State

Categories

Sub Categories

Click Here to Find Current Projects

List of Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks) Projects in NSW


BORAL RESOURCES CONCRETE PLANT
Boral Resources Concrete Plant is currently at the Construction stage, valued at about $ 1800000 it is Alterations to existing concrete plant. Click for more details...

CONCRETE BATCHING PLANT
Private ownership Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Weddin Council Area for New development. Construction of concrete batching plant, machinery shed, workshop, offices, storage shed, 20,000 litre fuel storage & associated infrastructure. Click for more details...

TALLAWARRA POWER STATION
Tallawarra Power Station is currently at the Construction stage, valued at about $ 350000000 it is Construction of a new 400 megawatt combined cycle gas fired turbine power plant, new switching yard, a 60 metre chimney, administration building & visitors centre, landscaping to foreshore of Lake Illawarra, roadworks. Click for more details...

FARR ST ASSEMBLY PLANT
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at 33 Farr St, Marrickville, NSW 2204 of Assembly Plant - 3 Storey type of New development. Demolish the existing improvements & construct a part 3 storey building over basement carparking level & to use the premises for the assembly of formwork, anchoring systems & storage of associated parts with associated offices & caretaker's residence. Click for more details...

KELLOGG RD CONCRETE BATCHING PLANT - REFER TO PROJECT ID2203355
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Blacktown Council Area of Concrete Batching Plant type. Construction of a twin alley concrete batching plant with annual production of 100,000 cubic metres. Plant includes: aggregated storage area; holding bins & weigh hoppers; raw material conveyor; 4 x slump stands; 4 x silos, 27 m high with holding capaciting of 120 tonnes each; amenities building & batch office to be housed in fixed demountable buildings; truck wash down area & 5 washout facilities; parking for 20 trucks & 24 cars. Click for more details...

BIOMASS FERTILISER PLANT
Factory/Office project at 35 Grand Avenue, Thackeray Avenue & Grand Avenue Road Reserves, Camellia, NSW 2142 In The Council Area Of Parramatta of Private. Construction and operation of a processing plant to process food waste (biomass) into energy and fertiliser, and the construction of two underground pipelines Click for more details...

AMCOR PAPER MILL - B9
Paper Mill project at 1891 (Lot 2 & Lot 1) Botany Rd (DP430252 & DP772737), Matraville, NSW 2036 In The Council Area Of Randwick of Private. Construction of a new paper machine building, stock preparation building, produce store waste paper yard, mill offices, control room & other ancillary works. Botany B9 paper mill project involves the construction of a new paper making facility which uses 100% recycled waster paper. The new paper mill would replace 2 existing paper making machines (NO 7 & 8) at the site. Click for more details...

BOULDER GROUP STEEL MILL
Boulder Group Steel Mill is currently at the Early Planning stage, valued at about $ 800000000 it is Construction of a stainless steel manufacturing plant known as a Danieli combi-mill that will produce a variety of stainless & speciality steels. The mill has been designed for an annual output of some 240,000 tons of stainless & special steels as per ISO 9002. The use of leading edge technology ensures high flexibility & in-time production of over 3,000 different types of steel. Some 60% of the output is destined for the Australian market as import substitutes. Click for more details...

AUSTEEL STEEL MILL
A project in the NSW Within Port Stephens. Construction of a Steel Mill to produce 4 million tonne per year of steel from the Western Australian Fortescue iron ore deposit. The steel mill complex will include 3 electric arc furnaces, 3 ladle furnaces, 2 thin slab casters, a thick slab caster, a hot strip mill & a hot strip temper mill. As well there is a cold mill complex comprising a pickle line, 2 single standing reversing mills, a galvanising line, a tempermill, batch annealing & an inspection/coil handling & packaging facility. The NSW Government has entered into an agreement to develop a 150ha site for the steel mill & a 25ha site for a port facility & lease them to Austeel on a long term commercial basis. The port will be designed to accommodate vessels with a capacity of up to 140,000 dead weight tonnes. Click for more details...

BHP SINTER EMISSION REDUCTION PLANT GAS MAIN
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Wollongong Council Area of Waste Gas Main type. Construction of a gas main, 6 metres diameter as component of the Sinter Plant Emission Reduction Project. Click for more details...

BURNET RD CONCRETE BATCHING PLANT
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Wyong Council Area of Private ownership. Construction of a concrete batching plant comprising an administration building, storage bins for aggregates and sand, 2 silos for concrete and flyash, aggregate weighing bins and associated internal roadworks, water treatment and storage facilities and a security fence around the site. Associated carparking for 14 cars Click for more details...

APOLLO CL BATCHING PLANT
2 (Lot 16) Apollo Cl (DP804013), Gosford West, NSW 2250 Has Apollo Cl Batching Plant currently at Planning stage. Construction of a concrete batching plant including office space of approximately 224sq m Click for more details...

NAMBUCCA VALLEY QUARRIES PLANT
Private ownership Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Nambucca Council Area for New development. Construction of a concrete batching plant. Click for more details...

AMCOR BOTANY MILL
Private ownership Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Randwick Council Area for New development. Construction of a new single storey building on the site of the former No 5 Paper Mill to house new installation of steam raising plant comprising of 4 package boilers which include 2 stacks - approximately 44m in height Click for more details...

BOTANY INDUSTRIAL PARK HCB STORAGE FACILITIES
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at 16-20 (Lot 11) Beauchamp Rd (DP1039919), Matraville, NSW 2036 for Addition. Expansion & consolidation of hexachlorobenzene (HCB) storage facilities at Botany Industrial Park. Orica has an ongoing annual program of repackaging any deteriorating drums of HCB into new drums. This process generates waste in the form of crushed drums, crushed pallets and Personal Protective Equipment (PPE). Orica proposes to automate the re-drumming process and provide additional storage facilities. The project consists of the following components: construction of new store J in a new warehouse near the north-western perimeter; construction & operation of 2 re-drumming lines; and construction & operation of a shredding line. Construction materials for store will be reinforced concrete slab floor, steel frame, steel wall sheeting & galvanised steel sheeting roof. The new warehouse will be approx 21m wide & 70m long and will be divided into 2 main sections: the north end will be dedicated to the HCB re-packing plant equipment. This operational area is to be partitioned from the rest of the warehouse. The south end is to be used for storage of drums. This section is known as Store J and is sized to store 4 shipping containers. The 2 ends of the warehouse will be separated by a solid wall. Click for more details...

SCHOOL DRIVE BATCHING PLANT - DOUBLE ENTRY REFER TO ID788131
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) New project at 21B School Dr, Tomago, NSW 2322. This type is Plant with Private ownership. Construction of a new concrete batching plant. Click for more details...

CALTEX REFINERY STORAGE TANK
Deisel Storage Tank project at 160-166 Captain Cook Dr, Kurnell, NSW 2231 In The Council Area Of Sutherland of Private. Levelling earthworks & excavation to enable construction footings & base for an 18 megalitre diesel storage tank, associated pipeworks, earthen bunds & fire hydrants. Modifications to existing stormwater system, pedestrian access walkways & stairs to the tank. Construction of ancillary infrastructure including access roadways & culverts. Click for more details...

SEDGWICK ST CONCRETE BATCHING PLANT
Concrete Batching Plant project at 8 (Lot 101) Sedgwick St (DP1080036), Camden, NSW 2570 In The Council Area Of Camden of Private. Construction of a concrete batching plant. Works will include plant, waste tanks, aggregate storage bins & wash pits. Click for more details...

BULLOCKY WAY CONCRETE BATCHING PLANT
New project of Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at 107 Bullocky Way, Failford, NSW 2430. Demolish existing workshop building. Construction of a concrete batching plant & new workshop building. Click for more details...

VOPAK SITE B BULK LIQUIDS STORAGE EXPANSION
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Randwick Council Area of Storage Facility - Expansion type. Expansion of the Vopak Bulk Liquids Storage Facility to increase storage capacity by approximately 185,000 cubic metres. Components of the facility would include: 9 additional storage tanks; pipework and pumps; loading bays; wastewater teatment plant; and maintenance building. Click for more details...

WHITE BAY BERTH 6
White Bay Berth 6 is currently at the Planning stage, valued at about $ 8000000 it is Proposed construction of a marine and supply facility. The proposal includes: Marine refuelling facilities consisting of tank farm capable of storing 350,000L of diesel fuel and 50,000L of unleaded fuel, eight card-operated refuelling dispensers and associated pipework; a 2 storey building approximately 11m in height and 50 in length for bulk storage (1125sq m) and a small number of offices leased for commercial marine service businesses (155sq m); a building of approximately 10m in height and 50m (1140sq m) in length for bulk indoor storage space for marine equipment including rope, buoys, lifeboats or other marine hardware; a roll on/roll off (RoRo) ramp for intermodal freight operations to service Sydney Harbour, with an associated lay down area for temporary storage of goods for water transport; A 75 tonne travel lift with associated construction of dual ramps adjacent to the RoRo ramp; grey water and sullage pump facilities; supply point for commercial vessels to collect pre-ordered supplies; and temporary vessel moorings. 30 associated carparking spaces. Click for more details...

MANILDRA PARK BULK LIQUIDS STORAGE & BIODIESEL PRODUCTION FACILITY
Currently at the Construction stage In Newcastle is a project estimated to be $ 32000000. This project Construction and operation of a marine fuel storage and distribution, and biodiesel production facility and associated infrastructure. The proposal will be undertaken in 3 distinct phases. Phase 1 involves refurbishing the 2 existing storage tanks, construction of pipeline & operating fuel receival & distribution facilities at the berth, construction of a road tanker loading bay & construction of amenities & service buildings. Under this phase the storage capacity is approx 51 ML. Phase 2 involves the construction of 3 additional fuel storage tanks. Associated with the increased storage capacity, is an increase in distribution volumes to service local land based bulk diesel users. Under this phase, the storage capacity is increased by approx 9 ML, taking the total storage capacity to approx 60 ML. Phase 3 involves the construction of a biodiesel production facility with a production capacity of approx 60 ML per year. The distribution of biodiesel will utilise the marine & road distribution infrastructure constructed as part of Phase 1. Under this phase, the construction of a 5 ML tank increases the total storage capacity to approx 65 ML. Click for more details...

GUNLAKE QUARRY
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) New project at 715 Brayton Rd, Marulan, NSW 2579. This type is Quarry/Crushing Plant/Road with Private ownership. Development of a Hard Rock quarry with associated processing plant & bypass road. It is proposed that the quarry will produce 500,000 tonnes per annum of finished product & will be operated as a conventional hard rock, open cut quarry involving the following main processes: overburden removal will be carried out using equipment such as excavators & dump trucks & will be stockpiled initially on the eastern side of the crushing plant area to create a bund wall extending the line of an existing ridge. The bund wall will become an effective noise & visual barrier; virtually eliminating lines of sight from the east. The crushing plant will be a 3 stage plant with crushing followed by the appropriate screening process including recirculation of material to produce the final products. These will be sized & stockpiled. The 3 crushing stages will most likely be done with a primary jaw crusher, a secondary gyratory crusher & tertiary cone crushers. the plant will have a production throughput of up to 300 tonnes per hour. As production increased, a bypass route around Marulan will be constructed to allow product destined for northern markets & all returning trucks to bypass Marulan. The bypass route involves the construction of a haul road over land owned by Gunlake Quarries to link with a new road to be constructed along a Crown Road Reserve to Red Hills Rd to meet with the Hume Highway Click for more details...

TOMAGO ASPHALT BATCHING PLANT
Asphalt Batching Plant project at Lots 14 & 15 Kennington Dr, Tomago, NSW 2322 In The Council Area Of Port Stephens of Private. Construction of a asphalt plant & associated infrastructure. The facility would produce up to 150,000 tonnes of asphalt a year. The primary components of this plant are: a dryer, bitumen kettle, batch tower (screen, hot aggregate storage bins and pugmill) and hot asphalt storage bins. The secondary components of this plant are: an energy source, baghouse, exhaust stack, dust and lime storage bins, a means of conveying product between plant components, RAP storage, bitumen storage, aggregate storage, laboratory, office, & workshop. The process component of this plant is a proprietary, self-contained plant. Click for more details...

MAGAZINE WAY CONCRETE BATCHING PLANT
Private ownership Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Broken Hill Council Area for New development. Construction of a new concrete batching plant. Click for more details...

LIEBHERR CRANE ASSEMBLY FACILITY
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Penrith Council Area of Warehouse/Workshop/Office - 4 Storey type. Construction of a crane assembly/service facility comprising 5,000sq m workshop, warehouse & a 4 storey ancillary office complex. Ground floor will comprise offices, parts store, 2 lifts, stair to upper levels, crane maintenance workshop area, paint shops, truck loading/manouevring areas. First floor will comprise offices. Second floor will comprise offices & parts store. Third floor will comprise offices & parts store. Looped heavy vehicle roadway through the warehouse linked with number of drive through openings. Internal loading & unloading areas. Hardstand area inclusive of car parking in front of the office building. Vitrapanel wall cladding, Kingspan cladding, clear double glazing, clear glass factory louvres, anodised aluminium & Vitrapanel sun shades, powdercoated gutters & down pipes, Kingspan metal deck roof sheeting, white pebble crane display area. Carparking for 77 vehicles, including 52 at grade & 25 in basement located under office building. Courtyard & landscaped areas. Click for more details...

BELFAST PL CONCRETE BATCHING PLANT
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) New project at 9-11 (Lots 3 & 4) Belfast Pl (DP1087992), Glendenning, NSW 2761. This type is Concrete Batching Plant with Private ownership. Construction of a concrete batching plant. Works may include plant, waste tanks, aggregate storage bins & wash pits. Click for more details...

ASTEC ASPHALT PLANT
New project of Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at 1 & 5 (Lot 4) Keevers Pl (DP1120230), Kembla Grange, NSW 2526. Construction of a new ASTEC asphalt plant & ancillary infrastructure. Major components comprise RAP stockpile area, gas bunkers, bulk storage area, cold feed system, scalping screen, inclined conveyor including weighbridge, CFM pulse jet baghouse, dry additive system, recycle feed bins, new generation storage system, waste bin, truck loadout & management system, 15,000 gallon vertical asphalt tank, 30,000 litre diesel bunded storage tank, administration office & maintenance workshop, substation, truck parking/loading areas, fencing & security, lighting, batter works, stormwater management system. Carparking. Landscaping. Click for more details...

SHELL REFINING
Shell Refining is currently at the Construction stage, valued at about $ 5000000 it is The proposed development provides a state of the art dedicated water cooling facility for the existing polypropylene plant. The efficiency of both the manufacturing plant & cooling tower will enhanced as a result of the new water cooling facility Click for more details...

REDIMIX CONCRETE BATCHING PLANT
18-20 (Lot 9) Armstrong St (DP1097227), Westdale, NSW 2340 Has Redimix Concrete Batching Plant currently at Construction stage. Construction of a new concrete batching plant. Click for more details...

BORAL CONCRETE BATCHING PLANT
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at 28 Grahams Hill Rd, Narellan, NSW 2567 of Concrete Batching Plant - Altns & Addns type of Addition development. Alterations & additions to concrete batching plant Click for more details...

SHOALHAVEN STARCHES ETHANOL EXPANSION PROJECT
Shoalhaven Starches Ethanol Expansion Project is currently at the Construction stage, valued at about $ 200000000 it is Expansion of ethanol production facility. The project involves increasing the ethanol production rate of the plant up to 300 million litres a year; implementing a range of odour control measures on site; and upgrading, augmenting and using the existing infrastructure on site. The following additions and alterations are proposed to the existing factory site as part of the ethanol upgrade: the provision of an additional dryer for the starch/gluten plant; additional equipment and storage vessels for the ethanol plant including 3 additional fermenters, additional cooling towers and molecular sieves; upgrades to the Stillage Recovery Plant including 6 additional Dried Distillers Grains Syrup (DDGS) dryers; 10 decanters; chemical storage and two evaporators. The proposal also includes the installation of a DDGS Pellet Plant within this part of the site; & the establishment of a new packing plant, container loading area and a rail spur line. The establishment of this facility on the northern side of Bolong Road will require the provision of an overhead bridge structure to allow product and safe pedestrian movement across Bolong Rd. Approx areas are: starch dryer 700 sq m; gas-fired boiler 150sq m; extension to DDG: loadout 500sq m, evaporator 50sq m, bioscrubbers 200sq m, pellet plant 200sq m, DDGS dryers 2,400sq m, MCC room 375sq m; gas-fired co-generator Plant 1000sq m; chemical storage 150sq m; packing plant 3000sq m; fire services 200sq m; total Area 8,925 sq m. Additional carparking for 94 vehicles will be provided. Click for more details...

GLOUCESTER BVD INDUSTRIAL DEVELOPMENT
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project for New development. Demolition of existing scrap copper storage shed. Relocation of a continuous billet caster facility including new vent stack, weighbridges & new sealed storage area. Click for more details...

COPFORD RD CONCRETE BATCHING PLANT
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at 8 Copford Rd, Goulburn, NSW 2580 of Batching Plant type of New development. Construction of a concrete batching plant. Click for more details...

STENHOUSE DR CONCRETE BATCHING PLANT
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Lake Macquarie Council Area of Private ownership. Construction of a concrete batching plant comprising plant, on ground aggregate storage bays & drivers room & amenities of 55sq m. Concrete & aluminium walls, steel frame, concrete floor & steel roof. Carparking. Landscaping. Click for more details...

ORICA AMMONIUM NITRATE EMULSION PROJECT
Production Facility project at Lot 2 George Booth Dr (DP809337), Richmond Vale, NSW 2323 in the Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)). Establishment of a new ammonium nitrate emulsion production facility & associated infrastructure. key infrastructure will comprise chemical, fuel & product storage tanks; ANE manufacturing plant; truck weighing, loading & unloading facilities; utilities including hot water, cooling water & compressed air systems, electricity distribution cables & a transformer; stormwater/spill management structures; plant site office, contral room, switch room & quality control laboratory; & access road. Click for more details...

PORT KEMBLA STEELWORKS BOS FLARE STACK NO 1
Lot 1 Five Islands Rd (DP606434), Port Kembla, NSW 2505 Has Port Kembla Steelworks Bos Flare Stack No 1 currently at Construction stage. Removal & replacement of No 1 Basic Oxygen Steelmaking (BOS) flare stack at No 2 steelworks. Development involves dismantling of the existing stack & installation of new stack of approx 85.6m in height & of steel construction. Click for more details...

PORT KEMBLA STEELWORKS BOS FLARE STACK NOS 2 & 3
A project in the NSW Within Wollongong. Demolition & replacement of BOS flare stacks Nos 2 & 3, each 2 x 7m, within the Port Kembla steelworks. New standard design stacks will be 85.6m, self supporting & constructed in 3-4 sections, steel construction. Click for more details...

SHOWGROUND RD CONCRETE BATCHING PLANT
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) New project at 25-43 Showground Rd, Taminda, NSW 2340. This type is Concrete Batching Plant with Private ownership. Construction of a new concrete batching plant. Click for more details...

FAIREY RD CONCRETE BATCHING PLANT
40 (Lot 24) Fairey Rd (DP1010188), Windsor South, NSW 2756 Has Fairey Rd Concrete Batching Plant currently at Construction stage. Construction of a new concrete batching plant, that will contain 5 aggregate storage bins, 1 x 100 tonne capacity split silo, aggregate weigh bins & covered conveyor, truck bathing enclosure with dry dust extraction, slump stand with hinged platform, batch plant control room, material settlement pits & stormwater management system. Truck & car parking area & truck turning circle, vehicle maintenance building, batch office & amenities building. Click for more details...

AUSTRAL PRECAST CONCRETE BATCHING PLANT
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at 33-41 (Lot 79) Cowpasture Rd (DP27515), Wetherill Park, NSW 2164 of Concrete Batching Plant type of New development. Construction of a concrete batching plant associated with an existing concrete products manufacturing facility. Production capacity of up to 60,000 m3 per year is envisaged. Inclusion of a closed loop concrete recycling process enabling aggregates to be washed and reused on site, and slurry to be stored and also reused on site. Modifications to the existing precast concrete facility to allow receipt of the ready-mix concrete from the proposed concrete batching plant. The plant would comprise plant to receive raw materials; storage of raw materials in fully enclosed bins (sand & aggregate) & silos (cement/flyash); mixing line, which would mix raw materials in certain ratios to produce ready-mixed concrete in twin rotary mixers; system to weigh & deliver (via conveyor belts and skip hoist) the raw materials into the mixing line; other auxiliary systems such as waste concrete & water recycling and safeguards for receiving cement/flyash into silos. Click for more details...

MAITLAND ST INDUSTRIAL DEVELOPMENT
Industrial Subdivision (9) Lots/Concrete Batching Plant project at 79-83 Maitland St, Branxton, NSW 2335 in the Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)). Industrial development. Stage 1 will be 9 industrial lots with the construction of a new road. Stage 2 construction of a new concrete batching plant. Click for more details...

VISY PLASTICS PROCESSING PLANT
Processing Plant - Altns & Addns To Factory project at 2 (Lot 2) Herbert Pl (DP849480), Smithfield, NSW 2164 in the Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)). Alterations & additions to existing building & change of use to a plastics processing plant. Works will include internal fitout; construction of a pipe bridge over part of the site; new waste water pre-treatment plant; increase in height over 2 sections of the building at the southern side, known as the top hats; installation of acoustic insulation on the underside of eastern awning; installation of exhaust fans; new load conveyer; construction of new openings on the eastern facade; cooling towers; construction of 2 electrical transformers; installation of water tanks; siteworks & external container storage area. Proposed top hats will be of steel framed construction with colorbond trimdeck walls to match existing, colorbond ridge capping eaves & colorbond roof. Modifications to carparking & driveways. Click for more details...

RUTHERFORD ASPHALT PLANT
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Maitland Council Area of Asphalt Productions Plant - Replacement type. Replacement of the existing asphalt production plant. Work comprises New bitumen loading areas. New weigh bridges. Relocation of water storage tanks, relocation & reworking of aggregate bins, relocation of existing lunch room, relocation & upgrade of operations building. Removal of some trees to allow for efficient & sale vehicle circulation & formal carparking areas. Additional landscaping incorporating tree plantings, ground cover plantings & grassed areas. Relocation of the flagpole. bulk earthworks to improve drainage & stormwater & drainage management Click for more details...

GLASS RECOVERY
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Penrith Council Area of Private ownership. Conversion of an existing industrial building into a glass beneficiation plant with the capacity to process 105,000 tonnes of glass per annum. Construction of a series of steel framed and sheet steel walled storage bunkers to the hardstand area to the south and east of the building. Installation of an overland conveyor to transport the glass cullet across to the adjoining property & glass bottling plant of Owens Illinois. Click for more details...

CEMENT AUSTRALIA GRINDING MILL
Trade Package For Jetty Strengthening Work New project In The Wollongong Council Area. Trade Package to locally strengthen section of No 6 jetty to support the unloading conveyor trestle foundations. Timing for commencement of works/ services estimated for 2nd Quarter of 2013 Click for more details...

SOUTHGATE CONTAINER PARK - VISA GLOBAL LOGISTICS- WAREHOUSE 1
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at 32 Swinbourne St cnr Coal Pier Rd, Botany, NSW 2019 of Warehouse/Office - 2 Storey type of New development. Stage 1: Construction of warehouse Building 1 comprises a container handling facility associated with warehouse 1 of 15,400sq m, installation of a diesel fuel tank for truck refuelling of approximately 50,000 litres, construction of a truck wash area. Construction of office space associated with warehouse 1 over 2 levels of approximately 1500sq m. Carparking for 100 vehicles located in the north western corner of the site with direct access to the Swinbourne St access handle. Construction of 7 loading docks. Landscaping includes the construction of a detention swale adjoining the access driveways to Coal Pier Rd. Signage, Construction of the cycleway linking Swinbourne St. Construction of an onsite detention tank in the south western corner of the site. Fitout of warehouse 1 for VISA Global Logistics. Click for more details...

ROADWORX STATIC ASPHALT PLANT KEMBLA GRANGE
Static Asphalt Plant project at 6 Keevers Pl, Kembla Grange, NSW 2526 In The Council Area Of Wollongong of Private. Construction of a static asphalt plant, mixing tower, drying and heating system and cold feed system, storage tanks. Single storey amenities block, product sampling laboratory incorporation shower and change facilities. Carparking for 7 vehicles. Click for more details...

EASY MIX CONCRETE
Batching Plant/Silos/Office - 2 Storey New project In The Wyong Council Area. Construction of a concrete batching plant. The plant will comprises 2 cement silos with reverse pulsing dust filters. Batch hopper & loading conveyor. Six aggregate/sand storage bins with concrete floors & walls with dust suppression water sprays. Dry dust extraction system. 22,500 litre paddle tank for reclaimed/recycled water storage. Construction of a 2 storey office & employee amenities. Yard paved to control rain water run off for harvesting & re-use. Bunded admixture storage area. 2 x wash out pits. Carparking for 4 cars including 2 covering parking bays Click for more details...

ASH CONVERSION PLANT MOUNT PIPER POWER STATION
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Lithgow Council Area of Ash Conversion Plant type. Construction of a manufacturing plant for fly ash conversion to construction materials. Nu-Rock will utilize approx 15,000 tonnes of Mt Piper's waste ash to produce environmentally friendly lightweight, fire rated blocks, pavers panels & other building materials. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect