State

Categories

Sub Categories

Click Here to Find Current Projects

List of Minerals Processing Projects in NSW


HILLGROVE PROJECT - GOLD & ANTIMONY RESOURCE
Mining - Primary And Secondary Processing (Minerals Processing) project In The Armidale Dumaresq Council Area of Private ownership. Inferred resource is 3.9 Mt @ 5.1 g/t Au & 2% Sb. A deposit of tungsten is also part of the project. The mine is expected to produce 10,000 tonnes of antimony metal, 20,000 ounces of gold and 300 tonnes of tungsten per annum. Click for more details...

RASP SILVER LEAD & ZINC OPERATIONS EXTENSION - PROCESSING PLANT
New project of Mining - Primary And Secondary Processing (Minerals Processing) project at via, Broken Hill, NSW 2880. A plant to handle increased Stage 2 production of 750,000 tonnes per annum (tpa) ore throughput to produce an average of 65,000tpa zinc concentrate (50% zinc) & 35,000tpa lead concentrate (70% lead) containing 800,000 ounces silver. Click for more details...

RASP SILVER LEAD & ZINC OPERATIONS EXTENSION
Mining - Primary And Secondary Processing (Minerals Processing) project for New development. Continuation of production at the Rasp Mine through a combination of open cut & underground workings. The existing Kintore open cut pit to be extended over 4 years for an anticipated 1.5-2 million tonnes (Mt) production comprising 16% lead plus zinc & 200g/t silver. A decline from the existing Kintore pit allows underground access to another 10Mt in the previously unmined Western & Centenary Mineralisations. Initially underground workings will focus on high grade pillars with the ore trucked out for processing at the Endeavour Mine. Construction of a processing plant to accommodate Stage 2 follow on underground mining of the Western & Centenary lodes for around 750,000 tonnes per annum (tpa). Power, water and rail access already connected to the site with buildings, workshops and general amenities also in place. Click for more details...

HILL END PROJECT - GOLD RESOURCE
Mining - Primary And Secondary Processing (Minerals Processing) project at 2 km northwest of, Hill End, NSW 2850 for New. The plant is processing material from the test drive on the M2 vein set, which has averaged over two ounces per tonne recovered grade with some material producing over four ounces per down. About 80 tonnes of M2 material have been stockpiled from the high grade north end of the test drive, which face sampling indicated would contain up to four ounces per tonne. An additional 200 tonne M2 stockpile of various grades is ready to be processed and narrow driving on the high grade M2 is continuing to the north and south of the test drive to produce plant feed material. Click for more details...

HILL END GOLD PROJECT - HAWKINS HILL/REWARD
Mining - Primary And Secondary Processing (Minerals Processing) project In The Bathurst Council Area of Mining/Processing Equipment - Supply type. The company has sourced some additional mining & processing equipment. Click for more details...

GLOUCESTER RUBY MINE
Mine - Rubies project at Mid way between Scone and, Gloucester, NSW 2422 In The Council Area Of Gloucester of Private. Mine production for December Quarter 2006 was 15,281 tonnes of gemstones. Click for more details...

HILL END GOLD PROJECT - PROCESSING FACILITIES UPGRADE
A project in the NSW Within Bathurst. Upgrade and recommissioning the Amalgamated gravity plant. Major work will be the installation of a gold room. The plant will be used for the bulk sampling program. Click for more details...

ENDEAVOUR BASE METALS OPERATIONS - ELURA
Mining - Primary And Secondary Processing (Minerals Processing) project for New development. The former Elura mine has now been renamed Endeavour. Various efficiencies including use of road trains for haulage have been introduced. Optimisation of the plant is planned by increasing flotation capacity. Click for more details...

COWAL GOLD PROJECT - ENDEAVOUR 42/ENDEAVOUR 46
Mining - Primary And Secondary Processing (Minerals Processing) project at Approx 45 kms north east of, West Wyalong, NSW 2671 of Resource - Gold/Infrastructure/Plant type of New development. The Cowal project has proven and probable reserves of 2.8 million ounces. The mine is expected to produce 220,000 to 235,000 ounces of gold per year on average. Mine and process plant construction is expected to take 21 months. Click for more details...

TRITTON COPPER PROJECT
Mining - Primary And Secondary Processing (Minerals Processing) project In The Bogan Council Area of Private ownership. Includes a 660,000 tpa copper concentrator (expandable to 900,000 tpa), a tailings dam and surface infrastructure such as roads and bridges. Click for more details...

CML 7 BROKEN HILL BASE METALS PROJECT
Mining - Primary And Secondary Processing (Minerals Processing) project at via, Broken Hill, NSW 2880 of Resource - Base Metals type of New development. Drilling to date has successfully intersected the shallow zinc lode mineralisation over a strike length of 120 metres with an average width of 80 metres. Drill intersections range from 4 to 13 metres at grades averaging greater than 10% lead and zinc. Click for more details...

ADELONG GOLD PROJECT - CHALLENGER
Mining - Primary And Secondary Processing (Minerals Processing) project for Renovations, Refurbishments etc. development. A crushing plant has been purchased and two ball mills installed. Click for more details...

REWARD GOLD PROJECT
Mining - Primary And Secondary Processing (Minerals Processing) project for New development. Inferred resource estimate of 124,400 tonnes @ 19 g/t Au for 75,900 ounces of gold. If the trial mining and sampling studies are successful at the Exhibition area then underground mining will conducted at the rate of 100,000 tonnes @ 20-30 g/t. The process plant has been redesigned and commissioning has commenced. In addition to the gravity sampling plant, which has a nominal capacity of 5 tonnes per hour, a mini-bulk sampling facility is being established on site for gold recovery from small development samples to provide a qualitative assessment of the vein sets as development proceeds. Click for more details...

CSA COPPER OPERATIONS - CONCRETE REMOVAL
Mining - Primary And Secondary Processing (Minerals Processing) project In The Cobar Council Area of Concrete Removal type. This package may be combined with Steel Work contract ID: 2155418. Decision is yet to be made whether concrete may be replaced with steel flooring. Click for more details...

BROULA KING GOLD PROJECT - TREATMENT PLANT
Mining - Primary And Secondary Processing (Minerals Processing) New project at 2715 Mid Western Highway, Bumbaldry, NSW 2794. This type is Treatment Plant with Private ownership. For the construction of a gold treatment plant. Click for more details...

RIDGEWAY UNDERGROUND GOLD MINE - NEW UNDERGROUND PRIMARY CRUSHER
Mining - Primary And Secondary Processing (Minerals Processing) project at 50 Km West of, Cargo, NSW 2800 for New. The proposal to extend underground operations at Ridgeway includes the installation of a new primary crusher approx 360 metres lower in the mine workings. Click for more details...

LIDDELL POWER STATION - REMOVAL OF ASH/DUST PLANT
Via, Liddell, NSW 2333 Has Liddell Power Station - Removal Of Ash/Dust Plant currently at Construction stage. The contract involves surveying the plant outline and producing cabling/wiring diagrams. Supply and commissioning new 115 V AC Power supplies. Supply and commissioning a new relay cabinet to control various items of plant. Install new start stop relays to motor control cubicles and modify control circuits. Recable direct from PLC cabinets or new relay cabinets to solenoid control cabinets at various locations. Splice or join dust solenoid control cables. Replace dust pump gland seal pressure switches with transmitters including PLC harware and cabling. Replace cabling to A Ash Train gland seal pressure switches. Install improved local dump valve position indication. PLC programme modifications. Removal of existing A & D cabinets and miscellaneous repairs to cabinets and doors. Click for more details...

LIDDELL POWER STATION - MAINTENANCE CONTRACT
Currently at the Construction stage In Muswellbrook is a project estimated to be $ 500000. This project The work covered by this specification generally encompasses the inspection, reporting, repairs, routine maintenance and emergency breakdown work on the Liddell Coal handling Plant and Hunter Valley gas Turbines for a period of two years. Click for more details...

LIDDELL POWER STATION - WATER TREATMENT PLANT BUND REPAIRS
A project in the NSW Within Muswellbrook. The work involves improving the bulk chemical containment systems employed in the water treatment plant. Click for more details...

ENDEAVOR BASE METAL OPERATIONS - COPPER RECOVERY CIRCUIT
Mining - Primary And Secondary Processing (Minerals Processing) project at 40 Km North west of, Cobar, NSW 2835 for New. Copper recovery circuit is in design. Construction is expected to commence shortly. Testwork and detailed design has been completed. The circuit will treat the lead concentrate to extract a copper concentrate estimate to be 1000 tonnes of copper per annum. Click for more details...

BERRIMA CEMENT WORKS - NO 7 CEMENT MILL
A project in the NSW Within Wingecarribee. The capacity of the new mill will be approximately 800,000 tonnes per year which is an increase of 400,000 tonnes per year above the existing cement milling capacity. The new mill will use the existing feed system and recently installed high efficiency separator from Cement Mill 5, and will be installed in a new building located in the centre of the Works adjacent to the existing mills. A new dust collector will be installed to further reduce dust emissions. No major earthworks will be required for the development. Click for more details...

HILLGROVE GOLD/ANTIMONY DEMONSTRATION PLANT
Demonstration Processing Plant project at 25 Km East of Armidale, at, Hillgrove, NSW 2350 in the Mining - Primary And Secondary Processing (Minerals Processing). To construct a 250,000 Mtpa plant. Some components of the exisiting processing plant at the mine site may be utilised in the demonstration plant. Click for more details...

BROULA MAGNETITE & LIMESTONE PROJECT - PROCESSING PLANT & DISTRIBUTION FACILITY
Processing Plant/Distribution Facility project at 10km West South West of, Cowra, NSW 2794 In The Council Area Of Cowra of Private. For the development of a processing plant and distribution facility, to process the deposit which contains around 900 000 tonnes of recoverable magnetite, contained within 1.3 million tonnes of ore, and a simlar quantity of limestone. The ore is to be mined via open cut methods. Click for more details...

BROKEN HILL SEPARATION PLANT UPGRADE - RUTILE CIRCUIT
Mining - Primary And Secondary Processing (Minerals Processing) project In The Broken Hill Council Area of Rutile Circuit type. For a 650,000 tpa fixed plant for heavy mineral concentrate. Rutile circuit to be one package. Click for more details...

BROKEN HILL SEPARATION PLANT UPGRADE - WET MAGNETIC SEPARATOR CIRCUIT
Mining - Primary And Secondary Processing (Minerals Processing) project for New development. Gravity wet plant for a 650,000 tpa facility is to be one package. Click for more details...

WONAWINTA SILVER LEAD ZINC PROJECT - PROCESSING PLANT
Processing Plant project at 80km approx south of, Cobar, NSW 2835 In The Council Area Of Cobar of Private. Metallurgical testwork has indicated that crushing & grinding may not be required & a washing and scrubbing circuit may be sufficient to prepare the ore for processing. The majority of silver can be recovered as bullion by cyanidation treatment of the ore. Lead and residual silver can be recovered as by-product credits by producing a gravity concentrate. Preliminary modelling is based on a nominal output of 3m ounces of silver per annum. Click for more details...

MOUNT BOPPY GOLD MINE RECOMMENCEMENT
Mining - Primary And Secondary Processing (Minerals Processing) New project at 46km East of, Cobar, NSW 2835. This type is Mine - Recommencement with Private ownership. Mount Boppy Mine recommencement. Ore to be delivered to the recently refurbished Manuka Silver Mine (formerly Wonawinta Silver Mine) Processing Plant for processing. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect