HISMELT EXPANSION PROJECT
Mechanical Installation - Package 3 project at Leath Rd, Kwinana, WA 6167 in the Mining - Subcontracts (Mechanical installation). One of three packages. Fabrication and installation. Click for more details...

WOODCUTTERS BASE METALS MINE
Mining - Subcontracts (Mechanical installation) project In The Darwin City Council Area of Private ownership. Overall proposal to include installation of underground loading station & shaft fitout. All electrical services to be carried out by contractor main work to involve 2 x plate feeders, conveyor & grisleys & general power distribution. Click for more details...

SYNTHETIC RUTILE ENHANCEMENT PROCESS (SREP)
Mining - Subcontracts (Mechanical installation) project at Possibly near, Geraldton, WA 6530 of Treatment Plant - Turnkey Package type of New development. Plant construction by early 1996 is envisaged following recent tests which produced synthetic rutile with acceptable levels of uranium & thorium. Trials on product were carried out in the United States. Contract work to involve piping, pumping, tankage, structural steelworks & some associated services such as electricals. This process is environmentally beneficial as it eliminates the use of sulphur in kilns (Narngulu). Click for more details...

NIMARY - GOLD
Mine - Treatment Plant - Relocation Addition project In The Wiluna Council Area. Second hand Labouchere plant purchased from Dominion Mining. Contract to involve dismantling the carbon-in-pulp plant & transporting it from site 180 km north of Meekatharra to new mine 40 km northeast of Wiluna. Plant to then be reassembled & some modifications to be undertaken prior to recommissioning. The 500,000tpa carbon-in-pulp/carbon-in-leach plant to be expanded to 650,000tpa. Additional requirements include tankage, structural steel, mechanical & piping works. Refurbishment of existing facilities & installation of new equipment also included in this tender. Work scheduled for completion 31 October 1995. Click for more details...

YANDI - IRON ORE
Addition project of Mining - Subcontracts (Mechanical installation) project at 90 km northwest of, Newman, WA 6753. Stacker, conveyors, structural steelwork & associated services required for new mine expansion. Overall project development still subject to obtaining necessary approvals. Click for more details...

EWINGTON 2 COAL OPERATIONS
Mining - Subcontracts (Mechanical installation) project for Addition development. Fabrication & installation of one run-of-mine (ROM) hopper. Contract to mainly involve steelwork. Work to commence early April 1996 on this contract with an estimated 10 week duration. Click for more details...

NELSON POINT/FINUCANE ISLAND - IRON ORE
Operations - Tunnel Conveyor - Mechanical/Structural Package project at Finucane Island to, Port Hedland, WA 6721 In The Council Area Of Port Hedland of Private. Contract to provide conveyor belt/system under the Pt Hedland harbour. Project designed to cart ore from Nelson Point to Finucane Island stockpiles. Conveyor expected to be 1.8m wide with capacity to move 4,000tph lump ore with full capacity of 10,000tph (ore) envisaged. This conveyor is to link up with the overland system during first half of 1997. Click for more details...

WOODCUTTERS BASE METALS MINE
Addition project of Mining - Subcontracts (Mechanical installation) project at 80 km south of, Darwin, NT 0800. Supply & installation of steelwork for shaft extension. Works to be carried out over 325m from the RL730 to the RL405 level. Click for more details...

YABULU NICKEL REFINERY EXTENSION - MHP RECEIVAL/TREATMENT FACILITIES CONTRACT
New project of Mining - Subcontracts (Mechanical installation) project at Refinery site at, Yabulu, QLD 4818. Contract package 4 involves a MHP leach area, ammonical solvent extraction area and a stripping stills and gas absorption area. This package involves construction on top of concrete, structural, mechanical, piping, electrical, instrumentation and controls for what are generally hydrometallurgical facilities. The contract involves both greenfield and brownfield work. The MHP Receival & Treatment Facilities include container storage and unloading and primary and secondary leaching facilities. The intermediate product (MHP) from Ravensthorpe will be received at Yabulu where it will be stockpiled in a weatherproof environment prior to feeding into a two stage leaching process. New material handling equipment will be constructed to process the additional MHP. Extension of the existing utilities plant will be required to provide additional power, steam and process gases. This includes a package plant for nitrogen generation by the pressure swing absorption process. Anhydrous ammonia will be imported to supplement ammonia currently produced on site. Click for more details...

