List of Industrial buildings Projects


HOXTON PARK RD INDUSTRIAL WORKSHOP
New project of Mining - Support Facilities (Industrial buildings) project at 376 (Lot 7) Hoxton Park Rd (DP1036695), Prestons, NSW 2170. (Lot 7; DP1036695) Construction of 644sqm workshop and 70sqm office Click for more details...

PENRITH CITY AUTOMOTIVES
Mining - Support Facilities (Industrial buildings) New project at 87-101 Great Western Hwy (Lot 200 & 201 DP553634, Lot 8 & 9 Sec G DP935), Kingswood, NSW 2747. This type is Showroom/Workshop with Private ownership. Demolish in stages existing buildings & erect new motor showroom, parts & service building & associated canopies. Click for more details...

TELFER PROJECT
Mining - Support Facilities (Industrial buildings) project In The Port Hedland Council Area of Gas Comresor Station/Vent/Offices type. Includes a storage room, control room, workshop,equipment room, foyer, kitchen and toilets, vent stack (5 metres high), turbines, scraper launcher, and other equipment for operation of the gas pipeline. The carpark and manouvering area will be sealed and includes four designated carparking spaces. Click for more details...

BAUHINIA REGIONAL RAIL PROJECT - ROLLESTON COAL PROJECT
Mining - Support Facilities (Industrial buildings) project at Lot 1 on SP144277 Dawson Highway, Parish of Albina, via, Rolleston, QLD 4702 of Fuel Depot type of New development. Southern fuel depot at South Rail Camp. Click for more details...

BERTH C
Bulk Loading & Storage Facilities project at Inner Harbour, Bunbury, WA 6230 In The Council Area Of Bunbury of State. Supply of components, fabrication, construction and commissioning of facilities associated with the new berth facilities. Mineral sands storage facility expected to involve several sheds approximately 100 m long, 55 m wide and up to 20 m high. Click for more details...

TELFER GOLD OPERATIONS
Site operations via, Telfer, WA 6762 Has Telfer Gold Operations currently at Construction stage. Single level steel framed construction involving some cladding & an iron roof is envisaged. Tender incorporates site preparation, general civils, drainage & concrete pad. Work also includes some cranage & a tyre fitters area. Click for more details...

YARRANDALE ROAD INDUSTRIAL STORAGE
Local Govt ownership Mining - Support Facilities (Industrial buildings) project In The Dubbo Council Area for New development. Construction of an industrial shed for storage, preparation & manufacture of furniture. Click for more details...

MOUNT GIBSON IRON ORE PROJECT
Mining - Support Facilities (Industrial buildings) project In The City Of Greater Geraldton Council Area of Private ownership. A subsidiary of Mount Gibson Iron has entered into a ground lease with the Geraldton Port Authority over 1.5 hectares of land where it will build a $5.0 million storage shed to enclose iron ore and other iron products to avoid dust problems. Click for more details...

ROLLESTON COAL PROJECT - COAL HANDLING/INFRASTRUCTURE
Mining - Support Facilities (Industrial buildings) New project at 16km west of, Rolleston, QLD 4702. This type is Crushing & Mine Site Infrastructure with Private ownership. Initial development will be for 6mtpa. Expansion to 8 mtpa allowed for. Click for more details...

COYOTE GOLD PROJECT - RESOURCE
Private ownership Mining - Support Facilities (Industrial buildings) project In The Halls Creek Council Area for New development. Production rate is expected to be at least 60,000 tonnes per annum. The preferred development plan is based upon a three stage open pit at Coyote to be mined over a year followed by decline development off the base of the pit. Preferred mining method is high grade narrow vein techniques. Infrastructure proposed for the development will be waste rock dumps, tailings storage facility, gold treatment plant, mining contractors area, workshops and stores, office complex, airstrip, accommodation village, haul roads and access roads. Recent resource estimates are 4 metres at 70 g/t Au. The Coyote gold project includes Coyote and the jv Kookaburra and Sandpiper deposits at Larraganni. Click for more details...

AUSTAR COAL OPERATIONS EXPANSION
Mining - Support Facilities (Industrial buildings) project In The Cessnock Council Area of Operating Mine - Extn - Stage 3 type. For longwall extraction from panels A1 & A2 using a new method of longwall mining known as longwall top caving. For the construction and operation of some additional surface infrastructure including a larger capacity ventilation fan, downcast shaft, substation, nitrogen injection plant, tube bundle shed, and diesel storage and dispatch system, and for the upgrading of some existing surface infrastructure including the water treatment plant, and the water reticulation and pumping system. Click for more details...

CENTURY ZINC MINE
Buildings project at North west of, Mount Isa, QLD 4825 In The Council Area Of Mt Isa City of Private. Change-house, workshop, laboratory & administration. 36 week contract period. Click for more details...

BENGALLA COAL OPERATIONS
Mining - Support Facilities (Industrial buildings) project, Bengalla, NSW 2333 of Truck Wash Facilities type of New development. Includes light duty truck wash to 40 tonnes and heavy duty truck wash to 300 tonnes and 2 fully automatic tank filling stations for the 300 tonne Eucalypt vehicles/ Click for more details...

GROSVENOR COAL PROJECT
via, Moranbah, QLD 4744 Has Grosvenor Coal Project currently at Construction stage. Underground longwall mining at a rate of 7 million tonnes a year (Mtpa) for 26 years. Run-of-mine (ROM) coal to be transported by new conveyor to the adjacent Moranbah North Mine from where 5 Mtpa of product export coking coal to be transported by existing rail facilities to the Abbot Point Coal Terminal. Mining infrastructure to include a new portal entrance to the underground mine access drift, ventilation shafts, water management infrastructure, gas drainage boreholes, underground communication cables, services & boreholes for supply of materials from the surface. Associated surface infrastructure to include administration & warehouse buildings, workshop & vehicle servicing facilities, bath house & employee facilities. Also required at Moranbah North new ROM & product stockpiles at its Coal Handling & Preparation Plant (CHPP) & expansion of the Co-disposal Area (CDA) to accommodate the increase tailings & coarse rejects. Possible relocation of a section of the Blair Athol rail line in the event of subsidence. Click for more details...

COORANBONG COLLIERY - LIFE EXTENSION PROJECT
New project of Mining - Support Facilities (Industrial buildings) project at South west of, Morisset, NSW 2264. Infrastructure to include administration buildings, concrete works, surface workshop, paving, dams, compressor buildings. Click for more details...

FLINDERS RANGES PROJECT - BELTANA - ZINC RESOURCE
Mining - Support Facilities (Industrial buildings) project In The Far North Council Area of Resource - Zinc type. Mining operation will be 150-180,000 tonnes per annum. Indicated-Inferred resource is 941,000 tonnes @ 30.6% zinc for 300,000 tonnes of zinc. Beltana deposit resource is 365,200 tonnes @ 31.2% zinc for 57,400 tonnes of zinc. The Beltana deposit will be mined first with the existing pit to be deepened from 65 metres by another 30 metres. Click for more details...

MINDARIE MINERAL SANDS PROJECT - PROCESSING FACILITY
Processing Facilities/Infrastructure project at Via, Karoonda, SA 5307 In The Council Area Of Karoonda of Private. To construct a processing plant comprising a product separation plant (Dry) and HMC separation plant (Wet) and a warehouse to store equipment and product. Click for more details...

NEW BENDIGO GOLD PROJECT - INFRASTRUCTURE
Mining - Support Facilities (Industrial buildings) project In The Greater Bendigo Council Area of Infrastructure type. Infrastructure includes upgrading power and dewatering facilities. Surface facilities include a new vent site, security building, workshop, muster room, car parks. A new evaporation pond is to be constructed at Woodvale which is 16 km from the mine. Click for more details...

KOOLYANOBBING IRON ORE OPERATIONS - EXPANSION - SHED
Private ownership Mining - Support Facilities (Industrial buildings) project In The Esperance Council Area for New development. Includes an additional 300,000 tonne capacity shed at the Port of Esperance. Click for more details...

TARCOOLA GOLD PROJECT
Currently at the Construction stage In Far North is a project estimated to be $ 4000000. This project A project based on an updated Resource Estimate of 973,000 tonne at 3.12g/t for 97.54 ounces of gold. The proposed open put will be mined using conventional mining equipment. Click for more details...

MID WEST IRON & STEEL PROJECT - KOOLANOOKA - STORAGE SHED/FACILITIES
Currently at the Construction stage In City Of Greater Geraldton is a project estimated to be $ 3000000. This project Construction of storage shed and associated facilities. Concrete floor, structural steel and cladding. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C - ANFO STORAGE FACILITY
Great Northern Highway, Newman, WA 6753 Has Iron Ore Rapid Growth 3 Project - Area C - Anfo Storage Facility currently at Construction stage. Ammonium Nitrate and Fuel Oil facility. The building will be built into the side of a hill and will be 3 levels and 27.1 metres high. The middle level will be 49.2 metres long and 26.2 metres wide. Click for more details...

CENTRAL NORSEMAN GOLD OPERATIONS - RESOURCE
Resource -Gold project at 30 Km North of, Norseman, WA 6443 In The Council Area Of Dundas of Private. Norseman gold operation comprises two underground mines, Harlequin, Bullen, various open pits and the Phoenix mill treatment plant. The Davyhurst gold operation has been sold to Monarch Resources. Mining is to continue at all operations and various infrastructure projects will be undertaken. At Harlequin the mine ventilation system and the surface workshop will be upgraded in preparation for long term mining at the Harlequin decline. The Phoenix mill treatment plant will undergo maintenance of the crusher, ball and SAG mill and the installation of new ore feeders. A new tailings storage facility designed to provide 10 years storage will be developed. A major upgrade to the power distribution network will be undertaken. Lastly the single person quarters at Norseman will be upgraded and refurbished. Click for more details...

INDEE GOLD PROJECT - ACCOMODATION/ADMINISTRATION/STORAGE FACILITY
80 Km South west of, Port Hedland, WA 6721 Has Indee Gold Project - Accomodation/Administration/Storage Facility currently at Tenders & Building stage. Construction comprises an accommodation building for 40 persons, ablution block, kitchen/mess facilities, administration building and an equipment storage facility. Click for more details...

KING ISLAND SCHEELITE MINE REDEVELOPMENT PROJECT STAGE 1 - MINING CONTRACTORS COMPOUND
New project of Mining - Support Facilities (Industrial buildings) project at Near, Grassy, TAS 7256. For the provision of mining contractors compound. Click for more details...

HOPE DOWNS IRON ORE PROJECT - PROCESSING PLANT
75 Km Northwest of, Newman, WA 6753 Has Hope Downs Iron Ore Project - Processing Plant currently at Construction stage. A crush and screen process plant. The plant will initially process 22 Mta of dry iron ore with expansion later on to process 30 Mta of dry iron ore. The process plant will comprise a primary crusher in a processing circuit that incorporates screens that will seperate the oversized ore. The primary ore will then be crushed a second time and fed to seperate lump and fine products. These will be stockpiled for train loading by conveyor belts and travelling luffing stackers. Stockpiled products will be reclaimed by a rail mounted bucket wheel reclaimer. It will then be conveyed to a train loading facility for transport by rail to Dampier port. Click for more details...

BODDINGTON GOLD MINE EXPANSION PROJECT - WORKSHOP/WASHDOWN FACILITY
Workshop/Washdown Facility project at Pinjarra - Williams Rd, Boddington, WA 6390 in the Mining - Support Facilities (Industrial buildings). Workshop and wash-down facility. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - NEWMAN HUB
Newman Hub project at Newman Hub, Newman, WA 6753 in the Mining - Support Facilities (Industrial buildings). The RGP4 modifications include the final tie-ins that convert the existing Newman Operations from a production plant producing secondary crushed ore (with a nominal top size of -100mm) to a plant producing shipping quality lump and fines products. The main features of the new tie-in, starting at TS2 are: A new transfer tower, 41SE010, built immediately to the NE of the existing TS2, in line with conveyor M110. This tower is structurally linked to TS2. The tail end of the existing conveyor M110 is removed and replace by a new conveyor. 41CV010, which runs in the opposite direction and discharges ore to a new transfer conveyor, 41CV020, the tail of which is in the new transfer tower 41SE010. Connecting to the existing Newman High Grade (NHG) discharge in TS2 (ore from #2 Plant and Bene Plant product). Construction of a new single rotary cell train car dumping facility, a new crushing and screening plant to include scalping with middlings recirculation to produce sized lump and fines product. Construction of a new blending stockyard 5 x 210kt lump and fines, live and dead including stacking and reclaim machines, to produce a direct-shippable blended lump and fines product. Construction of sampling facilities for reconciliation of production from the various ore sources (NHB and SOB sites) and as-stacked blend control on the stockpiles. Construction of a new drive through train loading (TLO) facility with separate lump and fines sections. Modifications and additional track at the entrance of Newman Hub rail loop and new loco services facility near the existing Hub workshops. Modifications and additional tracks and realingments in the vicinity of the existing OB29 train loading facility for connections to new car dumper and train loading facility. These works include the additional SOBs train by pass line. Deconstruction of PB29 conveyors M301, M309, M311 transfer station TS3, part deconstruction M308 and the removal of the entire OB29 train Load-out facility. The deconstruction works also include removal of sections of existing rail line made redundant by the Newman Hub works. Decommissioning of the existing train load-out stackers No 1 & 2, stacker conveyors M110 and M6 and the existing train loading tunnels (demolition not included in the RGP4 scope). Modifications and additions to the existing water supply and reticulation system. Design Capacity is 31Mtpa. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - JIMBLEBAR ORE PROCESSING PLANT
A project in the WA Within East Pilbara. The ore processing plant will include earthworks, civil works, electrical, structural, instrumentation and control, demolition, rail work, communication, stockyard and general services packages. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - YANDI ORE PROCESSING PLANT UPGRADE
Iron Ore Rapid Growth 4 Project - Yandi Ore Processing Plant Upgrade is currently at the Planning stage, valued at about $ 50000000 it is Work comprises upgrading the 42 Mtpa ore processing plant. Click for more details...

ROCGLEN COAL PROJECT - WORKSHOP
Mining - Support Facilities (Industrial buildings) project for New development. For the provision of a workshop. Click for more details...

ABYDOS IRON ORE PROJECT
Operating Mine - Iron Ore project at 85km West of, Marble Bar, WA 6760 in the Mining - Support Facilities (Industrial buildings). Upgraded resource estimate of 22.2Mt @ 56.7% Fe. Project will consist of two open pits which will be mined using conventional drill and blast, load and haul techniques. Pit dewatering will not be required. Ore processing and transport. Additional infrastructure will include the administration area, haul road, Abydos Link road, access tracks, explosives magazines, water bores and associated reticulation and borrow pits. Re-fuelling and fuel storage areas, workshops, washdown areas and laydown areas will be located within the administration area and the ROM area. All personnel and staff will be housed at the Abydos accommodation village. Click for more details...

BERRIMAH ROAD WAREHOUSE
Mining - Support Facilities (Industrial buildings) project In The Darwin City Council Area of Private ownership. Construction of a warehouse to include railway track running into warehouse. Parking for 6 cars. Associated landscaping. Click for more details...

PORT ADELAIDE BULK STORAGE & TRANSFER FACILITY
Mining - Support Facilities (Industrial buildings) project at Minnipa Rd & Grand Trunkway, Port Adelaide, SA 5015 for New. Proposed construction of two mineral sands storage sheds, two concentrate storage sheds with inloading and outloading conveyor systems and associated earthworks, roadways & stormwater infrastructure also includes the development of a rail spur running into the site from the Port Flat Rail Yards. Click for more details...

MURRAY BASIN STAGE 2 MINERAL SANDS PROJECT - CIVIL WORKS & BULK EARTHWORKS
Murray Basin Stage 2 Mineral Sands Project - Civil Works & Bulk Earthworks is currently at the Construction stage, valued at about $ 5000000 it is For the provision of site-wide civil works & bulk earthworks. Click for more details...

GLADSTONE LIQUID NATURAL GAS (GLNG) PROJECT - TEMPORARY SUPPORT BUILDINGS
Temporary Support Buildings project at ., Curtis Island, QLD 4680 in the Mining - Support Facilities (Industrial buildings). Construction of temporary support buildings that require a shelf life of 5 years. 20 plant infrastructure buildings including plant offices, medical facility, workshops, store rooms, equipment rooms, crib rooms & recreation rooms. Accommodation camp providing for 1860 persons in 48 pods. Click for more details...

PECULIAR KNOB IRON ORE PROJECT - TRANSHIPMENT STORAGE PORT FACILITY
At Berth 7, Port Pirie, SA 5540 Has Peculiar Knob Iron Ore Project - Transhipment Storage Port Facility currently at Construction stage. Contract for the design, procurement, construction & commissioning of an ore receival, storage & out-load facility at Port Pirie. To include train unloading, enclosed stockpiling in a storage shed (10,500 sqm), reclaiming/shiploading overland conveyors. Associated infrastructure/siteworks. Click for more details...

MOUNT ARTHUR COAL OPERATIONS EXPANSION RX1
Operating Mine - Expn - Rx1 New project In The Muswellbrook Council Area. Increase of run-of-mine (ROM) capacity by 4million tonnes per annum (Mtpa) to reach 24Mtpa approx. 300 new full time jobs expected. Click for more details...

PINE DALE COAL OPERATIONS STAGE 2 EXTENSION
Mining - Support Facilities (Industrial buildings) project In The Lithgow Council Area of Operating Mine - Extension type. A project to extend operations 10-15 years by incorporating 201ha in the Blackmans Flat area adjoining the now exhausted original Pine Dale mine & the recently approved 27ha Stage 1 Yarraboldy extension. Continued open cut operations accessing 14.2 million tonnes (Mt) at a rate of 2Mt product coal annually. Construction of a new mine industrial area to include a 600tph crushing & screening plant, 100,000t run-of-mine (ROM) stockpile, 200,000t product stockpiles & maintenance facilities. Construction or relocation of offices, amenities, workshop, water management infrastructure, electric power supply, explosives magazine & fuel storage area. Dewatering of existing pit prior to use for overburden & interburden emplacement. Reinstatement of the now derelict Wallerawang spur rail line & rail siding & construction of a rail load out facility. Internal access roads & private haul road crossing. An additional 60 employees expected at maximum production. Click for more details...

GLNG WALLUMBILLA GAS TREATMENT FACILITY (WGTF)
New project of Mining - Support Facilities (Industrial buildings) project at Walumbilla South Rd Iona Bardlomey Rd (Lot 33 SP 212840) 12km south of, Wallumbilla, QLD 4428. Staged development adjacent the existing Santos compressor (WCS) & metering (WMS) stations of a gas treatment facility of 2 trains each with a capacity of 250TJ/day. Each train to consist of gas compression, natural gas liquid removal & cryogenic gas treatment units & a gas turbine power generator using non-methane gas liquids & distributing power through alternators. Ancillary infrastructure to include condensate storage, hot oil system, air compression system, nitrogen generation plant, fire water system, flare & vent system, oily water system along with potable & service water system. Plant control room & workforce amenities. Click for more details...

CAPE LAMBERT CCGT POWER STATION
A project in the WA Within City Of Karratha. As part of the Pilbara Power System Upgrade project (PSU 330) supporting an increase iron ore production to 333 million tonnes per annum (Mtpa), replacement of the existing low efficiency 105MW power station. Construction of a 100-120MW power station with 2 x 40-45MW gas turbines & a 20-30MW steam turbine. A 220/132/33kV switchyard with 132kV & 220kV distribution lines. Gas feed to come by a new 1.6km lateral from the PL8 pipeline to a gas receival & conditioning station. Associated workshop/administration complex. Water to come by 2km pipeline from the West Pilbara Water Supply Scheme, water treatment plant & sedimentation & lined evaporation ponds. Back up diesel fuel store. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - GAS FIELD DEVELOPMENT - GAS PROCESSING PLANTS
Private ownership Mining - Support Facilities (Industrial buildings) project In The Various Council Area for New development. A contract for the construction of 7 gas processing plants at Condabri, Orana (east of Talinga), Reedy Creek, Combabula & Eurombah Creek. Associated integrated operations centres, warehouses, workshops & internal roadways. Click for more details...

DUGALD RIVER BASE METAL PROJECT - MINE INDUSTRIAL AREA & PLANT BUILDINGS
Private ownership Mining - Support Facilities (Industrial buildings) project In The Mt Isa City Council Area for New development. Construction of Plant & Industrial buildings. Click for more details...

BHP BILLITON MOOKA CAR REPAIR WORKSHOP
Bhp Billiton Mooka Car Repair Workshop is currently at the Construction stage, valued at about $ 30000000 it is Contract for the construction of a maintenance workshop & warehouse. To include process equipment installation as well as rail & infrastructure components including roads, track, signalling & communications electrical engineering. Water supply. Click for more details...

ROY HILL IRON ORE PROJECT - NON-PROCESS INFRASTRUCTURE - MINE SITE HV AREA
Currently at the Construction stage In East Pilbara is a project estimated to be $ 100000000. This project Construction of various non-process infrastructure buildings for the Roy Hill Iron Ore Mine, comprising three main works zones being Mine Services Area, a Gatehouse and Go-Line Facility and to include HV area. Click for more details...

AMRUN (SOUTH OF EMBLEY) BAUXITE PROJECT - EXPORT FACILITY
Mining - Support Facilities (Industrial buildings) project for New development. Construction of an Export Facility, including: Jetty (nom. 270m long) & tug berths, Wharf (nom. 624m long) & dolphins, Shiploader Feed Conveyor & Navigation Aids. The scope of works includes: Shop detailing, fabrication & supply of structural steel & precast concrete roadway decking. Supply of electrical & instrumentation & controls bulks, piping, & miscellaneous mechanical equipment. Supply of construction plant & equipment including offshore craneage. Construction management services. Mobilisation & demobilisation. Transportation of plant & equipment to & from project marshalling yard in Cairns. Design, supply & installation of temporary works including: cyclone moorings & tie-downs for vessels & equipment, temporary access platforms & supports. Installation of permanent plant equipment (SMP&E), including conveyor alignment & belt-pulling & splicing. Application & repair, as necessary, of protective coatings, isolating systems, bonding connections. Provision for diving services. Compliance with environmental approval including required marine fauna observations. Noise monitoring. All validation & verification activities including testing & survey. Click for more details...

PILGANGOORA LITHIUM-TANTALUM PROJECT - MINE WORKSHOP & OFFICES
Mining - Support Facilities (Industrial buildings) project for New development. For the provision of a mine workshop & offices. Click for more details...

NORTHERN GAS PIPELINE - MOTOR CONTROL CENTRES
Mining - Support Facilities (Industrial buildings) New project at Tennant Creek to Mount Isa, ., NT 8999. This type is Motor Control Centres with Private ownership. For the provision of 2 motor control centres. Click for more details...

PILGANGOORA LITHIUM PROJECT - INFRASTRUCTURE
A project in the WA Within Port Hedland. For the provision of site infrastructure. Click for more details...

WOODVIEW QUARRY
Mining - Support Facilities (Industrial buildings) project for New development. Proposed crushing aggregates & flood blend to include transporting & loading of feed rock into a primary crusher, crushing of feed rock through necessary crushers, screening of rock to meet specifications, re-crushing & re-screening of oversize rock to meet specifications, stockpiling of materials in uniform windrows to suit stockpile area, testing of MB20 & DGS40 to NSW Roads & Maritime Services specifications for quality & Council requirements for the number of tests required & testing of Flood Blend, 20mm Aggregate, Gabion Rock & -70mm to Council requirements. Click for more details...