List of Minerals Processing Projects in VIC


AUGUSTA/COSTERFIELD PROCESSING FACILITY
Currently at the Construction stage In Greater Bendigo is a project estimated to be $ 10000000. This project Development comprises the modification and and refurbishment of the existing Costerfield CIL plant and the construction of a new crushing/processing plant. Work comprises earthworks; contract project management, layout and design drafting for various sections of the plant; sourcing, inspecting and acquiring various items of second hand equipment; design of main and distribution switchboards, current limiting device and main switch for installation adjacent to transformer substation reserve; refurbishment of float cells, Knelson concentrators and process circuit pumps. Click for more details...

FOSTERVILLE GOLD OPERATIONS
Processing Facility project at Near Fosterville 20 km northeast of, Bendigo, VIC 3550 in the Mining - Primary And Secondary Processing (Minerals Processing). Gold Fields Ltd's BIOX process has been selected as the preferred technology for the treatment of Fosterville mineralisation. BIOX is a patented bacterial process designed to break down the suphide lattcie that contains the gold in the Fosterville mineralisation, enabling subsequent extraction by conventional cyanidation. Click for more details...

FOSTERVILLE GOLD OPERATIONS
Mining - Primary And Secondary Processing (Minerals Processing) project In The Greater Bendigo Council Area of Private ownership. Two separate packages. Click for more details...

BENAMBRA BASE METALS PROJECT
18 km northeast from, Benambra, VIC 3900 Has Benambra Base Metals Project currently at Early Planning stage. The Benambra Mine Reopening Study is substantially complete; the principal outstanding matters relate to the Victorian Department of Natural Resources & Environment (DNRE) approval of the Company's Workplan & the level of environmental bonding. Click for more details...

FOSTERVILLE GOLD OPERATIONS
Mining - Primary And Secondary Processing (Minerals Processing) New project at Near Fosterville 20 km northeast of, Bendigo, VIC 3550. This type is Ccd Thickener with Private ownership. Design & suply of CCD thickener. Click for more details...

NEW BENDIGO GOLD PROJECT - TREATMENT PLANT
Mining - Primary And Secondary Processing (Minerals Processing) project In The Greater Bendigo Council Area of Treatment Plant - Carshalton type. 0.3mtpa concentrator. 600,000 t/y plant capacity. Click for more details...

NEW BENDIGO GOLD PROJECT - KANGAROO FLAT MINE - RESOURCE
Mining - Primary And Secondary Processing (Minerals Processing) New project at via, Bendigo, VIC 3550. This type is Operating Mine with Private ownership. The plant is currently treating low-grade ore which was stockpiled during mining operations in 2006/2007. The first ore parcel from Gill reef is planned to be processed in late June, with trial gold production ramping up during the September 2008 quarter. Click for more details...

DOUGLAS MINERAL SANDS PROJECT
Turnkey Contract - Design & Project Management Of Processing Facilities New project In The West Wimmera Council Area. Includes design, procurement, construction & commissioning of the mineral sands processing facilities and associated infrastructure. Click for more details...

BALLARAT EAST GOLD PROJECT - PROCESSING FACILITY
Currently at the Construction stage In Ballarat is a project estimated to be $ 15000000. This project The plant has a staged construction. Initial production planned at 500,000 tpa, expanding to 800,000 tpa. Includes a conventional front end, with a jas crusher feediNg a SAG mill. An inline pressure jig (modern high yield) is used to concentrate the ore, with fine gold removed via a Falcon separator and coarse gold via an Inline Spinner (gravity separation device. The final product will go to an intensive cyanide leach circuit. Click for more details...

FOSTERVILLE GOLD OPERATIONS
Fosterville Gold Operations is currently at the Tenders & Building stage, valued at about $ 500000 it is One package for dosing pumps and another for peristatic pumps (hose pumps) . Click for more details...

NEW BENDIGO GOLD PROJECT -NORTHERN PROCESSING PLANT
New project of Mining - Primary And Secondary Processing (Minerals Processing) project at Via, Bendigo, VIC 3550. A 1.0mtpa concentrator. Click for more details...

MOUNT EGERTON GOLD TAILINGS PROJECT
Mining - Primary And Secondary Processing (Minerals Processing) project at 9 Blackhorse Lane, Mount Egerton, VIC 3345 for New. There are 25,000 tonnes of heap leach material to produce 12-15 kg gold. JORC compliant indicated resources 50,000 tonnes at 0.5 oz gold. Further exploration will continue for approximately 18 months. The proposed new joint venture partner will work on suring up the high grade resource to a mineable resource. Click for more details...

DONALD PROJECT - PILOT PLANT - DESIGN
Donald Project - Pilot Plant - Design is currently at the Planning stage, valued at about $ 1000000 it is Various pieces of equipment to be modified. Click for more details...

DONALD MINERAL SANDS PROJECT - EPCM CONTRACT
Currently at the Construction stage In Buloke is a project estimated to be $ 2000000. This project Ccommissioning to include minerals processing, conveyors, water infrastructure, site buildings & power infrastructure. Click for more details...

MURRAY BASIN STAGE 2 MINERAL SANDS PROJECT - WET CONCENTRATION PLANT
Currently at the Construction stage In Mildura is a project estimated to be $ 2000000. This project For the construction of a wet concentration plant. Click for more details...

INGLEWOOD GOLDFIELD PROJECT - PLANT RECOMMENCEMENT
Private ownership Mining - Primary And Secondary Processing (Minerals Processing) project In The Greater Bendigo Council Area for New development. A project on the historic Central Victorian Inglewood goldfield. Based on a resource estimate of 235,000 ounces (oz) from historic open pit & underground deposits. Recommissioning of the 90,000tpa CIP/CIL gold processing plant with associated equipment upgrades. Click for more details...

MURRAY BASIN STAGE 2 - KWR MINERAL SANDS PROJECT - PUMPS FOR PROCESSING PLANT
Mining - Primary And Secondary Processing (Minerals Processing) project at 28 km east of, Ouyen, VIC 3490 for New. Numerous pumps for the processing plant. Click for more details...

MURRAY BASIN STAGE 2 - KWR MINERAL SANDS PROJECT - SPIRALS FOR PROCESSING PLANT
Murray Basin Stage 2 - Kwr Mineral Sands Project - Spirals For Processing Plant is currently at the Planning stage, valued at about $ 1500000 it is For the provision of numerous spirals for the processing plant. Click for more details...

MURRAY BASIN STAGE 2 - KWR MINERAL SANDS PROJECT - SCREENS FOR PROCESSING PLANT
Screens - For Processing Plant project at 28 km east of, Ouyen, VIC 3490 In The Council Area Of Mildura of Private. For the provision of 3 screens for the processing plant. Click for more details...

MURRAY BASIN STAGE 2 - KWR MINERAL SANDS PROJECT - WHIMS MACHINES FOR PROCESSING PLANT
Whims Machines - For Processing Plant New project In The Mildura Council Area. For the provision of 7 wet high intensity magnetic separator (WHIMS) machines for the processing plant. Click for more details...

MURRAY BASIN STAGE 2 - KWR MINERAL SANDS PROJECT - STRUCTURAL STEEL & MECHANICAL FOR WHIMS BUILDING
New project of Mining - Primary And Secondary Processing (Minerals Processing) project at 28 km east of, Ouyen, VIC 3490. For the provision of structural steel & mechanical works for the wet high intensity magnetic separator building. Click for more details...

MURRAY BASIN STAGE 2 - KWR MINERAL SANDS PROJECT - ELECTRICAL FOR WET CONCENTRATOR
A project in the VIC Within Mildura. For the provision of electrical works for the wet concentrator. Click for more details...

MURRAY BASIN STAGE 2 - KWR MINERAL SANDS PROJECT - ELECTRICAL FOR WHIMS BUILDING
Electrical - For Whims Building New project In The Mildura Council Area. For the provision of electrical works & instrumentation for the wet high intensity magnetic separators building. Click for more details...

MURRAY BASIN STAGE 2 - KWR MINERAL SANDS PROJECT - ELECTRICAL FOR PRECONCENTRATOR PLANT
Currently at the Planning stage In Mildura is a project estimated to be $ 1200000. This project For the provision of electrical works for the preconcentrator plant. Click for more details...