JAGUAR BASE METALS PROJECT - PROCESSING PLANT/MECHANICAL WORKS CONTRACT
A project in the WA Within Leonora. A centrally located processing facility to be located on the granted Teutonic Bore mining lease, 4 km to the north of the Jaguar deposit. A 350,000 tpa plant to treat ore by crushing, grinding and flotation. Copper and zinc concentrate production is expected to commence in July 2007, increasing to 10,000 tonnes of copper, 34,000 tonnes if zinc and 1 million ounces of silver in concentrate per annum over a six year period. Click for more details...

KALGOORLIE NICKEL SMELTER
Mining - Subcontracts (Mechanical installation) project at 16 km southeast of, Kalgoorlie, WA 6430 for Addition. Structural/mechanical/piping works to be carried out on M1 & M2 areas for new 800,000tpa acid plant to be constructed near existing Kalgoorlie Nickel Smelter. Facility to use a 3-staged acid conversion process. Overall project scheduled for completion during latter half of 1996. Click for more details...

TOMS GULLY GOLD OPERATIONS
Mining - Subcontracts (Mechanical installation) project In The Darwin City Council Area of Private ownership. Items available for purchase include mill, carbon-in-pulp plant, tailings dam & tailings thickener equipment. The open cut mine/leases, workshops, offices & accommodation units are also incorporated in the sale. Resulting tenders may involve plant dismantling, transportation, modifications &/or re-commissioning. Click for more details...

OAKY NORTH MINE
Private ownership Mining - Subcontracts (Mechanical installation) project In The Central Highlands Regional Council Area for Subcontract development. For series of conveyors to transport coal from reclaimer to breaker to transfer station to stockpile. Conveyors include 2.3 km & 650 m approx lengths. Click for more details...

BARNEY POINT COAL TERMINAL UPGRADING - STAGE 2
Mining - Subcontracts (Mechanical installation) project In The Gladstone Regional Council Area of Private ownership. To include both mechanical and electrical installation. Click for more details...

PREMIER COAL OPERATIONS - COAL CHAR PILOT PLANT
Mining - Subcontracts (Mechanical installation) project at Premier mine site 15 km east of, Collie, WA 6225 of Equipment - Supply/Install type of New development. Likely to be one package, supply/install. Click for more details...

ST IVES GOLD OPERATIONS
Mining - Subcontracts (Mechanical installation) project at Perth location & site operations via, Kambalda, WA 6442 for Renovations, Refurbishments etc.. Cracks in the mill shell & some welds located during routine maintenance. Plant to be dismantled & transported to Perth for repair work which is expected to take 5 - 6 weeks. An additional tertiary crusher has been utilised on site in lieu of the SAG mill which is used for crushing ore to a fine slurry prior to treatment through flotation tanks. Click for more details...

ALCOA OF AUSTRALIA - AREA K PROJECT
Mining - Subcontracts (Mechanical installation) Addition project at Lot 100 Postans Rd, Hope Valley, WA 6165. This type is Mechanical/Electrical Installation For Residue Disposal Expansion with Private ownership. This major mechanical/electrical package includes installation of piping for the tailings dam expansion. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION
A project in the NT Within East Arnhem Shire. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. All new process areas will be concrete bunded with sumps installed. Stormwater drainage and utilities will be extended to all new areas and facilities. The existing sewerage treatment facility will be upgraded by the addition of separate reticulation and package sewerage plants. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

BHP BILLITON IRON ORE OPS - ASSET DEVELOPMENT PROJECTS - STEEL FABRICATION
New project of Mining - Subcontracts (Mechanical installation) project at Various sites via, Newman, WA 6753. BHP Billiton has increased iron ore production with work culminating in a production capacity of 110 Mtpa to be completed by late 2004. The company is now investigating ways of increasing production over the next five years to meet a projected increased in demand, especially from China. A complete process redesign will be involved with higher throughput levels and environmental and social benefits. Additional expansions of capacity to 145Mtpa are currently the subject of a feasibility study due for completion late 2004 approx. Click for more details...

KOGAN CREEK POWER STATION - BCP(PUMP CASING) - SUPPLY
A project in the QLD Within Western Downs Regional. BCP (Pump Casing) type grandless quantity: 1 Discharge rate:855/h Total Head: 911kpa Motor Capacity:400kw (Max), Voltage 690V. Click for more details...

NORTH WEST SHELF LNG TRAIN 5 PROJECT - STEEL FABRICATION SERVICES CONTRACT
Mining - Subcontracts (Mechanical installation) New project at Burrup Peninsula north of, Dampier, WA 6713. This type is Steel Fabrication Services Contract with Private ownership. 13,574 tonnes of structural steel will be used in the project. Click for more details...

BHP PORT HEADLANDS EXPANSION - RAPID GROWTH 2 - STRUCTURAL/MECHANICAL CONTRACT
Currently at the Planning stage In Port Hedland is a project estimated to be $ 65000000. This project Structural and mechanical work to be carried out at the existing Finucane Island and Nelson Point facilities. Click for more details...

RAVENSTHORPE NICKEL PROJECT - MECHANICAL INSTALLATION OF WATER SYSTEMS
Mining - Subcontracts (Mechanical installation) project at 50 Km North of, Hopetoun, WA 6348 of Mechanical/Piping Installation Of Water Systems type of New development. Mechanical and piping installation of water systems. Click for more details...

MIDDLEBACK RANGES OPERATIONS - PROJECT MAGNET - 7500 KW BALL MILL
7500 Kw Ball Mill project at North West of, Whyalla, SA 5600 in the Mining - Subcontracts (Mechanical installation). Development comprises the design, installation, commissioning and maintenance of 7500 kw ball mill. The mill will be rubber lined, it will be driven by two 3750 kw wound rotor induction motors and two conventional pinions. Click for more details...

MONTO MINERALS INDUSTRIAL MINERALS PROJECT - FELDSPAR WASH PLANT
Feldspar Wash Plant New project In The North Burnett Regional Council Area. Development comprises the construction of a treatment facility that will comprise a hot acid leach plant and associated equipment. The ore will be shipped from the mine to the feldspar plant at Dakiel Railroad Station where it will be loaded and sent to Gladstone and then be shipped to Brisbane. Click for more details...

IRON ORE RAPID GROWTH PROJECT 3 - AREA C - SAMPLE PREP/LAB EQUIPMENT
Private ownership Mining - Subcontracts (Mechanical installation) project In The East Pilbara Council Area for New development. Supply and Insall SAMPLE PREPERATION & LABORATORY EQUIPMENT. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - PORT - STRUCTURAL/MECHANICAL WORKS
Currently at the Construction stage In Port Hedland is a project estimated to be $ 180000000. This project Work comprises modification of existing conveyors to increase capacity, the installation of additional conveyors and associated transfers and pipework. On the upgraded Finucane Island wharf the dual cell car dumper will be upgraded and new ship loading conveyors will be provided. Click for more details...

LIDDELL POWER STATION - CONTINUOUS OPACITY MONITORING SYSTEM
New project of Mining - Subcontracts (Mechanical installation) project at Via, Liddell, NSW 2333. This Specification is for the design, supply, delivery, installation, commissioning and field audit performance tests for four continuous opacity monitoring systems (COMS) including dedicated air blowers for each COMS unit, weather covers and installation of new instrument tapping points into the side of the inclined duct work for each COMS unit. An optional firm price for the design, supply, delivery, installation, commissioning and field audit performance tests for an additional four COMS units and dedicated air blowers for each COMS unit. Click for more details...

COMALCO WEIPA OPERATIONS - SHIPLOADER
Mining - Subcontracts (Mechanical installation) project for New development. Ship Loader project involves the strengthening and extending the existing Lorim Point wharf, the installation of new conveying system and ship loader machine and dredging work. Click for more details...

LIDDELL POWER STATION - INSULATION/CLADDING REPAIRS/ASBESTOS REMOVAL/REINSULATION
Insulation/Cladding Repairs/Asbestos Removal/Reinsulation project at At, Liddell, NSW 2333 in the Mining - Subcontracts (Mechanical installation). This Specification covers the removal, handling and disposal of asbestos and non-asbestos materials. The supply and installation of replacement non-asbestos thermal insulation and cladding. The removal, reinstallation and refurbishment of damaged insulation and cladding. The installation of temporary staging/rigging access platforms as nominated by the Contract Manager. The Contract shall be for a period of two years from the date of the awarding of the Contract by the Principal (Portion 1), with a Macquarie Generation Option to extend the Contract for a further two year period (Portion 2, Option 1). Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - PRECOATED STEEL PILES
Mining - Subcontracts (Mechanical installation) project at Geraldton Port, Marine Terrace, Geraldton, WA 6530 for New. Supply of precoated steel piles for extension of Berth 5 and Berth 6. Piles of 762 mm and 508 mm diameter. Click for more details...

DAVYHURST GOLD PROJECT - GOLD MILL REFURBISHMENT
Mining - Subcontracts (Mechanical installation) New project at 80 Km North west of, Kalgoorlie, WA 6430. This type is Gold Mill Refurbishment with Private ownership. The 1.2 Mtpa mill was purchased from Croseus mining and remains in good condition. Work on the tanks and concrete pillars will be the focus of the work. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - BOLLARDS
Mining - Subcontracts (Mechanical installation) project In The City Of Greater Geraldton Council Area of Bollards - Design/Construct type. Design and construct Bollards & Quick Release Hooks. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - MINOR CIVIL/MECHANICAL/STRUCTURAL WORKS
Private ownership Mining - Subcontracts (Mechanical installation) project In The Mackay Regional Council Area for New development. Work comprises the contractor to do minor civil, mechanical and structural works on site when needed. Click for more details...

KESTREL COAL UNDERGROUND EXTENSION PROJECT - COAL HANDLING & PREPARATION PLANT UPGRADE
Mining - Subcontracts (Mechanical installation) project for Addition development. Upgrade to existing coal wash plant to increase production from 1000t/h to 1400t/h. Click for more details...

CHINCHILLA COAL SEAM GAS & UNDERGROUND COAL GASIFICATION PROJECT - STAGE 2 - MECHANICAL FOR LABORATORY
Mining - Subcontracts (Mechanical installation) project In The Western Downs Regional Council Area of Mechanical - For Laboratory type. For the larger mine site laboratory. Click for more details...

CHINCHILLA COAL SEAM GAS & UNDERGROUND COAL GASIFICATION PROJECT - STAGE 1 - STRUCTURAL STEEL FOR LABORATORY
Mining - Subcontracts (Mechanical installation) project In The Western Downs Regional Council Area of Private ownership. For the mine site laboratory. Click for more details...

KING ISLAND SCHEELITE PROJECT - STRUCTURAL STEEL FOR PROCESSING FACILITY
Structural Steel - For Processing Facility project at Near, Grassy, TAS 7256 in the Mining - Subcontracts (Mechanical installation). For the provision of structural steel for the processing facility. Click for more details...

KING ISLAND SCHEELITE PROJECT - STRUCTURAL STEEL FOR SECONDARY CRUSHING & SCREENING PLANT
Private ownership Mining - Subcontracts (Mechanical installation) project In The King Island Council Area for New development. For the provision of structural steel for the secondary crushing & screening plant. Click for more details...

LAKE VERMONT COAL PROJECT - MECHANICAL FOR COAL PREPARATION PLANT
Mechanical - For Coal Preparation Plant project at Approx 15 km north east of, Dysart, QLD 4745 In The Council Area Of Isaac Regional of Private. For a 4 Mtpa plant. Click for more details...

MURRAY BASIN STAGE 2 - KWR MINERAL SANDS PROJECT - STRUCTURAL STEEL & MECHANICAL FOR WHIMS BUILDING
New project of Mining - Subcontracts (Mechanical installation) project at 28 km east of, Ouyen, VIC 3490. For the provision of structural steel & mechanical works for the wet high intensity magnetic separator building. Click for more details...

BHP BILLITON RAPID GROWTH 5 IRON ORE PROJECT - STOCKYARD TRAIN LOAD OUT FACILITIES & ORE HANDLING PLANT
Private ownership Mining - Subcontracts (Mechanical installation) project In The East Pilbara Council Area for New development. The contract includes structural, mechanical and piping works for the supply, pre-assembly and installation of the stockyard and train load out facilities and modifications to the existing Ore Handling Plant 2 (OHP2). Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - EXPORT SHIPPING FACILITIES
Mining - Subcontracts (Mechanical installation) project for New development. Design & construction of a 168m long jetty, loading platform & berth for vessels with capacities from 125,000cu m (285m long) up to 220,000cu m (315m long) exporting liquefied natural gas (LNG) & 20,000-80,000cu m capacity for exporting liquid petroleum gas (LPG). Contract to include the procurement, fabrication, construciton & commissioning of the structural, mechanical & electrical components of the combined Marine Facilities. Click for more details...

MOUNT OXIDE MINE SITE SOLAR PUMP INSTALLATION
Installation - Of Solar Pumps project at via Gunpowder Rd at Mount Gordon Mine 100km northwest of, Mount Isa, QLD 4825 In The Council Area Of Mt Isa City of Private. Installation (design, supply & install pump mounting & float system, supply & install polypipe, testing) of 3 solar pumping systems at the south east catch dam, the sump area & the clean water catch dam. Maintenance for 12 months with an option for an additional 12 months as well as the possibility of additional site equipment being included in the maintenance contract. Click for more details...

MARANDOO IRON OPERATIONS PHASE 2 SMP CONTRACT
Structural/Mechanical/Piping Contract New project In The Ashburton Council Area. Structural, mechanical & piping contract as part of a project to increase Rio Tinto's Pilbara operational capacity to 353 million tonnes per annum (Mtpa). Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - 6 + 1 UPSTREAM PIPING SUPPLY
A project in the QLD Within Western Downs Regional. Supply of all piping for the Ruby central processing plant including fabrication, welding, NDT, hydro testing, painting & delivery to site. Associated mechanical, structural & piping services. Click for more details...

BHP BILLITON MOOKA CAR REPAIR WORKSHOP
Bhp Billiton Mooka Car Repair Workshop is currently at the Construction stage, valued at about $ 30000000 it is Contract for the construction of a maintenance workshop & warehouse. To include process equipment installation as well as rail & infrastructure components including roads, track, signalling & communications electrical engineering. Water supply. Click for more details...

ICHTHYS LNG PLANT - ONSHORE MECHANICAL WORKS (MEC-2) CONTRACT
Mechanical Works (Mec-2) Contract project at Blaydin Point via, Darwin, NT 0800 In The Council Area Of Darwin City of Private. For the provision of Onshore Mechanical Works (MEC-2) services. Click for more details...

BHP BILLITON NICKEL WEST MECHANICAL & ELECTRICAL SERVICES
Mining - Subcontracts (Mechanical installation) project at Various mines, ., WA 6999 for New. For the provision of a three year maintenance services to cover both mechanical & electrical services across all of BHP Billiton Nickel West's operations in Western Australia. Click for more details...

HAY POINT COAL TERMINAL EXPANSION - HPX3 PROJECT - ONSHORE TERMINAL UPGRADE ELECTRICAL & MECHANICAL CONTRACT & EXTENSION
Electrical/Mechanical - Contract New & Extn project at Offshore & 1175, 1395 Hay Point Rd, Hay Point, QLD 4740 in the Mining - Subcontracts (Mechanical installation). For the provision of new & extended electrical & mechanical work, onshore & offshore. Click for more details...