List of Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks) Projects in NSW


CONCRITE BATCHING PLANT
Concrete Batch Plant New project In The Sutherland Council Area. Construction of a new concrete batching plant producing around 125,000 cubic metres of concrete per year on a 24 hour basis. Click for more details...

BORAL CONCRETE
Currently at the Construction stage In Liverpool is a project estimated to be $ 250000. This project Establishment of concrete batching plant. Click for more details...

CONCRETE MANUFACTURING PLANT
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at 18 Chapman St, Queanbeyan, NSW 2620 for New. Construction of 6 above ground three sided reinforced concrete raw material storage bins. 2 silos for the storage of cement and/or fly ash with overhead hopper 12 meters maximum height. A water run off & recycling system to be installed to control all stormwater & waste/contaminated water from the manufacturing process. Water will pass from collection trough into settlement ponds and filtered water returned by pump to the water storage tank. Click for more details...

INTEGRAL ENERGY
Private ownership Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Not Yet Determined Council Area for New development. Provision of an Oil Treatment Plant. Click for more details...

FIVE ISLAND RD FIRE STATION
Storage Tank project at Lot 1 Five Islands Rd (DP606434), Port Kembla, NSW 2505 in the Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)). Installation of a liquid CO2 storage tank to existing fire station to allow filling of fire extinguishers & servicing. Click for more details...

CAMERON PARK CONCRETE BATCHING PLANT
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Lake Macquarie Council Area of Private ownership. Construction of a concrete batching plant to produce 47,000 tonnes annual. To construct administration centre consisting of an office, amenities building and carparking for 12 vehicles. Access and internal roads. A series of nine on-ground storage bins for storage. Two overhead storage silos for cement and /or flyash storage. Operator's cabin/control room. Two aggregate weigh bins and associated infrastructure to transfer aggregates to a waiting concrete agitator truck. Additive/chemical storage area. Waste washout and storgae facliities for solid concrete. A series of settlement pits, drainage dividers and sediment collection pits for water quality control. Associated landscaping. Click for more details...

BOULDER GROUP STEEL MILL
Boulder Group Steel Mill is currently at the Early Planning stage, valued at about $ 800000000 it is Construction of a stainless steel manufacturing plant known as a Danieli combi-mill that will produce a variety of stainless & speciality steels. The mill has been designed for an annual output of some 240,000 tons of stainless & special steels as per ISO 9002. The use of leading edge technology ensures high flexibility & in-time production of over 3,000 different types of steel. Some 60% of the output is destined for the Australian market as import substitutes. Click for more details...

BHP SINTER EMISSION REDUCTION PLANT GAS MAIN
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Wollongong Council Area of Waste Gas Main type. Construction of a gas main, 6 metres diameter as component of the Sinter Plant Emission Reduction Project. Click for more details...

WESTON ALUMINIUM SMELTER
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at Mitchell Ave, Kurri Kurri, NSW 2327 of Aluminium Smelter - Addns type of Addition development. Expansions of operations of an aluminium smelting plant. The plan is to recycle scrap metal at the Weston Plant, build 2 new furnaces, expand the production of aluminium ash by-product (Aldex ) & transport molten metal by road. Weston Aluminium would receive up to 35,000 tonnes of scrap metal a year. About 12,000 tonnes of aluminium scrap a year would be melted in 2 new alloying furnaces. Production of Aldex would be expanded, with the construction of a new premises for sorting & packaging the product for shipment. Click for more details...

BURNET RD CONCRETE BATCHING PLANT
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Wyong Council Area of Private ownership. Construction of a concrete batching plant comprising an administration building, storage bins for aggregates and sand, 2 silos for concrete and flyash, aggregate weighing bins and associated internal roadworks, water treatment and storage facilities and a security fence around the site. Associated carparking for 14 cars Click for more details...

REGIONAL DISTRIBUTION CENTRE
21 (Lot 5) Kellogg Rd (DP255515), Rooty Hill, NSW 2766 Has Regional Distribution Centre currently at Construction stage. The proposal is for construction & operation of a Regional Distribution Centre (RDC) near the intersection of the Main Western Railway and the M7 Motorway. The proposal comprises: A regional office building & quarry materials and concrete testing laboratory. Rail siding with an aggregate loading facility. Storage bin area and load out facilities. Ground storage & reclaim facilities. Blending plant/pug mill. A conveyor system linking the unloading station to the storage & truck load out facilities. Workshop, stores, site offices and amenities facilities, truck washdown facilities, truck refuelling, weighbridges, truck & carparking. Bridges at 2 locations over Angus Creek. Realignment of North Parade. Twin alley concrete batching plant. Click for more details...

APOLLO CL BATCHING PLANT
2 (Lot 16) Apollo Cl (DP804013), Gosford West, NSW 2250 Has Apollo Cl Batching Plant currently at Planning stage. Construction of a concrete batching plant including office space of approximately 224sq m Click for more details...

FORESHORE RD CONCRETE MASONRY PLANT
(Lots 1,1,2,1) Foreshore Rd (DP87432, DP88913,DP90127,DP735078, Number 404 Book 1912), Port Kembla, NSW 2505 Has Foreshore Rd Concrete Masonry Plant currently at Construction stage. Construction of a concrete masonry plant for the production of concrete bricks and blocks. Construction of curing chambers and bins for masonry block plant Click for more details...

BELMONT BUS DEPOT
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) New project at 2 Floraville Rd, Belmont, NSW 2280. This type is Fuel Storage Tank with State ownership. Decommission & removal of existing diesel fuel storage tanks & installation of a new 70,000 litre selfbunded above ground diesel fuel storage tank including pipework & pumps to the existing fuel system at Belmont Bus Depot. Click for more details...

CORELLA CL CONCRETE BATCHING PLANT
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) New project at 3 (Lot 101) Corella Cl (DP841453), Berkeley Vale, NSW 2261. This type is Concrete Batching Plant with Private ownership. Construction & operation of a concrete batching plant on a vacant site within the Enterprise Park Industrial Estate at the end of Corella Close. The plant consist of an administration building, office, amenities & workshop GFA 200sq m. Access & internal roadwork. A series of ten on ground storage bins for aggregate plus 2 smaller specialised aggregate bins. Two overhead storage silos for cement &/or fly ash storage. A operators cabin/control room. An additive/chemical storage area. Waste washout & storage facilities for solid concrete & a series of settlement pits, drainage dividers & sediment collections pits for water quality control. Click for more details...

CONCRETE BATCHING PLANT
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at 101-105 (Lots 122 & 121) Montague St (DP587977 & 703902), Wollongong North, NSW 2500 for New. Demolition of sheds & the removal of demountable buildings & the renovation & expansion of the existing concrete plant. Click for more details...

KING MIX FACTORY
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Campbelltown Council Area of Factory type. Construction of a factory building of 3010sq m adjacent to the existing workshop. Construction and operation of a masonry plant within the factory building. Construction and operation of a concrete batching plant adjacent to the factory building. Carparking for 70 vehicles and 7 truck spaces. Click for more details...

BORAL CONCRETE PLANT
Concrete Plant - Altns & Addns project at 53 South St, South Kempsey, NSW 2440 In The Council Area Of Kempsey of Private. Alterations & additions to an existing concrete plant. Click for more details...

WELLMIX CONCRETE BATCHING PLANT
Concrete Batching Plant New project In The Bathurst Council Area. Construction of a concrete batching plant. The development will include a 288sq m workshop, plant, 252 sq m of product bins & outdoor silo. Click for more details...

SEDGWICK ST CONCRETE BATCHING PLANT
Concrete Batching Plant project at 8 (Lot 101) Sedgwick St (DP1080036), Camden, NSW 2570 In The Council Area Of Camden of Private. Construction of a concrete batching plant. Works will include plant, waste tanks, aggregate storage bins & wash pits. Click for more details...

BULLOCKY WAY CONCRETE BATCHING PLANT
New project of Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at 107 Bullocky Way, Failford, NSW 2430. Demolish existing workshop building. Construction of a concrete batching plant & new workshop building. Click for more details...

TOMAGO ASPHALT BATCHING PLANT
Asphalt Batching Plant project at Lots 14 & 15 Kennington Dr, Tomago, NSW 2322 In The Council Area Of Port Stephens of Private. Construction of a asphalt plant & associated infrastructure. The facility would produce up to 150,000 tonnes of asphalt a year. The primary components of this plant are: a dryer, bitumen kettle, batch tower (screen, hot aggregate storage bins and pugmill) and hot asphalt storage bins. The secondary components of this plant are: an energy source, baghouse, exhaust stack, dust and lime storage bins, a means of conveying product between plant components, RAP storage, bitumen storage, aggregate storage, laboratory, office, & workshop. The process component of this plant is a proprietary, self-contained plant. Click for more details...

BORAL CONCRETE BATCHING PLANT
Private ownership Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Willoughby Council Area for New development. Alterations & additions to concrete batching plant. Development will comprise offices, amenities & control building; production area, return concrete recycling & truck wash area (with roof over) including 2 agitator truck loading alleys, 1 slump stand sediment collection wedge pit, 4 truck slump locations serviced by 2 dual slump stands, 2 in ground stirrer pits, 1 wedge stand, 5 washout pits, 3 clean area first flush & detention pits; 1 roof water storage tank, 77.6L recycled water agitator holding tank, raw material storage including 1,850 tonnes of aggregate & sand storage, 900 tonnes of cement within 6 silos, liquid admix in bunded area. Fencing. Carparking for 33 vehicles. Click for more details...

BELFAST PL CONCRETE BATCHING PLANT
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) New project at 9-11 (Lots 3 & 4) Belfast Pl (DP1087992), Glendenning, NSW 2761. This type is Concrete Batching Plant with Private ownership. Construction of a concrete batching plant. Works may include plant, waste tanks, aggregate storage bins & wash pits. Click for more details...

CEMEX PENDLE HILL
Private ownership Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Parramatta Council Area for Renovations, Refurbishments etc. development. Refurbishment of the existing concrete batching plant. Overall plant refurbishment comprises refurbishment of the existing batching plant equipment including the replacement of existing weigh hopper bins with more modern equipment. The reconfiguration of the loading structure to allow for drive through loading with waterless dust extraction unit & the addition of 2 x 100 tonne silos within the reconfigured loading structure to replace existing 1 x 44 & 1 x 45 tonne silos. Improved Aggregate & cement storage & handling comprising reconstruction of the existing loading ramp to allow for the construction of 5 new aggregate storage bins. Removal of some existing bins on the eastern boundary of the site. Creation of 3 truck parking spaces in place of the existing aggregate storage bins along the eastern boundary of the site. Installation of 2 x 50,000 litre water tanks along the eastern boundary of the site & an increased & safer turning area for aggregate deliver trucks Click for more details...

CONCRITE BATCHING PLANT
A project in the NSW Within Sutherland. Alterations to the aggregate storage bin facilities & their location together with other related minor modifications Click for more details...

SHOALHAVEN STARCHES ETHANOL EXPANSION PROJECT
Shoalhaven Starches Ethanol Expansion Project is currently at the Construction stage, valued at about $ 200000000 it is Expansion of ethanol production facility. The project involves increasing the ethanol production rate of the plant up to 300 million litres a year; implementing a range of odour control measures on site; and upgrading, augmenting and using the existing infrastructure on site. The following additions and alterations are proposed to the existing factory site as part of the ethanol upgrade: the provision of an additional dryer for the starch/gluten plant; additional equipment and storage vessels for the ethanol plant including 3 additional fermenters, additional cooling towers and molecular sieves; upgrades to the Stillage Recovery Plant including 6 additional Dried Distillers Grains Syrup (DDGS) dryers; 10 decanters; chemical storage and two evaporators. The proposal also includes the installation of a DDGS Pellet Plant within this part of the site; & the establishment of a new packing plant, container loading area and a rail spur line. The establishment of this facility on the northern side of Bolong Road will require the provision of an overhead bridge structure to allow product and safe pedestrian movement across Bolong Rd. Approx areas are: starch dryer 700 sq m; gas-fired boiler 150sq m; extension to DDG: loadout 500sq m, evaporator 50sq m, bioscrubbers 200sq m, pellet plant 200sq m, DDGS dryers 2,400sq m, MCC room 375sq m; gas-fired co-generator Plant 1000sq m; chemical storage 150sq m; packing plant 3000sq m; fire services 200sq m; total Area 8,925 sq m. Additional carparking for 94 vehicles will be provided. Click for more details...

KALARU CONCRETE BATCHING PLANT
Private ownership Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Bega Valley Council Area for New development. Construction of a concrete batching plant. Click for more details...

TROPIC ASPHALT BATCHING PLANT
Tropic Asphalt Batching Plant is currently at the Construction stage, valued at about $ 3000000 it is Construction of a new asphalt batching plant, with a floor area of 275sq m, with associated office & laboratory facilities, with the capacity to produce up to 100,000 tonnes per annum. The plant will incorporate the following measures to reduce environmental impacts: installation of dust suppression sytems; heating & drying processes utilise modern bag-house to clean exhaust gasses; water sensitive urban design principals, swale drains & bio retention areas to be incorporated into the stormwater management system. Aluminium walls, aluminium roof, concrete floor and steel frame construction. Click for more details...

ORICA AMMONIUM NITRATE EMULSION PROJECT
Production Facility project at Lot 2 George Booth Dr (DP809337), Richmond Vale, NSW 2323 in the Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)). Establishment of a new ammonium nitrate emulsion production facility & associated infrastructure. key infrastructure will comprise chemical, fuel & product storage tanks; ANE manufacturing plant; truck weighing, loading & unloading facilities; utilities including hot water, cooling water & compressed air systems, electricity distribution cables & a transformer; stormwater/spill management structures; plant site office, contral room, switch room & quality control laboratory; & access road. Click for more details...

PORT KEMBLA STEELWORKS BOS FLARE STACK NO 1
Lot 1 Five Islands Rd (DP606434), Port Kembla, NSW 2505 Has Port Kembla Steelworks Bos Flare Stack No 1 currently at Construction stage. Removal & replacement of No 1 Basic Oxygen Steelmaking (BOS) flare stack at No 2 steelworks. Development involves dismantling of the existing stack & installation of new stack of approx 85.6m in height & of steel construction. Click for more details...

BELLFROG ST CONCRETE BATCHING PLANT
New project of Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at Lots 18-20 Bellfrog St, formerly 1-7 Juno Pde, Greenacre, NSW 2190. Construction of a concrete batching plant for Hanson Construction Materials including office building, drivers room & amenities & plant control centre. 4 x 120 tonne cement storage silos, plant building & monorail crane; 1,800 tone underground aggregate storage area; 8 x 225 tonne ground bin stores; twin fully enclosed drive through agitator load bays; 4 x truck washout pits, 2 x wedge pits & 3 x truck wash bays. Associated hardstand & trafficable area. Click for more details...

SHOWGROUND RD CONCRETE BATCHING PLANT
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) New project at 25-43 Showground Rd, Taminda, NSW 2340. This type is Concrete Batching Plant with Private ownership. Construction of a new concrete batching plant. Click for more details...

WATER BOTTLE PRODUCTION PLANT
Private ownership Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Gosford Council Area for New development. Construction of a water bottling production plant. The building comprises a raw materials & bottling storage area. Bottling 'productions lines". Finished good storage/warehouse. Laboratory testing facilities. Machinery repair/workshop. Dispatch & office space. Associated carparking for 12 cars. The building is to be constructed of steel frame masonry & 'bonder' polystyrene metal clad 'sandwich' material Click for more details...

MIDAL CABLES - TOMAGO CABLE MANUFACTURING PROJECT
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at Lots 5 & 6 School Dr (DP270328), Tomago, NSW 2322 of Cable Manufacturing Facility type of New development. Construction of a aluminium rod & cable manufacturing facility & range of associated infrastructure. Construction of furnace & rolling mill in a building 98m x 38m & 8m high, cooling towers & infrastructure associated with the gas fired furnace & rolling mill. A building 124m x 46m x 8m high that would house wire drawing machines, standing machines & associated facilities. Laboratories & administration buildings. Stores building, electrical & mechanical workshops. On site sewerage treatment plant. Facility will be constructed adjacent to the Tomago Aluminium Smelter allowing it to process molten metal directly from the smelter. A total of 64 carparking spaces will be provided. Construction of a haul road 150m long.The facility will be used to process up to a maximum of 55,000 tonnes per annum. Click for more details...

MAITLAND ST INDUSTRIAL DEVELOPMENT
Industrial Subdivision (9) Lots/Concrete Batching Plant project at 79-83 Maitland St, Branxton, NSW 2335 in the Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)). Industrial development. Stage 1 will be 9 industrial lots with the construction of a new road. Stage 2 construction of a new concrete batching plant. Click for more details...

VISY PLASTICS PROCESSING PLANT
Processing Plant - Altns & Addns To Factory project at 2 (Lot 2) Herbert Pl (DP849480), Smithfield, NSW 2164 in the Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)). Alterations & additions to existing building & change of use to a plastics processing plant. Works will include internal fitout; construction of a pipe bridge over part of the site; new waste water pre-treatment plant; increase in height over 2 sections of the building at the southern side, known as the top hats; installation of acoustic insulation on the underside of eastern awning; installation of exhaust fans; new load conveyer; construction of new openings on the eastern facade; cooling towers; construction of 2 electrical transformers; installation of water tanks; siteworks & external container storage area. Proposed top hats will be of steel framed construction with colorbond trimdeck walls to match existing, colorbond ridge capping eaves & colorbond roof. Modifications to carparking & driveways. Click for more details...

GLASS RECOVERY
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Penrith Council Area of Private ownership. Conversion of an existing industrial building into a glass beneficiation plant with the capacity to process 105,000 tonnes of glass per annum. Construction of a series of steel framed and sheet steel walled storage bunkers to the hardstand area to the south and east of the building. Installation of an overland conveyor to transport the glass cullet across to the adjoining property & glass bottling plant of Owens Illinois. Click for more details...

CEMENT AUSTRALIA GRINDING MILL
Trade Package For Jetty Rail Works project at Outer Harbour, Port Kembla, NSW 2505 in the Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)). Trade pacakge tender for supply &/or install prefabricated rail segments to No 6 jetty to facilitate movement of shore based clinker unloading hoppers and conveyors. Timing for commencement of Works/ Services is estimated at 1st Quarter of 2013. Click for more details...

CEMENT AUSTRALIA GRINDING MILL
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project for New development. Various trade pacakge tenders called. Landscaping - supply & installation of landscaping materials; timing for commencement of works/services estimated for the 4th Quarter of 2013. Roads - supply & install internal sealed roads required by the plant design; timing for commencement of works/services is estimated for the 4th Quarter of 2013. Security Fencing - supply & installation of security fencing along the perimeter of the Port Kembla Grinding Facility; timing for commencement of works/services is estimated for the 4th Quarter of 2013. Security systems - supply, installation & on-going maintenance of a security system for the Port Kembla Grinding Facility; timing for the commencement of works/services is estimated for the 4th Quarter of 2013 Click for more details...

SHELL SERVICE STATION - LIQUEFIED NATURAL GAS FACILITY
Shell Service Station - Liquefied Natural Gas Facility is currently at the Construction stage, valued at about $ 1550000 it is Installation of a liquefied natural gas facility. Work comprises of the installation of 1, 11.5sq m high x 3.8sq m diameter, 7kl LNG storage tank. Construction of 12950sq m x 7100sq m foundation slab. Installation of 2, LNG dispensers & associated underground piping. Vapour recovery system including re-liquefactorion equipment. Installation of 1, 15KL tank to store liquid nitrogen. Construction of a control room. Provide new fill points. Installation concrete bollards to protect the new infrastructure. Erection of 1.8sq m chain wire fence around the perimeter of the LNG tank. Erection of ARMCO railing on the northern side of the LNG facility. Click for more details...

SOUTHGATE CONTAINER PARK - WAREHOUSE 2
A project in the NSW Within Botany. Construction of warehouse building 2 being approximately 5000sq m. Construction of a container handling facility associated with warehouse 2 of 15,145sq m. Construction of 2 loading docks, & office space associated with warehouse 2 approximately 725sq m. Carparking for 90 vehicles to be located along the southern boundary of the site. Landscaping on the western boundary of the site to ensure no restriction to overland flows. Construction of on site detention system & stormwater improvements devices. Construction of an onsite detention tank to the south of Building 2 outside the flood affected area. Construction of a suspended slab above the interceptor drain located at the north western corner of the site. Works to Flood vale Drain to address the structural integrity of work adjoining & above the drainage system. Signage Click for more details...

ROADWORX STATIC ASPHALT PLANT KEMBLA GRANGE
Static Asphalt Plant project at 6 Keevers Pl, Kembla Grange, NSW 2526 In The Council Area Of Wollongong of Private. Construction of a static asphalt plant, mixing tower, drying and heating system and cold feed system, storage tanks. Single storey amenities block, product sampling laboratory incorporation shower and change facilities. Carparking for 7 vehicles. Click for more details...

HY-TEC INDUSTRIES
A project in the NSW Within Parramatta. Construction of a Readymix concrete batching plant with a capacity of 150,000 cubic metres of concrete annually with associated batching office & drive facilities & laboratory. Works comprise construction of a laboratory, administration & amenities buildings, staff open space. Construction of heavy vehicle wash bays, slump stands, batch conveyor and loading tower, silos and heavy vehicle parking bays for 19 vehicles in the centre of the site. and carparking at the western end of the site. Construction of temporary mobile concrete batching plant on the northern part of the site Construction of underground storage facilities at the eastern end of the site; 2 driveway access points off Shirley St. Carparking at the western end of the site. Click for more details...

ALBRIGHT & WILSON AUSTRALIA MANUFACTURING FACILITY
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at 21 Davis Rd, Wetherill Park, NSW 2164 of Storage Tanks type of New development. Scope of work involves the addition of 7 storage tanks & the replacement of 3 existing tanks to create an additional 950 tonnes of storage capacity on the Albright & Wilson Wetherill Park manufacturing site. Excavation of the existing concrete pads followed by installing new pads & plinths to support the tanks Click for more details...

CHANNEL RD INDUSTRIAL COMPLEX
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Newcastle Council Area of Industrial Building/Office - 2 Storey type. Construction of a 2 storey industrial building with associated offices for use as conveyor engineering, fabrication & machining business. Ground floor consists of work floor area with 2 x 32T overhead cranes, roller shutter doors, reception area, office rooms & amenities. Mezzanine level consists of office space, meeting room, data & store room & lunch room. Pre-cast concrete panels, colorbond wall sheeting & roofing. Carparking for 20 vehicles. Landscaping. Click for more details...

BORAL CONCRETE BATCHING PLANT
Currently at the Construction stage In Holroyd is a project estimated to be $ 5000000. This project Alterations & additions to existing Granville concrete batching plant. The main alterations include demolition of existing buildings & plant, excavation of footings, excavation & lining of the recycled water & water storage pits, levelling of general site paving, concrete works for footings & construction of structures including silos, aggregate bins & conveyors. Work will be completed in two stages. Stage 1 will involve demolition of ancillary structures. Stage 2 will involve dismantling of all structures & remaining works and will involve plant shutting down for 4 months. Carparking for 22 vehicles. Click for more details...

FORESIGHT AV ASHPHALT BATCHING PLANT
4 Foresight Av, Tomago, NSW 2322 Has Foresight Av Ashphalt Batching Plant currently at Construction stage. Construction of a new asphalt batching plant. Click for more details...

INDUSTRIAL GLAVANIZERS CORP PLANT
New project of Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at 312 Maitland Rd & 121,123 & 133 Old Maitland Rd, Hexham, NSW 2322. The addition of an ash processing unit & mechanical ventilation system, to be located internally to the existing structures. Click for more details...

SUBLIME POINT WATER TREATMENT FACILITY
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Wollongong Council Area of Water Tanks - Replacement type. Replacement of 2 water tanks with 4 new tanks, 3 at WTP at Sublime point & 1 in Hopetoun Park at the Cliffhanger café. Scope of work includes: replacing concrete tanks with Colorbond steel tanks. Click for more details...