State

Categories

Sub Categories

Click Here to Find Current Projects

List of Minerals Processing Projects in WA


DEPARTMENT OF INDUSTRY & RESOURCES
Mining - Primary And Secondary Processing (Minerals Processing) project for New development. A consultancy study of "Energy for Minerals Development in the South West Coast Region of Western Australia". Click for more details...

EMILY ANN NICKEL OPERATIONS
Mining - Primary And Secondary Processing (Minerals Processing) project at South of, Marvel Loch, WA 6426 for New. Milling/flotation circuit upgrade. Click for more details...

WESTONIA GOLD PROJECT - PROCESSING FACILITY - RELOCATION/RECOMMISSION
Currently at the Planning stage In Westonia is a project estimated to be $ 41000000. This project Disassembly, relocation, re-erection and commissioning of a 2.2 Mtpa plant. The plant is currently located at Big Bell and is proposed to be moved to the mine site. The mill is expected to produce over 75,000-80,000 ounces of gold per year. Click for more details...

HISMELT EXPANSION PROJECT
Private ownership Mining - Primary And Secondary Processing (Minerals Processing) project In The Kwinana Council Area for New development. One of three packages. Pipework. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - MOUNT NICHOLAS
Mining - Primary And Secondary Processing (Minerals Processing) New project at North east of, Newman, WA 6753. This type is Resource - Iron Ore with Private ownership. Resource estimate is 390 Mt. The ore at Mount Nicholas will be benificiated. Strip mining with progressive backfilling of the open pit will be the preferred mining method. Infrastructure to be constructed and shared at Mount Nicholas, Mount Lewin, Christmas Creek and Cloud Break will comprise a semi-mobile crusher; overland conveyors; haul road and or rail to benificiation plant; haul roads and access tracks; secondary crushers; screening plant; benificiation plant; iron ore product stockpile and train loading facilities; mobile plant and machinery workshop; construction of 132 kv transmission line to Newman with capcity upgrade at Newman or a 45 MW power station (to be provided and maintained by an external supplier); bulk hydrocarbon storage facility; explosive,detonater and magazines; Accommodation and camp facilities, administration and ancillary support facilities; concrete batching plant (during construction), 11 Glpa water supply from borefield supplemeted by mine dewatering; a reverse osmosis plant for portable water use. Click for more details...

YANDI IRON ORE OPERATIONS
Currently at the Planning stage In East Pilbara is a project estimated to be $ 20000000. This project Anticipated annual production of 5 million tonnes of ore. Includes construction of a 32 km spur line to link Yandicoogina with Mt Newman's Port Hedland-Newman railway line. Click for more details...

NULLAGINE PROJECT - BULLFINCH CIP PLANT
Private ownership Mining - Primary And Secondary Processing (Minerals Processing) project In The East Pilbara Council Area for New development. A larger facility may be required. Various options under consideration. Click for more details...

TUTUNUP MINERAL SANDS PROJECT
Approximately 14 km south of, Capel, WA 6271 Has Tutunup Mineral Sands Project currently at Construction stage. The haulage contract is for removal of the Wet Processing Plant from Sandalwood to Tutunup, expected to commence in September 2003. Click for more details...

WORSLEY ALUMINA REFINERY CAPITAL DEVELOPMENT PROJECT
Mining - Primary And Secondary Processing (Minerals Processing) project In The Collie Council Area of Private ownership. Includes deep cone washers. Click for more details...

FORRESTANIA NICKEL PROJECT - CONCENTRATE PLANT
Currently at the Construction stage In Yilgarn is a project estimated to be $ 35000000. This project The Stage 1 concentrate plant is designed with 250 000 tpa capacity and will initially treat ore from the high grade Flying Fox Nickel Mine. The proposed Stage 2 plant will have 650 000 to 700 000 tpa capacity and is intended to treat ore from Flying Fox, Diggers South and potentially the New Morning/Daybreak and Cosmic Boy deposits. Click for more details...

JAGUAR BASE METALS PROJECT - PROCESSING PLANT/MECHANICAL WORKS CONTRACT
A project in the WA Within Leonora. A centrally located processing facility to be located on the granted Teutonic Bore mining lease, 4 km to the north of the Jaguar deposit. A 350,000 tpa plant to treat ore by crushing, grinding and flotation. Copper and zinc concentrate production is expected to commence in July 2007, increasing to 10,000 tonnes of copper, 34,000 tonnes if zinc and 1 million ounces of silver in concentrate per annum over a six year period. Click for more details...

EASTERN RANGES PROJECT - PARABURDOO
Eastern Ranges Project - Paraburdoo is currently at the Construction stage, valued at about $ 1000000 it is Includes modifications to plant at existing facilities (brownfields) and new project area (greenfields). Conveyor work involved. Click for more details...

PAULSENS GOLD PROJECT
Mining - Primary And Secondary Processing (Minerals Processing) project at 180 km west of, Paraburdoo, WA 6754 for New. A high grade shallow underground mine including 250,000 Tpa CIL plant. Gold production was 488,260 tonnes @ 7.94 g/t for 117,266 ounces of gold since June 2005. Production is expected to be 75-80,000 ounces of gold per annum. Measured and Indicated resource is 1,105,000 tonnes @ 10.7 g/t for 379,700 ounces of au and inferred resource is 122,000 tonnes @ 9.3 g/t for 36,300 ounces of au. Click for more details...

HITEC ELECTROLYTIC MANGANESE DIOXIDE PROJECT (EMD) - PROCESSING PLANT
Mining - Primary And Secondary Processing (Minerals Processing) project at Cawse 55 km north west of, Kalgoorlie, WA 6430 of Processing Plant - First Stage (Emd) type of New development. EMD plant of up to 23,000 tpa. Click for more details...

RADIO HILL NICKEL OPERATIONS
Mining - Primary And Secondary Processing (Minerals Processing) project at South of, Karratha, WA 6714 of Nickel/Copper Sulphide Process Plant & Associated Infrastructure type of New development. To include relocation and refurbishment of secondhand ball mill. Click for more details...

INDEE GOLD PROJECT - HEAP LEACH PLANT
Mining - Primary And Secondary Processing (Minerals Processing) project In The Port Hedland Council Area of Private ownership. The processing facility will initially treat oxide ores via carbon-in-leach technology. A two stage crushing and screening plant has been acquired. It comprises a feed hopper with vibrating screen and roller crusher, conveyors, 60 metre multi stage, heap leach conveying and stacking system, control room and CAT 320 kva generator. Heap leach pads, channel liners and pond liners are also to be supplied. Click for more details...

DUKETON REGIONAL GOLD PROJECT - MOOLART WELL
Resource - Gold project at 100 km North of, Laverton, WA 6440 In The Council Area Of Laverton of Private. The new estimate is 25 095kt at 0.46g/t for 375koz Au. The mining method have been chosen to best suit the style of gold mineralisation and provide the optimal movement rates: excavator and haul trucks. The developer will be manager for the mining-related construction activities (including ROM pad and haul road construction), maintenance during mining operations and the supply of lighting and pumping equipment. The process plant will comprise crushing, crushed ore stockpile and reclaim facility, grinding, gravity separations, leach and CIL adsorption, elution and regeneration and a gold room. The treatment plant is designed for a nominal 300tph milling rate and capacity of 2 000 000 tonnes per year. Run of mine (ROM) ore will be fed to the crushing plant at a design rate of 408tph and stored on the crushed ore stockpile. A maximum capacity of 450 tph has been allowed within the crushing circuit to cater for softer or and increased mill throughput. A gravity separation circuit is included in the design to enhance the recovery of gold that concentrates in the cyclone underflow system. The leach and CIL adsorption circuit design is based on the mill feed grade of 2.0 g/t Au and 20% gravity gold recovery. Tailings will be thickened using a high rate thickener with the underflow being pumped to the tailings storage facility (TSF). Water shall be reclaimed via a central decant and returned to the process facility. gold recovery by electrowinning. Dore and gold bearing product will be stored in the secure goldroom which has electronic surveillance systems installed. Raw water will be supplied from the mine dewatering network or from dedicated bores. Process water will be stored adjacent to the plant in a polyethylene lined process water dam. The following reagents will be required in the process and suitable systems for storage and controlled dosing have been provided in the process design: sodium cyanide, oxygen, quicklime, sodium hydroxide (Caustic Soda) and hydrochloric acid. The process facility will be controlled from PC based HMI systems located in the two control rooms for all other operations. Other infrastructure to include mine access roads (29kms new and approximately 90km upgrade), airstrip (suitable for Dash 8 100 - 36 persons), accommodation camp (140 persons), borefield, earthworks for process plant, accommodation camp, access road and access tracks, mechanical infrastructure for the process plant including potable water supply, sewerage treatment plants (camp and process plant), RO plant (potable water), process plant buildings and workshop, power station and light vehicle fuel storage facility and site communication system, administration offices, workshops and stores, mechanical infrastructure for the mine including fuel storage facility, heavy vehicle workshop and stores, heavy vehicle wash bay, tailings storage facility (TSF), electrical power supply via diesel operated power station (Build/Own/Operate) and light mobile vehicles. Click for more details...

WHIM CREEK COPPER PROJECT - MONS CUPRI
Renovations, Refurbishments etc. project of Mining - Primary And Secondary Processing (Minerals Processing) project at North West Hwy via, Whim Creek, WA 6718. The Whim Creek project is located between Karratha and Port Hedland in the Pilbara region of Western Australia. It conists of two deposits, Whim Creek and Mons Cupri approx 6 km apart. Both are mineable by conventional open cut methods. The feasibility study indicated a mine life of at least four years yielding a total of 51,000 tonnes of copper cathode. Click for more details...

CAROSUE DAM GOLD OPERATIONS - PROCESSING PLANT UPGRADE STAGE 2
Mining - Primary And Secondary Processing (Minerals Processing) project at 80 km south of, Laverton, WA 6440 for New. Expansion involving staged upgrade of the processing facility. Stage 1 expansion from 2.4 million tonnes per annum (Mtpa) to 3.2 Mtpa by installing 2 x 5HP crushers for a 3rd crushing circuit, a new screenhouse & additional tankage. Stage 2 increase to 4Mtpa through an additional ball mill running in series or parallel with the existing 4.5MW mill. Initial feed from a cut back at Whirling Dervish pit involving removal of 7 million cubic metres overburden. Other sources to be ore blended from the Whirling Dervish, Wallbrook & Million Dollar pits along with ore blended from the Red October, Deep South & Whirling Dervish underground mines. Click for more details...

BRONZEWING GOLD & NICKEL PROJECT
Resource - Gold/Nickel project at North east of, Leinster, WA 6437 In The Council Area Of Leonora of Private. Underground indicated resource estimate is now 6.32 Mt @ 1.9g/t Au for 396,000 contained ounces of gold, with expected gold production of 355,000 oz over mine life of 3.5 years. The sale of the project includes a 2.3Mtpa Processing Plant & a 280 person accommodation village. The mine is expected to recommence production in january 2010. Click for more details...

GOLDEN GROVE ZINC/COPPER OPERATIONS - RESOURCE
A project in the WA Within Yalgoo. Golden grove operations comprises the Gossan Hill copper, zinc, gold and silver underground mine, the Scuddles zinc and copper underground mine, a 1.3 million tpa treatment plant and a surrounding tenement package. Resource base totals 17 mt@5.9% zinc, 1.9% copper, 0.9% lead, 64g/t silver and 1.3g/t gold. Metal contained is 1,000,000 tonnes of zinc, 314,000 tonnes of copper, 155,000 tonnes of lead, 35 Moz of silver and 0.7 Moz of gold. Reserves are 4.8 Mt at 6.9% zinc, 2.1 copper, 0.9% lead, 75 g/t silver and 1.3 g/t gold. Click for more details...

RAVENSTHORPE NICKEL PROJECT
Mining - Primary And Secondary Processing (Minerals Processing) project In The Ravensthorpe Council Area of Desalination Plant& Water Treatment Plants type. Seawater will be piped to site via a 48 km long pipeline system and then desalinated on site, producing fresh water for steam production while the waste brine stream will be used in the beneficiation circuit. Water treatment plants for the project include potable water treatment plant and waste water treatment plants. Click for more details...

PINJARRA ALUMINA REFINERY EFFICIENCY UPGRADE
Mining - Primary And Secondary Processing (Minerals Processing) New project at Via Del Park Rd, Pinjarra, WA 6208. This type is Non Alcoa Valves with Private ownership. Gate, check, ball, knife. Click for more details...

PINJARRA ALUMINA REFINERY EFFICIENCY UPGRADE
Pinjarra Alumina Refinery Efficiency Upgrade is currently at the Construction stage, valued at about $ 100000 it is Boxed bends. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT
Consultancies For Feasibility Study project at Via, Newman, WA 6753 In The Council Area Of East Pilbara of Private. Feasibility work includes rail and rolling stock design, rail signals and communications design, marine studies, offshore and onshore geotechnical investigations and port stockyard design. Click for more details...

MURRIN MURRIN NICKEL OPERATIONS - ACID PLANT SHUTDOWN
Mining - Primary And Secondary Processing (Minerals Processing) project at 50 km east of, Leonora, WA 6438 for New. 21 day shutdown planned. Click for more details...

KOOLYANOBBING IRON ORE OPERATIONS - EXPANSION- CRUSHING/SCREENING
50km north east of, Southern Cross, WA 6426 Has Koolyanobbing Iron Ore Operations - Expansion- Crushing/Screening currently at Construction stage. Major upgrade of crushing and screening capacity. Part of expansion of capacity to 8,000,000 tonnes per annum approx. Click for more details...

LORD HENRY & LORD NELSON GOLD PROJECT - PROCESSING OPTIONS
Mining - Primary And Secondary Processing (Minerals Processing) project In The Sandstone Council Area of Processing - Options type. A decision has been made to have the ore hauled to another mill located 30 km away. Click for more details...

CENTRAL WEST COAL PROJECT - ENEABBA - PIG IRON PLANT
Central West Coal Project - Eneabba - Pig Iron Plant is currently at the Early Planning stage, valued at about $ 200000000 it is A 500,000 tpa pig iron facility to utilise 400,000 tpa of coal and 700,000tps of iron ore. Rotary hearth technology. The pig iron facility would co-generate up to 50 Mw of electricity to sell to the grid. Click for more details...

RAVENSTHORPE NICKEL PROJECT - PERMANENT VILLAGE BUILDINGS
Permanent Village Buildings New project In The Ravensthorpe Council Area. Development comprises 36 x 1 storey houses of three and four bedrooms, two bathrooms and air conditioning. Click for more details...

SWAN RIVER - MECKERING KAOLIN PROJECT - PILOT PROCESSING PLANT & LABORATORY
Private ownership Mining - Primary And Secondary Processing (Minerals Processing) project In The Northam Council Area for New development. The pilot plant to be located at Avon Industrial Park, will be in operation from December 2005 till approximately June 2006. The plan is to produce between 50 and 500 tonnes of product. Click for more details...

MAGELLAN LEAD CARBONATE PROJECT - GAS PIPELINE
Mining - Primary And Secondary Processing (Minerals Processing) project at Goldfields Gas Transit pipeline to proposed Refinery near, Wiluna, WA 6646 for New. The gas pipeline is proposed to run from the proposed refinery to the main Goldfields Gas transit pipeline. Goldfields gas pipeline is 35 km from the minesite where the refinery is to be located nearby. Click for more details...

RAVENSTHORPE NICKEL PROJECT - ELECTRICAL INSTALLATION OF WATER SYSTEM
Mining - Primary And Secondary Processing (Minerals Processing) project for New development. Electrical and instrumentation installation of water systems. Click for more details...

PERSEVERANCE JOINT VENTURE PROJECT - GOLD RESOURCE
Resource - Gold project at Via, Coolgardie, WA 6429 In The Council Area Of Coolgardie of Private. Recently completed grade control drilling has resulted in a 28% increase in the Indicated Resource from 448 000t @ 6.4%g/t for 92 100 contained ounces to 490 700t @ 7.5%g/t for 118 500 ounces as a result of the conversion of additional ounces. Click for more details...

MURRIN MURRIN NICKEL OPERATIONS - PROCESSING FACILITY SHUTDOWN
Mining - Primary And Secondary Processing (Minerals Processing) New project at 50 km east of, Leonora, WA 6438. This type is Processing Facility Shutdown with Private ownership. This is to be a Statutory shutdown. Click for more details...

HOPE DOWNS IRON ORE PROJECT - EPCM CONTRACT
Mining - Primary And Secondary Processing (Minerals Processing) project at 70 Km Northwest of, Newman, WA 6753 of Epcm Contract type of New development. EPCM contract will comprise design and construction of a process plant and the construction of the mine and associated infrastructure. Click for more details...

WORSLEY ALUMINA EFFICIENCY/GROWTH PROJECT - ELECTRICAL JUNCTION BOXES
A project in the WA Within Collie. For the supply of electrical junction boxes. Click for more details...

WORSLEY ALUMINA EFFICIENCY/GROWTH PROJECT - LEVEL & CLARITY MEASUREMENT
Mining - Primary And Secondary Processing (Minerals Processing) New project at 15 Km South east of, Collie, WA 6225. This type is Level/Clarity Measurement - Supply Of with Private ownership. For the supply of level and clarity management. Click for more details...

PILBARA IRON ORE & INFRASTRUCTURE PROJECT - ORE PREPERATION PLANT
Mining - Primary And Secondary Processing (Minerals Processing) project at Cloud Break Mine Site, Pilbara area via, Newman, WA 6753 for New. Ore Preparation Plant (OPP) is to comprise a crushing and screening operations. The facilities include a screen house, crushers, stockpiles and trainloader. The operation will process ore transported by a conveyor firstly to a portable crusher and sizer located at the operating face of the Cloud Break mine. When the ROM ore has been crushed and sized it will be transported via a conveyor to the screener and crusher. Ore will be sorted into super value fines, high grade fines, high grade lump and lower grade ore. The first three types of ore will be conveyed to the train loading station and shipped to Port Hedland. The low grade will be stockpiled for the future when the Christmas Creek Beneficiation Plant is constructed. Operating facilities at the plant will comprise a Sample Tester, Plant/Workshop store, Communication Tower, High Voltage Switchyard, Sewage Treatment Plant, Potable Water Plant including a Water Tank, Temporary Diesel Power Station, Control Room, Workshops, Laboratories, Amenities area, OPP Administration area including a Store, Laboratory, Emergency Response Centre and Administration building, Mining administration area, Car Parks, two Fuel Farms and a Vehicle Washdown Facility including a washdown slab and an oil separator and automated facilities. A desliming plant will also be constructed. Future expansion of the OPP will include a Desand Plant and associated infrastructure. The developer is currently designing the Desanding plant. Click for more details...

BODDINGTON GOLD MINE EXPANSION PROJECT - HARMONIC & PF COMPENSATION
Harmonic & Pf Compensation project at Pinjarra-Williams Road, Boddington, WA 6390 In The Council Area Of Boddington of Private. Harmonic & PF Compensation. Click for more details...

BODDINGTON GOLD MINE EXPANSION PROJECT - MILL LINER HANDLER & HYDRAULIC BOLT REMOVERS
Mining - Primary And Secondary Processing (Minerals Processing) project In The Boddington Council Area of Mill Liner Handler/Hydraulic Bolt Removers type. Mill liner handler and hydraulic bolt removers. Click for more details...

GERALDTON PORT BERTH 5 IRON ORE EXPANSION PROJECT - BELT SCRAPERS
New project of Mining - Primary And Secondary Processing (Minerals Processing) project at Geraldton Port, Marine Terrace, Geraldton, WA 6530. Belt Scrapers Click for more details...

MOUNT WELD RARE EARTHS OPERATIONS PLANT EXPANSION
Mining - Primary And Secondary Processing (Minerals Processing) project at near, Laverton, WA 6440 for New. Increase of initial 11,000 tonnes per annum (tpa) capacity to 22,000tpa through plant expansion from 120,000tpa to 240,000tpa throughput. Click for more details...

NICKEL WEST OPERATIONS - KAMBALDA NICKEL CONCENTRATOR MATERIALS HANDLING CONTRACT
via, Kambalda, WA 6442 Has Nickel West Operations - Kambalda Nickel Concentrator Materials Handling Contract currently at Construction stage. A 5 year contract at the concentrator plant which handles ore from the Leinster, Mouth Keith & Cliffs mines. To include ore handling, crushing & sampling. Click for more details...

DELFECTOR COPPER GOLD PROJECT - PROCESSING PLANT
Processing Plant New project In The City Of Greater Geraldon - Mullewa Council Area. New processing plant to comprise three stage crushing & screening, ball mill, gravity circuit, elution circuit & gold room & flotation circuit. Click for more details...

ROY HILL IRON ORE PROJECT - PACKAGE 1 MINE PROCESS PLANT - TRAIN LOAD OUT
Train Load Out project at 110km north of, Newman, WA 6753 in the Mining - Primary And Secondary Processing (Minerals Processing). For the supply of a train load out system. Click for more details...

ROY HILL IRON ORE PROJECT - PKG 1 MINE PROCESS PLANT
Mining - Primary And Secondary Processing (Minerals Processing) project In The East Pilbara Council Area of Mine Process Plant - Package 1 type. The processing plant is designed to produce 55Mtpa (wet) of lump & fines product and will be the largest single feed processing plant in the Pilbara region. A wet processing & beneficiating model has been selected, as approx 70% of the bedded resource is below the water table & containes wet, sticky plastic clay-rich shale bands, which would be difficult to handle in a dry crushing & screening process. Lump ores produced from the processing plant will range in size from 8mm to 40mm, while fines ores produced witll be less than 8mm in size. The processing plant will include the following components: Three remote primary/secondary crushing stations; Overland conveying; Crushed ore stockpile; Wet scrubbing & screening; Tertiary crushing; Product screening; De-sanding; Sampling; Stockyard Stacking; Reclaim & train loadout & Tailings storage facilities. The three primary & secondary crushing stations will each convert 5,000 tonnes of ore an hour into particles less than 150mm. This material is then conveyed to a surge stockpile prior to eing fed into the processing plant. When the ore is fed into the processing plant it enters the scrubbers, before being sent to wet screening. Oversize ore that is greater than 32mm in size is then conveyed to the tertiary crushers. Ore that is less than 32mm, but greater than 8mm is conveyed to the lump stockpile, while ore that is less than 8mm, but greater than 2 is conveyed to the fines stockpile. Any ore that is less than 2mm in size is conveyed to the de-sanding plant for beneficiating. Click for more details...

WINDIMURRA BENEFICIATION PLANT
Mining - Primary And Secondary Processing (Minerals Processing) project In The Mount Magnet Council Area of Private ownership. Design & construction of a beneficiation plant at Windimurra. Click for more details...

MULGA ROCK URANIUM PROJECT - PILOT PLANT
Mining - Primary And Secondary Processing (Minerals Processing) project at Via Tropicana Gold Mine access Rd, 120km SE of, Menzies, WA 6436 of Pilot Plant type of New development. For the provision of a pilot plant for metallurgical testwork of bulk samples. Click for more details...

PILGANGOORA LITHIUM TANTALUM PROJECT - EPC CONTRACT
Mining - Primary And Secondary Processing (Minerals Processing) project for New development. For the provision of engineering, procurements & construction for the Pilgangoora Lithium-Tantalum Project. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect