake Grace Road, Lake Grace, WA 6353 in the Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer). Construction of dangerous goods storage compound at a grain handling storage facility. Click for more details...

ALBURY WASTE MANAGEMENT CENTRE
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project In The Albury Council Area of Local Govt ownership. Construction of a push pit concrete structure & associated ground slabs including the design of a piped leachate drainage system from the compaction bunker to a holding tank. Structural design of the push pit steel structure including cladding details & roof drainage system to 2 interconnected tanks with provision for overflow to the nearby watercourse. The geometric civil design of the access roads & manoeuvring areas, including kerb & gutter alignment, associated with the push pit between the Green Waste Area & roundabout. Click for more details...

CORANGAMITE REGIONAL LANFILL EARTHWORKS
Earthworks project at County Boundary Rd, Naroghid, Camperdown, VIC 3260 In The Council Area Of Corangamite of Local Govt. Earthworks at the Corangamite Regional Landfill. Works include, Scrapers for the bulk excavation & placement of material. Compaction & roller plant for compaction of clay material in accordance with design requirements. Water carts & other associated plant for moisture conditioning of clay & maintenance of haul roads. Bulldozers with GPS for trimming to design levels & grades. Portable GPS survey equipment to check design levels & grades. Click for more details...

LITHGOW SOLID WASTE FACILITY
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project for New development. Excavation & construction of a storm water diversion drain at the Lithgow Solid Waste Facility. Scope of work involves: the excavation & construction of approximately 880 metres of embankment for around the southern & eastern side of the landfill. Two separate drains are proposed for construction, each measuring 4 metres wide at the base involving the removal of approximately 16,000 m3 of material to be stockpiled onsite. Click for more details...

COWES WASTE WATER TREATMENT PLANT PLC UPGRADE
New project of Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project at Cowes, Cowes, VIC 3922. Supply, installation, programming testing & commissioning of a Schneider Electric Modern PLC which is the main control PLC to the CWWTP. Click for more details...

BUNDABERG REGIONAL LANDFILL CELL THREE
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project In The Bundaberg Regional Council Area of Landfill type. Construction of a third cell at the Bundaberg Regional Landfill Facility. Scope of works includes: Installation of geosynthetic clay liner, HDPE liner, protective geotextile fabric, leachate drainage aggregate, separation geotextile, geonet and stormwater drainage. Construction of cell leachate diversion bunds and anchor trenches. General earthworks. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect