State
Categories
Sub Categories
-
Schools - primary, secondary (up to Yr 12)
-
Kindergartens, day nurseries, child care centres
-
Tertiary - colleges, institutes, universities
-
Surgeries, Medical centres
-
Veterinary Clinics
-
Rehabilitation Centres, Youth Care Accommodation
-
Hospitals & associated buildings, mortuaries
-
Shops, shopping centres & arcades, supermarkets
-
Theatres, Cinemas
-
Drive-in cinemas, ampitheatres
-
Parks, Leisure grounds, Playgrounds
-
Amusement parks, Zoos
-
Showrooms, Retail warehouses, Retail markets, Bulky goods
-
Religious Buildings, civil chapels
-
Crematoria, funeral parlours
-
Library, Archives, Galleries, Museums, Interpretive centres, Tourist info
-
Community centres, Clubs (unlicensed), Youth centres, Day respite
-
Amenities, Dressing rooms
-
Car parks (multi-storey)
-
Athletic Tracks
-
Golf courses, driving ranges
-
Sports ground hard surface (tennis courts,netball courts, basketball & skateparks)
-
Sports grounds soft surface (bowling greens, cricket pitches, rugby & soccer fields)
-
Indoor sports & leisure centres, bowling alleys, squash courts, gymnasiums
-
Swimming baths & assoc. facilities, Saunas, Spas, Solaria
-
Pavilions, Grandstands, Stadiums/halls
-
Ice Rinks
-
Ski Lifts
-
Race track (motor)
-
Race track (other)
-
Units, apartments, flats, townhouses, villas
-
Student & group accommodation
-
Aged care facilities
-
Retirement villages
-
Aged units, seniors units
-
Nursing homes
-
Roads, Air runways, Surface car parks, Kerbs, Culverts, Elevated highways
-
Bridges, Aqueducts, Viaducts
-
Tunnels, Subways
-
Pipelines
-
Marinas
-
Dams
-
Docks & piers, wharves, boat ramps
-
Retaining walls, Seawalls
-
Industrial Subdivision
-
Residential Subdivision
-
Rural Subdivision
-
Commercial Subdivision
-
Master plan communities/mini city
-
Yards, Sidings, Loading docks, Railways, Container terminals.
-
Lighting, signal towers, transmitting towers, lines, beacons
-
Landscaping, Fencing, Entry statements, Monuments, Fountains
-
Civil works, Excavation, Quarries, Foundations, Demolition, Dredging, Earthworks
-
Military housing & accommodation, Military colleges
-
Military installations & facilities
-
Open Cut
-
Underground - including longwall
-
Onshore - oil & gas
-
Offshore - oil & gas
-
Offshore - other
-
Sand mining - suction dredging
-
Exploration - Drilling
-
Exploration - airborne surveys etc.
-
Sample analysis, Laboratory testing
-
Offices
-
Medical facilities
-
Retail facilities
-
Administration facilities
-
Canteens, Messes, Crib room
-
Bath houses, Amenities, Dressing rooms
-
Sporting facilities, Gymnasiums, etc.
-
Industrial buildings
-
Labs, Testing facilities, Hazardous materials, Storage
-
Accommodation - units, housing, group accom.
-
Supply/fabrication
-
Catering, Cleaning, Laundering
-
Freight - Air, Sea, Land
-
Airservices for personnel
-
Other mining services
-
Supply of consumables e.g.chemicals, fuels, etc.
-
Banks
-
Mining equipment maintenance
-
Post Offices
-
Motor Registries
-
Radio & TV Stations, Studios
-
Processing & materials handling equipment maintenance incl. shutdowns
-
Oil & gas facilities maintenance
-
Civil Maintenance, eg.grading etc.
-
Maintenance of off-site building & housing
-
Computer centres
-
Coal Processing
-
Other processing including salt, sand etc
-
Crushing, Screening, Quarrying
-
Civil works at processing facilities
-
Tankage, Silos
-
Piping
-
Insulation
-
Computerised systems for processing equipment
-
Commercial complexes - shops, offices
-
Topside - modules, platforms
-
Sub-sea equipments, floating production facilities
-
Pipelines & associated contracts
-
Onshore processing facilities
-
Waste water/sewerage treatment, sew./waste pipes
-
Water distribution & pipelines, borefields
-
Power stations, Power generation
-
Pump stations, Above ground reservoirs
-
Transmission lines/towers, switching yards, transformers, substations, cabling
-
Rail loops, Track work, Signalling, Rolling stock, Switching yards
-
Roads, Airstrips, Culverts, Retaining walls
-
Bunding
-
Slurry pipelines
-
Tailings, Dams, Water supply dams
-
Conveyors, Stackers, Reclaimers, Materials handling
-
Drifts, ventilator shafts, portals, shotcreting, declines
-
Concrete Batching Plants
-
Wharfs, Piers, Port facilities, Piling, Dredging
-
Computer & telecommunication system for mine, scada
-
Open cut mining, Overburden, Draglines
-
Underground mining & crushing
-
Drill & Blast
-
Haulage Of Ore
-
Stockpile Management
-
Earthworks/general civil
-
Rehabilitation, Environmental mgmt, Decontamination
-
Landscaping, revegetation
-
Dredging, Pile driving, Sand mining, Section dredging
-
Mechanical installation
-
Electrical installation
-
Painting
-
Structural
-
Air-conditioning installation
-
Piping & Hydraulic
-
Dismantling, Demolition
-
Hotels, Serviced Apartments
-
Motels, Bed & Breakfast, Cabins
-
Backpacker Accommodation
-
Restaurants, Canteens
-
Take-away Outlets
-
Conference & reception centres & facilities
-
Clubs (licensed), licensed premises, casinos, taverns
-
Tourist villages, Resort complexes
-
Caravan parks with assoc facilities, Camping grounds
-
Fed, State, Local Gov't offices, Embassies, Job Centres, Civic Centres, Townhalls
-
Police Stations
-
Law Courts
-
Prisons
-
Fire Stations, SES
-
Ambulance Stations
-
Passenger terminals (aiport, bus, rail & sea), Air control towers
-
Treatment plants, Sewerage reticulation
-
Water distribution systems, Drainage
-
Power stations, Substations, Windfarms, Phone exchanges
-
Pumping Stations
-
Reservoirs
-
Light Industry (Laundries, printing works, textiles, clothing)
-
Cold Storage
-
Heavy Industry (assembly plants, conveyors/shiploaders, storage tanks)
-
Oil refineries, Chemical Plants
-
Ship building facilities, marine industries
-
Gas depots (inc. Manuf, Dist) Waste depots, Industrial waste disposal & transfer
-
Factories & Factory Units
-
Plant & Animal Husbandry (agri/horticultural buildings, sawmills, nurseries, greenhouses, stables, kennels)
-
Warehouses, cargo sheds, distribution centres
-
Depot, Garages, Workshops, Carwashes, Hangars
-
Laboratories, Research buildings & Observatories, Tracking stations, Launching facilities
-
High technology parks
-
Service stations
-
Abattoirs, Breweries, Dairies, Canneries, Bakeries, Wineries
-
Silos, Grain elevators
|
|
List of Minerals Processing Projects
WESTONIA GOLD PROJECT
1 km north of, Westonia, WA 6423 Has Westonia Gold Project currently at Construction stage. The plant is in good condition and located at Mount Pleasant, near Kalgoorlie (683365Big Bell), approx 300 km from the mine site. The specifications will be incorporated into the bankable feasibility study. A greater throughput of 2.5mtpa is being modelled. The original 1.5mtpa design is also being evaluated in terms of project economics.The plant has formerly produced 3.5Mtpa.The plant is expected to be able to process 2.5Mtpa of Westonia ore with the addition of a secondary crusher.
Click for more details...
UNION REEFS GOLD OPERATIONS - MINE & PLANT
Mining - Primary And Secondary Processing (Minerals Processing) project In The Katherine Town Council Area of Mine/Infrastructure type. Includes Union Reefs Gold Project and a 2.8mtpa gold plant, on care and maintenance since late 2003, and related site infrastructure. Situated 50 km south of Bocks Creek and Cosmo Deeps and approx 20 km north of Pine Creek.
Click for more details...
GLOUCESTER RUBY MINE
Mine - Rubies project at Mid way between Scone and, Gloucester, NSW 2422 In The Council Area Of Gloucester of Private. Mine production for December Quarter 2006 was 15,281 tonnes of gemstones.
Click for more details...
ARDLETHAN TIN OPERATIONS - TAILINGS TREATMENT CONSULTANCY
Mining - Primary And Secondary Processing (Minerals Processing) project for New development. The tailings retreatment project involves 8,000,000 tonnes of tailings to be retreated. Marlborough Resources are seeking proposal from consultants for the feasibility study, which includes mining, metallurgy, process design, detailed design and construction.
Click for more details...
FORTNUM GOLD PROJECT - PLANT RECOMMISSIONING
Mining - Primary And Secondary Processing (Minerals Processing) project In The Meekatharra Council Area of Processing Plant - Recommissioning type. 1 million tonnes per annum gold treatment plant. Findings of the pre-feasibility study include treatment plant recommissioning cost of approximately $1.6 million for a production rate of 60,000 to 70,000 ounces.
Click for more details...
YABULU NICKEL REFINERY EXTENSION - MHP RECEIVAL/TREATMENT FACILITIES CONTRACT
New project of Mining - Primary And Secondary Processing (Minerals Processing) project at Refinery site at, Yabulu, QLD 4818. Contract package 4 involves a MHP leach area, ammonical solvent extraction area and a stripping stills and gas absorption area. This package involves construction on top of concrete, structural, mechanical, piping, electrical, instrumentation and controls for what are generally hydrometallurgical facilities. The contract involves both greenfield and brownfield work. The MHP Receival & Treatment Facilities include container storage and unloading and primary and secondary leaching facilities. The intermediate product (MHP) from Ravensthorpe will be received at Yabulu where it will be stockpiled in a weatherproof environment prior to feeding into a two stage leaching process. New material handling equipment will be constructed to process the additional MHP. Extension of the existing utilities plant will be required to provide additional power, steam and process gases. This includes a package plant for nitrogen generation by the pressure swing absorption process. Anhydrous ammonia will be imported to supplement ammonia currently produced on site.
Click for more details...
NULLAGINE GOLD PROJECT
Resource - Gold New project In The East Pilbara Council Area. Upgraded Resource Estimate of 34.41 Mt grading at 1.13 g/t for 1 247 200 ounces gold. Mining methods for Golden Gate identified by the study can be done by a 90-100 tonne excavator & 4-5 50 tonne trucks. Project has the potential for a 8-10 year operation milling 1 Mt annually through a CIL processing plant.
Click for more details...
ENDEAVOUR BASE METALS OPERATIONS - ELURA
Mining - Primary And Secondary Processing (Minerals Processing) project for New development. The former Elura mine has now been renamed Endeavour. Various efficiencies including use of road trains for haulage have been introduced. Optimisation of the plant is planned by increasing flotation capacity.
Click for more details...
PLUTONIC GOLD OPERATIONS - RESOURCE
Operating Mine project at 180 km North east of, Meekatharra, WA 6642 In The Council Area Of Meekatharra of Private. The Plutonic gold operation comprises both open pit and underground operations. There is also a CIL plant which operates sulphide and oxide circuits on site for the processing of ore. The mine can produce between 1.3 Mtpa to 1.8 Mtpa. In 2005, 251,000 ounces of gold were produced. Ore reserves are 14 Mt @ 5.2 gpt Au. Development work proposed includes increased mining at the Freshwater mine, in pit Tailing storage facilities at the Callp and Pirana pits. Work at the Freshwater mine is entitled the Trout Mining Project.
Click for more details...
BROWNS OXIDE PROJECT - NICKEL/COBALT/COPPER/LEAD RESOURCE
7 Km North West of, Batchelor, NT 0845 Has Browns Oxide Project - Nickel/Cobalt/Copper/Lead Resource currently at Construction stage. The ore is to be mined, crushed, ground and slurried on site. Ore will be processed in a onsite process plant and tailing will be stored in a onsite tailings dam. The in-ground oxide resource estimate for the Batchelor region projects has an estimated value at over 1 billion dollars. Measured resource is 18 million tonnes, indicated is 27 million tonnes and inferred is 37 million tonnes. Metals in the ground are lead at 1,865,000 tonnes, copper 622,000 tonnes, cobalt at 98,000 tonnes and nickel at 90,000 tonnes. There are also significant exploration prospects at Mount Fitch and Mount Burton.
Click for more details...
MOUNT GORDON COPPER OPERATIONS
Mining - Primary And Secondary Processing (Minerals Processing) project at 155 km north of, Mount Isa, QLD 4825 of Mine/Infrastructure type of New development. Resource estimate is 495,000 tonnes of contained copper metal. Recent drilling at the Mammoth deposit has increased the resource estimate and the mine life has now been extended to late 2008.
Click for more details...
CAROSUE DAM GOLD OPERATIONS - PROCESSING PLANT UPGRADE STAGE 2
Mining - Primary And Secondary Processing (Minerals Processing) project at 80 km south of, Laverton, WA 6440 for New. Expansion involving staged upgrade of the processing facility. Stage 1 expansion from 2.4 million tonnes per annum (Mtpa) to 3.2 Mtpa by installing 2 x 5HP crushers for a 3rd crushing circuit, a new screenhouse & additional tankage. Stage 2 increase to 4Mtpa through an additional ball mill running in series or parallel with the existing 4.5MW mill. Initial feed from a cut back at Whirling Dervish pit involving removal of 7 million cubic metres overburden. Other sources to be ore blended from the Whirling Dervish, Wallbrook & Million Dollar pits along with ore blended from the Red October, Deep South & Whirling Dervish underground mines.
Click for more details...
GLADSTONE INTERNATIONAL NICKEL PROJECT - MARLBOROUGH
Mining - Primary And Secondary Processing (Minerals Processing) project In The Gladstone Regional Council Area of Processing Plant type. Processing of laterite ore. Ore likely to be sourced from New Caledonia via Cape size shipping through Gladstone's deepwater port, supplemented by ore from the deposits at Marlborough. This is likely to be a two stage development. Stage one to 65,000 tpa producing nickel cobalt suplhide will involve a 4 autoclave plant. Stage two would be likely to involve doubling of capacity.
Click for more details...
WHITE RANGE GOLD OPERATIONS - RESOURCE
Mining - Primary And Secondary Processing (Minerals Processing) project In The Alice Springs Town Council Area of Private ownership. Orex will construct a new leach pad to treat the residual stockpile of ore. The December Quarter 2006 saw the mine produce 346 ounces of gold. At present Orex is shifting over 7000 tonnes of ore @ 2 g/t au for leaching.
Click for more details...
KOGAN CREEK POWER PROJECT
Currently at the Construction stage In Western Downs Regional is a project estimated to be $ 5000000. This project Detailing, procurement, fabrication and erection of 2660 to structural steel works painted, 57 to sundry metal works, 3200m2 hot-dip galvanised gratings, 2420m railings, 210m step ladders.
Click for more details...
GLADSTONE ALUMINA PLANT
Mining - Primary And Secondary Processing (Minerals Processing) project In The Gladstone Regional Council Area of Private ownership. Three new calciners. Includes design, installation, commissioning and testing. The Calciners will be used for the calcination process which involves using extremely high temperatures to remove chemically bonded water from the alumina hydrate, ultimately producing the dry alumina powder from which aluminium is made. The new calciners will reduce dust emissions by around 90%, decrease gas usage by a quarter and cut greenhouse emissions by 245,000 tonnes per year.
Click for more details...
CSA COPPER OPERATIONS - CONCRETE REMOVAL
Mining - Primary And Secondary Processing (Minerals Processing) project In The Cobar Council Area of Concrete Removal type. This package may be combined with Steel Work contract ID: 2155418. Decision is yet to be made whether concrete may be replaced with steel flooring.
Click for more details...
BHP BILLITON IRON ORE OPS - ASSET DEVELOPMENT PROJECTS - STEEL FABRICATION
New project of Mining - Primary And Secondary Processing (Minerals Processing) project at Various sites via, Newman, WA 6753. BHP Billiton has increased iron ore production with work culminating in a production capacity of 110 Mtpa to be completed by late 2004. The company is now investigating ways of increasing production over the next five years to meet a projected increased in demand, especially from China. A complete process redesign will be involved with higher throughput levels and environmental and social benefits. Additional expansions of capacity to 145Mtpa are currently the subject of a feasibility study due for completion late 2004 approx.
Click for more details...
MOUNT ISA MINES COPPER SMELTER - EXPANSION STAGE ONE
Mount Isa Mines Copper Smelter - Expansion Stage One is currently at the Construction stage, valued at about $ 410000 it is The expansion includes installation of a second rotary holding furnace, a copper slag cleaning furnace, a converter slag treatment plant and associated plant, all designed to increase the smelter's capacity from 240,000 tpa to 280,000 tpa.
Click for more details...
TWIN HILLS GOLD PROJECT - PROCESSING PLANT
Approx 40 km east of, Charters Towers, QLD 4820 Has Twin Hills Gold Project - Processing Plant currently at Construction stage. Rishton Treatment Plant was acquired and a gravity circuit will be added, some tanks will be converted for CIL and enhanced gold security provisions will be made. A sediment dam is to be constructed. Power plants will also be installed for the crushing circuit and the processing circuit.
Click for more details...
KOOLAN ISLAND PROJECT - PROCESS PLANT
Process Plant project at on, Koolan Island, WA 6733 in the Mining - Primary And Secondary Processing (Minerals Processing). The plant will comprise a conventional 2 stage crushing and screening plant at a nominal capacity of 600 tonnes per hour (4 mtpa) to produce lump and fines product for export.
Click for more details...
MAGELLAN LEAD CARBONATE PROJECT - GAS PIPELINE
Mining - Primary And Secondary Processing (Minerals Processing) project at Goldfields Gas Transit pipeline to proposed Refinery near, Wiluna, WA 6646 for New. The gas pipeline is proposed to run from the proposed refinery to the main Goldfields Gas transit pipeline. Goldfields gas pipeline is 35 km from the minesite where the refinery is to be located nearby.
Click for more details...
MURRIN MURRIN NICKEL HEAP LEACH PROJECT - DEMONSTRATION PLANT
Murrin Murrin Nickel Heap Leach Project - Demonstration Plant is currently at the Planning stage, valued at about $ 12000000 it is Final stages of a study on an initial 200,000tpa scats Heap Leach project reveal the operation is anticipated to be established in 2006. Continuous laboratory pilot plant testing to establish the optimum treatment of the heap leach solutions indicates the technical feasibility of integration into the existing Murrin Murrin process plant. Heap leach recoveries of above 80% of nickel have been achieved on the scats material in less than 180 days of leaching.
Click for more details...
MOUNT ISA MINE COPPER SMELTER - EXPANSION STAGE TWO
Mining - Primary And Secondary Processing (Minerals Processing) New project at At, Mount Isa, QLD 4825. This type is Smelter Expansion - Stage 2 with Private ownership. The copper smelter's capacity will be upgraded from 280,000 to 300,000 kt anode. This will involve the installation of a slag clearing furnance, converter slag crushing plant and two new oxygen plants. As part of the upgrade, the Townsville copper refinery capacity will be upgraded from 280,000 to 300,000 kt cathode.
Click for more details...
HOPE DOWNS IRON ORE PROJECT - PROCESSING PLANT
75 Km Northwest of, Newman, WA 6753 Has Hope Downs Iron Ore Project - Processing Plant currently at Construction stage. A crush and screen process plant. The plant will initially process 22 Mta of dry iron ore with expansion later on to process 30 Mta of dry iron ore. The process plant will comprise a primary crusher in a processing circuit that incorporates screens that will seperate the oversized ore. The primary ore will then be crushed a second time and fed to seperate lump and fine products. These will be stockpiled for train loading by conveyor belts and travelling luffing stackers. Stockpiled products will be reclaimed by a rail mounted bucket wheel reclaimer. It will then be conveyed to a train loading facility for transport by rail to Dampier port.
Click for more details...
PROMINENT HILL GOLD/COPPER PROJECT - CONCENTRATE FILTER
Mining - Primary And Secondary Processing (Minerals Processing) project at 100 Km South East of, Coober Pedy, SA 5723 of Concentrate Filter type of New development. Supply of one automated pressure concentrate filter including supporting framework, hydraulic unit, control panel, load cells and ancillary equipment. Automatic operations include filtration, diaphragm pressing, air drying and cake discharge / cloth washing. Size - 132 m2 filter area, 22 plates 66tph instantaneous 12 min/cycle.
Click for more details...
WOLFRAM CAMP PROJECT - PROCESSING PLANT
15 Km North west of, Dimbulah, QLD 4872 Has Wolfram Camp Project - Processing Plant currently at Construction stage. Construction of a 150,000 tpa treatment plant. The developer has sourced a suitable second hand ball mill and is inspecting a second hand front end crushing and screening facility.
Click for more details...
HANDLEBAR HILL ZINC & LEAD PROJECT
Mining - Primary And Secondary Processing (Minerals Processing) project In The Mt Isa City Council Area of Private ownership. Recent drilling, metallurgical testing and design has confirmed a 3.4 million tonne open pit reserve in an area south of the George Fisher underground mine. Ore will be mined at a rate of up to 1.75 million tonnes per annum, crushed at George Fisher and trucked to the Mount Isa zinc-lead concetrator from mid 2008. The concentrator is currently being expanded from 6.5mtpa to 8mtpa. The open cut mine has an expected life time of two and a half years with the potential for underground mining operations into the future.
Click for more details...
MOUNT KEITH NICKEL OPERATIONS - TALC REDESIGN PROJECT
Talc Redesign - For Operating Nickel Mine project at 96 km north of, Leinster, WA 6437 in the Mining - Primary And Secondary Processing (Minerals Processing). A project to allow the concentrator to enhance the processing of talc-bearing ore types at the Mt Keith mine operating at around 100,000 tonnes per annum.
Click for more details...
GROOTE EYELANDT MANGANESE OPERATIONS EXPANSION
Mining - Primary And Secondary Processing (Minerals Processing) project at At, Groote Eylandt, NT 0822 for New. Part of a project to expand production from 4.2 million tonnes per annum (Mtpa) to 4.8Mtpa along with road & port capacity to 5.9Mtpa. Processing plant upgrade to include replacement of desliming screens with banana screens & a new lump bypass facility in the heavy media circuit. Replacement of stacker & hopper cars at the port stockpile. Increase of the ship loading conveyor & road train receival capacities. Upgrade of 2 intersections on the Rowell Highway.
Click for more details...
MULGA ROCK URANIUM PROJECT - PILOT PLANT
Mining - Primary And Secondary Processing (Minerals Processing) project at Via Tropicana Gold Mine access Rd, 120km SE of, Menzies, WA 6436 of Pilot Plant type of New development. For the provision of a pilot plant for metallurgical testwork of bulk samples.
Click for more details...
|
|