WEIPA BAUXITE OPERATIONS - LORIM POINT/NEWEIPA
Stacker - Erection & Miscellaneous Work project at At, Weipa, QLD 4874 in the Mining - Primary And Secondary Processing (Minerals Processing). At Lorim Point. Click for more details...

CRACOW GOLD PROJECT
Mining - Primary And Secondary Processing (Minerals Processing) project In The Banana Shire Council Area of Private ownership. Dismantling of some of the process equipment prior to refurbishment of the plant. Click for more details...

CRACOW GOLD PROJECT - KLONDYKE/ROYAL SHOOT/CROWN/ROSES PRIDE
Currently at the Construction stage In Banana Shire is a project estimated to be $ 500000. This project CIL tankage. Click for more details...

CRACOW GOLD PROJECT - KLONDYKE/ROYAL SHOOT/CROWN/ROSES PRIDE
Private ownership Mining - Primary And Secondary Processing (Minerals Processing) project In The Banana Shire Council Area for Renovations, Refurbishments etc. development. The development scheme involves refurbishing and upgrading the existing treatment plant and infrastructure at Cracow. Ore processing is based on a mining rate of 250,000 tonnes per year and involves the introduction of a third stage of crushing and additional grinding capacity. Click for more details...

KUNWARARA MAGNESITE OPERATIONS - KG2 EXTN
A project in the QLD Within Rockhampton Regional. Installation of a new crushing and screening circuit. Click for more details...

ROSEBY COPPER PROJECT - PROCESSING FACILITY
New project of Mining - Primary And Secondary Processing (Minerals Processing) project at North west of, Cloncurry, QLD 4824. The process plant is to be located immediately adjacent the Blackard Pit. The basic processes include: primary crushing, comprising feed bin, apron feeder, crusher and dust suppression, grinding in a single stage SAG mill and classification in cyclones, optional stockpiling of primary crushed or to de-couple the grinding and flotation processes for the crushing operations, rougher and scavenger flotations, rougher concentrate regrinding to improve final concentrate grade, two stages of cleaner flotation, concentrate thickening and filtration and filter cake storage before transportation, tailings thickening and disposal storage facility and reagents preparation and services. The process plant has been designed to treat approximately 3 Mtpa of sulphide feed, as this will be the case for the initial 4 years of production. Following this, the processing plant may require adaptation to process oxide ores, as the style of ore mineralisation vary. These throughputs are based on a 24 hour per day, 7 days per week operations. The flotation concentrate would be saleable for smelter feed. The proposed process plant comprises the following: Run of Mine (ROM) ore bin fed by either a front end loader or by trucks direct tipping ore, grizzly feeder to remove fines less than 150mm, conveyor feeding combined grizzly and crusher products to the mill, a SAG mill with single 3 MW drives, a ball miss with single 3MW drive, two sets of rougher/scavenger flotation cells (2x7x160 cubic metres), concentrate regrind mill with 550kW drive, cleaner flotation cells (6x50 cubic metres cells), recleaner flotation (4x20 cubic metres cells), concentrate thickening and filtration, reagents, air and water services and pumps, service cranes and hoists. Click for more details...

ROSEBY COPPER PROJECT - EXPLORATION JOINT VENTURE
Mining - Primary And Secondary Processing (Minerals Processing) project at North west of, Cloncurry, QLD 4824 of Processing - Sulphide Mineralisation type of New development. Likely to involve modifications to circuits at the Oxide processing facility, which incorporates grinding and flotation. To be developed at a later date. Click for more details...

MOUNT GARNET ZINC PROJECT TREATMENT FACILITY EXPANSION
Mining - Primary And Secondary Processing (Minerals Processing) Addition project at Via, Mount Garnet, QLD 4872. This type is Treatment Facility - Expansion/Dedicated Copper Circuit with Private ownership. An upgrade to increase plant capacity from the current 90,000 tonnes of concentrate per annum to 148,000 tonnes per annum. The zinc concentrate output will increase from 70,000 tonnes per annum to 110-120,000 tonnes per annum. A dedicated copper circuit will be installed as part of the upgrade. Click for more details...

DRUMMOND BASIN PROJECT - WIRRALIE
Mining - Primary And Secondary Processing (Minerals Processing) project In The Whitsunday Regional Council Area of Private ownership. Preliminary feasibility study results show heap leach processing, rather than using existing plant could improve economics. Click for more details...

YABULU NICKEL REFINERY EXTENSION - COOLING WATER TOWER CONTRACT
Mining - Primary And Secondary Processing (Minerals Processing) project at Refinery site at, Yabulu, QLD 4818 for New. The existing standby turbine alternator will be changed to generate power as required in conjuction with other units on site. The low pressure steam exhausted from the turbine in addition to other steam supplies on site will be reticulated throughout the site to the new plant for heating and process requirements. The capacity of the existing cooler water systems will be augmented by the addition of a new cooling tower to cater for the additional heat loadings. Click for more details...

YABULU NICKEL REFINERY EXTENSION - MHP RECEIVAL/TREATMENT FACILITIES CONTRACT
New project of Mining - Primary And Secondary Processing (Minerals Processing) project at Refinery site at, Yabulu, QLD 4818. Contract package 4 involves a MHP leach area, ammonical solvent extraction area and a stripping stills and gas absorption area. This package involves construction on top of concrete, structural, mechanical, piping, electrical, instrumentation and controls for what are generally hydrometallurgical facilities. The contract involves both greenfield and brownfield work. The MHP Receival & Treatment Facilities include container storage and unloading and primary and secondary leaching facilities. The intermediate product (MHP) from Ravensthorpe will be received at Yabulu where it will be stockpiled in a weatherproof environment prior to feeding into a two stage leaching process. New material handling equipment will be constructed to process the additional MHP. Extension of the existing utilities plant will be required to provide additional power, steam and process gases. This includes a package plant for nitrogen generation by the pressure swing absorption process. Anhydrous ammonia will be imported to supplement ammonia currently produced on site. Click for more details...

AURUKUN ALUMINA PROJECT - BAUXITE RESOURCE
A project in the QLD Within Weipa Shire. Preferred development is a mine based on the Aurukun bauxite resource, a washing plant at the mine site, and a new alumina refinery of at least 600,000 tonnes per annum output located in either Bowen, Townsville or Gladstone and all necessary supporting infrastructure and associated facilities. A resource of 480 Mt of dry beneficiated bauxite. Click for more details...

MOUNT MOSS PROJECT - MAGNETITE/COPPER/ZINC RESOURCE
Resource - Magnetite/Copper/Zinc project at Ewan Road via, Greenvale, QLD 4816 In The Council Area Of Charters Towers Regional of Private. Resource estimate is 3.5 Mt of magnetite ore and 600,000 tonnes of copper oxide ore. The operation comprises of open cut mining of magnetite, copper and zinc in one to three pits. Processing facility for the crushing and magnetic separation/enrichment of magnetite, stockpile area and loadout facilities and vat leaching processing facility for the production of copper concentrate. Other infrastructure included the upgrade of a 30 km haul road, waste rock dumps, ore stockpiles and the upgrade of an accommodation camp for 60 persons. Click for more details...

ALICE RIVER GOLD MINE
Cape York Peninsula 140 km northwest of, Laura, QLD 4871 Has Alice River Gold Mine currently at Planning stage. The Company plans to produce gold from tailings, underpinned by pre-existing on site and fully operational infrastructure including: a CIP Processing Plant, a water supply dam, a Tailings dam with a capacity of approximately 200,000 tonnes, and accessibility by road and air. Accommodation units, laboratory, communications facilities are also included. Click for more details...

MOUNT GORDON COPPER OPERATIONS
Mining - Primary And Secondary Processing (Minerals Processing) project at 155 km north of, Mount Isa, QLD 4825 of Mine/Infrastructure type of New development. Resource estimate is 495,000 tonnes of contained copper metal. Recent drilling at the Mammoth deposit has increased the resource estimate and the mine life has now been extended to late 2008. Click for more details...

LEICHARDT COPPER OPERATIONS - MOUNT CUTHBERT- PROCESSING PLANT
Private ownership Mining - Primary And Secondary Processing (Minerals Processing) project In The Cloncurry Shire Council Area for New development. The plant is a 5500 tpa solvent extraction/electrowinning (SX/EW) facility with associated leach pad and pond system. Supporting infrastructure includes roads, airstrips, power station, water supply, environmental protection facilities and an accommodation village. Click for more details...

DRUMMOND BASIN PROJECT - WIRRALIE
Processing Facility - Refurbishment Renovations, Refurbishments etc. project In The Whitsunday Regional Council Area. 1.5Mtpa CIP/CIL treatment plant. Heap leaching is now under consideration as a more economically attractive option. Click for more details...

TEXAS SILVER PROJECT - TWIN HILLS - RESOURCE
Currently at the Construction stage In Southern Downs Regional is a project estimated to be $ 20000000. This project Resource estimate is 44.5 million ounces of silver. Measured resource is 7.37 million ounces, Indicated resource is 13.15 million ounces and inferred is 23.98 million ounces. Click for more details...

GLADSTONE INTERNATIONAL NICKEL PROJECT - MARLBOROUGH
Mining - Primary And Secondary Processing (Minerals Processing) project In The Gladstone Regional Council Area of Processing Plant type. Processing of laterite ore. Ore likely to be sourced from New Caledonia via Cape size shipping through Gladstone's deepwater port, supplemented by ore from the deposits at Marlborough. This is likely to be a two stage development. Stage one to 65,000 tpa producing nickel cobalt suplhide will involve a 4 autoclave plant. Stage two would be likely to involve doubling of capacity. Click for more details...

KOGAN CREEK POWER PROJECT
Currently at the Construction stage In Western Downs Regional is a project estimated to be $ 5000000. This project Detailing, procurement, fabrication and erection of 2660 to structural steel works painted, 57 to sundry metal works, 3200m2 hot-dip galvanised gratings, 2420m railings, 210m step ladders. Click for more details...

CRACOW GOLD PROJECT - KLONDYKE/ROYAL SHOOT/CROWN/ROSES PRIDE
Surface Works New project In The Banana Shire Council Area. Includes excavation of box cut. Click for more details...

YABULU NICKEL REFINERY INCORPORATED INTO ID 4191956
Mining - Primary And Secondary Processing (Minerals Processing) Addition project at via, Yabulu, QLD 4818. This type is Gas Plant - For Product Processing Expansion with Private ownership. Extension of the existing utilities plant will be required to provide additional power, steam and process gases. This includes a package plant for nitrogen generation by the pressure swing absorption process. Anhydrous ammonia will be imported to supplement ammonia currently produced on site. Click for more details...

YABULU NICKEL REFINERY
Mining - Primary And Secondary Processing (Minerals Processing) project In The Townsville City Council Area of Private ownership. Gas scrubbing system to recover ammonia for re-use. Part of project to increase prodcution of cobalt. Click for more details...

RAVENSWOOD GOLD OPERATIONS - SARSFIELD
Mining - Primary And Secondary Processing (Minerals Processing) project at via, Ravenswood, QLD 4816 for New. The crushing circuit from the now-closed Kidston gold mine is being relocated to Sarsfield. Click for more details...

MOUNT ISA MINES COPPER SMELTER
Mining - Primary And Secondary Processing (Minerals Processing) project at At, Mount Isa, QLD 4825 for New. A leaching project to recover around 2,500 tonnes of additional copper per annum from electrostatic precipitator dust in the Mount Isa copper smelter. Click for more details...

MOUNT ISA MINES COPPER SMELTER - EXPANSION STAGE ONE
Mount Isa Mines Copper Smelter - Expansion Stage One is currently at the Construction stage, valued at about $ 410000 it is The expansion includes installation of a second rotary holding furnace, a copper slag cleaning furnace, a converter slag treatment plant and associated plant, all designed to increase the smelter's capacity from 240,000 tpa to 280,000 tpa. Click for more details...

TEXAS SILVER PROJECT - TWIN HILLS
Mining - Primary And Secondary Processing (Minerals Processing) project at Via, Texas, QLD 4385 for New. Mobile Crushing Plant comprising jaw crusher, screens and core crusher and will be on site early April 2005. Click for more details...

TEXAS SILVER PROJECT - SILVER SPUR SLAG DUMP
Private ownership Mining - Primary And Secondary Processing (Minerals Processing) project In The Goondiwindi Regional Council Area for New development. The slag heap at Silver Spur is a potentially valuable resource. Click for more details...

CHARTERS TOWERS GOLD OPERATIONS - UNDERGROUND MINING
Mining - Primary And Secondary Processing (Minerals Processing) project at Via, Charters Towers, QLD 4820 of Underground Mining type of New development. Company personnel are currently undertaking development to the ore zone. A contract is likely to be repriced involving further development work. Company personnel will then concentrate on production. Click for more details...

COLLINGWOOD TIN PROJECT - PLANT/INFRASTRUCTURE
Mining - Primary And Secondary Processing (Minerals Processing) project at 35 km south of, Cooktown, QLD 4871 for New. Water only gravity concentration process. Click for more details...

TWIN HILLS GOLD PROJECT - PROCESSING PLANT
Approx 40 km east of, Charters Towers, QLD 4820 Has Twin Hills Gold Project - Processing Plant currently at Construction stage. Rishton Treatment Plant was acquired and a gravity circuit will be added, some tanks will be converted for CIL and enhanced gold security provisions will be made. A sediment dam is to be constructed. Power plants will also be installed for the crushing circuit and the processing circuit. Click for more details...

TEXAS SILVER PROJECT - TWIN HILLS - EARTHWORKS/LEACH PONDS
Mining - Primary And Secondary Processing (Minerals Processing) project at Via, Texas, QLD 4385 for New. Construction of the base for the Heap Leach Pads and excavate the sites for the three (3) proposed Leach Ponds. Upgrading of the mine access road will also be carried out. Click for more details...

YABULU NICKEL REFINERY EXTENSION - INITIAL SITE INFRASTRUCTURE CONTRACT
Refinery site at, Yabulu, QLD 4818 Has Yabulu Nickel Refinery Extension - Initial Site Infrastructure Contract currently at Construction stage. Scope of the work involves mainly roads and some early site concrete. Click for more details...

YABULU NICKEL REFINERY EXTENSION - CARBONATE FACILITY
Mining - Primary And Secondary Processing (Minerals Processing) project at Refinery site at, Yabulu, QLD 4818 of Basic Nickel Carbonate Facility Contract type of New development. Scope of work involves the construction of two large tanks, a thickner and associated pipework. Click for more details...

YABULU NICKEL REFINERY EXTENSION - SITE WIDE CONCRETE CONTRACT
New project of Mining - Primary And Secondary Processing (Minerals Processing) project at Refinery site at, Yabulu, QLD 4818. Scope of work involves concrete work to the entire refinery site. Click for more details...

YABULU NICKEL REFINERY EXTENSION - WATER TREATMENT/RETICULATION CONTRACT
Water Treatment & Reticulation Contract New project In The Townsville City Council Area. The existing standby turbine alternator will be changed to generate power as required in conjuction with other units on site. The low pressure steam exhausted from the turbine in addition to other steam supplies on site will be reticulated throughout the site to the new plant for heating and process requirements. The capacity of the existing cooler water systems will be expanded involving water treatment and reticulation. Click for more details...

SARAJI COAL MINE THICKNER PLANT CONVERSION
Mining - Primary And Secondary Processing (Minerals Processing) project In The Isaac Regional Council Area of Private ownership. A 35m thickner plant was installed in 2004 and will be upgraded to improve efficiency of tailings disposal. Work comprises the design, removal of existing equipment, civil construction, installation of the high rate thickner. Associated works involve piping, pumps, structural and mechanical works. Electrical installation and recommissioning are also part of the work. Click for more details...

MUNGANA PROJECT PROCESSING PLANT
Private ownership Mining - Primary And Secondary Processing (Minerals Processing) project In The Tablelands Regional Council Area for New development. A polymetallic plant would be constructed to treat lead, zinc and molybdenum sourced from the surrounding deposits at Red Dome and Mungana. The treatment facility will more than double zinc production to 100 000 tonnes of contained zinc resulting in a significant reduction in costs. Click for more details...

MOUNT ISA MINE COPPER SMELTER - EXPANSION STAGE TWO
Mining - Primary And Secondary Processing (Minerals Processing) New project at At, Mount Isa, QLD 4825. This type is Smelter Expansion - Stage 2 with Private ownership. The copper smelter's capacity will be upgraded from 280,000 to 300,000 kt anode. This will involve the installation of a slag clearing furnance, converter slag crushing plant and two new oxygen plants. As part of the upgrade, the Townsville copper refinery capacity will be upgraded from 280,000 to 300,000 kt cathode. Click for more details...

TWIN HILLS GOLD PROJECT - LONE SISTER - RESOURCE
Private ownership Mining - Primary And Secondary Processing (Minerals Processing) project In The Charters Towers Regional Council Area for New development. Resource estimate is 435,000 tonnes @ 7.3 g/t containing 102,000 ounces of Au. Part of the mine planning involves the feasibility of processing high grade ore through a conventional CIP treatment plant and low grade material for heap leach recovery of gold. The plant is proposed to be located at the mine site to save transporting 280 Km to the Rishton treatment plant. Click for more details...

LUCKY BREAK HEAP LEACH PROJECT (NORNICO STAGE 2) - COMMERCIAL PLANT
Mining - Primary And Secondary Processing (Minerals Processing) project at Gregory Development Rd south of, Greenvale, QLD 4816 for New. For a 250,000 tpa plant to run 4-5 years. The building will be 40m x 60m & likely to be prefabricated. Click for more details...

WOLFRAM CAMP PROJECT - PROCESSING PLANT
15 Km North west of, Dimbulah, QLD 4872 Has Wolfram Camp Project - Processing Plant currently at Construction stage. Construction of a 150,000 tpa treatment plant. The developer has sourced a suitable second hand ball mill and is inspecting a second hand front end crushing and screening facility. Click for more details...

HANDLEBAR HILL ZINC & LEAD PROJECT
Mining - Primary And Secondary Processing (Minerals Processing) project In The Mt Isa City Council Area of Private ownership. Recent drilling, metallurgical testing and design has confirmed a 3.4 million tonne open pit reserve in an area south of the George Fisher underground mine. Ore will be mined at a rate of up to 1.75 million tonnes per annum, crushed at George Fisher and trucked to the Mount Isa zinc-lead concetrator from mid 2008. The concentrator is currently being expanded from 6.5mtpa to 8mtpa. The open cut mine has an expected life time of two and a half years with the potential for underground mining operations into the future. Click for more details...

MT COOLON CENTRAL TREATMENT PLANT
Mining - Primary And Secondary Processing (Minerals Processing) project at Via, Mount Coolon, QLD 4804 for New. For the construction of a central treatment plant and related infrastructure. Click for more details...

SHEPTON QUARRY UPGRADE
Crushing Plant project at 15kms of Capella, Capella, QLD 4702 in the Mining - Primary And Secondary Processing (Minerals Processing). Design, construction, installation, delivery & commissioning of a new crushing plant. Click for more details...

GEORGINA BASIN PHOSPHATE PROJECT - FERTILISER COMPLEX
Mining - Primary And Secondary Processing (Minerals Processing) project at MICA CREEK 10km south of, Gunpowder, QLD 4825 for New. Chemical processing including a 1600ktpa sulphuric acid plant, a 600ktpa phosphoric acid plant, a 1200ktpa Di/Mono Ammonium Phosphate (DAP/MAP) plant & a 30ktpa aluminium fluoride plant. Associated utilities & facilities. Click for more details...

GEORGINA BASIN PHOSPHATE PROJECT - PARADISE BENEFICIATION PLANT
Mining - Primary And Secondary Processing (Minerals Processing) New project at 120km north of MT ISA near, Gunpowder, QLD 4825. This type is Beneficiation Plant with Private ownership. Construction of a 1 million tonne per annum (Mtpa) beneficiation plant. To include rotary screen, rod mill, hydro-cyclone, feed filters, flotation cells, tailing & concentrate thickeners. Click for more details...

DUGALD RIVER BASE METAL PROJECT CRUSHING & SCREENING PLANT
A project in the QLD Within Mt Isa City. Crushing & screening plant for an underground mining operation of 2million tonnes per annum (Mtpa) of zinc/lead/silver plus 1Mtpa of copper for 200,000tpa zinc concentrate. Click for more details...

DUGALD RIVER BASE METAL PROJECT - CONCENTRATOR
Concentrator Plant/Associated Plant New project In The Mt Isa City Council Area. The concentrator will have an annual production of approximately 160,000 tonnes of zinc in zinc concentrate, plus by-products, over an estimated 28 year mine life. Click for more details...

AMRUN (SOUTH OF EMBLEY) BAUXITE PROJECT - PROCESS FACILITY
Mining - Primary And Secondary Processing (Minerals Processing) project for New development. For the provision of a process plant. The package will be issued for bid as one package with the following separable parts. Part A: Off-site Assembly of modules including, but not limited to: Modularised bauxite beneficiation plant (including concrete foundations), Modules are nominally 15m(W) x 25m(L) x 20m(H) & up to 1,200 metric tonnes, Primary & secondary sizer structures, Tertiary crushing structure, Transfer stations, Conveyor galleries, Conveyor ground modules. The expectation is that the Tenderer will utilise to the maximum extent possible, modularised structures to reduce manning levels required on-site. Part B: Installation of the modules on Site, Supply of all labour, tools, supervision, quality assurance, temporary storage & workshop facilities, construction plant & equipment, materials, services, ancillary equipment, utilities, consumables & perform all installation & testing necessary. Click for more details...