WESTERN AUSTRALIA MARITIME MUSEUM
Currently at the Construction stage In Fremantle is a project estimated to be $ 331000. This project A Shed - Stage 1: to comprise volunteers lunch room, staff lunch room, changerooms, 2 offices, & building services area. Stage 2: to comprise wet classroom, workshop, bag store, reception, office & maritime activity area. Stage 3: to comprise 4 offices. Click for more details...

LOFTUS CENTRE - STATE INDOOR MULTI-USE SPORTS CENTRE/COMMUNITY CENTRE/LIBRARY
Social (Library, Archives, Galleries, Museums, Interpretive centres, Tourist info) project In The Vincent Council Area of Local Govt ownership. Redevelopment of Loftus Recreaton Centre to create new State indoor multi-use sports centre on Loftus Centre land includes: new indoor 3 court sports hall built at same level as existing change rooms & sports hall with viewing gallery; extend existing souther 2 court sports hall to become WA Gymnastic & Rhythmic Gymnastics performance hall; minor alterations to existing physio & adjacent areas to create gymnastics administration offices & meeting rooms; minor alterations of existing creche to create smaller area of 120 sq m; minor alterations of cardio area to create 100 sq m physiotherapist suite for lease; extension at ground floor (west side of change rooms) to create centre management office are & additional storage room; first floor level - extend exsting gym to create large group fitness area/function area overlooking oval & windows overlooking gymnastics hall; minor alterations & relocation of gym to existing library area; retain existing reception & kiosk areas (no alterations/refurbishment required); increase facilities of Community Centre by including additional craft room area, child's toilets, toy library & expanded community hall; reloction of child play area to internal courtyard; construct new single storey 1,600 sq m library (including local history centre), having separate entry along with direct acces into community hall; outdoor soccer are on west side, accessible to both sports hall & change rooms; increase car parking by 86 car bays (approx) in underground car park, to be accessed through existing carpark via ramp. Click for more details...

WA MUSEUM - BEAUFORT STREET WING
Social (Library, Archives, Galleries, Museums, Interpretive centres, Tourist info) project at Cnr Beaufort & Francis Sts, Perth, WA 6000 of Museum - Airconditoining - Supply & Install type of Supply & Install development. Supply & install airconditioning to Beaufort St wing. Click for more details...

BROOME PERFORMING ARTS & COMMUNITY CENTRE
Renovations, Refurbishments etc. project of Social (Library, Archives, Galleries, Museums, Interpretive centres, Tourist info) project at 27 Weld St, Broome, WA 6725. Work to include the refurbishment & construction of the existing civic centre into a preforming arts & community centre. The development may include solar panel technology that would generate renewable energy. Click for more details...

COOLBELLUP COMMUNITY FACILITIES
Social (Library, Archives, Galleries, Museums, Interpretive centres, Tourist info) project In The Cockburn Council Area of Local Govt ownership. Refurbishment of Coolbellup Community Facilities is to be staged & may include: extension & refurbishment of Coolbellup Library; construction of new offices to accommodate Financial Counselling, Anglicare & Early Education; refurbishment of Centenary Hall comprising installation of air conditioning, sound proofing, kitchen upgrade, conversion of courtyard to fully enclosed space & refurbishment of fully enclosed covered area to serve as storage space; relocation of Cockburn Vocational Centre in to Community Centre building & refurbishment of Community Centre building; construction of new building to accommodate Adventure Club & Children's Activity Area; installation of additional 36 car parking bays adjacent to library/hall; adjustments to eastern car park; and removal of transportable buildings. Click for more details...

BROOME VISITORS' CENTRE
Visitors' Centre/Telecentre/Interpretive Facility - 2 Storey project at Recreation Reserve 38458 & ptn Reserve 8176 Male Oval, Short St & Broome Rd, Broome, WA 6725 In The Council Area Of Broome of Local Govt. Construction of single storey, 580 sq m steel structure - glass metal cladding, visitors' centre, electrical, mechanical & hydraulics & site works. Click for more details...

ALEXANDER LIBRARY
Alexander Library is currently at the Construction stage, valued at about $ 385000 it is Works comprise - building management, energy control, & security system upgrade, & such other work as shown on drawings or included in specification. Click for more details...

CITY OF BUNBURY LIBRARY & SMART BUILDING
Social (Library, Archives, Galleries, Museums, Interpretive centres, Tourist info) project at Lot 152 Parkfield St, Bunbury, WA 6230 of Library/Smart Building - 2 Storey type of New development. May include construction of new 2,000 sq m x 2 storey building containing new City Library, ICT Training facility, Smart Data Centre & some lettable commercial office space together with provision for 70 car parking bays. Click for more details...

WESTERN AUSTRALIAN MARITIME MUSEUM
Social (Library, Archives, Galleries, Museums, Interpretive centres, Tourist info) project for New development. Construction of new multi level steel & timber framed, concrete metal clad building, complete with services & external works. Click for more details...

WA MUSEUM - COLLECTIONS BUILDING WELSHPOOL
Collections Building - Fitout Refurbishment project In The Canning Council Area. Fitout works for proposed staff areas within existing office & collection buildings. Works comprise partitioning, cabinet work & floor finishes. Click for more details...

WALPOLE LIBRARY
Social (Library, Archives, Galleries, Museums, Interpretive centres, Tourist info) project at Within Walpole Community Centre, cnr Pier St & Latham Av, Walpole, WA 6398 for New. Redevelopment of lesser hall of community centre to accommodate library. Click for more details...

CLARKSON LIBRARY
Prtn lot 9005 cnr Ocean Keys Blvd & Ebb Wy, Clarkson, WA 6030 Has Clarkson Library currently at Construction stage. Construction of brick cladding & tiltup panels library building. Click for more details...

ALBANY PUBLIC LIBRARY REDEVELOPMENT
Social (Library, Archives, Galleries, Museums, Interpretive centres, Tourist info) project at Loc S110, S111 & pt S112 York St, Albany, WA 6332 of Library - Extensions type of Addition development. To provide 200 sq m necessary extra floor space in ground floor extension incorporating laneway between library & gardens to house childrens' library. Extended library will include walls repainted throughout, new electrical installation to extension, new carpet throughout, new staff & unisex disabled toilets, air-conditioning, group study & training room. Click for more details...

GOLDEN PIPELINE PROJECT
Social (Library, Archives, Galleries, Museums, Interpretive centres, Tourist info) project In The Mundaring Council Area of State ownership. Conservation restoration works for existing museum facility. Click for more details...

FREMANTLE PRISON
Renovations, Refurbishments etc. project of Social (Library, Archives, Galleries, Museums, Interpretive centres, Tourist info) project at The Terrace, Fremantle, WA 6160. Work comprises construction & installation of exhibition furniture & graphics for Fremantle Prison. Click for more details...

PERTH CULTURAL CENTRE - ARTS HOUSE
Social (Library, Archives, Galleries, Museums, Interpretive centres, Tourist info) project for Renovations, Refurbishments etc. development. Works comprise minor forward works within existing building as full stage construction of new concrete, steel & glass frame foyer, new entry - addition with glazed curtain wall & steel roof, supply & installation of new lift comprising electrical & hydraulic services. Click for more details...

ELLENBROOK TOWN CENTRE COMMUNITY LEARNING PRECINCT DOUBLE ENTRY REFER 6205521
Social (Library, Archives, Galleries, Museums, Interpretive centres, Tourist info) New project at Pinaster Pde, end of Main St area within Town Centre, Ellenbrook, WA 6069. This type is Library/Civic Community & Recreational Facilities - 2 Storey with Local Govt ownership. Proposal includes community learning precinct comprising of Student Services, Management Centre & Senior Learning Community buildings, three learning communities buildings, Community Learning Centre (Library) facility, Arts Production building, cafeteria building & recreation building & oval within Town Centre & including shared library facility with Department of Education. Proposal includes air-conditioned ground floor library (880 sq m), first floor offices/meeting rooms (500 sq m), lift, verandahs & balconies. Click for more details...

KUDARDUP - FISHER ROAD ECO-TOURISM/ FORESHORE MANAGEMENT PLAN
Currently at the Early Planning stage In Augusta-Margaret River is a project estimated to be $ 500000. This project May include eco-tourism development including: kiosk/cafe, art studio/gallery, eco-tourism interpretive centre, barbeques & grassed picnic areas, boardwalk, walk trails & carparking. Click for more details...

BUNBURY REGIONAL ART GALLERIES UPGRADE
Currently at the Construction stage In Bunbury is a project estimated to be $ 1500000. This project Works to comprise of an extn to existing art gallery to incorporate extra storage, display areas & community access. Click for more details...

CITY OF GREATER GERALDTON VISITOR CENTRE RELOCATION
Visitor Centre - Conservation/Conversion - 2 Storey project at Lot 2842, Crown Reserve 38454, Marine Tce, Geraldton, WA 6530 in the Social (Library, Archives, Galleries, Museums, Interpretive centres, Tourist info). Works to include the complete refurbishment, conservation & adaptive reuse of the original Railway Station building. Click for more details...

WHITFORD LIBRARY
Renovations, Refurbishments etc. project of Social (Library, Archives, Galleries, Museums, Interpretive centres, Tourist info) project at Cnr Banks & Marmion Avs, Hillarys, WA 6025. Interior upgrade for construction of new children's area. Click for more details...

SHIRE OF PEPPERMINT GROVE LIBRARY/COMMUNITY FACILITIES/ADMINISTRATION OFFICES
Shire Of Peppermint Grove Library/Community Facilities/Administration Offices is currently at the Construction stage, valued at about $ 15600000 it is May include construction of building containing library, community facilities & Shire of Peppermint Grove administration office. Click for more details...

COURTHOUSE ART GALLERY
Social (Library, Archives, Galleries, Museums, Interpretive centres, Tourist info) project at Edgar St, Port Hedland, WA 6721 for Renovations, Refurbishments etc.. Renovations to art gallery as per tender documentations, drawings & specifications. Click for more details...

RIVERTON LIBRARY
Currently at the Construction stage In Canning is a project estimated to be $ 150000. This project Works will include decommissioning & removal of an existing cooled chiller, & the supply, installation, commissioning & warranty of a new replacement air cooled chiller, at the Library. Click for more details...

ST GEORGES CATHEDRAL HERITAGE PRECINCT (BURT MEMORIAL HALL)
3 (Lot 24) Pier St & 38A (Lot 25) St Georges Tce, Perth, WA 6850 Has St Georges Cathedral Heritage Precinct (Burt Memorial Hall) currently at Construction stage. Works to include the construction of an office building, Song School Building, a pedestrian plaza area & St Georges Cathedral. The proposal is to demolish the existing 2 storey Playhouse Theatre building on Lot 24, 3 Pier Street & construct an 7 level office building. The existing crossover on Pier Street is to be the access for vehicles into the building to the 2 new basement levels of car parking for 59 cars & provides for bicycle parking & end of trip facilities. On the lower ground level of the building there is to be a double volume lobby & gallery space, there are to be 2 cafes of 57 & 87 sqm on the upper plaza level. An alfresco dining area to which both cafes have access is proposed & there are to be offices ranging in size between 283 & 318 sqm on the remaining 4 levels. The office building is set back from Pier Street having a copper clad facade which provides a screen over the glass curtain walls to the east, west & southern elevation extending to the Pier Street boundary. To screen the proposed plant rooms which will have all the plant equipment for all the buildings on the site, the screen on the southern elevation extends above the upper level of the building curving towards the middle. Between the Deanery & office building it is proposed to build The Song School building is to comprise of 2 storeys having robe rooms on the lower level to open onto the landscaped garden around the Deanery building & the hall on the upper level where rehearsals are to take place. The primary feature of the building are the glazed facades & the Pier Street elevation will comprise of an opaque white polycarbonate light well feature facade to extend above the lower level of the building to create an arched 3 dimensional structure. A copper clad facade is also proposed on the lower level similar to the one for the office building providing acoustic treatments & sun protection to the space. Within the development are also proposed associated facilities like a shop, gallery & private offices. The Burt Memorial hall building is also expected to have some modifications done along with the restoration works currently being done internally & externally. Between the new office & the Song School buildings, a pedestrian plaza is proposed to be accessible via Pier Street to provide connections & circulation throughout the site. There is also a proposal at the original line of the tower base to remove the 1903 bell tower & the original Blacket designed brickwork tower to be constructed in order to accommodate the proposed octagonal spire clad in bronze coloured metal of a height of 50 mtrs above ground floor level. the structure will house new timber floors, a bell-ring platform & bellcote within the belfry ensuring the original structure of the Cathedral is free from further loading. Click for more details...

RIO TINTO NATURESCAPE ENVIRONMENTAL DISCOVERY LEARNING FACILITY
Social (Library, Archives, Galleries, Museums, Interpretive centres, Tourist info) project In The Perth Council Area of J/V - Private & Govt ownership. Construction of an education building & amenities block for the Rio Tinto Naturescape in Kings Park. This tender also includes a Photovoltaic (PV) Solar Array. Click for more details...

MANNING COMMUNITY HUB - (MANNING DISTRICT COMMUNITY REDEVELOPMENT)
Social (Library, Archives, Galleries, Museums, Interpretive centres, Tourist info) project for New development. To include demolition of existing public facilities & the construction of a single storey community centre with basement car parking. The community centre will comprise of new state of the art Manning Library, a new modern Community Hall and meeting spaces with modern facilities accessible to all members of the community. A new early years space incorporating a toy library and play-group also a Moorditj Keila Aboriginal Group, child health clinic and a Manning Rippers Football Club. The sports ground will also be expanded to provide for a greater range of sporting facilities. Click for more details...

CATALINA ESTATE OFFICE/INFORMATION CENTRE
Social (Library, Archives, Galleries, Museums, Interpretive centres, Tourist info) New project at Bnd by Marmion Av, Connolly Dr & Neerabup Rd, Clarkson, WA 6030. This type is Office/Information Centre - Design & Construct Package with Local Govt ownership. Tenders are being sought from experiened builders for the design & construction of a sales office/information centre to be located within the Catalina Estate. Click for more details...

WIRELESS HILL PROJECT - HERITAGE BUILDING WORKS
Social (Library, Archives, Galleries, Museums, Interpretive centres, Tourist info) Renovations, Refurbishments etc. project at Wireless Hill Park, Ardross, WA 6153. This type is Heritage Building Works - Refurbishment with Local Govt ownership. To include Heritage & Conservation works for restoration & refurbishment of the South-West Anchor block; three buildings; museum; Cottage; hall/store & a small independent dis-used toilet block. Click for more details...

STATE LIBRARY OF WA - ROOF - STAGE 2
State Library Of Wa - Roof - Stage 2 is currently at the Construction stage, valued at about $ 268000 it is Works to include replacing the existing roof at the State Library of WA. Works comprising removal of the existing roof sheeting in sections, supply & install new roof sheeting as per the job specs. Click for more details...

BROWN PARK - COMMUNITY CENTRE/TOY LIBRARY
Social (Library, Archives, Galleries, Museums, Interpretive centres, Tourist info) New project at Salibury Rd, Swan View, WA 6056. This type is Community Centre/Toy Library with Local Govt ownership. Works at Brown Park to include a full upgrade of the Brown Park Community Centre & construction of Swan View Toy Library within the community centre. Click for more details...

SUCCESS INTEGRATED HEALTH FACILITY (WENTWORTH PARADE MULTI FUNCTIONAL)
New project of Social (Library, Archives, Galleries, Museums, Interpretive centres, Tourist info) project at Lot 855 Wentworth Pde, cnr Beeliar Dr, Success, WA 6164. To include completion of works. Click for more details...

WA MARITIME MUSEUM - SHIPWRECK GALLERIES LIFT
Lift - Refurbishment Renovations, Refurbishments etc. project In The Fremantle Council Area. Works to include the major upgrade to the lift including the upgrade of the lift car interior & associated works at the Shipwreck Galleries in Fremantle. Click for more details...

ROTTNEST ISLAND - CULTURAL HERITAGE - CONSERVATION MANAGEMENT PLAN
Resorts/Information Centre - Consultancy Svcs New project In The Cockburn Council Area. Consultancy svcs sought for the preparation of a Conservation Management Plan (CMP) for Rottnest Island in the context of the proposed nomination of the Island to National Heritage List. This document will provide information about the local, State & National cultural heritage values & potential World Heritage values as well as the statutory & management framework that will ensure that the local, State, National & potential World Heritage values of the Island are appropriately conserved & managed in a manner that ensures that the RIA meets its obligations under relevant legislation & conventions. The documents will also be the guiding document in planning & management decisions taken by the RIA in its management of the place, it will provide valuable research to support the interpretation programs to enhance visitor & community understanding of this important place & the document will be prepared in accordance with the principles of the Burra Charter, the Heritage Council of WA's guidelines for Conservation Management Plans & will make use of information in the conservation strategies that already exist as well as RIA archives, research & records. Click for more details...

DIANELLA PUBLIC LIBRARY - ACCESSIBILITY WORKS
Waverly St, Dianella, WA 6059 Has Dianella Public Library - Accessibility Works currently at Construction stage. Accessibility Works for the Dianella Public Library include the construction of new toilet facilities to accessible and ambulant standards within the main building, redesign of the existing entrance way and accessible path/ramp and upgrading the existing accessible parking bays. Click for more details...

PRESBYTERIAN LADIES' COLLEGE
Addition project of Social (Library, Archives, Galleries, Museums, Interpretive centres, Tourist info) project at 14 McNeil St, Peppermint Grove, WA 6011. To include minor additions to the library. Click for more details...

SHIRE OF EAST PILBARA - LOT 1913 DEVELOPMENT
Shire Of East Pilbara - Lot 1913 Development is currently at the Construction stage, valued at about $ 6561000 it is Works to include the development of Lot 1913 in Newman comprising of: a large portal framed shed of approximately 60m x 27m, an art gallery of metal framed fibre cement & profiled sheet clad, a caretakers' dwelling & associated landscape works. Click for more details...

NOLLAMARA PRIMARY SCHOOL
101 Harrison St, Nollamara, WA 6061 Has Nollamara Primary School currently at Construction stage. Works to include the construction of a new Library Resource Centre. Click for more details...

KELMSCOTT LIBRARY
Kelmscott Library is currently at the Construction stage, valued at about $ 523000 it is Works to include an internal fitout & associated works within the Kelmscott Library. Click for more details...

MRS O'REILLY'S COTTAGE/DEMASSON'S HOUSE WORKS
Social (Library, Archives, Galleries, Museums, Interpretive centres, Tourist info) project In The Toodyay Council Area of Museum - Restoration type. Works to include the restoration & repairs of Mrs O'Reilly's Cottage also known as Demasson's House caused by storm damage. Click for more details...

GARNENER'S SHED STORAGE FACILITY
A project in the WA Within Subiaco. Works to include internal & external alterations to the gardeners shed into a storage facility for the subiaco museum. To include removing rollers doors & creating a double brick cavity, replace damaged doors, remove & reposition lighting, prepare & paint all previously painted surfaces, install whether & pest seals, replacing ceiling, install block out blinds, ensure all plumbing is working correctly, replace tiling & re-glaze broken windows. Click for more details...

GOLDFIELDS ART CENTRE
35 Cheetham St, Kalgoorlie, WA 6430 Has Goldfields Art Centre currently at Construction stage. Works to include the design & construction of a 90-100kW Solar Photovoltaic system at the Goldfields Art Museum. Click for more details...

WESTERN AUSTRALIAN MUSEUM REDEVELOPMENT
Social (Library, Archives, Galleries, Museums, Interpretive centres, Tourist info) New project at Bnd by Francis, James, Beaufort & Museum Sts, Northbridge, WA 6003. This type is Electrical Services with State ownership. New Museum Project - Energy & Thermal Solution (ETS): Electrical Services. The scope of the Electrical Services works within the ETS includes but is not limited to: Production of shop drawings in a 3D environment. HV electrical services. Build two intake switch rooms to facilitate the redundancy of the Western Power 11 kV connections (rated at 5 MVA). Re-use existing Western Power assets currently on site & transferring to private ownership, these will include transformers, switchgear etc. Supply & installation of new transformers & switchgear as required. Supply & installation of a flexible high voltage ring main arrangement. Supply & installation of a active harmonic filtering systems. Supply & installation of a load management system (SCADA) to monitor the performance of the distribution system. Supply & installation of new generating sets will be provided to as part of these works. Builders work in connection with the installation of these services. Out of hours work to components of the above. Click for more details...

RAILWAY HOUSE INTERPRETATIVE CENTRE
Currently at the Planning stage In Busselton is a project estimated to be $ 110000. This project Designers & consultants to provide concept designs for the interpretation elements for the City of Busselton?s Railway House Interpretative Centre. Click for more details...

WESTERN AUSTRALIAN MUSEUM REDEVELOPMENT
Groundworks & Ground Probing project at Bnd by Francis, James, Beaufort & Museum Sts, Northbridge, WA 6003 in the Social (Library, Archives, Galleries, Museums, Interpretive centres, Tourist info). New Museum Project - Groundworks & Ground Probing. Scope of works will include, but are not limited to, Prepare, maintain & remove piling mat in accordance with the design for the perimeter wall retaining system (diaphragm wall / contiguous piling wall). Removal of temporary works (guide walls) used to construct the perimeter wall retaining system. Removal of spoil generated from the perimeter wall retaining system. Ground probing to locate & mark existing services, & objects (including non-heritage existing basement structures). Break-up & remove underground objects (e.g. non-heritage basement walls near Francis Street). Site preparation & clearing. Removal of trees & associated scrub & bushes. Services trenching. Bulk excavation of basement (approximately 30,000m3). Supply & install sub-soil drainage. Removal & disposal of surplus soil off-site. Import clean fill as required. Levelling, grading, trimming & compacting (including compaction certificates). Mobilisation & demobilisation. Click for more details...

RESIDENCY MUSEUM
Social (Library, Archives, Galleries, Museums, Interpretive centres, Tourist info) project for New development. Construction of roof repairs for the Residency Museum Albany. Click for more details...

WESTERN AUSTRALIAN MUSEUM REDEVELOPMENT
Concrete/Formwork New project In The Perth Council Area. New Museum Project - Concrete / Formwork. The Scope of Works for the Concrete / Formwork Structure from footing level will include all engineering (as required), surveying, shop drawings, plant, labour & materials to complete the following services, On-ground & suspended slabs. Lift/Stair Cores. Design, supply, install, strip & remove all formwork. Set out of all formwork. Concrete supply, placement & finishing to required class or finish including. Concrete pumping, patching, infilling & skim coating as required (approximately 4,000m3). Cast in all items supplied by others. Detailed excavation to ground slab elements. Lifting equipment (stillages, cages, clutches etc). Click for more details...

WESTERN AUSTRALIAN MUSEUM REDEVELOPMENT
State ownership Social (Library, Archives, Galleries, Museums, Interpretive centres, Tourist info) project In The Perth Council Area for New development. The scope of works will include all design & engineering (as required), plant, labour & equipment to complete the following works: Supply & installation of security services to new buildings & existing heritage listed buildings, gross floor area circa 22,000m2 & services design co-ordination. Click for more details...

SHIRE OF CUE COMMUNITY RESOURCE & VISITORS CENTRE
Currently at the Construction stage In Cue is a project estimated to be $ 350000. This project The project is the adaption of the former Cue Post Office to a Community Resource & Visitor Centre. Click for more details...

KALGOORLIE DRILL CORE LIBRARY
Currently at the Construction stage In Kalgoorlie-Boulder is a project estimated to be $ 107000. This project Conversion of air conditioning to split system at Kalgoorlie Drill Core Library. Click for more details...