AUGUSTA/COSTERFIELD PROCESSING FACILITY
Currently at the Construction stage In Greater Bendigo is a project estimated to be $ 10000000. This project Development comprises the modification and and refurbishment of the existing Costerfield CIL plant and the construction of a new crushing/processing plant. Work comprises earthworks; contract project management, layout and design drafting for various sections of the plant; sourcing, inspecting and acquiring various items of second hand equipment; design of main and distribution switchboards, current limiting device and main switch for installation adjacent to transformer substation reserve; refurbishment of float cells, Knelson concentrators and process circuit pumps. Click for more details...

HISMELT EXPANSION PROJECT
Mechanical Installation - Package 2 New project In The Kwinana Council Area. One of three packages. Fabrication and installation. Click for more details...

HISMELT EXPANSION PROJECT
Mechanical Installation - Package 3 project at Leath Rd, Kwinana, WA 6167 in the Mining - Subcontracts (Mechanical installation). One of three packages. Fabrication and installation. Click for more details...

HISMELT EXPANSION PROJECT
Private ownership Mining - Subcontracts (Mechanical installation) project In The Kwinana Council Area for New development. One of three packages. Pipework. Click for more details...

WOODCUTTERS BASE METALS MINE
Mining - Subcontracts (Mechanical installation) project In The Darwin City Council Area of Private ownership. Overall proposal to include installation of underground loading station & shaft fitout. All electrical services to be carried out by contractor main work to involve 2 x plate feeders, conveyor & grisleys & general power distribution. Click for more details...

SYNTHETIC RUTILE ENHANCEMENT PROCESS (SREP)
Mining - Subcontracts (Mechanical installation) project at Possibly near, Geraldton, WA 6530 of Treatment Plant - Turnkey Package type of New development. Plant construction by early 1996 is envisaged following recent tests which produced synthetic rutile with acceptable levels of uranium & thorium. Trials on product were carried out in the United States. Contract work to involve piping, pumping, tankage, structural steelworks & some associated services such as electricals. This process is environmentally beneficial as it eliminates the use of sulphur in kilns (Narngulu). Click for more details...

TARMOOLA GOLD OPERATIONS
30 km northwest of, Leonora, WA 6438 Has Tarmoola Gold Operations currently at Construction stage. This contract to mainly involve steel & platework fabrication. Overall project is to convert 2 existing mills to semi-autogenous grind. Main components of this tender expected to be the installation of the scalping screen building & bin support structure. Click for more details...

BIG BELL GOLD OPERATIONS
30 km northwest of, Cue, WA 6640 Has Big Bell Gold Operations currently at Construction stage. Contract to provide services for the 300m deep shaft. Work includes access ways, piping & electrical requirements & all associated design & fabrication work. Click for more details...

NELSON POINT - IRON ORE
Mining - Subcontracts (Mechanical installation) project at Port facilities via, Port Hedland, WA 6721 of Operations - Bogie Changeout type of Renovations, Refurbishments etc. development. Contract to involve refurbishment & replacement of bogies (8 sets) on car dumper number one. Click for more details...

QUARRY OPERATIONS
Private ownership Mining - Subcontracts (Mechanical installation) project In The Gosnells Council Area for Addition development. Structural steelwork required for new screening facility. Construction of 2 hoppers to be included in tender. Click for more details...

WILUNA - GOLD
Mine - Biox Tank Package Addition project In The Wiluna Council Area. Tender to be on a turnkey basis & will involve site preparation, concreting & miscellaneous structural/piping works. Main component is a stainless steel bio-oxidation tank. Some components to be supplied. Click for more details...

EWINGTON 2 COAL OPERATIONS
Currently at the Construction stage In Collie is a project estimated to be $ 1000000. This project Installation of 8 conveyors of various sizes required. Associated components have been ordered. Click for more details...

NELSON POINT/FINUCANE ISLAND - IRON ORE
Operations - Tunnel Conveyor - Mechanical/Structural Package project at Finucane Island to, Port Hedland, WA 6721 In The Council Area Of Port Hedland of Private. Contract to provide conveyor belt/system under the Pt Hedland harbour. Project designed to cart ore from Nelson Point to Finucane Island stockpiles. Conveyor expected to be 1.8m wide with capacity to move 4,000tph lump ore with full capacity of 10,000tph (ore) envisaged. This conveyor is to link up with the overland system during first half of 1997. Click for more details...

MURRIN MURRIN NICKEL/COBALT OPERATIONS
Mining - Subcontracts (Mechanical installation) project at 60 km east of, Leonora, WA 6438 for New. Contract to manufacture & deliver 5 x stainless steel units plus 4 very large titanium lined & clad autoclaves in addition to one special unit. Final specifications subject to ongoing design. Click for more details...

ENFIELD OIL PROJECT - WA-271-P
A project in the WA Within Ashburton. Includes 13 subsea trees, production controls and associated systems and technical services relating to installation and startup. Click for more details...

JAGUAR BASE METALS PROJECT - PROCESSING PLANT/MECHANICAL WORKS CONTRACT
A project in the WA Within Leonora. A centrally located processing facility to be located on the granted Teutonic Bore mining lease, 4 km to the north of the Jaguar deposit. A 350,000 tpa plant to treat ore by crushing, grinding and flotation. Copper and zinc concentrate production is expected to commence in July 2007, increasing to 10,000 tonnes of copper, 34,000 tonnes if zinc and 1 million ounces of silver in concentrate per annum over a six year period. Click for more details...

KALGOORLIE NICKEL SMELTER
Mining - Subcontracts (Mechanical installation) project at 16 km southeast of, Kalgoorlie, WA 6430 for Addition. Structural/mechanical/piping works to be carried out on M1 & M2 areas for new 800,000tpa acid plant to be constructed near existing Kalgoorlie Nickel Smelter. Facility to use a 3-staged acid conversion process. Overall project scheduled for completion during latter half of 1996. Click for more details...

PREMIER COAL OPERATIONS - COAL CHAR PILOT PLANT
Mining - Subcontracts (Mechanical installation) project at Premier mine site 15 km east of, Collie, WA 6225 of Equipment - Supply/Install type of New development. Likely to be one package, supply/install. Click for more details...

MONTO MINERALS INDUSTRIAL MINERALS PROJECT - WET SEPERATION PLANT
Mining - Subcontracts (Mechanical installation) project for New development. Wet Seperation Plant that will constructed next to the existing pilot plant. The plant will use non chemical seperation using gravity and magnetics. Plant is expected to process 142,000 tonnes in 2007 and 232,000 tonnes in 2008. Click for more details...

BHP BILLITON IRON ORE OPS - ASSET DEVELOPMENT PROJECTS - STEEL FABRICATION
New project of Mining - Subcontracts (Mechanical installation) project at Various sites via, Newman, WA 6753. BHP Billiton has increased iron ore production with work culminating in a production capacity of 110 Mtpa to be completed by late 2004. The company is now investigating ways of increasing production over the next five years to meet a projected increased in demand, especially from China. A complete process redesign will be involved with higher throughput levels and environmental and social benefits. Additional expansions of capacity to 145Mtpa are currently the subject of a feasibility study due for completion late 2004 approx. Click for more details...

KOGAN CREEK POWER PROJECT - MECHANICAL ERECTION CONTRACT
Mining - Subcontracts (Mechanical installation) project for New development. Mechanical erection of 1 Siemens Steam Turbine, 1 Siemens Generator THDF 125/67, Condenser, Tanks, Pumps, Compressors, Assembly of workshop and Store Click for more details...

KOGAN CREEK POWER STATION - BCP(PUMP CASING) - SUPPLY
A project in the QLD Within Western Downs Regional. BCP (Pump Casing) type grandless quantity: 1 Discharge rate:855/h Total Head: 911kpa Motor Capacity:400kw (Max), Voltage 690V. Click for more details...

KOGAN CREEK POWER STATION - FAN - SUPPLY
Mining - Subcontracts (Mechanical installation) project at Via, Brigalow, QLD 4412 for New. Sealing Air Fan Capacity: 600m3/min., Head: 6.67kPa, Quantity: 2 sets. Click for more details...

NEWLANDS COAL OPERATIONS - STRUCTURAL STEEL ERECTION
New project of Mining - Subcontracts (Mechanical installation) project at 13 km west of, Glenden, QLD 4743. Two Ultra Fine Coal buildings and one Portal building. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - STRUCTURAL/MECHANICAL
Mining - Subcontracts (Mechanical installation) project for New development. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

BHP PORT HEADLANDS EXPANSION - RAPID GROWTH 2 - STRUCTURAL/MECHANICAL CONTRACT
Currently at the Planning stage In Port Hedland is a project estimated to be $ 65000000. This project Structural and mechanical work to be carried out at the existing Finucane Island and Nelson Point facilities. Click for more details...

RAVENSTHORPE NICKEL PROJECT - MECHANICAL INSTALLATION OF WATER SYSTEMS
Mining - Subcontracts (Mechanical installation) project at 50 Km North of, Hopetoun, WA 6348 of Mechanical/Piping Installation Of Water Systems type of New development. Mechanical and piping installation of water systems. Click for more details...

RAVENSTHORPE NICKEL PROJECT - INSTALLATION OF CCD/FLOCCULANT SYSTEMS
Mechanical/Piping Installation Of Ccd/Flocculant Systems project at 50 Km North of, Hopetoun, WA 6348 in the Mining - Subcontracts (Mechanical installation). Mechanical and piping installation of CCS and flocculant systems. Click for more details...

NEWLANDS COAL OPERATIONS - SUPPLY OF STRUCTURAL STEEL PACKAGE NO2 FOR WASHPLANT
Mining - Subcontracts (Mechanical installation) project at 13 km west of, Glenden, QLD 4743 of Structural Steel Package (No2) - Supply For Washplant type of New development. Two Fine Coal buildings. Click for more details...

MIDDLEBACK RANGES OPERATIONS - PROJECT MAGNET - 7500 KW BALL MILL
7500 Kw Ball Mill project at North West of, Whyalla, SA 5600 in the Mining - Subcontracts (Mechanical installation). Development comprises the design, installation, commissioning and maintenance of 7500 kw ball mill. The mill will be rubber lined, it will be driven by two 3750 kw wound rotor induction motors and two conventional pinions. Click for more details...

SARAJI COAL MINE THICKNER PLANT CONVERSION
Mining - Subcontracts (Mechanical installation) project In The Isaac Regional Council Area of Private ownership. A 35m thickner plant was installed in 2004 and will be upgraded to improve efficiency of tailings disposal. Work comprises the design, removal of existing equipment, civil construction, installation of the high rate thickner. Associated works involve piping, pumps, structural and mechanical works. Electrical installation and recommissioning are also part of the work. Click for more details...

MONTO MINERALS INDUSTRIAL MINERALS PROJECT - FELDSPAR WASH PLANT
Feldspar Wash Plant New project In The North Burnett Regional Council Area. Development comprises the construction of a treatment facility that will comprise a hot acid leach plant and associated equipment. The ore will be shipped from the mine to the feldspar plant at Dakiel Railroad Station where it will be loaded and sent to Gladstone and then be shipped to Brisbane. Click for more details...

IRON ORE RAPID GROWTH PROJECT 3 - AREA C - SAMPLE PREP/LAB EQUIPMENT
Private ownership Mining - Subcontracts (Mechanical installation) project In The East Pilbara Council Area for New development. Supply and Insall SAMPLE PREPERATION & LABORATORY EQUIPMENT. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C - STOCKYARD MACHINES
Mining - Subcontracts (Mechanical installation) project In The East Pilbara Council Area of Stockyard Machines - Upgrade type. Area C Upgrade of Stockyard Machines. Click for more details...

LIDDELL POWER STATION - CONTINUOUS OPACITY MONITORING SYSTEM
New project of Mining - Subcontracts (Mechanical installation) project at Via, Liddell, NSW 2333. This Specification is for the design, supply, delivery, installation, commissioning and field audit performance tests for four continuous opacity monitoring systems (COMS) including dedicated air blowers for each COMS unit, weather covers and installation of new instrument tapping points into the side of the inclined duct work for each COMS unit. An optional firm price for the design, supply, delivery, installation, commissioning and field audit performance tests for an additional four COMS units and dedicated air blowers for each COMS unit. Click for more details...

ALCOA REFINERIES PINJARRA RESIDUE PROJECT - MECHANICAL INSTALL FOR CARBONATION PLANT
Currently at the Construction stage In Murray is a project estimated to be $ 22000000. This project For the provision of mechanical installation services for the carbonation plant. Click for more details...

LIDDELL POWER STATION - INSULATION/CLADDING REPAIRS/ASBESTOS REMOVAL/REINSULATION
Insulation/Cladding Repairs/Asbestos Removal/Reinsulation project at At, Liddell, NSW 2333 in the Mining - Subcontracts (Mechanical installation). This Specification covers the removal, handling and disposal of asbestos and non-asbestos materials. The supply and installation of replacement non-asbestos thermal insulation and cladding. The removal, reinstallation and refurbishment of damaged insulation and cladding. The installation of temporary staging/rigging access platforms as nominated by the Contract Manager. The Contract shall be for a period of two years from the date of the awarding of the Contract by the Principal (Portion 1), with a Macquarie Generation Option to extend the Contract for a further two year period (Portion 2, Option 1). Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - PRECOATED STEEL PILES
Mining - Subcontracts (Mechanical installation) project at Geraldton Port, Marine Terrace, Geraldton, WA 6530 for New. Supply of precoated steel piles for extension of Berth 5 and Berth 6. Piles of 762 mm and 508 mm diameter. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - FENDERS
Mining - Subcontracts (Mechanical installation) project for New development. Supply of Fenders. Fentek ship fenders with frontal frames. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - BOLLARDS
Mining - Subcontracts (Mechanical installation) project In The City Of Greater Geraldton Council Area of Bollards - Design/Construct type. Design and construct Bollards & Quick Release Hooks. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - MINOR CIVIL/MECHANICAL/STRUCTURAL WORKS
Private ownership Mining - Subcontracts (Mechanical installation) project In The Mackay Regional Council Area for New development. Work comprises the contractor to do minor civil, mechanical and structural works on site when needed. Click for more details...

KESTREL COAL UNDERGROUND EXTENSION PROJECT - COAL HANDLING & PREPARATION PLANT UPGRADE
Mining - Subcontracts (Mechanical installation) project for Addition development. Upgrade to existing coal wash plant to increase production from 1000t/h to 1400t/h. Click for more details...

KING ISLAND SCHEELITE PROJECT - STRUCTURAL STEEL FOR SECONDARY CRUSHING & SCREENING PLANT
Private ownership Mining - Subcontracts (Mechanical installation) project In The King Island Council Area for New development. For the provision of structural steel for the secondary crushing & screening plant. Click for more details...

RIDGEWAY DEEPS UNDERGROUND GOLD MINE EXTENSION PROJECT - MECHANICAL INSTALLATION FOR CONCENTRATOR UPGRADE
Mining - Subcontracts (Mechanical installation) project at 25 km south west of, Orange, NSW 2800 of Mechanical - Install For Concentrator Upgrade type of New development. Mechanical installation for the concentrator upgrade. Click for more details...

CHEVRON AUSTRALIA - OPERATIONS - MECHANICAL INSPECTION SERVICES
Mechanical Inspection Services New project In The Ashburton Council Area. For the provision of mechanical inspection services. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - 6 + 1 UPSTREAM PIPING SUPPLY
A project in the QLD Within Western Downs Regional. Supply of all piping for the Ruby central processing plant including fabrication, welding, NDT, hydro testing, painting & delivery to site. Associated mechanical, structural & piping services. Click for more details...

BHP BILLITON MOOKA CAR REPAIR WORKSHOP
Bhp Billiton Mooka Car Repair Workshop is currently at the Construction stage, valued at about $ 30000000 it is Contract for the construction of a maintenance workshop & warehouse. To include process equipment installation as well as rail & infrastructure components including roads, track, signalling & communications electrical engineering. Water supply. Click for more details...

ICHTHYS LNG PLANT - ONSHORE MECHANICAL WORKS (MEC-2) CONTRACT
Mechanical Works (Mec-2) Contract project at Blaydin Point via, Darwin, NT 0800 In The Council Area Of Darwin City of Private. For the provision of Onshore Mechanical Works (MEC-2) services. Click for more details...

BHP BILLITON NICKEL WEST MECHANICAL & ELECTRICAL SERVICES
Mining - Subcontracts (Mechanical installation) project at Various mines, ., WA 6999 for New. For the provision of a three year maintenance services to cover both mechanical & electrical services across all of BHP Billiton Nickel West's operations in Western Australia. Click for more details...

NORTH WEST SHELF OIL REDEVELOPMENT PROGRAM - MASTER SERVICES CONTRACT
Mining - Subcontracts (Mechanical installation) project at Approx 135km Northwest of, Karratha, WA 6714 of Master Services Contract - Multi Discipline type of New development. For the provision of master services including electrical & instrumentation, mechanical, inspection, cladding/insulation, blasting & painting, scaffolding, rope access & web decking & other Perth based support services. Contract to include 2 x 1 year extension options. Click for more details...