State

Categories

Sub Categories

Click Here to Find Current Projects

List of Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer Projects in WA


ONSLOW LANDFILL SITE
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project at Via Onslow Salt main access road, Onslow, WA 6710 of Landfill Site type of New development. It was proposed to develop new landfill site. Click for more details...

CITY OF ALBANY - COUNCIL FACILITIES
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project for Supply & Maintenance development. Maintenance, repairs & minor plumbing works for all Council-controlled facilities within City of Albany for period ending 30 June 2004. Click for more details...

JFR (JIM) MCGEOUGH RESOURCE RECOVERY FACILITY (FORMERLY BROCKWAY WASTE TRANSFER STATION)
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) New project at Reserve 33986 - 11541 Brockway Rd, cnr Lemnos St, Shenton Park, WA 6008. This type is Dicom Waste To Energy Plant - Stage 2 with J/V - Private & Govt ownership. Works to comprise expansion of the DiCOM trial plant into the full-scale DiCOM bioconversion waste processing system at the JFR (Jim) McGeough Resource Recovery Facility (formerly Brockway Waste Transfer Station) in Shenton Park. The waste processing system will process up to 55,000 tonnes of household waste per annum diverting btwn 65 & 80 per cent of our waste from landfill. The system sorts the waste to separate recyclables & then breaks down the organic components to produce market-quality compost & biogas. The generated biogas will power the plant & surplus will be exported to the grid as renewable energy. The power generation equipment is fully enclosed with a sound attenuated gas engine to eliminate noise. Digestion takes place within a sealed vessel to control odour. Click for more details...

WELSHPOOL INERT WASTE RECYCLING DEPOT
33-35 Kew St (lot 26), Welshpool, WA 6106 Has Welshpool Inert Waste Recycling Depot currently at Construction stage. Proposal is for construction of inert waste recycling depot for receipt of construction & demolition waste materials, clean concrete, tyres & recycled roadbase from Thomas Rd, Kwinana & transfer of sorted materials to separate processing facility in Medina. Would include weighbridge with fully computerised record system, weighbridge office, lunchroom & toilet, trommel (used to separate sand & soil from construction & demolition rubble), picking station (used for further product separation & recovery), stackers, groundwater bore & full site reticulation for dust & odour control & sealed asphalt roads. Site would be fully fenced with lockable gates, off-street parking for employees & two-stage sediment drain for surface water run-off. Click for more details...

BIOWISE COMPOSTING FACILITY
A project in the WA Within Kwinana. It is proposed to construct two underground storage tanks for storage of grease trap waste for incorporation into existing BioWise waste composting process. Tanks to have capacity of 16,000 l. Click for more details...

HENDERSON LANDFILL SITE - CELL 3
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project In The Cockburn Council Area of Local Govt ownership. Works to comprise installation of low permeability (geosynthetic clay liner) capping system for Cell 3 at Henderson Landfill Site. Contract period: 12 weeks. Click for more details...

DAMPIER TO BUNBURY NATURAL GAS PIPELINE
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project at Compressor Stations CS1, CS5 & CS8 Dampier to, Bunbury, WA 6231 of Transportable Control Buildings (3)/Service Building type of Supply & Install development. Control Buildings - 390 sq.m each & Service Building - 120 sq.m. Steel frame, designed to withstand cyclonic winds & seismic forces, & to be fitted out with power, water & air-conditioning services. The complete package also includes other minor building & solar canopies. Click for more details...

ST MARY'S INDUSTRIES - RECYCLING FACILITY
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project In The Kalgoorlie-Boulder Council Area of Recycling Facility type. New purpose-built recycling facility with associated offices of steel frame, concrete floor, iron roof & metal wall construction. Click for more details...

TAMALA PARK WASTE DISPOSAL FACILITY
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project for Addition development. Works comprise removal of up to 1.4 million t of limestone from Tamala Park for four-year period, with option to extend for further four years. Removal may include pre-processing on site before removal. Details of any pre-processing will need to be given on appropriate schedule. Click for more details...

CANNING VALE LANDFILL
Canning Vale Landfill is currently at the Construction stage, valued at about $ 115000 it is Clay liner & leachate control for stage 2 cell. Click for more details...

ADVANCED MANUFACTURING TECHNOLOGIES CENTRE - NATIONAL OIL & GAS TRAINING CENTRE
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project In The Subiaco Council Area of State ownership. Alterations, additions, refurbishments, supply & installation of simulation oil & gas production equipment & such other work as shown on drawings or included in specification. Click for more details...

WICKHAM WASTE TRANSFER STATION
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) New project at Pt Reserve 34631, Point Samson Roebourne Rd (former speedway site, mid-way btwn Wickham & Roebourne), Wickham, WA 6720. This type is Concrete Works For Waste Transfer Station with Local Govt ownership. Provision of concrete works for Wickham Waste Transfer Station, form supply & pour. Contract length: approximately 6 weeks. Click for more details...

TAMALA PARK WASTE DISPOSAL FACILITY
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project at Lot 17 Marmion Av, Tamala Park, WA 6030 of Workshop/Washdown/Administration Building - Miscellaneous Works & Addn type of Addition development. Construction of miscellaneous works & additions to include works to recycling facility workshop, washdown & administration building. Click for more details...

BULLER ROAD LANDFILL SITE
Buller Road Landfill Site is currently at the Early Planning stage, valued at about $ 1426000 it is Development of new 213,000 cu m Cell Two at Buller Rd landfill site. New cell is likely to be lined with synthetic material. Existing cell to be capped, covered & revegetated. Click for more details...

STANLEY ROAD REGIONAL REFUSE DISPOSAL SITE
A project in the WA Within Harvey. Undertaking of strategic study of Stanley Rd landfill facility. Click for more details...

NORTHAMPTON WASTE TRANSFER STATION
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) New project at Northampton Refuse Site, Northampton, WA 6535. This type is Waste Transfer Station with Local Govt ownership. It is proposed to construct waste transfer station at Northampton Refuse Site. Works comprise construction of retaining wall & associated concrete works as per specifications. Click for more details...

REGIONAL RESOURCE RECOVERY CENTRE - CANNING VALE
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project In The Canning Council Area of Structural Works For Recycling Centre type. Design & construct structural works for waste receival & in-vessel composting facility as part of State-Of-The-Art treatment plant for conversion of most household waste into marketable products. Click for more details...

REGIONAL RESOURCE RECOVERY CENTRE - CANNING VALE
Greenwaste Shredding Plant For Recycling Centre New project In The Canning Council Area. Supply, install & commission greenwaste shredding plant for processing greenwaste received by SMRC facility (up to 30,000 t per annum x greenwaste from verge collections, tree pruning & commercial & domestic trailer drop-off). Click for more details...

MINDARIE REGIONAL COUNCIL - SECONDARY WASTE TREATMENT FACILITY - STAGE 1
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project for New development. Build, own & operation of secondary waste treatment facility to treat up to 100,000 tpa of domestic municipal solid waste, increasing to 300 tpa. Plant is to convert waste into electricity & gas as well as mulch & fertilisers. Click for more details...

HENDERSON LANDFILL SITE - CELL 6
New project of Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project at Rockingham Rd, Henderson, WA 6166. Works to comprise of design of Cell 6, at Henderson Landfill Site. Click for more details...

BUSSELTON WASTEWATER VACUUM PUMPING STATION - NO 19
Pumping Station - Construction - Concrete Sub-Structure New project In The Busselton Council Area. Works to comprise of construction of concrete sub-structure for Busselton Wastewater Vacuum Pumping Station No 19. Pumping station is 12 m x 19 m brick with steel framework building with half of floor 4 m below ground level with concrete floor & walls, located near corner of Glenleigh & Seagrott Rds, Busselton. Click for more details...

CITY OF KALGOORLIE-BOULDER - GRAVITY EFFLUENT MAIN WORKS
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project for New development. Works to comprise of construction of approximately 1,086 lineal m of DN 355 PE effluent gravity main & associated works in Piccadilly St, Kalgoorlie. Click for more details...

BUSSELTON WASTEWATER VACUUM PUMPING STATION - NO 19
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project at Cnr Glenleigh & Seagrott Rds, Busselton, WA 6280 for Supply & Install. Works comprise of supply & installation of structural steel for Busselton Wastewater Vacuum Pumping Station No 19. Pumping station is 12 m x 19 m brick with steel framework building with half of floor 4 m below ground level with concrete floor & walls, located near corner of Glenleigh & Seagrott Rds. Click for more details...

RED HILL WASTE MANAGEMENT FACILITY
Landfill & Leachate Pond - Construction New project In The Swan Council Area. Works include construction of landfill & leachate pond at Red Hill Waste Management Facility. Click for more details...

BALDIVIS LANDFILL FACILITY - CELL 10
New project of Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project at Millar Rd, Baldivis, WA 6171. Works to comprise of importing, placing & compacting clay for construction of liner & started embankments, placing & compacting sand layer over pvc seal to form underdrainage blanket & installation of sub-surface piping for leachate collection. Click for more details...

MINDARIE REGIONAL COUNCIL TRANSFER STATION
Concrete Barriers - Supply & Install project at Lot 118 Marmion Av, Tamala Park, WA 6030 in the Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer). Works to comprise removal of existing, & supply & installation of new concrete barriers to transfer station. Click for more details...

BROOME NORTH WASTEWATER TREATMENT PLANT
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project In The Broome Council Area of State ownership. Construction of a wastewater treatment plant on Crab Creek Rd, approx 10 km north-east of the Broome town site. Click for more details...

RED HILL DEPOT LANDFILL CELL CONSTRUCTION
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project at Red Hill Waste Management Facility, 1094 Toodyay Rd, Gidgegannup, WA 6083 for New. The Eastern Metropolitan Regional Council is seeking tendersfor Class 3, Stage 12, Landfill Cell construction. Click for more details...

MINDARIE REGIONAL COUNCIL CONSULTANCY SERVICES PANEL
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project at For Mindarie Regional Council, Mindarie, WA 6030. The Mindarie Regional Council invites suitable companies or organisations to tender for appointment as a member of a panel for the supply of consultancy services in one or more of the following areas: Civil Engineering, Environmental Engineering, Architectural, Structural & Project Management. Click for more details...

TAMALA PARK WASTE DISPOSAL FACILITY
Tamala Park, Mindarie, WA 6030 Has Tamala Park Waste Disposal Facility currently at Construction stage. Construction of liner works & leachgate collection system for the stage 2 phase 3 liner works.The works will prepare the airspace for the next phase of landfilling operations. Click for more details...

PINGRUP WASTE TRANSFER STATION
Local Govt ownership Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project In The Kent Council Area for New development. Works to comprise construction of a waste transfer station 22 m long, 1.7 m high, 2.7 m pad on base & 3 m pad on top & supply of bulk bins including all earthworks at the Pingrup refuse site. Click for more details...

ROEROC REGIONAL RUBBISH SITE - WEIGHBRIDGE
A project in the WA Within Kondinin. Works to comprise supply, install & commission of an un-manned solar powered 30 m x 3.5 m aboveground weighbridge with capacity of 100 tonnes at RoeRoc Regional Rubbish site, Bendering, within the Shire of Kondinin. Click for more details...

MILLER ROAD LANDFILL FACILITY CELL 13 CLAY LINER
Miller Rd,, Baldivis, WA 6171 Has Miller Road Landfill Facility Cell 13 Clay Liner currently at Construction stage. Works to comprise construction of Cell 13 clay liner & associated works at Miller Rd Landfill Facility, Baldivis. Click for more details...

MILLAR ROAD WASTE EDUCATION CENTRE
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project for New development. Construction of a Waste Education Centre. Click for more details...

WARLU ROAD WASTE MANAGEMENT FACILITY/WASTE TRANSFER FACILITY
Waste Management Facility/Waste Transfer Facility project at 609 Warlu Rd, Located approx 11 km south west of the Karratha City Centre, adjacent to & on the eastern side of the Hamersley Ir, Karratha, WA 6714 In The Council Area Of City Of Karratha of Private. Works to comprise construction of a noxious industry comprising an industrial liquid waste treatment facility & solid waste depot & chemical &/or oil recycling & incidental uses being a waste transfer station. Click for more details...

MUNDAY AVENUE TRANSFER RECYCLING STATION
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project at 49 Munday Av, Pinjarra, WA 6208 of Transfer Recycling Station type of New development. Works to comprise construction of a transfer recycling station. Click for more details...

WESTERN METROPOLITAN REGIONAL COUNCIL - BROCKWAY WASTE TRANSFER STATION
New project of Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project at Brockway Waste Transfer Station, Brockway Rd, Shenton Park, WA 6008. Works to comprise provision & installation of 3 walking floors, a compactor & associated works at the existing transfer station. Click for more details...

TAMALA PARK WASTE DISPOSAL FACILITY
Capping Works - Stage 2 - Phase 1 - Section 2 project at Off Marmion Av, Tamala Park, WA 6030 in the Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer). Works to include construction of capping works for stage 2, phase 1, section 2, landfill at Tamala Park. Click for more details...

BANNISTER ROAD RECYCLING FACILITY
Bannister Road Recycling Facility is currently at the Construction stage, valued at about $ 200000 it is Works to include addns & altns to the Recycling Facility located on Bannister Rd. Click for more details...

MANDURAH WASTE MANAGEMENT CENTRE
Mandurah Waste Management Centre is currently at the Construction stage, valued at about $ 250000 it is To include power supply upgrade to the waste management centre. Click for more details...

MERU WASTE DISPOSAL FACILITY
Waste Disposal Facility/Cell 3 project at Located approx 6 km south east of, Meru, WA 6530 in the Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer). Construction of a Cell 3 at the Meru Disposal Facility. Works to include the following: Survey & setting out, mobilisation & demobilisation of all plant & equipment, payment of Building & Construction Industry Training fund Levy, supply of equipment, construction materials, labour & supervision, quality control & assurance, excavtion & backfilling of Cell 3 of the landfill, construction of Cell 3 of the landfill including all cell liners, stormwater drainage, leachate wells, leachate extraction system & stockpiling of excavated soil. Click for more details...

CLUNE STREET WASTE TRANSFER FACILITY
50-58 (Lot 2) Clune St, Bayswater, WA 6933 Has Clune Street Waste Transfer Facility currently at Construction stage. Works proposed to include the construction of an addnl new class 2 waste transfer facility for waste to include sand, bricks, tiles, concrete, metal, plastics, & timber as well as putrescible waste. The development to also include the addns & altns to the existing waste transfer facility to include concrete walls & screened bunkers, a new 7m metal deck screen fence along the western lot boundary, installation of a second concrete loading bay to be located adjacent to the existing loading bay for semi-trailers to park, altns to the entrance to the site, inbound & outbound weigh-bridges, wheel wash facilities, a bypass lane, gatehouse & lockable gates along the boundary. Click for more details...

BULK DIESEL FUEL TANK
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project In The City Of Karratha Council Area of Fuel Tank - Supply & Install type. To include the supply, installation, commissioning & testing of a 25,000 - 27,000 litre bulk fuel tank & associated connections. Click for more details...

GREAT NORTHERN HIGHWAY WASTE MANAGEMENT FACILITY
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project at Part of Lot 203 Great Northern Hwy, Port Hedland, WA 6721 for New. Construction of a new Waste Management Facility at a site that has been chosen by the Town of Port Hedland. Click for more details...

SIMS METAL - RECYCLING/PROCESSING FACILITY - STAGE 2
A project in the WA Within Kwinana. Works to include the construction of Stage 2 development of Sims Metal Recycling Facility. Works to include the construction of Administration & Amenities building of 32.5m width x 4.75m height to comprise of lunch room, training room, courtyard/alfresco, male/female toilets, store rooms, lockers & first aid room. Weighbridge/office building of 44.7m length x 10m width x 7.45m height to comprise of reception, entry, offices, cashier, tea prep, toilets/shower, computer room, inductions room, training room & 5 car park bays on the ground floor & boardroom, store rooms, offices, male/female toilets, kitchen, gym & viewing platform on the first floor. Workshop of 58.2m length x 13.4m height to comprise of gantry crane over workshop floor, welding bays & mezzanine level to comprise of lunch room & offices. Non-Ferrous Shed of 525sqm & 70m x 30m to comprise of batteries area, drive-thru area, 16 car park bays of 8 car park bays & 4 car/trailer bays, first floor to comprise of office. Off line Recovery Plant of 1,325sqm & 90m x 30m length x 10.13m height to comprise of plant floor, male/female toilets & first floor to comprise of offices. The development will also include end of life vehicle building, temporary site offices & amenities, washdown bay, car park area, landscaping & boundary/acoustic fence. Click for more details...

DUNSBOROUGH WASTE FACILITY - LANDFILL CELL 1
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project for New development. Works to include the construction of Landfill Cell 1 at the Dunsborough Waste Facility to comprise of: associated leachate drainage to be installed & treatment infrastructure. Click for more details...

MILLAR ROAD - LANDFILL FACILITY/LEACHATE PONDS - CELL 16
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project for New development. Works to include construction of the Landfill Facility - Cell 16, new leachate ponds & associated works at the Millar Rd Landfill Facility. Click for more details...

SHANNON NATIONAL PARK
Campground Water/Gas - Upgrade Renovations, Refurbishments etc. project In The Manjimup Council Area. Works to include laying of water pipes and/or gas pipes & backfill once pipes are pressure tested, purchase & install a water pressure pump & filter within a pump house, link water & gas pipes to existing outlets. The Contractor must provide safety signs to ensure the public is safe. Click for more details...

BUCKLEYS ROAD WASTE MANAGEMENT FACILITY
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project In The Broome Council Area of Weighbridge type. Works to include the supply, installation & commissioning of a Weighbridge at the Buckley Road waste Management Facility. Click for more details...

MILLAR ROAD LANDFILL FACILITY CELL 17
Industrial (Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer) project In The Rockingham Council Area of Local Govt ownership. Construction of Landfill Cell 17 & Associated Works at the Millar Road Landfill Facility, Baldivis. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect