State

Categories

Sub Categories

Click Here to Find Current Projects

List of Marinas Projects


DEPARTMENT FOR PLANNING & INFRASTRUCTURE - TRANSPORT INFRASTRUCTURE
Civil Engineering (Marinas) project at Within State of Western Australia, ., WA 6999 of Transport Infrastructure - Planning & Design Services For Various Locations type of Addition development. Formation of panel for provision of transport infrastructure planning & design services. Panel is for various projects on as-required basis for one year period, with option to extend to maximum of four years. Click for more details...

BUNBURY WATERFRONT - KOOMBANA BEACH REDEVELOPMENT- STAGE 1
Civil Engineering (Marinas) project for New development. Bunbury Waterfront will comprise 5 km of enhanced public waterfront, walkways, footbridge & cycleways with a new marina to create a world class tourism destination. The Waterfront will connect with Bunbury CBD with the improvement of boating facilities & open public access. A range of retail outlets, restaurants & cafes, bars as well as additional office, entertainment & tourist accommodation, greater residential options such as apartments & short-stay accommodation are part of the project to create a thriving community hub. Click for more details...

ALBANY BOAT HARBOUR & BREAKWATER
Civil Engineering (Marinas) New project at Princess Royal Harbour, Albany, WA 6330. This type is Environmental Consultancy Services For Boat Harbour & Breakwater with Local Govt ownership. It is proposed to develop working boat harbour & breakwater. New harbour will provide safe havens, pens & repair facilities for sailing & recreational boating & will also facilitate servicing of boats, especially boats of tuna fishing & gourmet table fishing fleets. Click for more details...

ABEL POINT MARINA
Currently at the Construction stage In Whitsunday Regional is a project estimated to be $ 10000000. This project Work includes construction of breakwater, dredging for marina for approximately 60 berths for 30m & 40 m craft. Associated landscaping & parking. Click for more details...

COOMERA WATERSPORTS COMPLEX
., Coomera, QLD 4209 Has Coomera Watersports Complex currently at Construction stage. Construction of twin concrete boat ramps & access road. Click for more details...

BREAKWATER PIER DEMOLITION WORKS
Local Govt ownership Civil Engineering (Marinas) project In The Hobsons Bay Council Area for New development. The demolition of approximately 340sq metres of concrete decking at Breadwater Pier, Williamstown. Companies having proven expertise, resources and experience in marine construction and demolition works are encouraged to tender. Click for more details...

LANCELIN ABALONE FARM
Abalone Farm project at Reserve 25305 Perth/Lancelin Rd, Lancelin, WA 6044 In The Council Area Of Gingin of Private. Proposal is for development of intensive land-based abalone farm where clean seawater would be pumped over abalone in shallow tanks located near to shore. It is envisaged that up to 200 tpa of abalone would be produced. Two pipes would be run from land-based structures out to sea in order to pump fresh seawater into tanks & return used water to ocean. Click for more details...

THE SOVEREIGN MILE MARINA
Civil Engineering (Marinas) project at The Sovereign Mile (adjacent Lot 505 RP 215032), Sovereign Islands, QLD 4216 of Marina type of New development. Proposed construction of 7 mega berth marina. Parking for 7 cars. Click for more details...

FISHERMANS WHARF DEVELOPMENT
A project in the NSW Within Wyong. Construction of a 3 storey tourist development that will include a number of upmarket restaurants, retail tenancies, extensive deck areas for outdoor eating and public entertainment, function rooms, public toilets and a timber boardwalk over the water supported on piers. The proposed development contains the following components: ground floor - 11 tenancies (shops/restaurants - 2 kitchens); 2 offices (centre manager & secretary); entry foyer/lift; open deck areas; storage areas; public toilets/baby change; and garbage bin storage. First floor - 7 tenancies (restaurant/function areas - 4 kitchens); entry foyer/lift; open deck areas; internal toilets. Second floor - 3 tenancies (restaurants/function areas - 2 kitchens); entry foyer/lift; open deck areas; and internal toilets. Total tenacy area will be 1,428.88sq m. The floors of the building are to be of suspended reinforced concrete with the internal columns and load bearing walls to be concrete or masonry. The roof structures are to include metal sheeting on steel frames with extensive use of fabric membrane sail structures over open deck areas. Glass/stainless steel framed balustrades are proposed for the decks. Associated carparking for 175 vehicles. Click for more details...

ALBANY BOAT HARBOUR & BREAKWATER
Currently at the Early Planning stage In Albany is a project estimated to be $ 234000. This project It is proposed to develop working boat harbour & breakwater. New harbour will provide safe havens, pens & repair facilities for sailing & recreational boating & will also facilitate servicing of boats, especially boats of tuna fishing & gourmet table fishing fleets. Click for more details...

PORT KEMBLA PORT CORPORATION
., Port Kembla, NSW 2505 Has Port Kembla Port Corporation currently at Tenders & Building stage. Biennial (2 yearly) trade packages services as follows: bridge & wharf works; carpentry & joinery & associated works; concreting; fencing; roadworks; plumbing; protecting coating services; steel fabrication; underwater diving services & glazing. Minor contract works are up to the value of $50,000. Click for more details...

THE DOLPHIN BOAT SHED
Civil Engineering (Marinas) project In The Hornsby Council Area of Boat Shed/Roadworks type. Demolition of additions to original boatshed building, construction of new building for office services, retail area, marine maintenance workshop, winch house, wharf gatehouse, passenger transport terminal, sealing of roadway & carpark. Also proposed is a passenger transport terminal to allow the pick-up and set-down of passengers by the MV Bay Runner. Click for more details...

CANAL ROCKS BOAT RAMP & FINGER JETTY
Off Caves Rd south of, Yallingup, WA 6282 Has Canal Rocks Boat Ramp & Finger Jetty currently at Construction stage. Concrete boat ramp with finger jetty constructed on western side of existing ramp & extended an extra 12 m into sea. Click for more details...

ALBANY BOAT HARBOUR & BREAKWATER
Civil & Structural Consultancy Services For Boat Harbour & Breakwater project at Princess Royal Harbour, Albany, WA 6330 in the Civil Engineering (Marinas). It is proposed to develop working boat harbour & breakwater. New harbour will provide safe havens, pens & repair facilities for sailing & recreational boating & will also facilitate servicing of boats, especially boats of tuna fishing & gourmet table fishing fleets. Click for more details...

PORT OF BUNBURY
A project in the WA Within Bunbury. Works comprise maintenance dredging of approach channel, turning basin & other areas of Port of Bunbury. Estimated volume of material to be removed is approximately 500,000 cu m at depths between 8.5 m & 12.8 m below datum. Material is mainly silt, sand & seaweed & is suited to trailer suction hopper dredge. Dumping ground is located approximately 2 nautical miles east of channel. Click for more details...

SUPERYACHT MARINA
Currently at the Construction stage In Leichhardt is a project estimated to be $ 31000000. This project Re-alignment of existing pontoons & addition of new pontoons to provide for a maximum of 43 vessels; demolish the existing refuelling facility & a section of the wharf apron; refined parking layout & refined vehicle access & loading areas to service the vessels; retain the existing services & marina management facilities & landscaping; refine the 24 hours public access to the foreshore including new pedestrian & cycle paths. Outdoor seating areas. Construction of 2 commercial maritime buildings with ancillary uses 6,880sq m, each 2 levels. Construction of a 5 level multi-level carparking building for 307 cars & marine storage facilites. Click for more details...

MARINA WELLINGTON
Subdivision - Waterfront project at East of Wellington Ferry Crossing, Wellington, SA 5259 In The Council Area Of Murray Bridge of Private. 55 lots approx. Pine log housing. Click for more details...

ESPERANCE FORESHORE
Civil Engineering (Marinas) project In The Esperance Council Area of Foreshore - Traffic Engineering Services For Foreshore Redevelopment type. Proposed upgrade to foreshore at Esperance may include relocation of tourist bureau & relocation of Tanker Jetty. Click for more details...

LUNA PARK REDEVELOPMENT
A project in the NSW Within North Sydney. The amusement area is to be redeveloped in 1930s style, a 2000 seat auditorium will be built for concerts. The Crystal Place building will be refurbished for functions. An office building containing 40 boutique styled offices part 4 storey/10 storey building with carparking for 40 tenants. There will also be a marina, offering short-stay berthing for up to 30 boats. Amendment of the approved envelopes for the circus building to accommodate the building structure - no height increase. Amendment of location of the proposed public pedestrian link between Glen St & the Lavender Bay boardwalk. Click for more details...

CAPE SEAFARMS PRAWN FARM
Civil Engineering (Marinas) project at Heron Point, Exmouth, WA 6707 of Prawn Farm - Stage 1 type of New development. Proposed 100 x 1 ha "grow-out" ponds, including reservoirs & discharge channels, settling & evaporation ponds, laboratory & hatchery as well as associated works. To be developed in stages over three years. Stage 1 to consist of 20 ponds. Click for more details...

BOBBIN HEAD MARINA
Civil Engineering (Marinas) project at Bobbin Head Rd Ku-ring-gai National Park, Bobbin Head, NSW 2074 for Renovations, Refurbishments etc.. Renovations & alterations to existing boatshed, removal of slipway, new hardstand area & travel lift, removal of 181 swing moorings & replaced with 181 wet berths, alignment of the layout of berths & associated works. Click for more details...

ONSLOW FORESHORE - SUNRISE BEACH
Sea Wall - Repair & Reinforcement project at Sunrise Beach, Onslow, WA 6710 in the Civil Engineering (Marinas). Repairs & reinforcements to sea wall to help protect townsite against wave action during cyclones. Wall may be reinstated to height of about 0.5 m above road level along First Av & ancillary works to be carried out in low-lying areas to minimise floodwaters backing up from Beadon Creek & torrential rain. Tenders are now invited for upgrading of the existing seawall, including quarrying of suitable armour rock & construction of drainage structures, access stairs & boat ramp. Click for more details...

COOMERA WATERS RESORT
Marina project at Off Torandeenin Rd, Coomera, QLD 4209 in the Civil Engineering (Marinas). 70 berth marina. Floating steel frame with concrete decking. Total area of land 188.7ha. Click for more details...

KO VEDA HOLIDAY PARK
A project in the NSW Within The Hills Shire. Construction of 100 cabins. Click for more details...

HONEYSUCKLE WATERFRONT
Civil Engineering (Marinas) project In The Newcastle Council Area of Foreshore Promenade type. Construction of foreshore promenade which is to be built in segments over the next 5 to 10 years & will stretch from the eastern end of the Merewether Street Wharf, where the $40 million Becton Hotel will be built, to the Commercial Fishermen's Co-op on Throsby Basin. Click for more details...

AUSTEEL STEEL MILL
A project in the NSW Within Port Stephens. Construction of a Steel Mill to produce 4 million tonne per year of steel from the Western Australian Fortescue iron ore deposit. The steel mill complex will include 3 electric arc furnaces, 3 ladle furnaces, 2 thin slab casters, a thick slab caster, a hot strip mill & a hot strip temper mill. As well there is a cold mill complex comprising a pickle line, 2 single standing reversing mills, a galvanising line, a tempermill, batch annealing & an inspection/coil handling & packaging facility. The NSW Government has entered into an agreement to develop a 150ha site for the steel mill & a 25ha site for a port facility & lease them to Austeel on a long term commercial basis. The port will be designed to accommodate vessels with a capacity of up to 140,000 dead weight tonnes. Click for more details...

NOTIONAL SEAWAY PROJECT CONSULTANCY FOR CRUISE SHIP TERMINAL
Consultancy For Cruise Ship Terminal/Marina Environmental Impact Statement New project In The Gold Coast City Council Area. The Notional Seaway Project comprises the following elements of the Gold Coast Marine Development Project, a cruise ship terminal on the northern end of The Spit and a marina for super yachts and other vessels in the Marine Stadium or to the west of Sea World. Click for more details...

CHINDERAH BAY DRIVE MARINA
Civil Engineering (Marinas) project In The Tweed Council Area of Marina - Stage 1 type. Construction of 29 berth marina. With associated facilities to handle sewage from boats & a biofiltration system for handling oil & grease contaminated bilge water. Click for more details...

PORT HEDLAND ENHANCEMENT SCHEME
Civil Engineering (Marinas) project In The Port Hedland Council Area of J/V - Private & Govt ownership. Proposed works at Pretty Pool Recreation Area include redevelopment & extension of existing landscaped park, provision of shade structures, shaded children's play area, entry statement, redevelopment & extension of existing carpark, upgrade to ablutions facilities, provision of solar-powered photo-electric timer controlled lighting to park & provision of time-controlled cold external showers, replace park furniture & bbq's, construct new footpaths & install park & interpretive signage. At Cemetery Beach, proposed works include redevelopment of existing park to include shade structures, fixed seating, barbecues, photo-electric timer controlled solar powered lighting, redesign & relocation of children's play area, safety fencing & defined hard-surface carpark, provision of walkway/viewing area to Flatback turtle nesting area on adjacent beach, fishing platform with shade structure, seating & solar powered lighting & erect turtle interpretive & park entrance information signage. At Civic Centre Performing Arts & public recreational area, proposed work includes removal of existing carpark & redevelopment of entire area to form landscaped area. Also proposed are dedicated platform at Cooke Point for viewing "Stairway to the Moon", additional beach shades & extension to Sutherland St footpath & install interpretive signage. Click for more details...

ROBE MARINA BOATYARD
Local Govt ownership Civil Engineering (Marinas) project In The Robe Council Area for Supply & Install development. Supply & construct concrete boat washdown area, associated drainage & treatment system. Click for more details...

CORAL BAY BOAT RAMP & ASSOCIATED INFRASTRUCTURE
State ownership Civil Engineering (Marinas) project In The Carnarvon Council Area for New development. As alternative to developing boat ramp at Monck Head, Coral Bay, it is proposed to develop boat ramp at northern Bills Bay. Click for more details...

NEWCASTLE MARITIME CENTRE
Civil Engineering (Marinas) project for New development. Demolition of four existing derelict jetties & installation of mooring piles, construction of marina style concrete pontoons & a 3 metre wide walkway, installation of two aluminium gangways hinged on a fixed timber ramp, construction of a timber ramp & landing platform, provision of services including water, lighting, electricity & telephone. Click for more details...

BAYVIEW ANCHORAGE MARINA
Civil Engineering (Marinas) project In The Pittwater Council Area of Marina - Upgrade type. Replacement & upgrade of existing marina, the completed works will result in 63 fixed berths, 2 floating walkway arms, 2 access gangways, piles securing floating structures & springer piles, services reticulation & outlet modules, sewerage pumpout facility, lighting. Click for more details...

SHIRE OF EXMOUTH - BOAT RAMP WORKS (BUNDEGI)
Shire Of Exmouth - Boat Ramp Works (Bundegi) is currently at the Construction stage, valued at about $ 110000 it is Works to comprise of construction of Bundegi Boat Ramp in Exmouth. Click for more details...

GREAT SOUTHERN MARINA - ROBE - STAGE 1
Lake Butler, Robe, SA 5276 Has Great Southern Marina - Robe - Stage 1 currently at Construction stage. Redevelopment of marina to accomodate 37 commercial & 54 recreational berths. Click for more details...

GREAT SOUTHERN MARINA - ROBE - STAGE 2
New project of Civil Engineering (Marinas) project at Lake Butler, Robe, SA 5276. Upgrade to boardwalks. Click for more details...

WHITE BAY BERTH 6
White Bay Berth 6 is currently at the Planning stage, valued at about $ 8000000 it is Proposed construction of a marine and supply facility. The proposal includes: Marine refuelling facilities consisting of tank farm capable of storing 350,000L of diesel fuel and 50,000L of unleaded fuel, eight card-operated refuelling dispensers and associated pipework; a 2 storey building approximately 11m in height and 50 in length for bulk storage (1125sq m) and a small number of offices leased for commercial marine service businesses (155sq m); a building of approximately 10m in height and 50m (1140sq m) in length for bulk indoor storage space for marine equipment including rope, buoys, lifeboats or other marine hardware; a roll on/roll off (RoRo) ramp for intermodal freight operations to service Sydney Harbour, with an associated lay down area for temporary storage of goods for water transport; A 75 tonne travel lift with associated construction of dual ramps adjacent to the RoRo ramp; grey water and sullage pump facilities; supply point for commercial vessels to collect pre-ordered supplies; and temporary vessel moorings. 30 associated carparking spaces. Click for more details...

BHP ORE BERTH FIVE
Civil Engineering (Marinas) project In The Newcastle Council Area of Private ownership. Refurbishment of the former ore berth. Scope of work includes construction of 265m of wharf deck area as part of the refurbishment of an existing wharf. Up to 80,000sq m of hardstand area which can be used for cargo handling, storage & assembly area Click for more details...

KWINANA BEACH STAGE 1 - MARINE WORKS
Marine Works - Offshore Artificial Headlands project at Kwinana Beach, Rockingham, WA 6168 in the Civil Engineering (Marinas). Marine works to consist of construction of one-two rock-armoured offshore artificial headlands & sand placement from local sand stockpile for beach renourishment. Click for more details...

FREMANTLE WATER POLICE
Walkway/Wave Breakers project at Harvest Rd, Fremantle, WA 6160 In The Council Area Of Fremantle of State. Works to comprise refurbishment of wave breakers & installation of walkway as per specifications & drawings. Click for more details...

BREAKWATER MARINA STAGE 2A PART 1 & STAGE 3
Civil Engineering (Marinas) project for New development. Stage 2A Part 1 includes extending remaining marina berth by 80 berths & Stage 3 includes construction of Breakwater Villas berths (approx 200 m in length) for existing waterfront homes to include 21 berths on a newly constructed pier. Click for more details...

CRONULLA MARINA
Marina project at 60 Waratah St, Cronulla, NSW 2230 in the Civil Engineering (Marinas). Expansion of existing marina at Cronulla. The proposal predominantly relates to the water based components of the marina & includes the extension of the existing wet berth marina complex by 38 berths, relinquishment of 42 swing moorings, relocation of 4 houseboat moorings as fore & aft moorings, & upgrade of the slipways & associated infrastructure. Total of 4 houseboat berths, dedicated 17m barge berth (Berth 3), 4 x 9m berths, 10 x 12m berths, 34 x 15m berths, 11 x 18m berths, 7 x 20m berths (plus 1 transit slipping bay designed to accommodate a 20m vessel) & 4 designated CAT berths. All berths in the marina will be serviced with water, power, lighting & security. The project includes a fuel pumpout service pontoon for commercial & private use & sewage pumpout & oily bilge disposal facilities; upgrade of the 2 existing slipways to provide full slipping & anti-fouling services & to meet full EPA requirements; relocation of the area approved as a loading bay under DA 06/0923 & excavation as required; & an awning over the slipway & loading bay. Click for more details...

MANDURAH OCEAN MARINA BOAT PENS/WESTERN FORESHORE SWIMMING PLATFORM
Mandurah Ocean Marina Boat Pens/Western Foreshore Swimming Platform is currently at the Construction stage, valued at about $ 655000 it is Works to comprise construction of 32 boat pens in Mandurah Ocean Marina & an upgrade & refurbishment of the Western Foreshore Swimming Platform. Click for more details...

ROTTNEST ISLAND MOORINGS
New project of Civil Engineering (Marinas) project at Within, Rottnest Island, WA 6161. Works comprising of the supply of new equipment, replacement of existing equipment & maintenance of hire moorings, marine hire facilities & santuary markers for Rottnest Island. Click for more details...

BATAVIA COAST MARINA FLOATING MOORING PENS
Civil Engineering (Marinas) project at Batavia Coast Marina, Geraldton, WA 6530 of Floating Mooring Pens type of New development. Works to comprise design & construction of 50 floating mooring pens at the Batavia Coast Marina, Geraldton WA. Click for more details...

MACHANS MARINA
Machans Marina is currently at the Construction stage, valued at about $ 350000 it is Upgrade & extension of existing marina Click for more details...

ST GEORGE MOTOR BOAT CLUB MARINA
Marina - Extn project at 2 Wellington St, Sans Souci, NSW 2219 in the Civil Engineering (Marinas). Expansion of the existing marina to provide an additional 101 berths. Construction of a new berthing arm (ARM F) to provide additional 37 berths. Expansion of the existing marina capacity by 41 new berths & regularisation & continued use of 23 existing unapproved berths. Modification to the existing lower level carparking layout & construction of a new parking level for an additional 36 carspaces. Click for more details...

MIDDLE HARBOUR YACHT CLUB
Civil Engineering (Marinas) New project at Parriwi Rd, Mosman, NSW 2088. This type is Marina - Extn with Private ownership. Extension of 28 berths to existing floating marina system. The proposed development consists of: extension of existing marina arm 'D' by 47m into middle harbour. Disconnection of the 'T' head to existing marina arm 'C'; extension of existing marina arm 'C' 33m into middle harbour & reconnection of the existing 'T' head. Disconnection of the 'T' head to existing marina arm 'B' including the existing pumpout; extension of the existing marina arm 'B' 23m into middle harbour & reconnection of the existing 'T' head & the existing pump out system. Connection of all services to the extension of the existing marina arms 'D', 'C' & 'B'; this includes navigation lights, sewerage pumpout & service pedestals to each twin berth. Piling as required. Click for more details...

ELIZABETH QUAY - PERTH WATERFRONT (PERTH CITY FORESHORE) - PUBLIC REALM & INLET
Civil Engineering (Marinas) New project at Foreshore btwn Barrack & William Sts, Perth, WA 6000. This type is Waterfront - Development - Consultancy Svcs with State ownership. Consultant sought for provision of structural engineering svcs for the Elizabeth Quay Perth Waterfront Development. Click for more details...

MELBOURNE CITY MARINA RENEWAL WORKS
Local Govt ownership Civil Engineering (Marinas) project In The Melbourne Council Area for Renovations, Refurbishments etc. development. The Melbourne City Marina, constructed in, or around, 2005, is a floating concrete pontoon marina comprising of an Eastern Marina Arm, with berthing facilities for 14 vessels up to 18 metres in length, and a Central two-arm commercial berthing and mooring facility for vessels up to 50 metres in length, and a Western Marina Arm with berthing facilities for up to 12 vessels up to 20 metres in length. The Eastern and Western Marina Arms of the marina are exhibiting significant deterioration. The Melbourne City Council wishes to repair and refurbish the two arms of marina, in order to reinstate the marina pontoon system to an ?as-built? condition. The Works comprise: Option 1: Replace all existing brackets in Eastern and Western walkways with new Grade 350 structural steel brackets; install new HDPE cover plates; install new HDPE wear blocks; install new HDPE pile sleeves; repair spalled concrete and replace gangway connection on the Commercial Walkway; replace existing timber Walers with Stress Grade F22 Hardwood Timber Walers; replace defective Ferrule; and replace existing fenders with Extruded Rubber fenders. Option 2: Replace existing Western and Eastern Walkway Berths with new pontoons (excluding existing piles). Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect