List of Industrial buildings Projects in Western Australia


PILBARA IRON ORE & INFRASTRUCTURE PROJECT - MOUNT NICHOLAS
Mining - Support Facilities (Industrial buildings) New project at North east of, Newman, WA 6753. This type is Resource - Iron Ore with Private ownership. Resource estimate is 390 Mt. The ore at Mount Nicholas will be benificiated. Strip mining with progressive backfilling of the open pit will be the preferred mining method. Infrastructure to be constructed and shared at Mount Nicholas, Mount Lewin, Christmas Creek and Cloud Break will comprise a semi-mobile crusher; overland conveyors; haul road and or rail to benificiation plant; haul roads and access tracks; secondary crushers; screening plant; benificiation plant; iron ore product stockpile and train loading facilities; mobile plant and machinery workshop; construction of 132 kv transmission line to Newman with capcity upgrade at Newman or a 45 MW power station (to be provided and maintained by an external supplier); bulk hydrocarbon storage facility; explosive,detonater and magazines; Accommodation and camp facilities, administration and ancillary support facilities; concrete batching plant (during construction), 11 Glpa water supply from borefield supplemeted by mine dewatering; a reverse osmosis plant for portable water use. Click for more details...

BLAIR NICKEL MINE - RESOURCE
Operating Mine project at North of, Kambalda, WA 6442 In The Council Area Of Coolgardie of Private. Resource estimate is 109,000 tonnes of ore @ 5.19% Ni for 5,660 tonnes of contained nickel. Excavation of new decline to access the ore on the 460 level and below. Click for more details...

WORSLEY ALUMINA REFINERY CAPITAL DEVELOPMENT PROJECT
Mining - Support Facilities (Industrial buildings) project at Near, Collie, WA 6225 for New. Temporary facilities for construction workers, includes offices, ablutions. Click for more details...

TELFER PROJECT
Mining - Support Facilities (Industrial buildings) project In The Port Hedland Council Area of Gas Comresor Station/Vent/Offices type. Includes a storage room, control room, workshop,equipment room, foyer, kitchen and toilets, vent stack (5 metres high), turbines, scraper launcher, and other equipment for operation of the gas pipeline. The carpark and manouvering area will be sealed and includes four designated carparking spaces. Click for more details...

LAVERTON GOLD OPERATIONS - TREATMENT PLANT REFURBISHMENT/EXPANSION
Treatment Plant - Refurbishment/Expansion Renovations, Refurbishments etc. project In The Laverton Council Area. Expansion to 1.5 million tonnes. Additional test work will be undertaken to obtain further information to fully optimise the process flow sheet at the 1.5 Mtpa throughput rate. Infrastructure proposed to be added are a second ball mill, additional tankage, a gravity circuit and in pit tailings disposal. The recent acquisition of additional tenenaments in the Laverton area has made the expansion of the plant economically viable. Click for more details...

BERTH C
Bulk Loading & Storage Facilities project at Inner Harbour, Bunbury, WA 6230 In The Council Area Of Bunbury of State. Supply of components, fabrication, construction and commissioning of facilities associated with the new berth facilities. Mineral sands storage facility expected to involve several sheds approximately 100 m long, 55 m wide and up to 20 m high. Click for more details...

TELFER GOLD OPERATIONS
Site operations via, Telfer, WA 6762 Has Telfer Gold Operations currently at Construction stage. Single level steel framed construction involving some cladding & an iron roof is envisaged. Tender incorporates site preparation, general civils, drainage & concrete pad. Work also includes some cranage & a tyre fitters area. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - RAIL INFRASTRUCTURE
Rail Infrastructure New project In The Port Hedland Council Area. Feasibility study has recommended a a 255 km railway line from Cloud Break to Port Headland port facility. A mine load out facility will be located at Cloud Break. There will be four train sets each comprising two locomotives and two hundred wagons. Supporting infrastructure will include sidings, passing bays and loading loops, train loader, temporary construction facilities, temporary track camps, administration offices and warehouses, trip servicing facilities, service and repair workshop, rail maintenance track, rail loops and marshalling yards, maintenance facilities, substations and communication systems. The proposed line does deviate where there are environmental, heritage and engineering constraints. Stage A PER covers the Port and North to South rail line. The Stage B PER covers the East to West rail spur. Click for more details...

MOUNT GIBSON IRON ORE PROJECT
Mining - Support Facilities (Industrial buildings) project In The City Of Greater Geraldton Council Area of Private ownership. A subsidiary of Mount Gibson Iron has entered into a ground lease with the Geraldton Port Authority over 1.5 hectares of land where it will build a $5.0 million storage shed to enclose iron ore and other iron products to avoid dust problems. Click for more details...

COYOTE GOLD PROJECT - RESOURCE
Private ownership Mining - Support Facilities (Industrial buildings) project In The Halls Creek Council Area for New development. Production rate is expected to be at least 60,000 tonnes per annum. The preferred development plan is based upon a three stage open pit at Coyote to be mined over a year followed by decline development off the base of the pit. Preferred mining method is high grade narrow vein techniques. Infrastructure proposed for the development will be waste rock dumps, tailings storage facility, gold treatment plant, mining contractors area, workshops and stores, office complex, airstrip, accommodation village, haul roads and access roads. Recent resource estimates are 4 metres at 70 g/t Au. The Coyote gold project includes Coyote and the jv Kookaburra and Sandpiper deposits at Larraganni. Click for more details...

RAVENSTHORPE NICKEL PROJECT - BANDALUP HILL - INFRASTRUCTURE
Infrastructure project at 50km north of, Hopetoun, WA 6348 in the Mining - Support Facilities (Industrial buildings). A combination of multi user regional infrastructure and project infrastructure. The multi user infrastructure includes upgrade of local roads, new shire airstrip, emergency services, sewered land, housing, power and water. Project infrastructure includes site buildings, communication, plant roads, construction camp and port facilities at Esperance. Click for more details...

KOOLYANOBBING IRON ORE OPERATIONS - EXPANSION - SHED
Private ownership Mining - Support Facilities (Industrial buildings) project In The Esperance Council Area for New development. Includes an additional 300,000 tonne capacity shed at the Port of Esperance. Click for more details...

KOOLAN ISLAND IRON ORE PROJECT - WORKSHOP/FUEL SUPPLY/OFFICES
Mining - Support Facilities (Industrial buildings) project at On, Koolan Island, WA 6733 for New. The contractor will be required to establish appropriate facilities on site, including workshops, administation offices,laboratory, three fuel storage facilities, explosive magazine, washdown bay and hardstand area. Click for more details...

MID WEST IRON & STEEL PROJECT - KOOLANOOKA - STORAGE SHED/FACILITIES
Currently at the Construction stage In City Of Greater Geraldton is a project estimated to be $ 3000000. This project Construction of storage shed and associated facilities. Concrete floor, structural steel and cladding. Click for more details...

MID WEST IRON & STEEL PROJECT - KOOLANOOKA - ROAD RECEIVAL FACILITY
Mining - Support Facilities (Industrial buildings) project for New development. Construction of a road receival facility and associated works. Click for more details...

EMILY ANN INFRASTRUCTURE EXPANSION
Infrastructure Expansion project at 140 kM West of, Norseman, WA 6443 In The Council Area Of Dundas of Private. Expansion of existing infrastructure at Maggie Hays comprises upgrading the processing plant from 0.5 mtpa of ore to 1.5 mtpa. Downstream facilities of flotation, concrete handling, tails disposal, reagent mixing and process water systems would also be expanded. Other facilities such as the laydown area, both explosive magazines and mixing facility, the ROM pad, waste rock dump, fuel storage (2 x 55,000 litre tanks) will be expanded. Expansion of existing workshop buildings and administration areas will be done as a needs basis. The power plant will Increase from 7 MW to 10 MW and the construction of a new 4 MW plant at the Maggie Hays mine site. Two new process water ponds and a merging lane at the corner of Hyden Norseman Road and the Maggie Hays access road. Click for more details...

IRON ORE RAPID GROWTH PROJECT 3 - PORT INFRASTRUCTURE
At, Finucane Island, WA 6721 Has Iron Ore Rapid Growth Project 3 - Port Infrastructure currently at Construction stage. Development comprises construction a new single stockyard row in area S, the Eastern Yard including a new stacker and new reclaimer. Constructing a new dedicated Return Screened Fines stockpile adjacent to Car Dumper 4 including new stacker and new reclaimer. Joining the existing Berths C & D together to allow existing shiploaders SLO3 and SLO4 to access either berth. Modifications to the long travel of shiploaders SLO3 and SLO4 so they can travel and shipload on Berth C and D. Upgrading and rebuilding the existing Berth C to accommodate shiploader SLO4 and 250,000 DWT vessels, modify the exisitng control system to suit the new operating regime, improve dust control measures, upgrade electrical infrastructure to suit the proposed development, upgrade the exisiting general infrastructure including upgrading a warhouse building , upgrading roads and constructing a new water recovery plant. The existing existing environmental berm will be extend to provide a visual buffer to the town of Port Hedland on the other side of the harbour from the new eastern stockyard. Construction of temporary lay down areas and buildings for the contractors and temporary construction offices for BHP and EPCM staff. Borrow pits will be developed for the taking of material for construction purposes. A new 66 Kv power line will also be constructed and installed. Click for more details...

MOUNT GIBSON IRON ORE MINE & INFRASTRUCTURE PROJECT - STORAGE SHED & FACILITIES
Mining - Support Facilities (Industrial buildings) project In The City Of Greater Geraldton Council Area of Storage Shed/Associated Facilities type. Construction of dedicated berth, storage shed and shiploading facilities to handle 130,000 tonnes of iron ore. Facilities will include hoppers, conveyors, storage tanks, clarifier, return water tank and pumps, HV cables, power transformer, MCC and switch rooms. A filter plant will be constructed to dry the slurry. Concrete floor, structural steel and cladding. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C - ANFO STORAGE FACILITY
Great Northern Highway, Newman, WA 6753 Has Iron Ore Rapid Growth 3 Project - Area C - Anfo Storage Facility currently at Construction stage. Ammonium Nitrate and Fuel Oil facility. The building will be built into the side of a hill and will be 3 levels and 27.1 metres high. The middle level will be 49.2 metres long and 26.2 metres wide. Click for more details...

CENTRAL NORSEMAN GOLD OPERATIONS - RESOURCE
Resource -Gold project at 30 Km North of, Norseman, WA 6443 In The Council Area Of Dundas of Private. Norseman gold operation comprises two underground mines, Harlequin, Bullen, various open pits and the Phoenix mill treatment plant. The Davyhurst gold operation has been sold to Monarch Resources. Mining is to continue at all operations and various infrastructure projects will be undertaken. At Harlequin the mine ventilation system and the surface workshop will be upgraded in preparation for long term mining at the Harlequin decline. The Phoenix mill treatment plant will undergo maintenance of the crusher, ball and SAG mill and the installation of new ore feeders. A new tailings storage facility designed to provide 10 years storage will be developed. A major upgrade to the power distribution network will be undertaken. Lastly the single person quarters at Norseman will be upgraded and refurbished. Click for more details...

INDEE GOLD PROJECT - ACCOMODATION/ADMINISTRATION/STORAGE FACILITY
80 Km South west of, Port Hedland, WA 6721 Has Indee Gold Project - Accomodation/Administration/Storage Facility currently at Tenders & Building stage. Construction comprises an accommodation building for 40 persons, ablution block, kitchen/mess facilities, administration building and an equipment storage facility. Click for more details...

NULLAGINE GOLD PROJECT - ACCOMMODATION VILLAGE/ANCILLARY FACILITIES
Accommodation Village/Ancillary Facilities project at 10 km South of, Nullagine, WA 6758 In The Council Area Of East Pilbara of Private. A 120 person accommodation village and ancillary buildings to be constructed. Living units will be both two and four room transportable accommodation units with their own ensuite shower and toilet. Ancillary buildings and facilities to be constructed comprise a dry mess and kitchen including refrigeration and dry storage area, outdoor barbeque area, wet mess inclusive of a small retail facility, laundry facility, recreational room including TV, tea & coffee making facilities, gymnasium, sports court and equipment, resident phone facilities, 5 or 6 person transportable units for short term residents, additional ablutions for recreational areas and short term residential accommodation, LPG facility to provide gas for cooking and hot water systems, truck delivery and turn around area, parking area, transportable site administration office with capacity for approximately 12 offices and first aid facilities, small onsite laboratory to process treatment plant samples, workshop building housing electrical, mechanical and fabrication works, maintenance office and crib room, ablutions to service the site facilities. An onsite diesel power station will be installed by a contractor which will supply the power for the camp. Water will be pumped from bores and stored in water tanks and treated by osmosis processing facility. Sewage from the camp will be pumped into septic tanks into a sewage treatment plant and sewage from the processing plant will be pumped into sceptic tanks and then pumped to leach drains. Click for more details...

HOPE DOWNS IRON ORE PROJECT - PROCESSING PLANT
75 Km Northwest of, Newman, WA 6753 Has Hope Downs Iron Ore Project - Processing Plant currently at Construction stage. A crush and screen process plant. The plant will initially process 22 Mta of dry iron ore with expansion later on to process 30 Mta of dry iron ore. The process plant will comprise a primary crusher in a processing circuit that incorporates screens that will seperate the oversized ore. The primary ore will then be crushed a second time and fed to seperate lump and fine products. These will be stockpiled for train loading by conveyor belts and travelling luffing stackers. Stockpiled products will be reclaimed by a rail mounted bucket wheel reclaimer. It will then be conveyed to a train loading facility for transport by rail to Dampier port. Click for more details...

BODDINGTON GOLD MINE EXPANSION PROJECT - WORKSHOP/WASHDOWN FACILITY
Workshop/Washdown Facility project at Pinjarra - Williams Rd, Boddington, WA 6390 in the Mining - Support Facilities (Industrial buildings). Workshop and wash-down facility. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - NEWMAN HUB
Newman Hub project at Newman Hub, Newman, WA 6753 in the Mining - Support Facilities (Industrial buildings). The RGP4 modifications include the final tie-ins that convert the existing Newman Operations from a production plant producing secondary crushed ore (with a nominal top size of -100mm) to a plant producing shipping quality lump and fines products. The main features of the new tie-in, starting at TS2 are: A new transfer tower, 41SE010, built immediately to the NE of the existing TS2, in line with conveyor M110. This tower is structurally linked to TS2. The tail end of the existing conveyor M110 is removed and replace by a new conveyor. 41CV010, which runs in the opposite direction and discharges ore to a new transfer conveyor, 41CV020, the tail of which is in the new transfer tower 41SE010. Connecting to the existing Newman High Grade (NHG) discharge in TS2 (ore from #2 Plant and Bene Plant product). Construction of a new single rotary cell train car dumping facility, a new crushing and screening plant to include scalping with middlings recirculation to produce sized lump and fines product. Construction of a new blending stockyard 5 x 210kt lump and fines, live and dead including stacking and reclaim machines, to produce a direct-shippable blended lump and fines product. Construction of sampling facilities for reconciliation of production from the various ore sources (NHB and SOB sites) and as-stacked blend control on the stockpiles. Construction of a new drive through train loading (TLO) facility with separate lump and fines sections. Modifications and additional track at the entrance of Newman Hub rail loop and new loco services facility near the existing Hub workshops. Modifications and additional tracks and realingments in the vicinity of the existing OB29 train loading facility for connections to new car dumper and train loading facility. These works include the additional SOBs train by pass line. Deconstruction of PB29 conveyors M301, M309, M311 transfer station TS3, part deconstruction M308 and the removal of the entire OB29 train Load-out facility. The deconstruction works also include removal of sections of existing rail line made redundant by the Newman Hub works. Decommissioning of the existing train load-out stackers No 1 & 2, stacker conveyors M110 and M6 and the existing train loading tunnels (demolition not included in the RGP4 scope). Modifications and additions to the existing water supply and reticulation system. Design Capacity is 31Mtpa. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - CRUSHING & SCREENING PLANT
Crushing & Screening Plant project at Newman Hub, Newman, WA 6753 in the Mining - Support Facilities (Industrial buildings). The screening facility comprises two buildings located in close proximity (one bay apart). The first building consists of five scalping screen bays that are fed by a continuously traveling shuttle head conveyor. Each bay consists of a surge bin that is emptied by a vibrating diverging pan feeder that distributes and feeds a double deck banana scalping screen. The second building consists of seven product screen bays that are fed by a continuously traveling tripper. Each bay consists of a surge bin that is emptied by a vibrating diverging pan feeder that distributes and feeds a double deck banana product screen. The crushing building consists of three crushing bays that are fed by a continuously traveling shuttle head conveyor. Each bay consists of a surge bin that is emptied by a vibrating feeder. Each vibrating feeder feeds a short belt conveyor that, in turn, feeds a cone crusher. The screening building has two dust collection systems. (one for each end of the building) and the crushing building has one dust collection system. Each system comprises reticulated ductwork, reverse pulse air cleaning type bag house c/w- bags, compressor, air receiver and receiving hoppers that are discharged by rotary valves back onto the adjacent mainline conveyors. The key criteria for the Crushing & Screening Sections is 58Mtpa. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - MOUNT WHALEBACK RAIL LOOP MODIFICATIONS
Rail Loop Modifications New project In The East Pilbara Council Area. Rail Loop Modifications. The new Newman Hub layout covers modifications at the yard entry, modifications for the new train load-out, modifications for the new car dumper and installation of facility for loco servicing. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - JIMBLEBAR ORE PROCESSING PLANT
A project in the WA Within East Pilbara. The ore processing plant will include earthworks, civil works, electrical, structural, instrumentation and control, demolition, rail work, communication, stockyard and general services packages. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - YANDI ORE PROCESSING PLANT UPGRADE
Iron Ore Rapid Growth 4 Project - Yandi Ore Processing Plant Upgrade is currently at the Planning stage, valued at about $ 50000000 it is Work comprises upgrading the 42 Mtpa ore processing plant. Click for more details...

ABYDOS IRON ORE PROJECT
Operating Mine - Iron Ore project at 85km West of, Marble Bar, WA 6760 in the Mining - Support Facilities (Industrial buildings). Upgraded resource estimate of 22.2Mt @ 56.7% Fe. Project will consist of two open pits which will be mined using conventional drill and blast, load and haul techniques. Pit dewatering will not be required. Ore processing and transport. Additional infrastructure will include the administration area, haul road, Abydos Link road, access tracks, explosives magazines, water bores and associated reticulation and borrow pits. Re-fuelling and fuel storage areas, workshops, washdown areas and laydown areas will be located within the administration area and the ROM area. All personnel and staff will be housed at the Abydos accommodation village. Click for more details...

WORSLEY ALUMINA EFFICIENCY & GROWTH PROJECT - HEAVY EQUIPMENT WORKSHOP & REFUELING
Mining - Support Facilities (Industrial buildings) project at 15 Km South east of, Collie, WA 6225 for New. For the supply of a heavy equipment workshop and refueling. Click for more details...

PANNAWONICA ACCOMMODATION & FACILITIES UPGRADE
Mining - Support Facilities (Industrial buildings) Renovations, Refurbishments etc. project at at, Pannawonica, WA 6716. This type is House Refurbishment/Office Refurbishment/Service Station/Workshop with Private ownership. Refurbishment of 233 houses. Upgrade & refurbishment of 19 existing commercial & infrastructure buildings. Construction also of a new service station & light vehicle workshop within the town. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT STAGE 1/PHASE A
Civils/Piping Works/Offices/Roads/Accommodation - Stage 1/Phase A New project In The City Of Karratha Council Area. As part of a plan to increase Rio Tinto's overall Pilbara operational capacity to 330million tonnes per annum (Mtpa), a project to increase the Cape Lambert Port iron ore handling, processing & ship loading capacity through construction in 2 stages (phases A 7 B) of new stockyard & port facilities of up to 100Mtpa capacity to the west of the existing 80Mtpa Port A operations. Construction of a 920m long jetty & a 2-berth wharf along with new shiploading facilities. Associated piping works expected to include relocation of the natural gas pipeline feeding the Cape Lambert power station, the Cape Lambert landfill site & a transmission line. Construction facilities expected to inlcude laydown & storage areas adjacent the stockpile area, construction contractor offices, minor roads & accommodation. Click for more details...

ANDERSON POINT PORT FACILITIES - BERTH 3
Mining - Support Facilities (Industrial buildings) New project at Anderson Point, Port Hedland, WA 6721. This type is Port Facilities with Private ownership. The expansion will provide an additional 400m of wharf superstructure, 7 berthing dolphins, navigational aids and associated mechanical components. Click for more details...

PORT HEDLAND BHP BILLITON NON-PROCESS INFRASTRUCTURE (PORT NPI) PHASE 1
Mining - Support Facilities (Industrial buildings) project In The Port Hedland Council Area of Lubrication Facility/Office, Administration & Stores Buildings - Altn & Addns type. A Port Hedland Inner Harbour project to increase throughput by upgrading existing & construction of new support facilities. Construction of a new lube facility including lube storage & dispensing unit & storage area; a workshop with washdown pad, office & workstations along with an amenities block, traffic management, oily water separation system & bulk diesel storage. Upgrade after removal of some portable buildings of the belt store including new storage/laydown area, high bay belt workshop, portable offices & amenities block, a cool, dry storage facility, light vehicle car park & truck loading yard. Expansion of the existing administration building including offices, conference rooms, open plan work areas, amenities, crib room, tool lockers, secure & public car parking & relocation of the barbecue area. Refurbishment & internal refit of existing crib rooms & amenities at the Nelson Point Crushing Offices as well as the Emergency Services Office. Click for more details...

CAPE LAMBERT CCGT POWER STATION
A project in the WA Within City Of Karratha. As part of the Pilbara Power System Upgrade project (PSU 330) supporting an increase iron ore production to 333 million tonnes per annum (Mtpa), replacement of the existing low efficiency 105MW power station. Construction of a 100-120MW power station with 2 x 40-45MW gas turbines & a 20-30MW steam turbine. A 220/132/33kV switchyard with 132kV & 220kV distribution lines. Gas feed to come by a new 1.6km lateral from the PL8 pipeline to a gas receival & conditioning station. Associated workshop/administration complex. Water to come by 2km pipeline from the West Pilbara Water Supply Scheme, water treatment plant & sedimentation & lined evaporation ponds. Back up diesel fuel store. Click for more details...

ROY HILL IRON ORE PROJECT - NON-PROCESSING INFRASTRUCTURE
Mining - Support Facilities (Industrial buildings) project for New development. For the development of heavy and light vehicle workshops, a washdown facility, a boilermaker workshop, tyre change facility, lube farm administration buildings and a gatehouse. Click for more details...

BHP BILLITON MOOKA CAR REPAIR WORKSHOP CIVIL WORKS
Bhp Billiton Mooka Car Repair Workshop Civil Works is currently at the Construction stage, valued at about $ 31000000 it is A contract to include bulk earthworks, rock excavation & culvert construction together with road construction & sub-ballast capping. Click for more details...

MULGA DOWNS IRON ORE PROJECT
Private ownership Mining - Support Facilities (Industrial buildings) project In The Ashburton Council Area for New development. A direct shipping ore (DSO) project based on the 14 million tonnes (Mt) Murray Hill bedded & detrital ore deposit at the Mulga Downs pastoral station. A single, above watertable open pit (2.5km x 1.8km) worked at a rate of 5 million tonnes per annum (Mtpa) for a life-of-mine (LoM) of 5 years. Conventional drill & blast, excavators & loader methods with ore trucked to a run-of-mine (ROM) stockpile prior to crushing & screening (mobile or modular/skid-mounted plant). Product ore to be trucked along the upgraded, 30km long Fenceline Rd to the Great Northern Highway for haulage 60km to join the proposed Roy Hill Infrastructure Railway by either the Coonarie or Two Camel roads. Associated infrastructure to include waste rock dumps, explosives store, generator power supply with associated double-skinned diesel storage tanks (18 x 110kL) & lined refuelling pads, potable water borefield & turkeys nest storage dam, access roads. A mines operation centre of transportable buildings plus contractor's facilities (offices, amenities, ablutions, fuel storage, refuelling area, heavy & light vehicle workshops, washdown area, laydown areas, parking). Permanent on site accommodation for up to 400 workers fly-in fly-out via Newman. Packaged wastewater treatment plant. Click for more details...

BHP BILLITON MOOKA CAR REPAIR WORKSHOP
Bhp Billiton Mooka Car Repair Workshop is currently at the Construction stage, valued at about $ 30000000 it is Contract for the construction of a maintenance workshop & warehouse. To include process equipment installation as well as rail & infrastructure components including roads, track, signalling & communications electrical engineering. Water supply. Click for more details...

ROY HILL IRON ORE PROJECT - NON-PROCESS INFRASTRUCTURE - MINE SITE HV AREA
Currently at the Construction stage In East Pilbara is a project estimated to be $ 100000000. This project Construction of various non-process infrastructure buildings for the Roy Hill Iron Ore Mine, comprising three main works zones being Mine Services Area, a Gatehouse and Go-Line Facility and to include HV area. Click for more details...

ROY HILL IRON ORE PROJECT - NON-PROCESS INFRASTRUCTURE - MINE SERVICES BUILDINGS - SECURITY SERVICES
A project in the WA Within East Pilbara. For the provision of security services. Click for more details...

CHEVRON AUSTRALIA - OPERATIONS - NORTH WEST OPERATIONS SHORE BASE & STAGING FACILITIES
Mining - Support Facilities (Industrial buildings) project In The Ashburton Council Area of Private ownership. For the provision of North West Operations Shore Base Facility & North West Operations Staging Facility. Click for more details...

ROY HILL IRON ORE PROJECT - PKG 3 - PORT LANDSIDE - EPC CONTRACT
Epc Contract project at Boodarie Industrials Estate, Southwest of, Port Hedland, WA 6721 In The Council Area Of Port Hedland of Private. For the provision of EPC services consisting of all SMPE&I for installation of the Train unloading systems, multiple conveyor systems including transfer stations & rescreening buildings, installation of stockyard Stackers & Reclaimers and all other services required. Click for more details...

NOVA NICKEL PROJECT - NON-PROCESS INFRASTRUCTURE
Non-Process Infrastructure project at 30km north of Eyre Hwy 120km E/NE of, Norseman, WA 6443 in the Mining - Support Facilities (Industrial buildings). For the provision of non-process infrastructure. Click for more details...

PILGANGOORA LITHIUM-TANTALUM PROJECT - MINE WORKSHOP & OFFICES
Mining - Support Facilities (Industrial buildings) project for New development. For the provision of a mine workshop & offices. Click for more details...

PILGANGOORA LITHIUM TANTALUM PROJECT - EPC CONTRACT
Mining - Support Facilities (Industrial buildings) project for New development. For the provision of engineering, procurements & construction for the Pilgangoora Lithium-Tantalum Project. Click for more details...

PILGANGOORA LITHIUM PROJECT - PROCESS PLANT SUPPORT FACILITIES
Process Plant Support Facilities project at 120km South of, Port Hedland, WA 6721 in the Mining - Support Facilities (Industrial buildings). For the provision of processing plant support facilities. Click for more details...

PILGANGOORA LITHIUM PROJECT - INFRASTRUCTURE
A project in the WA Within Port Hedland. For the provision of site infrastructure. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect