State

Categories

Sub Categories

Click Here to Find Current Projects

List of Indoor sports & leisure centres, bowling alleys, squash courts, gymnasiums Projects in NSW


ARTHUR PHILLIP HIGH SCHOOL
Arthur Phillip High School is currently at the Construction stage, valued at about $ 500000 it is Alterations to gymnasium to enlarge stage area. Click for more details...

O'RIORDAN ST MIXED DEVELOPMENT
O'Riordan St Mixed Development is currently at the Construction stage, valued at about $ 22000000 it is Consolidation of 2 lots. Demolition of structures. Construction of a 6 storey mixed development consisting of 108 residential units, studio x 22, 7 x 1, 78 x 2 & 1 x 3 bedrooms & some commercial space, swimming pool, gym & basement carparking for 199 vehicles. Associated landscaping. Click for more details...

GARDEN RESORT HEALTH SPA
Sports (Indoor sports & leisure centres, bowling alleys, squash courts, gymnasiums) project In The Cessnock Council Area of Private ownership. Construction of health spa with 50 villa suites, swimming pool, gymnasium & naturapothic centre. Click for more details...


Units (69) - 6 Storey Subcontract project In The Sydney Council Area. 2 levels basement carparking, cafe at ground level, swimming pool & gymnasium on mezzanine/courtyard level. 6 x bedsitters, 50 x 1 bedroom, 11 x 2 bedroom, 2 x 3 bedroom. Reinforced concrete frame, brick infill, concrete slab roof. Click for more details...

BONDI DIGGERS/CADIGAL
Units (17) project at 232 Campbell Pde, Bondi, NSW 2026 in the Sports (Indoor sports & leisure centres, bowling alleys, squash courts, gymnasiums). Construction of residential units, 15 x 3 & 2 x 2 bedrooms. Swimming pool & gymnasium. Carparking for 28 vehicles. Associated landscaping. Click for more details...

O'KEEFE DRIVE GYMNASIUM/POOL
Sports (Indoor sports & leisure centres, bowling alleys, squash courts, gymnasiums) project for Addition development. Construction of a gymnasium & swimming pool. Click for more details...

THE BAKEHOUSE QUARTER - BUILDING C
Sports (Indoor sports & leisure centres, bowling alleys, squash courts, gymnasiums) project at 16-22 & 11-13 George St (Arnott's site), North Strathfield, NSW 2137 of Supermarket/Gymnasium/Office/Medical Centre type of New development. Construction of a new building, referred to as Building C, to incorporate an Aldi Supermarket, Fitness First gymnasium, medical centre & offices. Click for more details...


A project in the NSW Within Port Stephens. Project includes a $1.2 mil 12 lane bowling alley with restaurant and other related facilities, also featuring a flourescent design for lighting over the lanes. The remainder of the site will house five commercial premises for future lease. Click for more details...

FORMER REX HOUSE
Units (124) - 26 Storey New project In The Sydney Council Area. Demolish Rex House & construct a 26 level residential building comprising 124 apartments (78 studio and 1 bedroom, 42 x 2 & 4 x 3 bedroom) with basement parking for 24 vehicles. One small retail tenancy on ground floor, gymnasium area which may contain pool. Click for more details...

OLYMPICS 2000
Sports (Indoor sports & leisure centres, bowling alleys, squash courts, gymnasiums) project for Subcontract development. Removal of east wall, extension of building including extending roof, increase in seating capacity from 4000 to 15000. Click for more details...

CAMDEN HAVEN HIGH SCHOOL
Sports (Indoor sports & leisure centres, bowling alleys, squash courts, gymnasiums) project at Lot 1 Valley View Rd (DP582797), West Haven, NSW 2443 for New. New high school, distance education facility & a multi purpose centre between Laurieton & Kew, Camden Haven. The secondary complex comprises Blocks A-G; Blocks J,K (multi purpose centre) & M; car parking; assembly; covered outdoor area; service road; bus layby; sports fields & agricultural plot. The following buildings are planned: Block A-Administration & Distance Education Centre; Block B-Technology & Applied Sciences; Block C-Special & General Learning; Block D-Art & General Learning; Block E-Staff Facilities; Block F-Science & Staff Studies; Block G-Music & General Learning; Block J-Performing Arts; Block K-Multi Purpose Centre; Block M-Agriculture & Garden & Sports; PE Courts; Sports Field, Passive Recreation Area. Concrete slab, brick, compressed fibre cement panels, metal roof. Click for more details...

NORTH SYDNEY OLYMPIC POOL
Sports (Indoor sports & leisure centres, bowling alleys, squash courts, gymnasiums) project In The North Sydney Council Area of Local Govt ownership. Fitout of gymnasium & fitness facility in centre currently under construction. Click for more details...

TUDOR HOUSE REDEVELOPMENT
Sports (Indoor sports & leisure centres, bowling alleys, squash courts, gymnasiums) project at 1 West Street, Forster, NSW 2428 of Boutique Hotel/Serviced Apartments (27) - 3/5 Storey type of New development. (Lot; DP) Proposed demolition of the existing Tudor House. Construction of a 3/5 storey Boutique Hotel with 27 serviced apartments (24 x 1& 3 x 2 bedrooms), with facilities for a restaurant, bar, coffee shop, conference room, outdoor entertaining area, similar to that which exists in the current building, managers quarters, reception. Basement carparking. Associated landscaping. The restaurant/bar area will have seating for 82 patrons. Thirty serviced apartments will also be incorporated into the Hotel. There are also plans for a guest gym. Click for more details...

OLD PITTWATER RD OFFICE - LIFESTYLE WORKING
Office - 3 Storey project at 117 (Lot 221) Old Pittwater Rd (DP596618), Brookvale, NSW 2100 In The Council Area Of Warringah of Private. Demolition of the existing structures & construction of an office complex with a semi- enclosed atrium style boardwalk throught the centre including a gymnasium, restaurant, 25 m swimming pool, basement carparking & strata subdivision. Click for more details...

PACIFIC HWY MIXED DEVELOPMENT - THE PINNACLE
635-637 (Lot 100 & Pt Lot 11 Sec 0) Pacific Hwy (DP1038823, DP9457), Belmont North, NSW 2280 Has Pacific Hwy Mixed Development - The Pinnacle currently at Tenders & Building stage. Demolition of existing building. Construction of a 4 storey mixed use building containing 24 apartments with 2400 sq m residential space over 4 split levels & 760 sq m commercial space at ground level comprising 4 shops & 2 offices & Feminine Fitness Gym. Basement carparking with 51 carparking spaces over 2 levels. Associated landscaping. Click for more details...

KING ST WHARF STRIKE 10 PIN BOWLING ALLEY
Sports (Indoor sports & leisure centres, bowling alleys, squash courts, gymnasiums) project for Renovations, Refurbishments etc. development. Fitout of existing premises, part of ground floor (site 4) entered from the promenade and basement (site 3) for use as a "Strike" ten pin bowling alley, including bar, cafe, function rooms, pool tables kitchen, bathrooms and outdoor seating (on the promenade). The internal fitout consists of a bar area, kitchen, cool room, post-mix room, male, female & disable toilets, 2 x function rooms seating 22 & 24 persons, a pool table room with 3 tables, office, workshop, storeroom, reception area and proposed maximum seating capacity for 450 people. The bowling centre proposes an outdoor seating area of approx 50sq m with 45 seats. Click for more details...

FITNESS FIRST GYMNASIUM
Sports (Indoor sports & leisure centres, bowling alleys, squash courts, gymnasiums) New project at 236 (Lots 1 & 2) Pacific Hwy (DP1037552), Hornsby, NSW 2077. This type is Gymnasium with Private ownership. Establishment of a Fitness First Gymnasium within an existing parking/loading area within Westfield Hornsby. The proposed alterations to the existing centre comprise modifications to existing Kmart loading dock; removal & conversion of existing carpark spaces at level B1; a new Fitness First facility occupying approx 2,240sq m of floor space; new glazed entry foyer & stepped floor levels; enhanced pedestrian entry point from Muriel St with improved landscape treatment. Click for more details...

THE HILLS SPORTS RECREATION AND AQUATIC CENTRE
15 (Lot 3) Powers Rd (DP1053570) & 20 Distribution Pl, Seven Hills, NSW 2147 Has The Hills Sports Recreation And Aquatic Centre currently at Construction stage. Construction of an indoor sports facility with 4 indoor courts, heated swimming pool, 600sq m gym, courts for cricket, soccer & netball, physiotherapy clinic, childrens play area & cafe. Click for more details...

VICTORIA PARK MIXED DEVELOPMENT - SITE 1 - VICTORIA PARK CENTRAL - EAST VILLAGE
Victoria Park Mixed Development - Site 1 - Victoria Park Central - East Village is currently at the Construction stage, valued at about $ 151851000 it is Construction of a new mixed use development. incorporating a 4 storey podium of residential, retail, commercial & carparking uses with residential units accommodated within 4 buildings located above, total GFA 41,647.7sq m + 680sq m for Section 96 additional retail/commercial floorspace. The proposal has a maximum height of 7 to 8 storeys. The proposal accommodates a total of 206 residential apartments, 1 x studio, 78 x 1, 68 x 2 bedroom standard, 49 x 2 bedroom large & 10 x 3 bedroom, 11,417sq m of commercial floor space, including a car service centre, gymnasium & 17 serviced apartments; 10,804.7sq m of retail floor space on the ground floor level, including a supermarket of approximately 3,500sq m. Stage 1 will comprise early works - site preparation works, including perimeter shoring & excavation. Stage 2 will comprise retail & commercial -construction of the basement levels, including carparking & plant; construction of the podium building up to level 4, including retail areas, residential entrance lobbies, service vehicle areas & loading dock; & all streetscape and public domain works. Stage 3 will comprise residential - construction of all levels above podium, being residential units on levels 5 to 8 (Buildings A, B, C and D); completion & fitout of residential & serviced apartments on level 3; & associated landscaping, communal open space & recreation facilities. The project will target a 5 Star Green Star rating. Precast concrete walls, green wall, shadow box glazed wall, high performance generally clear single & double glazing with powdercoated aluminium frames, timber blades, metal, bluestone & timber cladding, timber fins, glazed & solid awning with steel trim, aluminium framed balustrades with translucent glass infill, aluminium louvres, metal cladding. Basement carparking over 2 levels, total of 1185 carparking spaces & 63 motorcycle spaces. Landscaping & public domain works, including the provision of a landscaped podium skypark of approx 6,000sq m & a public plaza at the intersection of Gadigal/Defries Av. Click for more details...

QUEST SERVICED APARTMENTS
Sports (Indoor sports & leisure centres, bowling alleys, squash courts, gymnasiums) project at Site 22 Edwin Flack Dr & Part of site 2B Cnr Australia Ave & Parkview Dr, Sydney Olympic Park, NSW 2127 of Serviced Apartments - 8 Storey type of New development. Demolition of existing structures. Construction of an 8 storey serviced apartment building comprising 77 x 2 & 3 bedroom serviced apartments over 7 levels & 3 x ground floor retail tenancies of 161sq m, foyer, conference room & gymnasium on ground floor, with a total GFA of 7,907sq m. 63 of the apartments are twin key apartments providing dual access, of which 2 separate apartments can be formed & used as individual apartments. The proposed development includes a range of ESD measures including photovoltaic panels to roof, primary facade glazing, external louvres, toned performance glazing, operable windows, water supply to connect to WRAMS recycling system, designed to achieve a 4.5 star ABGR & a 4 star Green Star rating. Precast colonnade columns & wall panelling with a honed finish, selected aggregate & oxides; steel framed shopfront glazing to the ground level facilities; powdercoated aluminium framed window systems to apartments with colour back glass spandrels; high durability composite timber wall cladding comprising resin impregnated natural veneer on a resin core, to balcony reveals and soffits; shopfront glazing, aluminium framed glass balustrades to balconies; aluminium sunshade louvers; & bond steel panelling to roof top plant rooms. Single level basement carparking for 40 vehicles & 4 at grade carparking spaces. Public domain works. Landscaping. Click for more details...

NORTHMEAD VILLAGE
Sports (Indoor sports & leisure centres, bowling alleys, squash courts, gymnasiums) project for New development. Demolition of all remaining structures onsite including the 'EuroTint' structure facing Windsor Rd. Construction of 312 residential units to be built in 3 blocks with communal facilities including an internal swimming pool, lap pool & gymnasium. Block A contains 30 x 1, 174 x 2 & 20 x 3 bedroom units, Block B contains 2 x 1, 50 x 2 & 18 x 3 bedroom units & Block C contains 8 x 2 & 18 x 3 bedroom units. Basement parking for 683 vehicles. Landscaping Click for more details...

ENDEAVOUR RD OFFICE & MOTOR WORKSHOPS
Currently at the Construction stage In Sutherland is a project estimated to be $ 6429000. This project Alterations & additions to a number of existing buildings & carparking arrangements to a motor company's headquarters. The proposed works involve internal & external alterations & additions to the Links House; internal additions to Toyota House; internal & minor external alterations & additions to the Hubb; internal alterations & additions to the marketing display components of Thiess House; & revision & provision of additional carparking to the site. The works are primarily to enable the relocation of internal departments to make more efficient space within existing buildings. The proposal generally involves minor alterations & additions to the Links House, The Hubb, Thiess House & Toyota House to enable the relocation of existing activities into larger & more functional spaces. The Links House is located in the north-western corner of the site. It is proposed to undertake substantial modifications to the existing warehouse to enable the relocation of the vehicle customisation & fleet servicing operations from The Hubb. The proposed alterations & additions include the following: fitout of the ground floor warehouse space to accommodate relocated workshop equipment; reconfiguration of existing ground floor office area to accommodate 2 parts stores, a meeting room, a breakout area & an open office area; construction of a new storeroom; covered wash bay; new door openings & awnings; new mezzanine to be used for storage purposes; & provision of 3 x 5000L rainwater tanks. The proposed alterations to this building's floor space being increased by 188sq m to 2,189sq m, comprising office 550sq m, workshop 1,102sq m, storage 502sq m& amenities 35sq m. The Hubb is located centrally on the site. It is proposed to undertake substantial interior alterations & additions to enable relocation of staffroom Toyota House. The proposed alterations & additions include the following: internal reconfiguration of the existing workshops; & extension of existing mezzanine floors for office activities. The proposed alterations to this building result in the building's floor space being increased by 625sq m to 3,345sq m. The total floor space comprises: workshop 592sq m, office 1,737sq m, gym 216sq m, amenities 134sq m, display 543sq m & storage 123sq m. Toyota House is located in the north-eastern corner of the site & solely used for office purposes. It is proposed to undertake minor internal alterations to part of the ground level with no changes to the external fabric of the building. The alterations involve the reconfiguration of existing offices, a storeroom, delivery room, mail & printer room on the ground floor level to create 3 new meeting rooms. Thiess House is located to the east of the southern portion of the main warehouses. It is proposed to undertake minor alterations to the display & office areas in the southern-most portion of the building. The proposal involves an increase of 95sq m to the mezzanine floor level to provide additional office space associated with the marketing display area at the ground floor level. It is proposed to reconfigure & provide new carparking spaces, total of 180 spaces. Click for more details...

WATKIN TENCH PDE MIXED BUILDING
A project in the NSW Within Holroyd. Construction of a 3 storey mixed use building comprising ground floor retail & cafe space, first floor gymnasium & commercial offices, & second floor child care centre with outside play area. Construction of 5 x 3 storey & 1 x part 2 & 3 storey dwellings fronting Watkin Tench Pde. Construction of 5 x 3 storey x 1 x 2 storey storey dwellings fronting Biana St, all 4 bedroom. Staged subdivision of land. Lift access from carpark. Water feature to contain base constructed of stack stone. Basement carparking over 2 levels for 71 cars. Landscaping. Click for more details...

CIVIC AVENUE SERVICED APARTMENTS - QUEST APARTMENTS
Sports (Indoor sports & leisure centres, bowling alleys, squash courts, gymnasiums) project at Lots 2 & 3 Civic Ave (DP263209), Singleton, NSW 2330 of Serviced Apartments (35) - 3 Storey - Stage 1 type of New development. Construction of a 3 storey building containing 25 X 2 & 10 x 3 bedroom apartments, that incorporates cooking facilities, bathroom, lounge room & laundry. The complex will have its own gym. Carparking & landscaping. Click for more details...

STEEL ST MIXED DEVELOPMENT - SPIRE APARTMENTS AT MARKETOWN
Sports (Indoor sports & leisure centres, bowling alleys, squash courts, gymnasiums) project In The Newcastle Council Area of Apartments (161)/Commercial - 5 Storey - Stage 2 type. Minor amendments to mezzanine level of Marketown Shopping Centre. Construction of a mixed commercial/residential development as an extension to Marketown. Buildings 1 & 3 will comprise 2 residential towers of 4/5 storeys above the podium serviced by 2 lifts from a common residential foyer fronting Steel St. Resident amenities will be provided on the second floor podium level comprising gym, meeting room, swimming pool and toilets/change rooms, as well as extensive active & passive landscaped open space areas, including a water feature. Building 1 will contain a total of 50 apartments, 1 x studio, 24 x 1, 16 x 2 & 9 x 3 bedroom. Building 3 will contain a total of 63 apartments, 16 x 1, 34 x 2 & 13 x 3 bedroom. Construction of Building 2, a 4 & 5 storey building on the roof top of the podium located in the south-eastern corner of the site, containing 48 apartments, 21 x 1 & 27 x 2 bedroom & a common room at level 5, designed to form part of the roof structure, voids, skylights & louvres have been provided at the upper levels to provide natural light & ventilation. Creation of new commercial/retail tenancy 103sq m at level 3. Construction of garbage collection rooms at level 3 for Buildings 2 & 3; construction of elevator with lift lobbies located on level 3 carpark providing direct access to Building 2. Reconfiguration of carparking spaces. Landscaping at podium level comprising large common landscaped area with synthetic turf, canopy mass planting, timber decking & seating areas, hanging plants, network of pathways & 2 covered walkway structures, water feature, total landscaped area 7,439sq m. Click for more details...

NEWTOWN PLAZA - FITNESS FIRST GYM
Sports (Indoor sports & leisure centres, bowling alleys, squash courts, gymnasiums) project at 328-342 (Lot 1) King St (DP86503) (ground floor & level 3), Newtown, NSW 2042 for Renovations, Refurbishments etc.. Change of use and fitout of the ground floor tenancy and use of the upper floor as a Fitness First gym. Click for more details...

KAREENA RD GYM & DANCE STUDIO
Sports (Indoor sports & leisure centres, bowling alleys, squash courts, gymnasiums) project In The Sutherland Council Area of Private ownership. Alterations & additions existing factory for use as a gym & dance studio of 119sq m. The remaining 294sq m of the building will continue to be used as a warehouse, for storage of the gymnasium equipment. Click for more details...

TOP RYDE CITY - RESIDENTIAL - BUILDINGS B & F
Sports (Indoor sports & leisure centres, bowling alleys, squash courts, gymnasiums) project at 109-115, 123, 127-9 Blaxland Rd & 2 Devlin St, Ryde, NSW 2112 for New. Construction of 2 residential flat buildings (Buildings B & F) above the Top Ryde City Shopping Centre redevelopment together with the formal allocation of car parking spaces within the Centre and the installation of landscaping works on the podium. The proposed development comprises 2 out of 5 residential flat buildings above the Centre which were conceptually approved within DA 672/2006 for the Top Ryde City Shopping Centre. The 3 remaining residential flat buildings will be subject to future development applications. Residential Building B (located in the middle of the site) is to include 106 apartments, 13 x 1 bedroom, 26 x 1 bedroom + study, 54 x 2 bedroom, 2 x 2 bedroom + study & 11 x 3 bedroom + study, within 10 storeys while residential Building F (located in the south eastern side of the site) is to include 79 apartments, 20 x 1 bedroom, 2 x 1 bedroom + study, 11 x 2 bedroom, 42 x 2 bedroom + study & 4 x 3 bedroom + study, within 10 storeys. Facilities for residents including gymnasium, swimming pool & common rooms. There will be 3 common rooms, approx 252sq m, located on level 5 of Building F, a 15m lap pool & gymnasium, totalling 314sq m will be located on level 4 of Building F. 3 pairs of lifts (6 in total) provide direct access. Construction materials & finishes have been selected to integrate with the shopping centre: Bradcore or similar feature cladding panels; natural stone clad landscape feature wall; powdercoated aluminium vertical adjustable louvre blades; powdercoated metal semi-frameless glass balustrading; & transluscent or clear glass. This DA seeks consent for the design & embellishment of the Stage 1 residential allocated carparking (576 spaces), part of the commercial allocated carparking (41 spaces) on levels 3 & 4 & 2 additional bays to be used as wash bays, total of 619 carparking spaces. Associated private & communal landscape works. Click for more details...

HAMLYN TERRACE COMMUNITY CENTRE & SPORTING FACILITY
Sports (Indoor sports & leisure centres, bowling alleys, squash courts, gymnasiums) project In The Wyong Council Area of Community Centre/Sporting Facility type. Construction of the Hamlyn Terrace Community Centre & Sporting Facility. The works comprise a 350-400sq m Community Centre building, 2 x football playing fields, 1 x cricket/AFL oval, 3 x multi-purpose courts, amenities building, playground. Field & court floodlighting. 2 Petanque pistes. Shared pathway & exercise stations Carparking for 118 vehicles. Associated landscaping works. Click for more details...

FORMER SUNBEAM FACTORY SITE - CLEMTON PARK VILLAGE - COURTYARD APARTMENTS
60 Charlotte St, Campsie, NSW 2194 Has Former Sunbeam Factory Site - Clemton Park Village - Courtyard Apartments currently at Construction stage. Demolition, remediation & Torrens Title subdivision. Development of proposed Lot 11 for a 4 storey multiple-unit residential building containing 76 units & strata subdivision, 37 x 1 & 39 x 2 bedroom, GFA 5,939sq m & a 75 place child care centre of 582sq m. Cavity brick walls, generic single clear & lowe glass aluminium framed windows, colorbond roof, concrete floor. Carparking for 10 vehicles & 27 bicycles. Associated roads, landscaping & infrastructure. Click for more details...

TEN PIN BOWLING ALLEY
Bowling Alley project at 65A Trail St, Wagga Wagga, NSW 2650 in the Sports (Indoor sports & leisure centres, bowling alleys, squash courts, gymnasiums). Demolition of Pre-School & dwellings. Construction of a new 16 lane Ten Pin Bowling Alley adjacent to the Forum 6 cinema complex. Carparking. Click for more details...

PENRITH VALLEY REGIONAL SPORTS CENTRE
Addition project of Sports (Indoor sports & leisure centres, bowling alleys, squash courts, gymnasiums) project at 30 (Lot 10) Herbert St (DP873714), Cambridge Park, NSW 2747. Demolition of existing entry structure and creation of a new northern entry administration and medical offices associated with the centre. Expansion of the northern court structure by 24 metres to accommodate new amenities, FIBA standard courts, spectator seating and provide a contemporary address from the street. Relocating the existing change facilities and public toilets to create a new central circulation spine. Relocation of the canteen, stairs to the mezzanine level and mezzanine amenities. An increase in carparking spaces from 184 to 191 carparking spaces and 12 new bike spaces. Landscape works. Click for more details...

FRASERS BROADWAY BLOCK 2 - ONE CENTRAL PARK
Sports (Indoor sports & leisure centres, bowling alleys, squash courts, gymnasiums) project at 26 Broadway, Chippendale, NSW 2008 of Apartments (622)/Retail/Commercial - 34 Storey type of New development. Construction of a new mixed use retail, commercial & residential building GFA 66,698sq m on Block 2, within 2 towers (One Central Park East, 34 storeys & One Central Park West, 17 storeys), accommodating residential floor space comprising 622 residential apartments, 99 x studio, 262 x 1, 233 x 2 & 28 x 3 bedroom; 15,481sq m retail floor space comprising a food court, specialty retail & a supermarket. Construction of terraces (landscaped platforms) which rise from the plaza to the podium level 2 of the new building on Block 2; Installation of a heliostat (consisting of mirrors which are orientated to focus sunlight onto the landscaped platforms); construction of the surrounding public domain; & stratum subdivision. Podium will rise to a height of 4 storeys, with central atrium area, at the bottom of the atrium will be a planted area with a walkway running through, a glass roof will enclose the atrium space. A datum line relating to the height of the heritage gate has been incorporated into the podium. Two residential lobbies are proposed on the eastern side of the podium, the remainder of the ground & first floor will comprise specialty retail, on level 2 a food court is proposed. On the third level of the podium a gym & commercial office space is proposed. On the fourth level of the podium will be retail space. On the roof of the podium (Level 5) will be two separate residential recreational areas. Within the basement level of the building will be a supermarket. The eastern tower will contain 240 apartments & western tower 382 apartments. At ground & first floor level specialty retail spaces & a restaurant are proposed, the retail spaces vary between 45sq m & 220sq m in size and are capable of being amalgamated into larger stores. The restaurant is approximately 1,100sq m. A 3,900sq m food court is proposed which will occupy level 2, with 9 kiosks ranging between 30sq m & 40sq m. A series of landscaped platforms will rise from the northern edge of Main Park up to the level 2 food court. The platforms will be of concrete construction finished with timber decking & granite with voids lined with safety balustrades. A scenic lift will be installed within the platforms. ESD features include naturally & mechanically ventilated building, double glazing, blackwater treatment plant, green walls, tri-generation plant, chilled water reticulation. External materials & finishes comprise full height glazing & sliding system, vegetal walls combined with planter cables, perforated metal panels, winter garden enclosure: slide & turn full height glass panel system, roof gardens. Landscaping & public domain elements, including green walls/vertical garden, plaza with water features/reflection pools, modular planting system. Click for more details...

HYDRO MAJESTIC HOTEL
Hotel - 3 Storey - Altns & Addns New project In The Blue Mountains Council Area. Demolition of buildings known as the Old Laundry, Old Cellar, Gallery Building & Covered Walkway. Alterations & additions to existing hotel comprising construction of an additional 37 accommodation rooms within a 3 storey extension to the north of the existing buildings to be known as the Mark Foy Wing. A new conference facility is also proposed in the southern portion of the site. The proposal also involves refurbishment of a number of existing structures & construction of an enclosed swimming pool adjacent to the northern boundary between the existing Old Belgravia and Hydro Tavern buildings. The existing Hydro Tavern building will be refurbishment & converted to a gymnasium. A range of ancillary works are also proposed including formalisation of carparking facilities, additional landscaping in the vicinity of the new accommodation facilities, conversion of the existing swimming pool to a water storage facility, relocation of the existing sewage storage tanks, and drainage works including on-site stormwater detention, fire safety upgrade, disabled access. Masonry, glass, metal deck roofing. Total off-street car parking provision of 270 spaces is proposed. Extensive landscaping. Click for more details...

WHITE MEMORIAL LEISURE CENTRE
Leisure Centre - Refurbishment project at 1 (Lot 1) Wilkinson Ave, Muswellbrook, NSW 2333 in the Sports (Indoor sports & leisure centres, bowling alleys, squash courts, gymnasiums). Redevelopment of the existing facilities at the White Memorial Leisure Pool. Creation of a new entry & amenities building along the current 25m indoor pool enclosure. The new entry & amenities space will be conditioned to allow comfortable use of all facilities during the swimming year. New male & female bathroom facilities, kiosk & office arrangements & casual seating areas. The new entry has aces to a series of new ramps & stairs. Refurbishment of the existing 25m pool hall concourse to adjust the levels Click for more details...

WHITLAM LEISURE CENTRE
Renovations, Refurbishments etc. project of Sports (Indoor sports & leisure centres, bowling alleys, squash courts, gymnasiums) project at Memorial Av, Liverpool, NSW 2170. Construction of a new shade structure to the 50m external pool & partial air-conditioning system renewal at the Whitlam Leisure Centre Click for more details...

KINGSWAY COMMERCIAL & GYMNASIUM
Sports (Indoor sports & leisure centres, bowling alleys, squash courts, gymnasiums) project In The Sutherland Council Area of Commercial/Gym - 2 Storey - Altns & Addns type. Alterations & additions to existing commercial building including change of use of first floor to commercial units & use of second floor as a gymnasium. Installation of new lift. Hebel lightweight walls to upper floors, prefinised fibre cement panels, solartint glass to windows. Click for more details...

SHOALHAVEN CITY COUNCILS - RESERVE & COMMUNITY PRECINCT MASTER PLAN
Sports (Indoor sports & leisure centres, bowling alleys, squash courts, gymnasiums) project In The Shoalhaven Council Area of Consultancy For Master Plan/Plan Of Management type. Preparation of future reserve & community precinct master plans &/or Plans of Management. Council has identified the following sites for future planning:Artie Smith Oval, Bomaderry; Francis Ryan Reserve, Sanctuary Point; Sanctuary Point Oval, Sanctuary Point; Callala Sportsgrounds, Callala Bay; Bill Andriske Oval, Mollymook; Milton Pony Club, Mollymook; Kangaroo Valley Showground, Kangaroo Valley; Wool Lane Sporting Complex, St Georges Basin; Frogs Hollow, Milton &n Bomaderry Sports Complex, Bomaderry Click for more details...

GENESIS FITNESS CLUB PARRAMATTA
Sports (Indoor sports & leisure centres, bowling alleys, squash courts, gymnasiums) Renovations, Refurbishments etc. project at 91-95 (Lot 456) Fennell St (DP840052), Parramatta, NSW 1740. This type is Fitness Centre - 2 Storey - Fitout with Private ownership. Fitout and change of use to a fitness centre. Ground floor; reception/lounge/waiting area, creche, general training area, amenities, change rooms, toilets, showers, offices and storage areas. Mezzanine level; exercise studios and office. Click for more details...

AMF BOWLING CENTRE & BULKY GOODS PREMISES
Sports (Indoor sports & leisure centres, bowling alleys, squash courts, gymnasiums) project at 62-72 (Lot 11) Batt St (DP1097075), Jamisontown, NSW 2750 for New. Construction of an AMF bowling centre & bulky goods premises. The proposed development comprises construction of 3 buildings across the site, one to be occupied by an AMF bowling centre, & the others to be available as bulky goods tenancies. The eastern building is single storey, 3,393.7sq m in area & accommodates a 28 lane bowling centre with kitchen , party rooms, laserzone gaming & arcade & amusement game area, associated maintenance areas. The southern building is 2,802sq m in area & potentially able to be separated into 4 tenancies, accessible amenities have been provided on the basis of 4 tenancies being present. There are no specific tenancies for the southern building, the use is for generic bulky goods use. The western building has a GFA of 1,516sq m & comprises showroom floor area on the ground level & administrative space on the first level, with lift connection between these 2 floors. Tilt up concrete & glass walls. carparking for 163 vehicles. Landscaping. Click for more details...

BATEMANS BAY COMMERCIAL RECREATION FACILITY
New project of Sports (Indoor sports & leisure centres, bowling alleys, squash courts, gymnasiums) project at Princes Hwy, Eurobodalla, NSW 2545. Lease & development of land for a commercial recreation facility. Click for more details...

VALENTINE SPORTS PARK
Sports (Indoor sports & leisure centres, bowling alleys, squash courts, gymnasiums) project In The Blacktown Council Area of Private ownership. Redevelopment of existing football facilities to create a vibrant state of the art & contemporary headquarters including new building & facilities, extension of futsal stadium & upgrade of 3 fields. Demolition of 2 existing dwellings. Establishment of fields no 1 & 2 to an international football field dimension, 68m x 105m, with additional areas including player runoff & technical areas within a field fenced area. Fields 2, 3 & 4 are to be upgraded to a synthetic surface. A new Home of Football building is proposed between fields 1 & 2. Existing building presently occupied by Football NSW will be vacated upon completion & may be subsequently occupied as a sports science & medicine centre of excellence, focussing on football injury & rehabilitation. Existing gymnasium/futsal building is to be extended & refurbished to become a full sized futsal stadium as well as a learning & conference facility, creating an additional GFA of 356sq m. Partial demolition of internal mezzanine space is proposed allowing international futsal pitch dimensions to be achieved as well as creation of tiered spectator seating of max 400 persons. The western portion of the building will be refurbished for canteen/cafeteria for visitors. Lighting on fields 1 & 3 is proposed to be upgraded to 200 Lux & involves installation of new poles & lights. The proposed building comprises 3 levels. Ground floor contains player & officials change rooms GFA 1450sq m of which approx 27% is devoted to stores. Undercover warm up area of 313sq m. Concrete & glass walls, metal roof, concrete floor. Concourse level will contain the spectator facilities & learning centre GFA 340sq m including spectator amenities with accessible toilet facility, learning centre 145sq m, kitchen 16sq m, lobby 62sq m. Covered seating for up to 830 spectators is proposed beneath the undercroft formed by level 2 offices over. In total the concourse level will have a total seating capacity of 1538. Level 2 will contain offices & training/tribunal centre GFA 1113sq m of which approx 50% is devoted to staff accommodation for Football NSW. Ancillary pathways. Small amenities block in vicinity of field 4. Click for more details...

SIMEONI DR GYM - ANYTIME FITNESS
Sports (Indoor sports & leisure centres, bowling alleys, squash courts, gymnasiums) project for Addition development. Conversion of part of existing building into a gymnasium & associated fitout Click for more details...

SNAP FITNESS BONDI JUNCTION
Gym - Fitout project at 310-330 (Lot 100) Oxford St, Shop 9 (DP1142559), Bondi Junction, NSW 2022 in the Sports (Indoor sports & leisure centres, bowling alleys, squash courts, gymnasiums). Fitout of ground floor and use as a fitness centre. Minor internal alterations, removal of inter tenancy wall, 5 shower rooms, 4 WC, 1 disabled change room with accessible WC, office, conference room and personal training/consultation rooms and store room. Click for more details...

STRIKE BOWLING MACQUARIE CENTRE
Sports (Indoor sports & leisure centres, bowling alleys, squash courts, gymnasiums) project at 197-223 (Lot 123) Herring Rd (DP1130457) (Shop 405), Macquarie Park, NSW 2113 for Renovations, Refurbishments etc.. Fitout for change of use for Strike Bowling including a 10 lane bowling facility, reception area, 4 function rooms, bar & lounge area, kitchen including cool room & storage room. Click for more details...

HEADLAND RD SPORTS TRAINING CENTRE
Sports Centre - Refurbishment Renovations, Refurbishments etc. project In The Warringah Council Area. Internal refurbishment of existing industrial unit for use as a sports training centre Click for more details...

BLACKTOWN LEISURE CENTRE
Sentry Dr, Stanhope Gardens, NSW 2768 Has Blacktown Leisure Centre currently at Construction stage. Removal of the existing wire strand balustrade system, make good of floor finishes & the replacement installation of a frameless clear toughened laminated glass and stainless steel system. The Contract works are to be completed in 3 sequential stages to minimise disruption to the operation of the facility. Click for more details...

SMITHFIELD ANYTIME FITNESS
Gymnasium - Fitout Renovations, Refurbishments etc. project In The Holroyd Council Area. Use of premises as an indoor recreation facility for use by Anytime Fitness to operate 24/7. Extension of the mezzanine level. Associated fitout. Internal works comprise construction of mezzanine level; internal fitout including construction & installation of unisex amenity suites, including one for disability access; construction of stud walls. Click for more details...

MUSWELLBROOK ENTERTAINMENT CENTRE
A project in the NSW Within Muswellbrook. Internal alterations & extensions to an existing building to house a new Bowling Alley facility. Car parking. Click for more details...

KU-RING-GAI FITNESS AND AQUATIC CENTRE
Ku-Ring-Gai Fitness And Aquatic Centre is currently at the Construction stage, valued at about $ 1500000 it is Construction of a commercial scale solar PV system at the Ku-ring-gai Fitness & Aquatic Centre (KFAC). Scope of work includes: design, supply, installation, tuning & commissioning of the complete system. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect