State

Categories

Sub Categories

Click Here to Find Current Projects

List of Marinas Projects in WA


DEPARTMENT FOR PLANNING & INFRASTRUCTURE - TRANSPORT INFRASTRUCTURE
Civil Engineering (Marinas) project at Within State of Western Australia, ., WA 6999 of Transport Infrastructure - Planning & Design Services For Various Locations type of Addition development. Formation of panel for provision of transport infrastructure planning & design services. Panel is for various projects on as-required basis for one year period, with option to extend to maximum of four years. Click for more details...

BUNBURY WATERFRONT - KOOMBANA BEACH REDEVELOPMENT- STAGE 1
Civil Engineering (Marinas) project for New development. Bunbury Waterfront will comprise 5 km of enhanced public waterfront, walkways, footbridge & cycleways with a new marina to create a world class tourism destination. The Waterfront will connect with Bunbury CBD with the improvement of boating facilities & open public access. A range of retail outlets, restaurants & cafes, bars as well as additional office, entertainment & tourist accommodation, greater residential options such as apartments & short-stay accommodation are part of the project to create a thriving community hub. Click for more details...

ALBANY BOAT HARBOUR & BREAKWATER
Civil Engineering (Marinas) New project at Princess Royal Harbour, Albany, WA 6330. This type is Environmental Consultancy Services For Boat Harbour & Breakwater with Local Govt ownership. It is proposed to develop working boat harbour & breakwater. New harbour will provide safe havens, pens & repair facilities for sailing & recreational boating & will also facilitate servicing of boats, especially boats of tuna fishing & gourmet table fishing fleets. Click for more details...

ESPERANCE FORESHORE
Foreshore - Coastal Engineering Services For Foreshore Redevelopment Renovations, Refurbishments etc. project In The Esperance Council Area. Proposed upgrade to foreshore at Esperance may include relocation of tourist bureau & relocation of Tanker Jetty. Click for more details...

ESPERANCE FORESHORE
Civil Engineering (Marinas) project at Foreshore at, Esperance, WA 6450 for Renovations, Refurbishments etc.. Proposed upgrade to foreshore at Esperance may include relocation of tourist bureau & relocation of Tanker Jetty. Click for more details...

ESPERANCE FORESHORE
A project in the WA Within Esperance. Proposed upgrade to foreshore at Esperance may include relocation of tourist bureau & relocation of Tanker Jetty. Click for more details...

LANCELIN ABALONE FARM
Abalone Farm project at Reserve 25305 Perth/Lancelin Rd, Lancelin, WA 6044 In The Council Area Of Gingin of Private. Proposal is for development of intensive land-based abalone farm where clean seawater would be pumped over abalone in shallow tanks located near to shore. It is envisaged that up to 200 tpa of abalone would be produced. Two pipes would be run from land-based structures out to sea in order to pump fresh seawater into tanks & return used water to ocean. Click for more details...

JURIEN MARINE PARK
State ownership Civil Engineering (Marinas) project In The Dandaragan Council Area for New development. Works to comprise installation of float markers within Jurien Marine Park. Click for more details...

ALBANY BOAT HARBOUR & BREAKWATER
Currently at the Early Planning stage In Albany is a project estimated to be $ 234000. This project It is proposed to develop working boat harbour & breakwater. New harbour will provide safe havens, pens & repair facilities for sailing & recreational boating & will also facilitate servicing of boats, especially boats of tuna fishing & gourmet table fishing fleets. Click for more details...

ELIZABETH QUAY - PERTH WATERFRONT (PERTH CITY FORESHORE) - PUBLIC REALM & INLET
Waterfront - Redevelopment - Design & Construct project at Foreshore btwn Barrack & William Sts, Perth, WA 6000 In The Council Area Of Perth of State. Construction of a 2.8 ha inlet that will bring the river back to near its original shore line. The inlet will be surrounded by landscaped terraces, boardwalks & promenades. It is proposed to remove a section of Riverside Dr & some changes may be made to existing roads to create more pedestrian-friendly routes. Significant work may be done on road re-alignment, drainage & dredging. The inlet, designed to reflect the historical characteristics of Perth Port, will have room for public boat mooring facilities. At the centre of the new inlet will be an island. Potential land use mix may include 15,000 sqm of office space, 36,000 sqm of retail, 1700 apartments, 220 hotel & short stay accommodation rooms & land at the foot of William St has been set aside for a significant public building to be 9,000 sqm in area likely to be a National Centre for Indigenous Art & Culture. Event spaces may include a public square next to the Esplanade train station, the promenade, the island & a new road which can be closed to accommodate events. Works may also include a swimming pool. Click for more details...

FLAT ROCK BOATING FACILITY (AUGUSTA BOAT HARBOUR) - MARITIME STRUCTURES
Civil Engineering (Marinas) New project at Flat Rock in Flinders Bay, approx 5 km south of, Augusta, WA 6290. This type is Boating Facility - Design & Construct Package with State ownership. Works to include design & construction of the Maritime Structures at the Augusta Boat Harbour creating a protected harbour basin featuring 4 boat launching ramps, 2 boat holding jetties, 40 m service jetty & floating jetty with associated facilities, universal access pontoon, universal access fishing platform, parking for approx 160 cars/trailers & 90 parking bays for only cars, installation of utility svcs & navigation aids which will form Stage 2 of the project. Click for more details...

CORAL COAST MARINA RESORT (MAUD'S LANDING)
Inland Marina/Tourist Resort New project In The Carnarvon Council Area. Project proposed to be divided into two phases, phase 1 to include 710 tourist units & 10 tourist development sites & first stage of inland marina village resort. Tourist sites to include caravan/chalet park & backpackers' accommodation. Commercial sites including service station, tavern, newsagency, dive shop, boat chandlery, food take-away & delicatessen. 200 residential lots ranging in size from 400 sq m to 700 sq m, most having water frontage & option for boat pens. Sites to be serviced with water, power & sewerage. Click for more details...

CANAL ROCKS BOAT RAMP & FINGER JETTY
Off Caves Rd south of, Yallingup, WA 6282 Has Canal Rocks Boat Ramp & Finger Jetty currently at Construction stage. Concrete boat ramp with finger jetty constructed on western side of existing ramp & extended an extra 12 m into sea. Click for more details...

ALBANY BOAT HARBOUR & BREAKWATER
Civil & Structural Consultancy Services For Boat Harbour & Breakwater project at Princess Royal Harbour, Albany, WA 6330 in the Civil Engineering (Marinas). It is proposed to develop working boat harbour & breakwater. New harbour will provide safe havens, pens & repair facilities for sailing & recreational boating & will also facilitate servicing of boats, especially boats of tuna fishing & gourmet table fishing fleets. Click for more details...

CORAL BAY BOAT RAMP & ASSOCIATED INFRASTRUCTURE
Civil Engineering (Marinas) project at Monck Head, south of settlement of, Coral Bay, WA 6701 for New. Construction of rock armoured island & causeway, 2 boat ramps with 1 finger jetty & service jetty. Click for more details...

PORT OF BUNBURY
A project in the WA Within Bunbury. Works comprise maintenance dredging of approach channel, turning basin & other areas of Port of Bunbury. Estimated volume of material to be removed is approximately 500,000 cu m at depths between 8.5 m & 12.8 m below datum. Material is mainly silt, sand & seaweed & is suited to trailer suction hopper dredge. Dumping ground is located approximately 2 nautical miles east of channel. Click for more details...

MATILDA BAY BOAT RAMP & FINGER JETTY
Civil Engineering (Marinas) project In The Subiaco Council Area of Boat Ramp & Finger Jetty type. Construction of new boat ramp & finger jetty at Matilda Bay. Click for more details...

ONE MILE JETTY
Jetty - Renovation project at Annear Pl, Babbage Island, Carnarvon, WA 6701 in the Civil Engineering (Marinas). Conservation work includes replacement of 66 piles at end of jetty, stringers, rails & decking at head & neck of jetty & corrosion protection. Click for more details...

ESPERANCE FORESHORE PROTECTION & ENHANCEMENT PROJECT
Foreshore - Redevelopment New project In The Esperance Council Area. Four distinct development nodes have been defined & are recreational & tourism node with tidal pool & kiosks; retail node with marina, retail pier & commercial & recreational activities; cultural node; beach node with Heritage trails, shelters & kiosks & construction of protective seawall. Click for more details...

ESPERANCE FORESHORE
Civil Engineering (Marinas) project In The Esperance Council Area of Foreshore - Traffic Engineering Services For Foreshore Redevelopment type. Proposed upgrade to foreshore at Esperance may include relocation of tourist bureau & relocation of Tanker Jetty. Click for more details...

ESPERANCE FORESHORE
Foreshore - Landscape Architecture For Foreshore Redevelopment Renovations, Refurbishments etc. project In The Esperance Council Area. Proposed upgrade to foreshore at Esperance may include relocation of tourist bureau & relocation of Tanker Jetty. Click for more details...

CAPE SEAFARMS PRAWN FARM
Civil Engineering (Marinas) project at Heron Point, Exmouth, WA 6707 of Prawn Farm - Stage 1 type of New development. Proposed 100 x 1 ha "grow-out" ponds, including reservoirs & discharge channels, settling & evaporation ponds, laboratory & hatchery as well as associated works. To be developed in stages over three years. Stage 1 to consist of 20 ponds. Click for more details...

JERVOISE BAY/HENDERSON MARINE INDUSTRIAL ESTATE
State ownership Civil Engineering (Marinas) project In The Cockburn Council Area for New development. Works include: bulk earthworks, roads & services, seawalls, reclamation, new 15,000 t loadout & service wharf & navigation aids. Click for more details...

VASSE AND WONNERUP WATERWAYS - MARINE FLOODGATES
New project of Civil Engineering (Marinas) project at Vasse & Wonnerup Estuaries via Layman Rd & Floodgate Rd, Wonnerup, WA 6280. It is proposed to construct two new floodgates of concrete & steel in waterways of Vasse & Wonnerup Estuaries. New floodgates will be built in close proximity to existing timber floodgates, which have reached end of their design life. Existing timber floodgates to be kept operational while new work is being built. Generally scope of works shall comprise construction & commissioning of replacement floodgates, along with completion of all interfaces between new & existing elements. It includes civil, electrical, instrumentation, mechanical, telemetry & structural works. Scope includes, but is not necessarily limited to design & construction of temporary works such as coffer dams & dewatering facilities so that works can be undertaken in dry conditions; design & construction of measures to limit environmental impacts such as turbidity, odour & noise (it is envisaged that turbidity control measures will include detention basin, clearwater discharge facilities & silt curtains); demolition of remnants of Old Ballarat Railway Bridge & extraction of any associated timber piles that conflict with proposed position of cut-off sheet piles on new floodgates (this work includes backfilling of each extraction site); excavation, disposal & earth filling for floodgates & abutments; supply & installation of permanent sheet piling, cast in-situ reinforced concrete, pre-cast culverts, revetment mattresses, fibreglass stopboards & associated works; supply & installation of mechanical, electrical instrumentation & telemetry works for monitoring & actuation of floodgates; removal & modification of existing stainless steel flap gates from old timber structures & mounting on new structures; road & drainage works; testing & commissioning of new floodgates; demolition of old floodgates, including preservation of south abutment & infill wall of Wonnerup Floodgates. Click for more details...

ONSLOW FORESHORE - SUNRISE BEACH
Sea Wall - Repair & Reinforcement project at Sunrise Beach, Onslow, WA 6710 in the Civil Engineering (Marinas). Repairs & reinforcements to sea wall to help protect townsite against wave action during cyclones. Wall may be reinstated to height of about 0.5 m above road level along First Av & ancillary works to be carried out in low-lying areas to minimise floodwaters backing up from Beadon Creek & torrential rain. Tenders are now invited for upgrading of the existing seawall, including quarrying of suitable armour rock & construction of drainage structures, access stairs & boat ramp. Click for more details...

PORT HEDLAND ENHANCEMENT SCHEME
Civil Engineering (Marinas) project In The Port Hedland Council Area of J/V - Private & Govt ownership. Proposed works at Pretty Pool Recreation Area include redevelopment & extension of existing landscaped park, provision of shade structures, shaded children's play area, entry statement, redevelopment & extension of existing carpark, upgrade to ablutions facilities, provision of solar-powered photo-electric timer controlled lighting to park & provision of time-controlled cold external showers, replace park furniture & bbq's, construct new footpaths & install park & interpretive signage. At Cemetery Beach, proposed works include redevelopment of existing park to include shade structures, fixed seating, barbecues, photo-electric timer controlled solar powered lighting, redesign & relocation of children's play area, safety fencing & defined hard-surface carpark, provision of walkway/viewing area to Flatback turtle nesting area on adjacent beach, fishing platform with shade structure, seating & solar powered lighting & erect turtle interpretive & park entrance information signage. At Civic Centre Performing Arts & public recreational area, proposed work includes removal of existing carpark & redevelopment of entire area to form landscaped area. Also proposed are dedicated platform at Cooke Point for viewing "Stairway to the Moon", additional beach shades & extension to Sutherland St footpath & install interpretive signage. Click for more details...

BALBUK WAY/GOODWOOD PARADE FORESHORE
Foreshore Stabilisation Works project at Lot 800 Balbuk Wy (vicinity of Goodwood Pde boat ramp), Burswood, WA 6100 in the Civil Engineering (Marinas). Balbuk Foreshore is 585 m in length & includes Goodwood Pde boat ramp, carpark, picnic area & ablutions facility. Proposed satablisation works includes earthworks, limestone block retaining walls & revetment layer & concrete footpath. Click for more details...

PORT OF FREMANTLE - INNER HARBOUR
Marine Geotechnical Boreholes - Drilling For Harbour Deepening Addition project In The Fremantle Council Area. Works comprise drilling of marine geotechnical boreholes for proposed deepening of Inner Harbour. Click for more details...

BANDY CREEK BOAT HARBOUR
Civil Engineering (Marinas) project In The Esperance Council Area of Breakwaters/Groynes - Repairs For Boat Harbour type. Works comprise provision & placement of rock material to carry out repairs to existing granite groynes & breakwaters. Click for more details...

CORAL BAY BOAT RAMP & ASSOCIATED INFRASTRUCTURE
State ownership Civil Engineering (Marinas) project In The Carnarvon Council Area for New development. As alternative to developing boat ramp at Monck Head, Coral Bay, it is proposed to develop boat ramp at northern Bills Bay. Click for more details...

WHALE WORLD - BREAKWATER
New project of Civil Engineering (Marinas) project at Whale World headland, Frenchman Bay Rd, Frenchman Bay, WA 6330. Construction of 110m rock breakwater at Whale World headland. Click for more details...

HILLARYS BOAT HARBOUR
Civil Engineering (Marinas) project at Hillarys Boat Harbour, Hillarys, WA 6025 for Addition. Works involve the construction a 75 m extension to western breakwater at Hillarys Boat Harbour & include: Temporary works; preparation of haul route & existing breakwater crest for vehicle access; relocation of existing navigation aid & reinstatement; removal of existing armour from breakwater head to allow the tie-in of new core material with existing breakwater core; supply & placement of core material & armour stone to construct breakwater extension; supply & placement of armour stone along crest of breakwater including a section of existing breakwater; & limited environmental monitoring. Click for more details...

JURIEN BAY BOAT HARBOUR
Civil Engineering (Marinas) project In The Dandaragan Council Area of Boat Harbour - Dredging type. Works comprise of dredging & disposing of approximately 40,000 cu m of sand with weed & wrack both in body of material to be dredged & on the seabed. Click for more details...

BIGHT REEF - LIT PILED NAVIGATION AID WORKS
Navigation Aid - Fabrication & Installation Supply & Install project In The Mandurah Council Area. Works to comprise of fabrication & installation of lit piled navigation aid for Bight Reef, near Mandurah. Click for more details...

CITY OF BUNBURY - GRAND CANALS ESTATE
Civil Engineering (Marinas) project at Off Venezia Bvd, Pelican Point, WA 6230 of Boardwalk & Jetty - Construction type of New development. Works to comprise of construction of jetty & paths at Grand Canals Bunbury as enhancement to existing boat ramp. Click for more details...

SHIRE OF EXMOUTH - BOAT RAMP WORKS (BUNDEGI)
Shire Of Exmouth - Boat Ramp Works (Bundegi) is currently at the Construction stage, valued at about $ 110000 it is Works to comprise of construction of Bundegi Boat Ramp in Exmouth. Click for more details...

ROWLEY SHOALS MARINE PARK - VESSELL MOORINGS
Currently at the Construction stage In Offshore is a project estimated to be $ 1000000. This project Installation of vessel swing morrings at Clerke & Imperieuse Reefs, Rowley Shoals Marine Park. Click for more details...

STINGRAY POINT SEAWALL - STAGE 2
Stingray Point, off Ormsby Tce & Marco Polo Dr, Mandurah, WA 6210 Has Stingray Point Seawall - Stage 2 currently at Construction stage. Reconstruction & repair of 220 m section of Stingray Point Seawall along Mandjar Bay & Mandurah Estuary foreshores, Mandurah. Works include: construction of limestone block seawall, repair & heightening of historically significant seawall, & construction of small section of limestome rip rap seawall. Click for more details...

KWINANA BEACH STAGE 1 - MARINE WORKS
Marine Works - Offshore Artificial Headlands project at Kwinana Beach, Rockingham, WA 6168 in the Civil Engineering (Marinas). Marine works to consist of construction of one-two rock-armoured offshore artificial headlands & sand placement from local sand stockpile for beach renourishment. Click for more details...

CITY OF BELMONT KERBING
City Of Belmont Kerbing is currently at the Construction stage, valued at about $ 500000 it is Construct kerbing & associated works for various sites. Click for more details...

EXMOUTH BOAT HARBOUR UPGRADE STAGE 2
Civil Engineering (Marinas) project for Renovations, Refurbishments etc. development. Works to include the first stage of a multi-stage process to undertake Stage 2 - Exmouth Boat Harbour Upgrade Marine Structures & Civil Works. The works are proposed to include Marine Structures: extension of existing service wharf by 94m including construction of a new 40m heavy lift zone for crane lifts; reconfiguration of existing cyclone mooring system to make way for the new wharf extension; construction of 4 new trawler pens & demolition of the existing trawler pens to make way for the new wharf extension. Breakwater works: raising of existing southern breakwater to provide adequate protection to vessels in new trawler pens during storms. Civil works: construction of heavy duty hardstand pavement wharf extension; reconstruction of harbour access road; sealing of fuel farm access road; installation of wharf & hardstand drainage. Services: to new wharf & trawler pens including power, lighting, potable water, fire water & communications; provision for fuel to new wharf (fuel infrastructure is to be provided by others). Stage 1 works which are now complete included the construction of boat pens providing 25 addnl floating boat pens ranging in size from 15 to 25m. Click for more details...

ALBANY WATERFRONT DEVELOPMENT
Civil Engineering (Marinas) project In The Albany Council Area of Civil Works - Stage 2 type. Civil works to include construction of marina & breakwater & development of the future hotel, short stay accommodation & commercial sites to the east of the jetty. Click for more details...

CITY OF GERALDTON-GREENOUGH FORESHORE ENHANCEMENT
Civil Engineering (Marinas) project In The City Of Greater Geraldton Council Area of Foreshore Upgrade - Building Construction type. Project involves building construction works. Click for more details...

FREMANTLE WATER POLICE
Walkway/Wave Breakers project at Harvest Rd, Fremantle, WA 6160 In The Council Area Of Fremantle of State. Works to comprise refurbishment of wave breakers & installation of walkway as per specifications & drawings. Click for more details...

HILLARYS & FREMANTLE BOAT HARBOURS
Civil Engineering (Marinas) New project at Hillarys Boat Harbour & Fremantle Fishing Boat Harbour, ., WA 6999. This type is Floating Pen Systems - Design & Construct with State ownership. Works are part of a staged capital works programme to replace or upgrade the marina berthing jetty systems at Hillarys Boat Harbour & Fremantle Fishing Boat Harbour. The contract is proposed to be a long term supply arrangement & it is anticipated that over the next five years approx, the following works may be undertaken: 1. replacement of existing floating jetties at Hillarys Boat Harbour; 2. installation of a new universal access floating pontoon at Hillarys Boat Harbour; 3. extension of an existing jetty & installation of new floating jetties at Fremantle Fishing Boat Harbour; 4. post construction service & maintenance. Click for more details...

MANDURAH OCEAN MARINA BOAT PENS/WESTERN FORESHORE SWIMMING PLATFORM
Mandurah Ocean Marina Boat Pens/Western Foreshore Swimming Platform is currently at the Construction stage, valued at about $ 655000 it is Works to comprise construction of 32 boat pens in Mandurah Ocean Marina & an upgrade & refurbishment of the Western Foreshore Swimming Platform. Click for more details...

ROTTNEST ISLAND MOORINGS
New project of Civil Engineering (Marinas) project at Within, Rottnest Island, WA 6161. Works comprising of the supply of new equipment, replacement of existing equipment & maintenance of hire moorings, marine hire facilities & santuary markers for Rottnest Island. Click for more details...

BATAVIA COAST MARINA FLOATING MOORING PENS
Civil Engineering (Marinas) project at Batavia Coast Marina, Geraldton, WA 6530 of Floating Mooring Pens type of New development. Works to comprise design & construction of 50 floating mooring pens at the Batavia Coast Marina, Geraldton WA. Click for more details...

MEWS ROAD FREMANTLE BOAT PARK
A project in the WA Within Fremantle. To include extension works to comprise of 2 boat stacks approx 12m in height to accommodate 84 boats over the water. The gantry works will extend approx 45m west of the foreshore. This development will occupy approx 1300sqm of the existing harbour water space, minor jetty infrastructure will need to be removed to allow for new screw piling works. The extension will not exceed the heights of the existing boat stacks. Click for more details...

ELIZABETH QUAY - PERTH WATERFRONT (PERTH CITY FORESHORE) - PUBLIC REALM & INLET
Civil Engineering (Marinas) New project at Foreshore btwn Barrack & William Sts, Perth, WA 6000. This type is Waterfront - Development - Consultancy Svcs with State ownership. Consultant sought for provision of structural engineering svcs for the Elizabeth Quay Perth Waterfront Development. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect