State

Categories

Sub Categories

Click Here to Find Current Projects

List of Laboratories, Research buildings & Observatories, Tracking stations, Launching facilities Projects


HMAS STIRLING
Currently at the Construction stage In Rockingham is a project estimated to be $ 1500000. This project Construction of guided weapons in-service support facility. Click for more details...

WAITE CAMPUS
Private ownership Industrial (Laboratories, Research buildings & Observatories, Tracking stations, Launching facilities) project In The Mitcham Council Area for New development. Refurbish part of 2 storey old library building to accommodate computer research facility. Work includes: gutting & constructing new partitions, mechanical, electrical, fire & hydraulic works, lift & lift shaft, extending an external wall. Click for more details...

CENTRAL METROPOLITAN COLLEGE OF TAFE - LEEDERVILLE CAMPUS
College - Altns & Renovations 1996 project at Richmond St, Leederville, WA 6007 In The Council Area Of Perth of State. The works comprise renovations and alterations to form new Geoscience Facility together with renovations to existing Geology Laboratory and Preparation Area and such other work as shown on the drawings or included in the specification. Click for more details...

BLUE CIRCLE SOUTHERN CEMENT
Currently at the Planning stage In Greater Geelong is a project estimated to be $ 45000000. This project Stage 2 of Blue Circle Southern Cement Waurn Ponds facility expansion. Production upgrades, reduction of energy costs by the use of alternative fuels. Click for more details...

THE VINEYARD INDUSTRIAL ESTATE
Industrial (Laboratories, Research buildings & Observatories, Tracking stations, Launching facilities) project In The Blacktown Council Area of Private ownership. 120 ha site with access to M4, Wallgrove Rd & Elizabeth Dr. Access to Western Sydney Orbital Rd (when completed). Zoned for: manufacturing; warehousing; high technology; storage; research uses. Click for more details...


Currently at the Construction stage In Banana Shire is a project estimated to be $ 2000000. This project Occupied control & workshop buildings. Plant to produce 180,000 tonnes of ammonium nitrate per year. Click for more details...


Laboratory Complex New project In The Newcastle Council Area. 2 factories to be used for laboratory testing. Concrete slab, tile-up concrete panels, metal roof. Click for more details...

UNIVERSITY OF TECHNOLOGY SYDNEY
State ownership Industrial (Laboratories, Research buildings & Observatories, Tracking stations, Launching facilities) project In The Sydney Council Area for Renovations, Refurbishments etc. development. Refurbish Science Labs to Forensic - Research Facilities - Building 4 Click for more details...

NATIONAL CENTRE FOR PETROLEUM & MINERAL RESOURCES RESEARCH
Subcontract For Mechanical Services - Research Centre - Reloc - Single & 3 Sty project at Bentley Technology Park crown reserves 24727 & 26916 Kent St cnr proposed "Perry Dve", Bentley, WA 6102 in the Industrial (Laboratories, Research buildings & Observatories, Tracking stations, Launching facilities). Mechanical services for research centre. Click for more details...

BIRRALEE ROAD AMENITIES/LABORATORY
Industrial (Laboratories, Research buildings & Observatories, Tracking stations, Launching facilities) project In The Westbury Council Area of Amenities Building/Laboratory type. Briock Veneer, steel frame, metal roof. Click for more details...

BRISTOL-MYERS SQUIBB AUSTRALIA
Industrial (Laboratories, Research buildings & Observatories, Tracking stations, Launching facilities) project In The Greater Dandenong Council Area of Laboratory type. Proposed construction of an industrial building for laboratory. Click for more details...

SANDY CREEK ROAD LABORATORY
Laboratory project at 760 Sandy Creek Rd, Lara, VIC 3212 in the Industrial (Laboratories, Research buildings & Observatories, Tracking stations, Launching facilities). Proposed construction of an emissions testing laboratory. Click for more details...

CENTRAL COAST GRAMMAR SCHOOL
School - Altns & Addns - 2 Storey project at 1 (Lot 121) Arundel Rd (DP1046908), Erina, NSW 2250 in the Industrial (Laboratories, Research buildings & Observatories, Tracking stations, Launching facilities). Additions and refurbishments to Blocks A, B, and E including computer lab. Click for more details...

CSR TECHNICAL SERVICES BUILDING
Industrial (Laboratories, Research buildings & Observatories, Tracking stations, Launching facilities) project In The Fairfield Council Area of Private ownership. Construction of a new technical services building for use as offices & laboratories. Brick walls & tiled roof. Click for more details...

MACQUARIE HOSPITAL
A project in the NSW Within Ryde. Alterations & additions to toxicology laboratory Click for more details...

AGRI QUALITY MANUFACTURING LABORATORY STAGE 3
Research & Development Centre - Addns & Altns project at 3-5 Lillee st, Tullamarine, VIC 3043 In The Council Area Of Hume of Private. Alterations & additions to existing building for use as a research & development centre. Click for more details...

PHARMAXIS
Industrial (Laboratories, Research buildings & Observatories, Tracking stations, Launching facilities) project for New development. Construction of a pharmaceutical facility for Pharmaxis. The facility comprises 4022sq m of warehouse & 3250sq m of office & production laboratory space. Associated carparking for 136 cars Click for more details...

BROKEN HILL HIGH SCHOOL
Industrial (Laboratories, Research buildings & Observatories, Tracking stations, Launching facilities) project In The Broken Hill Council Area of State ownership. Upgrade to the science laboratory Click for more details...

JUSTINIAN HOUSE REDEVELOPMENT - SYDNEY MELANOMA UNIT
Industrial (Laboratories, Research buildings & Observatories, Tracking stations, Launching facilities) project for New development. Construction of a new medical research facility, comprising 3533sq m of medical research, consultation, education and ancillary office facilities. The redevelopment of Justinian House will enable the establishment of the world's largest melanoma research & treatment centre, adjacent to the Mater Hospital, the proponent will be St Vincents & Mater health Sydney. It will be operated by the Sydney Melanoma unit. The proposed facility is not intended to provide in-patient services. The new facility will attract world class researchers, whilst providing treatment & therapy for public & private patients. The development will comprise reception area & lobby; patient interaction & treatment facilities including day procedures unit, infusion suite & consulting rooms; research facilities including workspaces for scientists, biospecimen bank & wet laboratories; conference & education facilities including meeting rooms, library & a 100 seat auditorium for visiting practitioners; pharmaceutical, dispensing, administrative & fundraising facilities, including board room & staff amenities; & offices for the Mercy Foundation The medical research facility is proposed to be accommodated in a new purpose built 2/3 storey building. Level 1 will comprise conference & education centre, academic research offices, database & server room, wet laboratories, Mercy Foundation offices. Level 2 will contain main reception, 6 consultation suites, patient lounge, executive offices & clinician lounge, &clinical trials research offices & consultation suite. Level 3 will contain the Sydney Melanoma Unit administration, NSW Melanoma Network offices & specialist dermatology suite. The new facility is being designed to achieve a Green Star rating of at least 4 stars under the Green Building Council of Australia?s rating system to achieve a building with an efficient use of energy, water and materials, as well as a high level of internal amenity for occupants. Construction materials will be pre-cast concrete panels & metal deck roofing. facade treatment will be masonry brickwork, & stone & copper cladding, frameless & aluminium framed glazing. 2 levels of basement carparking accommodating 118 cars, 12 motorcycles and 10 bicycles. The perimeter and internal courtyards of the site will be landscaped. Click for more details...

CSIRO BIOSCIENCE LABORATORY FOR THE ENTOMOLOGY DIVISION
Industrial (Laboratories, Research buildings & Observatories, Tracking stations, Launching facilities) project at Clunies Ross St (Black Mountain Campus), Acton, ACT 2601 for New. Trade package for building joinery to building 179 Click for more details...

PATHWEST LABORATORY MEDICINE WA
Industrial (Laboratories, Research buildings & Observatories, Tracking stations, Launching facilities) project at QEII Medical Centre, Hospital Av, Nedlands, WA 6009 for New. Complete electrical consultancy including security, communications, vertical transportation & fire detection engineering subconsultancy services. Click for more details...

BUREAU OF METEROLOGY - RADAR FACILITY
Perth Airport, Between runways, Perth Airport, WA 6105 Has Bureau Of Meterology - Radar Facility currently at Construction stage. To include for civil works & site services associated with the upgrade of the radar facility at Perth Airport. Click for more details...

NEUROSCIENCE RESEARCH PRECINCT - PRINCE OF WALES MEDICAL RESEARCH INSTITUTE
Industrial (Laboratories, Research buildings & Observatories, Tracking stations, Launching facilities) project In The Randwick Council Area of J/V - Private & Govt ownership. Stage 2 will comprise construction of a 6 storey building of 25,420sq m containing research & office space, including laboratories to support the POWMRI research and development, staff cafeteria, auditorium, MRI & associated clinical areas. The proposal has been developed with an expressive glazed veil form which dramatically sweeps around the corner site, constructed as a conventional curtain wall, it is shaped as a serrated form which curves in response to the rise and fall in site levels and the corner site. Outdoor courtyard. Porte cochere. Level 1 will contain pedestrian foyer entry, reception areas to POWMRI & MRI facilities, MRI clinical rooms, staff cafeteria, ambulance station, loading dock area, workshops & associated storage areas, auditorium. Level 2 will comprise animal house, staff eatery, seminar room, laboratories, offices. Level 3 will comprise board room with terrace overlooking courtyard, offices, laboratories. Levels 4-6 will contain office & laboratories. Level 7 will contain plant areas. 4 lifts. The base building design will target an energy performance rating equivalent to 5 star NABERS rating Education model). Construction elements comprise precast coloured concrete panels, high-performance glazing, & extensive metal sun shading. Basement carparking over 2 levels for 176 vehicles & at grade carparking for 50 vehicles. Landscaping. Click for more details...

SOUTH AUSTRALIAN HEALTH & MEDICAL RESEARCH INSTITUTE CONSULTANCY OVERALL PROJECT, ID 1155978
Industrial (Laboratories, Research buildings & Observatories, Tracking stations, Launching facilities) project at North Tce, Adelaide, SA 5000 for New. Construction of new Flagship Research Facility to be a key element of South Australia's new Health & Medical Research Institute (SAHMRI). The facility will be fully integrated with the new Royal Adelaide Hospital to be built in Adelaide's west-end (North Tce). The Research Facility (25,000 sqm) will house 675 researchers with fully flexible lab space (100 percent wet convertible); PC2 laboratory standard; 9 research modules - consisting of 1/3 dry & 2/3 wet laboratory space; space for cyclotron & animal house facilities. Click for more details...

UTAS BISDEE TIER OBSERVATORY
Industrial (Laboratories, Research buildings & Observatories, Tracking stations, Launching facilities) New project at Off Midland Highway, Oatlands, TAS 7120. This type is Observatory with State ownership. Construction of an optical observatory and administration building, concrete structure and timber frame. Click for more details...

UNIVERSITY OF NSW - METALLURGY PROCESS BUILDING D7
Industrial (Laboratories, Research buildings & Observatories, Tracking stations, Launching facilities) Addition project at 330 (Lot 3) Anzac Pde (DP1104617), Kensington, NSW 2033. This type is Laboratory with Private ownership. Refurbishment and mezzanine floor infill to north section of the existing upper level of the metallurgy process building to accomadate the new ARC splintering laboratory. The existing furnace laboratory located at ground level below the proposed mezzanine infill will be consolidated and relocated to the new mezzinine floor infill. Ground; install new columns to support new floor, relocate existing furnace laboratory to new floor above. Mezzanine; demolish existing light weight mezzanine floor. Construct new concrete floor with steel supports to increase floor loading and floor area. Click for more details...

CSIRO FLOREAT SOUTH LABORATORY UPGRADE
Industrial (Laboratories, Research buildings & Observatories, Tracking stations, Launching facilities) project at Level 2, CSIRO Building 40, Underwood Av, Floreat, WA 6014 for Renovations, Refurbishments etc.. Works to comprise of an upgrade of CSIRO Floreat Building 40, Level 2, South Laboratory. The scope of works covers the reconfiguration & refurbishment of existing laboratories located on the south wing upper floor of Building 40 within the CSIRO Floreat campus. Works include demolition & reconstruction of metal stud & plasterboard lined partitioning, replacement of some of the existing vinyl floor covering with more extensive treatments, removal of some existing laboratory joinery & re-use or replacement with new laboratory benchwork, modification to & upgrading of existing mechanical electrical & hydraulic systems to suit the new layout including upgrade of most electrical light fittings, renovation to existing grid & plasterboard tiled ceilings as required & re-decoration of the areas. Click for more details...

AQUACULTURE & VEGETABLE RESEARCH FACILITY
Industrial (Laboratories, Research buildings & Observatories, Tracking stations, Launching facilities) project In The Camden Council Area of Educational Research Facility - 2 Storey type. Construction of an industry based aquaculture & vegetable research facility. Construction of a greenhouse for aquaculture & intensive agriculture. Improvement of an existing access driveway. Associated siteworks & carparking for 15 cars. The proposed aquaculture activity will initially be the breeding of Barramundi. The lower ground floor of approximately 1465sq m will contain aquaculture tanks, plant room, packing & storage rooms & office. Ground floor of approximately 13,025sq m is for intensive horticulture. Mezzanine level of approximately 217sq m contains seed growing areas & storage. External facades & roofing of the proposed development will generally be comprised of greenhouse glass Click for more details...

WEROMBI RD RESEARCH BUILDING
Industrial (Laboratories, Research buildings & Observatories, Tracking stations, Launching facilities) project for New development. Construction of a single storey research building to house controlled environment rooms and frost simulator. Click for more details...

BYFORD SENIOR HIGH SCHOOL - STAGE 1A
Lot 282 Mead St & Lot 52 Abernethy Rd, Byford, WA 6201 Has Byford Senior High School - Stage 1a currently at Construction stage. Stage 1A - Construction of Byford Senior High School to accommodate approximately 375 year 8 students comprising of: admin block, student service area, library, general classrooms, science area & 2 chemistry labs plus 7 multipurpose labs, technology & enterprise workshops, music, art, drama & media classes, food & textile studios, changerooms, sports courts & store, gardeners workshop & cafeteria. Click for more details...

PERTH MODERN SCHOOL SCIENCE LABORATORY
Science Laboratory - Refurbishment Renovations, Refurbishments etc. project In The Subiaco Council Area. To include refurbishment of 6 existing science laboratories, chemical store room & lockable store room. Click for more details...

CENTRAL COAST GRAMMAR SCHOOL - BLOCK L
Central Coast Grammar School - Block L is currently at the Construction stage, valued at about $ 650000 it is Refurbishment of Block L. Internal refurbishment of 5 existing science laboratories & associated support spaces within the building. Minor External works being provision of an infill roof to a section of uncovered verandah & enclosure of a small external entry lobby Click for more details...

THE KINGS SCHOOL SCIENCE LEARNING CENTRE
Industrial (Laboratories, Research buildings & Observatories, Tracking stations, Launching facilities) project In The The Hills Shire Council Area of Private ownership. Demolition of existing agricultural building. Relocation of 2 demountable classrooms. Relocation of existing shade house & greenhouse .Construction of a 2/3 storey science learning centre to be used for the teaching of science to senior school students, to be known as the new Science Learning Centre and will form the centrepiece of a new science precinct. The building contains 18 student science laboratories plus associated laboratory support areas ? hydroponics room, technical preparation room & storage areas, 2 research laboratories and staff work areas & amenities. The building can accommodate up to a total of 500 existing students in the student labs, 36 students in the research labs, & 26 staff members. The building is over 3 levels, however, as the lower ground level is partially excavated, the building only presents as a 2 storey building to its main 2 elevations. The building form consists of 2 parallel wings flanking either side of a generous circular full height atrium. Minor upgrade to access road. The roof profile consists of 2 pitched metal deck roofs located above each parallel wing, with a flat metal deck roof located between, & is connected back to the main academic quadrangle via a single story colonnade, a tapered entry stair also connects the building to the parade ground. Face brick walls with some metal & sandstone feature cladding, metal structural frame, cement render glazed openings, powdercoated aluminium framed single & double glazing & safety glass, fixed louvre grille, painted steel upright balustrdes, sandstone paving, colorbond roof. Landscaping. Click for more details...

GORE HILL TECHNOLOGY PARK - BUILDING C
Industrial (Laboratories, Research buildings & Observatories, Tracking stations, Launching facilities) project for New development. Construction of Building C in part of the Gore Hill Technology Park, a stand alone 14,000sq m A Grade building with large efficient floor plates. Designed to achieve 5 Star NABERS and 5 Star Green Star. Floorplates 1,000sq m?7,000sq m. Floor to ceiling glass. Building C is a 5 storey high technology facility. Building designed for 4 levels of research & development office space, a motor showroom on the ground floor & workshop facilities & parking in the basement levels. There is porte cochere access off the spine road to the main lobby. Click for more details...

WESTERN AUSTRALIAN COLLEGE OF AGRICULTURE - CUNDERDIN - SCIENCE LAB
Industrial (Laboratories, Research buildings & Observatories, Tracking stations, Launching facilities) project at 267 Baxter Rd, Cunderdin, WA 6407 of Fume Cupboard - Supply, Install, Commission & Service type of New development. Works to include the supply, installation, commissioning & servicing of a new Fume Cupboard in the Science lab located at the College of Agriculture. Click for more details...

AUSTRALIAN TECHNOLOGY PARK - BIOMEDICAL BUILDING
Industrial (Laboratories, Research buildings & Observatories, Tracking stations, Launching facilities) project In The Sydney Council Area of State ownership. Internal fitout of level 2 within the Biomedical building for teaching, research and educational purposes. New administrative offices, tutorial rooms, laboratory space and the installation of a new flue on the roof of the building. Click for more details...

MAIN ROADS WA - PILBARA LABORATORY
Industrial (Laboratories, Research buildings & Observatories, Tracking stations, Launching facilities) project for New development. Works to include the construction of a new laboratory to replace the existing facility. Click for more details...

JAMES COOK UNIVERSITY TOWNSVILLE CAMPUS RESEARCH FACILITES (AITHM & TRF)
Research Facilities - 2 & 3 Storey New project In The Townsville City Council Area. Construction of 3 storey Australian Institute of Tropical Health & Medicine (AITHM) facility & separate 2 storey Translational Research Facility (TRF) with connecting common court yard & partial roof area. Assocaited landscaping. Click for more details...

SIENNA COLLEGE
Industrial (Laboratories, Research buildings & Observatories, Tracking stations, Launching facilities) project at 60 Sippy Downs Dr, Sippy Downs, QLD 4556 for New. Construction of Hospitality Centre, Classroom Block, Science Laboratory, Drama Block & Adminstration Building. To include extension to the Manual Arts Block. Associated works & services. Click for more details...

SAINT NARSAI ASSYRIAN CHRISTIAN COLLEGE
New project of Industrial (Laboratories, Research buildings & Observatories, Tracking stations, Launching facilities) project at 217-233 (Lot 210) Horsley Rd (DP13905), Horsley Park, NSW 2175. Construction of classroom buildings 1 & 2 storey, containing 4 general learning areas, library, 6 specialty classrooms (2 x visual arts) communal staff room, kitchen & staff study room, 1 music & 1 drama rooms, 15 learning units, 2 x male & female bathrooms, 1 science lab, open classroom/temporary hall, 3 x specialty classrooms. New front & side boundary fences, centre court yard, maintenance storeroom. Click for more details...

PORT AUGUSTA STERILE INSECT PRODUCTION FACILITY REDEVELOPMENT
Industrial (Laboratories, Research buildings & Observatories, Tracking stations, Launching facilities) project for New development. Construction of a laboratory type facility for production of sterile male flies and associated carpark at Pt Augusta. The first production facility in Australia. Click for more details...

CHILVERS RD HIGH TECHNOLOGY INDUSTRY
Industrial (Laboratories, Research buildings & Observatories, Tracking stations, Launching facilities) project In The Hornsby Council Area of Private ownership. Change of use from warehouse to High Technology Industry to be used for importing, calibrating, repairing, maintaining & installing GPS device for road transport & related activities. Alterations & additions to provide for additional mezzanine floor space & to facilitate disabled access to the building. Scope of work comprises: Street/basement level - marking & lining for a disabled access pathway on the ramp down to basement; new entry door for pedestrian access with intercom to reception; new automatic sliding door to main carpark entry; rearrangement of carparking to provide for a disable access lift. Ground floor - demolition of some existing internal partitions; new reception, amenities, boardroom, breakout, laboratory & testing areas beneath the new mezzanine; upgrade of existing amenities beneath existing mezzanine; enlargement of existing loading area; disabled lift access. Mezzanine - construction of a new mezzanine level in the north-western corner of the building containing technician workbenches, meeting rooms & offices; upgrade of existing mezzanine for ancillary/office storage & disabled lift access; replacement of several existing spandrels in the front western elevation with glazed windows. Click for more details...

GORDON ST MEDICAL CENTRE
Currently at the Construction stage In Coffs Harbour is a project estimated to be $ 650000. This project Demolition of existing weatherboard cottage. Construction of a new medical centre, consisting of 4 consulting room, laboratory, 2 office areas, waiting room, 4 toilets, kitchenette & reception. Underdeck rainwater tanks to be connected to all toilets, laundering facility & garden irrigation systems. Carparking & Landscaping. Click for more details...

DOWNLANDS COLLEGE YEAR 7 REFURBISHMENT
Industrial (Laboratories, Research buildings & Observatories, Tracking stations, Launching facilities) project In The Toowoomba Regional Council Area of Private ownership. Refurbishment to single storey science block, including classrooms & laboratories. Click for more details...

COVENANT CHRISTIAN SCHOOL - BLOCKS E & F
Covenant Christian School - Blocks E & F is currently at the Construction stage, valued at about $ 2500000 it is Alterations & additions to TAS & Science departments in Blocks E & F Click for more details...

VICTORIA RIVER RESEARCH STATION REFURBISHMENT
Victoria River Research Station Refurbishment is currently at the Construction stage, valued at about $ 235000 it is Refurbishment works to the Northern Territory's Department of Primary Industry & Fishery Victoria River Research Station, 257km West of Katherine. Full internal refurbishment of the research station to include electrical works, door frames, doors & locks. Works to include supply & installation of 150m x 90m x 10m steel angles to the underside of beams & bolt through the beam at 500mm. Construction of new ceiling, wall sheeting & insulation. Supply & installation of joinery, plumbing fixtures & floor coverings. Click for more details...

UNIVERSITY OF QUEENSLAND ST LUCIA CAMPUS GP SOUTH BUILDING LABORATORY REFURBISHMENT
Industrial (Laboratories, Research buildings & Observatories, Tracking stations, Launching facilities) project at Sir Fred Schonell Dr, St Lucia, QLD 4067 for Renovations, Refurbishments etc.. Refurbishment of computer laboratory on level 1 of General Purpose (GP) South building (Building 78). Click for more details...

IDEXX HEADQUARTERS
Private ownership Industrial (Laboratories, Research buildings & Observatories, Tracking stations, Launching facilities) project In The Parramatta Council Area for Addition development. Use of unit 6 & 10 as a laboratory, office & warehouse. Internal fit-out of the building including glass partitions Click for more details...

PERTH MINT ASSAY REFINERY
Industrial (Laboratories, Research buildings & Observatories, Tracking stations, Launching facilities) project at 131 Horrie Miller Dr, Perth Airport, WA 6105 for New. Works to include the expansion of the Perth Mint Assay Lab with the construction of a new building to include new laboratories, offices, amenties. Click for more details...

KELVIN GROVE STATE COLLEGE
Currently at the Construction stage In Brisbane City is a project estimated to be $ 1200000. This project Construction of a new suspended concrete covered walkway & new lift shaft. Refurbishment of the Home Economics & Science labs Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect