State

Categories

Sub Categories

Click Here to Find Current Projects

List of Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer Projects in NSW


WOY WOY WASTE FACILITY
Gatehouse/Weighbridge project at Lot 1 Nagari Rd (DP654885) Woy Woy Landfill site, Woy Woy, NSW 2256 In The Council Area Of Gosford of Local Govt. Construction of gatehouse & weighbridge. The works include: construction of a 26 sq m building with masonry walls & colorbond steel roof comprising office/kitchen/toilet facilities. Construction of concrete foundations for weighbridge. Supply & installation of a 60t weighbridge together with the transfer of control systems of the existing weighbridge to the new facility. Construction of external concrete paving & ramp. Click for more details...

MINTO WASTE TRANSFER FACILITY
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project for New development. (Lot 101; DP3852) Construction of waste transfer facility for storage of scrap metal. Associated carparking for 15 vehicles. Click for more details...

BROU LAKE LANDFILL SITE
Local Govt ownership Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project In The Eurobodalla Council Area for New development. Design & construction of waste cell & leachate dam. The work will include the detailed design of dams, waste cells, stormwater drains & leachate pipes as well as cell construction. Click for more details...

WASTE MANAGEMENT FACILITY
Waste Management Facility - Addns project at 43 (Lot 123) Bay Rd (DP815747), Taren Point, NSW 2229 In The Council Area Of Sutherland of Private. Proposed expansion of an existing waste management facility. Click for more details...

BANKSTOWN-CANTERBURY WASTE MANAGEMENT CENTRE
Bankstown-Canterbury Waste Management Centre is currently at the Construction stage, valued at about $ 3000000 it is Transfer station, recycling & green waste processing facility. Landscaping, retaining wall, road, bridge, ramps & 13 carparking spaces, gatehouse, 2 weighbridges. Click for more details...

VISY RECYCLING CENTRE
Recycling Facility project at 32 South St, Rydalmere, NSW 2116 In The Council Area Of Parramatta of Private. Construction of a material recycling facility of domestic waste. Click for more details...

BUCKETTS WY TRANSFER STATION
Waste Transfer Station New project In The Greater Taree Council Area. Construction of a new waste transfer station. The works generally comprise earthworks, road works & construction of a new transfer station building. Click for more details...

CAIRNCROSS WASTE MANAGEMENT FACILITY
Local Govt ownership Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project In The Port Macquarie-Hastings Council Area for New development. Establishment of a waste management facility incorporating a solid waste landfill & extractive industry. Construction of: 2.1 kilometre access road; initial landfill placement area; ancillary site infrastructure; buildings. Click for more details...

MT VINCENT ROAD WASTE DEPOT
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project In The Maitland Council Area of Local Govt ownership. Construction of 400 m x 16 m wide clay cap. Click for more details...

AWABA WASTE MANAGEMENT CENTRE
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) Supply & Install project at Wilton Rd, Awaba, NSW 2283. This type is Gas Monitoring Wells with Local Govt ownership. Construction of 7 subsurface gas monitoring wells on site. Extraction & management of gas. Click for more details...

BOC GASES
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) New project at 428-440 Victoria Rd (lot 2 DP203580), Wetherill Park, NSW 2164. This type is Bulk Liquid Gas Facility with Private ownership. Installation of a bulk liquid ammonium nitrate facility within an existing nitrous oxide production plant. Click for more details...

DRIVE-THRU RECYCLING CENTRE
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project at Great Western Hwy & Reserve Rd, Werrington, NSW 2747 for New. Construction of a facility for items collected during council clean-ups, furniture, whitegoods, hazardous household goods etc for despatch to re-use, fencing, landscaping, construction of 2.5 metre high acoustic barrier, car parking, roadworks, kerb & guttering, drainage. Click for more details...

MOORE ST RECYCLABLE MATERIAL SORTING FACILITY
Currently at the Planning stage In Botany is a project estimated to be $ 5000000. This project Construction & operation of a recyclable materials sorting facility which will process up to 230,000 tonnes per annum of dry recyclable materials such as paper,cardboard, glass, plastic, aluminium & steel collected from the community in eastern & southern Sydney. Construction & operation of a separate paper sorting facility, construction of 2 weighbridges & all necessary infrastructure & modification & extension of an existing building into offices & a community education centre. Click for more details...

BELMONT BUS DEPOT
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) New project at 2 Floraville Rd, Belmont, NSW 2280. This type is Fuel Storage Tank with State ownership. Decommission & removal of existing diesel fuel storage tanks & installation of a new 70,000 litre selfbunded above ground diesel fuel storage tank including pipework & pumps to the existing fuel system at Belmont Bus Depot. Click for more details...

LITHGOW WASTE FACILITY
Waste Facility New project In The Lithgow Council Area. Proposal encompasses landfilling of solid & inert waste for the City Of Lithgow. Storage & transfer of recyclable materials & construction of associated facilities. Click for more details...

NORTH BOAMBEE VALLEY WASTE PROCESSING FACILITY
Waste Processing Faciliy project at 31 Englands Rd, North Boambee Valley, NSW 2450 in the Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer). Construction of a composting & waste processing facility. Click for more details...

WASTE OIL TANK FARM & PRE-TREATMENT FACILITY
Tank Farm/Pretreatment Facility project at not yet detemined, Bomen, NSW 2650 In The Council Area Of Wagga Wagga of Private. Construction of a facility to store & initially treat used lubrication oil, prior to the oil being refined at the facility on the existing site. The wasted oil tank farm will be located at the rear of the existing refinery & tank farm & is expected to occupy an area of around 3000-4000sq m. The tank farm will comprise of approximately 8 tanks of 55kL to 555kL in size holding a total of 905kL or 815 tonnes of waste oil. Construction will include provision of a large concrete slab for the tanks with suitable footings, concrete bunding around the tanks, a separate bunded concrete slab with roofing component for the coolant & oil filter storage area, a small site office (prefabricated), a dust sealed access & parking area suitable for the proposed trucks, pumping equipment & plumbing, boiler unit, connection of power & other ancillary requirements. Click for more details...

RURAL WASTE TRANSFER STATIONS
Currently at the Construction stage In Bathurst is a project estimated to be $ 1000000. This project Construction of 4 Rural Waste Transfer stations. Works comprise approximately 1100sq m sealed pavement, a 12.5m x 7m steel shelter & other associated works at each site. Click for more details...

TARANA WASTE TRANSFER STATION
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project In The Lithgow Council Area of Waste Transfer Station type. Construction of a new waste transfer station. Click for more details...

VEOLIA ENVIRONMENTAL SERVICES
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project at 37 (Lot 1) Grand Ave (DP589690), Camellia, NSW 2142 for New. The proposal related to the temporary storage of wastes received in packages within 1 existing building, a vehicle workshop which is located along the western boundary at the northern end of the site & occupies an area of 265sq m . This area represents the existing footprint of the current workshop. Minor storages of packaged wastes, in approved cabinets, as well as a dedicated decant area are proposed within an outdoor compound secured by chain wire fencing. Click for more details...

CHRISTIE ST CONTAINER RECYCLING FACILITY
New project of Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project at 75 (Lot 1331) Christie St (DP586330), St Marys, NSW 2760. Container recycling facility Click for more details...

ALL CITY RECYCLERS OLD DAIRY CLOSE
12 - 14 (Lot 5) Old Dairy Close (DP1053325), Moss Vale, NSW 2577 Has All City Recyclers Old Dairy Close currently at Construction stage. Construction of a factory building with an area of 600sq m and a office of 80sq m. Construction of a weighbridge. A hard stand area of 3000sq m which can accommodate some external storage and parking. Click for more details...

POLO AVE WASTE RECYCLING CENTRE
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project at 6 (Lot 23) Polo Ave (DP5497), Mona Vale, NSW 2103 of Waste Recycling Centre type of New development. Construction of a waste handling and recycling centre including a recycling shed, office and amenities building, driveway and parking area. Associated siteworks and landscaping. Piping of an open drainage channel. Carparking for 17 vehicles. Construction materials will consist of tilt-up concrete panels, the roof will be steel sheeting. The lunch room, office and amenites building will be of face brick construction. Click for more details...

KEMBLA GRANGE MATERIAL RECOVERY FACILITY
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project at 61 (Lot 6) Reddalls Rd (DP1120230), Kembla Grange, NSW 2526 for New. Designated and integrated development, material recovery facility. The major components of the proposed development are: Site access road & car park. Weighbridges, office and amenities building. Green waste processing building. Water management infrastructure. Landscaping works & signage. Click for more details...

BYRNES RD LIQUID WASTE RECYCLING FACILITY
Currently at the Construction stage In Wagga Wagga is a project estimated to be $ 200000. This project Construction of a Liquid Waste Recycling Facility. Click for more details...

NAMBUCCA WASTE MANAGEMENT FACILITY
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project at off Old Coast Rd, Nambucca Heads, NSW 2448 for New. Construction of a computerised weighbridge, gatehouse & amenities building & associated infrastructure. The weighbridge shall have a 60,000kg capacity Click for more details...

BEGA VALLEY SHIRE CENTRAL WASTE MANAGEMENT FACILITY
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project at Lot 3 Wanatta Ln & Princes Hwy (DP592206) Frogs Hollow, north of, Wolumla, NSW 2550 of Waste Management Facility type of New development. Proposed establishment of a central waste management facility. The sequencing of cell construction and subsequent landfilling operations in 6 stages will enable progressive capping to be undertaken as each stage is completed. Development of Stage 1 waste cell, landfilling operations in stage 1 waste cell which would be active for 2.1 years prior to initiating landfilling in the stage 2 Waste cell. Development of Stage 2 waste cell with landfilling continuing within the active stage 1 cell, final capping and establishment of vegetation on stage 1 as landfilling operations occur in stage 2, the cell would be active for approximately 4.1 years prior to initiating landfilling in the stage 3 waste cell. Stage 3 waste cell with landfilling continuing within the active stage 2 cell, final capping and establishment of vegetation on stage 2 as landfilling operations occur in stage 3. The stage 3 cell would be active for approximately 4.7 years prior to initiating landfilling in the stage 4 waste cell. Development of Stage 4 waste cell with landfilling continuing within the active stage 3 cell, final capping and establishment of vegetation on stage 3 as landfilling operations occur in stage 4. The Stage 4 cell would be active for approximately 6.0 years prior to initiating landfilling in the stage 5 waste cell. Development of Stage 5 waste cell with landfilling continuing within the active stage 4 cell, final capping and establishment of vegetation on stage 4 as landfilling operations occur in stage 5. The Stage 5 cell would be active for approximately 8.1 years prior to initiating landfilling in the stage 6 waste cell. Development of Stage 6 waste cell with the landfilling continuing within the active stage 5 cell, final capping and establishment of vegetation on stage 5 as landfilling operations occur in stage 6, the stage 6 cell is the final stage of the landfill development and would be active for approximately 6.2 years, final capping and establishment of vegetation on stage 6 and closure of the landfill in accordance with a closure plan prepared for the site. Click for more details...

BUNGENDORE RESOURCE RECOVERY CENTRE & WASTE TRANSFER STATION
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project for New development. Proposed construction of a Resource Recovery Centre & waste transfer station. The proposed facility will handle up to 9,000m³ of material per year within 10 years & 10,500m³ per year within 20 years. The development will consist of a 240sq m used goods shed; 360sq m shed for materials recovery & recycling; 600sq m shed for waste transfer area shelter & associated carparking for 9 cars; 96sq m plant shed; gatehouse; staff amenities; after hours recycling area & associate carparking for 7 cars; 3 outdoor storage areas with gravel base for green waste, scrap steel & builders waste; drum muster & tyres bin; dead animal pit & staff amenities. Click for more details...

STERIHEALTH
Sterihealth is currently at the Construction stage, valued at about $ 600000 it is Alterations & additions to existing clinical waste processing facility including installation of autoclave Click for more details...

TUNCURRY WASTE MANAGEMENT FACILITY
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project at Lot 1 Tuncurry Tip Rd, Darawank, NSW 2428 for Addition. Construction of a 1500sq m MRF building which includes an attached office & amenities annex. of 126sq m. The main building will be constructed from steel portal frames with colorbond extenal cladding. The annex will be constructed from concrete blocks with a colorbond roof. Carparking for 7 vehicles. Associated landscaping. Click for more details...

TEA GARDENS RESOURCE RECOVERY & WASTE TRANSFER STATION
Resource Recovery/Waste Transfer Station/Subdivision project at 556 Myall Wy & 3 Carrapool Pl & Winta Rd, Tea Gardens, NSW 2324 in the Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer). Construction comprises three main elements. The first is the extension of the Tea Gardens Industrial Estate, the second is the new Waste Transfer Station, and the third is the preparation of the new works depot site. The Tea Gardens Industrial Estate involves the extension of one road (Winta Rd) & the construction of another (Transfer Rd) & the creation of 12 industrial subdivision lots (four to be constructed fully with the remaining eight to be constructed to the extent that the continued operation of the existing Council?s Works Depot is not affected). Supporting works includes, but is not limited to: construction of a large open stormwater drainage line; construction of a vacuum sewerage system; extension to the water reticulation supply; extension to the electricity supply & extension to the telecommunications network. Construction of a resource recovery & waste transfer station. The facility will involve the separation of waste into segregated areas for sale, collection for recycling or disposal on the Tuncurry landfill site. The proposed development involves clearing of native vegetation & deviation of a natural waterway. Waste intended for landfill will be compacted & placed in sealed bins. The facility will collect & separate putrescible waste from households, recyclable materials, green waste, scrap metal, construction waste, hazardous goods & medical waste. A tip shop building of 30m x 20m will be established for collection of goods suitable for resale. Reinforced concrete walls, structural steel frame & roof. Bio-retention management system, effluent management system, bitumen flush seal or asphalt to prescribed areas, perimeter fence, compact road base for roadways, parking areas, waste bins & site. Works upon the works depot site will be limited to clearing & grubbing the site; fencing the boundary & construction of utility connections to the nominated point(s). Click for more details...

CHASTON ST E-RECYCLING FACILITY
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project In The Wagga Wagga Council Area of Private ownership. Construction of a new E-recycling resource facility. Click for more details...

ALBURY WASTE MANAGEMENT CENTRE
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project for New development. Construction of a gatehouse & awnings at the centre. Construction of an all steel superstructure, office fitout, installation & commission of building services. Click for more details...

NEWCASTLE GAS STORAGE FACILITY
Storage Facility/Pipeline New project In The Newcastle Council Area. Construction of a gas plant & pipelines. The Project includes the following components: the gas plant site, including subdivision; access road and utility corridor; gas pipeline access corridor; pipeline corridor including temporary construction areas; Hexham receiving station; gas pipeline connection to the existing Jemena Gate Station at Hexham; associated and ancillary infrastructure. The fenced gas plant infrastructure area will occupy less than half of the 28ha gas plant site. Construction comprises a processing plant that will convert pipeline natural gas to liquefied natural gas (LNG) by cooling it to -162°C, it will be capable of processing up to 66,500 t of LNG per year. Insulated, non-pressurised LNG storage tank (capable of containing 30,000 t or 63,000 m3 of LNG, equivalent to 1.5 petajoules & an associated containment bund to contain any potential spills or leaks. A re-gasification unit to convert the LNG in the storage tank back into natural gas.A flare. A truck loading facility to allow the dispatch of up to 1,000 tankers of LNG per year. A new road to connect the gas plant site to TAC Northern Access Road. Infrastructure & utility connections. An emergency access road. A natural gas pipeline connecting the gas plant site to the receiving station. A receiving station at Hexham to link the Project into the NSW gas network via the existing Wilton - Newcastle trunk pipeline. Click for more details...

RICHARDSON RD WASTE TREATMENT FACILITY
A project in the NSW Within Dubbo. Construction of a new liquid trade waste treatment facility and additions and alterations to an existing building. The proposed development will allow the bulk of grease trap and oily waste that is currently disposed of to landfill and depots in other centres to be treated to a suitable level for acceptance into Council?s sewerage system. The proposed development will treat grease trap and mineral oily waste through two separate processes. The grease trap and oily waste treatment processes will utilise the proposed addition to the existing shed to receive waste in order to minimise odours. To better manage odours all greasy waste will be received from vehicles within a sealed section of the shed. Odours from the receival dock will be captured and treated prior to extraction to the environment. The proposed development will collect greasy waste from commercial food premises and oily waste from mechanical repair operations and wash bays. Up to 2 megalitres of greasy waste and 2 megalitres of oily waste will be treated by the proposed development. Waste will be disposed either to Council?s sewer system or landfill. Click for more details...

APPLEDALE PROCESSORS WASTE MANAGEMENT FACILITY
5 Stephen Pl, Orange, NSW 2800 Has Appledale Processors Waste Management Facility currently at Construction stage. Construction of a waste management facility. Click for more details...

MOUNT HUNTER WASTE MANAGEMENT
Private ownership Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project In The Wollondilly Council Area for New development. Construction of a waste management facility land filling and depot. Clearing of vegetation within quarry voids. Filling of 2 disused quarry voids with 50000 cubic metres of fill. Rehabilitation of the quarry voids and vegetation. Construction of a hardstand area to be used as a depot for the storage of plant equipment and materials, including temporary parking area for trucks and amenities. Click for more details...

THARBOGANG WASTE TRANSFER STATION
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project for New development. Construction of a Waste Transfer Station at the Waste Management Centre to allow the ongoing management of waste, recyclables, scrap steel, household problem waste, tyres, e-waste and garden waste. Scope of works may include: site access roads, line marking & road furniture (boom gates etc), including interfacing with existing infrastructure where applicable. Road and site informative & directional signage. Leachate control. Surface water runoff control. A 4 bay WTS & associated retaining wall(s). A roof to cover the WTS. A rain water tank & associated pressure pump. Landscaping. Household problem waste facility. Site storage sheds. E-waste, tyres & mattress receival area. Recycling bin storage, drop off & pick up area. Scrap steel stockpile area. Waste overflow stockpile area. Security lighting. CCTV camera layout & specification. Click for more details...

TUNCURRY WASTE TRANSFER STATION & COMMUNITY RECYCLING CENTRE
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project In The Great Lakes Council Area of Waste Depot type. Conversion of existing Tuncurry waste facility from landfill to modern recycling centre & waste transfer station. Scope of work includes: Construction of community recycling centre building. Construction of waste transfer station. Upgrade of site facilities (water, power, sewer & telecommunications. Civil works. Click for more details...

DENILIQUIN WASTE DISPOSAL DEPOT
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) Addition project at Lots 167, 7317 & 1 Hay Rd (DP722062, DP1157261 & DP1198406), Deniliquin, NSW 2710. This type is Resource Recovery Facility - Altns & Addns with Private ownership. Alterations & addition to the existing resource recovery facility, incorporating tip shop, gatehouse, weigh bridge,associated infrastructure & roadworks. Click for more details...

CHARMHAVEN & TOUKLEY STW WASTE RECEIVING STATIONS
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project for New development. Improvements to the existing waste receiving facilities at Charmhaven & Toukley STW, Wilfred Barret Drive, Noraville. Scope of work includes: removal of the existing waste receiving station at Toukley STW, and the design, supply & installation of new liquid waste screening stations & bagging unit, pavement & hardstand areas, drying bed (Toukley only), drainage, site pipework, work area lighting & all associate power supply & control equipment. Click for more details...

MACLACHLAN AV WASTE MANAGEMENT FACILITY
Waste Management Facility project at 10 (Lot 5) McLachlan Av (DP25667), Artarmon, NSW 2064 in the Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer). Demolition of the existing structures. Construction of a materials recovery and waste transfer facility and associated works, which would be capable of processing/transferring up to 60,000 tonnes per annum of target inert wastes being mainly general solid (non-putrescible) dry waste generated from construction and demolition activities, as well as wastes generated from commercial and industrial premises. The main building complex will include a receiving, sorting and transfer area,office, amenities and lunch room will be located at the eastern portion of the site. The proposal will include an incoming weighbridge and associated office facilities within the building. Masonry walls, prefinished metal wall cladding, prefinished metal roof sheeting. Undercroft carparking for 12 vehicles & located within the building adjacent to the office administration building & 5 additional spaces. Landscaping. Click for more details...

ST MARYS WASTE MANAGEMENT & RECYCLING FACILITY
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project at 25 Dunheved Cct, St Marys, NSW 2760 of Waste Management & Recycling Facility type of Renovations, Refurbishments etc. development. Alterations & additions to an existing waste management and recycling facility including: demolition of an existing shed & amenities/office building. Construction of a new concrete tilt panel & metal clad shed & a new amenities building. Installation of two (2) weighbridges at the entry/exit of the shed. Filling an existing pit within the central portion of the site. Removal of 7 trees. Click for more details...

SHOALHAVEN CITY COUNCIL COMMUNITY RECYCLING CENTRES
New project of Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project at various locations in the Shoalhaven City Council area, Nowra, NSW 2541. Design, approval & construction of 10 new Community Recycling Centres (CRC). Scope of work includes: The West Nowra facility shall be 20m x 6m with a height similar to the adjacent shed (approximately 4.5m); the structure shall be supported by central columns to allow access from both sides, with a 20m x 6m concrete slab designed to withstand wheel loads of a maximum of five tons; the slab should be level with the existing bitumen seal. The nine CRC facilities shall be 8m x 3m & be 3.5m high with a skillion roof; they shall have 3 galvanised 150mm diameter bollards installed to protect the structural columns. Some will be constructed on gravel hardstand with the remainder being constructed on existing bitumen. All structural members are to be hot dipped galvanised. The sites are West Nowra, Huskisson, Ulladulla, Sussex Inlet, Lake Cojola, Bendalong, Berry, Callala, Kangaroo Valley & Kioloa Click for more details...

MINNAMURRA WASTE & RECYCLING FACILITY
New project of Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project at 446 Riverside Dr, Minnamurra, NSW 2533. Construction of the community recycling centre shed with a 20,000 litre water tank including pump & associated plumbing & drainage. Click for more details...

DUNMORE RESOURCE RECOVERY CENTRE
New project of Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project at 44 Buckleys Rd, Dunmore, NSW 2529. Design & construct with operating term for facility. Scope of work includes: construction, operation & maintenance of organics processing facility. Click for more details...

SURF BEACH SPECIALTY WASTE CENTRE
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project In The Eurobodalla Council Area of Waste Centre type. Design & construction of the Surf beach speciality waste centre. The facility is to have a concrete drive-in, drive-out drop-off area, accessed from the road immediately past the weighbride Click for more details...

WEST NOWRA RECYCLING & WASTE FACILITY
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project In The Shoalhaven Council Area of Local Govt ownership. Construction of a 35m x 20m weather protected waste transfer facility at the existing West Nowra Recycling & Waste Facility. The facility includes 10 concrete recycling bays & a concrete drop off area. Steel frame, concrete half walls, steel roof with translucent panels, steel guttering, wire mesh soffits. Installation of CRT glass waste cell. New pavement. New bitumen sealed roadways. Upgrade to drainage system. Landscaping. Click for more details...

BROKEN HILL WASTE MANAGEMENT FACILITY
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project In The Broken Hill Council Area of Transfer Station type. Construction of a transfer station for the Broken Hill Waste Management facility Click for more details...


Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect