List of Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks) Projects


HARVEY NORMAN HOMEMAKER CENTRE
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at Cnr Bass Hwy & Edwards St, Burnie, TAS 7320 for New. An expanded Harvey Norman store, Spotlight and three other businesses still to be confirmed, are proposed for this 11,250 sqm corner site with national highway frontage, close to Burnie commercial and industrial centres. Convenient access to port, rail, airport and natural gas. Post tensioned concrete floor slab, precast concrete walls, metal roof, aluminium shop fronts. Click for more details...

HISMELT EXPANSION PROJECT
Mechanical Installation - Package 3 project at Leath Rd, Kwinana, WA 6167 in the Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)). One of three packages. Fabrication and installation. Click for more details...

DAMPIER PORT BULK LIQUIDS BERTH (BLB) PROJECT
Private ownership Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The City Of Karratha Council Area for Addition development. Additional facilities to be constructed to enable accommodation of increased port traffic to service new fertiliser & gas to liquids projects on Burrup Peninsula. New multi-user bulk cargo export berth is being constructed to service liquids tankers & bulk solid cargo vessels. Dredging work of up to 4.5 million cu m of sediments is also being undertaken. Click for more details...

FLINT INK AUSTRALIA
Addition project of Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at 14A Williamson Rd, Ingleburn, NSW 2565. Alterations & additions to existing factory. The Proposal includes a tote storage area, external holding tanks & revised truck access to the building Click for more details...

PORT HEDLAND PORT
New project of Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at Port of, Port Hedland, WA 6721. Works comprise design, supply & installation of sampling system to sample copper concentrate. Sampler will be located on existing conveyor at Port Hedland Port Authority & used for export of copper concentrate from Telfer. General specification is as follows: Primary cross belt sampler; secondary vezin, or sliding plate sampler; rotary indexing, two cannister sample collector; belt feeder from primary to secondary sampler; electrical connection. Click for more details...

LUCCA RD FACTORY
Private ownership Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Wyong Council Area for Addition development. Installation of 2 above ground tanks, wash bays & additions to existing factory. Click for more details...

GOSNELLS ASPHALT PLANT
Gosnells Asphalt Plant is currently at the Planning stage, valued at about $ 2100000 it is Development of new asphalt plant at CSR's Gosnells Quarry site. Click for more details...

ALBANY CHIP TERMINAL PROJECT
Currently at the Construction stage In Albany is a project estimated to be $ 18000000. This project Woodchip export facility to include truck unloading area, ramps, control room, stacker, office block & network of conveyors leading to waiting ship at Berth No. 6. Retention pond also to be constructed. It is envisaged exports of woodchips will commence at rate of around 300,000 tpa from 2004, increasing to over 1 Mtpa by 2007. Click for more details...

VICTORIA DOCK/MAJOR PORT OF MELBOURNE DEVELOPMENT - STAGES 2 & 3
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project for New development. Proposed industrial park of 20 hectares. Work to include general warehousing and distribution centre (30,000sqm) and part rail sidings. which will benefit from the close proximity to the common user general cargo wharf at Victoria Dock, the dual gauge rail serving the port, as well as the two major international container terminals at nearby Swanston Dock. Click for more details...

BOULDER GROUP STEEL MILL
Boulder Group Steel Mill is currently at the Early Planning stage, valued at about $ 800000000 it is Construction of a stainless steel manufacturing plant known as a Danieli combi-mill that will produce a variety of stainless & speciality steels. The mill has been designed for an annual output of some 240,000 tons of stainless & special steels as per ISO 9002. The use of leading edge technology ensures high flexibility & in-time production of over 3,000 different types of steel. Some 60% of the output is destined for the Australian market as import substitutes. Click for more details...

COLLTECH AUSTRALIA - COLLAGEN EXTRACTION PLANT (NARROGIN)
A project in the WA Within Narrogin. It was proposed to develop new plant to extract collagen from sheepskin. Click for more details...

KWINANA ALUMINA REFINERY
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Kwinana Council Area of Carbonation Facility - Upgrade type. Includes installation of a new carbonation vessel, modifications to the existing carbonation facility, a new causticisation facility (2 causticisers and a 200 kL lime slurry storage tank and a new discharge pipeline between the causticisation facility and the residue disposal area H. Click for more details...

PORT OF GERALDTON - BERTH 6
Shiploader For Berth 6 Addition project In The City Of Greater Geraldton Council Area. New shiploading facility includes refurbished A Frame loader & truck dumping facility with multiple delivery capabilities. Click for more details...

BURRUP FERTILISERS AMMONIA PLANT PROJECT
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The City Of Karratha Council Area of Hvac System For Ammonia Plant type. Supply of HVAC system. Click for more details...

DALRYMPLE BAY COAL TERMINAL - FURTHER EXPANSION
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at Hay Point Rd, Hay Point, QLD 4740 of Coal Terminal - Expansion type of New development. First phase will take capacity to 68 million tonnes by July 2007. More specifically work onshore will involve a new out loading conveyor system from the stockyard feeding to a new surge bin and sample plant complex (surge bin 3). This will feed to a new shuttling head conveyor that can feed either of the two existing jetty conveyors and a third future conveyor. Offshore work involves a new conveyor L15 gallery structure, a 10 metre widening of the existing jetty by addition of a third pile and an extension of the existing steel headstock at each bent. A new access roadway in between conveyors L5 and L15 to provide maintenance access to L15. An extension of existing conveyor L17 tail. A new drive tower and transfer tower at the head of L15, supported upon a piled platform that will also provide for roadway access to this area and relocated transformers. Two new stackers and two reclaimers will also be installed. Click for more details...

MACONACHIE STREET CONCRETE BATCHING PLANT
94 Maconachie St, Portsmith, QLD 4870 Has Maconachie Street Concrete Batching Plant currently at Planning stage. Construction of large office and associated works concrete batching plant and warehouse to be relocated here from another site Click for more details...

WESTRAC DEPOT
New project of Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at 22-28 Frank St, Wetherill Park, NSW 2164. Installation of bulk oil tanks. Click for more details...

METROMIX HORNSBY
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project for Addition development. Addition to the existing concrete batching plant. The addition is a new roof which will be located over the batch ramp Click for more details...

CORELLA CL CONCRETE BATCHING PLANT
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) New project at 3 (Lot 101) Corella Cl (DP841453), Berkeley Vale, NSW 2261. This type is Concrete Batching Plant with Private ownership. Construction & operation of a concrete batching plant on a vacant site within the Enterprise Park Industrial Estate at the end of Corella Close. The plant consist of an administration building, office, amenities & workshop GFA 200sq m. Access & internal roadwork. A series of ten on ground storage bins for aggregate plus 2 smaller specialised aggregate bins. Two overhead storage silos for cement &/or fly ash storage. A operators cabin/control room. An additive/chemical storage area. Waste washout & storage facilities for solid concrete & a series of settlement pits, drainage dividers & sediment collections pits for water quality control. Click for more details...

GERALDTON PORT AUTHORITY - IRON ORE EXPANSION PROJECT - MATERIALS HANDLING
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at Geraldton Port, Marine Terrace, Geraldton, WA 6530 for New. Development comprises modifications for Conveyor (CV) 13 to allow for the upgrading and reversal for conveying iron to Berth 5. New conveying circuit for iron ore from reversed and upgraded CV 13 to Berth 5. Modifications to the concentrate load out arrangements. Modifications and new conveying circuit to route all minerals and concentrates from the existing mineral sands ship loading truck dump facility to Berth 4. Minor upgrade of Berth 6 ship loader (only if required to accommodate modifications to suit a new minerals conveyor feed circuit such as a reversed feed tipper). New electrical substations, power distribution and electrics for the new development. New control system and provisions for future control systems for all recalim, conveying and ship loading circuits including intergration with existing systems. Upgrade of existing reclaim systems as required to accommodate the loading circuit modifications for both iron ore and minerals. Click for more details...

BORAL CONCRETE PLANT
Concrete Plant - Altns & Addns project at 53 South St, South Kempsey, NSW 2440 In The Council Area Of Kempsey of Private. Alterations & additions to an existing concrete plant. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - PHASE 2/3
New project of Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at Hay Point Rd, Hay Point, QLD 4740. Terminal expansion to increase capacity to 85 Mtpa. Click for more details...

DALRYMPLE BAY COAL TERMINAL - CONVEYOR UPGRADE
Private ownership Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Mackay Regional Council Area for New development. Upgrades to conveyors L 1, L2, L3 and L 4. The tender comprises upgrades to the belt feeder drivers BF5, BF6 and BF7. Click for more details...

SCHOOL DRIVE BATCHING PLANT - DOUBLE ENTRY REFER TO ID788131
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) New project at 21B School Dr, Tomago, NSW 2322. This type is Plant with Private ownership. Construction of a new concrete batching plant. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - MATERIAL HANDLING SYSTEM TO BERTH 5
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at Geraldton Port, Marine Terrace, Geraldton, WA 6530 for New. Construction Package 3. New Material Handling System to Berth 5. Package 2. Fabrication, supply, installation and commissioning of materials handling system. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - MATERIAL HANDLING SYSTEM TO BERTH 4
A project in the WA Within City Of Greater Geraldton. Material Handling System to Berth 4. Package 1. Fabrication, supply, installation & commissioning of material handling system. Click for more details...

COCA-COLA AMITIL FACILITY NORTHMEAD
Coca-Cola Amitil Facility Northmead is currently at the Construction stage, valued at about $ 140000000 it is Construction of a high bay automated bulk distribution facility (warehouse), adjoining the existing manufacturing operation, with a building footprint of approx 16,000sq m. The work includes demolition; site preparation works, including excavation & bulk earthworks; construction and use of a new 32 metre high automated high bay warehouse and associated staging area; building envelope for a new building to house a canteen, offices & training facilities; building envelope for a new gatehouse and driver amenities; upgrading of the on site stormwater drainage system; implementation of access and traffic circulation improvements, including parking and new entrances; and site landscaping. Concrete slab, fibre cement cladding & metal deck roof Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - RELOCATING/UPGRADING STACKER/RECLAIMER SR3
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) New project at Hay Point Rd, Hay Point, QLD 4740. This type is Stacker/Reclaimer Sr3 - Relocate/Upgrade/Modify with Private ownership. Relocate, upgrade and modify stacker/reclaimer SR3 to SR6 location. The upgrade includes the supply of a new elevator conveyor as well as an upgrade of the electrical system. Click for more details...

BORAL CONCRETE
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Melton Council Area of Concrete Batching Plant type. Relocation of batching plant equipment. Work consists of foundations and slab on ground at an existing plants. Click for more details...

YARWUN ALUMINA REFINERY EXPANSION
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Gladstone Regional Council Area of Private ownership. Expansion of the existing refinery to increase its capacity by 2million tonnes per annum (Mtpa) to 3.4Mtpa. Includes construction of a 160MW, gas-fired cogeneration plant to improve energy efficiency while reducing greenhouse gas emissions. About half the electricity generated by the plant will be used to power the existing & new refinery facilities with the remainder exported to the national electricity grid. By mid 2010 the cogeneration plant had been handed over & the wharf extension & major tank builds had been completed. Click for more details...

INTEGRATED OIL SEED PROCESSING & BIODIESEL FACILITY
Seed Crushing Facility/Biodiesel Plant New project In The Wagga Wagga Council Area. Proposed construction of an oil seed crushing facility & biodiesel plant. The plant will utilise approx 165,000 tonnes of oil seed per annum & produce 25,000 tonnes of edible oil, 100,000 tonnes of meal & 75 million litres of biodiesel. Construction of an integrated oilseed processing & biodiesel facility. The plant would use canola and safflower seed as raw material to produce vegetable oil, from which bio-diesel is manufactured through a process known as trans-esterification. It is envisaged that the integrated plant would produce up to 75 ML of bio-diesel per annum using 165 000 tonnes of oilseed. The development includes the following proposed facilities: Oilseed Crushing Plant. The oilseed crushing equipment would be housed in a steel building with a concrete floor. The footprint of the building would be approximately 48m x 20m. The plant would have the capacity to process some 500 tonnes per day (TPD) of oil seed and produce around 100 TPD of expelled oil and about 400 TPD of oil cake. Solvent Extraction Plant. The solvent extraction equipment would be housed in a steel building without walls. It would have a concrete floor and a footprint of approximately 30m x 12m. The use of hexane in the building would make it a hazardous area. The facility would have the capacity to process about 400 TPD of oil cake, some 100 TPD of solvent extracted oil and around 300 TPD of de-oiled cake. Meal Blending Shed. This would be an enclosed steel building with a footprint of approximately 12m x 8m. De-oiled meal from the solvent extraction building would be conditioned by mixing it with produced gum and adjusting the moisture content of the meal. Vegetable Oil Refinery. The oil refining equipment would be housed in an enclosed building with a concrete floor and a footprint of approximately 20 m x 18m. The refinery would have the capacity to process some 200 TPD of expelled oil or solvent extracted oil. Biodiesel Plant. The bio-diesel plant would comprise an open building with a footprint of approximately 25m x 15m. The area would be treated as hazardous due to the use of methanol as a solvent. The plant would have the capacity to produce some 6.25 ML of bio-diesel per month. Weighbridge. A weighbridge would be installed near the main access point of the plant to weigh all raw material, chemicals, products and by-products. It would be fully automated to handle semitrailer and B-double vehicles up to 90 T. Storage. Oilseed would be stored in six steel silos, each with the capacity to store around 3 300 T. The silos would be gas tight to allow for fumigation and would have an aeration system. Each silo would also have temperature and level monitoring equipment installed. From the silos, the oilseed would be conveyed to two day bins from which the crushing plant is supplied. This would occur at a controlled rate of around 20 ? 40 tonnes per hour (TPH). De-oiled meal would initially be stored in day bins and then conveyed to the meal storage shed or loaded directly onto trucks. The meal storage shed would have the capacity to store some 3000 T of meal. Meal from the shed would be loaded onto trucks by a front end loader. Vegetable Oil Storage. Six vertical cylindrical tanks with flat floors and conical roofs would be installed to store the refined canola and safflower separately. Each tank would have a nominal capacity of 500 KL and have steam heating coils installed to maintain the temperature at approximately 50°C. Two tanks of some 240 KL capacity would be constructed to store procured palm oil. Biodiesel Storage. Biodiesel would be stored in four day tanks of nominal 110 KL capacity and three bulk storage tanks of nominal 1 370 KL capacity. These storage tanks would have nitrogen blanketing. Biodiesel would be pumped to road tankers from these tanks for dispatch by road. Click for more details...

MCMANUS ROAD ASPHALT PLANT
Currently at the Construction stage In Greater Geelong is a project estimated to be $ 4000000. This project Construction of a asphalt plant. Steel structure. To include feed conveyor, bins, burners, storage stormwater pipework, pumps and landscaping. Click for more details...

A1 DEVELOPMENTS
Concrete Crushing Plant project at 40 Parinda Rd, Drouin, VIC 3818 in the Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)). Use and development of the land for a concrete crushing plant, including storage bunkers, additional car parking and an outbuilding. Click for more details...

ORICA AMMONIUM NITRATE EMULSION PROJECT
Production Facility project at Lot 2 George Booth Dr (DP809337), Richmond Vale, NSW 2323 in the Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)). Establishment of a new ammonium nitrate emulsion production facility & associated infrastructure. key infrastructure will comprise chemical, fuel & product storage tanks; ANE manufacturing plant; truck weighing, loading & unloading facilities; utilities including hot water, cooling water & compressed air systems, electricity distribution cables & a transformer; stormwater/spill management structures; plant site office, contral room, switch room & quality control laboratory; & access road. Click for more details...

MACKENZIE ROAD INDUSTRIAL DEVELOPMENT
New project of Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at 40-44 MacKenzie Rd, Coode Island, West Melbourne, VIC 3003. Demolition of existing office and construction of a new office and ten liquid storage tanks; Also the relocation of 1 existing bulk liquid storage tank. Click for more details...

SOMMERVILLE CCT CONCRETE BATCHING PLANT
New project of Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at 49-55 (Lots 31 & 32) Sommerville Cct (DP1105133), Emu Plains, NSW 2750. Construction of a new concrete batching plant with an intended daily production rate of 100-200m³ (210-420T) per day or approximately 27,300-54,000m³ (57,330-114,660T) per year. The development will comprise office/batch room & amenities building; above ground aggregate & sand storage bays; 4 x 120T fly ash & cement storage silos; covered batching & loading facility; & agitator truck washout Pits. Carparking for 15 cars. Click for more details...

VISY PLASTICS PROCESSING PLANT
Processing Plant - Altns & Addns To Factory project at 2 (Lot 2) Herbert Pl (DP849480), Smithfield, NSW 2164 in the Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)). Alterations & additions to existing building & change of use to a plastics processing plant. Works will include internal fitout; construction of a pipe bridge over part of the site; new waste water pre-treatment plant; increase in height over 2 sections of the building at the southern side, known as the top hats; installation of acoustic insulation on the underside of eastern awning; installation of exhaust fans; new load conveyer; construction of new openings on the eastern facade; cooling towers; construction of 2 electrical transformers; installation of water tanks; siteworks & external container storage area. Proposed top hats will be of steel framed construction with colorbond trimdeck walls to match existing, colorbond ridge capping eaves & colorbond roof. Modifications to carparking & driveways. Click for more details...

GRAND JUNCTION ROAD ASPHALT PLANT
Grand Junction Road Asphalt Plant is currently at the Tenders & Building stage, valued at about $ 11150000 it is Construction of asphalt plant. Click for more details...

CEMENT AUSTRALIA GRINDING MILL
Trade Package For Jetty Strengthening Work New project In The Wollongong Council Area. Trade Package to locally strengthen section of No 6 jetty to support the unloading conveyor trestle foundations. Timing for commencement of works/ services estimated for 2nd Quarter of 2013 Click for more details...

CEMENT AUSTRALIA GRINDING MILL
Trade Package For Jetty Rail Works project at Outer Harbour, Port Kembla, NSW 2505 in the Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)). Trade pacakge tender for supply &/or install prefabricated rail segments to No 6 jetty to facilitate movement of shore based clinker unloading hoppers and conveyors. Timing for commencement of Works/ Services is estimated at 1st Quarter of 2013. Click for more details...

SOUTHGATE CONTAINER PARK - VISA GLOBAL LOGISTICS- WAREHOUSE 1
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at 32 Swinbourne St cnr Coal Pier Rd, Botany, NSW 2019 of Warehouse/Office - 2 Storey type of New development. Stage 1: Construction of warehouse Building 1 comprises a container handling facility associated with warehouse 1 of 15,400sq m, installation of a diesel fuel tank for truck refuelling of approximately 50,000 litres, construction of a truck wash area. Construction of office space associated with warehouse 1 over 2 levels of approximately 1500sq m. Carparking for 100 vehicles located in the north western corner of the site with direct access to the Swinbourne St access handle. Construction of 7 loading docks. Landscaping includes the construction of a detention swale adjoining the access driveways to Coal Pier Rd. Signage, Construction of the cycleway linking Swinbourne St. Construction of an onsite detention tank in the south western corner of the site. Fitout of warehouse 1 for VISA Global Logistics. Click for more details...

JERSEY ROAD ASPHALT PLANT
Asphalt Plant project at 18 Jersey Rd, Bayswater, VIC 3153 In The Council Area Of Knox of Private. Replacement of an existing asphalt plant with a new asphalt plant, including ancillary material recycling (reclaimed asphalt). Click for more details...

SHELL SERVICE STATION - LIQUEFIED NATURAL GAS FACILITY
Shell Service Station - Liquefied Natural Gas Facility is currently at the Construction stage, valued at about $ 1550000 it is Installation of a liquefied natural gas facility. Work comprises of the installation of 1, 11.5sq m high x 3.8sq m diameter, 7kl LNG storage tank. Construction of 12950sq m x 7100sq m foundation slab. Installation of 2, LNG dispensers & associated underground piping. Vapour recovery system including re-liquefactorion equipment. Installation of 1, 15KL tank to store liquid nitrogen. Construction of a control room. Provide new fill points. Installation concrete bollards to protect the new infrastructure. Erection of 1.8sq m chain wire fence around the perimeter of the LNG tank. Erection of ARMCO railing on the northern side of the LNG facility. Click for more details...

GUNLAKE CONCRETE BATCHING PLANT
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project for New development. Construction of a concrete batching plant with an intended production capacity of up to 100,000³m of concrete per annum Click for more details...

TUGGERANONG BUS DEPOT
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Act Council Area of Fuel Tanks type. Replacement of underground fuel tanks with 2 new 88l bunded above ground tanks. New bulk diesal storage, unloading area, extension of the existing carpark & associated civil works. Click for more details...

UTAH BULK HANDLING FACILITY
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) Addition project at Finuccane Island, end of FMG Rd, Port Hedland, WA 6721. This type is Cv07 Tundish - Fabrication & Installation with State ownership. Works to include the fabrication & installation of a washdown catchment (Tundish) structure & associated steelwork & will include modifications to the existing structure to facilitate the installation at the Port of Port Hedland's Utah Bulk Handling Facility. Click for more details...

PILBARA PORTS AUTHORITY - HYDROGRAPHIC SURVEY CONSULTANCY SERVICES
State ownership Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Port Hedland Council Area for New development. Consultants are sought for the provision of Hydrographic Survey consultancy svcs for Pilbara Ports Authority to include: pre-. post- & progress dredge surveys; metocean equipment inspections & general hydrographic & related topographic survey svcs. Click for more details...

NORTH BURNETT COUNCIL DISASTER CO-ORDINATION CENTRE
Disaster Centre New project In The North Burnett Regional Council Area. Construction of a Disaster Management Co-ordination Centre & the design & construction of a Storage/Dispensing Facility for aviation fuel. Click for more details...

MOUNT ISA EFFLUENT STORAGE TANK
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Mt Isa City Council Area of Effluent Storage Tank type. Construction of a 2.8ML effluent steel holding tank in Mount Isa. Click for more details...

REDBANK PLAINS ROAD CONCRETE BATCHING PLANT STAGE 1
Concrete Batching Plant - Stage 1 project at 1005 Redbank Plains Rd (Lot 18 SP212644), Swanbank, QLD 4306 In The Council Area Of Ipswich City of Private. Construction of concrete batching plant in stage 1. Car parking for 24 vehicles to include 23 car parking & 1 accessible car parking. Associated landscaping. Click for more details...