State

Categories

Sub Categories

Click Here to Find Current Projects

List of Mechanical installation Projects


AUGUSTA/COSTERFIELD PROCESSING FACILITY
Currently at the Construction stage In Greater Bendigo is a project estimated to be $ 10000000. This project Development comprises the modification and and refurbishment of the existing Costerfield CIL plant and the construction of a new crushing/processing plant. Work comprises earthworks; contract project management, layout and design drafting for various sections of the plant; sourcing, inspecting and acquiring various items of second hand equipment; design of main and distribution switchboards, current limiting device and main switch for installation adjacent to transformer substation reserve; refurbishment of float cells, Knelson concentrators and process circuit pumps. Click for more details...

HISMELT EXPANSION PROJECT
Mechanical Installation - Package 3 project at Leath Rd, Kwinana, WA 6167 in the Mining - Subcontracts (Mechanical installation). One of three packages. Fabrication and installation. Click for more details...

BLACKWATER COMET PROJECT
Structural Steelwork project at Via, Blackwater, QLD 4717 in the Mining - Subcontracts (Mechanical installation). More than one package. Click for more details...

WOODCUTTERS BASE METALS MINE
Mining - Subcontracts (Mechanical installation) project In The Darwin City Council Area of Private ownership. Overall proposal to include installation of underground loading station & shaft fitout. All electrical services to be carried out by contractor main work to involve 2 x plate feeders, conveyor & grisleys & general power distribution. Click for more details...

TARMOOLA GOLD OPERATIONS
30 km northwest of, Leonora, WA 6438 Has Tarmoola Gold Operations currently at Construction stage. This contract to mainly involve steel & platework fabrication. Overall project is to convert 2 existing mills to semi-autogenous grind. Main components of this tender expected to be the installation of the scalping screen building & bin support structure. Click for more details...

GRANTS PATCH - GOLD
Mine - Treatment Plant - Relocation Renovations, Refurbishments etc. project In The Katanning Council Area. Recent purchase included a 250,000tpa carbon-in-pulp plant. Facility to be moved to Company's proposed mine 36 km east Katanning. Small Victorian company (undisclosed) to carry out plant dismantling, re-assembly & modifications. Remainder of works expected to utilise inhouse resources or subcontractors on an ad hoc basis. Click for more details...

TARMOOLA GOLD OPERATIONS
Mining - Subcontracts (Mechanical installation) project at 30 km northwest of, Leonora, WA 6438 of Gold Room (Construction) - 3 Levels type of Addition development. Work to mainly involve fabrication & cladding over a 3 level structure. Minimal site works required. Click for more details...

YANDI - IRON ORE
Addition project of Mining - Subcontracts (Mechanical installation) project at 90 km northwest of, Newman, WA 6753. Stacker, conveyors, structural steelwork & associated services required for new mine expansion. Overall project development still subject to obtaining necessary approvals. Click for more details...

QUARRY OPERATIONS
Mining - Subcontracts (Mechanical installation) project at Lot 467 & 453 Stephen St, Orange Grove, WA 6109 for Addition. Structural steelwork & piping required for this contract which mainly involves conveyors (8) & screens. Tender also includes associated earthworks, drainage, general site services & electrical requirements. Existing plant is to be demolished & will be replaced by a 22m high building constructed of concrete panels & colourbond sheeting. A conveyor belt extends from this complex to load-out bins to load vehicles similar to the current facilities. Work scheduled for completion during April 1996. Project has received EPA approval for grinding & milling works. Click for more details...

BIG BELL GOLD OPERATIONS
30 km northwest of, Cue, WA 6640 Has Big Bell Gold Operations currently at Construction stage. Contract to provide services for the 300m deep shaft. Work includes access ways, piping & electrical requirements & all associated design & fabrication work. Click for more details...

NELSON POINT - IRON ORE
Mining - Subcontracts (Mechanical installation) project at Port facilities via, Port Hedland, WA 6721 of Operations - Bogie Changeout type of Renovations, Refurbishments etc. development. Contract to involve refurbishment & replacement of bogies (8 sets) on car dumper number one. Click for more details...

EWINGTON 2 COAL OPERATIONS
Mining - Subcontracts (Mechanical installation) project In The Collie Council Area of Screen type. Supply & delivery of one new screen required for materials handling facility. Click for more details...

QUARRY OPERATIONS
Private ownership Mining - Subcontracts (Mechanical installation) project In The Gosnells Council Area for Addition development. Structural steelwork required for new screening facility. Construction of 2 hoppers to be included in tender. Click for more details...

YANDI - IRON ORE
Mining - Subcontracts (Mechanical installation) project for Addition development. Supply only contract to provide approximately 250t of steel for the new stacker & a similar amount of steelwork for the new feed conveyor. Pricing exercise & design work completed. Click for more details...

WILUNA - GOLD
Mine - Biox Tank Package Addition project In The Wiluna Council Area. Tender to be on a turnkey basis & will involve site preparation, concreting & miscellaneous structural/piping works. Main component is a stainless steel bio-oxidation tank. Some components to be supplied. Click for more details...

FINUCANE ISLAND - IRON ORE
Operations - Dust Pip - Upgrade project at Site facilities via, Port Hedland, WA 6721 in the Mining - Subcontracts (Mechanical installation). Dust suppression required for crushing & screening plant area as part of current project improvement programme. Tender expected to include sprinklers plus associated equipment & electrical services. Work scheduled for completion 31 July 1996. Click for more details...

EWINGTON 2 COAL OPERATIONS
Currently at the Construction stage In Collie is a project estimated to be $ 1000000. This project Installation of 8 conveyors of various sizes required. Associated components have been ordered. Click for more details...

MURRIN MURRIN NICKEL/COBALT OPERATIONS
Mining - Subcontracts (Mechanical installation) project at 60 km east of, Leonora, WA 6438 for New. Contract to manufacture & deliver 5 x stainless steel units plus 4 very large titanium lined & clad autoclaves in addition to one special unit. Final specifications subject to ongoing design. Click for more details...

WOODCUTTERS BASE METALS MINE
Addition project of Mining - Subcontracts (Mechanical installation) project at 80 km south of, Darwin, NT 0800. Supply & installation of steelwork for shaft extension. Works to be carried out over 325m from the RL730 to the RL405 level. Click for more details...

WOODCUTTERS BASE METALS MINE
Mining - Subcontracts (Mechanical installation) project at 80 km south of, Darwin, NT 0800 for Addition. Contract for supply & installation of grisleys, 2 x plate feeders & one conveyor system. This tender is to include all associated electricals such as general power distribution & lighting. Click for more details...

CHARIOT GOLD PROJECT - WARREGO TREATMENT PLANT
Private ownership Mining - Subcontracts (Mechanical installation) project In The Barkly Shire Council Area for New development. Mechanical works packages. Package one tankage work and structural repairs. Click for more details...

KALGOORLIE NICKEL SMELTER
Mining - Subcontracts (Mechanical installation) project at 16 km southeast of, Kalgoorlie, WA 6430 for Addition. Structural/mechanical/piping works to be carried out on M1 & M2 areas for new 800,000tpa acid plant to be constructed near existing Kalgoorlie Nickel Smelter. Facility to use a 3-staged acid conversion process. Overall project scheduled for completion during latter half of 1996. Click for more details...

TOMS GULLY GOLD OPERATIONS
Mining - Subcontracts (Mechanical installation) project In The Darwin City Council Area of Private ownership. Items available for purchase include mill, carbon-in-pulp plant, tailings dam & tailings thickener equipment. The open cut mine/leases, workshops, offices & accommodation units are also incorporated in the sale. Resulting tenders may involve plant dismantling, transportation, modifications &/or re-commissioning. Click for more details...

ST IVES GOLD OPERATIONS
Mining - Subcontracts (Mechanical installation) project at Perth location & site operations via, Kambalda, WA 6442 for Renovations, Refurbishments etc.. Cracks in the mill shell & some welds located during routine maintenance. Plant to be dismantled & transported to Perth for repair work which is expected to take 5 - 6 weeks. An additional tertiary crusher has been utilised on site in lieu of the SAG mill which is used for crushing ore to a fine slurry prior to treatment through flotation tanks. Click for more details...

MONTO MINERALS INDUSTRIAL MINERALS PROJECT - WET SEPERATION PLANT
Mining - Subcontracts (Mechanical installation) project for New development. Wet Seperation Plant that will constructed next to the existing pilot plant. The plant will use non chemical seperation using gravity and magnetics. Plant is expected to process 142,000 tonnes in 2007 and 232,000 tonnes in 2008. Click for more details...

BHP BILLITON IRON ORE OPS - ASSET DEVELOPMENT PROJECTS - STEEL FABRICATION
New project of Mining - Subcontracts (Mechanical installation) project at Various sites via, Newman, WA 6753. BHP Billiton has increased iron ore production with work culminating in a production capacity of 110 Mtpa to be completed by late 2004. The company is now investigating ways of increasing production over the next five years to meet a projected increased in demand, especially from China. A complete process redesign will be involved with higher throughput levels and environmental and social benefits. Additional expansions of capacity to 145Mtpa are currently the subject of a feasibility study due for completion late 2004 approx. Click for more details...

