CAIRN HILL MAGNETITE COPPER GOLD PROJECT
Resource - Copper/Gold/Magnetite project at Stuart Highway 55 Km South East of, Coober Pedy, SA 5723 in the Mining - Primary And Secondary Processing (Minerals Processing). Resource of 10.5million tonnes indicated & 4.2million tonnes inferred of ore @ 51.9% Fe, 0.4% Cu, 0.12g/t Au. Phase 1 of the mine operations to consist of 2 open pits located to extract the northern and southern mineralisations. The project will initially involve a trial mining operation to remove and crush 20 000 tonnes of ore in order to refine engineering parameters. The main mining operation will then involve mining of an estimated 7.3 million tonnes of reserves in the western portion of the ML area, using open pit techniques. The project will involve on-site crushing with direct export of ore for processing. The ore will be transported in bulk by road to a proposed new rail siding (the Mast) and then by rail to Darwin for export by ship. Facilities at the site will include a mobile crushing plant, two waste rock dumps, diesel power plant and reverse osmosis plant. Associated infrastructure will include a water supply borefield and a site access/haulage road to the proposed rail siding. Phase 2 will target low copper & sulphur magnetite deposits immediately to the east of Phase 1 activity. Phase 3 involves expansion further east again. Detailed aeromagnetic surveys have identified targets for drilling to identify these easterly deposits. It is hoped these will come into operation when additional port capacity becomes available at Port Bonython or Darwin, leading to operations expanding up to 5Mtpa. Click for more details...

GOONDICUM CRATER PROJECT
Private ownership Mining - Primary And Secondary Processing (Minerals Processing) project In The North Burnett Regional Council Area for New development. Consultants are to review the plans for the Demonstration Plant utilising the natural slope of the land to reduce construction costs. A design throughput rate of 20 tonnes per hour remains and the plant is planned to run for 75 days to produce a minimum of 1000 tonnes ilmenite, 2400 tonnes feldspar, 300 tonnes apatite and 600 tonnes titano-magnetite. Click for more details...

ALCAN GOVE BAUXITE OPERATIONS - REFINERY EXPANSION - INFRASTRUCTURE
Mining - Primary And Secondary Processing (Minerals Processing) New project at Gove Peninsula, North West Arnhem Land via, Nhulunbuy, NT 0880. This type is Infrastructure with Private ownership. Refinery expansion will increase production from a current 2 Mt/y to 3.8Mt/y in 2007. All new process areas will be concrete bunded with sumps installed. Stormwater drainage and utilities will be extended to all new areas and facilities. The existing sewerage treatment facility will be upgraded by the addition of seperate reticulation and package sewerage plants. Proposed expansion includes stockpiling and handling. Bauxite will not be exported from Gove anymore but will be directed to the refinery. Stockpile sizes will remain the same, but stacker and feed conveyor systems will be upgraded or replaced and the refinery reclaimer will also be replaced. Three new grinding mills will be installed to replace the old rod and ball mills. One new mill slurry tank and pump transfer system together with one train of indirect mill slurry equipment will be installed. The heated feed will now be processed in a new high temperature double digestion process. A third low temperature digestion plant will be installed, as well as deep-cone thickners and high pressure pumps. The mud and liquor residue will be seperated in pressure decanters and processed through a train of new high rate washers and a single train of five deep cone thickners. The existing washers and thickners will be used for storage of residue liquids. Some will be demolished. Six new vertical pressure filters will be installed in a new security filtation area to process most of the turbid liquor flow from the thickners. Agglomeration precipitators and growth precipitators will be added to increase capacity as well as two interstage cooling facilities will be installed on each growth precipitator train. Flash vessels and a barometric condenser will be installed using cooling water from new cooling towers. A new hydrocyclone classification system with three classification stages allowing three different sized hydrate streams to be produced will be installed. A new filtration area and equipment will be installed to conduct filtration of various hydrate streams. Equipment will include six drum filters, vacum pumps and air blowers. Three new stationary calciners will be installed in conjunction with new hydrate conveyors and upgraded aluminia transfer systems. A new evaporation plant will be installed as well as cooling towers for vapour removal in the last three flash stages. Lime plant capacity will be increased from 140 t/h to 200 t/h by installing a new burner system and modifying the kiln's internal geometry. A new burnt lime storage silo will be installed. The existing power station will be converted from fuel oil to gas that will involve a new boiler and associated turbine units. The neutralisation plant will include a mixing tank and two thickners in a bunded area. New liquor purification plant will be constructed involving two seperate plants for the mixing and drying stage. Click for more details...

DEPARTMENT OF INDUSTRY & RESOURCES
Mining - Primary And Secondary Processing (Minerals Processing) project for New development. A consultancy study of "Energy for Minerals Development in the South West Coast Region of Western Australia". Click for more details...

HISMELT EXPANSION PROJECT
Mining - Primary And Secondary Processing (Minerals Processing) project at Leath Rd, Kwinana, WA 6167 for New. Package let is for supply of instrumentation. Click for more details...

HISMELT EXPANSION PROJECT
Mining - Primary And Secondary Processing (Minerals Processing) project In The Kwinana Council Area of Earthworks - Preliminary Works type. Concrete works and pipebridges. A vertical package comprising both civil and mechanical works. Includes earthworks, stone column foundations, 10,000 cu m of reinforced concrete foundations and 1,000 tonnes of structural steel pipe racks, associated pipes, ducting and accessories. Click for more details...

WESTONIA GOLD PROJECT
Mining - Primary And Secondary Processing (Minerals Processing) project In The Westonia Council Area of Secondary Crusher type. The big Bell plant purchased (subject to contract) is expected to be able to process 2.5Mtpa of Westonia ore with the addition of a secondary crusher. Requirements not yet finalised. The agreement to purchase the Big Bell mill means the feasibility study can now be finalised. Click for more details...

ROSEBY COPPER PROJECT - PROCESSING FACILITY
New project of Mining - Primary And Secondary Processing (Minerals Processing) project at North west of, Cloncurry, QLD 4824. The process plant is to be located immediately adjacent the Blackard Pit. The basic processes include: primary crushing, comprising feed bin, apron feeder, crusher and dust suppression, grinding in a single stage SAG mill and classification in cyclones, optional stockpiling of primary crushed or to de-couple the grinding and flotation processes for the crushing operations, rougher and scavenger flotations, rougher concentrate regrinding to improve final concentrate grade, two stages of cleaner flotation, concentrate thickening and filtration and filter cake storage before transportation, tailings thickening and disposal storage facility and reagents preparation and services. The process plant has been designed to treat approximately 3 Mtpa of sulphide feed, as this will be the case for the initial 4 years of production. Following this, the processing plant may require adaptation to process oxide ores, as the style of ore mineralisation vary. These throughputs are based on a 24 hour per day, 7 days per week operations. The flotation concentrate would be saleable for smelter feed. The proposed process plant comprises the following: Run of Mine (ROM) ore bin fed by either a front end loader or by trucks direct tipping ore, grizzly feeder to remove fines less than 150mm, conveyor feeding combined grizzly and crusher products to the mill, a SAG mill with single 3 MW drives, a ball miss with single 3MW drive, two sets of rougher/scavenger flotation cells (2x7x160 cubic metres), concentrate regrind mill with 550kW drive, cleaner flotation cells (6x50 cubic metres cells), recleaner flotation (4x20 cubic metres cells), concentrate thickening and filtration, reagents, air and water services and pumps, service cranes and hoists. Click for more details...

NULLAGINE PROJECT - BULLFINCH CIP PLANT
Nullagine Project - Bullfinch Cip Plant is currently at the Early Planning stage, valued at about $ 500000 it is The former Bullfinch CIP plant is in working order. Conveyors are in good order. Leaching tanks were demolished and are likely to be replaced (a train of 6 leaching tanks). Some chutes will need to be ordered. Components required for refurbishment subject to scoping study. Click for more details...

