State

Categories

Sub Categories

Click Here to Find Current Projects

List of Labs, Testing facilities, Hazardous materials, Storage Projects in NSW


AUSTAR COAL OPERATIONS EXPANSION
Mining - Support Facilities (Labs, Testing facilities, Hazardous materials, Storage) project In The Cessnock Council Area of Operating Mine - Extn - Stage 3 type. For longwall extraction from panels A1 & A2 using a new method of longwall mining known as longwall top caving. For the construction and operation of some additional surface infrastructure including a larger capacity ventilation fan, downcast shaft, substation, nitrogen injection plant, tube bundle shed, and diesel storage and dispatch system, and for the upgrading of some existing surface infrastructure including the water treatment plant, and the water reticulation and pumping system. Click for more details...

COORANBONG COLLIERY - LIFE EXTENSION PROJECT
New project of Mining - Support Facilities (Labs, Testing facilities, Hazardous materials, Storage) project at South west of, Morisset, NSW 2264. Infrastructure to include administration buildings, concrete works, surface workshop, paving, dams, compressor buildings. Click for more details...

UNIVERSITY OF SYDNEY FLAMMABLE GOODS STORE
Mining - Support Facilities (Labs, Testing facilities, Hazardous materials, Storage) project at 1 City Road, Camperdown, NSW 2050 of Flammable Goods Store type of New development. Proposal for the construction of a new building for the storage of dangerous & flammable goods (6000 litre) for the Faculty of Medicine. Proposed building approximately 52 sq m in area & will be of brick & blockwork construction with a metal deck roof & mechanical ventilation. Click for more details...

INTEGRA COAL OPERATIONS - OPEN CUT EXTENSION PROJECT
Currently at the Construction stage In Singleton is a project estimated to be $ 10000000. This project Extension further south of the existing South Pit (247ha). Trucks & shovel/excavators to access 30million tonnes (Mt) of Run-of-Mine (RoM) coal at a rate of 2.3-4.2Mtpa to give a Life-of-Mine (LoM) of 9 years. Associated infrastructure to include relocation of power lines & telecommunications in the proposed open cut area. Construction of temporary haul roads & surface water management structures. Installation of tansportable site office, crib room & bathhouse. Installation of a transportable, above ground equipment refuelling station. Click for more details...

MAULES CREEK COAL PROJECT - MINE INDUSTRIAL AREA
Maules Creek Coal Project - Mine Industrial Area is currently at the Construction stage, valued at about $ 75000000 it is Surface facilities at the Mine Infrastructure Area to include workshops, heavy & light vehicle refuelling & washing facilities as well as tyre jacking slabs. Click for more details...

LIDDELL COAL OPERATIONS EXPANSION
Mining - Support Facilities (Labs, Testing facilities, Hazardous materials, Storage) project at Old New England Hwy, Ravensworth, NSW 2330 for New. A project for a 5 year life-of-mine (LoM) extension by expanding the existing South pit followed by expansion of the Entrance pit after which a new MIA pit to be developed involving relocation of the current mine infrastructure area. Construction of a new conveyor & transfer point to link to the existing overland conveyor to allow transfer of up to 1.5 million tonnes per annum (Mtpa) of coal to the Ravensworth coal handling & preparation plant (CHPP) now that the demolished Cumnock CHPP is no longer available to take excess run-of-mine (ROM) coal. A new 50,000t stockpile at the new conveyor & expansion of the existing ROM stockpile capacity to 200,000t as well as a new tailings emplacement area in the South Pit void. Associated infrastructure expected to include access & haul roads, surface water management systems, new dewatering bores for the Hazeldene, Entrance & South pit workings, an explosive reload facility, powerlines, pipelines & a water truck fill point. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect