List of Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks) Projects


HANSOL/PULPWOOD WOODCHIP MILL
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Bunbury Council Area of Woodchip Mill type. It is proposed to develop woodchip mill for plantation timber in south west region of Western Australia. It is envisaged mill would process around 3.6 mtpa of wood. Click for more details...

CONCRETE MANUFACTURING PLANT
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at 18 Chapman St, Queanbeyan, NSW 2620 for New. Construction of 6 above ground three sided reinforced concrete raw material storage bins. 2 silos for the storage of cement and/or fly ash with overhead hopper 12 meters maximum height. A water run off & recycling system to be installed to control all stormwater & waste/contaminated water from the manufacturing process. Water will pass from collection trough into settlement ponds and filtered water returned by pump to the water storage tank. Click for more details...

WESTERN MINERAL FERTILISERS - FACTORY
A project in the WA Within Cranbrook. Construction of silicate-based natural fertiliser manufacturing & blending plant, loading facilities & showroom. Click for more details...

FLINT INK AUSTRALIA
Addition project of Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at 14A Williamson Rd, Ingleburn, NSW 2565. Alterations & additions to existing factory. The Proposal includes a tote storage area, external holding tanks & revised truck access to the building Click for more details...

PARADISE ROAD BATCHING PLANT
Paradise Road Batching Plant is currently at the Construction stage, valued at about $ 500000 it is Construction of batching plant. To include, portable building, storage bins for aggregate & sand with dust suppression sprays, sealed concrete storage silo & sealed concrete mixing plant. Large sealed & graded vehicle manouvering area. Washout settling ponds with recirculating apparatus to allow for reuse of water. Click for more details...

CONCRETE BATCHING PLANT
Private ownership Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Weddin Council Area for New development. Construction of concrete batching plant, machinery shed, workshop, offices, storage shed, 20,000 litre fuel storage & associated infrastructure. Click for more details...

KWINANA BULK TERMINAL - MATERIALS HANDLING EQUIPMENT
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) Renovations, Refurbishments etc. project at Lot 120 Kwinana Beach Rd, Kwinana, WA 6167. This type is Materials Handling - Control Systems Upgrade with State ownership. Works comprise materials handling upgrade - control systems. Click for more details...

KWINANA BULK TERMINAL - MATERIALS HANDLING EQUIPMENT
State ownership Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Kwinana Council Area for Renovations, Refurbishments etc. development. Works comprise mechanical & electrical upgrade to materials handling equipment at Kwinana Bulk Terminal. Click for more details...

PORT KEMBLA STEELWORKS
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) Addition project at Lot 1 Five Islands Rd (DP606434), Port Kembla, NSW 2505. This type is Hot Strip Mill - Addns with Private ownership. Additions to existing facility, including, changing the process of slab handling, installation of second Walking Beam Furnace including new stack, modifications to existing ancillary equipment, modifications to the coil processing & despatch systems, modifications to No. 25 Boiler to make Coke Oven Gas (COG) available for use at the Hot Strip Mill Walking Beam Furnace. Click for more details...

GERALDTON PORT ENHANCEMENT PROJECT
Port of, Geraldton, WA 6530 Has Geraldton Port Enhancement Project currently at Early Planning stage. Investigation, design & documentation of modifications to shiploaders to accommodate relocation of berth face by approximately 7 m seaward. Click for more details...

WESFARMERS CSBP AMMONIA PROJECT
A project in the WA Within Kwinana. It is proposed to modify existing anhydrous ammonia import facility so that ammonia can also be exported. To facilitate this, export pump is to be installed in ammonia transfer line near to 30,000 t ammonia storage tank. Loading rate of about 500 tph is envisaged. Click for more details...

METHANEX AUSTRALIA PROJECT
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) New project at King Bay-Hearson's Cove Industrial Precinct, Burrup Peninsula, Dampier, WA 6713. This type is Methanol Plant with Private ownership. A 1.3 million tonne per year methanol project, as the first stage of a planned Asia Pacific hub. This was a reduction in capacity of about 35% compared to the original project plan of 2 million tonnes per annum. Click for more details...

METHANEX SYNGAS GAS TO LIQUIDS (GTL) FACILITY
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Darwin City Council Area of Synthesis Gas Generation Facility type. Proposed large-scale synthesis gas (syngas) generation facility. Syngas can be used as a feedstock to produce a variety of chemicals and fuels. Methanex is exploring product and technology options for this proposed syngas project including methanol, hydrogen and gas-to-liquids. Methanex, with the cooperation of the Northern Australia Gas Venture (NAGV), is also seeking downstream customers for methanol for production of ethylene and propylene, and for hydrogen to production of ammonia. Click for more details...

BOULDER GROUP STEEL MILL
Boulder Group Steel Mill is currently at the Early Planning stage, valued at about $ 800000000 it is Construction of a stainless steel manufacturing plant known as a Danieli combi-mill that will produce a variety of stainless & speciality steels. The mill has been designed for an annual output of some 240,000 tons of stainless & special steels as per ISO 9002. The use of leading edge technology ensures high flexibility & in-time production of over 3,000 different types of steel. Some 60% of the output is destined for the Australian market as import substitutes. Click for more details...

TOYOTA TSUSHO
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Wyndham Council Area of Production Area/Office type. Proposed new production area with adjoining office and associated car parking. Click for more details...

BURRUP FERTILISERS AMMONIA PLANT PROJECT
Burrup Fertilisers Ammonia Plant Project is currently at the Construction stage, valued at about $ 900000 it is Supply of air intake system for gas turbine. Click for more details...

BURRUP FERTILISERS AMMONIA PLANT PROJECT
Refractory - Supply & Installation For Ammonia Plant project at Btwn King Bay & Hearson Cove, Burrup Peninsula nr, Karratha, WA 6714 in the Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)). Refractory supply & installation. Click for more details...

AUSTRALIAN MARINE COMPLEX - FABRICATION HALL (BUILDING 9)
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at 124 Quill Wy, Henderson, WA 6166 of Fabrication Hall type of New development. Work comprise design & construction of fabrication hall (Building 9) at Australian Marine Complex in Cockburn Sound as part of Common User Facility. Click for more details...

KWINANA BULK TERMINAL CONVEYOR REPAIRS
A project in the WA Within Kwinana. Repairs to walkway structure of conveyors CV1 & CV3 at Kwinana Bulk Terminal. Click for more details...

WESTRAC DEPOT
New project of Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at 22-28 Frank St, Wetherill Park, NSW 2164. Installation of bulk oil tanks. Click for more details...

ABB GRAIN - MECHANICAL PACKAGE 1
Private ownership Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Port Adelaide Enfield Council Area for New development. Manufacture & installation of mechanical equipment sited in elevator tower at new ABB Grain storage terminal. Equipment comprises bucket elevators, grain & distributor values, weigh batching & calibration systems & interconnecting chute work. Click for more details...

GROVE ROAD WAREHOUSE/CONCRETE BATCHING PLANT
Warehouse/Concrete Batching Plant project at 115 Grove Rd, Grovedale, VIC 3216 in the Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)). Construction of a warehouse and concrete batching plant Click for more details...

SUGAR AUSTRALIA
Sugar Australia is currently at the Construction stage, valued at about $ 42000000 it is Proposed construction of a new sugar bulk material handling facility. Concrete and steel construction. Site contains 9 heritage buildings. Click for more details...

NATIONAL DRIVE CONCRETE BATCHING PLANT
Currently at the Construction stage In Casey is a project estimated to be $ 700000. This project Construction of a concrete batching plant. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - CONVEYORS R8 & S8
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Mackay Regional Council Area of Private ownership. To construct and supply conveyors for R8 and S8. Click for more details...

MANILDRA PARK BULK LIQUIDS STORAGE & BIODIESEL PRODUCTION FACILITY
Currently at the Construction stage In Newcastle is a project estimated to be $ 32000000. This project Construction and operation of a marine fuel storage and distribution, and biodiesel production facility and associated infrastructure. The proposal will be undertaken in 3 distinct phases. Phase 1 involves refurbishing the 2 existing storage tanks, construction of pipeline & operating fuel receival & distribution facilities at the berth, construction of a road tanker loading bay & construction of amenities & service buildings. Under this phase the storage capacity is approx 51 ML. Phase 2 involves the construction of 3 additional fuel storage tanks. Associated with the increased storage capacity, is an increase in distribution volumes to service local land based bulk diesel users. Under this phase, the storage capacity is increased by approx 9 ML, taking the total storage capacity to approx 60 ML. Phase 3 involves the construction of a biodiesel production facility with a production capacity of approx 60 ML per year. The distribution of biodiesel will utilise the marine & road distribution infrastructure constructed as part of Phase 1. Under this phase, the construction of a 5 ML tank increases the total storage capacity to approx 65 ML. Click for more details...

SINTER PLANT & RAW MATERIALS HANDLING AREA UPGRADE
Sinter Plant & Raw Materials Handling Area Upgrade is currently at the Construction stage, valued at about $ 134000000 it is The project involves an increase in the production capacity of the Sinter Plant from 5.5Mt to 6.6Mt per annum. Scope of work includes: the sinter strand length will be marginally increased by 15m to enable installation of a segregating cooler filling chute. The existing waste gas main will be extended commensurate with the strand extension, with a proper number of new wind boxes installed; Sinter strand deepening by 200mm, the deepening will involve removal of existing pallet side-plates & replacement with new pallet side-plates; installation of new strand feeding technology. It is proposed that the exiting chute feed system be replaced with a new active strand-feeding device designed to promote vertical segregation of the feed material, remote motor drives on each feed gate are also planned; installation of a new ignition furnace to provide better ignition; modification of structural components of the stand, including relocation of hearth layer bin support beams, installation of new hearth layer lower hopper dust sealing at the deed end & installation of discharge end de-dusting hoods; removal of existing hot sinter feeders from strand to cooler & relocation of the lowering wheel & discharge end de-dusting hoods; installation of a new vertical cooler feed chute at the end of the strand; installation of internal components into Zone 1 of each Waste gas Precipator; upgrade of belt conveyors 29, 3305, 3314 & 3317, minor modifications to the feed hopper, hearth layer bin, split bin & strand motor & extension of the Sinter Plant building by approximately 14m at the Sinter Cooler end. The Sinter Plant upgrade also includes rebuilding the Sinter Cooler. The Raw Materials Handling area scope of work involves: construction of a new 26m conveyor FA from F26 to Transfer Tower T4 including minor modifications to F26 & addition of a new chute for FA, installation of new conveyors F93 & F94 from Transfer Tower T4 to F76, replacing conveyor F76 with F95 to a existing product fines bin; installation of new conveyors F12, F13 & shuttle F14 from a new hopper to the Fine Ore Bins at the Sinter Plant, installation of a new shuttle from F34 to S4; excavation for the installation of the new Primary yard by-pass conveyors will be approximately 300m³ & excavation for installation of the new Sinter Plant Feed Sequence conveyors will be approximately 100m³ & upgrading of the secondary stacker chute Click for more details...

WAGNERS POTASSIUM STREET CONCRETE BATCHING PLANT
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at 201-205 (Lot 4) Potassium St CP913021, Narangba, QLD 4504 for New. Construction of a Concrete Batching Plant. Concrete & steel. Click for more details...

BORAL CONCRETE
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Melton Council Area of Concrete Batching Plant type. Relocation of batching plant equipment. Work consists of foundations and slab on ground at an existing plants. Click for more details...

MAGAZINE WAY CONCRETE BATCHING PLANT
Private ownership Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Broken Hill Council Area for New development. Construction of a new concrete batching plant. Click for more details...

ASTEC ASPHALT PLANT
New project of Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at 1 & 5 (Lot 4) Keevers Pl (DP1120230), Kembla Grange, NSW 2526. Construction of a new ASTEC asphalt plant & ancillary infrastructure. Major components comprise RAP stockpile area, gas bunkers, bulk storage area, cold feed system, scalping screen, inclined conveyor including weighbridge, CFM pulse jet baghouse, dry additive system, recycle feed bins, new generation storage system, waste bin, truck loadout & management system, 15,000 gallon vertical asphalt tank, 30,000 litre diesel bunded storage tank, administration office & maintenance workshop, substation, truck parking/loading areas, fencing & security, lighting, batter works, stormwater management system. Carparking. Landscaping. Click for more details...

SHELL REFINING
Shell Refining is currently at the Construction stage, valued at about $ 5000000 it is The proposed development provides a state of the art dedicated water cooling facility for the existing polypropylene plant. The efficiency of both the manufacturing plant & cooling tower will enhanced as a result of the new water cooling facility Click for more details...

SOMERTON ROAD CONCRETE BATCHING PLANT
Private ownership Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Hume Council Area for New development. Construction of a mini concrete mix plant to an existing garden supplies centre. Click for more details...

A1 DEVELOPMENTS
Concrete Crushing Plant project at 40 Parinda Rd, Drouin, VIC 3818 in the Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)). Use and development of the land for a concrete crushing plant, including storage bunkers, additional car parking and an outbuilding. Click for more details...

PRIMAL SURFACING PTY LTD
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Wyndham Council Area of Private ownership. Construction of a concrete batching plant. Click for more details...

HUME ASPHALT MANUFACTURING PLANT
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at Blk 76 Secn 7 off Tralee St, Hume, ACT 2620 of Ashpalt Manufacturing Plant type of New development. Construction of an asphalt manufacturing plant. Buildings to comprise the asphalt plant with tank farm & storage bunkers. Administration building of 2 storeys 612sq m . Colorbond roof & facade, rendered & painted concrete columns, fascia, awning & sunshade, retaining walls of brick blockwork anodised window & doorframes. Construction of a workshop & storage shed with wash bay of 690sq m with roller doors, custom orb steel cladding, kliplok roof & skylights. Carparking for 53 vehicles. Associated landscaping. Click for more details...

BELLFROG ST CONCRETE BATCHING PLANT
New project of Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at Lots 18-20 Bellfrog St, formerly 1-7 Juno Pde, Greenacre, NSW 2190. Construction of a concrete batching plant for Hanson Construction Materials including office building, drivers room & amenities & plant control centre. 4 x 120 tonne cement storage silos, plant building & monorail crane; 1,800 tone underground aggregate storage area; 8 x 225 tonne ground bin stores; twin fully enclosed drive through agitator load bays; 4 x truck washout pits, 2 x wedge pits & 3 x truck wash bays. Associated hardstand & trafficable area. Click for more details...

SOMMERVILLE CCT CONCRETE BATCHING PLANT
New project of Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at 49-55 (Lots 31 & 32) Sommerville Cct (DP1105133), Emu Plains, NSW 2750. Construction of a new concrete batching plant with an intended daily production rate of 100-200m³ (210-420T) per day or approximately 27,300-54,000m³ (57,330-114,660T) per year. The development will comprise office/batch room & amenities building; above ground aggregate & sand storage bays; 4 x 120T fly ash & cement storage silos; covered batching & loading facility; & agitator truck washout Pits. Carparking for 15 cars. Click for more details...

AUSTRAL PRECAST CONCRETE BATCHING PLANT
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at 33-41 (Lot 79) Cowpasture Rd (DP27515), Wetherill Park, NSW 2164 of Concrete Batching Plant type of New development. Construction of a concrete batching plant associated with an existing concrete products manufacturing facility. Production capacity of up to 60,000 m3 per year is envisaged. Inclusion of a closed loop concrete recycling process enabling aggregates to be washed and reused on site, and slurry to be stored and also reused on site. Modifications to the existing precast concrete facility to allow receipt of the ready-mix concrete from the proposed concrete batching plant. The plant would comprise plant to receive raw materials; storage of raw materials in fully enclosed bins (sand & aggregate) & silos (cement/flyash); mixing line, which would mix raw materials in certain ratios to produce ready-mixed concrete in twin rotary mixers; system to weigh & deliver (via conveyor belts and skip hoist) the raw materials into the mixing line; other auxiliary systems such as waste concrete & water recycling and safeguards for receiving cement/flyash into silos. Click for more details...

GREAT EASTERN HIGHWAY FIRE RESERVE WATER TANKS - SCREEN ENCLOSURE
Screen Enclosure project at 201 (lot 15) Great Eastern Hwy, Burswood, WA 6100 in the Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)). Works to include the construction of screen enclosure for the reserve fire tanks at the rear of the convention centre. Click for more details...

CEMENT AUSTRALIA GRINDING MILL
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at Outer Harbour, Port Kembla, NSW 2505 of Grinding Mill type of New development. Construction of a grinding mill facility in the outer harbour of Port Kembla. The intention is to construct and commission a plant that has the capability to be expanded in the future should demand warrant the plant's expansion. There are 3 components of this project, the unloading of raw materials, the processing of raw material and the loading of finished product. The key components of the project comprise: Processing plant including transfer hoppers, storage bins, grinding mill and storage silos for dispatch of product. A materials transfer system which incorporates extensive covered and enclosed conveyor systems, transfer chutes and dust suppression system and bag house for air quality control. Clinker storage shed. Truck and ship loading and unloading facilities. Associated office and amenities, workshop, substation, transformer yard and car parking. Temporary covered external stockpile for raw product (excluding clinker). Construction of a conveyor to transport clinker from ships to the clinker storage shed. The Project will broadly consist of the following modules: Clinker Receiving & Storage System - transferring clinker from ships to the clinker storage shed. Gypsum, Slag & Limestone Receiving & Storage System - transferring gypsum, slag & limestone to dedicated feed bins. Clinker Shed Extraction System - a system to transfer clinker from the storage shed to the cement mill feed bin. Gypsum Dehydration System - for dehydrating gypsum prior to it being fed into the cement mill. Cement Mill Feed & Recirculation System - this will feed wet (slag & limestone) & dry (clinker) material to the cement mill. Cement Mill - the major part of the project used to grind the clinker into cement & other products. Cement Storage & Transport System - a system to transport the ground cement powder from the cement mill to the cement storage silos. Bulk Loading road system - for transferring cement & GGBFS from storage silos to weighbridges. Compressed Air System - providing sufficient dry, oil free compressed air to the various plant departments. Process Control System - automation for the main processing equipment. Closed Loop Water Processing System - treating water for the entire cement production plant. Electric Power Supply System - providing electrical power to the total cement production facility. Fire protection and alarm system - protecting the plant from fire damage Click for more details...

FREIGHT DRIVE CONCRETE BATCHING PLANT
28-32 Freight Dr (Lot 187), Somerton, VIC 3062 Has Freight Drive Concrete Batching Plant currently at Construction stage. Construction of a concrete batching plant. Click for more details...

ADELAIDE BRIGHTON CEMENT SHIP LOADER FACILITY UPGRADE
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Port Adelaide Enfield Council Area of Private ownership. Upgrade of existing ship loader facility. Click for more details...

COLLIER ROAD CONCRETE BATCHING PLANT
Concrete Batching Plant project at 277-279 (lot 2) Collier Rd, Bayswater, WA 6053 in the Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)). Construction of a concrete batching plant, comprising of underground aggregate delivery bins & above ground storage bins that will be enclosed within a 12.0m high building, also to include the construction of a concrete aggregate recycling unit & one cement storage silo. Associated car parking & landscaping. Click for more details...

BLACKSHAWS ROAD STORAGE TANKS
Currently at the Planning stage In Hobsons Bay is a project estimated to be $ 80000. This project Construction of 2 storage tanks Click for more details...

WINDEYER ROAD CONCRETE BATCHING PLANT
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at Lot 26 Windeyer Rd, Wandoan, QLD 4419 of Concrete Batching Plant type of New development. Construction of batch plant & office to process 2,500cu m/annum. Click for more details...

JERSEY ROAD ASPHALT PLANT
Asphalt Plant project at 18 Jersey Rd, Bayswater, VIC 3153 In The Council Area Of Knox of Private. Replacement of an existing asphalt plant with a new asphalt plant, including ancillary material recycling (reclaimed asphalt). Click for more details...

SUBLIME POINT WATER TREATMENT FACILITY
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Wollongong Council Area of Water Tanks - Replacement type. Replacement of 2 water tanks with 4 new tanks, 3 at WTP at Sublime point & 1 in Hopetoun Park at the Cliffhanger café. Scope of work includes: replacing concrete tanks with Colorbond steel tanks. Click for more details...

DOHERTYS ROAD INDUSTRIAL DEVELOPMENT
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at 150-154 Dohertys Rd, Laverton North, VIC 3026 for New. Buildings and works to an existing warehouse including an additional factory room, 3 plant rooms, associated office and parking. Click for more details...

SOUTH WESTERN HIGHWAY - HANSON CONCRETE BATCHING PLANT
Concrete Batching Plant project at Lot 202 South Western Hwy, Whitby, WA 6202 in the Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)). Works to include the construction of a concrete batching plant to include a wash/service area to facilitate cleaning the agitator trucks after delivery of the concrete. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect