State

Categories

Sub Categories

Click Here to Find Current Projects

List of Landscaping, Fencing, Entry statements, Monuments, Fountains Projects


HIGH & ELGIN STS BUS SHELTERS
New project of Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project at High & Elgin Sts, Maitland, NSW 2320. Fabrication & installation of new bus shelters in High Street & Elgin Street, Maitland & landscaping works adjacent to the new High Street bus shelter. Click for more details...

NEPEAN HIGHWAY UNITS
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project In The Mornington Peninsula Council Area of Units (13) type. Thirteen 1 & 2 level units - 3 bedroom. To include 6 x 2 storey attached units and 7 x 1 level free-standing units. Brick and render construction, timber frame, concrete slab, double garages, landscaping. Click for more details...

BILL SOHIER PARK
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) Addition project at Brush Rd, Ourimbah, NSW 2258. This type is Playing Fields - Upgrade - Stage 1 with Local Govt ownership. Proposed reconfiguration of playing fields including a new full size senior rugby league field which will require a net 600 cubic metres of cut to the flood plain, new sub-surface drainage system & irrigation system to be installed. Click for more details...

TRANSPORT SA - SOUTHERN EXPRESSWAY
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) New project at Darlington -, Reynella, SA 5161. This type is Landscaping Maintenance For Roadworks - Stage 1 with State ownership. Maintenance of landscaping as part of Southern Expressway project. Click for more details...

CRAIG FAMILY CENTRE
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project In The Boroondara Council Area of Local Govt ownership. Construction of a 575 sqm extension to the Craig Family Centre to accommodate a community health facility. The Centre will include ten medical and dental consulting rooms and extensive renovations to existing toilet facilities. The project also includes earthworks, drainage, car park alterations and landscaping. Click for more details...

BUNDANOON STREETSCAPE
Streetscape/Drainage/Access - Upgrade Addition project In The Wingecarribee Council Area. Proposed streetscape, drainage & access improvements. Work includes: new sandstone retaining wall; terrace with planter boxes; aluminium & timber bench seats; aluminium litter bins; bollard lighting; new drainage system; landscaping. Click for more details...

LIDCOMBE COMMUNITY CENTRE
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project at Lot 4 & pts 27 28 Bridge St, Lidcombe, NSW 2141 for New. Demolition of existing building. New library with 2 reading rooms, seminar room, office, storerooms & amenities. Community hall with associated dressing room, kitchenette, storerooms & amenities. Baby health centre with 2 consulting rooms, waiting room & amenities. Concrete slab floor, double brick walls, metal roof. Aluminium framed windows. Landscaping. Click for more details...

CRANBOURNE CHRISTIAN FELLOWSHIP CENTRE - STAGED PROJECT
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project at 1785 South Gippsland Hwy, Cranbourne, VIC 3977 for New. Buildings and works for school and associated farm, children's activities centre, church and staff housing with carparking and landscaping. Stage 1. Multi-purpose room with seating for between 500 and 1000, and one residential home. Stage 2. Childrens daycare nursery and farem support area. Stage 3. Specific classrooms - music, art, woodwork etc. Stage 4. more classrooms and and admin. bldg. Stage 5 more classrooms and a gymnasium. Click for more details...

NARELLAN TOWN CENTRE
Private ownership Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project In The Camden Council Area for New development. 8,450 sq.m. floor area Woolworths, Fosseys department store,40 speciality shops, carparking Click for more details...

CANNON HILLS COMMUNITY LINKS REMEDIATION STAGE 1
A project in the QLD Within Brisbane City. Construction of an integrated residential development. Remediation of former Cannon Hill Tip (125ha) between Fursden Road & the western bank of Bulimba Creek to include removal of leachate & 965sq m of waste material, construction of 5 small & medium sized lakes, installation of a new compacted clay cap & installation of permanent leachate gathering systems. Retention of 33ha of squirrel glider habitat. Associated landscaping & earthworks. Click for more details...


Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project at South Rd Connector (Magazine Rd - Salisbury Hwy) Dry Creek, Salisbury, SA 5094 of Landscaping For Wetlands type of New development. Work to include: 40,000 terrestrial & aquatic plants. Seed & plant material will be Principal supplied. Maintenance of plantings for 12 months applies. Click for more details...

STIRLING MAIN STREET REDEVELOPMENT
Street - Redevelopment project at Mt Barker Rd, Stirling, SA 5152 In The Council Area Of Adelaide Hills of Local Govt. Comprising streetscaping, landscaping & carparking. Click for more details...

NORTH BEACH CARAVAN PARK
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project In The Bellingen Council Area of Caravan Park - Upgrade type. Refurbishment of existing caravan park including landscaping, signage, childrens playground, electrical switch room, refurbish swimming pool, water reticulation system, new ablution building, install & equip 6 new cabins. Water, sewer & electricity reticulation works due for completion October 2001. Cabin, amenities & camp kitchen construction due for commencement April 2002 & completion by December 2002. Click for more details...

MILLERS RESERVE SKATEPARK
Skateboard Facilities project at Condamine St, Manly Vale, NSW 2093 In The Council Area Of Warringah of Local Govt. Proposed construction of skateboard facilities, landscaping. Click for more details...

BELMORE RESIDENTIAL/COMMERCIAL DEVELOPMENT
Units (260)/Motel - 22 Storeys project at 26-62 Bridge Rd, Belmore, NSW 2192 in the Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains). Amended proposal comprises construction of 3 towers ranging in height from 66m to 40m containing 260 residential units & a 120 suite motel. Carparking for 1296 vehicles. Associated landscaping. Click for more details...

RIVERWOOD SKATE PARK
Belmore Rd, Skate Park, Riverwood, NSW 2210 Has Riverwood Skate Park currently at Construction stage. Lanscaping works at Skate Park, Riverwood. The work includes the construction of retaining walls, segmental shrub planting, turfing & maintenance of the works for 13 weeks. Click for more details...

CITY OF JOONDALUP - FENCING
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) Supply & Install project at Various locations within City of, Joondalup, WA 6027. This type is Fencing - Supply, Delivery & Installation with Local Govt ownership. Works to comprise of supply, delivery & installation of fencing at various locations within council area of Joondalup. Click for more details...

BUNDEENA OVAL
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project for New development. Construction of netball courts, landscaping. Click for more details...

EASTERN HORIZONS REDEVELOPMENT PROJECT - LLOYD PENN PARK
A project in the WA Within Swan. Works to comprise of upgrading of part of Lloyd Penn Park in Koongamia. Works to include concrete paving, laterite stone walls, bench seats, tree planting & sundry other works. Maintenance of works will be for 52 weeks. Click for more details...

ALBURY LIBRARY/MUSEUM LANDSCAPING
Local Govt ownership Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project In The Albury Council Area for New development. The work will include the laying of precast concrete, clay & granite pavers, exposed aggregate & coloured concrete & asphalt paving. It will also incorporate cast in-situ concrete seating, turfing, tree planting & an irrigation system & will involve adjustment to existing footpath service lids. Click for more details...

ANNADALE CENTRALISED BIOSOLIDS STORAGE FACILITY
Centralised Biosolids Storage Facility New project In The Moora Council Area. Proposal comprises establishment of Stage 1: Trial Facility to be operated for estimated 18 months to determine design parameters prior to construction of full scale CBSF. Trial facility will consist of 2 storage structures (each 40 m long x 12.8 m wide), with combined storage capacity of approx 1,400 wet tonnes of biosolids. Scope of works will also include gravel access road incorporating site crossover from paddock south perimeter road & truck turnaround area, truck unloading/dump pad (concrete pad adjacent to Trial facility) & temporary stock fencing. Construction will not include establishment of permanent site infrastructure (access roads, fencing, site drainage, sewerage, power supply, lighting, water supply & landscaping). Stage 2: Final design will be dependant on outcomes of stage 1, however the likely project scope may include 36 buildings - parallel storage structures (total 2.7 ha), access road from hwy to site (approx 6 km), operations building, machinery shed, truck was facility, rainwater tank, diesel re-fuelling station. Scope of works will include site perimeter landscaping, site fencing, lighting, pumping station, power generator & water bore. Click for more details...

SAINT NARSAI ASSYRIAN CHRISTIAN COLLEGE
Currently at the Construction stage In Fairfield is a project estimated to be $ 14500000. This project Construction of a new high school & tertiary college for 600 students comprising a 2 storey administration block, staff amenities, staff lounge, meeting rooms, seminar rooms. Canteen, pupil amenities, 8 general learning classrooms, COLA, materials & specialist building containing 3 science laboratories & food technology area. Materials workshop for wood/metal work, computer rooms. Electrical substation, water management system. Drainage & civil works. On grade carparking for 100 cars. Landscaping Click for more details...

VICTOR HARBOR FORESHORE PROMENADE DEVELOPMENT STAGE 1
Local Govt ownership Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project In The Victor Harbor Council Area for New development. Stage 1 includes earthworks, paving & associated landscaping. Click for more details...

DEPARTMENT FOR CHILD PROTECTION FENCING
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project In The Halls Creek Council Area of State ownership. Works to comprise installation of fencing. Click for more details...

DOURO ROAD MIXED USE DEVELOPMENT
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project In The Fremantle Council Area of Private ownership. Works to include the construction of a 3 storey mixed use development comprising of: 20 multiple dwellings, office, lunch bar/shop. The ground floor to have 420sqm of non-residential floor space for a lunch bar/shop & office, lobby, service areas, storage including bin area & on-site parking for 30 vehicles, the first & second floors to have 6 x single bedroom or studio dwellings & 6 x 2 bedroom dwellings, the second floor to have 7 x 2 bedroom dwellings, a ground floor alfresco area for the lunch bar & landscaping. Click for more details...

MAN FROM SNOWY RIVER HUB DEVELOPMENT
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) New project at Attree Park, Corryong, VIC 3707. This type is Playground/Landscaping/Soundshell with Local Govt ownership. Construction of the Man from Snowy River Hub located at Attree Park, Corryong to include the erection of the statue/sculpture of Jack Riley and horse (the Man from Snowy River) and redevelopment of the Corryong Visitor Information Centre (VIC), playground, rotunda, sound shell and the surrounds. The statue will be place on a concrete base approximately 1/2 metre high with the statue rising to a height of 2.9m. The base will be surrounded/clad in natural rock and ground cover vegetation. The base will be set off by a new forecourt constructed in exposed local granite concrete from the existing kerb line to the statue and surrounding the natural rock base. There will be access around all sides of the statue and there will be a low rock wall from the back edge of this area extending back to the VIC. The playground will remain where it is but be enhanced with additional play equipment. The rotunda/BBQ will also be enhanced with better weather protection (including roofing and possible partial walls) anc improved seating and landscaping. The sound shell will be enhanced with monor works on the grassed area nad painting of it and other buildings to bring them all together form an aesthetic viewpoint. Water tanks will be installed to catch water from buildings and utilise within the toilets. It has also been suggested that the existing 'well' have a small electric pump installed and connected to a new garden irrigation system. Click for more details...

BELGIAN GARDENS SUBSTATION LANDSCAPE WORKS
New project of Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project at Fry St, Belgian Gardens, QLD 4810. The landscaping works include, but not limited to: soil preparation, planting, turfing, seeding & miscellaneous items such as garden edging, bollards, galvanised pipe barriers and reinforced turf. Click for more details...

CITY OF COCKBURN LANDSCAPING WORKS
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project for Renovations, Refurbishments etc. development. Works to include turf renovations at various sports fields & public open spaces within the Shire of Cockburn. Click for more details...

DUMARESQ & MCINTYRE ST APARTMENTS
Dumaresq & Mcintyre St Apartments is currently at the Construction stage, valued at about $ 23400000 it is Demolition of the existing structures. Construction of a residential flat development comprising 2 buildings, containing a total of 80 apartments, 26 x 1, 43 x 2 & 11 x 3 bedroom. The development has been designed to address both McIntyre & Dumaresq Sts, with Building A facing McIntyre St & Building B facing Dumaresq St. Communal open space is provided on either side of the riparian corridor. Cavity brick & concrete walls, painted fibre cement, timber cladding, timber battens, timber & aluminium framed single/low e/double tint glass windows, painted timber screens, anodised aluminium, metal balustrade, concrete floor, concrete roof. Basement carparking over 2 levels for 111 vehicles, bicycle spaces & storage. Landscaping. Click for more details...

THE GREATER METROPOLITAN CEMETERIES TRUST
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project In The Moreland Council Area of Pier And Beam Foundations type. The Greater Metropolitan Cemeteries Trust pier and beam foundations 2011. Works involve the excavation for and construction of concrete piers, excavation for and construction of concrete monumental beams and associated site works. Click for more details...

LIFESTYLE COMMUNITIES SHEPPARTON
65 Channel Rd, Shepparton, VIC 3630 Has Lifestyle Communities Shepparton currently at Construction stage. Construction of bowling greens, tennis courts, civil and landscaping works, parks and gardens. Click for more details...

WESTERN HIGHWAY BRIDGE WORKS
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project at Western Hwy, Wail, VIC 3414 of Bridge Works type of New development. Bridge strengthening and barrier upgrade including associated road works on the Western Highway at Wail Rail Overpass chainage 321.435km. Click for more details...

CANTWELL PARK DEVELOPMENT - STAGE 2
Park/Playground project at Cantwell Park, Reserve 29516, George St, Murray, WA 6999 in the Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains). To include the park & playground development. Click for more details...

LAUNCESTON COUNCIL PERIODIC CONSTRUCTION CONTRACTS 2012-2014
Launceston Council Periodic Construction Contracts 2012-2014 is currently at the Tenders & Building stage, valued at about $ 800000 it is Works within this tender include *Asphalt works *Road and footpaths *Kerb and channel *Traffic Island *Drainage Works Landscaping *Pipe cracking *Pipe relining *Communication conduit *Line making and *Day works. Click for more details...

ELIZABETH QUAY BARRACK SQUARE
A project in the WA Within Perth. To include installation of seven temporary kiosks that will be modified & have completed interior fitouts. These buildlings will be fabricated from A-grade shipping containers & will cater for Module 1 - Bar, 2 - Food, 3 - Store Facility, 4 - Amenties, 5 - Bike Cafe, 6 - Ice-cream Kiosk, 7 - Amenities. The Modules (1, 2, 5 & 6) are expected to be leased by tenants to complement the existing retail mix within the Square. Works also to include landscaping comprising of the removal of undergrowth vegetation within the garden beds adjacent to the food & bar area, construction of a new playground with synthetic soft-fall around the play equipment & surrounded with a 900 mm fence woven with brightly coloured shade cloth. Additional landscape furniture to include bike racks, seats, drinking fountains, bins to be placed opposite the food area. The Amenties block will also be prefabricated. Click for more details...

STIRLING CITY CENTRE
Local Govt ownership Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project In The Stirling Council Area for Renovations, Refurbishments etc. development. A suitably qualified and experienced consultancy team is required to work collaboratively with the Stirling Alliance Group in providing a Urban Design & Landscape Strategy Planning, Strategic Advice & related technical services for the Stirling City Centre Alliance. Click for more details...

HURSTVILLE SHIRE COUNCIL CONCRETE WORKS
various locations in the Hurstville City Council area, Hurstville, NSW 2220 Has Hurstville Shire Council Concrete Works currently at Construction stage. Concrete construction, kerb & gutters, paving & drainage services Click for more details...

EVATT SHOPPING CENTRE
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project at 26 Heydon Pl, Evatt, ACT 2617 of Shopping Centre - Landscaping type of New development. Upgrade of the existing shopping centre may comprise parking, street furniture, signage, lighting & landscaping Click for more details...

GAVEY ST INDUSTRIAL DEVELOPMENT
Private ownership Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project In The Newcastle Council Area for New development. Construction of a new industrial building housing a workshop manufacturing area, office space. New hardstand area. Carparking, landscaping & fence. Click for more details...

KOOMBANA PARK LANDSCAPE CONSTRUCTION UPGRADE
Koombana Park, cnr Captains Wy & Steamer Av, South Hedland, WA 6722 Has Koombana Park Landscape Construction Upgrade currently at Construction stage. To include landscape construction upgrade works at Koombana Park. The development may also include CCTV, a sealed car park, improved irrigation system, more shelters and more play equipment. Click for more details...

GREEN SQUARE VALUE SUITES
Hotel - 8 Storey project at 16 (Lot 1) O'Riordan St (DP16475), Alexandria, NSW 2015 in the Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains). Demolition of existing factory & workshop. Remediation of site. Construction of an 8 storey hotel comprising 100 rooms, each with bathroom facilities, foyer, managers flat, staff amenity area. The application also involves public domain improvement works including the dedication of 38.04sq m of land to Council and embellishment for footpath purposes. Shoring & bulk earthworks & building platform for the proposed hotel. Concrete block walls rendered & painted, anodised aluminium privacy screen, applied timber finish to feature wall, aluminium framed glazing, fixed anodised aluminium louvres, concrete floor. Ground level carparking for 4 cars & bicycle parking for 5 bikes. Click for more details...

ST BENEDICT'S COLLEGE
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project at 70, 78 & 86 (Lot 18) Oran Park Dr (31996), Oran Park, NSW 2571 for New. Construction of 2 new buildings & associated site works. One building is a single storey stud framed Class 9b building with a tiled truss roof containing 6 science labs & an associated prep area. The other building is a single storey, steel framed Class 5 building with a metal roof for staff administration. Associated site works include a 42 bay carpark with bio-filtration gardens, OSD works to existing site dams, some minor pathways & landscaping. Click for more details...

BRUNSWICK TERMINAL STATION UPGRADE
State ownership Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project In The Moreland Council Area for New development. The upgrade involves the removing existing buildings, outdoor electrical equipment & existing 25 m tower, relocating 22 kV cable around the station out of the way of the new works, construction of two new buildings housing the 220kV & 66kV GIS equipment, two retaining walls, new oil containment system, bulk earthworks, roads, drainage, services, landscaping & fencing at the Brunswick Terminal Station, Brunswick East. Click for more details...

WALGETT LEVEE - STAGE 5
Currently at the Construction stage In Walgett is a project estimated to be $ 2000000. This project Construction of new levee embankment between CH 4,650 to CH 6,700. Clearing, grubbing & trimming of topsoil & disposal of material to nominated area. Construction of new detention basin at CH 6,520 & CH 6,600. Design & construction of pump station at CH 5,160 & CH 6,520. Design & construction of culvert gate at CH 6,530 including 2 x 900 Batescrew Gates. Reinstatement &/or relocation of existing fence, tracks & drainages after completion of levee. Click for more details...

ANZAC CENTENARY MEMORIAL GARDEN WALK ADDITION
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) New project at Kintore Ave, Adelaide, SA 5000. This type is Memorial Walkway - Construction/Delivery with Local Govt ownership. Delivery of the Anzac Centenary Memorial Garden Walk. The Anzac Centenary Memorial Garden Walk will run along Kintore Ave between the war memorial & the Torrens Parade Ground & the Pathway of Honour - across the road from the University of Adelaide North Tce campus. The Kintore Ave boundary of Government House will be brought in 10 metres to create the Anzac Centenary Memorial Garden Walk that links the grounds of Government House with the Walk. Work to comprise demolition of existing perimeter fence & internal wall (eastern side) & caretakers cottage within Government House. Construct new wall & fence along an amended alignment (including a change of land use to Public thoroughfare). Associated tree removal or pruning, installation of paving, landscaping, public lighting, artwork, security gate & signage. Click for more details...

KU DE TA RESTAURANT
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project In The Perth Council Area of Restaurant/Function Centre/Bar type. Multi-purpose leisure complex featuring rooftop bar with 600 capacity, function centre, gardens, jetties, bars & dining facilities. Associated landscaping, civil works & carparking. Click for more details...

ROCKHAMPTON RIVERBANK PRECINCT STAGE 1 LANDSCAPING WORKS
A project in the QLD Within Rockhampton Regional. Landscaping works for Stage 1 of the Rockhampton Riverside Precinct. To include supply & installation of irrigation system, signage, umbrellas, bike station & fencing. Installation of furniture. Click for more details...

LAKE ANNAN
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project In The Camden Council Area of Water Treatment Works type. Scope of works at Lake Annan include: modifications of an existing GPT to act as an inlet zone where stormwater discharges from a large pipe & associated channel works. Modifications will include a low flow channel, areas of landscaped rock & planted beds on the eastern side of the motified structure. Floating treatment wetlands will be installed if budget allows. Click for more details...

NARACOORTE CAVES NATIONAL PARK WALKING TRAIL WORKS
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project at Naracoorte Caves National Park (near), Naracoorte, SA 5271 of Observation Platfom(S)/Furniture/Lighting/Fencing/Civil Works - Stage 2 type of New development. The Principal invites tenders for Stage 2 construction of a project to establish a surfaced 1 km interpretive trail that leads visitors to a range of cave openings & features to provide a high quality above-ground experience around the Naracoorte Caves Visitor Centre precinct. In 2016-2016 Stage 1 of the project (being civil works to construct the trail surface to achieve disability access compliance) was completed. The scope of works for Stage 2 is for building construction of viewing platform(s) & seating at cave sites & associated structures, for example,structures for interpretive panels, balustrading, cave fencing, lighting & other design elements to complete construction components of the walking trail. Click for more details...

ALF PEARCE RESERVE DOG PARK
New project of Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project at 111 Carnarvon Rd, Strathmore, VIC 3041. Construction of Fencing, Furniture & Landscaping works at ALF Pearce Reserve Dog Park. Works to include fence dog park, earthworks, drainage works, granitic sand surface, fencing, entry gates, furniture, agility equipment, rockwork, gardens beds & planting. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect