State

Categories

Sub Categories

Click Here to Find Current Projects

List of Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks) Projects in WA


HANSOL/PULPWOOD WOODCHIP MILL
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Bunbury Council Area of Woodchip Mill type. It is proposed to develop woodchip mill for plantation timber in south west region of Western Australia. It is envisaged mill would process around 3.6 mtpa of wood. Click for more details...

HISMELT EXPANSION PROJECT
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at Leath Rd, Kwinana, WA 6167 for New. Package let is for supply of instrumentation. Click for more details...

HISMELT EXPANSION PROJECT
Mechanical Installation - Package 3 project at Leath Rd, Kwinana, WA 6167 in the Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)). One of three packages. Fabrication and installation. Click for more details...

HISMELT EXPANSION PROJECT
Private ownership Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Kwinana Council Area for New development. One of three packages. Pipework. Click for more details...

BURRUP FERTILISERS AMMONIA PLANT PROJECT
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at Btwn King Bay & Hearson Cove, Burrup Peninsula nr, Karratha, WA 6714 of Ammonia Plant type of New development. Ammonia plant comprising: 2,200 t per day production of liquid ammonia from natural gas; power plant consisting of 20 MW steam turbines & 2 x gas-fired auxiliary boilers; 2 x vent stacks where gases, excluding ammonia, will be vented with steam during normal operating conditions, start-up & upset conditions; 2 x 40,000 t atmospheric pressure, double-walled, double-integrity cryogenic ammonia storage tanks, complete with flare stack; closed circuit seawater-freshwater cooling system & single seawater cooling tower; supply of 74 TJ/day of natural gas from Dampier to Bunbury Natural Gas Pipeline (pipeline to be below ground, 1.3 km in length & constructed by Apache Energy); supply of seawater & freshwater via thermal desalination plant proposed by Water Corporation; demineralisation water plant; wastewater treatment plant; ammonia loading & recirculation facilities for Dampier Public Wharf; associated support facilities. Click for more details...

CHALLENGE DAIRY CO-OPERATIVE/SANYUAN FOODS MILK PROCESSING PLANT
Private ownership Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Capel Council Area for New development. Development of milk processing plant that would produce high-quality powdered milk, chocolate, yoghurt & other value-added products. Click for more details...

DAMPIER PORT BULK LIQUIDS BERTH (BLB) PROJECT
Private ownership Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The City Of Karratha Council Area for Addition development. Additional facilities to be constructed to enable accommodation of increased port traffic to service new fertiliser & gas to liquids projects on Burrup Peninsula. New multi-user bulk cargo export berth is being constructed to service liquids tankers & bulk solid cargo vessels. Dredging work of up to 4.5 million cu m of sediments is also being undertaken. Click for more details...

BGC - BRICKWORKS
Brickworks project at Not yet determined, within Perth Metropolitan Region, ., WA 6999 in the Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)). It is proposed to develop brickworks. Click for more details...

PORT OF ESPERANCE
Port Of Esperance is currently at the Construction stage, valued at about $ 12000000 it is Design & construction of storage shed of approximately 210 m in length x 74 m width & 30 m in height, conveyors of approximately 600 m in length, truck loading facility, berth hoppers & other associated works. Storage facility will have capacity to store 120,000 tonnes of sulphur. Click for more details...

WEST KIMBERLEY RESOURCE DEVELOPMENT STUDY
Private ownership Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Various Council Area for New development. Qualified consultants to provide services to undertake a "West Australian Resource Development Study" - a strategic infrastructure planning study identifying the long term requirements for multi-use industrial infrastructure, social infrastructure and associated services related to mineral and petroleum development in the West Kimberley. Click for more details...

PORT HEDLAND PORT
New project of Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at Port of, Port Hedland, WA 6721. Works comprise design, supply & installation of sampling system to sample copper concentrate. Sampler will be located on existing conveyor at Port Hedland Port Authority & used for export of copper concentrate from Telfer. General specification is as follows: Primary cross belt sampler; secondary vezin, or sliding plate sampler; rotary indexing, two cannister sample collector; belt feeder from primary to secondary sampler; electrical connection. Click for more details...

LUPIN DE-HULLING PLANT
Lupin De-Hulling Plant project at CBH Metro Grain Centre, Abernethy Rd, Forrestfield, WA 6058 In The Council Area Of Kalamunda of Private. It is proposed to develop lupin de-hulling plant at Metro Grain Centre in Forrestfield. Click for more details...

CORAL BAY WASTEWATER SCHEME
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project for New development. To dispose of wastewater from Coral Bay, it is proposed to construct wastewater treatment plant, below-ground sewers & pumping station, along with ancillary items. Pumping station is proposed to be located on western end of Robinson St. Pressure main will run along Coral Bay Rd & wastewater treatment ponds would be located on eastern side of settlement. Click for more details...

KWINANA BULK TERMINAL - MATERIALS HANDLING EQUIPMENT
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) Renovations, Refurbishments etc. project at Lot 120 Kwinana Beach Rd, Kwinana, WA 6167. This type is Materials Handling - Control Systems Upgrade with State ownership. Works comprise materials handling upgrade - control systems. Click for more details...

GOSNELLS ASPHALT PLANT
Gosnells Asphalt Plant is currently at the Planning stage, valued at about $ 2100000 it is Development of new asphalt plant at CSR's Gosnells Quarry site. Click for more details...

ALBANY CHIP TERMINAL PROJECT
Currently at the Construction stage In Albany is a project estimated to be $ 18000000. This project Woodchip export facility to include truck unloading area, ramps, control room, stacker, office block & network of conveyors leading to waiting ship at Berth No. 6. Retention pond also to be constructed. It is envisaged exports of woodchips will commence at rate of around 300,000 tpa from 2004, increasing to over 1 Mtpa by 2007. Click for more details...

WESFARMERS CSBP AMMONIA PROJECT
A project in the WA Within Kwinana. It is proposed to modify existing anhydrous ammonia import facility so that ammonia can also be exported. To facilitate this, export pump is to be installed in ammonia transfer line near to 30,000 t ammonia storage tank. Loading rate of about 500 tph is envisaged. Click for more details...

METHANEX AUSTRALIA PROJECT
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) New project at King Bay-Hearson's Cove Industrial Precinct, Burrup Peninsula, Dampier, WA 6713. This type is Methanol Plant with Private ownership. A 1.3 million tonne per year methanol project, as the first stage of a planned Asia Pacific hub. This was a reduction in capacity of about 35% compared to the original project plan of 2 million tonnes per annum. Click for more details...

COLLTECH AUSTRALIA - COLLAGEN EXTRACTION PLANT
Currently at the Construction stage In Collie is a project estimated to be $ 3000000. This project Development of new plant to extract collagen from sheepskin. Click for more details...

JERVOISE BAY/HENDERSON MARINE INDUSTRIAL ESTATE
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project for New development. On-site facilities contract to comprise whole of design, approvals, construction, testing & commissioning of buildings, equipment, fixtures, fittings & pavements as shown on drawings. In particular, works to include, but not necessarily be limited to: 1) Construction of fabrication & assembly hall, complete with travelling systems, overhead cranes, offices & amenities. 2) 150 t SWL portal crane. 3) 3,000 t loadout corridor from assembly area westward to join with pavement by Civil & Marine contractor (separable portion for early completion). 4) 3,000 t load corridor northwest from assembly area to boundary line. 5) 15,000 t loadout corridor from assembly area to southern boundary to join with pavement by Civil & Marine contractor. 6) Crane & heavy/wide load access areas from main gate & around fabrication area. 7) General hardstanding, fabrication of storage areas & landscaping/reticulation elsewhere within site. 8) Boundary line & internal fences, gates & security control. 9) New sewer main from main entrance on southern boundary to connect into existing sewer (northern boundary). 10) Underground services reticulation throughout site including stormwater disposal, power, telecommunications (conduiting only), sewer, water supply, fire protection, site security. 11) Demolition/removal of existing foundations & excess buildings. 12) General facilities buildings complete including workers amenities, project office, trade shops, workshops, warehouse/storage, first aid & induction, gatehouses (2), Facilities Manager office. 13) All other works to completed operational facility. Click for more details...

COLLTECH AUSTRALIA - COLLAGEN EXTRACTION PLANT (NARROGIN)
A project in the WA Within Narrogin. It was proposed to develop new plant to extract collagen from sheepskin. Click for more details...

KWINANA ALUMINA REFINERY
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Kwinana Council Area of Carbonation Facility - Upgrade type. Includes installation of a new carbonation vessel, modifications to the existing carbonation facility, a new causticisation facility (2 causticisers and a 200 kL lime slurry storage tank and a new discharge pipeline between the causticisation facility and the residue disposal area H. Click for more details...

PORT OF GERALDTON - BERTH 4 BULK HANDLING FACILITY
Bulk Handling Facility - Upgrade To Berth 4 project at Port of, Geraldton, WA 6530 in the Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)). Work to comprise reconditioning of Berth 4 loading & unloading conveyors & part of port's shiploader & installation of electronic controls. Click for more details...

BURRUP FERTILISERS AMMONIA PLANT PROJECT
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The City Of Karratha Council Area of Hvac System For Ammonia Plant type. Supply of HVAC system. Click for more details...

BURRUP FERTILISERS AMMONIA PLANT PROJECT
Burrup Fertilisers Ammonia Plant Project is currently at the Construction stage, valued at about $ 900000 it is Supply of air intake system for gas turbine. Click for more details...

BURRUP FERTILISERS AMMONIA PLANT PROJECT
A project in the WA Within City Of Karratha. Insulating & painting for ammonia plant. Click for more details...

BURRUP FERTILISERS AMMONIA PLANT PROJECT
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) New project at Btwn King Bay & Hearson Cove, Burrup Peninsula nr, Karratha, WA 6714. This type is Electrical/Instrumentation For Ammonia Plant with Private ownership. Electrical & instrumentation works for ammonia plant. Click for more details...

BURRUP FERTILISERS AMMONIA PLANT PROJECT
Refractory - Supply & Installation For Ammonia Plant project at Btwn King Bay & Hearson Cove, Burrup Peninsula nr, Karratha, WA 6714 in the Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)). Refractory supply & installation. Click for more details...

JOE WHITE MALTINGS - MALT PROCESSING FACILITY
Access Industrial Park, 770 Abernethy Rd, Forrestfield, WA 6058 Has Joe White Maltings - Malt Processing Facility currently at Construction stage. It is proposed to increase size of facility from 93,000 t to 200,000 t capacity. It is envisaged production will commence early in 2006. Expansion is effectively duplication of existing facility & site was originally designed & sized for duplication, with all services & facilities in place for such expansion. Work will include new steep house, germination vessels also with attendant silos, water tanks, piping, electrical & civil works. Click for more details...

COCKBURN ROAD REFINERY - OFFICE
New project of Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at Lot 102 Cockburn Rd, Naval Base, WA 6165. Construction of new transportable office for refinery. Click for more details...

AUSTRALIAN MARINE COMPLEX - FABRICATION HALL (BUILDING 9)
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at 124 Quill Wy, Henderson, WA 6166 of Fabrication Hall type of New development. Work comprise design & construction of fabrication hall (Building 9) at Australian Marine Complex in Cockburn Sound as part of Common User Facility. Click for more details...

KWINANA BULK TERMINAL CONVEYOR REPAIRS
A project in the WA Within Kwinana. Repairs to walkway structure of conveyors CV1 & CV3 at Kwinana Bulk Terminal. Click for more details...

GERALDTON PORT AUTHORITY - SHIP LOADER CONVEYOR CV5
Conveyor Cv5 project at Geralton Port, Geraldton, WA 6530 In The Council Area Of City Of Greater Geraldton of Local Govt. Works comprise of detailing, manufacturing, erection & commissioning of shiploader conveyor CV5, including manufacture of new feed & discharge chutes, dump chute & re-routing of access stairs. Click for more details...

GERALDTON PORT AUTHORITY - CONTROL ROOM/SECURITY OFFICE
Geraldton Port,, Geraldton, WA 6530 Has Geraldton Port Authority - Control Room/Security Office currently at Tenders & Building stage. Works comprise of construction of control room & security office mounted on top of loading conveyor tower at Berth 4 & associated stairway access. Click for more details...

GERALDTON PORT AUTHORITY - IRON ORE EXPANSION PROJECT - MATERIALS HANDLING
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at Geraldton Port, Marine Terrace, Geraldton, WA 6530 for New. Development comprises modifications for Conveyor (CV) 13 to allow for the upgrading and reversal for conveying iron to Berth 5. New conveying circuit for iron ore from reversed and upgraded CV 13 to Berth 5. Modifications to the concentrate load out arrangements. Modifications and new conveying circuit to route all minerals and concentrates from the existing mineral sands ship loading truck dump facility to Berth 4. Minor upgrade of Berth 6 ship loader (only if required to accommodate modifications to suit a new minerals conveyor feed circuit such as a reversed feed tipper). New electrical substations, power distribution and electrics for the new development. New control system and provisions for future control systems for all recalim, conveying and ship loading circuits including intergration with existing systems. Upgrade of existing reclaim systems as required to accommodate the loading circuit modifications for both iron ore and minerals. Click for more details...

KWINANA BULK TERMINAL - CONVEYOR JCOI
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at Lot 120 Kwinana Beach Rd, Kwinana Beach, WA 6167 of Conveyor Replacement Belt - Supply & Install type of Supply & Install development. Works to comprise of supply & installation of replacement belt for Conveyor JC01 at Kwinana Bulk Terminal. Click for more details...

WESFARMERS LNG PLANT
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) New project at Lot 14 Mason Rd, Naval Base, WA 6165. This type is Lng Plant - Construction with Local Govt ownership. Works to comprise of construction of Wesfarmers 175 tonne-per-day LNG Plant in Naval Base together with distribution infrastructure & 2 remote power stations. Click for more details...

ALCOA REFINERIES PINJARRA RESIDUE PROJECT - MECHANICAL INSTALL FOR CARBONATION PLANT
Currently at the Construction stage In Murray is a project estimated to be $ 22000000. This project For the provision of mechanical installation services for the carbonation plant. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - MATERIAL HANDLING SYSTEM TO BERTH 5
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at Geraldton Port, Marine Terrace, Geraldton, WA 6530 for New. Construction Package 3. New Material Handling System to Berth 5. Package 2. Fabrication, supply, installation and commissioning of materials handling system. Click for more details...

AUSTRALIAN MARINE COMPLEX TRAINING MARINE COMPLEX OIL & GAS PROJECT - HENDERSON CHALLENGER TAFE
A project in the WA Within Cockburn. Works to comprise of installation of processing plant designed to mimic typical oil/gas/water separation plant for training at TAFE. Processing plant facilities will comprise vessels, pumps, pipe work, instrumentation & control systems. Click for more details...

ALBANY IRON ORE PROJECT - PORT EXPANSION
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Albany Council Area of Port - Expansion type. Albany Port Authority proposes to dredge within Princess Royal Harbour & King George Sound to facilitate access of cape size vessels. Proposal includes dredged materials being used for land reclamation to create an additional berth adjacent to port to be leased to Grange Resources LTD to accommodate their Port infrastructure. Magnetite mined by Grange will be pumped as slurry approx 100 km from their Southdown Magnetite & Kemaman Pellet Plant to concentrate storage facility at Albany Port before being loaded on to cape size vessels to be shipped to Malaysia. Click for more details...

BINNINGUP DESALINATION PILOT PLANT
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project for New development. Works may include the development of a temporary Pilot Plant for the proposed Binningup Desalination Plant. The proposal consists of seawater intake/outlet pipes & pumps, various tanks, 5 sea containers for equipment storage & ancillary amenities (toilet & parking). Pipes will also traverse the adjoining Reserve 29628 to link the Pilot Plant to the ocean. Click for more details...

KWINANA BULK TERMINAL - CONVEYOR ECO3
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project at Lot 120 Kwinana Beach Rd, Kwinana Beach, WA 6167 of Conveyor - Design & Reconstruction type of New development. Works to comprise design & reconstruction of a conveyor system & tunnel that were previously damaged by fire at Kwinana Bulk Terminal load out facility. Click for more details...

GREAT EASTERN HIGHWAY FIRE RESERVE WATER TANKS - SCREEN ENCLOSURE
Screen Enclosure project at 201 (lot 15) Great Eastern Hwy, Burswood, WA 6100 in the Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)). Works to include the construction of screen enclosure for the reserve fire tanks at the rear of the convention centre. Click for more details...

MERMAID MARINE - BRINESTORAGE TANK
Currently at the Planning stage In City Of Karratha is a project estimated to be $ 2500000. This project Tenders are being sought for the design, construction, supply, manufacture & testing of a circular roof water storage tank with a capacity of 2,000 cubic metre to be located at the Burrup brine tank site. Click for more details...

UTAH BULK HANDLING FACILITY
Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) Addition project at Finuccane Island, end of FMG Rd, Port Hedland, WA 6721. This type is Cv07 Tundish - Fabrication & Installation with State ownership. Works to include the fabrication & installation of a washdown catchment (Tundish) structure & associated steelwork & will include modifications to the existing structure to facilitate the installation at the Port of Port Hedland's Utah Bulk Handling Facility. Click for more details...

UTAH BULK HANDLING FACILITY TRANSFER STATION 1
State ownership Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Port Hedland Council Area for Renovations, Refurbishments etc. development. Improvement works at the Utah Bulk Handling Facility. Works to include installation of 2 monorail hoists, associated steelwork & construction of a maintenance platforms, installation of a improved deflector into transfer chute, modifications to existing lower chute & installation of new upper chute. Click for more details...

PILBARA PORTS AUTHORITY - HYDROGRAPHIC SURVEY CONSULTANCY SERVICES
State ownership Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)) project In The Port Hedland Council Area for New development. Consultants are sought for the provision of Hydrographic Survey consultancy svcs for Pilbara Ports Authority to include: pre-. post- & progress dredge surveys; metocean equipment inspections & general hydrographic & related topographic survey svcs. Click for more details...

BORAL ORANGE GROVE CRUSHING PLANT UPGRADE
Boral Orange Grove Crushing Plant Upgrade is currently at the Construction stage, valued at about $ 40000000 it is Boral Resources currently operate a hard rock quarry on the Darling Scarp, production activities include drilling, blasting, crushing/screening, storage & haulage of hard rock materials. The quarry produces an average of 1 million tonnes per annum, the site contains a series of primary, secondary & tertiary crushers & vibrating screens, the product is stored onsite in bays & stockpile prior to delivery. Works to include the replacement/modernising of the existing open crushing/screening facilities & replacing with an enclosed automatic system. The new plant will be located near the existing plant & the existing screenhouse will be retained. The plant upgrade will be undertaken on a phased basis with the existing plant decomissioned immediately after the new plant is commissioned. Click for more details...

SOUTH WESTERN HIGHWAY - HANSON CONCRETE BATCHING PLANT
Concrete Batching Plant project at Lot 202 South Western Hwy, Whitby, WA 6202 in the Industrial (Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)). Works to include the construction of a concrete batching plant to include a wash/service area to facilitate cleaning the agitator trucks after delivery of the concrete. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect