List of Minerals Processing Projects


MAGELLAN LEAD CARBONATE PROJECT - REFINERY - PHASE TWO
Mining - Primary And Secondary Processing (Minerals Processing) project at West of, Wiluna, WA 6646 for New. The refinery location is to be onsite near the new processing facility and mine. An initial scoping study has defined the operational parameters that will affect layout and overall design. Construction is expected to commence in January 2006. Click for more details...

WORSLEY ALUMINA REFINERY CAPITAL DEVELOPMENT PROJECT
Mill Capacity Upgrade project at Near, Collie, WA 6225 In The Council Area Of Collie of Private. Expansion from 3.2 to 3.5 mtpa. Click for more details...

WESTONIA GOLD PROJECT - PROCESSING FACILITY - RELOCATION/RECOMMISSION
Currently at the Planning stage In Westonia is a project estimated to be $ 41000000. This project Disassembly, relocation, re-erection and commissioning of a 2.2 Mtpa plant. The plant is currently located at Big Bell and is proposed to be moved to the mine site. The mill is expected to produce over 75,000-80,000 ounces of gold per year. Click for more details...

RASP SILVER LEAD & ZINC OPERATIONS EXTENSION
Mining - Primary And Secondary Processing (Minerals Processing) project for New development. Continuation of production at the Rasp Mine through a combination of open cut & underground workings. The existing Kintore open cut pit to be extended over 4 years for an anticipated 1.5-2 million tonnes (Mt) production comprising 16% lead plus zinc & 200g/t silver. A decline from the existing Kintore pit allows underground access to another 10Mt in the previously unmined Western & Centenary Mineralisations. Initially underground workings will focus on high grade pillars with the ore trucked out for processing at the Endeavour Mine. Construction of a processing plant to accommodate Stage 2 follow on underground mining of the Western & Centenary lodes for around 750,000 tonnes per annum (tpa). Power, water and rail access already connected to the site with buildings, workshops and general amenities also in place. Click for more details...

HILL END PROJECT - GOLD RESOURCE
Mining - Primary And Secondary Processing (Minerals Processing) project at 2 km northwest of, Hill End, NSW 2850 for New. The plant is processing material from the test drive on the M2 vein set, which has averaged over two ounces per tonne recovered grade with some material producing over four ounces per down. About 80 tonnes of M2 material have been stockpiled from the high grade north end of the test drive, which face sampling indicated would contain up to four ounces per tonne. An additional 200 tonne M2 stockpile of various grades is ready to be processed and narrow driving on the high grade M2 is continuing to the north and south of the test drive to produce plant feed material. Click for more details...

ROSEBY COPPER PROJECT - PROCESSING FACILITY
New project of Mining - Primary And Secondary Processing (Minerals Processing) project at North west of, Cloncurry, QLD 4824. The process plant is to be located immediately adjacent the Blackard Pit. The basic processes include: primary crushing, comprising feed bin, apron feeder, crusher and dust suppression, grinding in a single stage SAG mill and classification in cyclones, optional stockpiling of primary crushed or to de-couple the grinding and flotation processes for the crushing operations, rougher and scavenger flotations, rougher concentrate regrinding to improve final concentrate grade, two stages of cleaner flotation, concentrate thickening and filtration and filter cake storage before transportation, tailings thickening and disposal storage facility and reagents preparation and services. The process plant has been designed to treat approximately 3 Mtpa of sulphide feed, as this will be the case for the initial 4 years of production. Following this, the processing plant may require adaptation to process oxide ores, as the style of ore mineralisation vary. These throughputs are based on a 24 hour per day, 7 days per week operations. The flotation concentrate would be saleable for smelter feed. The proposed process plant comprises the following: Run of Mine (ROM) ore bin fed by either a front end loader or by trucks direct tipping ore, grizzly feeder to remove fines less than 150mm, conveyor feeding combined grizzly and crusher products to the mill, a SAG mill with single 3 MW drives, a ball miss with single 3MW drive, two sets of rougher/scavenger flotation cells (2x7x160 cubic metres), concentrate regrind mill with 550kW drive, cleaner flotation cells (6x50 cubic metres cells), recleaner flotation (4x20 cubic metres cells), concentrate thickening and filtration, reagents, air and water services and pumps, service cranes and hoists. Click for more details...

AREA C - MOUNT GOLDSWORTHY IRON ORE OPERATIONS EXTENSION PROJECT - RESOURCE
Currently at the Construction stage In East Pilbara is a project estimated to be $ 420000000. This project Total resource body is estimated at 2.2 million tonnes. Ore production is to remain at 8.5 Mtpa. Proposal for the expansion are the mining of three new and existing areas. At the new Cattle Gorge area mining approx 11 Mt of ore and 12 Mt of low grade ore/overburden. In the new Nimingarra hard rock mining area of approx 1mt of ore and 7.3 Mt of low grade ore/overburden. Extension to three existing crustal iron ore deposits at Yarrie to mine an additional 2.2 Mt of ore and approx 1 Mt of low grade ore/overburden. Access roads and haul roads will be developed to connect with project area. Electricity supply will be extended to the Cattle Gorge mining area. The Yarrie acccommodation village will be upgraded to 450 rooms and be a fly in fly out operation. New water lines will be entended into the new mining areas. When mining is completed rehabilitation of the site area is to be carried out. Click for more details...

TUTUNUP MINERAL SANDS PROJECT
Approximately 14 km south of, Capel, WA 6271 Has Tutunup Mineral Sands Project currently at Construction stage. The haulage contract is for removal of the Wet Processing Plant from Sandalwood to Tutunup, expected to commence in September 2003. Click for more details...

YABULU NICKEL REFINERY EXTENSION - MHP RECEIVAL/TREATMENT FACILITIES CONTRACT
New project of Mining - Primary And Secondary Processing (Minerals Processing) project at Refinery site at, Yabulu, QLD 4818. Contract package 4 involves a MHP leach area, ammonical solvent extraction area and a stripping stills and gas absorption area. This package involves construction on top of concrete, structural, mechanical, piping, electrical, instrumentation and controls for what are generally hydrometallurgical facilities. The contract involves both greenfield and brownfield work. The MHP Receival & Treatment Facilities include container storage and unloading and primary and secondary leaching facilities. The intermediate product (MHP) from Ravensthorpe will be received at Yabulu where it will be stockpiled in a weatherproof environment prior to feeding into a two stage leaching process. New material handling equipment will be constructed to process the additional MHP. Extension of the existing utilities plant will be required to provide additional power, steam and process gases. This includes a package plant for nitrogen generation by the pressure swing absorption process. Anhydrous ammonia will be imported to supplement ammonia currently produced on site. Click for more details...

JAGUAR BASE METALS PROJECT - PROCESSING PLANT/MECHANICAL WORKS CONTRACT
A project in the WA Within Leonora. A centrally located processing facility to be located on the granted Teutonic Bore mining lease, 4 km to the north of the Jaguar deposit. A 350,000 tpa plant to treat ore by crushing, grinding and flotation. Copper and zinc concentrate production is expected to commence in July 2007, increasing to 10,000 tonnes of copper, 34,000 tonnes if zinc and 1 million ounces of silver in concentrate per annum over a six year period. Click for more details...

ENDEAVOUR BASE METALS OPERATIONS - ELURA
Mining - Primary And Secondary Processing (Minerals Processing) project for New development. The former Elura mine has now been renamed Endeavour. Various efficiencies including use of road trains for haulage have been introduced. Optimisation of the plant is planned by increasing flotation capacity. Click for more details...

MOUNT BISCHOFF TIN OPERATIONS - PROCESSING PLANT REFURBISHMENT
Mining - Primary And Secondary Processing (Minerals Processing) project at Via, Waratah, TAS 7321 of Processing Plant - Refurbishment type of New development. A revised process flow sheet for the existing process plant has been produced and it will involve minimal engineering and processing modifications. Processing rate is expected to be 60,000 tonnes per month. New equipment proposed is a high gravity jig advancements with the addition of Falcon Ultra Fine concentrators. Processing plant when refurbished is expected to process 60,000 tonnes per month. Click for more details...

FOSTERVILLE GOLD OPERATIONS
Mining - Primary And Secondary Processing (Minerals Processing) New project at Near Fosterville 20 km northeast of, Bendigo, VIC 3550. This type is Ccd Thickener with Private ownership. Design & suply of CCD thickener. Click for more details...

DRUMMOND BASIN PROJECT - WIRRALIE
Processing Facility - Refurbishment Renovations, Refurbishments etc. project In The Whitsunday Regional Council Area. 1.5Mtpa CIP/CIL treatment plant. Heap leaching is now under consideration as a more economically attractive option. Click for more details...

BRONZEWING GOLD & NICKEL PROJECT
Resource - Gold/Nickel project at North east of, Leinster, WA 6437 In The Council Area Of Leonora of Private. Underground indicated resource estimate is now 6.32 Mt @ 1.9g/t Au for 396,000 contained ounces of gold, with expected gold production of 355,000 oz over mine life of 3.5 years. The sale of the project includes a 2.3Mtpa Processing Plant & a 280 person accommodation village. The mine is expected to recommence production in january 2010. Click for more details...

BEACONSFIELD GOLD MINE JV - RESOURCE
5 West St, Beaconsfield, TAS 7270 Has Beaconsfield Gold Mine Jv - Resource currently at Exploration, Drilling, Survey & Assessment stage. An extensive RC drilling program is to target the North Please Creek tenements. UP to 20 RC holes to a depth of 200 metres will be drilled. Exploration is being undertaken in the area surrounding Beaconsfield mine. Two recent RC holes cut 0.8g/t gold over 35 metres, including 5.3g/t gold over 2 metres from 52 metres (hole BFRC17), and anomalous gold within the Johnsons Creek fault (hole BFRC18). Click for more details...

HELLYER METALS PROJECT - MILL/INFRASTRUCTURE
A project in the TAS Within Waratah-Wynyard. Includes a 1.5mtpa mill, designed for differential flotation. The existing concentrator and facilities will be used for reagent handling, preparation, maintenance and office areas. Click for more details...

ARDLETHAN TIN OPERATIONS - ERECTION/INSTALLATION PACKAGES
Erection/Installation Packages New project In The Coolamon Council Area. Packages include mechanical, structural, piping and electrical work for the processing area. Click for more details...

ACID MINE DRAINAGE PROJECT
A project in the TAS Within West Coast. Acid drainage is produced by natural weathering and biological reactions in which sulphide minerals when exposed to air and water will oxidise forming sulphuric acid and cause metals to dissolve and these toxic metals then enter the environment endangering human, bird, animal and aquatic life. Oretek Limited has developed and patented a number of non-toxic polymers for the treatment of AMD and related environmental problems. Click for more details...

CML 7 BROKEN HILL BASE METALS PROJECT
Mining - Primary And Secondary Processing (Minerals Processing) project at via, Broken Hill, NSW 2880 of Resource - Base Metals type of New development. Drilling to date has successfully intersected the shallow zinc lode mineralisation over a strike length of 120 metres with an average width of 80 metres. Drill intersections range from 4 to 13 metres at grades averaging greater than 10% lead and zinc. Click for more details...

YABULU NICKEL REFINERY
Mining - Primary And Secondary Processing (Minerals Processing) project In The Townsville City Council Area of Private ownership. Gas scrubbing system to recover ammonia for re-use. Part of project to increase prodcution of cobalt. Click for more details...

RAVENSWOOD GOLD OPERATIONS - SARSFIELD
Mining - Primary And Secondary Processing (Minerals Processing) project at via, Ravenswood, QLD 4816 for New. The crushing circuit from the now-closed Kidston gold mine is being relocated to Sarsfield. Click for more details...

BHP BILLITON IRON ORE OPS - ASSET DEVELOPMENT PROJECTS - CRUSHING/SCREENING
Mining - Primary And Secondary Processing (Minerals Processing) project at Via, Newman, WA 6753 of Crushing & Screening Plants type of New development. Additional expansion from 110Mtpa to 145Mtpa. Part of a proposed additional expansion to meet increased demand, involving engineering works and capital investment of 2-3 billion $AU over the next five years. The feasibility study is being undertaken by MPDJV (Mine & Port Joint Venture). Click for more details...

MOUNT ISA MINES COPPER SMELTER - EXPANSION STAGE ONE
Mount Isa Mines Copper Smelter - Expansion Stage One is currently at the Construction stage, valued at about $ 410000 it is The expansion includes installation of a second rotary holding furnace, a copper slag cleaning furnace, a converter slag treatment plant and associated plant, all designed to increase the smelter's capacity from 240,000 tpa to 280,000 tpa. Click for more details...

MURRIN MURRIN NICKEL PROJECT - HYDROGEN SULPHIDE PLANT SHUTDOWN
A project in the WA Within Leonora. 10 DAY shutdown planned. Click for more details...

CHARTERS TOWERS GOLD OPERATIONS - UNDERGROUND MINING
Mining - Primary And Secondary Processing (Minerals Processing) project at Via, Charters Towers, QLD 4820 of Underground Mining type of New development. Company personnel are currently undertaking development to the ore zone. A contract is likely to be repriced involving further development work. Company personnel will then concentrate on production. Click for more details...

BHP BILLITON IRON ORE RAPID GROWTH PROJECT 2 - OREBODY 25 PLANT MODIFICATIONS
Orebody 25 Plant - Modifications project at Via, Newman, WA 6753 in the Mining - Primary And Secondary Processing (Minerals Processing). Modifications at Orebody 25 will produce additional brockman lump and fines products. Click for more details...

KOOLAN ISLAND PROJECT - PROCESS PLANT
Process Plant project at on, Koolan Island, WA 6733 in the Mining - Primary And Secondary Processing (Minerals Processing). The plant will comprise a conventional 2 stage crushing and screening plant at a nominal capacity of 600 tonnes per hour (4 mtpa) to produce lump and fines product for export. Click for more details...

RAVENSTHORPE NICKEL PROJECT - LIMESTONE BALL MILL
Ravensthorpe Nickel Project - Limestone Ball Mill is currently at the Construction stage, valued at about $ 10000000 it is Limestone Ball Mill Click for more details...

TEXAS SILVER PROJECT - TWIN HILLS - EARTHWORKS/LEACH PONDS
Mining - Primary And Secondary Processing (Minerals Processing) project at Via, Texas, QLD 4385 for New. Construction of the base for the Heap Leach Pads and excavate the sites for the three (3) proposed Leach Ponds. Upgrading of the mine access road will also be carried out. Click for more details...

LIDDELL POWER STATION - MAINTENANCE CONTRACT
Currently at the Construction stage In Muswellbrook is a project estimated to be $ 500000. This project The work covered by this specification generally encompasses the inspection, reporting, repairs, routine maintenance and emergency breakdown work on the Liddell Coal handling Plant and Hunter Valley gas Turbines for a period of two years. Click for more details...

YABULU NICKEL REFINERY EXTENSION - CARBON DIOXIDE PLANT CONTRACT
Refinery site at, Yabulu, QLD 4818 Has Yabulu Nickel Refinery Extension - Carbon Dioxide Plant Contract currently at Construction stage. The existing standby turbine alternator will be changed to generate power as required in conjuction with other units on site. The low pressure steam exhausted from the turbine in addition to other steam supplies on site will be reticulated throughout the site to the new plant for heating and process requirements. A carbon dioxide plant will be constructed as part of this process. Click for more details...

RAVENSTHORPE NICKEL PROJECT - STRUCTURAL STEEL
Mining - Primary And Secondary Processing (Minerals Processing) project In The Ravensthorpe Council Area of Private ownership. Supply of structural steel for PAL, CCD and MHP. Click for more details...

RAVENSTHORPE NICKEL PROJECT - ELECTRICAL INSTALLATION OF WATER SYSTEM
Mining - Primary And Secondary Processing (Minerals Processing) project for New development. Electrical and instrumentation installation of water systems. Click for more details...

RAVENSTHORPE NICKEL PROJECT - AIR VALVES
Ravensthorpe Nickel Project - Air Valves is currently at the Construction stage, valued at about $ 100000 it is Air valves for seawater pipeline. Click for more details...

RAVENSTHORPE NICKEL PROJECT - HIGH ALLOY ITEMS/PIPE SPOOLS
Currently at the Construction stage In Ravensthorpe is a project estimated to be $ 100000. This project Fabrication of high alloy items and pipe spools. Click for more details...

THREE MILE HILL GOLD PROCESSING PLANT - RECOMMISSIONING
Gold Processing Plant project at Near, Coolgardie, WA 6429 In The Council Area Of Coolgardie of Private. The re-commissioning will focus on a number of proposed modifications and improvements to the plant in order to accomodate an initial low grade feed, reduced operating costs and increased efficiency. Also the feasibility of replacing the primary crusher, a new gravity circuit and new cyclones will be investigated. Click for more details...

LEONORA GOLD OPERATIONS - TARMOOLA PIT - RESOURCE
Leonora Gold Operations - Tarmoola Pit - Resource is currently at the Early Planning stage, valued at about $ 20000000 it is Resource estimate is 35,000,000 tonnes @ 1.2 g/t for 1,300,000 ounces of Au. Click for more details...

SCOTIA MINE - TIN/SAPPHIRE RESOURCE
Mining - Primary And Secondary Processing (Minerals Processing) project at 3 Km North via the Cape Portland Rd, Gladstone, TAS 7264 for New. Development comprises mining the Scotia open pit, constructing three tailings dams, one fresh water dam and a gravity processing plant with associated conveyors. Scheduling of pre-mining site works is complete. Development will involve road and bridge upgrading, provision of new heavy vehicle access, dam site construction, commencement of pumping of freshwater to dam storage, treatment plant and site office and workshop infrastructure construction. Road engineering and bridge/culvert design are completed. The Company has already commenced dam wall foundation geotechnical works. With the recent arrival on site of the specialized sapphire conveyors installation of the tin/sapphire clean-up circuit at the Campbell Street facility is underway and completion of the circuit to production standard is scheduled to coincide with the issue of Council permitting. Click for more details...

BODDINGTON GOLD MINE EXPANSION PROJECT - HARMONIC & PF COMPENSATION
Harmonic & Pf Compensation project at Pinjarra-Williams Road, Boddington, WA 6390 In The Council Area Of Boddington of Private. Harmonic & PF Compensation. Click for more details...

BODDINGTON GOLD MINE EXPANSION PROJECT - MILL LINER HANDLER & HYDRAULIC BOLT REMOVERS
Mining - Primary And Secondary Processing (Minerals Processing) project In The Boddington Council Area of Mill Liner Handler/Hydraulic Bolt Removers type. Mill liner handler and hydraulic bolt removers. Click for more details...

IRON ORE PAID GROWTH 4 PROJECT - CAR DUMPER WORK PACKAGE 4N08
Mining - Primary And Secondary Processing (Minerals Processing) project at Newman Hub, Newman, WA 6753 for New. A new single rotating cell car dumper located inside of the main rail loop, north of the existing OB29 TLO. A trade approved train weighbridge will be installed on both sides of the Car Dumper. There is a receival hopper complete with an apron feeder 51FE010 below the car dumper. The feeder discharges to a reclaim conveyor that lifts the ore to the surface. The reclaim conveyor 51CV010 discharges to the surge stockpile stacker conveyor 51CV020. The surge stockpile stacker conveyor also received ore from the supply conveyor 41CV030 from the NHG/Bene supply. Thus, all the ore sources are discharged to the surge stockpile together. There is sample extraction at the head of the car dumper conveyor which includes a sample cutter, apron feeder and primary increment crusher (SPB lump size being too big to be handled by a modular sample station). The sample extraction will be linked to a new sample stations. The car dumper has dedicated dust extraction/scrubber and ventilation systems comprising ducting, fans, scrubbers and pumps. The key criteria for the Car Dumper and discharge are 27Mtpa, discharge rate is 6,500tph. Samples will be taken on a time based system. A lot is defined as one shuttle load. The final sample collection will be in buckets on carousels containing approximately 7.5kg per lot. The sample station will have divisions down to quaternary cutting for chemical sampling. Metallurgical samples can be collected as and when required. The sample station is of a single modular design similar to those for as stacked sampling. The key criteria for the SOB Sample Station has a design capacity of 27Mtpa. Surge Stockpile will receive ore from NHG No 2 Plant, the Bene Plant and the SOB Car Dumper. The stockpile comprises one pile, with a live capacity of 15,000 ton minimum. There is gravity reclaim from the stockpile through two draw-down hopper openings in the roof of the reclaim ton. The hoppers are each located over an apron feeder that discharges to the plant feed conveyor 51CV020. The stockpile live volumne and feeder capacities are sized to produce a smooth head feed to the screening/crushing process plant. There are dust suppression cannon around the stockpile as well as dust suppression sprays at the head of the stacking conveyor. High pressure water for the cannon will come from the stockyard high pressure distribution. The key criteria for the Surge Stockpile is 58Mtpa. Click for more details...

KING ISLAND SCHEELITE PROJECT - MECHANICAL FOR SECONDARY CRUSHING & SCREENING PLANT
New project of Mining - Primary And Secondary Processing (Minerals Processing) project at Near, Grassy, TAS 7256. For the provision of mechanical installation for the secondary crushing & screening plant. Click for more details...

IRON ORE RAPID GROWTH 4 PROJECT - LOW SPEED WEIGHBRIDGE
Newman Hub, Newman, WA 6753 Has Iron Ore Rapid Growth 4 Project - Low Speed Weighbridge currently at Tenders & Building stage. For the supply of a low speed weighbridge. Click for more details...

HOPE DOWNS 4 JOINT VENTURE IRON ORE PROJECT - WET ORE PROCESSOR SMP
Mining - Primary And Secondary Processing (Minerals Processing) project In The East Pilbara Council Area of Structural/Mechanical/Piping - For Wet Ore Processor type. Contract for the provision of structural, mechanical & piping engineering services for a 15 million tonnes per annum (Mtpa) wet ore processor to accommodate 220t capacity haul trucks. To include primary & secondary crushing & screening, waste fines thickening & discharge return lines, stockpiling of lump & fines product, reclaiming & train loadout. Click for more details...

MOUNT WELD RARE EARTHS OPERATIONS PLANT EXPANSION
Mining - Primary And Secondary Processing (Minerals Processing) project at near, Laverton, WA 6440 for New. Increase of initial 11,000 tonnes per annum (tpa) capacity to 22,000tpa through plant expansion from 120,000tpa to 240,000tpa throughput. Click for more details...

NICKEL WEST OPERATIONS - KAMBALDA NICKEL CONCENTRATOR MATERIALS HANDLING CONTRACT
via, Kambalda, WA 6442 Has Nickel West Operations - Kambalda Nickel Concentrator Materials Handling Contract currently at Construction stage. A 5 year contract at the concentrator plant which handles ore from the Leinster, Mouth Keith & Cliffs mines. To include ore handling, crushing & sampling. Click for more details...

MINDARIE MINERAL SANDS OPERATIONS RECOMMENCEMENT
A project in the SA Within Karoonda. A project to recommence operations targeting 10,000t per month of heavy mineral concentrate to be trucked to port for export for overseas processing into zircon, ilmenite & rutile. Click for more details...

NOVA NICKEL PROJECT - PROCESSING & PASTE PLANT
New project of Mining - Primary And Secondary Processing (Minerals Processing) project at 30km north of Eyre Hwy 120km E/NE of, Norseman, WA 6443. For the provision of a processing plant including crushing, grinding, flotation & dewatering & paste plant. Click for more details...

THUNDERBOX GOLD & NICKEL OPERATIONS RECOMMENCEMENT - PLANT REFURBISHMENT
Thunderbox Gold & Nickel Operations Recommencement - Plant Refurbishment is currently at the Construction stage, valued at about $ 16300000 it is Refurbishment of existing 2.5Mtpa CIL plant. Click for more details...