ARDLETHAN TIN OPERATIONS - TAILINGS TREATMENT CONSULTANCY
Mining - Primary And Secondary Processing (Minerals Processing) project for New development. The tailings retreatment project involves 8,000,000 tonnes of tailings to be retreated. Marlborough Resources are seeking proposal from consultants for the feasibility study, which includes mining, metallurgy, process design, detailed design and construction. Click for more details...

ST IVES GOLD OPERATIONS - EXPANSION
Currently at the Construction stage In Coolgardie is a project estimated to be $ 103000000. This project A new mill to boost annual production to approximately 600,000 ounces per year. The mill is designed for expansion to 7 million tonnes per year throughput capacity to enable exploitation of additional lower grade areas of the resource. Click for more details...

LAVERTON GOLD OPERATIONS - TREATMENT PLANT REFURBISHMENT/EXPANSION
Treatment Plant - Refurbishment/Expansion Renovations, Refurbishments etc. project In The Laverton Council Area. Expansion to 1.5 million tonnes. Additional test work will be undertaken to obtain further information to fully optimise the process flow sheet at the 1.5 Mtpa throughput rate. Infrastructure proposed to be added are a second ball mill, additional tankage, a gravity circuit and in pit tailings disposal. The recent acquisition of additional tenenaments in the Laverton area has made the expansion of the plant economically viable. Click for more details...

YABULU NICKEL REFINERY EXTENSION - NICKEL PRODUCT BUILDING CONTRACT
Mining - Primary And Secondary Processing (Minerals Processing) project at Refinery site at, Yabulu, QLD 4818 for New. Contract package 6 & 7 covers nickel carbonate recovery, calcination and the final nickel product. The contract will involve the construction of a hydrometallurgical facilities including a calciner, furnaces and the production of nickel compacts. Work will be largely greenfield. A second nickel product plant will be constructed to provide capacity for additional throughput. Includes precipitation, filtration, calcining, reduction, sintering and packaging. Click for more details...

SALLY MALAY NICKEL PROJECT
A project in the WA Within Wyndham-E Kimberley. Stage two optimisation. Previous test work has shown that fine grinding is an option to increase recoveries. This will be studied once plant (to be constructed shortly) is in full production Click for more details...

YANDICOOGINA IRON ORE OPERATIONS
A project in the WA Within East Pilbara. Expansion to 36 million tpa .Some conveyor work involved. Flow modifications. A current project to increase output to 24 million tonnes per annum is nearing completion. Click for more details...

FOSTERVILLE GOLD OPERATIONS
Mining - Primary And Secondary Processing (Minerals Processing) project In The Greater Bendigo Council Area of Private ownership. Two separate packages. Click for more details...

FORRESTANIA NICKEL PROJECT - CONCENTRATE PLANT
Currently at the Construction stage In Yilgarn is a project estimated to be $ 35000000. This project The Stage 1 concentrate plant is designed with 250 000 tpa capacity and will initially treat ore from the high grade Flying Fox Nickel Mine. The proposed Stage 2 plant will have 650 000 to 700 000 tpa capacity and is intended to treat ore from Flying Fox, Diggers South and potentially the New Morning/Daybreak and Cosmic Boy deposits. Click for more details...

MOUNT GIBSON GOLD PROJECT
Mining - Primary And Secondary Processing (Minerals Processing) project In The Yalgoo Council Area of Private ownership. The CIL plant has 3 ball mills (2 operational, 1 inoperative). The bankable feasibility study is examining the economics of resuming gold production at Mount Gibson using the existing gold processing plant. Metallurgical test work was carried out on PQ diamond drill samples obtained in the March 2003 quarter. Samples were from Yorktown, Capricorn and Saratoga and were representative of mineralisation selected for mining at those areas. Gravity spearation of free gold was excellent. Cyanide leachable gold test yielded recoveries up to 98% iwth fast leach times. Click for more details...

MOUNT BISCHOFF TIN OPERATIONS - PROCESSING PLANT REFURBISHMENT
Mining - Primary And Secondary Processing (Minerals Processing) project at Via, Waratah, TAS 7321 of Processing Plant - Refurbishment type of New development. A revised process flow sheet for the existing process plant has been produced and it will involve minimal engineering and processing modifications. Processing rate is expected to be 60,000 tonnes per month. New equipment proposed is a high gravity jig advancements with the addition of Falcon Ultra Fine concentrators. Processing plant when refurbished is expected to process 60,000 tonnes per month. Click for more details...

AURUKUN ALUMINA PROJECT - BAUXITE RESOURCE
A project in the QLD Within Weipa Shire. Preferred development is a mine based on the Aurukun bauxite resource, a washing plant at the mine site, and a new alumina refinery of at least 600,000 tonnes per annum output located in either Bowen, Townsville or Gladstone and all necessary supporting infrastructure and associated facilities. A resource of 480 Mt of dry beneficiated bauxite. Click for more details...

KOGAN CREEK POWER PROJECT
Currently at the Construction stage In Western Downs Regional is a project estimated to be $ 5000000. This project Detailing, procurement, fabrication and erection of 2660 to structural steel works painted, 57 to sundry metal works, 3200m2 hot-dip galvanised gratings, 2420m railings, 210m step ladders. Click for more details...

GOLDEN GROVE ZINC/COPPER OPERATIONS - RESOURCE
A project in the WA Within Yalgoo. Golden grove operations comprises the Gossan Hill copper, zinc, gold and silver underground mine, the Scuddles zinc and copper underground mine, a 1.3 million tpa treatment plant and a surrounding tenement package. Resource base totals 17 mt@5.9% zinc, 1.9% copper, 0.9% lead, 64g/t silver and 1.3g/t gold. Metal contained is 1,000,000 tonnes of zinc, 314,000 tonnes of copper, 155,000 tonnes of lead, 35 Moz of silver and 0.7 Moz of gold. Reserves are 4.8 Mt at 6.9% zinc, 2.1 copper, 0.9% lead, 75 g/t silver and 1.3 g/t gold. Click for more details...

CHARIOT GOLD PROJECT
Mining Contract - Open Cut New project In The Barkly Shire Council Area. For the greater part, Chariot will be an underground mine. An open pit will be excavated to a depth of 45 m from which a portal for a decline will be established to access the orebody. Click for more details...

KOOLYANOBBING IRON ORE OPERATIONS - RESOURCE
Mining - Primary And Secondary Processing (Minerals Processing) New project at 50 km north north east of, Southern Cross, WA 6426. This type is Resource - Iron Ore with Private ownership. Northern Tenements Expansion. Click for more details...

FOSTERVILLE GOLD OPERATIONS
Fosterville Gold Operations is currently at the Tenders & Building stage, valued at about $ 500000 it is One package for dosing pumps and another for peristatic pumps (hose pumps) . Click for more details...

BHP BILLITON IRON ORE OPS - ASSET DEVELOPMENT PROJECTS - STEEL FABRICATION
New project of Mining - Primary And Secondary Processing (Minerals Processing) project at Various sites via, Newman, WA 6753. BHP Billiton has increased iron ore production with work culminating in a production capacity of 110 Mtpa to be completed by late 2004. The company is now investigating ways of increasing production over the next five years to meet a projected increased in demand, especially from China. A complete process redesign will be involved with higher throughput levels and environmental and social benefits. Additional expansions of capacity to 145Mtpa are currently the subject of a feasibility study due for completion late 2004 approx. Click for more details...

BHP BILLITON IRON ORE OPS - ASSET DEVELOPMENT PROJECTS - CRUSHING/SCREENING
Mining - Primary And Secondary Processing (Minerals Processing) project at Via, Newman, WA 6753 of Crushing & Screening Plants type of New development. Additional expansion from 110Mtpa to 145Mtpa. Part of a proposed additional expansion to meet increased demand, involving engineering works and capital investment of 2-3 billion $AU over the next five years. The feasibility study is being undertaken by MPDJV (Mine & Port Joint Venture). Click for more details...

SAND GEORGE GOLD PROJECT - TOLL MILLING CONTRACT
Mining - Primary And Secondary Processing (Minerals Processing) project for New development. Toll milling of gold. Click for more details...

BROWNS OXIDE PROJECT - PROCESSING PLANT/ LEACHING FACILITIES
Processing Plant/Leaching Facilities project at South East of, Darwin, NT 0800 in the Mining - Primary And Secondary Processing (Minerals Processing). The plant will treat 1.3 million tonnes per year. All major items of equipment for the plant have been acquired including grinding and classification circuit, Cawse solvent extraction, electrowinning plant, thickners and tanks have also been acquired. Other equipment is being custom designed and fabricated offsite. Detailed engineering design works of the plant are in progress. Finalisation of processing plant flowsheet and confirmatory metallurgical testwork are also in progress. Testwork has already shown that the valuable copper, cobalt and nickel minerals are dissolved in acid. Once the metals are in the solution, the liquor is separated from the leached solids which are then washed and sent to the tailings storage facility. Testwork is confirming solvent extraction design criteria for concentrating metals in solution ahead of copper electrowinning of high purity cathode product. The facility will comprise a solvent extraction plant, electrowiring plant, tankage and product filtering equipment. Click for more details...

DARWIN EAST ARM WHARF - OPERATORS/TESTING BUILDING
Darwin East Arm Wharf - Operators/Testing Building is currently at the Construction stage, valued at about $ 289000 it is The contract comprises the design, construction and installation of two buildings. The buildings are to comprise split system air conditioning, all fixed furniture, the installation of a safety shower and additional security fencing with gates. Connections to existing power, water and sewerage services is to be carried out. Click for more details...

YABULU NICKEL REFINERY EXTENSION - SITE WIDE CONCRETE CONTRACT
New project of Mining - Primary And Secondary Processing (Minerals Processing) project at Refinery site at, Yabulu, QLD 4818. Scope of work involves concrete work to the entire refinery site. Click for more details...

SWAN RIVER - MECKERING KAOLIN PROJECT - PILOT PROCESSING PLANT & LABORATORY
Private ownership Mining - Primary And Secondary Processing (Minerals Processing) project In The Northam Council Area for New development. The pilot plant to be located at Avon Industrial Park, will be in operation from December 2005 till approximately June 2006. The plan is to produce between 50 and 500 tonnes of product. Click for more details...

MURRIN MURRIN NICKEL HEAP LEACH PROJECT - DEMONSTRATION PLANT
Murrin Murrin Nickel Heap Leach Project - Demonstration Plant is currently at the Planning stage, valued at about $ 12000000 it is Final stages of a study on an initial 200,000tpa scats Heap Leach project reveal the operation is anticipated to be established in 2006. Continuous laboratory pilot plant testing to establish the optimum treatment of the heap leach solutions indicates the technical feasibility of integration into the existing Murrin Murrin process plant. Heap leach recoveries of above 80% of nickel have been achieved on the scats material in less than 180 days of leaching. Click for more details...

WORSLEY ALUMINA EXPANSION EFFICIENCY & GROWTH PROJECT
Mining - Primary And Secondary Processing (Minerals Processing) project In The Collie Council Area of Mine Expansion/Refinery - Upgrade type. Development comprises two parts. Expansion of the existing bauxite mining activities and an upgrade of the refinery. Mining will expand into the Saddleback, Marradong, Hotham North, East Quindanning, Morgans, Hotham North Extension, Central and Brookton mining envelopes. Throughput will expand to 16.5 Mtpa. The expansion of mining activities will involve the addition of three new primary crushers and a new crushed ore stockpile will be needed next to the existing secondary crusher to provide extra surge material to feed the overland bauxite conveyor. Additional conveyors include a 34 km extension from the Hotham North mining envelope which will cross both the Albany Highway and the Wandering-North Bannister road, a 16 Km spur from the south east of the Central mining envelope to the Luptons mining envelope and lastly a 28 Km extension from the Central mining envelope to the Brookton mining envelope. Additional bauxite conveyors spurs and haul truck transport may be needed in the future. Refinery expansion will involve an increase in the Bauxite stockpile of 0.5 Mt. At the Milling and Digestion plant an additional mill, an additional desilication tank and eight new slurry heaters will be required. At the Seperation plant, an extension of the residue washing tanks and an expansion of capacity of the causticiser circuit. At the Calcination plant an additional gas fired calciner with bag house with a new hydrate filtration building. Addition of a coal-fired co-generation facility with bag house designed to produce 350 tonnes of steam per hour (equivalent to 204 Mw) and 35 Mw of electrical power. Click for more details...

WORSLEY ALUMINA EFFICIENCY/GROWTH PROJECT - LEVEL & CLARITY MEASUREMENT
Mining - Primary And Secondary Processing (Minerals Processing) New project at 15 Km South east of, Collie, WA 6225. This type is Level/Clarity Measurement - Supply Of with Private ownership. For the supply of level and clarity management. Click for more details...

COSMOS NICKEL PROCESSING FACILITY - UPGRADE
Nickel Processing Facility - Upgrade project at 35 Km North West of, Leinster, WA 6437 In The Council Area Of Leonora of Private. The plant currently processes 150,000 tonnes of ore per annum and some years has produce 30% more than this. Plant equipment comprises crusher, sag mill, flotation cells, cyclones, a thickner and filter. It is proposed to upgrade the plant to process 300,000 tonnes of ore per year by upgrading the comminution circuit. Click for more details...

ALCOA REFINERIES PINJARRA RESIDUE PROJECT - ELECTRICAL INSTALL FOR CARBONATION PLANT
Private ownership Mining - Primary And Secondary Processing (Minerals Processing) project In The Murray Council Area for New development. For the provision of electrical installation services for the carbonation plant. Click for more details...

BURNSIDE GOLD OPERATIONS - UNIONS REEF GOLD PLANT UPGRADE
Currently at the Early Planning stage In Katherine Town is a project estimated to be $ 15000000. This project The Union Reef gold plant is 2.5 Mt dual mill CIL plant. It has recently been recommissioned and did its first gold pour in late September 2006. The developer has signed a licence agreement with GeoBiotics to use the GEOCOAT refractory ore treatment process. Using this process the developer is proposing to construct a new flotation plant and a bio-oxidation heap leach facility. Ore production is targeted at 250,000 ounces per annum. Click for more details...

RANGER URANIUM MINE - LATERITE PROCESSING PLANT
Mining - Primary And Secondary Processing (Minerals Processing) project In The Unincorporated North Council Area of Private ownership. To construct a plant to process lateric ore, which is a material containing a high proportion of clay. The plant will process the ore before it is introduced to the main processing plant. The minesite has stockpile of 1.6 million tonnes of lateric ore. Click for more details...

BALLA BALLA TITANOMAGNETITE PROCESSING PLANT - STAGE 1
Mining - Primary And Secondary Processing (Minerals Processing) project at 10 Km South of, Whim Creek, WA 6718 for New. For the construction and operation of the 6 million tpa concentration circuit, which includes all plant and infrastructure required for it to function as a stand-alone operation. Click for more details...

BROULA MAGNETITE & LIMESTONE PROJECT - PROCESSING PLANT & DISTRIBUTION FACILITY
Processing Plant/Distribution Facility project at 10km West South West of, Cowra, NSW 2794 In The Council Area Of Cowra of Private. For the development of a processing plant and distribution facility, to process the deposit which contains around 900 000 tonnes of recoverable magnetite, contained within 1.3 million tonnes of ore, and a simlar quantity of limestone. The ore is to be mined via open cut methods. Click for more details...

KING ISLAND SCHEELITE PROJECT - STRUCTURAL STEEL FOR PROCESSING FACILITY
Structural Steel - For Processing Facility project at Near, Grassy, TAS 7256 in the Mining - Primary And Secondary Processing (Minerals Processing). For the provision of structural steel for the processing facility. Click for more details...

MURRAY BASIN STAGE 2 - KWR MINERAL SANDS PROJECT - PUMPS FOR PROCESSING PLANT
Mining - Primary And Secondary Processing (Minerals Processing) project at 28 km east of, Ouyen, VIC 3490 for New. Numerous pumps for the processing plant. Click for more details...

MURRAY BASIN STAGE 2 - KWR MINERAL SANDS PROJECT - ELECTRICAL FOR WET CONCENTRATOR
A project in the VIC Within Mildura. For the provision of electrical works for the wet concentrator. Click for more details...

GROOTE EYELANDT MANGANESE OPERATIONS EXPANSION
Mining - Primary And Secondary Processing (Minerals Processing) project at At, Groote Eylandt, NT 0822 for New. Part of a project to expand production from 4.2 million tonnes per annum (Mtpa) to 4.8Mtpa along with road & port capacity to 5.9Mtpa. Processing plant upgrade to include replacement of desliming screens with banana screens & a new lump bypass facility in the heavy media circuit. Replacement of stacker & hopper cars at the port stockpile. Increase of the ship loading conveyor & road train receival capacities. Upgrade of 2 intersections on the Rowell Highway. Click for more details...

NULLAGINE GOLD PROJECT - MOBILE PLANT & EQUIPMENT HIRE
Nullagine Gold Project - Mobile Plant & Equipment Hire is currently at the Construction stage, valued at about $ 40000000 it is For the provision of mobile plant and equipment. Click for more details...

DELFECTOR COPPER GOLD PROJECT - PROCESSING PLANT
Processing Plant New project In The City Of Greater Geraldon - Mullewa Council Area. New processing plant to comprise three stage crushing & screening, ball mill, gravity circuit, elution circuit & gold room & flotation circuit. Click for more details...

DUGALD RIVER BASE METAL PROJECT - CONCENTRATOR
Concentrator Plant/Associated Plant New project In The Mt Isa City Council Area. The concentrator will have an annual production of approximately 160,000 tonnes of zinc in zinc concentrate, plus by-products, over an estimated 28 year mine life. Click for more details...

BROWNS RANGE HREE PROJECT - PROCESSING PLANT
Browns Range Hree Project - Processing Plant is currently at the Construction stage, valued at about $ 40000000 it is The pilot plant is stage 1 of the new business plan for the Browns Range project. Stage 1 incorporates the construction of a Pilot Plant at Browns Range wotj a 60,000tpa capacity to produce 49,000kg dysprosium, in 590,000kg TREO per annum. The Pilot Plant will de-risk the full scale project. As ore processing occurs via a 2 stage process, the construction of the Pilot Plant will include beneficiation & hydrometallurgical process pilot plants. Beneficiation unit operations are proposed to be a crushing circuit, grinding in semi-autogenous grinding (SAG) mill &/or a ball mill, two stage wet high gradient magnetic separation (WHGMS) process, flotation circuit to produce a mineral concentrate, tailings thickening of residues from the WHGMS & flotation circuits co-mingling with the hydrometallurgical tailings for disposal in the tailings storage facility. The hydrometallurgical plant process comprises drying of the mineral concentrate followed by acidification & roasting to crack the mineral structure, water leaching to bring metals into solution, purification & ion exchange to remove impurities, precipitation of RE using oxalic acid & calcinations to convert RE oxalates to oxides, neutralisation & thickening of waste streams prior to co-mingling with the beneficiation tailings & subsequent delivery to the tailings storage facility. Click for more details...

PILGANGOORA LITHIUM PROJECT - PROCESS PLANT SUPPORT FACILITIES
Process Plant Support Facilities project at 120km South of, Port Hedland, WA 6721 in the Mining - Primary And Secondary Processing (Minerals Processing). For the provision of processing plant support facilities. Click for more details...