State
Categories
Sub Categories
-
Schools - primary, secondary (up to Yr 12)
-
Kindergartens, day nurseries, child care centres
-
Tertiary - colleges, institutes, universities
-
Surgeries, Medical centres
-
Veterinary Clinics
-
Rehabilitation Centres, Youth Care Accommodation
-
Hospitals & associated buildings, mortuaries
-
Shops, shopping centres & arcades, supermarkets
-
Theatres, Cinemas
-
Drive-in cinemas, ampitheatres
-
Parks, Leisure grounds, Playgrounds
-
Amusement parks, Zoos
-
Showrooms, Retail warehouses, Retail markets, Bulky goods
-
Religious Buildings, civil chapels
-
Crematoria, funeral parlours
-
Library, Archives, Galleries, Museums, Interpretive centres, Tourist info
-
Community centres, Clubs (unlicensed), Youth centres, Day respite
-
Amenities, Dressing rooms
-
Car parks (multi-storey)
-
Athletic Tracks
-
Golf courses, driving ranges
-
Sports ground hard surface (tennis courts,netball courts, basketball & skateparks)
-
Sports grounds soft surface (bowling greens, cricket pitches, rugby & soccer fields)
-
Indoor sports & leisure centres, bowling alleys, squash courts, gymnasiums
-
Swimming baths & assoc. facilities, Saunas, Spas, Solaria
-
Pavilions, Grandstands, Stadiums/halls
-
Ice Rinks
-
Ski Lifts
-
Race track (motor)
-
Race track (other)
-
Units, apartments, flats, townhouses, villas
-
Student & group accommodation
-
Aged care facilities
-
Retirement villages
-
Aged units, seniors units
-
Nursing homes
-
Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways
-
Bridges, Aqueducts, Viaducts
-
Tunnels, Subways
-
Pipelines
-
Marinas
-
Dams
-
Docks & piers, wharves, boat ramps
-
Retaining walls, Seawalls
-
Industrial Subdivision
-
Residential Subdivision
-
Rural Subdivision
-
Commercial Subdivision
-
Master plan communities/mini city
-
Yards, Sidings, Loading docks, Railways, Container terminals.
-
Lighting, signal towers, transmitting towers, lines, beacons
-
Landscaping, Fencing, Entry statements, Monuments, Fountains
-
Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks
-
Military housing & accommodation, Military colleges
-
Military installations & facilities
-
Open Cut
-
Underground - including longwall
-
Onshore - oil & gas
-
Offshore - oil & gas
-
Offshore - other
-
Sand mining - suction dredging
-
Exploration - Drilling
-
Exploration - airborne surveys etc.
-
Sample analysis, Laboratory testing
-
Offices
-
Medical facilities
-
Retail facilities
-
Administration facilities
-
Canteens, Messes, Crib room
-
Bath houses, Amenities, Dressing rooms
-
Sporting facilities, Gymnasiums, etc.
-
Industrial buildings
-
Accommodation - units, housing, group accom.
-
Supply/fabrication
-
Catering, Cleaning, Laundering
-
Freight - Air, Sea, Land
-
Airservices for personnel
-
Other mining services
-
Supply of consumables e.g.chemicals, fuels, etc.
-
Banks
-
Mining equipment maintenance
-
Post Offices
-
Motor Registries
-
Radio & TV Stations, Studios
-
Processing & materials handling equipment maintenance incl. shutdowns
-
Oil & gas facilities maintenance
-
Civil Maintenance, eg.grading etc.
-
Maintenance of off-site building & housing
-
Computer centres
-
Coal Processing
-
Minerals Processing
-
Other processing including salt, sand etc
-
Crushing, Screening, Quarrying
-
Civil works at processing facilities
-
Tankage, Silos
-
Piping
-
Insulation
-
Computerised systems for processing equipment
-
Commercial complexes - shops, offices
-
Topside - modules, platforms
-
Sub-sea equipments, floating production facilities
-
Pipelines & associated contracts
-
Onshore processing facilities
-
Waste water/sewerage treatment, sew./waste pipes
-
Water distribution & pipelines, borefields
-
Power stations, Power generation
-
Pump stations, Above ground reservoirs
-
Transmission lines/towers, switching yards, transformers, substations, cabling
-
Rail loops, Track work, Signalling, Rolling stock, Switching yards
-
Roads, Airstrips, Culverts, Retaining walls
-
Bunding
-
Slurry pipelines
-
Tailings, Dams, Water supply dams
-
Conveyors, Stackers, Reclaimers, Materials handling
-
Drifts, ventilator shafts, portals, shotcreting, declines
-
Concrete Batching Plants
-
Wharfs, Piers, Port facilities, Piling, Dredging
-
Computer & telecommunication system for mine, scada
-
Open cut mining, Overburden, Draglines
-
Underground mining & crushing
-
Drill & Blast
-
Haulage Of Ore
-
Stockpile Management
-
Earthworks/general civil
-
Rehabilitation, Environmental mgmt, Decontamination
-
Landscaping, revegetation
-
Dredging, Pile driving, Sand mining, Section dredging
-
Mechanical installation
-
Electrical installation
-
Painting
-
Structural
-
Air-conditioning installation
-
Piping & Hydraulic
-
Dismantling, Demolition
-
Hotels, Serviced Apartments
-
Motels, Bed & Breakfast, Cabins
-
Backpacker Accommodation
-
Restaurants, Canteens
-
Take-away Outlets
-
Conference & reception centres & facilities
-
Clubs (licensed), licensed premises, casinos, taverns
-
Tourist villages, Resort complexes
-
Caravan parks with assoc facilities, Camping grounds
-
Fed, State, Local Gov't offices, Embassies, Job Centres, Civic Centres, Townhalls
-
Police Stations
-
Law Courts
-
Prisons
-
Fire Stations, SES
-
Ambulance Stations
-
Passenger terminals (aiport, bus, rail & sea), Air control towers
-
Treatment plants, Sewerage reticulation
-
Water distribution systems, Drainage
-
Power stations, Substations, Windfarms, Phone exchanges
-
Pumping Stations
-
Reservoirs
-
Light Industry (Laundries, printing works, textiles, clothing)
-
Cold Storage
-
Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)
-
Oil refineries, Chemical Plants
-
Ship building facilities, marine industries
-
Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer
-
Factories & Factory Units
-
Plant & Animal Husbandry (agri/horticultural buildings, sawmills, nurseries, greenhouses, stables, kennels)
-
Warehouses, cargo sheds, distribution centres
-
Depot, Garages, Workshops, Carwashes, Hangars
-
Laboratories, Research buildings & Observatories, Tracking stations, Launching facilities
-
High technology parks
-
Service stations
-
Abattoirs, Breweries, Dairies, Canneries, Bakeries, Wineries
-
Silos, Grain elevators
|
|
List of Labs, Testing facilities, Hazardous materials, Storage Projects
FIMISTON GOLD OPERATIONS
Concentrator Plant - Upgrade & Laboratory project at Golden Mile via, Kalgoorlie, WA 6430 In The Council Area Of Kalgoorlie-Boulder of Private. Overall upgrade aimed at centralising process facilities & streamlining Super Pit operations. Concentrate plant to undergo an upgrade & a new metallurgical laboratory will be required.
Click for more details...
AUSTAR COAL OPERATIONS EXPANSION
Mining - Support Facilities (Labs, Testing facilities, Hazardous materials, Storage) project In The Cessnock Council Area of Operating Mine - Extn - Stage 3 type. For longwall extraction from panels A1 & A2 using a new method of longwall mining known as longwall top caving. For the construction and operation of some additional surface infrastructure including a larger capacity ventilation fan, downcast shaft, substation, nitrogen injection plant, tube bundle shed, and diesel storage and dispatch system, and for the upgrading of some existing surface infrastructure including the water treatment plant, and the water reticulation and pumping system.
Click for more details...
CENTURY ZINC MINE
Buildings project at North west of, Mount Isa, QLD 4825 In The Council Area Of Mt Isa City of Private. Change-house, workshop, laboratory & administration. 36 week contract period.
Click for more details...
RAVENSTHORPE NICKEL PROJECT - BANDALUP HILL - INFRASTRUCTURE
Infrastructure project at 50km north of, Hopetoun, WA 6348 in the Mining - Support Facilities (Labs, Testing facilities, Hazardous materials, Storage). A combination of multi user regional infrastructure and project infrastructure. The multi user infrastructure includes upgrade of local roads, new shire airstrip, emergency services, sewered land, housing, power and water. Project infrastructure includes site buildings, communication, plant roads, construction camp and port facilities at Esperance.
Click for more details...
COORANBONG COLLIERY - LIFE EXTENSION PROJECT
New project of Mining - Support Facilities (Labs, Testing facilities, Hazardous materials, Storage) project at South west of, Morisset, NSW 2264. Infrastructure to include administration buildings, concrete works, surface workshop, paving, dams, compressor buildings.
Click for more details...
UNIVERSITY OF SYDNEY FLAMMABLE GOODS STORE
Mining - Support Facilities (Labs, Testing facilities, Hazardous materials, Storage) project at 1 City Road, Camperdown, NSW 2050 of Flammable Goods Store type of New development. Proposal for the construction of a new building for the storage of dangerous & flammable goods (6000 litre) for the Faculty of Medicine. Proposed building approximately 52 sq m in area & will be of brick & blockwork construction with a metal deck roof & mechanical ventilation.
Click for more details...
BOOTU CREEK MANGANESE PROJECT - INFRASTRUCTURE
Infrastructure project at 130 km north of, Tennant Creek, NT 0860 in the Mining - Support Facilities (Labs, Testing facilities, Hazardous materials, Storage). 75 person accommodation village, office, stores, laboratory, heavy vehicle workshop, diesel fuelled power generating plant.
Click for more details...
ANTHILL COPPER PROJECT
via McNamara's Hwy 100km northwest of, Mount Isa, QLD 4825 Has Anthill Copper Project currently at Construction stage. A project based on a resource estimate (inferred, indicated) of 2.4 million tonnes (Mt) containing 27,000t of copper. Conventional drill & blast open cut operations to develop a pit 500 x 800m & 120m deep. After removal by hydraulic excavators, ore to be trucked to an interim run-of-mine (ROM) stockpile prior to haulage along McNamara Road to the existing processing plant at Mt Kelly. A mine infrastructure area (office building, first aid room, crib room, ablutions). Also heavy vehicle workshop with down pad & oil water separator, storage (explosives, fuel, scrap steel, stores, waste hydrocarbon). Diversion of Johnson Creek. Dewatering bores. Bunded waste rock dumps up to 40-50m high. Sediment dams. Haulage & access roads. Sewerage treatment plant.
Click for more details...
PATRICIA-BALEEN GAS PLANT UPGRADE
Mining - Support Facilities (Labs, Testing facilities, Hazardous materials, Storage) project for New development. For the upgrade to the existing Patricia-Baleen Gas Plant. The works include: installation of a condensate separation and stabilisation system, installation of condensate storage tanks and truck load-out facility, installation of hydrocarbon dew point control facilities for the gas, reconfiguration of the existing compressors to increase compression capacity, upgrade to the sales gas dehydration system to accommodate higher gas rates and minimise glycol carryover, installation of monoethylene glycol (MEG) storage and injection facilities to prevent hydrate formation in the offshore pipeline and selected plant process locations, and associated MEG regeneration facilities. Installation of a corrosion inhibitor injection system for the offshore pipeline, installation of a hot oil heater and hot oil circulation system to provide process heat to the processing facilities, installation of a n"off-gas" compressor to recycle gas vented from the condensate stabilisation system to eliminate operations flaring. Installation of new flare systems and removal of existing flare system, modifications to the drainage system, including a new API Separator and extension of the storm water system. Installation of a water vaporiser to dispose of excess produced water that cannot be reused or naturally evaporates. Modifications to various plant utilities, namely, the fuel gas system, odourisation system, compressed air system and plant process control system. Upgrade of the fire and gas protection facilities including installation of fixed firewater pumps and foam systems. Exte4nsion of office facilities and installation of a laboratory, and the construction of a new workshop/warehouse facility.
Click for more details...
TOM PRICE AERODROME
Mining - Support Facilities (Labs, Testing facilities, Hazardous materials, Storage) project at Approximately 18km North of, Tom Price, WA 6751 of Aerodrome type of New development. It is proposed to construct an aerodrome capable of accommodating jet aircraft (e.g. Boeing 737, Airbus A320) and includes the following facilities: runway (approximately 3km in length); regular public transport apron; general aviation apron; terminal; car parking area; site for commercial/business use and a fuel compound.
Click for more details...
PORT BONYTHON FUEL STORAGE & DISTRIBUTION FACILITY STAGE 2
Currently at the Construction stage In Whyalla is a project estimated to be $ 110000000. This project For the construction and operation of a fuel storage and distribution facility at Port Bonython in South Australia's Upper Spencer Gulf Region. To include construction of fuel unloading facilities at Port Bonython Jetty. Construction of 5.3 km long fuel pipeline from jetty head to land owned by Port Bonython Fuels. Construction of tanks with a diesel storage capacity in excess of 100 million litres. Construction of truck loadout & associated facilities.
Click for more details...
PL 16 SILVER SPRINGS UNDERGROUND GAS STORAGE PROJECT
Mining - Support Facilities (Labs, Testing facilities, Hazardous materials, Storage) project In The Maranoa Regional Council Area of Private ownership. Reuse of the existing Silver Springs Processing Plant & now depleted, 1.5km deep Silver Springs/Renlim Field underground reservoir for temporary storage of up to 44billion standard cubic feet (Bscf) of gas as part of Queensland Gas Company's Queensland Curtis Liquified Natural Gas (QCLNG) project. Extension at the plant site of the the existing Berwyndale to Wallumbilla & Silver Springs pipelines (PPLs 123 & 4) for gas injection & later withdrawl using 4 refurbished wells & a new well along with an additional 5 monitoring wells. Initial gas injection planned from 2011-2013 & withdrawl expected 2014-2017.
Click for more details...
INTEGRA COAL OPERATIONS - OPEN CUT EXTENSION PROJECT
Currently at the Construction stage In Singleton is a project estimated to be $ 10000000. This project Extension further south of the existing South Pit (247ha). Trucks & shovel/excavators to access 30million tonnes (Mt) of Run-of-Mine (RoM) coal at a rate of 2.3-4.2Mtpa to give a Life-of-Mine (LoM) of 9 years. Associated infrastructure to include relocation of power lines & telecommunications in the proposed open cut area. Construction of temporary haul roads & surface water management structures. Installation of tansportable site office, crib room & bathhouse. Installation of a transportable, above ground equipment refuelling station.
Click for more details...
PEL 91 COOPER BASIN JOINT VENTURE OIL PROJECT - BAUER FIELD
A project in the SA Within Unincorporated. A project thought to have recoverable reserves of 3.5 million barrels (MMbbl) making it one of the largest discoveries on the Western Flank Oil Fairway. The Bauer-1 well which encountered an oil column followed up with 3 appraisal well including the Bauer-3 well which was cased & suspended as a future production well. Initial surface production facilities expected to include gathering pipelines, dewatering & evaporation facilities, oil storage & crude load-out facilities. Lift pumping units to be installed subsequently as required to increase production. Initial production of 800 bbls per day expected to increase to 5000bbls a day. Initial oil transport by truck to the Moomba Crude Oil terminal until an export pipeline from the Bauer Facility to Lycium oil hub is constructed.
Click for more details...
CHEVRON AUSTRALIA - OPERATIONS - SUPPLY OF MODULAR CAROUSEL STORAGE SYSTEM
Mining - Support Facilities (Labs, Testing facilities, Hazardous materials, Storage) project at Via, Barrow Island, WA 6712 for New. For the supply of modular/carousel storage systems. To include: 3 Modular Carousels @ 4m (Wide) x 3m (Depth) x 6m (High); or
o 4 Modular Carousels @ 3m (Wide) x 3m (Depth) x 6m (High). Units will need to be accessible from a single side. Each unit will need to have the capability to have its own dehumidified environment controlled to a fixed temperature. Installation will need to be provided for on Barrow Island or the supplier will need to partner with the current construction contractor of the warehouse on Barrow Island.
Click for more details...
GLNG WALLUMBILLA GAS TREATMENT FACILITY (WGTF)
New project of Mining - Support Facilities (Labs, Testing facilities, Hazardous materials, Storage) project at Walumbilla South Rd Iona Bardlomey Rd (Lot 33 SP 212840) 12km south of, Wallumbilla, QLD 4428. Staged development adjacent the existing Santos compressor (WCS) & metering (WMS) stations of a gas treatment facility of 2 trains each with a capacity of 250TJ/day. Each train to consist of gas compression, natural gas liquid removal & cryogenic gas treatment units & a gas turbine power generator using non-methane gas liquids & distributing power through alternators. Ancillary infrastructure to include condensate storage, hot oil system, air compression system, nitrogen generation plant, fire water system, flare & vent system, oily water system along with potable & service water system. Plant control room & workforce amenities.
Click for more details...
PORT HEDLAND BHP BILLITON NON-PROCESS INFRASTRUCTURE (PORT NPI) PHASE 1
Mining - Support Facilities (Labs, Testing facilities, Hazardous materials, Storage) project In The Port Hedland Council Area of Lubrication Facility/Office, Administration & Stores Buildings - Altn & Addns type. A Port Hedland Inner Harbour project to increase throughput by upgrading existing & construction of new support facilities. Construction of a new lube facility including lube storage & dispensing unit & storage area; a workshop with washdown pad, office & workstations along with an amenities block, traffic management, oily water separation system & bulk diesel storage. Upgrade after removal of some portable buildings of the belt store including new storage/laydown area, high bay belt workshop, portable offices & amenities block, a cool, dry storage facility, light vehicle car park & truck loading yard. Expansion of the existing administration building including offices, conference rooms, open plan work areas, amenities, crib room, tool lockers, secure & public car parking & relocation of the barbecue area. Refurbishment & internal refit of existing crib rooms & amenities at the Nelson Point Crushing Offices as well as the Emergency Services Office.
Click for more details...
ICHTHYS LNG PROJECT - ONSHORE - OPERATIONS CENTRE
Operations Centre project at Blaydin Point, Darwin, NT 0800 In The Council Area Of Darwin City of Private. For the construction of an operations complex area including operations office, central control building and fire station, training and canteen facility, warehouses, workshops laboratory, guardhouse and associated infrastructure.
Click for more details...
GIFFEN WELL IRON ORE PROJECT - EXPORT FACILITIES
A project in the SA Within Port Pirie. Construction at Port Pirie of rail receival, storage & outloading facilities. To include construction in the Port Pirie marshalling yards of 2 equal length dead end sidings behind the tip pocket to allow for unloading in 3 sections. Construction adjacent the port of a 185,000t capacity, negatively pressured ore management shed including a rail unloader (tippler), conveyor to wharf & wash down facilities.
Click for more details...
LIDDELL COAL OPERATIONS EXPANSION
Mining - Support Facilities (Labs, Testing facilities, Hazardous materials, Storage) project at Old New England Hwy, Ravensworth, NSW 2330 for New. A project for a 5 year life-of-mine (LoM) extension by expanding the existing South pit followed by expansion of the Entrance pit after which a new MIA pit to be developed involving relocation of the current mine infrastructure area. Construction of a new conveyor & transfer point to link to the existing overland conveyor to allow transfer of up to 1.5 million tonnes per annum (Mtpa) of coal to the Ravensworth coal handling & preparation plant (CHPP) now that the demolished Cumnock CHPP is no longer available to take excess run-of-mine (ROM) coal. A new 50,000t stockpile at the new conveyor & expansion of the existing ROM stockpile capacity to 200,000t as well as a new tailings emplacement area in the South Pit void. Associated infrastructure expected to include access & haul roads, surface water management systems, new dewatering bores for the Hazeldene, Entrance & South pit workings, an explosive reload facility, powerlines, pipelines & a water truck fill point.
Click for more details...
BHP BILLITON MOOKA CAR REPAIR WORKSHOP
Bhp Billiton Mooka Car Repair Workshop is currently at the Construction stage, valued at about $ 30000000 it is Contract for the construction of a maintenance workshop & warehouse. To include process equipment installation as well as rail & infrastructure components including roads, track, signalling & communications electrical engineering. Water supply.
Click for more details...
ICHTHYS LNG PROJECT - ONSHORE FACILITIES - TANK CALIBRATION
Tank Calibration Services New project In The Darwin City Council Area. Comprehensive post-build survey of the interior of tanks followed by preparation of detailed calibration charts. To include a propane refrigerant storage sphere & miscellaneous non-cryogenic storage tanks (eg condensate, hydrocarbon drain, solvent, water, diesel).
Click for more details...
CHEVRON AUSTRALIA - OPERATIONS - CYLINDER GASES
Mining - Support Facilities (Labs, Testing facilities, Hazardous materials, Storage) project at On & off, Barrow Island, WA 6712 for New. For the provision of Cylinder Gases including: Industrial gases, Laboratory gases, Instrumentation gases, Calibration gases & Specialty cylinder gases.
Click for more details...
|
|