State

Categories

Sub Categories

Click Here to Find Current Projects

List of Industrial buildings Projects


HOXTON PARK RD INDUSTRIAL WORKSHOP
New project of Mining - Support Facilities (Industrial buildings) project at 376 (Lot 7) Hoxton Park Rd (DP1036695), Prestons, NSW 2170. (Lot 7; DP1036695) Construction of 644sqm workshop and 70sqm office Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - MOUNT NICHOLAS
Mining - Support Facilities (Industrial buildings) New project at North east of, Newman, WA 6753. This type is Resource - Iron Ore with Private ownership. Resource estimate is 390 Mt. The ore at Mount Nicholas will be benificiated. Strip mining with progressive backfilling of the open pit will be the preferred mining method. Infrastructure to be constructed and shared at Mount Nicholas, Mount Lewin, Christmas Creek and Cloud Break will comprise a semi-mobile crusher; overland conveyors; haul road and or rail to benificiation plant; haul roads and access tracks; secondary crushers; screening plant; benificiation plant; iron ore product stockpile and train loading facilities; mobile plant and machinery workshop; construction of 132 kv transmission line to Newman with capcity upgrade at Newman or a 45 MW power station (to be provided and maintained by an external supplier); bulk hydrocarbon storage facility; explosive,detonater and magazines; Accommodation and camp facilities, administration and ancillary support facilities; concrete batching plant (during construction), 11 Glpa water supply from borefield supplemeted by mine dewatering; a reverse osmosis plant for portable water use. Click for more details...

WORSLEY ALUMINA REFINERY CAPITAL DEVELOPMENT PROJECT
Mining - Support Facilities (Industrial buildings) project at Near, Collie, WA 6225 for New. Temporary facilities for construction workers, includes offices, ablutions. Click for more details...

TELFER PROJECT
Mining - Support Facilities (Industrial buildings) project In The Port Hedland Council Area of Gas Comresor Station/Vent/Offices type. Includes a storage room, control room, workshop,equipment room, foyer, kitchen and toilets, vent stack (5 metres high), turbines, scraper launcher, and other equipment for operation of the gas pipeline. The carpark and manouvering area will be sealed and includes four designated carparking spaces. Click for more details...

BERTH C
Bulk Loading & Storage Facilities project at Inner Harbour, Bunbury, WA 6230 In The Council Area Of Bunbury of State. Supply of components, fabrication, construction and commissioning of facilities associated with the new berth facilities. Mineral sands storage facility expected to involve several sheds approximately 100 m long, 55 m wide and up to 20 m high. Click for more details...

MOUNT GIBSON IRON ORE PROJECT
Mining - Support Facilities (Industrial buildings) project In The City Of Greater Geraldton Council Area of Private ownership. A subsidiary of Mount Gibson Iron has entered into a ground lease with the Geraldton Port Authority over 1.5 hectares of land where it will build a $5.0 million storage shed to enclose iron ore and other iron products to avoid dust problems. Click for more details...

ROLLESTON COAL PROJECT - COAL HANDLING/INFRASTRUCTURE
Mining - Support Facilities (Industrial buildings) New project at 16km west of, Rolleston, QLD 4702. This type is Crushing & Mine Site Infrastructure with Private ownership. Initial development will be for 6mtpa. Expansion to 8 mtpa allowed for. Click for more details...

MEANDU COAL OPERATIONS
Currently at the Construction stage In South Burnett Regional is a project estimated to be $ 500000. This project Structural steel frame and metal clad walls. Includes additional carpark. Click for more details...

COYOTE GOLD PROJECT - RESOURCE
Private ownership Mining - Support Facilities (Industrial buildings) project In The Halls Creek Council Area for New development. Production rate is expected to be at least 60,000 tonnes per annum. The preferred development plan is based upon a three stage open pit at Coyote to be mined over a year followed by decline development off the base of the pit. Preferred mining method is high grade narrow vein techniques. Infrastructure proposed for the development will be waste rock dumps, tailings storage facility, gold treatment plant, mining contractors area, workshops and stores, office complex, airstrip, accommodation village, haul roads and access roads. Recent resource estimates are 4 metres at 70 g/t Au. The Coyote gold project includes Coyote and the jv Kookaburra and Sandpiper deposits at Larraganni. Click for more details...

PHOSPHATE HILL OPERATIONS
Mining - Support Facilities (Industrial buildings) project at Phosphate Hill approx 190 km south east of Mount Isa via, Cloncurry, QLD 4824 for New. Workshop, store & control building. Concrete slab & likely to be metal cladding. Click for more details...

CENTURY ZINC MINE
Buildings project at North west of, Mount Isa, QLD 4825 In The Council Area Of Mt Isa City of Private. Change-house, workshop, laboratory & administration. 36 week contract period. Click for more details...

RAVENSTHORPE NICKEL PROJECT - BANDALUP HILL - INFRASTRUCTURE
Infrastructure project at 50km north of, Hopetoun, WA 6348 in the Mining - Support Facilities (Industrial buildings). A combination of multi user regional infrastructure and project infrastructure. The multi user infrastructure includes upgrade of local roads, new shire airstrip, emergency services, sewered land, housing, power and water. Project infrastructure includes site buildings, communication, plant roads, construction camp and port facilities at Esperance. Click for more details...

BALLERA GAS CENTRE - SOUTH WEST QUEENSLAND GAS PROJECT
Mining - Support Facilities (Industrial buildings) project at Ballera, ., QLD 4999 of Electrical Installation For Operations Village/Workshops & Admin. Facilities type of Subcontract development. Includes workshop, offices for permanent camp Click for more details...

RAVENSWOOD GOLD OPERATIONS - MOUNT WRIGHT - GOLD RESOURCE
Mining - Support Facilities (Industrial buildings) project for New development. Design work and equipment procurement is to commence shortly with major site works scheduled to start July 2006. The project is expect to cost $77 million with $28.8 million for underground facilities and equipment, $21.7 million for surface facilities and equipment and $26.4 million for capitalised mine development. During the first two years $42 million will be spent on development. Production cost is expected to be $34 per tonne of ore processed. The project will develop in two stages with phase one involving decline development and exploration access for the drill program, while providing a platform for production from the upper levels of the resource. Phase two will extract the remaining resources identified in phase one. The feasibility study completed a comprehensive metallurgical test work, processing strategy using the existing plant, options study on different mining methods, environmental issues connected to tailing storage have been addressed. Underground mining is the method of mining. The Mount Wright prospect is located 10 km northwest of the Sarsfield open pit and is proposed to be developed as a decline accessed underground mine. Mining is to be by open stoping with 50 metre sub-levels at an extraction rate of 1 million tonnes per annum. An extensive underground DC drilling program will be undertaken in conjunction with mine development to upgrade the resource status. Inferred and indicated resource estimate is 1,054,722 ounces of gold. An eight year production life to 2015 and production rate of 1 MTPA. Click for more details...

GROSVENOR COAL PROJECT
via, Moranbah, QLD 4744 Has Grosvenor Coal Project currently at Construction stage. Underground longwall mining at a rate of 7 million tonnes a year (Mtpa) for 26 years. Run-of-mine (ROM) coal to be transported by new conveyor to the adjacent Moranbah North Mine from where 5 Mtpa of product export coking coal to be transported by existing rail facilities to the Abbot Point Coal Terminal. Mining infrastructure to include a new portal entrance to the underground mine access drift, ventilation shafts, water management infrastructure, gas drainage boreholes, underground communication cables, services & boreholes for supply of materials from the surface. Associated surface infrastructure to include administration & warehouse buildings, workshop & vehicle servicing facilities, bath house & employee facilities. Also required at Moranbah North new ROM & product stockpiles at its Coal Handling & Preparation Plant (CHPP) & expansion of the Co-disposal Area (CDA) to accommodate the increase tailings & coarse rejects. Possible relocation of a section of the Blair Athol rail line in the event of subsidence. Click for more details...

COORANBONG COLLIERY - LIFE EXTENSION PROJECT
New project of Mining - Support Facilities (Industrial buildings) project at South west of, Morisset, NSW 2264. Infrastructure to include administration buildings, concrete works, surface workshop, paving, dams, compressor buildings. Click for more details...

BATCHELOR MAGNESIUM PROJECT
Infrastructure project at Rum Jungle district 85 km south of, Darwin, NT 0800 in the Mining - Support Facilities (Industrial buildings). Following completion of the Stage one Feasibility study, locations were selected for each of the facilities necessary for development of the Project. All available technical data relating to each site was compiled and reviewed. Some further exploration drilling was carried out. Based on this review it has been concluded that the sites seem suitable for the assigned purpose. Click for more details...

BOOTU CREEK MANGANESE PROJECT - INFRASTRUCTURE
Infrastructure project at 130 km north of, Tennant Creek, NT 0860 in the Mining - Support Facilities (Industrial buildings). 75 person accommodation village, office, stores, laboratory, heavy vehicle workshop, diesel fuelled power generating plant. Click for more details...

KOOLYANOBBING IRON ORE OPERATIONS - EXPANSION - SHED
Private ownership Mining - Support Facilities (Industrial buildings) project In The Esperance Council Area for New development. Includes an additional 300,000 tonne capacity shed at the Port of Esperance. Click for more details...

KOOLAN ISLAND IRON ORE PROJECT - WORKSHOP/FUEL SUPPLY/OFFICES
Mining - Support Facilities (Industrial buildings) project at On, Koolan Island, WA 6733 for New. The contractor will be required to establish appropriate facilities on site, including workshops, administation offices,laboratory, three fuel storage facilities, explosive magazine, washdown bay and hardstand area. Click for more details...

ENSHAM CENTRAL EXPANSION PROJECT - DRAGLINE ASSEMBLY WORKSHOP
Mining - Support Facilities (Industrial buildings) project at (Lot 34 RP 864576) Duckponds Road, Emerald, QLD 4720 of Dragline Assembly Workshop type of New development. Construction comprises an assembly workshop (450 sqm), abultion block, crib room, office, 8 metre wide sealed road and 2 buses & 15 vehicle parking spaces. Click for more details...

EMILY ANN INFRASTRUCTURE EXPANSION
Infrastructure Expansion project at 140 kM West of, Norseman, WA 6443 In The Council Area Of Dundas of Private. Expansion of existing infrastructure at Maggie Hays comprises upgrading the processing plant from 0.5 mtpa of ore to 1.5 mtpa. Downstream facilities of flotation, concrete handling, tails disposal, reagent mixing and process water systems would also be expanded. Other facilities such as the laydown area, both explosive magazines and mixing facility, the ROM pad, waste rock dump, fuel storage (2 x 55,000 litre tanks) will be expanded. Expansion of existing workshop buildings and administration areas will be done as a needs basis. The power plant will Increase from 7 MW to 10 MW and the construction of a new 4 MW plant at the Maggie Hays mine site. Two new process water ponds and a merging lane at the corner of Hyden Norseman Road and the Maggie Hays access road. Click for more details...

IRON ORE RAPID GROWTH PROJECT 3 - PORT INFRASTRUCTURE
At, Finucane Island, WA 6721 Has Iron Ore Rapid Growth Project 3 - Port Infrastructure currently at Construction stage. Development comprises construction a new single stockyard row in area S, the Eastern Yard including a new stacker and new reclaimer. Constructing a new dedicated Return Screened Fines stockpile adjacent to Car Dumper 4 including new stacker and new reclaimer. Joining the existing Berths C & D together to allow existing shiploaders SLO3 and SLO4 to access either berth. Modifications to the long travel of shiploaders SLO3 and SLO4 so they can travel and shipload on Berth C and D. Upgrading and rebuilding the existing Berth C to accommodate shiploader SLO4 and 250,000 DWT vessels, modify the exisitng control system to suit the new operating regime, improve dust control measures, upgrade electrical infrastructure to suit the proposed development, upgrade the exisiting general infrastructure including upgrading a warhouse building , upgrading roads and constructing a new water recovery plant. The existing existing environmental berm will be extend to provide a visual buffer to the town of Port Hedland on the other side of the harbour from the new eastern stockyard. Construction of temporary lay down areas and buildings for the contractors and temporary construction offices for BHP and EPCM staff. Borrow pits will be developed for the taking of material for construction purposes. A new 66 Kv power line will also be constructed and installed. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C - ANFO STORAGE FACILITY
Great Northern Highway, Newman, WA 6753 Has Iron Ore Rapid Growth 3 Project - Area C - Anfo Storage Facility currently at Construction stage. Ammonium Nitrate and Fuel Oil facility. The building will be built into the side of a hill and will be 3 levels and 27.1 metres high. The middle level will be 49.2 metres long and 26.2 metres wide. Click for more details...

INDEE GOLD PROJECT - ACCOMODATION/ADMINISTRATION/STORAGE FACILITY
80 Km South west of, Port Hedland, WA 6721 Has Indee Gold Project - Accomodation/Administration/Storage Facility currently at Tenders & Building stage. Construction comprises an accommodation building for 40 persons, ablution block, kitchen/mess facilities, administration building and an equipment storage facility. Click for more details...

MURRAY BASIN STAGE 2 - KWR MINERAL SANDS PROJECT - WORKSHOP
Mining - Support Facilities (Industrial buildings) project at 28 km east of, Ouyen, VIC 3490 of Workshop type of New development. For the construction of a workshop. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT PHASE B
Private ownership Mining - Support Facilities (Industrial buildings) project In The City Of Karratha Council Area for New development. As part of a plan to increase Rio Tinto's overall Pilbara operational capacity to 330million tonnes per annum (Mtpa), a project to increase the Cape Lambert Port iron ore handling, processing & ship loading capacity through construction in 2 stages of new stockyard & port facilities of up to 100Mtpa capacity to the west of the existing 80Mtpa Port A operations. Ore to be unloaded from rail wagons using one of 3 car dumpers constructed by drilling, blasting & excavating 1.2million cubic metres of rock which will be used as fill. 2.6milion cubic metres of excavation also expected in constructing the nearby stockyard. Ore to be transferred to this stockyard by conveyors for blending of products using stackers to move material to appropriate stockpiles. Further materials movement through 3 slewing, luffing & travelling reclaimers. 2 screenhouses & transfer stations also expected. Marine facilities to include doubling of the stage 1 access jetty up to 1.8km long to provide for 2 extra berths serviced by ship loaders along with wharf conveyors. Rail facilities in addition to the car dumpers to include 6 new railway tracks with signals as well as modification of existing Port A signalling. Ancillary operational facilities to include offices, warehouses & workshops. Construction facilities expected to inlcude laydown & storage areas adjacent the stockpile area, construction contractor offices, minor roads & accommodation. Extension of the existing quarry. Click for more details...

HOPE DOWNS IRON ORE PROJECT - PROCESSING PLANT
75 Km Northwest of, Newman, WA 6753 Has Hope Downs Iron Ore Project - Processing Plant currently at Construction stage. A crush and screen process plant. The plant will initially process 22 Mta of dry iron ore with expansion later on to process 30 Mta of dry iron ore. The process plant will comprise a primary crusher in a processing circuit that incorporates screens that will seperate the oversized ore. The primary ore will then be crushed a second time and fed to seperate lump and fine products. These will be stockpiled for train loading by conveyor belts and travelling luffing stackers. Stockpiled products will be reclaimed by a rail mounted bucket wheel reclaimer. It will then be conveyed to a train loading facility for transport by rail to Dampier port. Click for more details...

BROKEN HILL SEPARATION PLANT UPGRADE
Currently at the Planning stage In Broken Hill is a project estimated to be $ 36000000. This project The upgrade of the separation plant is proposed to take into account the development of the nearby Snapper project. Upgrades will be undertaken for the plant itself and associated infrastructure. The plant upgrades planned are the additions of a rutile circuit and a zircon circuit. An option to locate a Wet High Intensity Magnetic Separator circuit from the mine site is also proposed. These addition will production to increase from 576,000 tpa to 650,000 tpa. The rutile, ilmenite and zircon circuit feed and rejects stockpiles will all be expanded. The non-magnetic concentrate heavy mineral concentrate receival area will also be expanded. The capacity of the two coal container storages will be expanded from 1000 tonnes to 1500 tonnes. Click for more details...

ROCGLEN COAL PROJECT - WORKSHOP
Mining - Support Facilities (Industrial buildings) project for New development. For the provision of a workshop. Click for more details...

CHINESE SOUTH EXTENDED & MOTTRAMS GOLD MINE PROJECT
Mining - Support Facilities (Industrial buildings) project at Doulgas Station, Stuart Hwy, 12km North of Hayes Creek Wayside Inn, via, Pine Creek, NT 0847 for New. The company proposes to recommence gold mining operations. Mining is proposed to commence on two deposits within this area. The proposed mining development consists of two open cut pits and will employ conventional open cut excavation methods. No mineral processing will occur on these sites. The ore will be transported by road, approximately 62km south-east, for processing. The major components of the proposed Chinese South Extended and Mottrams development include: construction of two open cut mines, pit dewatering, water storage and management, stockpiling of ore, construction of access and haul roads; and construction of two waste rock storage facilites. Click for more details...

DRAYTON COAL OPERATIONS EXTENSION PROJECT
Mining - Support Facilities (Industrial buildings) project for New development. Mining of an additional resource of 30 million tonnes from the Greta Coal Measures (targeting the Rowan formation) at a rate of up to 8 Mtpa to extend the mine life to 2017. The extension of mining will predominantly progress to the South of current operations; however, additional areas within the North and East of the project area are also proposed to be mined. The project will require some additional items of equipment to accommodate an increased rate of production such as: 1 x excavator, 3 x track dozers, 5 x 280 tonne rear dump trucks, 1 x additional drill, grader and watercart, plus other minor ancillary equipment. The existing Coal Handling Plant (CHP) & associated stockpile reclamation system will be upgraded in order to align the facilities with the proposed increase in annual production. A new 80 000 tonnes product coal stockpile & a 40 000 tonne domestic product coal stockpile are proposed to further assist production efficiencies. Minor changes to Drayton's water management system are also proposed to maximise water management & use at the mine. Drayton will continue to utilise dragline, excavators, loaders and a fleet of trucks to both uncover the coal & transport it to on-site processing and load-out facilities. Blasting will continue to be required to assist with overburden & coal extraction. Drayton will continue to utilise existing infrastructure such as administration offices, workshops, parking facilities, conveyors, coal handling facilities and coal stockpiles. Click for more details...

KUNIOON COAL PROJECT - CONSULTANCY FOR COAL MINE INFRASTRUCTURE & OVERLAND CONVEYOR SYSTEM
A project in the QLD Within South Burnett Regional. Engineering consultancy for Kunioom mine infrastructure & overland conveyor. Click for more details...

NEWLANDS SOUTHERN UNDERGROUND COAL OPERATIONS - DISMANTLE & REMOVAL OF OFFICES & WORKSHOP
Offices/Workshop - Dismantle/Removal New project In The Isaac Regional Council Area. For the dismantling & removal of: 1 x office building & change house (approx 55m x 25m), 1 x office building & fittings (approx 20m x 15m), and, 1 x workshop building & fittings (approx 35m x 25 m), all located at the Southern Underground area of the Newlands Coal Mine. Buildings & associated items to be removed from site within agreed time of notification. Click for more details...

INNAMINCKA JOINT VENTURE GEOTHERMAL PROJECT - WAREHOUSE
Mining - Support Facilities (Industrial buildings) New project at Cooper Basin via, Innamincka, SA 5731. This type is Warehouse with Private ownership. For the provision of a warehouse. Click for more details...

WORSLEY ALUMINA EFFICIENCY & GROWTH PROJECT - HEAVY EQUIPMENT WORKSHOP & REFUELING
Mining - Support Facilities (Industrial buildings) project at 15 Km South east of, Collie, WA 6225 for New. For the supply of a heavy equipment workshop and refueling. Click for more details...

SAVAGE RIVER IRON ORE OPERATIONS - MANUFACTURE PLANT
Approx 60 km south west of Burnie, Savage River, TAS 7321 Has Savage River Iron Ore Operations - Manufacture Plant currently at Construction stage. For the construction of an onsite plant for manufacturing explosives. Click for more details...

RAVENSWORTH COAL OPERATIONS EXPANSION - RAVENSWORTH NORTH PROJECT
Operating Mine/S - Expansion project at Lemington Rd, Singleton, NSW 2330 in the Mining - Support Facilities (Industrial buildings). A project to create a mining complex incorporating neighbouring open cut & underground operations at Ravensworth West, Narama and Cumnock No 1 Colliery & the surface facilities associated with Ravensworth Underground Mine (RUM) for mining up to 16million tonnes per annum (Mtpa) of Run-Of-Mine (ROM) coal over an expected Life-of-mine (LOM) of 29 years. Establishment south of Davis Creek & west of Bayswater Creek of the new Ravensworth North Pit. Open cut operations to continue to involve prestripping, drill & blast overburden removal, coal extraction through blasting or bulldozer, transportation of the ROM coal by truck to stockpiles & then by conveyor to a local power station (Macquarie Generation) or the Ravensworth Coal Terminal (RCT). Expansion of the product coal capacity of the existing northerly Ravensworth Coal Handling & Preparation Plant (RCHPP) & RCT loadout facility to 20Mtpa. A new Raw Coal stockpile with associated conveyor & access bridge over the New England Highway to the RCT. At this coal terminal a new product coal stockpile as well as a water dam. A new rejects bin at the existing centrally located ROM pad along with new conveyor to link to the existing rejects conveyor. Establishment of new workshop & office facilities north of Davis Creek. Realignment of an existing 330kV transmission line & ancillary services. Construction of a mine access road along with realignment of Lemington Road involving a New England Highway intersection upgrade. A new explosives facility. Diversion of Emu Creek. A new main storage dam in the south of the project area with associated drains & pipelines. Expanded out of pit emplacement areas. New Cumnock 3 tailings dam to the south of the existing dams. Construction of temporary employee, maintenance & equipment storage facilities at the Narama operations. Click for more details...

PECULIAR KNOB IRON ORE PROJECT - TRANSHIPMENT STORAGE PORT FACILITY
At Berth 7, Port Pirie, SA 5540 Has Peculiar Knob Iron Ore Project - Transhipment Storage Port Facility currently at Construction stage. Contract for the design, procurement, construction & commissioning of an ore receival, storage & out-load facility at Port Pirie. To include train unloading, enclosed stockpiling in a storage shed (10,500 sqm), reclaiming/shiploading overland conveyors. Associated infrastructure/siteworks. Click for more details...

NAMMULDI-SILVERGRASS IRON ORE OPERATIONS EXPANSION (NBWT)
Mining - Support Facilities (Industrial buildings) project at 60km northwest of, Tom Price, WA 6751 for New. A project to extend open cut mining below the water table. Widening & deepening of existing pits concurrently at Nammuldi (Marra Mamba Pits A-F) & Silvergrass (Valley, Range & Flats Marra Mamba pits) which will require new permanent out-of-pit waste dump areas. Dewatering by in & out of pit bores at a maximum rate of 138ML/day at Nammuldi & 90ML/day at Silvergrass with water to be used in operations (processing, dust suppression, crib rooms, ablutions), piped to Brockman Syncline 4 mine, local agricultural irrigation or discharged into Duck or Caves Creeks. Ore to be transported by conveyor to one of 2 new wet processing plants with a combined capacity of 45 million tonne per annum (Mtpa). Overland pipelines to take plant waste fines to a new storage facility to be constructed north of Nammuldi. Construction also north of Nammuldi of a new rail loop & stockyards to link to the existing Brockman 2 spur for export through either Cape Lambert or Dampier. Associated infrastructure to include explosives storage, workshops (fabrication, heavy vehicle maintenance), offices, packaged water treatment plants, lay down areas, warehousing, a fuel storage tank with refuelling aprons & a concrete batching plant during construction. New 33kV power lines to be connected to the existing system. Construction also of a sealed access road to provide an all-weather traffic route from Tom Price to Silvergrass via Brockman 2 & Nammuldi. Realignment of 2.5km of Caves Creek's main channel. Accommodation options include use of expanded facilities at Brockman Syncline 4 mine or a new camp at Western Ridge or next to the existing Brockman 2/Nammuldi camp. Click for more details...

MORANBAH REGION EXPANSION PROJECT - CIVIL WORKS PACKAGES
Private ownership Mining - Support Facilities (Industrial buildings) project In The Isaac Regional Council Area for New development. Packages to include site wide pioneering earthworks, road, drainage & civil works (C001). Bulk earthworks (cut & cover) from the mining infrastructure area (MIA) to the run-of-mine (ROM) area (C002) & from the ROM area to the train load out (C003). The co-disposal dam wall (C004). Supply of gravel (C005); crush rock backfill (C006); precast concrete pipes, boxes & headwalls (C007); high density polyethylene (HDPE) liners (C008) & geogrids (C009). Construction of warehouse & workshop building (C010); bathhouse & administration building (C011) & roadways & carparks in the MIA (C013). Spillway (C014). Supply of concrete (C015); fuel handling equipment (C016); lube handling equipment (C017); tanks (C020); hydrants & hose reels (C021); sewage treatment plant (C022); potable water treatment plant (C023) & fencing (C024). Design & construction of gas drainage plant & booster station (C025) along with supply of vacuum pumps (C029); surface reticulation piping (C030); underground reticulation piping (C031) & installation of the surface & underground reticulation system (C032). Mine cooling system (C026); stone dust system (C027) & diesel & lubrication supply (C028). Click for more details...

MOUNT ARTHUR COAL OPERATIONS - TOOLS STORE/REPAIR BAYS/FIRST AID FACILITY
New project of Mining - Support Facilities (Industrial buildings) project at Denman Rd cnr Thomas Mitchell Dr 5km south of, Muswellbrook, NSW 2333. Contract for heavy vehicle tool store, light vehicle repair bays & first aid building. Click for more details...

PORT OF WHYALLA NORTH HARBOUR EXPANSION
Mining - Support Facilities (Industrial buildings) project In The Whyalla Council Area of Rail Facilities/Ship Loading type. Expansion of OneSteel's bulk export operations from 7 million tonnes per annum (Mtpa) approx to 12 Mtpa. To include construction of additional receival & storage facilities (rail infrastructure, tip pocket & storage sheds), ship loading facilities (conveyors, loader, berthing infrastructure) & expansion of transhipping operations. Click for more details...

PINE DALE COAL OPERATIONS STAGE 2 EXTENSION
Mining - Support Facilities (Industrial buildings) project In The Lithgow Council Area of Operating Mine - Extension type. A project to extend operations 10-15 years by incorporating 201ha in the Blackmans Flat area adjoining the now exhausted original Pine Dale mine & the recently approved 27ha Stage 1 Yarraboldy extension. Continued open cut operations accessing 14.2 million tonnes (Mt) at a rate of 2Mt product coal annually. Construction of a new mine industrial area to include a 600tph crushing & screening plant, 100,000t run-of-mine (ROM) stockpile, 200,000t product stockpiles & maintenance facilities. Construction or relocation of offices, amenities, workshop, water management infrastructure, electric power supply, explosives magazine & fuel storage area. Dewatering of existing pit prior to use for overburden & interburden emplacement. Reinstatement of the now derelict Wallerawang spur rail line & rail siding & construction of a rail load out facility. Internal access roads & private haul road crossing. An additional 60 employees expected at maximum production. Click for more details...

PORT HEDLAND BHP BILLITON NON-PROCESS INFRASTRUCTURE (PORT NPI) PHASE 1
Mining - Support Facilities (Industrial buildings) project In The Port Hedland Council Area of Lubrication Facility/Office, Administration & Stores Buildings - Altn & Addns type. A Port Hedland Inner Harbour project to increase throughput by upgrading existing & construction of new support facilities. Construction of a new lube facility including lube storage & dispensing unit & storage area; a workshop with washdown pad, office & workstations along with an amenities block, traffic management, oily water separation system & bulk diesel storage. Upgrade after removal of some portable buildings of the belt store including new storage/laydown area, high bay belt workshop, portable offices & amenities block, a cool, dry storage facility, light vehicle car park & truck loading yard. Expansion of the existing administration building including offices, conference rooms, open plan work areas, amenities, crib room, tool lockers, secure & public car parking & relocation of the barbecue area. Refurbishment & internal refit of existing crib rooms & amenities at the Nelson Point Crushing Offices as well as the Emergency Services Office. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - GAS FIELD DEVELOPMENT - GAS PROCESSING PLANTS
Private ownership Mining - Support Facilities (Industrial buildings) project In The Various Council Area for New development. A contract for the construction of 7 gas processing plants at Condabri, Orana (east of Talinga), Reedy Creek, Combabula & Eurombah Creek. Associated integrated operations centres, warehouses, workshops & internal roadways. Click for more details...

STORMONT JOINT VENTURE GOLD PROJECT
Mining - Support Facilities (Industrial buildings) New project at off Cradle Mountain Rd west of, Moina, TAS 7306. This type is Resource - Gold with Private ownership. Mining of 80,000t approx of the Stormont skarn-style gold-silver-bismuth deposit to 50m deep using conventional methods (drill & blast, excavators, articulated trucks). Ore to be trucked from a run-of-mine (RoM) stockpile over 130km for processing at BCD's Beaconsfield carbon-in-leach (CIL)/Bacox plant. An on-site mobile crusher may be required in addition to a hydraulic rock-breaker. Associated temporary waste rock dump, office, crib room/amenities, workshop (open ended shed with laydown area) & diesel fuel/oil storage system. Rehabilitation at completion of campaign. Expected employment for 14 people plus truck haulers. Click for more details...

AMRUN (SOUTH OF EMBLEY) BAUXITE PROJECT - EXPORT FACILITY
Mining - Support Facilities (Industrial buildings) project for New development. Construction of an Export Facility, including: Jetty (nom. 270m long) & tug berths, Wharf (nom. 624m long) & dolphins, Shiploader Feed Conveyor & Navigation Aids. The scope of works includes: Shop detailing, fabrication & supply of structural steel & precast concrete roadway decking. Supply of electrical & instrumentation & controls bulks, piping, & miscellaneous mechanical equipment. Supply of construction plant & equipment including offshore craneage. Construction management services. Mobilisation & demobilisation. Transportation of plant & equipment to & from project marshalling yard in Cairns. Design, supply & installation of temporary works including: cyclone moorings & tie-downs for vessels & equipment, temporary access platforms & supports. Installation of permanent plant equipment (SMP&E), including conveyor alignment & belt-pulling & splicing. Application & repair, as necessary, of protective coatings, isolating systems, bonding connections. Provision for diving services. Compliance with environmental approval including required marine fauna observations. Noise monitoring. All validation & verification activities including testing & survey. Click for more details...

PILGANGOORA LITHIUM TANTALUM PROJECT - EPC CONTRACT
Mining - Support Facilities (Industrial buildings) project for New development. For the provision of engineering, procurements & construction for the Pilgangoora Lithium-Tantalum Project. Click for more details...

PILGANGOORA LITHIUM PROJECT - INFRASTRUCTURE
A project in the WA Within Port Hedland. For the provision of site infrastructure. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect