LIDDELL COAL COLLIERY - RESOURCE
Mine - Coal New project In The Singleton Council Area. Existing operation produces 4.5 Mtpa of Rom coal and the CHPP processes 700 tonnes per hour. A proposal has been approved to increase ROM coal production to 8 Mtpa. Associated development will comprise the construction of a new Coal Handling Plant, establishment of a new supplementary stockpile with capacity of 450,000 tonnes, alter the planned 1500 ML Dam 13B footprint, construct a bridge over the main Northern Railway to improve transport between existing coal pits, alter an access road to the CHPP, relocation of offices, workshop and storage area and an associated access road, and the construction of a desalination unit within the CHPP area for the treatment of mine water. Capital expenditure on the Washplant upgrade alone was approx $100 million. Click for more details...

ULAN NO 2 COAL MINE
New project of Mining - Support Facilities (Industrial buildings) project at off Cassilis Rd, Ulan, NSW 2850. Concrete slab, steel frame and metal clad walls and roof. Includes air conditioning to offices. Click for more details...

BAUHINIA REGIONAL RAIL PROJECT - ROLLESTON COAL PROJECT
Mining - Support Facilities (Industrial buildings) project at Lot 1 on SP144277 Dawson Highway, Parish of Albina, via, Rolleston, QLD 4702 of Fuel Depot type of New development. Southern fuel depot at South Rail Camp. Click for more details...

BERTH C
Bulk Loading & Storage Facilities project at Inner Harbour, Bunbury, WA 6230 In The Council Area Of Bunbury of State. Supply of components, fabrication, construction and commissioning of facilities associated with the new berth facilities. Mineral sands storage facility expected to involve several sheds approximately 100 m long, 55 m wide and up to 20 m high. Click for more details...

MOUNT GIBSON IRON ORE PROJECT
Mining - Support Facilities (Industrial buildings) project In The City Of Greater Geraldton Council Area of Private ownership. A subsidiary of Mount Gibson Iron has entered into a ground lease with the Geraldton Port Authority over 1.5 hectares of land where it will build a $5.0 million storage shed to enclose iron ore and other iron products to avoid dust problems. Click for more details...

ROLLESTON COAL PROJECT - COAL HANDLING/INFRASTRUCTURE
Mining - Support Facilities (Industrial buildings) New project at 16km west of, Rolleston, QLD 4702. This type is Crushing & Mine Site Infrastructure with Private ownership. Initial development will be for 6mtpa. Expansion to 8 mtpa allowed for. Click for more details...

MEANDU COAL OPERATIONS
Currently at the Construction stage In South Burnett Regional is a project estimated to be $ 500000. This project Structural steel frame and metal clad walls. Includes additional carpark. Click for more details...

COYOTE GOLD PROJECT - RESOURCE
Private ownership Mining - Support Facilities (Industrial buildings) project In The Halls Creek Council Area for New development. Production rate is expected to be at least 60,000 tonnes per annum. The preferred development plan is based upon a three stage open pit at Coyote to be mined over a year followed by decline development off the base of the pit. Preferred mining method is high grade narrow vein techniques. Infrastructure proposed for the development will be waste rock dumps, tailings storage facility, gold treatment plant, mining contractors area, workshops and stores, office complex, airstrip, accommodation village, haul roads and access roads. Recent resource estimates are 4 metres at 70 g/t Au. The Coyote gold project includes Coyote and the jv Kookaburra and Sandpiper deposits at Larraganni. Click for more details...

TARAWONGA COAL PROJECT - RESOURCE
Resource - Coal project at Maules Creek & Goonbri Rds, 15 km north east of, Boggabri, NSW 2382 In The Council Area Of Narrabri of Private. The expected mine life between 8 to 10 years, will yield close to 12 million tonnes of export quality low sulphur, low ash, high-energy semi-soft coking coal from the Forest View, Thuin and Nagero properties east of Boggabri (formerley named East Boggabri Coal Project). Click for more details...

PHOSPHATE HILL OPERATIONS
Mining - Support Facilities (Industrial buildings) project at Phosphate Hill approx 190 km south east of Mount Isa via, Cloncurry, QLD 4824 for New. Workshop, store & control building. Concrete slab & likely to be metal cladding. Click for more details...

RAVENSWOOD GOLD OPERATIONS - MOUNT WRIGHT - GOLD RESOURCE
Mining - Support Facilities (Industrial buildings) project for New development. Design work and equipment procurement is to commence shortly with major site works scheduled to start July 2006. The project is expect to cost $77 million with $28.8 million for underground facilities and equipment, $21.7 million for surface facilities and equipment and $26.4 million for capitalised mine development. During the first two years $42 million will be spent on development. Production cost is expected to be $34 per tonne of ore processed. The project will develop in two stages with phase one involving decline development and exploration access for the drill program, while providing a platform for production from the upper levels of the resource. Phase two will extract the remaining resources identified in phase one. The feasibility study completed a comprehensive metallurgical test work, processing strategy using the existing plant, options study on different mining methods, environmental issues connected to tailing storage have been addressed. Underground mining is the method of mining. The Mount Wright prospect is located 10 km northwest of the Sarsfield open pit and is proposed to be developed as a decline accessed underground mine. Mining is to be by open stoping with 50 metre sub-levels at an extraction rate of 1 million tonnes per annum. An extensive underground DC drilling program will be undertaken in conjunction with mine development to upgrade the resource status. Inferred and indicated resource estimate is 1,054,722 ounces of gold. An eight year production life to 2015 and production rate of 1 MTPA. Click for more details...

GROSVENOR COAL PROJECT
via, Moranbah, QLD 4744 Has Grosvenor Coal Project currently at Construction stage. Underground longwall mining at a rate of 7 million tonnes a year (Mtpa) for 26 years. Run-of-mine (ROM) coal to be transported by new conveyor to the adjacent Moranbah North Mine from where 5 Mtpa of product export coking coal to be transported by existing rail facilities to the Abbot Point Coal Terminal. Mining infrastructure to include a new portal entrance to the underground mine access drift, ventilation shafts, water management infrastructure, gas drainage boreholes, underground communication cables, services & boreholes for supply of materials from the surface. Associated surface infrastructure to include administration & warehouse buildings, workshop & vehicle servicing facilities, bath house & employee facilities. Also required at Moranbah North new ROM & product stockpiles at its Coal Handling & Preparation Plant (CHPP) & expansion of the Co-disposal Area (CDA) to accommodate the increase tailings & coarse rejects. Possible relocation of a section of the Blair Athol rail line in the event of subsidence. Click for more details...

MINDARIE MINERAL SANDS PROJECT - PROCESSING FACILITY
Processing Facilities/Infrastructure project at Via, Karoonda, SA 5307 In The Council Area Of Karoonda of Private. To construct a processing plant comprising a product separation plant (Dry) and HMC separation plant (Wet) and a warehouse to store equipment and product. Click for more details...

BATCHELOR MAGNESIUM PROJECT
Infrastructure project at Rum Jungle district 85 km south of, Darwin, NT 0800 in the Mining - Support Facilities (Industrial buildings). Following completion of the Stage one Feasibility study, locations were selected for each of the facilities necessary for development of the Project. All available technical data relating to each site was compiled and reviewed. Some further exploration drilling was carried out. Based on this review it has been concluded that the sites seem suitable for the assigned purpose. Click for more details...

KOGAN CREEK POWER PROJECT - ELECTRICAL INSTALLATION/WORKSHOP
South of, Brigalow, QLD 4412 Has Kogan Creek Power Project - Electrical Installation/Workshop currently at Construction stage. Erection of 1 Siemens Steam Turbine, 1 Siemens Generator THDF 125/67, Condenser, Tanks, Pumps, Compressors, Assembly of Workshop and Store, Electrical and I & C installation Click for more details...

MILLENNIUM MORANBAH COAL PROJECT - MINING CONTRACT
New project of Mining - Support Facilities (Industrial buildings) project at North of Poitrel via, Moranbah, QLD 4744. Includes infrastructure, administration facilities, workshops etc. Click for more details...

NEW BENDIGO GOLD PROJECT - INFRASTRUCTURE
Mining - Support Facilities (Industrial buildings) project In The Greater Bendigo Council Area of Infrastructure type. Infrastructure includes upgrading power and dewatering facilities. Surface facilities include a new vent site, security building, workshop, muster room, car parks. A new evaporation pond is to be constructed at Woodvale which is 16 km from the mine. Click for more details...

KOOLAN ISLAND IRON ORE PROJECT - WORKSHOP/FUEL SUPPLY/OFFICES
Mining - Support Facilities (Industrial buildings) project at On, Koolan Island, WA 6733 for New. The contractor will be required to establish appropriate facilities on site, including workshops, administation offices,laboratory, three fuel storage facilities, explosive magazine, washdown bay and hardstand area. Click for more details...

MOUNT ETNA MINE - PURCHASE & REMOVAL OF WORKSHOP BUILDING & FENCING
Workshop Building & Fencing - Purchase & Removal project at The Caves, 20 km north of, Rockhampton, QLD 4700 In The Council Area Of Rockhampton Regional of Private. Purchase and removal of Workshop Building and 2m Manproof Fencing to Workshop Perimeter. Click for more details...

MID WEST IRON & STEEL PROJECT - KOOLANOOKA - STORAGE SHED/FACILITIES
Currently at the Construction stage In City Of Greater Geraldton is a project estimated to be $ 3000000. This project Construction of storage shed and associated facilities. Concrete floor, structural steel and cladding. Click for more details...

MIDDLEBACK RANGES OPERATIONS - PROJECT MAGNET - EXPORT FACILITIES UPGRADE
Port of, Whyalla, SA 5600 Has Middleback Ranges Operations - Project Magnet - Export Facilities Upgrade currently at Construction stage. Construction and upgrade of a hematite export facilities at the Port of Whyalla. Click for more details...

ENSHAM CENTRAL EXPANSION PROJECT - DRAGLINE ASSEMBLY WORKSHOP
Mining - Support Facilities (Industrial buildings) project at (Lot 34 RP 864576) Duckponds Road, Emerald, QLD 4720 of Dragline Assembly Workshop type of New development. Construction comprises an assembly workshop (450 sqm), abultion block, crib room, office, 8 metre wide sealed road and 2 buses & 15 vehicle parking spaces. Click for more details...

EMILY ANN INFRASTRUCTURE EXPANSION
Infrastructure Expansion project at 140 kM West of, Norseman, WA 6443 In The Council Area Of Dundas of Private. Expansion of existing infrastructure at Maggie Hays comprises upgrading the processing plant from 0.5 mtpa of ore to 1.5 mtpa. Downstream facilities of flotation, concrete handling, tails disposal, reagent mixing and process water systems would also be expanded. Other facilities such as the laydown area, both explosive magazines and mixing facility, the ROM pad, waste rock dump, fuel storage (2 x 55,000 litre tanks) will be expanded. Expansion of existing workshop buildings and administration areas will be done as a needs basis. The power plant will Increase from 7 MW to 10 MW and the construction of a new 4 MW plant at the Maggie Hays mine site. Two new process water ponds and a merging lane at the corner of Hyden Norseman Road and the Maggie Hays access road. Click for more details...

IRON ORE RAPID GROWTH PROJECT 3 - PORT INFRASTRUCTURE
At, Finucane Island, WA 6721 Has Iron Ore Rapid Growth Project 3 - Port Infrastructure currently at Construction stage. Development comprises construction a new single stockyard row in area S, the Eastern Yard including a new stacker and new reclaimer. Constructing a new dedicated Return Screened Fines stockpile adjacent to Car Dumper 4 including new stacker and new reclaimer. Joining the existing Berths C & D together to allow existing shiploaders SLO3 and SLO4 to access either berth. Modifications to the long travel of shiploaders SLO3 and SLO4 so they can travel and shipload on Berth C and D. Upgrading and rebuilding the existing Berth C to accommodate shiploader SLO4 and 250,000 DWT vessels, modify the exisitng control system to suit the new operating regime, improve dust control measures, upgrade electrical infrastructure to suit the proposed development, upgrade the exisiting general infrastructure including upgrading a warhouse building , upgrading roads and constructing a new water recovery plant. The existing existing environmental berm will be extend to provide a visual buffer to the town of Port Hedland on the other side of the harbour from the new eastern stockyard. Construction of temporary lay down areas and buildings for the contractors and temporary construction offices for BHP and EPCM staff. Borrow pits will be developed for the taking of material for construction purposes. A new 66 Kv power line will also be constructed and installed. Click for more details...

HOPE DOWNS IRON ORE PROJECT - PROCESSING PLANT
75 Km Northwest of, Newman, WA 6753 Has Hope Downs Iron Ore Project - Processing Plant currently at Construction stage. A crush and screen process plant. The plant will initially process 22 Mta of dry iron ore with expansion later on to process 30 Mta of dry iron ore. The process plant will comprise a primary crusher in a processing circuit that incorporates screens that will seperate the oversized ore. The primary ore will then be crushed a second time and fed to seperate lump and fine products. These will be stockpiled for train loading by conveyor belts and travelling luffing stackers. Stockpiled products will be reclaimed by a rail mounted bucket wheel reclaimer. It will then be conveyed to a train loading facility for transport by rail to Dampier port. Click for more details...

BODDINGTON GOLD MINE EXPANSION PROJECT - WORKSHOP/WASHDOWN FACILITY
Workshop/Washdown Facility project at Pinjarra - Williams Rd, Boddington, WA 6390 in the Mining - Support Facilities (Industrial buildings). Workshop and wash-down facility. Click for more details...

BROKEN HILL SEPARATION PLANT UPGRADE
Currently at the Planning stage In Broken Hill is a project estimated to be $ 36000000. This project The upgrade of the separation plant is proposed to take into account the development of the nearby Snapper project. Upgrades will be undertaken for the plant itself and associated infrastructure. The plant upgrades planned are the additions of a rutile circuit and a zircon circuit. An option to locate a Wet High Intensity Magnetic Separator circuit from the mine site is also proposed. These addition will production to increase from 576,000 tpa to 650,000 tpa. The rutile, ilmenite and zircon circuit feed and rejects stockpiles will all be expanded. The non-magnetic concentrate heavy mineral concentrate receival area will also be expanded. The capacity of the two coal container storages will be expanded from 1000 tonnes to 1500 tonnes. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - NEWMAN HUB
Newman Hub project at Newman Hub, Newman, WA 6753 in the Mining - Support Facilities (Industrial buildings). The RGP4 modifications include the final tie-ins that convert the existing Newman Operations from a production plant producing secondary crushed ore (with a nominal top size of -100mm) to a plant producing shipping quality lump and fines products. The main features of the new tie-in, starting at TS2 are: A new transfer tower, 41SE010, built immediately to the NE of the existing TS2, in line with conveyor M110. This tower is structurally linked to TS2. The tail end of the existing conveyor M110 is removed and replace by a new conveyor. 41CV010, which runs in the opposite direction and discharges ore to a new transfer conveyor, 41CV020, the tail of which is in the new transfer tower 41SE010. Connecting to the existing Newman High Grade (NHG) discharge in TS2 (ore from #2 Plant and Bene Plant product). Construction of a new single rotary cell train car dumping facility, a new crushing and screening plant to include scalping with middlings recirculation to produce sized lump and fines product. Construction of a new blending stockyard 5 x 210kt lump and fines, live and dead including stacking and reclaim machines, to produce a direct-shippable blended lump and fines product. Construction of sampling facilities for reconciliation of production from the various ore sources (NHB and SOB sites) and as-stacked blend control on the stockpiles. Construction of a new drive through train loading (TLO) facility with separate lump and fines sections. Modifications and additional track at the entrance of Newman Hub rail loop and new loco services facility near the existing Hub workshops. Modifications and additional tracks and realingments in the vicinity of the existing OB29 train loading facility for connections to new car dumper and train loading facility. These works include the additional SOBs train by pass line. Deconstruction of PB29 conveyors M301, M309, M311 transfer station TS3, part deconstruction M308 and the removal of the entire OB29 train Load-out facility. The deconstruction works also include removal of sections of existing rail line made redundant by the Newman Hub works. Decommissioning of the existing train load-out stackers No 1 & 2, stacker conveyors M110 and M6 and the existing train loading tunnels (demolition not included in the RGP4 scope). Modifications and additions to the existing water supply and reticulation system. Design Capacity is 31Mtpa. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - CRUSHING & SCREENING PLANT
Crushing & Screening Plant project at Newman Hub, Newman, WA 6753 in the Mining - Support Facilities (Industrial buildings). The screening facility comprises two buildings located in close proximity (one bay apart). The first building consists of five scalping screen bays that are fed by a continuously traveling shuttle head conveyor. Each bay consists of a surge bin that is emptied by a vibrating diverging pan feeder that distributes and feeds a double deck banana scalping screen. The second building consists of seven product screen bays that are fed by a continuously traveling tripper. Each bay consists of a surge bin that is emptied by a vibrating diverging pan feeder that distributes and feeds a double deck banana product screen. The crushing building consists of three crushing bays that are fed by a continuously traveling shuttle head conveyor. Each bay consists of a surge bin that is emptied by a vibrating feeder. Each vibrating feeder feeds a short belt conveyor that, in turn, feeds a cone crusher. The screening building has two dust collection systems. (one for each end of the building) and the crushing building has one dust collection system. Each system comprises reticulated ductwork, reverse pulse air cleaning type bag house c/w- bags, compressor, air receiver and receiving hoppers that are discharged by rotary valves back onto the adjacent mainline conveyors. The key criteria for the Crushing & Screening Sections is 58Mtpa. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - JIMBLEBAR ORE PROCESSING PLANT
A project in the WA Within East Pilbara. The ore processing plant will include earthworks, civil works, electrical, structural, instrumentation and control, demolition, rail work, communication, stockyard and general services packages. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - YANDI ORE PROCESSING PLANT UPGRADE
Iron Ore Rapid Growth 4 Project - Yandi Ore Processing Plant Upgrade is currently at the Planning stage, valued at about $ 50000000 it is Work comprises upgrading the 42 Mtpa ore processing plant. Click for more details...

QSN LINK GAS PIPELINE
Private ownership Mining - Support Facilities (Industrial buildings) project In The Not Yet Determined Council Area for New development. The QSN Link pipeline will extend south-west from the Ballera Gas facility in Queensland. It will pass approximately 7km to the south of Innamincka in South Australia and terminate at the Moomba plant. The pipeline will be some 180km in length, with approximately 90km in Queensland and 91.5km in South Australia. The pipeline will be typical of a modern, small to medium diameter gas transmission pipeline. Final design parameters are yet to be determined, but it is likely to involve the following infrastructure: a buried, high pressure, steel, natural gas pipeline, with a diameter in the order of 400mm, an inlet station at Ballera, above ground facilities at intervals along the pipeline include a mid-line mainline valve, cathodic protection systems and marker signs and an outlet delivery station at Moomba. The construction workforce will be accommodated in temporary camps and at local accommodation. two preliminary campsite locations have been selected which will accommodate a single camp that will be mobilised from one location to the other during the construction phase of the project. construction depots will be used primarily for equipment storage and will typically be co-located with the construction camps. Facilities and equipment stored at the construction depots may include: site office and administration centre, construction vehicles, diesel fuel and lubricants, vehicle maintenance equipment, sand bags, sediment fencing, star droppers and wooden stakes and pipe wrapping and joint coating materials. When the utility is no longer required, the pipeline will be decommissioned in accordance with the regulatory requirements and accepted environmental best practices at the time. currently decommissioning procedures require the removal of all above ground infrastructure and the restoration of associated disturbed areas. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - WAREHOUSE
Hay Point Rd, Hay Point, QLD 4740 Has Dalrymple Bay Coal Terminal Expansion - Warehouse currently at Planning stage. To construct a warehouse for storage purposes. Click for more details...

ANTHILL COPPER PROJECT
via McNamara's Hwy 100km northwest of, Mount Isa, QLD 4825 Has Anthill Copper Project currently at Construction stage. A project based on a resource estimate (inferred, indicated) of 2.4 million tonnes (Mt) containing 27,000t of copper. Conventional drill & blast open cut operations to develop a pit 500 x 800m & 120m deep. After removal by hydraulic excavators, ore to be trucked to an interim run-of-mine (ROM) stockpile prior to haulage along McNamara Road to the existing processing plant at Mt Kelly. A mine infrastructure area (office building, first aid room, crib room, ablutions). Also heavy vehicle workshop with down pad & oil water separator, storage (explosives, fuel, scrap steel, stores, waste hydrocarbon). Diversion of Johnson Creek. Dewatering bores. Bunded waste rock dumps up to 40-50m high. Sediment dams. Haulage & access roads. Sewerage treatment plant. Click for more details...

INNAMINCKA JOINT VENTURE GEOTHERMAL PROJECT - WAREHOUSE
Mining - Support Facilities (Industrial buildings) New project at Cooper Basin via, Innamincka, SA 5731. This type is Warehouse with Private ownership. For the provision of a warehouse. Click for more details...

TALINGA DEVELOPMENT PROJECT
Mining - Support Facilities (Industrial buildings) project In The Western Downs Regional Council Area of Resource - Coal Seam Gas type. The project involves transitioning the existing pilot trial of 12 wells to production of up to 90TJ/day of coal seam gas, which will contribute to the supply of gas to the Darling Downs Power Station. The development will involve installing coal seam gas wells at a spacing of between 750m and 1000m; associated gas and water gathering systems, a gas plant, a produced water treatment facility, evaporation ponds, offices, storage areas, workshops, camp and gravel pits. Based on current well production predictions, this equates to the installation of approximately 100 coal seam gas wells. This project will incorporate a water treatment facility to significantly reduce the evaporation pond surface area down to approximately 170ha. The water treatment facility will employ an integrated membrane system, including reverse osmosis, to achieve an 85% desalination recovery and create a freshwater resource. The freshwater will be discharged to the Condamine River catchment until higher level beneficial used, such as industrial, urban or agricultural use, can be implemented. Click for more details...

RG TANNA COAL TERMINAL BUILDING SERVICES WORKSHOP CONVERSION
., Gladstone, QLD 4680 Has Rg Tanna Coal Terminal Building Services Workshop Conversion currently at Construction stage. Construction of concrete footings & slab, underground services installation and asphalting the compound. Click for more details...

GLADSTONE LIQUID NATURAL GAS (GLNG) PROJECT - TEMPORARY SUPPORT BUILDINGS
Temporary Support Buildings project at ., Curtis Island, QLD 4680 in the Mining - Support Facilities (Industrial buildings). Construction of temporary support buildings that require a shelf life of 5 years. 20 plant infrastructure buildings including plant offices, medical facility, workshops, store rooms, equipment rooms, crib rooms & recreation rooms. Accommodation camp providing for 1860 persons in 48 pods. Click for more details...

PANNAWONICA ACCOMMODATION & FACILITIES UPGRADE
Mining - Support Facilities (Industrial buildings) Renovations, Refurbishments etc. project at at, Pannawonica, WA 6716. This type is House Refurbishment/Office Refurbishment/Service Station/Workshop with Private ownership. Refurbishment of 233 houses. Upgrade & refurbishment of 19 existing commercial & infrastructure buildings. Construction also of a new service station & light vehicle workshop within the town. Click for more details...

PECULIAR KNOB IRON ORE PROJECT - TRANSHIPMENT STORAGE PORT FACILITY
At Berth 7, Port Pirie, SA 5540 Has Peculiar Knob Iron Ore Project - Transhipment Storage Port Facility currently at Construction stage. Contract for the design, procurement, construction & commissioning of an ore receival, storage & out-load facility at Port Pirie. To include train unloading, enclosed stockpiling in a storage shed (10,500 sqm), reclaiming/shiploading overland conveyors. Associated infrastructure/siteworks. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT STAGE 1/PHASE A
Civils/Piping Works/Offices/Roads/Accommodation - Stage 1/Phase A New project In The City Of Karratha Council Area. As part of a plan to increase Rio Tinto's overall Pilbara operational capacity to 330million tonnes per annum (Mtpa), a project to increase the Cape Lambert Port iron ore handling, processing & ship loading capacity through construction in 2 stages (phases A 7 B) of new stockyard & port facilities of up to 100Mtpa capacity to the west of the existing 80Mtpa Port A operations. Construction of a 920m long jetty & a 2-berth wharf along with new shiploading facilities. Associated piping works expected to include relocation of the natural gas pipeline feeding the Cape Lambert power station, the Cape Lambert landfill site & a transmission line. Construction facilities expected to inlcude laydown & storage areas adjacent the stockpile area, construction contractor offices, minor roads & accommodation. Click for more details...

MOUNT ARTHUR COAL OPERATIONS - TOOLS STORE/REPAIR BAYS/FIRST AID FACILITY
New project of Mining - Support Facilities (Industrial buildings) project at Denman Rd cnr Thomas Mitchell Dr 5km south of, Muswellbrook, NSW 2333. Contract for heavy vehicle tool store, light vehicle repair bays & first aid building. Click for more details...

PINE DALE COAL OPERATIONS STAGE 2 EXTENSION
Mining - Support Facilities (Industrial buildings) project In The Lithgow Council Area of Operating Mine - Extension type. A project to extend operations 10-15 years by incorporating 201ha in the Blackmans Flat area adjoining the now exhausted original Pine Dale mine & the recently approved 27ha Stage 1 Yarraboldy extension. Continued open cut operations accessing 14.2 million tonnes (Mt) at a rate of 2Mt product coal annually. Construction of a new mine industrial area to include a 600tph crushing & screening plant, 100,000t run-of-mine (ROM) stockpile, 200,000t product stockpiles & maintenance facilities. Construction or relocation of offices, amenities, workshop, water management infrastructure, electric power supply, explosives magazine & fuel storage area. Dewatering of existing pit prior to use for overburden & interburden emplacement. Reinstatement of the now derelict Wallerawang spur rail line & rail siding & construction of a rail load out facility. Internal access roads & private haul road crossing. An additional 60 employees expected at maximum production. Click for more details...

GLNG WALLUMBILLA GAS TREATMENT FACILITY (WGTF)
New project of Mining - Support Facilities (Industrial buildings) project at Walumbilla South Rd Iona Bardlomey Rd (Lot 33 SP 212840) 12km south of, Wallumbilla, QLD 4428. Staged development adjacent the existing Santos compressor (WCS) & metering (WMS) stations of a gas treatment facility of 2 trains each with a capacity of 250TJ/day. Each train to consist of gas compression, natural gas liquid removal & cryogenic gas treatment units & a gas turbine power generator using non-methane gas liquids & distributing power through alternators. Ancillary infrastructure to include condensate storage, hot oil system, air compression system, nitrogen generation plant, fire water system, flare & vent system, oily water system along with potable & service water system. Plant control room & workforce amenities. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - GAS FIELD DEVELOPMENT - GAS PROCESSING PLANTS
Private ownership Mining - Support Facilities (Industrial buildings) project In The Various Council Area for New development. A contract for the construction of 7 gas processing plants at Condabri, Orana (east of Talinga), Reedy Creek, Combabula & Eurombah Creek. Associated integrated operations centres, warehouses, workshops & internal roadways. Click for more details...

STORMONT JOINT VENTURE GOLD PROJECT
Mining - Support Facilities (Industrial buildings) New project at off Cradle Mountain Rd west of, Moina, TAS 7306. This type is Resource - Gold with Private ownership. Mining of 80,000t approx of the Stormont skarn-style gold-silver-bismuth deposit to 50m deep using conventional methods (drill & blast, excavators, articulated trucks). Ore to be trucked from a run-of-mine (RoM) stockpile over 130km for processing at BCD's Beaconsfield carbon-in-leach (CIL)/Bacox plant. An on-site mobile crusher may be required in addition to a hydraulic rock-breaker. Associated temporary waste rock dump, office, crib room/amenities, workshop (open ended shed with laydown area) & diesel fuel/oil storage system. Rehabilitation at completion of campaign. Expected employment for 14 people plus truck haulers. Click for more details...

ROY HILL IRON ORE PROJECT - NON-PROCESS INFRASTRUCTURE - MINE SITE HV AREA
Currently at the Construction stage In East Pilbara is a project estimated to be $ 100000000. This project Construction of various non-process infrastructure buildings for the Roy Hill Iron Ore Mine, comprising three main works zones being Mine Services Area, a Gatehouse and Go-Line Facility and to include HV area. Click for more details...

PILGANGOORA LITHIUM-TANTALUM PROJECT - MINE WORKSHOP & OFFICES
Mining - Support Facilities (Industrial buildings) project for New development. For the provision of a mine workshop & offices. Click for more details...

NORTHERN GAS PIPELINE - MOTOR CONTROL CENTRES
Mining - Support Facilities (Industrial buildings) New project at Tennant Creek to Mount Isa, ., NT 8999. This type is Motor Control Centres with Private ownership. For the provision of 2 motor control centres. Click for more details...

PILGANGOORA LITHIUM TANTALUM PROJECT - EPC CONTRACT
Mining - Support Facilities (Industrial buildings) project for New development. For the provision of engineering, procurements & construction for the Pilgangoora Lithium-Tantalum Project. Click for more details...