HISMELT EXPANSION PROJECT
Private ownership Mining - Subcontracts (Mechanical installation) project In The Kwinana Council Area for New development. One of three packages. Pipework. Click for more details...

BLACK SWAN DISSEMINATED TWO PROJECT - PLANT UPGRADE
53 km north east of, Kalgoorlie, WA 6430 Has Black Swan Disseminated Two Project - Plant Upgrade currently at Construction stage. Expansion in production capacity of the processing plant from 600,000 tpa to 2,150,000 tpa. Production of 13,000 tonnes of payable nickel per annum is to be produced. This will require two new grinding mills, which have already been sourced second hand. Project to include upgrade of grinding circuit, new tank cells, relocation of control room. Click for more details...

QUARRY OPERATIONS
Mining - Subcontracts (Mechanical installation) project at Lot 467 & 453 Stephen St, Orange Grove, WA 6109 for Addition. Structural steelwork & piping required for this contract which mainly involves conveyors (8) & screens. Tender also includes associated earthworks, drainage, general site services & electrical requirements. Existing plant is to be demolished & will be replaced by a 22m high building constructed of concrete panels & colourbond sheeting. A conveyor belt extends from this complex to load-out bins to load vehicles similar to the current facilities. Work scheduled for completion during April 1996. Project has received EPA approval for grinding & milling works. Click for more details...

BIG BELL GOLD OPERATIONS
30 km northwest of, Cue, WA 6640 Has Big Bell Gold Operations currently at Construction stage. Contract to provide services for the 300m deep shaft. Work includes access ways, piping & electrical requirements & all associated design & fabrication work. Click for more details...

QUARRY OPERATIONS
Private ownership Mining - Subcontracts (Mechanical installation) project In The Gosnells Council Area for Addition development. Structural steelwork required for new screening facility. Construction of 2 hoppers to be included in tender. Click for more details...

FINUCANE ISLAND - IRON ORE
Operations - Dust Pip - Upgrade project at Site facilities via, Port Hedland, WA 6721 in the Mining - Subcontracts (Mechanical installation). Dust suppression required for crushing & screening plant area as part of current project improvement programme. Tender expected to include sprinklers plus associated equipment & electrical services. Work scheduled for completion 31 July 1996. Click for more details...

EWINGTON 2 COAL OPERATIONS
Mining - Subcontracts (Mechanical installation) project for Addition development. Fabrication & installation of one run-of-mine (ROM) hopper. Contract to mainly involve steelwork. Work to commence early April 1996 on this contract with an estimated 10 week duration. Click for more details...

EWINGTON 2 COAL OPERATIONS
Currently at the Construction stage In Collie is a project estimated to be $ 1000000. This project Installation of 8 conveyors of various sizes required. Associated components have been ordered. Click for more details...

MURRIN MURRIN NICKEL/COBALT OPERATIONS
Mining - Subcontracts (Mechanical installation) project at 60 km east of, Leonora, WA 6438 for New. Contract to manufacture & deliver 5 x stainless steel units plus 4 very large titanium lined & clad autoclaves in addition to one special unit. Final specifications subject to ongoing design. Click for more details...

WOODCUTTERS BASE METALS MINE
Addition project of Mining - Subcontracts (Mechanical installation) project at 80 km south of, Darwin, NT 0800. Supply & installation of steelwork for shaft extension. Works to be carried out over 325m from the RL730 to the RL405 level. Click for more details...

WOODCUTTERS BASE METALS MINE
Mining - Subcontracts (Mechanical installation) project at 80 km south of, Darwin, NT 0800 for Addition. Contract for supply & installation of grisleys, 2 x plate feeders & one conveyor system. This tender is to include all associated electricals such as general power distribution & lighting. Click for more details...

MOUNT TODD GOLD MINE
Mine - Mechanical Package - Wet Plant - Installation - Phase 2 - Expansion project at 45 km northeast of, Pine Creek, NT 0847 In The Council Area Of Katherine Town of Private. It is envisaged this facility will utilise a combination of flotation/regrind/leach methods. Contract to provide structural steelwork & mechanical services. Click for more details...

ENFIELD OIL PROJECT - WA-271-P
A project in the WA Within Ashburton. Includes 13 subsea trees, production controls and associated systems and technical services relating to installation and startup. Click for more details...

YABULU NICKEL REFINERY EXTENSION - MHP RECEIVAL/TREATMENT FACILITIES CONTRACT
New project of Mining - Subcontracts (Mechanical installation) project at Refinery site at, Yabulu, QLD 4818. Contract package 4 involves a MHP leach area, ammonical solvent extraction area and a stripping stills and gas absorption area. This package involves construction on top of concrete, structural, mechanical, piping, electrical, instrumentation and controls for what are generally hydrometallurgical facilities. The contract involves both greenfield and brownfield work. The MHP Receival & Treatment Facilities include container storage and unloading and primary and secondary leaching facilities. The intermediate product (MHP) from Ravensthorpe will be received at Yabulu where it will be stockpiled in a weatherproof environment prior to feeding into a two stage leaching process. New material handling equipment will be constructed to process the additional MHP. Extension of the existing utilities plant will be required to provide additional power, steam and process gases. This includes a package plant for nitrogen generation by the pressure swing absorption process. Anhydrous ammonia will be imported to supplement ammonia currently produced on site. Click for more details...

JAGUAR BASE METALS PROJECT - PROCESSING PLANT/MECHANICAL WORKS CONTRACT
A project in the WA Within Leonora. A centrally located processing facility to be located on the granted Teutonic Bore mining lease, 4 km to the north of the Jaguar deposit. A 350,000 tpa plant to treat ore by crushing, grinding and flotation. Copper and zinc concentrate production is expected to commence in July 2007, increasing to 10,000 tonnes of copper, 34,000 tonnes if zinc and 1 million ounces of silver in concentrate per annum over a six year period. Click for more details...

KALGOORLIE NICKEL SMELTER
Mining - Subcontracts (Mechanical installation) project at 16 km southeast of, Kalgoorlie, WA 6430 for Addition. Structural/mechanical/piping works to be carried out on M1 & M2 areas for new 800,000tpa acid plant to be constructed near existing Kalgoorlie Nickel Smelter. Facility to use a 3-staged acid conversion process. Overall project scheduled for completion during latter half of 1996. Click for more details...

TOMS GULLY GOLD OPERATIONS
Mining - Subcontracts (Mechanical installation) project In The Darwin City Council Area of Private ownership. Items available for purchase include mill, carbon-in-pulp plant, tailings dam & tailings thickener equipment. The open cut mine/leases, workshops, offices & accommodation units are also incorporated in the sale. Resulting tenders may involve plant dismantling, transportation, modifications &/or re-commissioning. Click for more details...

BARNEY POINT COAL TERMINAL UPGRADING - STAGE 2
Mining - Subcontracts (Mechanical installation) project In The Gladstone Regional Council Area of Private ownership. To include both mechanical and electrical installation. Click for more details...

NELSON POINT ORE HANDLING FACILITY - PACE
Structural/Mechanical Works For Finance Island Tunnel New project In The Port Hedland Council Area. Supply and installation of structural and mechanical works for Finance Island tunnel, shiploading routes and lump rescreening plant. Click for more details...

MONTO MINERALS INDUSTRIAL MINERALS PROJECT - WET SEPERATION PLANT
Mining - Subcontracts (Mechanical installation) project for New development. Wet Seperation Plant that will constructed next to the existing pilot plant. The plant will use non chemical seperation using gravity and magnetics. Plant is expected to process 142,000 tonnes in 2007 and 232,000 tonnes in 2008. Click for more details...

ARDLETHAN TIN OPERATIONS - PREPARATION/TREATMENT EQUIPMENT SUPPLY
A project in the NSW Within Coolamon. Includes mobile preparation & treatment equipment to be located close to the excavator. Ore is placed in a stockpile & a loader working continuously will feed the ore into the feeder-hopper of the scrubber-trommel. More water will be added so that the undersize can be pumped through in-line jigs which will be located within boom of the trommel unit. Some tin concentrate will be recovered in the in-line pressure jigs. The finer tin particles will be picked up in a spiral plant. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION
A project in the NT Within East Arnhem Shire. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. All new process areas will be concrete bunded with sumps installed. Stormwater drainage and utilities will be extended to all new areas and facilities. The existing sewerage treatment facility will be upgraded by the addition of separate reticulation and package sewerage plants. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

BHP BILLITON IRON ORE OPS - ASSET DEVELOPMENT PROJECTS - STEEL FABRICATION
New project of Mining - Subcontracts (Mechanical installation) project at Various sites via, Newman, WA 6753. BHP Billiton has increased iron ore production with work culminating in a production capacity of 110 Mtpa to be completed by late 2004. The company is now investigating ways of increasing production over the next five years to meet a projected increased in demand, especially from China. A complete process redesign will be involved with higher throughput levels and environmental and social benefits. Additional expansions of capacity to 145Mtpa are currently the subject of a feasibility study due for completion late 2004 approx. Click for more details...

KOGAN CREEK POWER STATION - SEALING AIR FAN MOTOR
Mining - Subcontracts (Mechanical installation) project In The Western Downs Regional Council Area of Sealing Air Fan Motor - Supply type. HITO410 Sealing Air Fan Motor of 110kw capacity. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - STRUCTURAL/MECHANICAL
Mining - Subcontracts (Mechanical installation) project for New development. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

RAVENSTHORPE NICKEL PROJECT - INSTALLATION OF CCD/FLOCCULANT SYSTEMS
Mechanical/Piping Installation Of Ccd/Flocculant Systems project at 50 Km North of, Hopetoun, WA 6348 in the Mining - Subcontracts (Mechanical installation). Mechanical and piping installation of CCS and flocculant systems. Click for more details...

NEWLANDS COAL OPERATIONS - SUPPLY OF STRUCTURAL STEEL PACKAGE NO2 FOR WASHPLANT
Mining - Subcontracts (Mechanical installation) project at 13 km west of, Glenden, QLD 4743 of Structural Steel Package (No2) - Supply For Washplant type of New development. Two Fine Coal buildings. Click for more details...

KALGOORLIE SUPERPIT GOLD MINE - CYANIDE PIPING UPGRADE
Mining - Subcontracts (Mechanical installation) project at 15 Km North of, Kalgoorlie, WA 6430 of Fimiston Cil Plant/Gidji Roaster Upgrade type of New development. Fabrication and installation of 316l stainless steel piping, high quality diaphragm valves and flanges with suitable transparent flange covers for extra protection. Click for more details...

SARAJI COAL MINE THICKNER PLANT CONVERSION
Mining - Subcontracts (Mechanical installation) project In The Isaac Regional Council Area of Private ownership. A 35m thickner plant was installed in 2004 and will be upgraded to improve efficiency of tailings disposal. Work comprises the design, removal of existing equipment, civil construction, installation of the high rate thickner. Associated works involve piping, pumps, structural and mechanical works. Electrical installation and recommissioning are also part of the work. Click for more details...

LIDDELL POWER STATION - CONVEYOR BELTS
Currently at the Construction stage In Muswellbrook is a project estimated to be $ 400000. This project Development comprises the replacement of conveyor belts at Liddell Power Station, as and when directed by the Principal for a two (2) year period from the date of the awarding of Macquarie Generation's Contract. The work includes the removal, overhaul and installation of each conveyor's head and tail end belt cleaning systems. Tenderers are to demonstrate in their tender a working knowledge of the requirements of the Specification gained through experience with and knowledge of the plant described or similar plant. Click for more details...

MONTO MINERALS INDUSTRIAL MINERALS PROJECT - FELDSPAR WASH PLANT
Feldspar Wash Plant New project In The North Burnett Regional Council Area. Development comprises the construction of a treatment facility that will comprise a hot acid leach plant and associated equipment. The ore will be shipped from the mine to the feldspar plant at Dakiel Railroad Station where it will be loaded and sent to Gladstone and then be shipped to Brisbane. Click for more details...

ANGEL GAS PROJECT - JACKET/PIPELINE INSTALLATION CONTRACT
Private ownership Mining - Subcontracts (Mechanical installation) project In The Dampier Sub Basin Council Area for New development. The contract comprises the substructure and pipeline installation of a 7500 MT jacket and piles by J.Ray's launch barge, the Intermac 650, from a fabrication yard in China to the offshore installation site as well as the launch, upend, and set down of the jacket. One of J Ray's marine vessels will install the jackets and pipelines. Pipeline work will involve the installation of an 80 mile x 30 inch pipeline from the first trunk-line and the installation of three infield 14 inch CRA pipelines. The jacket foundation will be drilled and gouted and will require the installation of eight primary and eight secondary piles in holes up to 10 feet in diameter. Installation welding will be done by the inhouse automated welding systems. The construction of drilling work decks, caissons and other items will be fabricated at Batam Island, Indonesia. Click for more details...

LIDDELL POWER STATION - INSULATION/CLADDING REPAIRS/ASBESTOS REMOVAL/REINSULATION
Insulation/Cladding Repairs/Asbestos Removal/Reinsulation project at At, Liddell, NSW 2333 in the Mining - Subcontracts (Mechanical installation). This Specification covers the removal, handling and disposal of asbestos and non-asbestos materials. The supply and installation of replacement non-asbestos thermal insulation and cladding. The removal, reinstallation and refurbishment of damaged insulation and cladding. The installation of temporary staging/rigging access platforms as nominated by the Contract Manager. The Contract shall be for a period of two years from the date of the awarding of the Contract by the Principal (Portion 1), with a Macquarie Generation Option to extend the Contract for a further two year period (Portion 2, Option 1). Click for more details...

LIDDELL COAL OPERATIONS - COAL HANDLING PREPARATION PLANT
Coal Handling Preparation Plant project at 20 Km North West of, Singleton, NSW 2330 In The Council Area Of Singleton of Private. Construction of a new Coal Handling Preparation Plant. This will involve the construction of a new preparation section, upgrades to the ROM receival and product coal facilities. The new preparation area will be located next to the old CHPP and its capacity will be 1200 tonnes per hour. This will include new screening, cyclone and spiral components for the plant. Upgrades to the ROM receival equipment include shortening of the apron feeder, a new rotating star wheel, new sizers and an increase in the drive power and length of the ROM conveyor. Modifications to the product handling equipment will include a short product conveyor to collect coal from the new CHPP to be deposited at a new transfer station onto the existing product stockpile rising conveyor. The existing road truck type coarse rejects bin will be replaced by a larger bin capable of loading mining sized trucks. The exisiting CHPP will be dismantled and recycled or disposed of over a one year period. Click for more details...

CHINCHILLA COAL SEAM GAS & UNDERGROUND COAL GASIFICATION PROJECT - STAGE 2 - MECHANICAL FOR LABORATORY
Mining - Subcontracts (Mechanical installation) project In The Western Downs Regional Council Area of Mechanical - For Laboratory type. For the larger mine site laboratory. Click for more details...

CHINCHILLA COAL SEAM GAS & UNDERGROUND COAL GASIFICATION PROJECT - STAGE 1 - STRUCTURAL STEEL FOR LABORATORY
Mining - Subcontracts (Mechanical installation) project In The Western Downs Regional Council Area of Private ownership. For the mine site laboratory. Click for more details...

KING ISLAND SCHEELITE PROJECT - STRUCTURAL STEEL FOR PROCESSING FACILITY
Structural Steel - For Processing Facility project at Near, Grassy, TAS 7256 in the Mining - Subcontracts (Mechanical installation). For the provision of structural steel for the processing facility. Click for more details...

LAKE VERMONT COAL PROJECT - STRUCTURAL STEEL FOR COAL PREPARATION PLANT
Mining - Subcontracts (Mechanical installation) New project at Approx 15 km north east of, Dysart, QLD 4745. This type is Structural Steel - For Coal Preparation Plant with Private ownership. For a 4 Mtpa plant. Click for more details...

RIDGEWAY DEEPS UNDERGROUND GOLD MINE EXTENSION PROJECT - MECHANICAL INSTALLATION FOR CONCENTRATOR UPGRADE
Mining - Subcontracts (Mechanical installation) project at 25 km south west of, Orange, NSW 2800 of Mechanical - Install For Concentrator Upgrade type of New development. Mechanical installation for the concentrator upgrade. Click for more details...

BHP BILLITON RAPID GROWTH 5 IRON ORE PROJECT - STOCKYARD TRAIN LOAD OUT FACILITIES & ORE HANDLING PLANT
Private ownership Mining - Subcontracts (Mechanical installation) project In The East Pilbara Council Area for New development. The contract includes structural, mechanical and piping works for the supply, pre-assembly and installation of the stockyard and train load out facilities and modifications to the existing Ore Handling Plant 2 (OHP2). Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - EXPORT SHIPPING FACILITIES
Mining - Subcontracts (Mechanical installation) project for New development. Design & construction of a 168m long jetty, loading platform & berth for vessels with capacities from 125,000cu m (285m long) up to 220,000cu m (315m long) exporting liquefied natural gas (LNG) & 20,000-80,000cu m capacity for exporting liquid petroleum gas (LPG). Contract to include the procurement, fabrication, construciton & commissioning of the structural, mechanical & electrical components of the combined Marine Facilities. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT STAGE 1 - CAR DUMPER SMP
Cape Lambert Port B (Clb) Development Stage 1 - Car Dumper Smp is currently at the Construction stage, valued at about $ 10000000 it is Structural, mechanical & piping for the screen house & car dumper. Click for more details...

ERNEST HENRY COPPER-GOLD OPERATIONS - UNDERGROUND EXPANSION (SHUG) SMP CONTRACTOR PANEL
New project of Mining - Subcontracts (Mechanical installation) project at East of, Cloncurry, QLD 4824. Registered contractors experienced in structural, mechanical & pipe installation in hard rock underground mines to be invited over the coming months to tender for parcels of work between 6-9 months duration & up to $5 million in value. Click for more details...

GREATER GORGON GAS PROJECT - MECHANICAL ELECTRICAL & INSTRUMENTATION - CHEMICAL CLEANING SUBCONTRACT
Mining - Subcontracts (Mechanical installation) project at On, Barrow Island, WA 6712 for New. For the provision of the chemical cleaning subcontract. Click for more details...

GREATER GORGON GAS PROJECT - MECHANICAL ELECTRICAL & INSTRUMENTATION - GROUTING SUBCONTRACT
A project in the WA Within Ashburton. For the provision of the grouting subcontract. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT PHASE B - SMP CONTRACT
Structural/Mechanical/Piping - For Balance Of Plant New project In The City Of Karratha Council Area. Structural, mechanical & piping services for conveyors & transfer stations associated with a screenhouse & a pair of car dumpers. Click for more details...

LEICHHARDT CCGT POWER STATION
Private ownership Mining - Subcontracts (Mechanical installation) project In The Mt Isa City Council Area for New development. EPC turnkey contract including engineering, procurement & construction of a 80MW combined cycle gas turbine (CCGT) power station to act as back up to the 240MW Diamantina Power Station currently under construction. To include design & procurement of the dual fuel Rolls Royce Trent 60 WLE gas turbine generator & associated electrical & mechanical equipment, footings, structural & drainage work, assembly & installation of the main generation unit & balance of plant. Associated cabling & switchgear, telecommunications, instrument control & switchyard connections. Commissioning & operational handover. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - 6 + 1 UPSTREAM PIPING SUPPLY
A project in the QLD Within Western Downs Regional. Supply of all piping for the Ruby central processing plant including fabrication, welding, NDT, hydro testing, painting & delivery to site. Associated mechanical, structural & piping services. Click for more details...

ICHTHYS LNG PLANT - ONSHORE MECHANICAL WORKS (MEC-2) CONTRACT
Mechanical Works (Mec-2) Contract project at Blaydin Point via, Darwin, NT 0800 In The Council Area Of Darwin City of Private. For the provision of Onshore Mechanical Works (MEC-2) services. Click for more details...

AMRUN (SOUTH OF EMBLEY) BAUXITE PROJECT - EXPORT FACILITY
Mining - Subcontracts (Mechanical installation) project for New development. Construction of an Export Facility, including: Jetty (nom. 270m long) & tug berths, Wharf (nom. 624m long) & dolphins, Shiploader Feed Conveyor & Navigation Aids. The scope of works includes: Shop detailing, fabrication & supply of structural steel & precast concrete roadway decking. Supply of electrical & instrumentation & controls bulks, piping, & miscellaneous mechanical equipment. Supply of construction plant & equipment including offshore craneage. Construction management services. Mobilisation & demobilisation. Transportation of plant & equipment to & from project marshalling yard in Cairns. Design, supply & installation of temporary works including: cyclone moorings & tie-downs for vessels & equipment, temporary access platforms & supports. Installation of permanent plant equipment (SMP&E), including conveyor alignment & belt-pulling & splicing. Application & repair, as necessary, of protective coatings, isolating systems, bonding connections. Provision for diving services. Compliance with environmental approval including required marine fauna observations. Noise monitoring. All validation & verification activities including testing & survey. Click for more details...