State

Categories

Sub Categories

Click Here to Find Current Projects

List of Hotels, Serviced Apartments Projects in NSW


VALENTINE ON GEORGE
Valentine On George is currently at the Construction stage, valued at about $ 400000 it is Fitout upper levels of building as hotel rooms/bar facilities. Click for more details...

EMPIRE HOTEL
Sports Bar - Conversion From Shops project at 32-32a Darlinghurst Rd, Darlinghurst, NSW 2010 In The Council Area Of Sydney of Private. Convert 3 shops to TAB/Sports bar for Empire Hotel. Click for more details...

WOOLWICH PIER HOTEL
Currently at the Construction stage In Hunters Hill is a project estimated to be $ 1500000. This project Remodel & restore the existing Woolwich Pier Hotel. It is proposed to replace the original verandah. The face of the Hotel is proposed to be sand blasted to remove the cement render and reveal the original face brick finish. The interior of the Hotel will refurbished at both levels, to open up the excessive partitioning within the public bar & upstairs area. The pool room & playground area will revert to a gaming room & beer garden respectively. A more significant change will be made at the first floor level where the existing function rooms & office space would be converted to a lounge bar area. It is further proposed that the bar areas be reconfigured, the kitchen & dining room be expanded & large part of the existing storeroom within the old stables be converted to toilets. Other alterations include, addition of an outdoor storeroom & bar in the south western corner of the site, replacement of the existing awning & construction of a more formal structure over as a dining area improving the presentation to the street. Construction of acoustically lined booths in the north western corner of the beer garden. General upgrade of the flooring throughout, including timber decking to the beer garden area. Provision of a landscape strip along most of the Woolwich Rd frontage. Click for more details...

CRITERION HOTEL
Addition project of Hospitality (Hotels, Serviced Apartments) project at 75 Cessnock Rd, Weston, NSW 2326. Alterations & additions to an existing Hotel. Click for more details...

SOFITEL WENTWORTH HOTEL
Hotel - Altns & Addns - Stage 1 project at 61-101 Phillip St, Sydney, NSW 2000 In The Council Area Of Sydney of Private. Refurbishment of the Wentworth Hotel including replanning of the retail, restaurant, bar, arcade & hotel areas on levels B1, 1, 2 & 3. Relocation of valet parking drop-off & queuing area within the building & the construction of new retail shops to Bligh Street replacing the existing porte cochere. Click for more details...

THREE WEEDS HOTEL
Addition project of Hospitality (Hotels, Serviced Apartments) project at 193 Evans St, Rozelle, NSW 2039. Alterations & additions to the existing Three Weeds Hotel, to include construction of a new & enlarged kitchen & dining area, refurbishment of existing spaces within the overall hotel floor plan. Conversion of the space previously used as a live entertainment area into a restaurant, with general seating for 58 persons, plus seating for an additional 38 persons in 2 separate private function rooms (total seating capacity 96 persons). Reconstruction & extension of kitchen facilites, general refurbishment of bars, toilet facilites, wall, door, window, floor & ceiling finish. Relocation of existing gaming lounge, to a new room on the eastern side. New lounge bar area in location of existing framing room, on western side. Upgrade of all services including fire, acoustics, electrical, air conditioning & ventilation. Changes to detailing of window openings on first floor. Extension of roof platform to house additional services equipment & refurbishment & improvement of Evans St garbage area, to incorporate a ventilated garbage room for refuse & recyclables. Click for more details...

OXFORD ST PUB
Hospitality (Hotels, Serviced Apartments) project at 21 Oxford St, Darlinghurst, NSW 2010 for New. Conversion of basement, ground & first level of an existing building to a pub. Each level of the building would be used as follows: The basement would include a gaming lounge, bar, BBQ area within the light well, toilet facilities, store areas (including waste storage), new passenger lift & entry point for disabled persons & service deliveries & a new stair well providing access to the ground floor. The ground level includes the main entry point for patrons, located on the corner of Oxford St & Brisbane St. This level will aso include a bar & lounge area & small juliet balconies that would include openings into the light well. The first floor level would repeat the layout of the ground floor with a bar & lounge area. This level would also include toilet facilities, however would not include orpenings into the light well. The first floor level would repeat the layout of the ground floor with a bar & lounge area. This level would also include toilet facilities, however would not include openings into the light well. A mezzanine level over the first floor would be utilised as an office & staff area. Click for more details...

SPORTSMAN HOTEL
Hospitality (Hotels, Serviced Apartments) project at 81 (Lot 459) Kildare Rd (DP 656985), Blacktown, NSW 2148 for Renovations, Refurbishments etc.. Alterations & refurbishment to the lounge area of the Sportsman Hotel. Click for more details...

BOTANY BAY HOTEL
Addition project of Hospitality (Hotels, Serviced Apartments) project at 1807 Botany Rd, Botany, NSW 2019. Alterations & additions to the existing hotel, which will include internal & external works & small additions on the ground floor level at the rear. The Hotel extends over 3 levels providing a public bar & bistro area at the ground floor, accommodation (including managers residence) at the first floor, & further accommodation & storage areas at the second floor. Including managers residence. Breakdown as follows, alterations to the southern facade of the building so that the existing 3 windows & 2 doorways are replaced with 2 large timber framed windows. The existing female toilet is converted to a disabled toilet. The area of the male toilets is reduced & female amenities are provided adjacent. A portion of the cool room, the existing office area & a storeroom is to be made available for a larger bar area & gaming room. The location of the kitchen & 'wash-up' area remains unchanged, however, layout changes are proposed. A room approximately 9.2 sq m in area is to be constructed adjacent to the 'wash-up' area & is to be used as food cool room. Part of the existing loading dock is to be re-constructed into an extension for the keg/package cool room. Replacement of the existing loading dock amenities with an office (appoximate floor area 10.8 sq m). First floor, the following changes are proposed to the first floor, divide the existing common bathrooms into male & female amenities, convert 1 of the existing bedrooms into a storeroom. Construction of a plant equipment enclosure & acoustic screen, adjacent to the new storeroom. Upgrade existing staircase to conform with current building requirements. Convert 2 bedrooms & bathroom to an open pool room. Convert the existing manager's residence & living area to a dining room. Convert the existing bedrooms along the southern elevation into an enclosed deck. Replace the existing bedroom adjacent to the staircase with an open foyer area. Second floor, convert the existing hotel accommodation (including 3 bedrooms & bathroom) to manager's accommodation. The manager's accommodation is to include 1 bedroom, living area, dining/kitchen & bathroom. Convert the existing storage area to a passage that leads to the external staircase. Click for more details...

GARRISON HOTEL
Private ownership Hospitality (Hotels, Serviced Apartments) project In The Albury Council Area for Addition development. Alterations & additions to the bar area of an existing Hotel. Click for more details...

CROWN HOTEL
Hotel - Altns & Addns Renovations, Refurbishments etc. project In The Sydney Council Area. Construction of an additional level containing plant, storage rooms & offices to the existing Crown Hotel. Click for more details...

HILTON HOTEL & CAPITAL CENTRE
Currently at the Construction stage In Sydney is a project estimated to be $ 167000000. This project Refurbishment to the existing Hilton Hotel that will include, renovation of the hotel's public areas & guest rooms, creating a new lobby & building a street level entrance. Other work will include a 3,000 delegate conference & convention centre, a ballroom that will seat 1,200 guests, 23 new fully equipped meeting rooms, 15,000 sq m of A-grade commercial office space, 2,500 sq m health club & a 3 storey basement carpark. The concrete facade & car ramps outside the Sydney hotel will be demolished & replaced with sandstone columns & glass. The facelift takes in the Capital Centre, the 585 rooms hotel, retail arcade, 9 levels of commercial space. Other changes include, new pedestrian links at basement & ground level to Town Hall through the Galleries Victoria, street frontages with clear visibility into the hotel reception, banquet, conference, restaurant & bar areas. New alfresco dining, meeting area & a new public indoor court area with views to the QVB. Click for more details...

CITY WATER RESERVOIR SITE REDEVELOPMENT
Hospitality (Hotels, Serviced Apartments) New project at cnr Jondaryan Ave & Yambil St, Griffith, NSW 2680. This type is Commercial Development with Private ownership. Proposal for the redevelopment of the city water reservoir site. Preferred uses include a casino, nightclub, tavern, cinema, a major anchor shopping centre, commercial, premises, convention centre, cultural facility, motel, offices, park, restaurants or shops. Click for more details...

EASTWOOD HOTEL
Hospitality (Hotels, Serviced Apartments) project for Renovations, Refurbishments etc. development. Refurbishment will include extended gaming lounge & a new nightclub. Click for more details...

GEORGE ST REDEVELOPMENT
Hotel - Altns & Addns Addition project In The Sydney Council Area. Alterations & additions to existing building & use as a 24 room hotel including a 5 storey addition with retail area on ground floor. Click for more details...

SUSSEX ARCADE HOTEL
Private ownership Hospitality (Hotels, Serviced Apartments) project In The Sydney Council Area for Addition development. The scope of the work includes a new cafe at the rear of the site within a new building extension, refurbishment of Sussex Arcade including new shopfronts & the fitout & use of upper levels of the existing heritage buildings as a 73 room hotel. Click for more details...

CHIFLEY HOTEL
Private ownership Hospitality (Hotels, Serviced Apartments) project In The Blacktown Council Area for New development. Construction of a 2 storey hotel comprising 103 rooms & restaurants. Associated carparking for 151 cars & landscaping. Click for more details...

OCEAN BEACH HOTEL
Private ownership Hospitality (Hotels, Serviced Apartments) project In The Shellharbour Council Area for Addition development. Alterations & additions to the existing Ocean Beach Hotel. Click for more details...

DONCASTER HOTEL
268-270 Anzac Pde, Kensington, NSW 2033 Has Doncaster Hotel currently at Construction stage. Alterations & additions to the existing Doncaster Hotel by demolishing existing bistro, beer garden & bottle shop & reconstruction to include a new lounge bar area & 1st floor outdoor dining area, new fire stair & internal changes to create function rooms & administration areas. Click for more details...

RYEDALE TAVERN
Currently at the Construction stage In Ryde is a project estimated to be $ 1000000. This project Alterations & additions to the Ryedale Tavern to include a new roof, internal alterations & external finishes. Click for more details...

PARK HYATT HOTEL
Park Hyatt Hotel is currently at the Construction stage, valued at about $ 23012000 it is Alterations & additions to & refurbishment of the existing hotel. Works comprise modifications to roof top level; provision of upgraded & reconfigured rooftop pool terrace area; upgrades to the external facade of the hotel, & complete refurbishment of all internal spaces within the hotel including rooms, lobby, restaurant & function spaces. External works comprise regrading of main entry; all prefinished metal balustrades & planters on balconies & terraces to the guest rooms to be replaced with glass balustrades; modifications to upper level balcony metal pergolas including rust proofing & replacing metal dividing privacy screens with timber battens; essential repairs to all external walls; reconfigure existing access stairs; modifications to dining room glazed doors & metal and glazed roof over; modifications to existing loading dock portals consisting of new prefinished metal battens; new sandstone faced wall. Roof top level works comprise modifications to internal configuration including 2 executive suites; changes to the roof form; upgraded & reconfigured pool terrace area; new spa & gym facilities at levels 2 & 3, linked by an open stair case; changes to existing lift arrangement and lobby levels including the reconfiguration of access to the new spa & gym levels; lifts upgrades to provide access to rooftop suites & pool deck, existing lift tower will be over clad with prefinished metal; addition of planter boxes & screening; provision of horizontal louvre screening. Ground floor & lobby works comprise new glazing & additional stone cladding; reconfiguration of main entry facade, new frameless glazing; relocation of cashier, check-in counter & concierge; refurbishment of existing restaurant, bar, business centre & function rooms. Click for more details...

KIRKETON HOTEL
229-231 Darlinghurst Rd, Darlinghurst, NSW 2010 Has Kirketon Hotel currently at Construction stage. Internal refurbishment & minor internal reconfiguration of the existing restaurant & bar on the ground floor. Click for more details...

BANKSTOWN HOTEL
Renovations, Refurbishments etc. project of Hospitality (Hotels, Serviced Apartments) project at 102 Bankstown City Plaza, Bankstown, NSW 2200. Refurbishment of the existing Bankstown Hotel. Click for more details...

SWANSEA HOTEL
Hospitality (Hotels, Serviced Apartments) project at 8 Wood St & Lots 1 & 2 Pacific Hwy (DP634759), Swansea, NSW 2281 of Hotel - Addns & Altns - 2 Storey type of Addition development. Interior & exterior refurbishment & additions to the existing Swansea Hotel. The existing public bar will be demolished & incresed in size. Demolition of existing male toilets. Conversion of existing toilets to male toilets & construction of new female toilets. Demolitin of existing kitchen & rear additions & construction of new extension against rear wall. This extension will house kitchen, storage, female toilets & bistro area which opens to refurbished courtyard area. Existing courtyard area to be re-leveled & refurbished with new paving, planters, shade structures, children's play area & fences along all boundaries. Demolition of existing garages to the rear & construction of a new cold storage room housing cool room, parent facilities, dry storage & cleaners room. Upgrade of existing toilets in the gaming area & addition of new courtyard. Existing first storey layout to be retained with relocation of fire stair. Existing facade of hotel to be upgraded including replacement of windows & doors. Click for more details...

LAWSON HOTEL
Hospitality (Hotels, Serviced Apartments) project In The Blue Mountains Council Area of Private ownership. Partially demolish previous additions & renovate/extend the existing Lawson Hotel. The renovations will involve: Ground floor: removing the existing bar, providing 2 new bars & an external beer garden, providing a new bottle shop & upgrading the kitchen & providing a new family/dining area & outdoor dining area in addition to general upgrades & refurbishments. Reinstation part of the verandah on the northern & south eastern elevations of the building. First Floor: restoring the first floor veranda, providing a total of 15 bedrooms on the first floor including the provision of 4 new bedrooms & relocation to the access stairwell south east of the existing stairwell. The existing roof form will be largely retained, with extensions to the roof on the western & southern elevation to match with existing roof. The existing chimneys will also be retained. A spire is proposed that replicates a spire that was part of the original 1910 building. The proposal would result in the demolition of some parts of the front of the hotel & the extension of hotel to the southern & western elevations. Click for more details...

ROYAL HOTEL
Currently at the Construction stage In Wingecarribee is a project estimated to be $ 350000. This project Alterations & additions to the existing Royal Hotel to include Strata Title of the 14 suites, the bistro, expansion of the carpark, effluent disposal & landscaping. Click for more details...

HARLEQUIN INN
Hospitality (Hotels, Serviced Apartments) project In The Sydney Council Area of Private ownership. Alterations & additions to the Harlequin Inn, increasing the area of the outdoor courtyard and first floor bar. Works will include reinstatement of the open courtyard area, to provide new WC facilities and kitchen, stair access to first floor, a larger gaming room and changed egress. The proposal includes the demolition of roof over the dining & kitchen area to create an open courtyard. An acoustic screen will be provided & a retractable roof over proposed outdoor terrace area. The existing internal timber stairs connecting ground to first floor will be modified and larger window openings created. Click for more details...

KELLETT ST BAR & NIGHTCLUB
Addition project of Hospitality (Hotels, Serviced Apartments) project at 54-64 Kellet St, Potts Point, NSW 2011. Alterations & additions to existing building for use as a lounge bar/restaurant. Enclosure of existing courtyard. Excavation of the courtyard area in order to lower the exisitng floor level, construction of a new 2100mm high boundary wall and installation of a fixed glass roof. The proposal also includes internal ground level modifications, including new access stair and opening to enclosed courtyard, additional bar/service area, reconfiguration of kitchen/coolroom and new office. Click for more details...

MILLER ST MIXED DEVELOPMENT
Currently at the Construction stage In North Sydney is a project estimated to be $ 28000000. This project Demolition of existing 7 storey commercial building. Construction of a 19 storey mixed use building comprising 67 residential units, 8 x 1, 39 x 2 & 20 x 3 bedroom, 12 serviced apartments, 5 x 1 & 7 x 2 bedroom, & 270sq m of non-residential floor space, including 1 commercial tenancy & cafe of 81sq m. Gymnasium. Construction materials will be concrete walls, tile & slate roof & concrete floor. Basement carparking over 6 levels for 80 vehicles. Associated landscaping. Click for more details...

TOWRADGI BEACH HOTEL
Hospitality (Hotels, Serviced Apartments) project at 170 (Lot 2001) Pioneer Rd (DP1102607), Fairy Meadow, NSW 2519 of Hotel - Refurbishment type of Renovations, Refurbishments etc. development. Internal & external upgrade & refurbishment of the existing 720sq m Towradgi Beach Hotel. Click for more details...

KELLY'S RUGBY HOTEL
Kelly's Rugby Hotel is currently at the Construction stage, valued at about $ 280000 it is Alterations & additions to the existing Hotel. Click for more details...

SURF ROCK HOTEL
Hospitality (Hotels, Serviced Apartments) Addition project at 1060-1066 (Lots 20, 21) Pittwater Rd (DP218990), Collaroy, NSW 2097. This type is Hotel - Altns & Addns with Private ownership. Internal & external alterations to the Hogs Breath Cafe for change of use to a hotel & integration into the Surf Rock hotel. Works will include new dining area, reconfiguration of partitions, glazed timber bifold doors & new lounge area. Click for more details...

GRAND HOTEL
A project in the NSW Within Waverley. Alterations and additions to the existing hotel for a new outdoor smoking terrace. Construction of a new bar. Click for more details...

LAKE MULWALA HOTEL/MOTEL
88 Melbourne Rd, Mulwala, NSW 2647 Has Lake Mulwala Hotel/Motel currently at Planning stage. Construction of a new Hotel/Motel. The new Motel will be built facing the lake across a park & will have a carpark built on Melbourne Rd where the present pub is located. The pub will remain standing while the Motel is in construction but will be demolished when construction of the new carpark commences. The new building will have dining areas, a bar & a poker machines area with a terrace overlooking the lake. Click for more details...

FORMER ENDEAVOUR CREDIT UNION - KENT ST BAR
Bar - Fitout project at 545-553 Kent St (ground floor), Sydney, NSW 2000 In The Council Area Of Sydney of Private. Conversion of lower level of 6 storey office building into an upmarket bar. Construct a new licenced hotel to the ground level areas occupied by Don Quixote restaurant and carparking and loading areas. Proposed works comprise new bars, kitchen, toilets,service areas, lounge areas, new glass shopfront replacing existing roller shutters to driveway and reconfiguration of basement carpark to include loading bay. Click for more details...

SUGARMILL HOTEL POTTS POINT
Currently at the Construction stage In Sydney is a project estimated to be $ 3017000. This project Fitout and change of use of existing building (former backpackers hostel) to provide car parking within basement, offices on levels 1 & 3, licensed bar on level 2, and fitout and use of rooftop as terrace bar with a partial enclosure of service area. Proposed works to basement level will comprise creation of 4 parking spaces, Installation of car lift servicing vehicular entrance to basement car park from ground floor level (at Earl Place), construction of new internal stairs along the mid western boundary providing access between this level and ground floor level, demolition of existing stairs, one on the east and western side of the building, demolition of internal walls and partitioning, including removal of the 2 existing toilets, construction of a penetration in existing common wall between 37 and 33-35 Darlinghurst Road giving access to the store rooms of 33-35 Darlinghurst Rd, demolition of existing staircases, office and entranceway to backpackers hostel above, construction of lift lobby, demolition of existing toilets & internal wall in south western corner & construction of new female and male toilets.The proposed works within the first floor level are as follows:construction of an open office area of 208sq m including reception area, construction of two enclosed offices and one meeting room using lightweight internal partitions, male, female and accessible toilet, construction of new internal stair case on western boundary with access to ground floor level below, lift shaft to accommodate installation of a lift servicing all levels in south east corner of the site, installation of sliding glass doors set back 3m from the site boundary, leading out onto a recessed front verandah of 24sq m on the Darlinghurst Road frontage, & demolition of internal walls and partitions. The proposed works within Level 2 (licensed bar) are as follows: demolition of all internal walls and partitions, demolition of existing stairs, installation of new floor slab to enclose existing atrium and flooring to accommodate new open courtyard approx. 25sq m, with landscape planting , bar service area of 18m² with a licensed floor area of approx 155sq m, construction of recessed verandah, 3 new female and one new male toilet. This bar will act as an extension to the existing lounge bar on Level 1 of 33-35 Darlinghurst Road, by way of an air locked stepped doorway between the two premises. The proposed character of the internal fitout for the 'lounge' bar will be that of an elegant modern lounge bar with unique internal design, fittings and furnishing. The open court will incorporate landscape planter boxes with ceiling hung bifold doors. The proposed works within the third floor level (office space) are:demolition of internal walls and partitions, demolition of existing stairs, creation of office space by construction of board room, 2 enclosed offices, one tea room, one male and one female toilet, the remainder being open plan office space, retention of existing void, enclosed using acoustically treated glass, construction of new internal stair case with access to level below and above, installation of lift shaft to accommodate lift servicing all levels, recessed verandah. Level 4 will comprise a semi-open roof-top terrace bar. The proposed works within the rooftop level (existing roof terrace) are as follows: demolition of existing building works covering staircase and providing storage space, construction of internal L-shaped building area to enclose 82sq m of the floorplate accommodating staircase, toilets and bar service area with pebble ballast on the roof above, internal bar service area being 15sq m in size serving a licensed floor area of 126sq m, internal access stairs, 1 new male and 3 new female toilets, construction of a lift shaft, 1m high masonry parapet, installation of a transparent acoustic glazed wall. Fitout and change of use to Click for more details...

BALGOWNIE HOTEL
Hotel - Refurbishment - 2 Storey project at 141-143 Balgownie Rd (DP872833), Balgownie, NSW 2519 In The Council Area Of Wollongong of Private. Interior refurbishment of hotel. Click for more details...

ROYAL HOTEL QUEANBEYAN
A project in the NSW Within Queanbeyan. Alterations & additions to the existing hotel to comprise a refit of the lower & mino refurbishment of upper floors. The kitchen will be relocated & a courtyard & dining area will be built. Major works to the bistro & bar area. Refurbishment & repair of the roof. Renovation of the external features including the colour & imagery. Click for more details...

HUSKISSON HOTEL REDEVELOPMENT
Hospitality (Hotels, Serviced Apartments) Renovations, Refurbishments etc. project at 75 (Lots 1 & 87) Owen St (DP209436, DP755928), Huskisson, NSW 2540. This type is Hotel - 2 Storey - Renovation - Stage 1 with Private ownership. Stage 1; Demolition of recent additions & structures at the rear of the existing hotel & refurbishment of existing hotel. Click for more details...

ADINA SERVICED APARTMENTS MASCOT
Hospitality (Hotels, Serviced Apartments) New project at 15 (Lot 13) Bourke St (DP853792), Mascot, NSW 2020. This type is Serviced Apartments (151)/Function Facilities/Cafe - 7 Storey with Private ownership. Construction of a 7 storey building comprising 151 serviced apartments, 66 x studio, 71 x 1, 6 x 2 bedroom & 8 x accessible suites, & ground floor cafe/ bar & function facilities. The cafe/bar will have a GFA of 259sq m with indoor seating for up to 120 people & 74 people in outdoor terrace area. The proposal includes conference facilities on ground floor, linking up with building's lobby & comprise a pre-function area of 78sq m, 2 conference rooms that can be joined to make a single large conference room, an outdoor terrace area, ancillary conference kitchen & communications room. Carparking for 68 vehicles, 62 within basement & 6 at grade. Landscaping. Click for more details...

GREAT WESTERN HOTEL/MOTEL
Hospitality (Hotels, Serviced Apartments) project at 145-147 Peisley St & Kite St, Orange, NSW 2800 of Motel - Altns & Addns type of Addition development. Alterations & additions to the Great Western Hotel/Motel, comprising 10 new rooms, including 2 disabled rooms. There will also be changes made to the lounge & entertainment areas. Skillion sloping roof for the verandah. Click for more details...

AURA APARTMENTS
59 Shoal Bay Rd, Shoal Bay, NSW 2315 Has Aura Apartments currently at Construction stage. Refurbishment of existing serviced apartments. Click for more details...

FAIRMONT HOTEL
Fairmont Hotel is currently at the Construction stage, valued at about $ 1199000 it is Construction of a 2 storey addition to the northern end of the existing fitness centre building comprising 12 new massage therapy rooms each with ensuite bathrooms, lounge areas & storeroom. Internal alterations to the existing fitness centre comprising sauna/hot tub rooms, new toilet facilities, reception areas & staff kitchenette. Construction of a pool bar/cabana adjacent to the existing outdoor swimming pool. Click for more details...

BLUE CATTLE DOG HOTEL
Hotel - Atlns & Adns project at 249 (Lot 1) Mamre Rd (DP730490), St Clair, NSW 2759 In The Council Area Of Penrith of Private. Reconfiguration of the bistro gaming & function areas to include larger bistro, indoor & outdoor gaming & a children's play area. Removal of the cool room adjoining the kitchen & a replacement cool room to the back-of-house area. Two new airlock's to the entry aside the kitchen & aside the existing function room Click for more details...

PARKROYAL PARRAMATTA
Hospitality (Hotels, Serviced Apartments) project for Addition development. Alterations & additions to the Parkroyal hotel, including construction of a 9 storey addition containing 90 rooms, additional function space/meeting rooms & restaurant/bar areas. Ground floor works comprise demolition of existing porte cochere & existing glazed facade; Phillip St frontage to be reconfigured to provide a flexible pick up/drop off area; new banquet pre-function area; creation of 3 meeting rooms & plant room; outside bar as an extension to the lobby bar; main entry feature; fire exits in the south-western corner of the building; pedestrian ramp next to main entry; 3 flag poles next to driveway to be removed; demolish existing fire stairs; new fire booster, bollards & dish drain kerb. Level 1 works comprise 30sq m of additional office space; new fire stairs; Red Salt Restaurant extended towards front of building; void next to restaurant extension increased in size; new void created over former porte cochere; bridge link between void & restaurant extension; function room; mens toilets relocated; new furniture store. Level 2 works comprise fire stairs & plant room; 15 new guest rooms and link corridors to main linkage corridor from lifts; gymnasium & associated male/female change rooms/toilets; timber walkway off pool with landscaped edging; landscaped planter boxes. Level 3 works comprise fire stairs; plant room; 16 new guest rooms (2 accessible) & link corridors to main linkage corridor from lifts; timber walkway off existing guest corridor with landscaped edging; landscaped planter boxes. Level 4 works comprise fire stairs; plant room; 16 new guest rooms (2 accessible) and link corridors to main linkage corridor from lifts; timber walkway off existing guest corridor with landscaped edging; landscaped planter boxes. New shear wall created along the south-western corner of the basement levels 1 & 2, new reinforced concrete columns & strengthening to support the new building over. Aluminium cladding, facade glazing, wall tiles, timber battens, floor tiles. Landscaping. Click for more details...

QUEST HOTEL SUSSEX ST
Quest Hotel Sussex St is currently at the Construction stage, valued at about $ 36196000 it is Demolition of existing substation. Construction of an 8 storey development for hotel accommodation comprising 163 hotel rooms over 7 levels. level 1 hotel lobby including a public bar, which will be subject to a Hotel Liquor Licence; level 1 retail/restaurant floor space; lower ground conference centre/function room; lower ground floor retail tenancy; street awning; screen canvas for a public art installation; & landscaping of the internal lightwell at lower ground. Lower ground floor 634sq m will contain retail tenancy facing Sussex St; conference room with associated storeroom & kitchen; 12 bicycle parking spaces & associated end of trip facilities; guest laundry room; 2 accessible WCs; garbage storage room; & plant services. Lower ground mezzanine works comprise void to the lower ground below; fire stairs & access ramp to bicycle parking & the lower ground floor below; & plant service. Level 1 893sq m comprises retail tenancy fronting Sussex St; hotel entrance & lobby with reception & a public bar; managers & admin office; housekeeping storeroom; & 13 hotel rooms. Levels 2-8 each contain housekeeping storerooms & hotel rooms. 2 passenger lifts. Lightwell between the east & west wings of the building. Facade of geometrical windows that will be treated as spandrel glass, frame of horizontal & vertical black steel beams, black steel as a frame to glass awning to hotel entry, internal timber floor zone, exposed concrete column treatment to frame shopfront window bays, awning comprising black, angled metal with a bronzed metal backing & central clear glass panels between shopfront bays for light infiltration; & external perforated metal screen to act as a backing for a public art installation. Click for more details...

RADISSON BLU PLAZA HOTEL SYDNEY
Hospitality (Hotels, Serviced Apartments) project at 27 O'Connell St, Sydney, NSW 2000 for Renovations, Refurbishments etc.. Refurbishment of all hotel guest rooms, all corridors & lifts. The Presidential suite will be turned into 2 suites. Click for more details...

AUSTRAL HOTEL - STAR CASINO
Hospitality (Hotels, Serviced Apartments) project In The Sydney Council Area of Private ownership. Refurbishment of levels 6-11, a total of 231 rooms. Scope of work includes: demolition of all the rooms, make good & a soft refurbishment which includes all bathrooms, flooring & wall finished including corridors Click for more details...

TRAVELODGE SYDNEY CENTRAL HOTEL
Hospitality (Hotels, Serviced Apartments) project at 27-33 Wentworth Av (Level 2) (Lot 10 DP1008842), Sydney, NSW 2000 of Hotel - Altns & Addns type of Renovations, Refurbishments etc. development. Internal alterations to Level 2 of the Travelodge Sydney Central Hotel including the conversion of existing meeting rooms into 4 new guest rooms. Provision of a new roof terrace adjoining each new guest room. The internal fitout will also include the provision of self-contained bathrooms in each guest room. Click for more details...

SALISBURY HOTEL
Renovations, Refurbishments etc. project of Hospitality (Hotels, Serviced Apartments) project at 118-120 Percival Rd (Lot 1 DP1042273), Stanmore, NSW 2048. Alterations & additions to the existing 2 storey hotel. Demolition of part of the premises including the existing kitchen & cool room. Construction of a new kitchen & cool room in the former children's play area, modifications to the existing courtyard including repaving, new lighting, new timber overhang, new awning to connect the kitchen to the main building, new courtyard bar, modifications to staircases & internal walls on the first & second floors & improvements to the accessibility within the premises. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect