List of Industrial buildings Projects in VIC


NEW BENDIGO GOLD PROJECT - INFRASTRUCTURE
Mining - Support Facilities (Industrial buildings) project In The Greater Bendigo Council Area of Infrastructure type. Infrastructure includes upgrading power and dewatering facilities. Surface facilities include a new vent site, security building, workshop, muster room, car parks. A new evaporation pond is to be constructed at Woodvale which is 16 km from the mine. Click for more details...

PORT OF PORTLAND FACILITIES EXPANSION
Mining - Support Facilities (Industrial buildings) project In The Glenelg Council Area of Private ownership. Development includes the construction of a new 50,000 tonne mineral and sand product storage facility warehouse. Shiploading infrastructure will be constructed that is capable of transferring product at 1500 tonnes per hour. This will include manual front end loaders, hoppers, outloader conveyor and shiploader. It is expected that Iluka will ship 260,000 tonnes per annum through the new port facilities. Click for more details...

MURRAY BASIN STAGE 2 - KWR MINERAL SANDS PROJECT - WORKSHOP
Mining - Support Facilities (Industrial buildings) project at 28 km east of, Ouyen, VIC 3490 of Workshop type of New development. For the construction of a workshop. Click for more details...

PATRICIA-BALEEN GAS PLANT UPGRADE
Mining - Support Facilities (Industrial buildings) project for New development. For the upgrade to the existing Patricia-Baleen Gas Plant. The works include: installation of a condensate separation and stabilisation system, installation of condensate storage tanks and truck load-out facility, installation of hydrocarbon dew point control facilities for the gas, reconfiguration of the existing compressors to increase compression capacity, upgrade to the sales gas dehydration system to accommodate higher gas rates and minimise glycol carryover, installation of monoethylene glycol (MEG) storage and injection facilities to prevent hydrate formation in the offshore pipeline and selected plant process locations, and associated MEG regeneration facilities. Installation of a corrosion inhibitor injection system for the offshore pipeline, installation of a hot oil heater and hot oil circulation system to provide process heat to the processing facilities, installation of a n"off-gas" compressor to recycle gas vented from the condensate stabilisation system to eliminate operations flaring. Installation of new flare systems and removal of existing flare system, modifications to the drainage system, including a new API Separator and extension of the storm water system. Installation of a water vaporiser to dispose of excess produced water that cannot be reused or naturally evaporates. Modifications to various plant utilities, namely, the fuel gas system, odourisation system, compressed air system and plant process control system. Upgrade of the fire and gas protection facilities including installation of fixed firewater pumps and foam systems. Exte4nsion of office facilities and installation of a laboratory, and the construction of a new workshop/warehouse facility. Click for more details...

MURRAY BASIN STAGE 2 MINERAL SANDS PROJECT - CIVIL WORKS & BULK EARTHWORKS
Murray Basin Stage 2 Mineral Sands Project - Civil Works & Bulk Earthworks is currently at the Construction stage, valued at about $ 5000000 it is For the provision of site-wide civil works & bulk earthworks. Click for more details...