State

Categories

Sub Categories

Click Here to Find Current Projects

List of Landscaping, Fencing, Entry statements, Monuments, Fountains Projects in NSW


MACKILLOP CATHOLIC COMMUNITY
Mackillop Catholic Community is currently at the Construction stage, valued at about $ 2500000 it is Construction of: administration building; staff building; church; access roads; carparks; landscaping. Click for more details...

EMERALD PARK - BUILDINGS A1, A2, B & E - PARC
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project In The Sydney Council Area of Private ownership. Excavation. Construction of 4 residential apartment buildings known as Buildings A1, A2, B and E, ranging in height from 5 to 9 storeys containing 207 apartments, 81 x studio/1 bedroom, 112 x 2 bedroom & 14 x 3 bedroom, GFA 19,525sq m & 205sq m of retail floor space. Building A1 is 5 storey containing 23 apartments. Building A2 is 7 storey containing 42 apartments & 75sq m retail tenancy. Building B is 7 storey containing 67 apartments & 130sq m retail tenancy. Building E is 9 storey containing 75 apartments. Construction will comprise 5 stages: Stage 3A ? Early works for Buildings A1 & A2; excavation & shoring of the Stage 3 component of the integrated basement level beneath the footprint of Buildings A1 & A2; & piling & piering of in-ground substructures. Stage 3B - Buildings A1 & A2 - Construction & line-marking of Stage 3 component of integrated basement level beneath Buildings A1 & A2; construction of vehicular access ramp to Lamond Ln; construction of Buildings A1 & A2; & construction & landscaping of the southern component of central communal courtyard adjacent to Buildings A1 & A2. Stage 4A ? Early works for Buildings B & E; excavation & shoring of the Stages 4 & 5 component of the integrated basement level beneath the footprint of Buildings B & E; & piling & piering of in-ground substructures. Stage 4B - Building B - Construction of Stages 4 & 5 component of integrated basement level beneath Building B; vehicular access ramps to Joynton Av; fitout & line-marking of Stage 4 component of the integrated basement level; construction of Building B; & construction & landscaping of the central component of the communal courtyard & paved entry forecourt in the southeastern corner of the site. Stage 5 - Building E - site preparation works; fitout & line-marking of the final Stage 5 component of integrated basement level beneath Building E; construction of Building E; & construction & landscaping of the northern component of the central communal courtyard. Concrete block/panel walls, aluminium cladding, aluminium framed doors & windows, anodised aluminium vertical blinds,fixed anodised aluminium bar grille, vision panel low-E glass, semi-frameless glass balustrade with powdercoated aluminium posts, metal louvres, metal sheet/concrete tiled roof, concrete floor. Remaining portions of integrated basement carparking level, accommodating a further 159 carparking spaces & 92 bicycle parking spaces, with vehicular access off Joynton Av & Lamond Ln. Landscaping. Click for more details...

SURRY HILLS PARK
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project at Goulburn St (former Sydney Police Centre carpark), Surry Hills, NSW 2010 for New. The construction of a new public park. Work includes, site remediation, landscaping & associated works, including but not limited to the construction of stormwater retention tank & installation of irrigation, tree & shrub planting, paving & turfing. Click for more details...

CHIFLEY COLLEGE BIDWELL CAMPUS
New project of Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project at Lot 59 Bunya Rd, Bidwill, NSW 2770. Refurbishment of: ground floor Block H; part upper & part ground floor of Block F; part ground floor of Block G. Construction of outdoor workshop. Click for more details...

GRANVILLE PUBLIC SCHOOL
Currently at the Construction stage In Parramatta is a project estimated to be $ 600000. This project Demolish and construct a 280 sq m building to be used as a preschool on a heritage listed property (Granville Public School) and a 200 sq m playground. Click for more details...

TALLAWARRA POWER STATION
Tallawarra Power Station is currently at the Construction stage, valued at about $ 350000000 it is Construction of a new 400 megawatt combined cycle gas fired turbine power plant, new switching yard, a 60 metre chimney, administration building & visitors centre, landscaping to foreshore of Lake Illawarra, roadworks. Click for more details...

THE FATHOMS
Holiday Apartments - Stage 2 New project In The Shoalhaven Council Area. 20 seaside holiday units with cantilevered balconies within precast concrete structure. Airconditioning via mechanical ventilation, swimming pool. Extensive landscaping. 20 garages. Click for more details...

FEMALE ORPHAN SCHOOL
Female Orphan School is currently at the Early Planning stage, valued at about $ 4000000 it is Stage 2 willbe the alterations & additions to the East wing, Stage 3 will be the additions & alterations to the West wing. Click for more details...

HARRINGTON PARK
Bnd by The Northern Rd Camden Valley Way & Oran Park Rd, Narellan, NSW 2567 Has Harrington Park currently at Early Planning stage. 15 ha man made lake, civic facilities, 1200 residential lots. Click for more details...

ST PATRICK'S CATHEDRAL
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project for Addition development. Reconstruction of historic building destroyed by fire. Demolition, alterations & construction of new buildings, including 900 sq m new Cathedral to seat 800, new 450 sq m Parish Hall. New paved courtyard, cloister, carpark. Original materials to be re-used wherever possible. New work will be contract slab, steel frame, exposed aggregate panels, slate roofing for church, metal for hall. Copper to be mixed with aggregate for 2 walls. Click for more details...


Subcontract project of Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project at 78-82 Beach Road, Bondi, NSW 2026. Site area 1135.8 sqm. Landscaping 777.36 sqm. Basement carparking. Click for more details...


29-31 Green St (lot 8 DP 79156), Botany, NSW 2019 currently at Construction stage. New factory for use as an auto-electrical workshop, offices, car parking, landscaping. Site area 1440 sq m. Click for more details...

GEOFF BOYD MOTORS
Showroom - Altns/Addns - Subcontracts Subcontract project In The Newcastle Council Area. 3 separate buildings comprising: offices; 4 shops; accessories fitting workshop; display area; carparking. Steel frame, precast concrete panels, shopfront glazing, metal roof. Click for more details...

MORUYA CBD STREETSCAPE
Currently at the Construction stage In Eurobodalla is a project estimated to be $ 430000. This project Beautification programme to cover main streets. Click for more details...


14 Queens Rd, Westmead, NSW 2145 currently at Construction stage. 3 x 2 & 3 x 3 bedroom. Associated carparking. Landscaping. Click for more details...

OLYMPICS 2000 SYDNEY INTERNATIONAL EQUESTRIAN CENTRE
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project In The Fairfield Council Area of Core Area Construction Package type. Work includes: services reticulation; roadworks; equine training & competition areas; stables; indoor arena; various amenities buildings; hard & soft landscaping for entire 50 ha site. Combined show jumping & dressage area comprising: entrance paddock; Olympic cross-country course (7.4 km with 42 jumps); 15.4 km of endurance roads & tracks; steeplechase track; stables & tack rooms; equine clinic; training facilities; external lighting; 2000 permanent grandstand seats; grooms' temporary accommodation; hay & fodder storage; maintenance shed. Click for more details...

ABBOTSFORD ROAD SUBDIVISION
Subdivision - Residential project at Lot 1 Abbotsford Road (DP24460), Picton, NSW 2571 in the Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains). 11 lot community title subdivision, lots ranging in size from 1.0 hectares to 3.6 hectares. Click for more details...

PITT PARK
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project In The Blue Mountains Council Area of Playing Fields - Upgrade type. Upgrading of Pitt Park to include earthworks, field surface renovation, installation of drainage & irrigation system, oval lighting, installation of 100 metres of weld-mesh fence to a heighth of 1200 mm, construction of a sports pavilion & amenities facility. Click for more details...

MAITLAND PARK - MAITLAND HOCKEY CENTRE
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project In The Maitland Council Area of Synthetic Hockey Facility type. The scope of work includes design, documentation, site preparation, pavement/subgrade preparation, synthetic playing field, floodlighting & fencing Click for more details...

INTERCITI ARNCLIFFE - TEMPE HOUSE
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project at 1 Princes Hwy (off Holbeach Ave), Arncliffe, NSW 2205 of Heritage Buildings (2) - Restoration type of Renovations, Refurbishments etc. development. Restoration of Tempe House, constructed 1831, St Magdalen's Chapel, constructed 1888, including upgrade of grounds. Click for more details...

WILLOUGHBY DWELLINGS
A project in the NSW Within Willoughby. Demolition of existing 16 free standing dwellings, road, kerb & gutter, fences & driveways. Construction of 22 dwellings mostly 2 storey, swimming pool & associated landscaping. Click for more details...

NELSON'S RIDGE COMMUNITY FACILITIES & CHILDCARE CENTRE
A project in the NSW Within Holroyd. Construction of a community centre, youth annexe, long day care centre & after school care centre within 2 buildings. Shared car parking area for 45 spaces & a drop off zone and a pedestrian link including landscaping. Click for more details...

NELSON'S GROVE RETIREMENT VILLAGE (NELSON'S RIDGE)
Units (170)/Community Centre/Retail - 3 Storey New project In The Holroyd Council Area. Proposed staged development of a retirement village comprising: Stage 1, building envelopes & masterplan only, a total of up to 170 seniors living, self contained dwellings; 6 x 3 storey buildings with basement parking & consolidation of site. Stage 2: Detailed design, construction of building 1 (3 storeys) containing a total of 25 seniors living apartments comprising 4 x 1, 11 x 2, 2 x 2 + study & 8 x 3 bedroom units with basement parking for 30 vehicles; community centre including billiards area, dance floor, lounge, dining area, craft room, indoor pool & gym on the ground floor; administration area on ground floor of building 1, including dedicated commercial space (consulting room & hair dressers) to service residents, office & reception area; a one way private access road between road 401 & Griffin St with drop off zone & 6 visitor parking spaces, landscaping around building 1; demolition of existing temporary turning circle and construction of a pedestrian crossing over Road 401. Landscaping of the Building 1 site. Click for more details...

BLACKTOWN PARKLANDS
Blacktown Parklands is currently at the Planning stage, valued at about $ 25000000 it is Rehabilitation of creek area & creation of new parklands. Click for more details...

FORMER NARWEE BOYS HIGH SCHOOL SITE
Currently at the Planning stage In Hurstville is a project estimated to be $ 5000000. This project Proposed development of site into a range of styles for 79 dwellings comprising standard houses, courtyard houses, dual occupancies, townhouses & loft houses, public open space & landscaping. Click for more details...

COOK PARK
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project In The Rockdale Council Area of Local Govt ownership. A comprehensive review of the Cook Park Plan of Management is required to address a number of contemporary issues, commercial opportunities & the upgrading of facilities. A new tourism focus at Brighton Le Sands is expected. Click for more details...

REGATTA WALK FORESHORE RESERVE
Foreshore - Upgrade New project In The Lake Macquarie Council Area. Proposed major upgrade of foreshore reserve, landscaping, lighting, pathways, picnic furniture, playground equipment, shade areas, provision of an outdoor cinema screen. Click for more details...

UNIVERSITY OF NEW SOUTH WALES HOUSING PROJECT
University Of New South Wales Housing Project is currently at the Construction stage, valued at about $ 85000000 it is Demolition of 8 existing buildings (excluding the three contributory buildings within the Old Tote Heritage Conservation Area). Construction of a new part 4 and part 8 storey building consisting of 303 dwellings incorporating a total of 1,030 beds for students and visiting staff & associated administrative/retail uses. There will be a total of 130 x 1 bedroom, 17 x 2, 3 x 4, 67 x 5 & 86 x 6 bedroom units. facilities will also include specialty shops/cafes 150sq m, admin area 280sq m, amenities/laundries 125sq m & 2 e libraries with computer, lounge & reception areas. The apartments will be environmentally sustainable with a 5 star NSW Building And Sustainability Index. Construction features will include thermomass walls & hollow core floor slabs. There will also be solar boosted gas hot water systems & grey water treatment for laundries. Ground and basement levels car parking for 74 vehicles. Provision of associated servicing, landscaping and public domain works Click for more details...

SITA ADVANCED WASTE TREATMENT FACILITY
Private ownership Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project In The Penrith Council Area for New development. Construction and operation of a facility to process 120,000 tonnes per annum of waste and 14,400 tpa of biosolids. The SAWT facility will consist of a main building housing waste receival, resource recovery, composting tunnels, biocells and waste load out. Anaerobic digestion will include digester, gas storage tank, gas flare, maturation pads for compost, final refining building and electricity generation and supply to the grid. Additional elements to aid operations & environmental protection will include sedimentation ponds and diversion drains, leachate pond and diversion drains, landscaping, construction of access roads and weighbridge, control room, staff amenities and carparking, and security fencing. Construction will primarily consist of earthworks related to preparation of civil infrastructure, installation of concrete foundations, and construction of buildings. Other earthworks will be related to the construction of the leachate and stormwater dams, the construction of a bund above the 1:00 floodline (which will carry part of the access road), and the construction of an area for use a maturation pads. Click for more details...

THOMAS ST CARPARK SITE - CENTRIUM CHATSWOOD
Private ownership Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project In The Willoughby Council Area for New development. Construction of 2 towers with approximately 58,621sq m GFA of residential & serviced apartment space & retail space 486sq m. The 2 towers are separated by a large public area which is activated at ground level by retail outlets & the lobbies of the serviced apartments & residential towers, this public area includes a landscaped zone which also acts as a mid-block pedestrian connection from Albert Av to Thomas St. The serviced apartment tower is located on the south western portion of the site. Building 1 - 49 storey residential building will contain a total of 353 apartments, GFA 31,423sq m, 137 x 1, 186 x 2 & 30 x 3 bedroom, 20% of which are adaptable, 3 x retail units & 1 x office unit on ground floor. Level 4 of the residential building includes resident facilities such as a gym & indoor swimming pool & open landscaped terrace. Building 2 - 38 storey serviced apartment building GFA 25,644sq m, will contain 356 serviced apartments, 287 x 1, 64 x 2 & 5 x 3 bedroom, & 3 storey podium for public carparking. Public domain works comprising publicly accessible open space with associated landscaping works; pedestrian through site link; vehicular right-of-way between Thomas St & Fleet Ln. Precast concrete walls, aluminium framed single glazed doors & windows, concrete slab roof with pebbles, concrete floor. Total carparking for 740 vehicles including 5 level basement & 250 public carparking spaces in 3 storey podium, & bicycle parking. Landscaping. Click for more details...

J J CAHILL MEMORIAL HIGH SCHOOL
Gymnasium project at 51 Sutherland St, Mascot, NSW 2020 in the Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains). The proposal includes the construction, operation & maintenance of a new single storey gymnasium. The Gymnasium comprises main gymnasium space accommodating basketball, netball, volleyball & badminton, Stage Performance workshop, practice, performance store, store, weights room, boys & girls toilets, chair store, large equipment store, change rooms, access toilet, first aid room, cleaners room & seating; new landscaping, paving & associated siteworks, infrastructure & services. The Gymnasium will seat approximately 600 persons Click for more details...

HAMLYN TERRACE SPECIALIST AGED CARE VILLAGE
Aged Care Facility project at 614-624 (Lots 1, A & B) Pacific Hwy (DP432827 & DP31271), Hamlyn Terrace, NSW 2259 In The Council Area Of Wyong of State. Construction of a 100 bed residential aged care village. The proposed village consists of 10 "houses" for 10 residents each, 605sq m of shared support nodes which comprises shared staff office, managers office, equipment store, therapy room, residents laundry, dirty utility room, staff room & toilet/bathroom; 605sq m of central administration area comprising entry/waiting room, multi-purpose space capable of holding up to 70 residents, shared executive PA work station/reception, CEO office, finance/administration office, general office, day activities co-ordinator office, residential unit nurse manager office, central equipment store, central dirty linen & holding kitchen; landscaping; access ways & associated carparking for 74 cars. The "houses" will be 1 storey & distinguished from one another through landscaping & facade treatments. Each house will have a separate entrance accessed from a fully accessible path which leads from the surrounding internal pedestrian & access road. Click for more details...

UPPER WARRELL CREEK RD 70 LOT SUBDIVISION
A project in the NSW Within Nambucca. Subdivision of 70 lots. Scope of work includes: civil road, kerbs & guttering, stormwater drainage, stormwater detention basin, sewer pump station & rising main. Electrical, water & sewer reticulation. Site & road verge landscaping Click for more details...

RAAF BASE WILLIAMTOWN
Security Fencing project at RAAF Base, Williamtown Raaf, NSW 2314 in the Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains). Construction of security & kangaroo proof fencing at RAAF Base Williamtown. The scope of work includes, but it not limited to: removal & replacement of existing fire damaged chain mesh security & kangaroo proof fence - approximate length is 2.42km. Removal & replacement of existing fire damaged chain mesh fence - approximate length of fence is 880m. Removal & replacement of 375m of an existing security fence forming a section of the existing boundary of the base Explosive Ordnance area; the installation will include 2.4m high chain mesh fence with case in-situ concrete beam at base of fence. Disposal of all demolished fence material to meet environmental conditions Click for more details...

PENINSULA RECREATION PROJECT
Currently at the Construction stage In Gosford is a project estimated to be $ 1500000. This project Construction of the external landscape works comprising all landscaping, pavement & playground works including water, irrigation, electrical, lighting & CCTV works Click for more details...

TRANSGRID NEWCASTLE AREA SITES
Trade Services New project In The Various Council Area. TransGrid intends to engage a number of contractors to perform the services (listed below) under Period Order conditions at TransGrid sites on the Central Coast, around Newcastle and in the Hunter Valley (refer to list below). The engagement/s shall be on a Schedule of Rates basis for labour and selected plant with provision for supply of materials or specialist resources. Each Period Order issued may be for: one or more of the listed services & also one or more of the listed zones. Even though a Period Order may be issued, there is no guarantee that any contractor will be asked to perform any service under the relevant Period Order, as work loads fluctuate based on need and available resources as well as other business constraints. It is TransGrid?s desire to establish good working relations with the contractors to enable sound operational and functional performance of our assets. The Specification covers work performed by various trades and skilled labour as and when required at the listed sites (within a particular zone) for a period of two-years, with an option for a further three one-year extensions (at the discretion of TransGrid). The requirements for each site involve work on buildings and other infrastructure and may be within High Voltage Switchyards. List of services - plumbing, concreting, carpentry, painting, pipelaying, earthworks (including excavations & roadwork), fencing, landscaping (including tree maintenance), steelwork (including welding), demolition & Office/Workshop fitout. Locations - Central Coast Zone ? Substations at Tuggerah, Munmorah, Vales Point, Eraring. Newcastle Zone ? Substations at Newcastle (Killingworth), Waratah West, Tomago 330 & 132 as well as a Depot at Newcastle Regional Centre (in Waratah West). Hunter Zone ? Substations at Bayswater, Liddell & Muswellbrook Click for more details...

GRAYTHWAITE ESTATE - SHORE
School - Stage 1 project at 20 Edward St, North Sydney, NSW 2059 In The Council Area Of North Sydney of Private. Minor demolition works. Conservation & refurbishmentof Graythwaite House, the Coach House, Tom O?Neill Centre & associated garden area. Drainage & stormwater improvements & site levelling. Use of the Graythwaite middle & lower terrace as a play and educational space. Transport, traffic, parking & access improvements to the Graythwaite and Shore sites. Miscellaneous works including site fencing & lighting to Graythwaite House & the driveway. Stage 1 comprises the following conservation works: Conservation & refurbishment of Graythwaite House for staff administration & meeting rooms, comprising demolition of sundry additions; exterior repair & reconstruction of historic fabric including sandstone, timber door, window, verandah & roof joinery, cast iron, slate roofing, rainwater goods; construction of a glazed link & new lift to the rear; interior alterations & refurbishment works, including new staff office fitouts, joinery, WCs & new finishes & fittings generally. Coach House: Conservation & refurbishment of the Coach House for staff administration & caretaker?s residence, comprising exterior repair & reconstruction of historic fabric including brickwork, timber door, window & roof joinery; new verandah structure to replace the existing verandah; renewal of roofing & rainwater goods; interior alterations & refurbishment works, including new staff office fitout, joinery, WCs, kitchen, laundry, bedrooms & fixtures & fittings. Tom O?Neill Centre: Adaptation & refurbishment of the former Tom O?Neill Centre for multi-purpose student activities, comprising exterior repair works to brickwork, timber door, window & roof joinery; renewal of roofing & rainwater goods; interior alterations & refurbishment works including new WCs; kitchenette & new finishes & fittings; minor alterations at the northern end to achieve a suitable teaching space; new entrance at the north elevation. Construction of an internal road providing a link between Union St & Hunter Cr as a pick-up zone with capacity to accommodate a minimum of 4 vehicles adjacent to a designated student waiting area. Landscaping. Click for more details...

SCALABRINI VILLAGE - CHIPPING NORTON
Currently at the Construction stage In Liverpool is a project estimated to be $ 10000000. This project Demolition of the existing multipurpose building/shed & some internal/external walls in existing Buildings A, B & C. Staged construction works comprising: Stage 2A (Building B) - conversion of existing low care hostel into 30 high care beds. Stage 2B (Building C) - conversion of existing administration building into community facilities. Stage 3 (Building A) - conversion of existing nursing home into 49 high care beds. A total of 151 aged care beds comprising 102 existing beds + 49 new beds. Expanded back of house facilities to accommodate the increase in beds - laundry, kitchen, nurse stations, staff amenities etc. Stormwater, drainage & service facilities upgrades. Boundary fencing. Face brick walls, colorbond walls, fibre cement sheeting, colorbond roof sheeting. Carparking for 40 carparking spaces, 2 bus parking, loading bay & 2 ambulance bays. Landscaping 9,166sq m. Click for more details...

WENTWORTH POINT APARTMENTS - THE ADDRESS - SAVANNAH
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project In The Auburn Council Area of Apartments (281) - 20 Storey type. Construction of a residential flat complex comprising 3 buildings C1, C2 & C3 of 6, 8 & 20 storeys containing 281 apartments, 106 x 1, 157 x 2 17 x 3 & 1 x 4 bedroom, communal room 55sq m, communal facilities comprising a gymnasium 106sq m & lap pool 114sq m. Internal courtyard 1,564sq m, other common open space 1,081sq m. Building C1 will be 20 storey & will contain 74 x 1, 145 x 2, 16 x 3 & 1 x 4 bedroom apartments. Building C2 will be 6 storey & will contain 22 x 1 & 6 x 2 bedroom apartments. Building C3 will be 8 storey & will contain 106 x 1, 157 x 2, 17 x 1 & 1 x 4 bedroom apartments. Basement carparking for 330 vehicles & 5 street carparking spaces. Landscaping. Click for more details...

HAROLD PARK PRECINCT 6B - ALTIVOLO
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project In The Sydney Council Area of Apartments (85) - 5 Storey type. Construction of a residential flat building containing 85 residential apartments, 5 x studio, 23 x 1, 52 x 2 & 5 x 3 bedroom, 13 of which are adaptable. Green roof. Establishment of a central private landscaped courtyard. Rendered concrete & face brick walls, timber cladding, metal framed balustrading, single clear glazed aluminium framed windows, metal pergola to roof edge, glazed sliding doors, colourback glass spandrels, metal top rail with glazed balustrade on concrete upstand, feature facade cladding, painted concrete portal frame, metal palisade fence & gate, sandstone cladding planter walls, concrete slab roof, concrete floor. Basement carparking for 77 cars, motorcycle & bicycle parking, rainwater harvesting & detention tanks. Landscaping. Click for more details...

WEST PENNANT HILLS SPORTS CLUB
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project In The Hornsby Council Area of Sports Club - Altns & Addns type. Alterations & additions to existing West Pennant Hills Sports Club. Stage 2B: Deactivate central bowling green; complete undercroft area as additional temporary parking for Stage 2A club extension areas; construct central courtyard areas & western edge of Stage 1B areas; complete acoustic walls & landscape treatments to northern boundary buffer zone. Stage 2C: construct new western basement parking; construct new bowling greens; complete last portion of ground floor club facilities extensions; complete northern and southern boundary landscape screen treatments; complete New Line Rd landscape treatments and footpath/bus bay; complete fitout of new gymnasium facility; construct new traffic management improvement to New Line Rd. Stage 3: complete riparian zone works and landscape treatments. Click for more details...

TARONGA ZOO - SUMATRAN TIGER ADVENTURE
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) New project at Lot 22 Bradleys Head Rd (DP843294), Mosman, NSW 2088. This type is Sumatran Tiger Enclosure with State ownership. Development of a new tiger exhibit known as the Sumatran Tiger Adventure at Taronga Zoo. Demolition of the existing carnivore exhibit. Construction of a new carnivore exhibit for large cats (tiger, lions, leopards, etc). The new exhibit will include: 3 exhibit areas; interpretative Sumatran village to facilitate learning about humans living with tigers; new aviary, which is to likely house the Nickobar Pigeon and Metallic Starlings; holding dens; containment fences; milling and seating areas. Interpretative and directional signage; 2 new exhibit pedestrian pathways; keeper safe corridors; exhibit enrichment devices and visitor viewing areas; ranger outpost; food cart; office and staff amenities; and animal food preparation area/equipment store. It is also proposed to rebuild and re-orientate the end of the existing accessible ramp to align with the 2 new exhibit pathways. Services will be relocated, upgraded and augmented, where required. Steel frame, core filled concrete block with render & epoxy paint finish, rendered masonry walls & columns, corrugated zincalume cladding, aluminium storm louvres with internal weld mesh, timber decking over concrete slab, membraned concrete roof, canvas tarpaulin awning, meshed roof exhibit, metal deck roofing, tile & thatch roofing. Landscaping, including new tropical vegetation. Click for more details...

ALEXANDRIA CANAL WORKS DEPOT
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project at 67C-K Bourke Rd & part 6B Huntley St, Alexandria, NSW 2015 for New. Construction of an operational depot facility for the City of Sydney comprising construction of a single storey with mezzanine metal clad building, designed to appear as a series of interlinked contemporary woolshed style structures to accommodate maintenance functions including fleet services, cleansing services, waste services and civil maintenance services. GFA depot 9,416sq & ancillary office space 546sq m. Common open space 2,488sq m including terrace 75sq m & staff garden 2,413sq m. Concrete panel walls, powdercoated fold-up doors, ceramic floor tiles, colorbond sun blades, metal wall cladding, stainless steel handrails & balustrades, colourback glass, colorbond flashings, cappings, gutters & downpipes, palisade fence, translucent roof sheeting, colorbond metal roof sheeting. At grade carparking for 170 carparking spaces & 20 bicycle parking spaces. Landscaping, including substantial tree planting, landscaped break-out spaces & large staff garden/communal open space. Click for more details...

WESTERN MOTORWAY WAREHOUSE/DISTRIBUTION FACILITY - FISHER & PAYKEL
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project at (Lot 9) Western Mwy (DP241859), Eastern Creek, NSW 2766 of Warehouse/Distribution Facility/Industrial Facility - 2 Level type of New development. Construction of 2 x warehouses & distribution & industrial facilities, one for Fisher & Paykel & the other a speculative facility. Associated offices. The Fisher & Paykel facility will include fitout & use of facility for warehousing & distribution of their products, ancillary spare parts, product service & repair facility & will comprise a total of 13,400sq m, including industrial component 13,000sq m, service zone 600sq m, service office 50sq m, battery charge point 281sq m, warehouse office 50sq m, main office 400sq m. The speculative industrial facility will comprise 9,612sq m, including industrial component 9,062sq m, 2 level office 550sq m, Concrete dado panel walls, steel frame, prefinished metal wall sheeting, metal sheet roof, concrete floor, aluminium composite panel cladding, prefinished sheet metal, aluminium framed glazing & sunshade louvres to office component. Carparking. Retaining walls. Landscaping over 2 stages. Click for more details...

ORION BEACH
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) New project at Minerva Av to Plantation Point Pde, Vincentia, NSW 2540. This type is Pathway with Local Govt ownership. Construction of 2.5 metres shared user path extending for approximately 500 lineal metres from Minerva Av to Plantation Point Pde. The pathway is a combination of both concrete (full depth oxide pigment) pathway at grade joining sections of elevated walkway with decking. Handrails & blockwork retaining walls along the path on either or both sides. Click for more details...

EAGLE VALE DRIVE
Currently at the Construction stage In Campbelltown is a project estimated to be $ 17500000. This project Upgrade of Eagle Vale Drive including road construction, road reconstruction, cycleway, drainage & landscaping Click for more details...

PACIFIC HIGHWAY - WOOLGOOLGA TO BALLINA - EARLY WORKS
Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project for New development. Upgrade of HW10 Pacific Highway; early works - Wave 4 (Tuckombil Canal). Scope of works involves enabling soft soil treatment works for the future northbound Pacific Highway (HW10, MC10), Woolgoolga to Ballina. Wave 4 covers one soft soil site known as: Soft Soil Site Section 8 - approximately 1.4 km, STN 129,500 to STN 130,900 north of Grafton (Tuckombil Canal) Click for more details...

ST MICHAELS CATHEDRAL
Private ownership Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project In The Wagga Wagga Council Area for New development. Strengthening of the Bell tower of St Michaels Cathedral Click for more details...

NEW SOUTH HEAD ROAD PUBLIC DOMAIN WORKS
A project in the NSW Within Woollahra. Public domain works in New South Head Rd between Darling Point Rd & Mona Rd, Edgecliff. Scope of work includes: includes repair, removal, replacement of kerb & gutter, supply & laying roof stormwater down pipes, construction of brick paved footpath on a concrete base, construction of driveways & kerb ramps, adjustments of Telstra pits as necessary & adjustment of services covers to suit new footpath levels relocation/replacement of signage Click for more details...

RICKARD RD & JACOBS ST STREETSCAPE
New project of Civil Engineering (Landscaping, Fencing, Entry statements, Monuments, Fountains) project at Rickard Rd & Jacobs St, Bankstown, NSW 2200. Upgrade of the existing stormwater system, realignment of kerb & gutter, reconstruction of existing commercial crossing, median islands, kerb ramps & construction of type (1) footpaving. Sign posting. Landscaping. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect