State

Categories

Sub Categories

Click Here to Find Current Projects

List of Mechanical installation Projects


HISMELT EXPANSION PROJECT
Mechanical Installation - Package 2 New project In The Kwinana Council Area. One of three packages. Fabrication and installation. Click for more details...

BLACK SWAN DISSEMINATED TWO PROJECT - PLANT UPGRADE
53 km north east of, Kalgoorlie, WA 6430 Has Black Swan Disseminated Two Project - Plant Upgrade currently at Construction stage. Expansion in production capacity of the processing plant from 600,000 tpa to 2,150,000 tpa. Production of 13,000 tonnes of payable nickel per annum is to be produced. This will require two new grinding mills, which have already been sourced second hand. Project to include upgrade of grinding circuit, new tank cells, relocation of control room. Click for more details...

WOODCUTTERS BASE METALS MINE
Mining - Subcontracts (Mechanical installation) project In The Darwin City Council Area of Private ownership. Overall proposal to include installation of underground loading station & shaft fitout. All electrical services to be carried out by contractor main work to involve 2 x plate feeders, conveyor & grisleys & general power distribution. Click for more details...

SYNTHETIC RUTILE ENHANCEMENT PROCESS (SREP)
Mining - Subcontracts (Mechanical installation) project at Possibly near, Geraldton, WA 6530 of Treatment Plant - Turnkey Package type of New development. Plant construction by early 1996 is envisaged following recent tests which produced synthetic rutile with acceptable levels of uranium & thorium. Trials on product were carried out in the United States. Contract work to involve piping, pumping, tankage, structural steelworks & some associated services such as electricals. This process is environmentally beneficial as it eliminates the use of sulphur in kilns (Narngulu). Click for more details...

TARMOOLA GOLD OPERATIONS
30 km northwest of, Leonora, WA 6438 Has Tarmoola Gold Operations currently at Construction stage. This contract to mainly involve steel & platework fabrication. Overall project is to convert 2 existing mills to semi-autogenous grind. Main components of this tender expected to be the installation of the scalping screen building & bin support structure. Click for more details...

YANDI - IRON ORE
Addition project of Mining - Subcontracts (Mechanical installation) project at 90 km northwest of, Newman, WA 6753. Stacker, conveyors, structural steelwork & associated services required for new mine expansion. Overall project development still subject to obtaining necessary approvals. Click for more details...

BIG BELL GOLD OPERATIONS
30 km northwest of, Cue, WA 6640 Has Big Bell Gold Operations currently at Construction stage. Contract to provide services for the 300m deep shaft. Work includes access ways, piping & electrical requirements & all associated design & fabrication work. Click for more details...

YANDI - IRON ORE
Mining - Subcontracts (Mechanical installation) project for Addition development. Supply only contract to provide approximately 250t of steel for the new stacker & a similar amount of steelwork for the new feed conveyor. Pricing exercise & design work completed. Click for more details...

WILUNA - GOLD
Mine - Biox Tank Package Addition project In The Wiluna Council Area. Tender to be on a turnkey basis & will involve site preparation, concreting & miscellaneous structural/piping works. Main component is a stainless steel bio-oxidation tank. Some components to be supplied. Click for more details...

FINUCANE ISLAND - IRON ORE
Operations - Dust Pip - Upgrade project at Site facilities via, Port Hedland, WA 6721 in the Mining - Subcontracts (Mechanical installation). Dust suppression required for crushing & screening plant area as part of current project improvement programme. Tender expected to include sprinklers plus associated equipment & electrical services. Work scheduled for completion 31 July 1996. Click for more details...

EWINGTON 2 COAL OPERATIONS
Mining - Subcontracts (Mechanical installation) project for Addition development. Fabrication & installation of one run-of-mine (ROM) hopper. Contract to mainly involve steelwork. Work to commence early April 1996 on this contract with an estimated 10 week duration. Click for more details...

EWINGTON 2 COAL OPERATIONS
Currently at the Construction stage In Collie is a project estimated to be $ 1000000. This project Installation of 8 conveyors of various sizes required. Associated components have been ordered. Click for more details...

WOODCUTTERS BASE METALS MINE
Addition project of Mining - Subcontracts (Mechanical installation) project at 80 km south of, Darwin, NT 0800. Supply & installation of steelwork for shaft extension. Works to be carried out over 325m from the RL730 to the RL405 level. Click for more details...

WOODCUTTERS BASE METALS MINE
Mining - Subcontracts (Mechanical installation) project at 80 km south of, Darwin, NT 0800 for Addition. Contract for supply & installation of grisleys, 2 x plate feeders & one conveyor system. This tender is to include all associated electricals such as general power distribution & lighting. Click for more details...

ENFIELD OIL PROJECT - WA-271-P
A project in the WA Within Ashburton. Includes 13 subsea trees, production controls and associated systems and technical services relating to installation and startup. Click for more details...

CHARIOT GOLD PROJECT - WARREGO TREATMENT PLANT
Private ownership Mining - Subcontracts (Mechanical installation) project In The Barkly Shire Council Area for New development. Mechanical works packages. Package one tankage work and structural repairs. Click for more details...

KALGOORLIE NICKEL SMELTER
Mining - Subcontracts (Mechanical installation) project for Addition development. Work expected to involve a 2.4m diameter stainless steel duct & associated services. This new plant is designed to reduce sulphur dioxide emissions. Click for more details...

TOMS GULLY GOLD OPERATIONS
Mining - Subcontracts (Mechanical installation) project In The Darwin City Council Area of Private ownership. Items available for purchase include mill, carbon-in-pulp plant, tailings dam & tailings thickener equipment. The open cut mine/leases, workshops, offices & accommodation units are also incorporated in the sale. Resulting tenders may involve plant dismantling, transportation, modifications &/or re-commissioning. Click for more details...

OAKY NORTH MINE
Private ownership Mining - Subcontracts (Mechanical installation) project In The Central Highlands Regional Council Area for Subcontract development. For series of conveyors to transport coal from reclaimer to breaker to transfer station to stockpile. Conveyors include 2.3 km & 650 m approx lengths. Click for more details...

BARNEY POINT COAL TERMINAL UPGRADING - STAGE 2
Mining - Subcontracts (Mechanical installation) project In The Gladstone Regional Council Area of Private ownership. To include both mechanical and electrical installation. Click for more details...

ALCOA OF AUSTRALIA - AREA K PROJECT
Mining - Subcontracts (Mechanical installation) Addition project at Lot 100 Postans Rd, Hope Valley, WA 6165. This type is Mechanical/Electrical Installation For Residue Disposal Expansion with Private ownership. This major mechanical/electrical package includes installation of piping for the tailings dam expansion. Click for more details...

KOGAN CREEK POWER PROJECT
Currently at the Construction stage In Western Downs Regional is a project estimated to be $ 5000000. This project Detailing, procurement, fabrication and erection of 2660 to structural steel works painted, 57 to sundry metal works, 3200m2 hot-dip galvanised gratings, 2420m railings, 210m step ladders. Click for more details...

BHP BILLITON IRON ORE OPS - ASSET DEVELOPMENT PROJECTS - STEEL FABRICATION
New project of Mining - Subcontracts (Mechanical installation) project at Various sites via, Newman, WA 6753. BHP Billiton has increased iron ore production with work culminating in a production capacity of 110 Mtpa to be completed by late 2004. The company is now investigating ways of increasing production over the next five years to meet a projected increased in demand, especially from China. A complete process redesign will be involved with higher throughput levels and environmental and social benefits. Additional expansions of capacity to 145Mtpa are currently the subject of a feasibility study due for completion late 2004 approx. Click for more details...

KOGAN CREEK POWER PROJECT - MECHANICAL ERECTION CONTRACT
Mining - Subcontracts (Mechanical installation) project for New development. Mechanical erection of 1 Siemens Steam Turbine, 1 Siemens Generator THDF 125/67, Condenser, Tanks, Pumps, Compressors, Assembly of workshop and Store Click for more details...

KOGAN CREEK POWER STATION - BCP(PUMP CASING) - SUPPLY
A project in the QLD Within Western Downs Regional. BCP (Pump Casing) type grandless quantity: 1 Discharge rate:855/h Total Head: 911kpa Motor Capacity:400kw (Max), Voltage 690V. Click for more details...

NEWLANDS COAL OPERATIONS - STRUCTURAL STEEL ERECTION
New project of Mining - Subcontracts (Mechanical installation) project at 13 km west of, Glenden, QLD 4743. Two Ultra Fine Coal buildings and one Portal building. Click for more details...

RAVENSTHORPE NICKEL PROJECT - MECHANICAL INSTALLATION OF WATER SYSTEMS
Mining - Subcontracts (Mechanical installation) project at 50 Km North of, Hopetoun, WA 6348 of Mechanical/Piping Installation Of Water Systems type of New development. Mechanical and piping installation of water systems. Click for more details...

RAVENSTHORPE NICKEL PROJECT - INSTALLATION OF CCD/FLOCCULANT SYSTEMS
Mechanical/Piping Installation Of Ccd/Flocculant Systems project at 50 Km North of, Hopetoun, WA 6348 in the Mining - Subcontracts (Mechanical installation). Mechanical and piping installation of CCS and flocculant systems. Click for more details...

LIDDELL POWER STATION - BOILER MAINTENANCE CONTRACT
Liddell Power Station - Boiler Maintenance Contract is currently at the Construction stage, valued at about $ 200000 it is Work comprises the emergency repair of the four 500 MW boilers. Click for more details...

KALGOORLIE SUPERPIT GOLD MINE - CYANIDE PIPING UPGRADE
Mining - Subcontracts (Mechanical installation) project at 15 Km North of, Kalgoorlie, WA 6430 of Fimiston Cil Plant/Gidji Roaster Upgrade type of New development. Fabrication and installation of 316l stainless steel piping, high quality diaphragm valves and flanges with suitable transparent flange covers for extra protection. Click for more details...

LIDDELL POWER STATION - CONVEYOR BELTS
Currently at the Construction stage In Muswellbrook is a project estimated to be $ 400000. This project Development comprises the replacement of conveyor belts at Liddell Power Station, as and when directed by the Principal for a two (2) year period from the date of the awarding of Macquarie Generation's Contract. The work includes the removal, overhaul and installation of each conveyor's head and tail end belt cleaning systems. Tenderers are to demonstrate in their tender a working knowledge of the requirements of the Specification gained through experience with and knowledge of the plant described or similar plant. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C/PORT - ELECTRICAL/CONTROLS
Near, Newman, WA 6753 Has Iron Ore Rapid Growth 3 Project - Area C/Port - Electrical/Controls currently at Construction stage. Area C Electrical and Controls. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - PORT - STRUCTURAL/MECHANICAL WORKS
Currently at the Construction stage In Port Hedland is a project estimated to be $ 180000000. This project Work comprises modification of existing conveyors to increase capacity, the installation of additional conveyors and associated transfers and pipework. On the upgraded Finucane Island wharf the dual cell car dumper will be upgraded and new ship loading conveyors will be provided. Click for more details...

ANGEL GAS PROJECT - JACKET/PIPELINE INSTALLATION CONTRACT
Private ownership Mining - Subcontracts (Mechanical installation) project In The Dampier Sub Basin Council Area for New development. The contract comprises the substructure and pipeline installation of a 7500 MT jacket and piles by J.Ray's launch barge, the Intermac 650, from a fabrication yard in China to the offshore installation site as well as the launch, upend, and set down of the jacket. One of J Ray's marine vessels will install the jackets and pipelines. Pipeline work will involve the installation of an 80 mile x 30 inch pipeline from the first trunk-line and the installation of three infield 14 inch CRA pipelines. The jacket foundation will be drilled and gouted and will require the installation of eight primary and eight secondary piles in holes up to 10 feet in diameter. Installation welding will be done by the inhouse automated welding systems. The construction of drilling work decks, caissons and other items will be fabricated at Batam Island, Indonesia. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - FENDERS
Mining - Subcontracts (Mechanical installation) project for New development. Supply of Fenders. Fentek ship fenders with frontal frames. Click for more details...

DALRYMPLE BAY COAL TERMINAL EXPANSION - MINOR CIVIL/MECHANICAL/STRUCTURAL WORKS
Private ownership Mining - Subcontracts (Mechanical installation) project In The Mackay Regional Council Area for New development. Work comprises the contractor to do minor civil, mechanical and structural works on site when needed. Click for more details...

CHINCHILLA COAL SEAM GAS & UNDERGROUND COAL GASIFICATION PROJECT - STAGE 2 - MECHANICAL FOR LABORATORY
Mining - Subcontracts (Mechanical installation) project In The Western Downs Regional Council Area of Mechanical - For Laboratory type. For the larger mine site laboratory. Click for more details...

KING ISLAND SCHEELITE PROJECT - STRUCTURAL STEEL FOR SECONDARY CRUSHING & SCREENING PLANT
Private ownership Mining - Subcontracts (Mechanical installation) project In The King Island Council Area for New development. For the provision of structural steel for the secondary crushing & screening plant. Click for more details...

LAKE VERMONT COAL PROJECT - STRUCTURAL STEEL FOR COAL PREPARATION PLANT
Mining - Subcontracts (Mechanical installation) New project at Approx 15 km north east of, Dysart, QLD 4745. This type is Structural Steel - For Coal Preparation Plant with Private ownership. For a 4 Mtpa plant. Click for more details...

BHP BILLITON RAPID GROWTH 5 IRON ORE PROJECT - STOCKYARD TRAIN LOAD OUT FACILITIES & ORE HANDLING PLANT
Private ownership Mining - Subcontracts (Mechanical installation) project In The East Pilbara Council Area for New development. The contract includes structural, mechanical and piping works for the supply, pre-assembly and installation of the stockyard and train load out facilities and modifications to the existing Ore Handling Plant 2 (OHP2). Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - EXPORT SHIPPING FACILITIES
Mining - Subcontracts (Mechanical installation) project for New development. Design & construction of a 168m long jetty, loading platform & berth for vessels with capacities from 125,000cu m (285m long) up to 220,000cu m (315m long) exporting liquefied natural gas (LNG) & 20,000-80,000cu m capacity for exporting liquid petroleum gas (LPG). Contract to include the procurement, fabrication, construciton & commissioning of the structural, mechanical & electrical components of the combined Marine Facilities. Click for more details...

MORANBAH REGION EXPANSION PROJECT - SMP PACKAGES
A project in the QLD Within Isaac Regional. Structural, mechanical & piping (SMP) services for materials handling (CX002/X004) & coal preparation plant (CPP) (CX003/X005). Click for more details...

PILBARA IRON ORE EXPANSION - SMP FRAMEWORK AGREEMENT
Mining - Subcontracts (Mechanical installation) project at via, Karratha, WA 6714 for New. Preferred structural, mechanical & piping (SMP) contractor status for 5 years in the program to expand capacity to 353 million tonnes per annum (Mtpa). To include early contractor involvement. Click for more details...

ROCKLANDS GROUP JOINT VENTURE COPPER PROJECT - PROCESSING PLANT INSTALLATION
Structural/Mechanical/Piping Installation New project In The Cloncurry Shire Council Area. Installation of a fully computerised & automated 3 million tonne per annum (Mtpa) processing plant for copper/gold, cobaltic-pyrite, native copper & magnetite concentrate production. Click for more details...

ERNEST HENRY COPPER-GOLD OPERATIONS - UNDERGROUND EXPANSION (SHUG) SMP CONTRACTOR PANEL
New project of Mining - Subcontracts (Mechanical installation) project at East of, Cloncurry, QLD 4824. Registered contractors experienced in structural, mechanical & pipe installation in hard rock underground mines to be invited over the coming months to tender for parcels of work between 6-9 months duration & up to $5 million in value. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT PHASE B - SMP CONTRACT
Structural/Mechanical/Piping - For Balance Of Plant New project In The City Of Karratha Council Area. Structural, mechanical & piping services for conveyors & transfer stations associated with a screenhouse & a pair of car dumpers. Click for more details...

MOUNT OXIDE MINE SITE SOLAR PUMP INSTALLATION
Installation - Of Solar Pumps project at via Gunpowder Rd at Mount Gordon Mine 100km northwest of, Mount Isa, QLD 4825 In The Council Area Of Mt Isa City of Private. Installation (design, supply & install pump mounting & float system, supply & install polypipe, testing) of 3 solar pumping systems at the south east catch dam, the sump area & the clean water catch dam. Maintenance for 12 months with an option for an additional 12 months as well as the possibility of additional site equipment being included in the maintenance contract. Click for more details...

MARANDOO IRON OPERATIONS PHASE 2 SMP CONTRACT
Structural/Mechanical/Piping Contract New project In The Ashburton Council Area. Structural, mechanical & piping contract as part of a project to increase Rio Tinto's Pilbara operational capacity to 353 million tonnes per annum (Mtpa). Click for more details...

LEICHHARDT CCGT POWER STATION
Private ownership Mining - Subcontracts (Mechanical installation) project In The Mt Isa City Council Area for New development. EPC turnkey contract including engineering, procurement & construction of a 80MW combined cycle gas turbine (CCGT) power station to act as back up to the 240MW Diamantina Power Station currently under construction. To include design & procurement of the dual fuel Rolls Royce Trent 60 WLE gas turbine generator & associated electrical & mechanical equipment, footings, structural & drainage work, assembly & installation of the main generation unit & balance of plant. Associated cabling & switchgear, telecommunications, instrument control & switchyard connections. Commissioning & operational handover. Click for more details...

NORTH WEST SHELF OIL REDEVELOPMENT PROGRAM - MASTER SERVICES CONTRACT
Mining - Subcontracts (Mechanical installation) project at Approx 135km Northwest of, Karratha, WA 6714 of Master Services Contract - Multi Discipline type of New development. For the provision of master services including electrical & instrumentation, mechanical, inspection, cladding/insulation, blasting & painting, scaffolding, rope access & web decking & other Perth based support services. Contract to include 2 x 1 year extension options. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect