AUGUSTA/COSTERFIELD PROCESSING FACILITY
Currently at the Construction stage In Greater Bendigo is a project estimated to be $ 10000000. This project Development comprises the modification and and refurbishment of the existing Costerfield CIL plant and the construction of a new crushing/processing plant. Work comprises earthworks; contract project management, layout and design drafting for various sections of the plant; sourcing, inspecting and acquiring various items of second hand equipment; design of main and distribution switchboards, current limiting device and main switch for installation adjacent to transformer substation reserve; refurbishment of float cells, Knelson concentrators and process circuit pumps. Click for more details...

HISMELT EXPANSION PROJECT
Mechanical Installation - Package 3 project at Leath Rd, Kwinana, WA 6167 in the Mining - Subcontracts (Mechanical installation). One of three packages. Fabrication and installation. Click for more details...

BLACKWATER COMET PROJECT
Structural Steelwork project at Via, Blackwater, QLD 4717 in the Mining - Subcontracts (Mechanical installation). More than one package. Click for more details...

WOODCUTTERS BASE METALS MINE
Mining - Subcontracts (Mechanical installation) project In The Darwin City Council Area of Private ownership. Overall proposal to include installation of underground loading station & shaft fitout. All electrical services to be carried out by contractor main work to involve 2 x plate feeders, conveyor & grisleys & general power distribution. Click for more details...

TARMOOLA GOLD OPERATIONS
30 km northwest of, Leonora, WA 6438 Has Tarmoola Gold Operations currently at Construction stage. This contract to mainly involve steel & platework fabrication. Overall project is to convert 2 existing mills to semi-autogenous grind. Main components of this tender expected to be the installation of the scalping screen building & bin support structure. Click for more details...

GRANTS PATCH - GOLD
Mine - Treatment Plant - Relocation Renovations, Refurbishments etc. project In The Katanning Council Area. Recent purchase included a 250,000tpa carbon-in-pulp plant. Facility to be moved to Company's proposed mine 36 km east Katanning. Small Victorian company (undisclosed) to carry out plant dismantling, re-assembly & modifications. Remainder of works expected to utilise inhouse resources or subcontractors on an ad hoc basis. Click for more details...

YANDI - IRON ORE
Addition project of Mining - Subcontracts (Mechanical installation) project at 90 km northwest of, Newman, WA 6753. Stacker, conveyors, structural steelwork & associated services required for new mine expansion. Overall project development still subject to obtaining necessary approvals. Click for more details...

QUARRY OPERATIONS
Mining - Subcontracts (Mechanical installation) project at Lot 467 & 453 Stephen St, Orange Grove, WA 6109 for Addition. Structural steelwork & piping required for this contract which mainly involves conveyors (8) & screens. Tender also includes associated earthworks, drainage, general site services & electrical requirements. Existing plant is to be demolished & will be replaced by a 22m high building constructed of concrete panels & colourbond sheeting. A conveyor belt extends from this complex to load-out bins to load vehicles similar to the current facilities. Work scheduled for completion during April 1996. Project has received EPA approval for grinding & milling works. Click for more details...

CHANDALA - SYNTHETIC RUTILE
Chandala - Synthetic Rutile is currently at the Construction stage, valued at about $ 9000000 it is Overall proposal is to modify the existing plant in order to increase production to 200,000tpa (currently licenced to 165,000tpa). In order to produce an additional 35,000tpa of synthetic rutile a further 58,000tpa of ilmenite will be required. Works to include modifications to coal crushing/ screening area & kiln/cooler arch. New installations involve a waste gas fan, clarifier & pump hopper (re-circulating tank) & 2 additional screens. 11 shell fans to be replaced & fitted with air flow measuring devices plus 2 extra aerators are needed. Intermediates bin to be upgraded & a second 450t storage bin to be provided with additional feed chutes. Heat exchanger to be relocated & duplicated (including pumps). 5 acid leach tanks to also be re-sited. Synthetic rutile drier & hydrocycloning section to be upgraded & new thickener to be installed for the waste water plant. Click for more details...

YANDI - IRON ORE
Mining - Subcontracts (Mechanical installation) project for Addition development. Supply only contract to provide approximately 250t of steel for the new stacker & a similar amount of steelwork for the new feed conveyor. Pricing exercise & design work completed. Click for more details...

EWINGTON 2 COAL OPERATIONS
Mining - Subcontracts (Mechanical installation) project for Addition development. Fabrication & installation of one run-of-mine (ROM) hopper. Contract to mainly involve steelwork. Work to commence early April 1996 on this contract with an estimated 10 week duration. Click for more details...

EWINGTON 2 COAL OPERATIONS
Currently at the Construction stage In Collie is a project estimated to be $ 1000000. This project Installation of 8 conveyors of various sizes required. Associated components have been ordered. Click for more details...

ENFIELD OIL PROJECT - WA-271-P
A project in the WA Within Ashburton. Includes 13 subsea trees, production controls and associated systems and technical services relating to installation and startup. Click for more details...

JAGUAR BASE METALS PROJECT - PROCESSING PLANT/MECHANICAL WORKS CONTRACT
A project in the WA Within Leonora. A centrally located processing facility to be located on the granted Teutonic Bore mining lease, 4 km to the north of the Jaguar deposit. A 350,000 tpa plant to treat ore by crushing, grinding and flotation. Copper and zinc concentrate production is expected to commence in July 2007, increasing to 10,000 tonnes of copper, 34,000 tonnes if zinc and 1 million ounces of silver in concentrate per annum over a six year period. Click for more details...

BARNEY POINT COAL TERMINAL UPGRADING - STAGE 2
Mining - Subcontracts (Mechanical installation) project In The Gladstone Regional Council Area of Private ownership. To include both mechanical and electrical installation. Click for more details...

MONTO MINERALS INDUSTRIAL MINERALS PROJECT - WET SEPERATION PLANT
Mining - Subcontracts (Mechanical installation) project for New development. Wet Seperation Plant that will constructed next to the existing pilot plant. The plant will use non chemical seperation using gravity and magnetics. Plant is expected to process 142,000 tonnes in 2007 and 232,000 tonnes in 2008. Click for more details...

KOGAN CREEK POWER PROJECT
Currently at the Construction stage In Western Downs Regional is a project estimated to be $ 5000000. This project Detailing, procurement, fabrication and erection of 2660 to structural steel works painted, 57 to sundry metal works, 3200m2 hot-dip galvanised gratings, 2420m railings, 210m step ladders. Click for more details...

ARDLETHAN TIN OPERATIONS - PREPARATION/TREATMENT EQUIPMENT SUPPLY
A project in the NSW Within Coolamon. Includes mobile preparation & treatment equipment to be located close to the excavator. Ore is placed in a stockpile & a loader working continuously will feed the ore into the feeder-hopper of the scrubber-trommel. More water will be added so that the undersize can be pumped through in-line jigs which will be located within boom of the trommel unit. Some tin concentrate will be recovered in the in-line pressure jigs. The finer tin particles will be picked up in a spiral plant. Click for more details...

ARDLETHAN TIN OPERATIONS - ERECTION/INSTALLATION PACKAGES
Erection/Installation Packages New project In The Coolamon Council Area. Packages include mechanical, structural, piping and electrical work for the processing area. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION
A project in the NT Within East Arnhem Shire. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. All new process areas will be concrete bunded with sumps installed. Stormwater drainage and utilities will be extended to all new areas and facilities. The existing sewerage treatment facility will be upgraded by the addition of separate reticulation and package sewerage plants. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

BHP BILLITON IRON ORE OPS - ASSET DEVELOPMENT PROJECTS - STEEL FABRICATION
New project of Mining - Subcontracts (Mechanical installation) project at Various sites via, Newman, WA 6753. BHP Billiton has increased iron ore production with work culminating in a production capacity of 110 Mtpa to be completed by late 2004. The company is now investigating ways of increasing production over the next five years to meet a projected increased in demand, especially from China. A complete process redesign will be involved with higher throughput levels and environmental and social benefits. Additional expansions of capacity to 145Mtpa are currently the subject of a feasibility study due for completion late 2004 approx. Click for more details...

KOGAN CREEK POWER PROJECT - MECHANICAL ERECTION CONTRACT
Mining - Subcontracts (Mechanical installation) project for New development. Mechanical erection of 1 Siemens Steam Turbine, 1 Siemens Generator THDF 125/67, Condenser, Tanks, Pumps, Compressors, Assembly of workshop and Store Click for more details...

KOGAN CREEK POWER STATION - SEALING AIR FAN MOTOR
Mining - Subcontracts (Mechanical installation) project In The Western Downs Regional Council Area of Sealing Air Fan Motor - Supply type. HITO410 Sealing Air Fan Motor of 110kw capacity. Click for more details...

RAVENSTHORPE NICKEL PROJECT - LIMESTONE BALL MILL
Ravensthorpe Nickel Project - Limestone Ball Mill is currently at the Construction stage, valued at about $ 10000000 it is Limestone Ball Mill Click for more details...

NEWLANDS COAL OPERATIONS - STRUCTURAL STEEL ERECTION
New project of Mining - Subcontracts (Mechanical installation) project at 13 km west of, Glenden, QLD 4743. Two Ultra Fine Coal buildings and one Portal building. Click for more details...

RAVENSTHORPE NICKEL PROJECT - INSTALLATION OF CCD/FLOCCULANT SYSTEMS
Mechanical/Piping Installation Of Ccd/Flocculant Systems project at 50 Km North of, Hopetoun, WA 6348 in the Mining - Subcontracts (Mechanical installation). Mechanical and piping installation of CCS and flocculant systems. Click for more details...

LIDDELL POWER STATION - BOILER MAINTENANCE CONTRACT
Liddell Power Station - Boiler Maintenance Contract is currently at the Construction stage, valued at about $ 200000 it is Work comprises the emergency repair of the four 500 MW boilers. Click for more details...

KALGOORLIE SUPERPIT GOLD MINE - CYANIDE PIPING UPGRADE
Mining - Subcontracts (Mechanical installation) project at 15 Km North of, Kalgoorlie, WA 6430 of Fimiston Cil Plant/Gidji Roaster Upgrade type of New development. Fabrication and installation of 316l stainless steel piping, high quality diaphragm valves and flanges with suitable transparent flange covers for extra protection. Click for more details...

MIDDLEBACK RANGES OPERATIONS - PROJECT MAGNET - 7500 KW BALL MILL
7500 Kw Ball Mill project at North West of, Whyalla, SA 5600 in the Mining - Subcontracts (Mechanical installation). Development comprises the design, installation, commissioning and maintenance of 7500 kw ball mill. The mill will be rubber lined, it will be driven by two 3750 kw wound rotor induction motors and two conventional pinions. Click for more details...

SARAJI COAL MINE THICKNER PLANT CONVERSION
Mining - Subcontracts (Mechanical installation) project In The Isaac Regional Council Area of Private ownership. A 35m thickner plant was installed in 2004 and will be upgraded to improve efficiency of tailings disposal. Work comprises the design, removal of existing equipment, civil construction, installation of the high rate thickner. Associated works involve piping, pumps, structural and mechanical works. Electrical installation and recommissioning are also part of the work. Click for more details...

MONTO MINERALS INDUSTRIAL MINERALS PROJECT - FELDSPAR WASH PLANT
Feldspar Wash Plant New project In The North Burnett Regional Council Area. Development comprises the construction of a treatment facility that will comprise a hot acid leach plant and associated equipment. The ore will be shipped from the mine to the feldspar plant at Dakiel Railroad Station where it will be loaded and sent to Gladstone and then be shipped to Brisbane. Click for more details...

IRON ORE RAPID GROWTH PROJECT 3 - AREA C - SAMPLE PREP/LAB EQUIPMENT
Private ownership Mining - Subcontracts (Mechanical installation) project In The East Pilbara Council Area for New development. Supply and Insall SAMPLE PREPERATION & LABORATORY EQUIPMENT. Click for more details...

IRON ORE RAPID GROWTH 3 PROJECT - AREA C - STRUCTURAL/MECHANICAL/PIPING
Structural/Mechanical/Piping New project In The East Pilbara Council Area. Work comprises structural, mechanical and piping work associated with the expansion of Mining Area C iron ore processing facilities. Click for more details...

ALCOA REFINERIES PINJARRA RESIDUE PROJECT - MECHANICAL INSTALL FOR CARBONATION PLANT
Currently at the Construction stage In Murray is a project estimated to be $ 22000000. This project For the provision of mechanical installation services for the carbonation plant. Click for more details...

LIDDELL POWER STATION - INSULATION/CLADDING REPAIRS/ASBESTOS REMOVAL/REINSULATION
Insulation/Cladding Repairs/Asbestos Removal/Reinsulation project at At, Liddell, NSW 2333 in the Mining - Subcontracts (Mechanical installation). This Specification covers the removal, handling and disposal of asbestos and non-asbestos materials. The supply and installation of replacement non-asbestos thermal insulation and cladding. The removal, reinstallation and refurbishment of damaged insulation and cladding. The installation of temporary staging/rigging access platforms as nominated by the Contract Manager. The Contract shall be for a period of two years from the date of the awarding of the Contract by the Principal (Portion 1), with a Macquarie Generation Option to extend the Contract for a further two year period (Portion 2, Option 1). Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - FENDERS
Mining - Subcontracts (Mechanical installation) project for New development. Supply of Fenders. Fentek ship fenders with frontal frames. Click for more details...

DAVYHURST GOLD PROJECT - GOLD MILL REFURBISHMENT
Mining - Subcontracts (Mechanical installation) New project at 80 Km North west of, Kalgoorlie, WA 6430. This type is Gold Mill Refurbishment with Private ownership. The 1.2 Mtpa mill was purchased from Croseus mining and remains in good condition. Work on the tanks and concrete pillars will be the focus of the work. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - BOLLARDS
Mining - Subcontracts (Mechanical installation) project In The City Of Greater Geraldton Council Area of Bollards - Design/Construct type. Design and construct Bollards & Quick Release Hooks. Click for more details...

CHINCHILLA COAL SEAM GAS & UNDERGROUND COAL GASIFICATION PROJECT - STAGE 1 - STRUCTURAL STEEL FOR LABORATORY
Mining - Subcontracts (Mechanical installation) project In The Western Downs Regional Council Area of Private ownership. For the mine site laboratory. Click for more details...

KING ISLAND SCHEELITE PROJECT - STRUCTURAL STEEL FOR SECONDARY CRUSHING & SCREENING PLANT
Private ownership Mining - Subcontracts (Mechanical installation) project In The King Island Council Area for New development. For the provision of structural steel for the secondary crushing & screening plant. Click for more details...

LAKE VERMONT COAL PROJECT - STRUCTURAL STEEL FOR COAL PREPARATION PLANT
Mining - Subcontracts (Mechanical installation) New project at Approx 15 km north east of, Dysart, QLD 4745. This type is Structural Steel - For Coal Preparation Plant with Private ownership. For a 4 Mtpa plant. Click for more details...

MURRAY BASIN STAGE 2 - KWR MINERAL SANDS PROJECT - STRUCTURAL STEEL & MECHANICAL FOR WHIMS BUILDING
New project of Mining - Subcontracts (Mechanical installation) project at 28 km east of, Ouyen, VIC 3490. For the provision of structural steel & mechanical works for the wet high intensity magnetic separator building. Click for more details...

ROCKLANDS GROUP JOINT VENTURE COPPER PROJECT - PROCESSING PLANT INSTALLATION
Structural/Mechanical/Piping Installation New project In The Cloncurry Shire Council Area. Installation of a fully computerised & automated 3 million tonne per annum (Mtpa) processing plant for copper/gold, cobaltic-pyrite, native copper & magnetite concentrate production. Click for more details...

ERNEST HENRY COPPER-GOLD OPERATIONS - UNDERGROUND EXPANSION (SHUG) SMP CONTRACTOR PANEL
New project of Mining - Subcontracts (Mechanical installation) project at East of, Cloncurry, QLD 4824. Registered contractors experienced in structural, mechanical & pipe installation in hard rock underground mines to be invited over the coming months to tender for parcels of work between 6-9 months duration & up to $5 million in value. Click for more details...

CAPE LAMBERT PORT B (CLB) DEVELOPMENT PHASE B - SMP CONTRACT
Structural/Mechanical/Piping - For Balance Of Plant New project In The City Of Karratha Council Area. Structural, mechanical & piping services for conveyors & transfer stations associated with a screenhouse & a pair of car dumpers. Click for more details...

LEICHHARDT CCGT POWER STATION
Private ownership Mining - Subcontracts (Mechanical installation) project In The Mt Isa City Council Area for New development. EPC turnkey contract including engineering, procurement & construction of a 80MW combined cycle gas turbine (CCGT) power station to act as back up to the 240MW Diamantina Power Station currently under construction. To include design & procurement of the dual fuel Rolls Royce Trent 60 WLE gas turbine generator & associated electrical & mechanical equipment, footings, structural & drainage work, assembly & installation of the main generation unit & balance of plant. Associated cabling & switchgear, telecommunications, instrument control & switchyard connections. Commissioning & operational handover. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - 6 + 1 UPSTREAM PIPING SUPPLY
A project in the QLD Within Western Downs Regional. Supply of all piping for the Ruby central processing plant including fabrication, welding, NDT, hydro testing, painting & delivery to site. Associated mechanical, structural & piping services. Click for more details...

ICHTHYS LNG PLANT - ONSHORE MECHANICAL WORKS - MEC 2 - SUPPLY & INSTALLATION OF GROUT
Grout - Supply & Installation New project In The Darwin City Council Area. For the supply & installation of grout. Click for more details...

HAY POINT COAL TERMINAL EXPANSION - HPX3 PROJECT - ONSHORE TERMINAL UPGRADE ELECTRICAL & MECHANICAL CONTRACT & EXTENSION
Electrical/Mechanical - Contract New & Extn project at Offshore & 1175, 1395 Hay Point Rd, Hay Point, QLD 4740 in the Mining - Subcontracts (Mechanical installation). For the provision of new & extended electrical & mechanical work, onshore & offshore. Click for more details...

NORTH WEST SHELF OIL REDEVELOPMENT PROGRAM - MASTER SERVICES CONTRACT
Mining - Subcontracts (Mechanical installation) project at Approx 135km Northwest of, Karratha, WA 6714 of Master Services Contract - Multi Discipline type of New development. For the provision of master services including electrical & instrumentation, mechanical, inspection, cladding/insulation, blasting & painting, scaffolding, rope access & web decking & other Perth based support services. Contract to include 2 x 1 year extension options. Click for more details...