HYDRO ALUMINIUM SMELTER SURF PROJECT
Smelter - Altns & Addns - Stage 2 Addition project In The Cessnock Council Area. Update & retrofit Aluminium Smelter in 3 stages. Stage 2 - Construction of a new Anode Baking Furnace & the upgrade of Potlines 2 & 3. Click for more details...

VAW ALUMINIUM SMELTER
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at Hart Rd, Loxford, Kurri Kurri, NSW 2327 of Smelter -Altns & Addns - Stage 1 type of Addition development. Update & retrofit Aluminium smelter in 3 stages. Stage 1 -Installation of a greenmix scrubber for air emissions & associated civil works. Click for more details...

LUCCA RD FACTORY
Private ownership Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Wyong Council Area for Addition development. Installation of 2 above ground tanks, wash bays & additions to existing factory. Click for more details...

TALLAWARRA POWER STATION
Tallawarra Power Station is currently at the Construction stage, valued at about $ 350000000 it is Construction of a new 400 megawatt combined cycle gas fired turbine power plant, new switching yard, a 60 metre chimney, administration building & visitors centre, landscaping to foreshore of Lake Illawarra, roadworks. Click for more details...

PORT KEMBLA STEELWORKS
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) Addition project at Lot 1 Five Islands Rd (DP606434), Port Kembla, NSW 2505. This type is Hot Strip Mill - Addns with Private ownership. Additions to existing facility, including, changing the process of slab handling, installation of second Walking Beam Furnace including new stack, modifications to existing ancillary equipment, modifications to the coil processing & despatch systems, modifications to No. 25 Boiler to make Coke Oven Gas (COG) available for use at the Hot Strip Mill Walking Beam Furnace. Click for more details...

FARR ST ASSEMBLY PLANT
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at 33 Farr St, Marrickville, NSW 2204 of Assembly Plant - 3 Storey type of New development. Demolish the existing improvements & construct a part 3 storey building over basement carparking level & to use the premises for the assembly of formwork, anchoring systems & storage of associated parts with associated offices & caretaker's residence. Click for more details...

BTR ENGINEERING
Manufacturing Facility - Extns project at 186 Kaitlers Rd, Springdale Heights, NSW 2641 in the Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)). Extension to the existing manufacturing complex. Click for more details...

STENHOUSE DRIVE CONCRETE BATCHING PLANT
Concrete Batching Plant/Silos New project In The Lake Macquarie Council Area. Construction of concrete batching plant that includes two 21 metre tall silos and a chemical storage area. Click for more details...

KELLOGG RD CONCRETE BATCHING PLANT - REFER TO PROJECT ID2203355
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Blacktown Council Area of Concrete Batching Plant type. Construction of a twin alley concrete batching plant with annual production of 100,000 cubic metres. Plant includes: aggregated storage area; holding bins & weigh hoppers; raw material conveyor; 4 x slump stands; 4 x silos, 27 m high with holding capaciting of 120 tonnes each; amenities building & batch office to be housed in fixed demountable buildings; truck wash down area & 5 washout facilities; parking for 20 trucks & 24 cars. Click for more details...

CAMERON PARK CONCRETE BATCHING PLANT
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Lake Macquarie Council Area of Private ownership. Construction of a concrete batching plant to produce 47,000 tonnes annual. To construct administration centre consisting of an office, amenities building and carparking for 12 vehicles. Access and internal roads. A series of nine on-ground storage bins for storage. Two overhead storage silos for cement and /or flyash storage. Operator's cabin/control room. Two aggregate weigh bins and associated infrastructure to transfer aggregates to a waiting concrete agitator truck. Additive/chemical storage area. Waste washout and storgae facliities for solid concrete. A series of settlement pits, drainage dividers and sediment collection pits for water quality control. Associated landscaping. Click for more details...

AMCOR PAPER MILL - B9
Paper Mill project at 1891 (Lot 2 & Lot 1) Botany Rd (DP430252 & DP772737), Matraville, NSW 2036 In The Council Area Of Randwick of Private. Construction of a new paper machine building, stock preparation building, produce store waste paper yard, mill offices, control room & other ancillary works. Botany B9 paper mill project involves the construction of a new paper making facility which uses 100% recycled waster paper. The new paper mill would replace 2 existing paper making machines (NO 7 & 8) at the site. Click for more details...

BOULDER GROUP STEEL MILL
Boulder Group Steel Mill is currently at the Early Planning stage, valued at about $ 800000000 it is Construction of a stainless steel manufacturing plant known as a Danieli combi-mill that will produce a variety of stainless & speciality steels. The mill has been designed for an annual output of some 240,000 tons of stainless & special steels as per ISO 9002. The use of leading edge technology ensures high flexibility & in-time production of over 3,000 different types of steel. Some 60% of the output is destined for the Australian market as import substitutes. Click for more details...

PORT KEMBLA STORAGE FACILITY
Private ownership Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Wollongong Council Area for New development. Construction of a shed & enclosed conveyor for the storage of copper concentrate prior to exporting. Click for more details...

FORESHORE RD CONCRETE MASONRY PLANT
(Lots 1,1,2,1) Foreshore Rd (DP87432, DP88913,DP90127,DP735078, Number 404 Book 1912), Port Kembla, NSW 2505 Has Foreshore Rd Concrete Masonry Plant currently at Construction stage. Construction of a concrete masonry plant for the production of concrete bricks and blocks. Construction of curing chambers and bins for masonry block plant Click for more details...

BELMONT BUS DEPOT
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) New project at 2 Floraville Rd, Belmont, NSW 2280. This type is Fuel Storage Tank with State ownership. Decommission & removal of existing diesel fuel storage tanks & installation of a new 70,000 litre selfbunded above ground diesel fuel storage tank including pipework & pumps to the existing fuel system at Belmont Bus Depot. Click for more details...

NAMBUCCA VALLEY QUARRIES PLANT
Private ownership Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Nambucca Council Area for New development. Construction of a concrete batching plant. Click for more details...

METROMIX HORNSBY
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project for Addition development. Addition to the existing concrete batching plant. The addition is a new roof which will be located over the batch ramp Click for more details...

BERESFIELD CONCRETE BATCHING PLANT
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) New project at 72 (Lot 506) Enterprise Dr (DP1038004), Beresfield, NSW 2322. This type is Concrete Batching Plant with Private ownership. Construction of a concrete batching plant & associated facilities. Click for more details...

CARGILL OILSEED PROCESSING FACILITY
New project of Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at 140 (Part Lot 119) Cormorant Rd (DP832729) Kooragang Island, Newcastle, NSW 2300. Expansion of Cargill Oilseed processing facility at Kooragang Island to include: a bleaching & deodorising plant; expansion of the existing tank farm from 4,700 tonne capacity to 11,700 tonne capacity; gas fired boiler and associated stack. Click for more details...

BORAL CONCRETE PLANT
Concrete Plant - Altns & Addns project at 53 South St, South Kempsey, NSW 2440 In The Council Area Of Kempsey of Private. Alterations & additions to an existing concrete plant. Click for more details...

BOTANY INDUSTRIAL PARK HCB STORAGE FACILITIES
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at 16-20 (Lot 11) Beauchamp Rd (DP1039919), Matraville, NSW 2036 for Addition. Expansion & consolidation of hexachlorobenzene (HCB) storage facilities at Botany Industrial Park. Orica has an ongoing annual program of repackaging any deteriorating drums of HCB into new drums. This process generates waste in the form of crushed drums, crushed pallets and Personal Protective Equipment (PPE). Orica proposes to automate the re-drumming process and provide additional storage facilities. The project consists of the following components: construction of new store J in a new warehouse near the north-western perimeter; construction & operation of 2 re-drumming lines; and construction & operation of a shredding line. Construction materials for store will be reinforced concrete slab floor, steel frame, steel wall sheeting & galvanised steel sheeting roof. The new warehouse will be approx 21m wide & 70m long and will be divided into 2 main sections: the north end will be dedicated to the HCB re-packing plant equipment. This operational area is to be partitioned from the rest of the warehouse. The south end is to be used for storage of drums. This section is known as Store J and is sized to store 4 shipping containers. The 2 ends of the warehouse will be separated by a solid wall. Click for more details...

CALTEX REFINERY STORAGE TANK
Deisel Storage Tank project at 160-166 Captain Cook Dr, Kurnell, NSW 2231 In The Council Area Of Sutherland of Private. Levelling earthworks & excavation to enable construction footings & base for an 18 megalitre diesel storage tank, associated pipeworks, earthen bunds & fire hydrants. Modifications to existing stormwater system, pedestrian access walkways & stairs to the tank. Construction of ancillary infrastructure including access roadways & culverts. Click for more details...

WELLMIX CONCRETE BATCHING PLANT
Concrete Batching Plant New project In The Bathurst Council Area. Construction of a concrete batching plant. The development will include a 288sq m workshop, plant, 252 sq m of product bins & outdoor silo. Click for more details...

SEDGWICK ST CONCRETE BATCHING PLANT
Concrete Batching Plant project at 8 (Lot 101) Sedgwick St (DP1080036), Camden, NSW 2570 In The Council Area Of Camden of Private. Construction of a concrete batching plant. Works will include plant, waste tanks, aggregate storage bins & wash pits. Click for more details...

SCHOOL DR CONCRETE BATCHING PLANT
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at 21b (Lot 3) School Dr (DP270328), Tomago, NSW 2322 of Concrete Batching Plant type of New development. The development proposal consists of a proposed Concrete Batching Plant with an annual production of 2000-40000 tonnes of concrete per annum & approximately 80m3 per hour. The proposal includes an administration centre, carparking areas, nine on-ground storage bins for aggregate, plus two smaller specialised aggregate bins, two overhead storage silos, control room, two aggregate weigh bins & associated infrastructure, chemical storage area, waste washout facility & a series of settlement & sediment pits. Click for more details...

CALTEX REFINERY PERFORMANCE UPGRADE PROGRAM
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) New project at 2 (Lot 25) Solander St, Kurnell, NSW 2231. This type is Storage Tanks/Civil Works with Private ownership. New crude oil storage tank & new diesel storage tanks including civil works Click for more details...

BODEN RD FACTORY
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project for Addition development. Alterations and additions to the existing factory comprising the installation of 4 new processing tanks and ancilliaries. Click for more details...

GUNLAKE QUARRY
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) New project at 715 Brayton Rd, Marulan, NSW 2579. This type is Quarry/Crushing Plant/Road with Private ownership. Development of a Hard Rock quarry with associated processing plant & bypass road. It is proposed that the quarry will produce 500,000 tonnes per annum of finished product & will be operated as a conventional hard rock, open cut quarry involving the following main processes: overburden removal will be carried out using equipment such as excavators & dump trucks & will be stockpiled initially on the eastern side of the crushing plant area to create a bund wall extending the line of an existing ridge. The bund wall will become an effective noise & visual barrier; virtually eliminating lines of sight from the east. The crushing plant will be a 3 stage plant with crushing followed by the appropriate screening process including recirculation of material to produce the final products. These will be sized & stockpiled. The 3 crushing stages will most likely be done with a primary jaw crusher, a secondary gyratory crusher & tertiary cone crushers. the plant will have a production throughput of up to 300 tonnes per hour. As production increased, a bypass route around Marulan will be constructed to allow product destined for northern markets & all returning trucks to bypass Marulan. The bypass route involves the construction of a haul road over land owned by Gunlake Quarries to link with a new road to be constructed along a Crown Road Reserve to Red Hills Rd to meet with the Hume Highway Click for more details...

BORAL CONCRETE BATCHING PLANT
Private ownership Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Willoughby Council Area for New development. Alterations & additions to concrete batching plant. Development will comprise offices, amenities & control building; production area, return concrete recycling & truck wash area (with roof over) including 2 agitator truck loading alleys, 1 slump stand sediment collection wedge pit, 4 truck slump locations serviced by 2 dual slump stands, 2 in ground stirrer pits, 1 wedge stand, 5 washout pits, 3 clean area first flush & detention pits; 1 roof water storage tank, 77.6L recycled water agitator holding tank, raw material storage including 1,850 tonnes of aggregate & sand storage, 900 tonnes of cement within 6 silos, liquid admix in bunded area. Fencing. Carparking for 33 vehicles. Click for more details...

BELFAST PL CONCRETE BATCHING PLANT
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) New project at 9-11 (Lots 3 & 4) Belfast Pl (DP1087992), Glendenning, NSW 2761. This type is Concrete Batching Plant with Private ownership. Construction of a concrete batching plant. Works may include plant, waste tanks, aggregate storage bins & wash pits. Click for more details...

SHELL REFINING
Shell Refining is currently at the Construction stage, valued at about $ 5000000 it is The proposed development provides a state of the art dedicated water cooling facility for the existing polypropylene plant. The efficiency of both the manufacturing plant & cooling tower will enhanced as a result of the new water cooling facility Click for more details...

HUNTER EMPLOYMENT ZONE - PLANT HIRE
A project in the NSW Within Cessnock. Construction of a 30,000sq m regional plant & machinery maintenance facility that will undertake the maintenance & repair of rail stock & machinery, mining machinery & civil works machinery including a 1,900sq m workshop with attached office component, sand blast/spray booth of 135sq m, finishing booth of 135sq m & designated loading/unloading area with awning of 555sq m. 2 storey office component attached to the workshop building with a GFA of 308sq m with lunch room & amenities at ground level & offices on first floor. Separate single storey office & amenities building GFA 455sq m, consisting of large open office area, meeting rooms, lunch room & amenities. Pedestrian pathway will provide a link between workshop & office building. Wash bay of 180sq m & fuel store building of 120sq m on northern boundary of site. Internal driveways & access roads, hardstand area. 3 external driveways off the HEZ Spine Rd. Clearing of further 0.68h of land for construction of a secondary feeder road of the HEZ Spine Rd being 20m wide & 340m long, adjacent to the southern boundary of the site. Carparking for 69 vehicles. Landscaping, stormwater drainage, retaining walls & wetland. Click for more details...

CONCRITE BATCHING PLANT
A project in the NSW Within Sutherland. Alterations to the aggregate storage bin facilities & their location together with other related minor modifications Click for more details...

SHOALHAVEN STARCHES ETHANOL EXPANSION PROJECT
Shoalhaven Starches Ethanol Expansion Project is currently at the Construction stage, valued at about $ 200000000 it is Expansion of ethanol production facility. The project involves increasing the ethanol production rate of the plant up to 300 million litres a year; implementing a range of odour control measures on site; and upgrading, augmenting and using the existing infrastructure on site. The following additions and alterations are proposed to the existing factory site as part of the ethanol upgrade: the provision of an additional dryer for the starch/gluten plant; additional equipment and storage vessels for the ethanol plant including 3 additional fermenters, additional cooling towers and molecular sieves; upgrades to the Stillage Recovery Plant including 6 additional Dried Distillers Grains Syrup (DDGS) dryers; 10 decanters; chemical storage and two evaporators. The proposal also includes the installation of a DDGS Pellet Plant within this part of the site; & the establishment of a new packing plant, container loading area and a rail spur line. The establishment of this facility on the northern side of Bolong Road will require the provision of an overhead bridge structure to allow product and safe pedestrian movement across Bolong Rd. Approx areas are: starch dryer 700 sq m; gas-fired boiler 150sq m; extension to DDG: loadout 500sq m, evaporator 50sq m, bioscrubbers 200sq m, pellet plant 200sq m, DDGS dryers 2,400sq m, MCC room 375sq m; gas-fired co-generator Plant 1000sq m; chemical storage 150sq m; packing plant 3000sq m; fire services 200sq m; total Area 8,925 sq m. Additional carparking for 94 vehicles will be provided. Click for more details...

GLOUCESTER BVD INDUSTRIAL DEVELOPMENT
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project for New development. Demolition of existing scrap copper storage shed. Relocation of a continuous billet caster facility including new vent stack, weighbridges & new sealed storage area. Click for more details...

ORICA AMMONIUM NITRATE EMULSION PROJECT
Production Facility project at Lot 2 George Booth Dr (DP809337), Richmond Vale, NSW 2323 in the Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)). Establishment of a new ammonium nitrate emulsion production facility & associated infrastructure. key infrastructure will comprise chemical, fuel & product storage tanks; ANE manufacturing plant; truck weighing, loading & unloading facilities; utilities including hot water, cooling water & compressed air systems, electricity distribution cables & a transformer; stormwater/spill management structures; plant site office, contral room, switch room & quality control laboratory; & access road. Click for more details...

SOMMERVILLE CCT CONCRETE BATCHING PLANT
New project of Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at 49-55 (Lots 31 & 32) Sommerville Cct (DP1105133), Emu Plains, NSW 2750. Construction of a new concrete batching plant with an intended daily production rate of 100-200m³ (210-420T) per day or approximately 27,300-54,000m³ (57,330-114,660T) per year. The development will comprise office/batch room & amenities building; above ground aggregate & sand storage bays; 4 x 120T fly ash & cement storage silos; covered batching & loading facility; & agitator truck washout Pits. Carparking for 15 cars. Click for more details...

AUSTRAL PRECAST CONCRETE BATCHING PLANT
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at 33-41 (Lot 79) Cowpasture Rd (DP27515), Wetherill Park, NSW 2164 of Concrete Batching Plant type of New development. Construction of a concrete batching plant associated with an existing concrete products manufacturing facility. Production capacity of up to 60,000 m3 per year is envisaged. Inclusion of a closed loop concrete recycling process enabling aggregates to be washed and reused on site, and slurry to be stored and also reused on site. Modifications to the existing precast concrete facility to allow receipt of the ready-mix concrete from the proposed concrete batching plant. The plant would comprise plant to receive raw materials; storage of raw materials in fully enclosed bins (sand & aggregate) & silos (cement/flyash); mixing line, which would mix raw materials in certain ratios to produce ready-mixed concrete in twin rotary mixers; system to weigh & deliver (via conveyor belts and skip hoist) the raw materials into the mixing line; other auxiliary systems such as waste concrete & water recycling and safeguards for receiving cement/flyash into silos. Click for more details...

ELF SUBSTRATE PLANT
New project of Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at 108 Mulgrave Rd, Mulgrave, NSW 2756. Expansion of operations to increase substrate production levels at existing substrate plant. Proposed construction works include extension to the pre-wet building; 2 additional phase 1 tunnels; 2 storage sheds for baled straw; second bale wetting area; second phase 2/3 tunnel building containing 22 tunnels & a storage tunnel; second bio-scrubber with chimney; other alterations, including conveyors, access, parking & drainage systems. A second pre-wet building will be erected adjacent to the existing building, approx 133m x 45m, on 3 sides the walls will be concrete for the first 2m above the floor and then sheeted with a combination of metal & clear panel above, roof will be clad with metal sheeting, floor of the extension will be of reinforced concrete within which will be cast a manifold of air pipes with spigots protruding through the floor. A hopper at the southern end of the extension will feed a conveyor located beneath the roof of the existing pre-wet building and then outside to the east & north, connecting with the Phase 1 tunnel building. The existing Phase 1 tunnel building will be extended to provide 2 additional tunnels & associated loading area & equipment space. 2 storage sheds for straw bales will be constructed to the east of the existing storage building & phase 1 tunnels. The buildings will each be 50m x 26m, the walls & pitched roof will be clad with metal sheeting except for the lower 2m of the walls, where reinforced concrete will be used, roller door, each bale storage shed will have an automatic sprinkler system for fire protection. The second (east) bale wetting area will be located between the southern bale storage shed & existing raw materials storage shed, bale wetting area is a concrete slab profiled to drain to an in-ground water recycle pit, slab is approx 49m x 18m, surrounded with walls on 3 sides. The east water recycle pit will have a capacity of 100 kilolitres & be fitted with an inlet filter & 2 pumps. Straw bales stacked in the bale wetting area will be sprayed from movable boom sprays using recycled water that is filtered and aerated through the pit. The second phase 2/3 tunnel building will be approx 114m x 73m, building extends approximately 10m at a lower height to contain refrigeration plant, staff amenities, storage & other plant ancillaries, building walls will be constructed of colorbond insulated panels, galvanised metal sheeting on pitched roof. Internally, the building will enclose 22 processing tunnels & 1 storage tunnel with filling & emptying halls along each of the long sides, tunnels are erected on a raised concrete grid floor, hebel panels are used for the tunnel walls & ceiling. The second bioscrubber will be erected at the northern end of the pre-wet building extension. The bioscrubber will be a stand-alone structure measuring approx 22m x 15m, external walls of the bioscrubber will be of concrete panels, flat reinforced concrete roof, water storage tank, chmney will extend from the roof of the structure to 40m above ground. 3 new conveyors to be installed with the plant extension. Click for more details...

MAITLAND ST INDUSTRIAL DEVELOPMENT
Industrial Subdivision (9) Lots/Concrete Batching Plant project at 79-83 Maitland St, Branxton, NSW 2335 in the Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)). Industrial development. Stage 1 will be 9 industrial lots with the construction of a new road. Stage 2 construction of a new concrete batching plant. Click for more details...

COCA COLA BLOW FILL PRODUCTION LINE
Private ownership Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Parramatta Council Area for New development. Infrastructure work involved in the installation of a new conveyor for the Blow Fill Production Line Click for more details...

RUTHERFORD ASPHALT PLANT
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Maitland Council Area of Asphalt Productions Plant - Replacement type. Replacement of the existing asphalt production plant. Work comprises New bitumen loading areas. New weigh bridges. Relocation of water storage tanks, relocation & reworking of aggregate bins, relocation of existing lunch room, relocation & upgrade of operations building. Removal of some trees to allow for efficient & sale vehicle circulation & formal carparking areas. Additional landscaping incorporating tree plantings, ground cover plantings & grassed areas. Relocation of the flagpole. bulk earthworks to improve drainage & stormwater & drainage management Click for more details...

GLASS RECOVERY
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Penrith Council Area of Private ownership. Conversion of an existing industrial building into a glass beneficiation plant with the capacity to process 105,000 tonnes of glass per annum. Construction of a series of steel framed and sheet steel walled storage bunkers to the hardstand area to the south and east of the building. Installation of an overland conveyor to transport the glass cullet across to the adjoining property & glass bottling plant of Owens Illinois. Click for more details...

CEMENT AUSTRALIA GRINDING MILL
Trade Package For Jetty Rail Works project at Outer Harbour, Port Kembla, NSW 2505 in the Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)). Trade pacakge tender for supply &/or install prefabricated rail segments to No 6 jetty to facilitate movement of shore based clinker unloading hoppers and conveyors. Timing for commencement of Works/ Services is estimated at 1st Quarter of 2013. Click for more details...

IMMIX INTEGRATED METALS MANAGEMENT
A project in the NSW Within Albury. Redevelopment of the site with a change of use to Metals Recycling & processing, including open yard bunker storages & metals baling machinery, building facade upgrade, street screen walls & fencing. The existing building will remain at 500sq m of warehouse (for bulk containers) but will also include minor internal upgrade for office & amenities. A full facade upgrade is proposed. Construction of facade upgrade will be of light steel framing, with external cladding of prefinished metal, corrugated metal & render over masonry. Construction of bunkers, baling machine area & screen walls will be of precast concrete, with the street frontage panels, being suitably sculpted, coloured & finished in geometric pattern. Parking for 6 cars & landscaping. Click for more details...

BULK LIQUIDS TERMINAL
Terminal project at ., Mayfield, NSW 2304 in the Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)). Design, construction & operation of a Bulk Liquids Terminal on the Bulk Liquids Precinct Mayfield site in the Port of Newcastle. Newcastle Port Corporation (NPC) objectives for development of the site but not limited to are: have the Site used for receival, storage, blending and distribution of bulk liquids. Have tank farms with steel storage tanks, bulk liquids distribution pipelines, truck loading/unloading facilities, bunded areas, workshops, and administration buildings, consistent with the characteristics, assets & capabilities of the site. Click for more details...

GUNLAKE CONCRETE BATCHING PLANT
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project for New development. Construction of a concrete batching plant with an intended production capacity of up to 100,000³m of concrete per annum Click for more details...

CSR - PGH BRICKS
Csr - Pgh Bricks is currently at the Construction stage, valued at about $ 422000 it is Construction of a new addition behind the existing plant building for storage. Construction of 2 new dry press batch kilns. Demolition of existing Hoffman kiln 1 chimney. Replace Hoffmann chimney with new batch kiln 2 chimney. New batch kiln 3 chimney stack. The new storage building is proposed behind the south western corner of the existing plant west of the existing Hoffmann kiln. The new building will store stockpiles to keep them dry. The proposed dry press batch kilns will be located within the existing plant building. Batch kiln 2 is located at the southern end of the plant & batch kiln 3 is at the northern end Click for more details...

BORAL CONCRETE BATCHING PLANT
Currently at the Construction stage In Holroyd is a project estimated to be $ 5000000. This project Alterations & additions to existing Granville concrete batching plant. The main alterations include demolition of existing buildings & plant, excavation of footings, excavation & lining of the recycled water & water storage pits, levelling of general site paving, concrete works for footings & construction of structures including silos, aggregate bins & conveyors. Work will be completed in two stages. Stage 1 will involve demolition of ancillary structures. Stage 2 will involve dismantling of all structures & remaining works and will involve plant shutting down for 4 months. Carparking for 22 vehicles. Click for more details...

SUBLIME POINT WATER TREATMENT FACILITY
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Wollongong Council Area of Water Tanks - Replacement type. Replacement of 2 water tanks with 4 new tanks, 3 at WTP at Sublime point & 1 in Hopetoun Park at the Cliffhanger café. Scope of work includes: replacing concrete tanks with Colorbond steel tanks. Click for more details...