KOGAN CREEK POWER STATION - SEALING AIR FAN MOTOR
Mining - Subcontracts (Mechanical installation) project In The Western Downs Regional Council Area of Sealing Air Fan Motor - Supply type. HITO410 Sealing Air Fan Motor of 110kw capacity. Click for more details...

KOGAN CREEK POWER STATION - FAN - SUPPLY
Mining - Subcontracts (Mechanical installation) project at Via, Brigalow, QLD 4412 for New. Sealing Air Fan Capacity: 600m3/min., Head: 6.67kPa, Quantity: 2 sets. Click for more details...

RAVENSTHORPE NICKEL PROJECT - LIMESTONE BALL MILL
Ravensthorpe Nickel Project - Limestone Ball Mill is currently at the Construction stage, valued at about $ 10000000 it is Limestone Ball Mill Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - STRUCTURAL/MECHANICAL
Mining - Subcontracts (Mechanical installation) project for New development. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

BHP PORT HEADLANDS EXPANSION - RAPID GROWTH 2 - STRUCTURAL/MECHANICAL CONTRACT
Currently at the Planning stage In Port Hedland is a project estimated to be $ 65000000. This project Structural and mechanical work to be carried out at the existing Finucane Island and Nelson Point facilities. Click for more details...

RAVENSTHORPE NICKEL PROJECT - INSTALLATION OF CCD/FLOCCULANT SYSTEMS
Mechanical/Piping Installation Of Ccd/Flocculant Systems project at 50 Km North of, Hopetoun, WA 6348 in the Mining - Subcontracts (Mechanical installation). Mechanical and piping installation of CCS and flocculant systems. Click for more details...

SARAJI COAL MINE THICKNER PLANT CONVERSION
Mining - Subcontracts (Mechanical installation) project In The Isaac Regional Council Area of Private ownership. A 35m thickner plant was installed in 2004 and will be upgraded to improve efficiency of tailings disposal. Work comprises the design, removal of existing equipment, civil construction, installation of the high rate thickner. Associated works involve piping, pumps, structural and mechanical works. Electrical installation and recommissioning are also part of the work. Click for more details...

LIDDELL POWER STATION - CONVEYOR BELTS
Currently at the Construction stage In Muswellbrook is a project estimated to be $ 400000. This project Development comprises the replacement of conveyor belts at Liddell Power Station, as and when directed by the Principal for a two (2) year period from the date of the awarding of Macquarie Generation's Contract. The work includes the removal, overhaul and installation of each conveyor's head and tail end belt cleaning systems. Tenderers are to demonstrate in their tender a working knowledge of the requirements of the Specification gained through experience with and knowledge of the plant described or similar plant. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C/PORT - ELECTRICAL/CONTROLS
Near, Newman, WA 6753 Has Iron Ore Rapid Growth 3 Project - Area C/Port - Electrical/Controls currently at Construction stage. Area C Electrical and Controls. Click for more details...

LIDDELL POWER STATION - CONTINUOUS OPACITY MONITORING SYSTEM
New project of Mining - Subcontracts (Mechanical installation) project at Via, Liddell, NSW 2333. This Specification is for the design, supply, delivery, installation, commissioning and field audit performance tests for four continuous opacity monitoring systems (COMS) including dedicated air blowers for each COMS unit, weather covers and installation of new instrument tapping points into the side of the inclined duct work for each COMS unit. An optional firm price for the design, supply, delivery, installation, commissioning and field audit performance tests for an additional four COMS units and dedicated air blowers for each COMS unit. Click for more details...

ANGEL GAS PROJECT - JACKET/PIPELINE INSTALLATION CONTRACT
Private ownership Mining - Subcontracts (Mechanical installation) project In The Dampier Sub Basin Council Area for New development. The contract comprises the substructure and pipeline installation of a 7500 MT jacket and piles by J.Ray's launch barge, the Intermac 650, from a fabrication yard in China to the offshore installation site as well as the launch, upend, and set down of the jacket. One of J Ray's marine vessels will install the jackets and pipelines. Pipeline work will involve the installation of an 80 mile x 30 inch pipeline from the first trunk-line and the installation of three infield 14 inch CRA pipelines. The jacket foundation will be drilled and gouted and will require the installation of eight primary and eight secondary piles in holes up to 10 feet in diameter. Installation welding will be done by the inhouse automated welding systems. The construction of drilling work decks, caissons and other items will be fabricated at Batam Island, Indonesia. Click for more details...

LIDDELL POWER STATION - INSULATION/CLADDING REPAIRS/ASBESTOS REMOVAL/REINSULATION
Insulation/Cladding Repairs/Asbestos Removal/Reinsulation project at At, Liddell, NSW 2333 in the Mining - Subcontracts (Mechanical installation). This Specification covers the removal, handling and disposal of asbestos and non-asbestos materials. The supply and installation of replacement non-asbestos thermal insulation and cladding. The removal, reinstallation and refurbishment of damaged insulation and cladding. The installation of temporary staging/rigging access platforms as nominated by the Contract Manager. The Contract shall be for a period of two years from the date of the awarding of the Contract by the Principal (Portion 1), with a Macquarie Generation Option to extend the Contract for a further two year period (Portion 2, Option 1). Click for more details...

CHINCHILLA COAL SEAM GAS & UNDERGROUND COAL GASIFICATION PROJECT - STAGE 1 - STRUCTURAL STEEL FOR LABORATORY
Mining - Subcontracts (Mechanical installation) project In The Western Downs Regional Council Area of Private ownership. For the mine site laboratory. Click for more details...

LAKE VERMONT COAL PROJECT - STRUCTURAL STEEL FOR COAL PREPARATION PLANT
Mining - Subcontracts (Mechanical installation) New project at Approx 15 km north east of, Dysart, QLD 4745. This type is Structural Steel - For Coal Preparation Plant with Private ownership. For a 4 Mtpa plant. Click for more details...

RIDGEWAY DEEPS UNDERGROUND GOLD MINE EXTENSION PROJECT - MECHANICAL INSTALLATION FOR CONCENTRATOR UPGRADE
Mining - Subcontracts (Mechanical installation) project at 25 km south west of, Orange, NSW 2800 of Mechanical - Install For Concentrator Upgrade type of New development. Mechanical installation for the concentrator upgrade. Click for more details...

MURRAY BASIN STAGE 2 - KWR MINERAL SANDS PROJECT - STRUCTURAL STEEL & MECHANICAL FOR WHIMS BUILDING
New project of Mining - Subcontracts (Mechanical installation) project at 28 km east of, Ouyen, VIC 3490. For the provision of structural steel & mechanical works for the wet high intensity magnetic separator building. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - EXPORT SHIPPING FACILITIES
Mining - Subcontracts (Mechanical installation) project for New development. Design & construction of a 168m long jetty, loading platform & berth for vessels with capacities from 125,000cu m (285m long) up to 220,000cu m (315m long) exporting liquefied natural gas (LNG) & 20,000-80,000cu m capacity for exporting liquid petroleum gas (LPG). Contract to include the procurement, fabrication, construciton & commissioning of the structural, mechanical & electrical components of the combined Marine Facilities. Click for more details...

MORANBAH REGION EXPANSION PROJECT - SMP PACKAGES
A project in the QLD Within Isaac Regional. Structural, mechanical & piping (SMP) services for materials handling (CX002/X004) & coal preparation plant (CPP) (CX003/X005). Click for more details...

CHEVRON AUSTRALIA - OPERATIONS - MECHANICAL INSPECTION SERVICES
Mechanical Inspection Services New project In The Ashburton Council Area. For the provision of mechanical inspection services. Click for more details...

MOUNT OXIDE MINE SITE SOLAR PUMP INSTALLATION
Installation - Of Solar Pumps project at via Gunpowder Rd at Mount Gordon Mine 100km northwest of, Mount Isa, QLD 4825 In The Council Area Of Mt Isa City of Private. Installation (design, supply & install pump mounting & float system, supply & install polypipe, testing) of 3 solar pumping systems at the south east catch dam, the sump area & the clean water catch dam. Maintenance for 12 months with an option for an additional 12 months as well as the possibility of additional site equipment being included in the maintenance contract. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - 6 + 1 UPSTREAM PIPING SUPPLY
A project in the QLD Within Western Downs Regional. Supply of all piping for the Ruby central processing plant including fabrication, welding, NDT, hydro testing, painting & delivery to site. Associated mechanical, structural & piping services. Click for more details...

WALLUMBILLA GAS HUB COMPRESSORS UPGRADE
Compressors project at via, Wallumbilla, QLD 4428 In The Council Area Of Maranoa Regional of Private. Upgrade at the Walumbilla gas hub which connects to APA's Roma-Brisbane & South West Queensland Pipelines. Installation of 3 new compressors & associated services. Click for more details...

ICHTHYS LNG PLANT - ONSHORE MECHANICAL WORKS (MEC-2) CONTRACT
Mechanical Works (Mec-2) Contract project at Blaydin Point via, Darwin, NT 0800 In The Council Area Of Darwin City of Private. For the provision of Onshore Mechanical Works (MEC-2) services. Click for more details...

ICHTHYS LNG PLANT - ONSHORE MECHANICAL WORKS - MEC 2 - SUPPLY & INSTALLATION OF GROUT
Grout - Supply & Installation New project In The Darwin City Council Area. For the supply & installation of grout. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect