State

Categories

Sub Categories

Click Here to Find Current Projects

List of Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks) Projects


VAW ALUMINIUM SMELTER
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at Hart Rd, Loxford, Kurri Kurri, NSW 2327 of Smelter -Altns & Addns - Stage 1 type of Addition development. Update & retrofit Aluminium smelter in 3 stages. Stage 1 -Installation of a greenmix scrubber for air emissions & associated civil works. Click for more details...

HISMELT EXPANSION PROJECT
Private ownership Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Kwinana Council Area for New development. One of three packages. Pipework. Click for more details...

BURRUP FERTILISERS AMMONIA PLANT PROJECT
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at Btwn King Bay & Hearson Cove, Burrup Peninsula nr, Karratha, WA 6714 of Ammonia Plant type of New development. Ammonia plant comprising: 2,200 t per day production of liquid ammonia from natural gas; power plant consisting of 20 MW steam turbines & 2 x gas-fired auxiliary boilers; 2 x vent stacks where gases, excluding ammonia, will be vented with steam during normal operating conditions, start-up & upset conditions; 2 x 40,000 t atmospheric pressure, double-walled, double-integrity cryogenic ammonia storage tanks, complete with flare stack; closed circuit seawater-freshwater cooling system & single seawater cooling tower; supply of 74 TJ/day of natural gas from Dampier to Bunbury Natural Gas Pipeline (pipeline to be below ground, 1.3 km in length & constructed by Apache Energy); supply of seawater & freshwater via thermal desalination plant proposed by Water Corporation; demineralisation water plant; wastewater treatment plant; ammonia loading & recirculation facilities for Dampier Public Wharf; associated support facilities. Click for more details...

DAMPIER PORT BULK LIQUIDS BERTH (BLB) PROJECT
Private ownership Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The City Of Karratha Council Area for Addition development. Additional facilities to be constructed to enable accommodation of increased port traffic to service new fertiliser & gas to liquids projects on Burrup Peninsula. New multi-user bulk cargo export berth is being constructed to service liquids tankers & bulk solid cargo vessels. Dredging work of up to 4.5 million cu m of sediments is also being undertaken. Click for more details...

CENTRAL QUEENSLAND MINING SUPPLIES
Central Queensland Mining Supplies is currently at the Planning stage, valued at about $ 2000000 it is 1) upgrading furnace fume extraction & filtration system, 2) construct new exhaust & filtration system for PFU mould cooling, 3) construct new hoods & ducting to contain fumes & smoke, 4) construct 30 m high stacks to exhaust baghouse filters, 5) extend stacks to four (4) existing baghouse filters on west of foundry building, 6) remove two (2) existing baghouse filters, 7) erect acoustic air relief grilles with dampers at low level, 8) install new exhaust fans with 3 m discharge stacks, 9) erect new spray booth stack, 10) relocate air compressors with upgraded acoustic enclosures, 11) sealing building openings to prevent fugitive emissions excaping, 12) erect new roof access stairs & platforms along ridge of roof, 13) partially re-clad north & west of building to seal emissions of noise & odour, 14) internally construct mould cooling bunker with concrete/steel walls & sealed roof for noise & odour control, 15) install two (2) new stormwater interceptors to north of foundry buildings. Click for more details...

BORAL RESOURCES (NSW)
Currently at the Construction stage In Sutherland is a project estimated to be $ 1100000. This project Refurbishment of existing concrete batching plant. Click for more details...

STENHOUSE DRIVE CONCRETE BATCHING PLANT
Concrete Batching Plant/Silos New project In The Lake Macquarie Council Area. Construction of concrete batching plant that includes two 21 metre tall silos and a chemical storage area. Click for more details...

GOVE DISTRICT HOSPITAL
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) Renovations, Refurbishments etc. project at Matthew Flinders Wy, Nhulunbuy, NT 0880. This type is Fuel Tank - Relocaction For Hospital with State ownership. Relocate day service fuel tank for main emergency generating set from boiler room to mezzanine floor in services building. Click for more details...

BASS POINT QUARRY
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project for New development. Proposed development involves a number of aspects. The primary component of the proposal is to deepen & extend the quarrying operations so as to maximise the extraction of an identified significant resource. The proposal seeks to relocate & upgrade the processing plant on the site such that Hanson can make the best use of modern technology & decommission the older processing equipment that is less efficient, less reliable & located in a less than ideal location. Erection of new processing plant centrally in the quarry extraction area, & decommissioning the existing processing plant from the north-eastern portion of the site. Relocation of associated stockpiles from the north-eastern portion of the site to also be located centrally on the site near to the new processing plant. Relocation of the office, workshop & amenities. Relocation concrete batching plant ? essentially involving the same plant with minor upgrades. A defined parking area located near to the new office & workshop areas & the installation of a new weighbridge adjacent to the office & administration area. Construction of six slip-form concrete silos (including post tensioned slabs, silo recovery culverts, scalps stockpile tunnel, primary stockpile reclaim tunnel & a primary crusher station). Click for more details...

METHANEX AUSTRALIA PROJECT
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) New project at King Bay-Hearson's Cove Industrial Precinct, Burrup Peninsula, Dampier, WA 6713. This type is Methanol Plant with Private ownership. A 1.3 million tonne per year methanol project, as the first stage of a planned Asia Pacific hub. This was a reduction in capacity of about 35% compared to the original project plan of 2 million tonnes per annum. Click for more details...

TRANSPORT DRIVE STORAGE TANK
Storage Tank New project In The Hume Council Area. Buildings & works to allow installation of liquid storage tanks & associated works. Click for more details...

JERVOISE BAY/HENDERSON MARINE INDUSTRIAL ESTATE
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project for New development. On-site facilities contract to comprise whole of design, approvals, construction, testing & commissioning of buildings, equipment, fixtures, fittings & pavements as shown on drawings. In particular, works to include, but not necessarily be limited to: 1) Construction of fabrication & assembly hall, complete with travelling systems, overhead cranes, offices & amenities. 2) 150 t SWL portal crane. 3) 3,000 t loadout corridor from assembly area westward to join with pavement by Civil & Marine contractor (separable portion for early completion). 4) 3,000 t load corridor northwest from assembly area to boundary line. 5) 15,000 t loadout corridor from assembly area to southern boundary to join with pavement by Civil & Marine contractor. 6) Crane & heavy/wide load access areas from main gate & around fabrication area. 7) General hardstanding, fabrication of storage areas & landscaping/reticulation elsewhere within site. 8) Boundary line & internal fences, gates & security control. 9) New sewer main from main entrance on southern boundary to connect into existing sewer (northern boundary). 10) Underground services reticulation throughout site including stormwater disposal, power, telecommunications (conduiting only), sewer, water supply, fire protection, site security. 11) Demolition/removal of existing foundations & excess buildings. 12) General facilities buildings complete including workers amenities, project office, trade shops, workshops, warehouse/storage, first aid & induction, gatehouses (2), Facilities Manager office. 13) All other works to completed operational facility. Click for more details...

PROTECH STEELMILL
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at Kooragang Island, Kooragang, NSW 2304 of Steel Making Facility - Stage 1 type of New development. Proposed steelmaking facility, comprising the construction of an integrated mini-mill on a 48 ha site to process iron ore & coal to produce approximately 1 million tonnes of steel & value-added products each year.Stage 1 is the construction of one cold-rolling mill. Stage 2 is the construction of 2 hot-rolled steelmaking facilities. Click for more details...

AUSTEEL STEEL MILL
A project in the NSW Within Port Stephens. Construction of a Steel Mill to produce 4 million tonne per year of steel from the Western Australian Fortescue iron ore deposit. The steel mill complex will include 3 electric arc furnaces, 3 ladle furnaces, 2 thin slab casters, a thick slab caster, a hot strip mill & a hot strip temper mill. As well there is a cold mill complex comprising a pickle line, 2 single standing reversing mills, a galvanising line, a tempermill, batch annealing & an inspection/coil handling & packaging facility. The NSW Government has entered into an agreement to develop a 150ha site for the steel mill & a 25ha site for a port facility & lease them to Austeel on a long term commercial basis. The port will be designed to accommodate vessels with a capacity of up to 140,000 dead weight tonnes. Click for more details...

BURRUP FERTILISERS AMMONIA PLANT PROJECT
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The City Of Karratha Council Area of Hvac System For Ammonia Plant type. Supply of HVAC system. Click for more details...

BURRUP FERTILISERS AMMONIA PLANT PROJECT
Burrup Fertilisers Ammonia Plant Project is currently at the Construction stage, valued at about $ 900000 it is Supply of air intake system for gas turbine. Click for more details...

BURNET RD CONCRETE BATCHING PLANT
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Wyong Council Area of Private ownership. Construction of a concrete batching plant comprising an administration building, storage bins for aggregates and sand, 2 silos for concrete and flyash, aggregate weighing bins and associated internal roadworks, water treatment and storage facilities and a security fence around the site. Associated carparking for 14 cars Click for more details...

FORESHORE RD CONCRETE MASONRY PLANT
(Lots 1,1,2,1) Foreshore Rd (DP87432, DP88913,DP90127,DP735078, Number 404 Book 1912), Port Kembla, NSW 2505 Has Foreshore Rd Concrete Masonry Plant currently at Construction stage. Construction of a concrete masonry plant for the production of concrete bricks and blocks. Construction of curing chambers and bins for masonry block plant Click for more details...

PORT RIVER MARINE SERVICES TANK/WHARF FACILITY
Storage Tank/Diesel/Petrol Fuel Wharf Facility project at 4-6 Davis St, Largs North, SA 5016 In The Council Area Of Port Adelaide Enfield of Private. Construct bunded storage tank area (steel tanks) & new diesel/petrol fuel wharf facility. Click for more details...

CONTOUR ROAD CONCRETE PLANT
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at 114 Contour Rd (Lot LP 135724 LP 147245), Trafalgar, VIC 3824 for New. Proposed construction of a concrete plant and administration office. Click for more details...

O'HERNS ROAD CONCRETE BATCHING PLANT
A project in the VIC Within Whittlesea. Construction of a concrete batching plant and materials recycling/crushing facility and two offices. Click for more details...

AMCOR BOTANY MILL
Private ownership Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Randwick Council Area for New development. Construction of a new single storey building on the site of the former No 5 Paper Mill to house new installation of steam raising plant comprising of 4 package boilers which include 2 stacks - approximately 44m in height Click for more details...

GERALDTON PORT AUTHORITY - IRON ORE EXPANSION PROJECT - MATERIALS HANDLING
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at Geraldton Port, Marine Terrace, Geraldton, WA 6530 for New. Development comprises modifications for Conveyor (CV) 13 to allow for the upgrading and reversal for conveying iron to Berth 5. New conveying circuit for iron ore from reversed and upgraded CV 13 to Berth 5. Modifications to the concentrate load out arrangements. Modifications and new conveying circuit to route all minerals and concentrates from the existing mineral sands ship loading truck dump facility to Berth 4. Minor upgrade of Berth 6 ship loader (only if required to accommodate modifications to suit a new minerals conveyor feed circuit such as a reversed feed tipper). New electrical substations, power distribution and electrics for the new development. New control system and provisions for future control systems for all recalim, conveying and ship loading circuits including intergration with existing systems. Upgrade of existing reclaim systems as required to accommodate the loading circuit modifications for both iron ore and minerals. Click for more details...

DUST EXTRACTION SYSTEMS - DUST COLLECTORS
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) New project at Outer Harbor Terminal, Pelican Rd, Outer Harbor, SA 5018. This type is Dust Collectors For Terminal with Private ownership. Works consist of supply, manufacture & delivery of dust collectors & associated discharge augers & rotary values at grain terminal. Click for more details...

GUNNS BLEACHED KRAFT PULP MILL
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at Vicinity Tamar River, Bell Bay, TAS 7253 of Bulk Earthworks type of New development. The work will include overburden removal excavation in rock including blasting, separation of rock and crushing, construction of temporary access roads, internal roads, hard stand and lay down areas. The design and construction of major drainage structures including building site and access road drainage. The earthworks volume is approximately 2.5m m3 of which a large proportion is expected to be rock. Click for more details...

CARGILL OILSEED PROCESSING FACILITY
New project of Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at 140 (Part Lot 119) Cormorant Rd (DP832729) Kooragang Island, Newcastle, NSW 2300. Expansion of Cargill Oilseed processing facility at Kooragang Island to include: a bleaching & deodorising plant; expansion of the existing tank farm from 4,700 tonne capacity to 11,700 tonne capacity; gas fired boiler and associated stack. Click for more details...

KWINANA BULK TERMINAL - CONVEYOR JCOI
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at Lot 120 Kwinana Beach Rd, Kwinana Beach, WA 6167 of Conveyor Replacement Belt - Supply & Install type of Supply & Install development. Works to comprise of supply & installation of replacement belt for Conveyor JC01 at Kwinana Bulk Terminal. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - UPGRADE TO CONVEYOR
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at Hay Point Rd, Hay Point, QLD 4740 for New. Upgrade of existing yard conveyor. Click for more details...

ALCOA REFINERIES PINJARRA RESIDUE PROJECT - ELECTRICAL INSTALL FOR CARBONATION PLANT
Private ownership Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Murray Council Area for New development. For the provision of electrical installation services for the carbonation plant. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - MATERIAL HANDLING SYSTEM TO BERTH 5
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at Geraldton Port, Marine Terrace, Geraldton, WA 6530 for New. Construction Package 3. New Material Handling System to Berth 5. Package 2. Fabrication, supply, installation and commissioning of materials handling system. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - MATERIAL HANDLING SYSTEM TO BERTH 4
A project in the WA Within City Of Greater Geraldton. Material Handling System to Berth 4. Package 1. Fabrication, supply, installation & commissioning of material handling system. Click for more details...

BULLOCKY WAY CONCRETE BATCHING PLANT
New project of Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at 107 Bullocky Way, Failford, NSW 2430. Demolish existing workshop building. Construction of a concrete batching plant & new workshop building. Click for more details...

BURKE STREET STORAGE TANKS
A project in the VIC Within Maribyrnong. Buildings and works to develop the site for the construction of six storage tanks. Click for more details...

WAGNERS POTASSIUM STREET CONCRETE BATCHING PLANT
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at 201-205 (Lot 4) Potassium St CP913021, Narangba, QLD 4504 for New. Construction of a Concrete Batching Plant. Concrete & steel. Click for more details...

PORT ADELAIDE BULK STORAGE & TRANSFER FACILITY
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at Minnipa Rd & Grand Trunkway, Port Adelaide, SA 5015 for New. Proposed construction of two mineral sands storage sheds, two concentrate storage sheds with inloading and outloading conveyor systems and associated earthworks, roadways & stormwater infrastructure also includes the development of a rail spur running into the site from the Port Flat Rail Yards. Click for more details...

SHELL REFINING
Shell Refining is currently at the Construction stage, valued at about $ 5000000 it is The proposed development provides a state of the art dedicated water cooling facility for the existing polypropylene plant. The efficiency of both the manufacturing plant & cooling tower will enhanced as a result of the new water cooling facility Click for more details...

BORAL TEMPORARY ASPHALT PLANT
Boral Temporary Asphalt Plant is currently at the Construction stage, valued at about $ 4950000 it is Construction of a temporary mobile asphalt batching plant near existing plant at Riding Boundary Road, Ravenhall. The plant is to supply asphalt during the various stages of the nearby Deer Park Bypass construction. Work includes relocation and setting up of equipment, Eathworks, compaction, connection to drainage pits. Foundations and slab on ground. Click for more details...

ANDERSON RD INDUSTRIAL DEVELOPMENT
Currently at the Construction stage In Camden is a project estimated to be $ 1000000. This project Construction of a concrete batching plant, ancillary office & associated site works Click for more details...

MARSTEL TERMINALS BULK LIQUIDS STORAGE FACILITY
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at Lots 1 & 2 western end of former BHP steelworks site, Mayfield, NSW 2304 of Bulk Liquids Storage Facility type of New development. Development and operation of a bulk liquid fuel storage facility, comprising development of a tank farm with capacity to store diesel and biodiesel liquid fuel products; use of an existing ship berthing facility (Berth M4) to receive diesel fuel by sea; development of a pipeline to transport diesel fuel from this berthing facility to the tank farm; use of the existing road network to receive biofuels and to dispatch diesel and biodiesel; and development of ancillary services and infrastructure, including internal roads. excavation of areas for tank foundations; construction of reinforced concrete bund walls; preparation of the bund floor (excavation, backfilling with crushed rock, installation of liner, additional backfilling with crushed rock and priming/sealing); installation and diversion of services and infrastructure, including stormwater drainage lines; construction of internal roadways (excavation, compacting of road base; pouring of concrete pavement (reinforced) for main driveway; construction of a pipeline on existing supports to transfer materials between the berth and the storage facility; and - construction vehicle movements. Much of the material would be prefabricated and installed on site, particularly fuel facility components, thereby minimising the construction activities required on site. Proposed site structures include: 3 x diesel storage tanks (38 m diameter and 18 m high); 1 x biodiesel storage tank (8 m diameter and 12 m high); 1 x additive tank (3 m diameter x 6 m long); 1 x slops tank (2.6 m diameter x 4.5 m long); office and amenities (16 m x 9 m and 4 m high); truck loading gantry (33.5 m x 16.5 m and 6.5 m high); fire water storage tank (10.5 m diameter and 8.5 m high); firepump building (15.5 m x 5 m and 5.5 m high); workshop and MCC (10 m x 9 m and 5 m high). Click for more details...

TROPIC ASPHALT BATCHING PLANT
Tropic Asphalt Batching Plant is currently at the Construction stage, valued at about $ 3000000 it is Construction of a new asphalt batching plant, with a floor area of 275sq m, with associated office & laboratory facilities, with the capacity to produce up to 100,000 tonnes per annum. The plant will incorporate the following measures to reduce environmental impacts: installation of dust suppression sytems; heating & drying processes utilise modern bag-house to clean exhaust gasses; water sensitive urban design principals, swale drains & bio retention areas to be incorporated into the stormwater management system. Aluminium walls, aluminium roof, concrete floor and steel frame construction. Click for more details...

ORICA AMMONIUM NITRATE EMULSION PROJECT
Production Facility project at Lot 2 George Booth Dr (DP809337), Richmond Vale, NSW 2323 in the Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)). Establishment of a new ammonium nitrate emulsion production facility & associated infrastructure. key infrastructure will comprise chemical, fuel & product storage tanks; ANE manufacturing plant; truck weighing, loading & unloading facilities; utilities including hot water, cooling water & compressed air systems, electricity distribution cables & a transformer; stormwater/spill management structures; plant site office, contral room, switch room & quality control laboratory; & access road. Click for more details...

SHOWGROUND RD CONCRETE BATCHING PLANT
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) New project at 25-43 Showground Rd, Taminda, NSW 2340. This type is Concrete Batching Plant with Private ownership. Construction of a new concrete batching plant. Click for more details...

ADELAIDE BRIGHTON CEMENT SHIP LOADER FACILITY UPGRADE
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Port Adelaide Enfield Council Area of Private ownership. Upgrade of existing ship loader facility. Click for more details...

MAITLAND ST INDUSTRIAL DEVELOPMENT
Industrial Subdivision (9) Lots/Concrete Batching Plant project at 79-83 Maitland St, Branxton, NSW 2335 in the Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)). Industrial development. Stage 1 will be 9 industrial lots with the construction of a new road. Stage 2 construction of a new concrete batching plant. Click for more details...

RUTHERFORD ASPHALT PLANT
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Maitland Council Area of Asphalt Productions Plant - Replacement type. Replacement of the existing asphalt production plant. Work comprises New bitumen loading areas. New weigh bridges. Relocation of water storage tanks, relocation & reworking of aggregate bins, relocation of existing lunch room, relocation & upgrade of operations building. Removal of some trees to allow for efficient & sale vehicle circulation & formal carparking areas. Additional landscaping incorporating tree plantings, ground cover plantings & grassed areas. Relocation of the flagpole. bulk earthworks to improve drainage & stormwater & drainage management Click for more details...

WINDEYER ROAD CONCRETE BATCHING PLANT
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at Lot 26 Windeyer Rd, Wandoan, QLD 4419 of Concrete Batching Plant type of New development. Construction of batch plant & office to process 2,500cu m/annum. Click for more details...

BORAL CONCRETE BATCHING PLANT
Currently at the Construction stage In Holroyd is a project estimated to be $ 5000000. This project Alterations & additions to existing Granville concrete batching plant. The main alterations include demolition of existing buildings & plant, excavation of footings, excavation & lining of the recycled water & water storage pits, levelling of general site paving, concrete works for footings & construction of structures including silos, aggregate bins & conveyors. Work will be completed in two stages. Stage 1 will involve demolition of ancillary structures. Stage 2 will involve dismantling of all structures & remaining works and will involve plant shutting down for 4 months. Carparking for 22 vehicles. Click for more details...

COLES EXPRESS WARRENHEIP
A project in the VIC Within Ballarat. Installation of an underground tank at an existing service station. Click for more details...

SOUTH WESTERN HIGHWAY - HANSON CONCRETE BATCHING PLANT
Concrete Batching Plant project at Lot 202 South Western Hwy, Whitby, WA 6202 in the Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)). Works to include the construction of a concrete batching plant to include a wash/service area to facilitate cleaning the agitator trucks after delivery of the concrete. Click for more details...

LARAPINTA CONCRETE BATCHING PLANT
Private ownership Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Brisbane City Council Area for New development. Construction of new concrete batching plant at Larapinta. To include offices, amenities, washout & drying bays, silo towers & loading bays. Car parking for 23 vehicles. Associated landscaping. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect