List of Oil refineries, Chemical Plants Projects


WANNEROO 132/22 KV SUBSTATION UPGRADE
Wanneroo 132/22 Kv Substation Upgrade is currently at the Construction stage, valued at about $ 150000 it is Works comprise extension to relay room as part of Wanneroo 132/22 Kv Substation upgrade. Click for more details...

JFR (JIM) MCGEOUGH RESOURCE RECOVERY FACILITY (FORMERLY BROCKWAY WASTE TRANSFER STATION)
Industrial (Oil refineries, Chemical Plants) New project at Reserve 33986 - 11541 Brockway Rd, cnr Lemnos St, Shenton Park, WA 6008. This type is Dicom Waste To Energy Plant - Stage 2 with J/V - Private & Govt ownership. Works to comprise expansion of the DiCOM trial plant into the full-scale DiCOM bioconversion waste processing system at the JFR (Jim) McGeough Resource Recovery Facility (formerly Brockway Waste Transfer Station) in Shenton Park. The waste processing system will process up to 55,000 tonnes of household waste per annum diverting btwn 65 & 80 per cent of our waste from landfill. The system sorts the waste to separate recyclables & then breaks down the organic components to produce market-quality compost & biogas. The generated biogas will power the plant & surplus will be exported to the grid as renewable energy. The power generation equipment is fully enclosed with a sound attenuated gas engine to eliminate noise. Digestion takes place within a sealed vessel to control odour. Click for more details...

WESTERN POWER - SOUTH WEST INTERCONNECTED SYSTEM (SWIS)
Within South West region of Western Australia, ., WA 6999 Has Western Power - South West Interconnected System (Swis) currently at Tenders & Building stage. Provision of 300 to 330 MW of baseload generating capacity by 2008/2009. The facility will be gas-fired. Click for more details...

MOUNT CHARLOTTE IPSTAR SATELLITE EARTH STATION
Satellite Earth Station At Microwave Site project at Mount Charlotte Microwave Site, Kanowna Rd, Parkeston, WA 6434 in the Industrial (Oil refineries, Chemical Plants). Microwave site presently consists of 51 m high tower, microwave building, garages, diesel plant room & associated telecommunications infrastructure. It is proposed to construct 24 m x 10 m equipment building for communications control, erection of two dish antennas (4.9 m & 8.1 m) for transmission & receipt of satellite signals & construction of self-contained emergency generator set for iPSTAR satellite. Building to be of concrete floor, steel frame, iron roof & double brick construction. Contract length: 24 weeks. Click for more details...

SHARK BAY AIRPORT
A project in the WA Within Shark Bay. It is proposed to install pilot-activated runway lighting at Shark Bay Airport, along with standby generator. Click for more details...

ORGANIC RESOURCE TECHNOLOGY - DICOM WASTE TO ENERGY PLANT - STAGE 1
Industrial (Oil refineries, Chemical Plants) project at Reserve 33986 - 11541 Brockway Rd cnr Lemnos St, Shenton Park, WA 6008 for New. Development of 486 sq m metal deck factory building at rear of existing transfer station, to be used for sorting & separating recyclable & organic material from mixed waste which is delivered to site & 17.2 m high cylindrical steel & metal deck vessel which will be located on excavated area (vessel to treat solid organic waste to produce mature agricultural-grade compost, using DiCOM technology). Electricity is generated from biogases produced. Click for more details...

MOBIL OIL REFINERY
Mobil Oil Refinery is currently at the Planning stage, valued at about $ 5000000 it is Proposed modifications to petrochemical processing units. Click for more details...

YABULU NICKEL REFINERY EXTENSION - MHP RECEIVAL/TREATMENT FACILITIES CONTRACT
New project of Industrial (Oil refineries, Chemical Plants) project at Refinery site at, Yabulu, QLD 4818. Contract package 4 involves a MHP leach area, ammonical solvent extraction area and a stripping stills and gas absorption area. This package involves construction on top of concrete, structural, mechanical, piping, electrical, instrumentation and controls for what are generally hydrometallurgical facilities. The contract involves both greenfield and brownfield work. The MHP Receival & Treatment Facilities include container storage and unloading and primary and secondary leaching facilities. The intermediate product (MHP) from Ravensthorpe will be received at Yabulu where it will be stockpiled in a weatherproof environment prior to feeding into a two stage leaching process. New material handling equipment will be constructed to process the additional MHP. Extension of the existing utilities plant will be required to provide additional power, steam and process gases. This includes a package plant for nitrogen generation by the pressure swing absorption process. Anhydrous ammonia will be imported to supplement ammonia currently produced on site. Click for more details...

MOBIL REFINERY
Mobil Refinery is currently at the Planning stage, valued at about $ 3500000 it is Demolition of two exhaust stacks. Click for more details...

ALINTA CO-GENERATION PROJECT
State ownership Industrial (Oil refineries, Chemical Plants) project In The Murray Council Area for Addition development. Fabricated structural steelwork for upgrade to substation. Click for more details...

WESFARMERS CSBP AMMONIA PROJECT
A project in the WA Within Kwinana. It is proposed to modify existing anhydrous ammonia import facility so that ammonia can also be exported. To facilitate this, export pump is to be installed in ammonia transfer line near to 30,000 t ammonia storage tank. Loading rate of about 500 tph is envisaged. Click for more details...

WESTERN POWER GENERATION ASSETS
Western Power Generation Assets is currently at the Planning stage, valued at about $ 500000 it is Western Power is seeking to select preferred consultants to supply engineering, design, contracting, chemical, metallurgical & environmental services for portfolio of steam & gas turbine power stations it operates for two-year period. Click for more details...

ROTTNEST ISLAND WIND ENERGY PROJECT
Rottnest Island Wind Energy Project is currently at the Tenders & Building stage, valued at about $ 2000000 it is 80 m high wind tower to provide low cost electricity for Island & supplement power to upgraded water desalination plant. To be single wind turbine generator with nominal maximum power rating in range of 500 kW to 750 kW. DGPS co-ordinates of site are: Datum = WGS 84; latitude: 31 degrees 59.629 minutes (south); longitude: 115 degrees 31.728 minutes. Contract length: 26 weeks. Click for more details...

COLLTECH AUSTRALIA - COLLAGEN EXTRACTION PLANT
Currently at the Construction stage In Collie is a project estimated to be $ 3000000. This project Development of new plant to extract collagen from sheepskin. Click for more details...

SYNTROLEUM SYNTHETIC HYDROCARBONS PROJECT - BURRUP PENINSULA (GAS TO LIQUID)
Plant For Natural Gas To Liquids Conversion (Synthetic Hydrocarbons) New project In The City Of Karratha Council Area. 10,000 - 11,500 nominal barrels per day gas to liquids plant for production of natural gas into ultra-clean, high performance & sulphur-free synthetic products such as lubricants, industrial fluids & paraffins, as well as synthetic transportable fuels, using Fischer-Tropsch technology. Click for more details...

SHELL OIL REFINERY
Durham St, Rosehill, NSW 2142 Has Shell Oil Refinery currently at Construction stage. Proposed modification to existing Platformer Unit to reduce the benzene content of the platformer product. Click for more details...

NEW METRORAIL - EAST CANNINGTON SWITCHYARD
Industrial (Oil refineries, Chemical Plants) project at Railway Pde north of Crawford St intersection, East Cannington, WA 6107 for New. Construction of new switchyard, which will also involve installation of underground cables from Western Power's substation off Grose Av in Cannington to new switchyard (cables will be laid in trench along Grey, Wilson, Bent & Sevenoaks Sts). Click for more details...

BANKSIA GROVE BOOSTER PUMP STATION
Industrial (Oil refineries, Chemical Plants) project for New development. Supply & delivery of generating set for Banksia Grove Booster Pump Station. Click for more details...

SHALE ROAD LANDFILL GAS POWER GENERATION FACILITY
Industrial (Oil refineries, Chemical Plants) project at Lot 200 Shale Rd, Whitby, WA 6202 of Landfill Gas Power Generation Facility type of New development. It is proposed to develop landfill gas power generation facility to convert landfill gas into electricity (site is presently used as landfill facility). Major components of facility to be series of acoustic enclosures, each containing internal combustion engine generator, gas processing unit, electricity transformer & control equipment. Generating unit is 35 m x 22 m in area. Click for more details...

KEMERTON SUBSTATIONS
State ownership Industrial (Oil refineries, Chemical Plants) project In The Harvey Council Area for New development. Stage 2 civil works for Kemerton 330 KV substations. Click for more details...

WESTERN POWER - SOUTH WEST INTERCONNECTED SYSTEM (SWIS) - KEMERTON POWER STATION
Lot 502 Wellesley Rd, northeast area of Kemerton Industrial Park (approx 20 km north of Bunbury), Kemerton, WA 6224 Has Western Power - South West Interconnected System (Swis) - Kemerton Power Station currently at Construction stage. Construction of Relay Room No. 1 for Kemerton Power Station. Click for more details...

BURRUP FERTILISERS AMMONIA PLANT PROJECT
A project in the WA Within City Of Karratha. Insulating & painting for ammonia plant. Click for more details...

BURRUP FERTILISERS AMMONIA PLANT PROJECT
Refractory - Supply & Installation For Ammonia Plant project at Btwn King Bay & Hearson Cove, Burrup Peninsula nr, Karratha, WA 6714 in the Industrial (Oil refineries, Chemical Plants). Refractory supply & installation. Click for more details...

WALKAWAY WIND FARM (ALINTA WIND FARM)
Walkaway Wind Farm (Alinta Wind Farm) is currently at the Construction stage, valued at about $ 200000 it is Transportable relay room for Alinta Wind Farm. Click for more details...

MILLERS ROAD PETROLEUM REFINERY
Millers Road Petroleum Refinery is currently at the Planning stage, valued at about $ 385000 it is Proposed construction of a new Petroleum Refinery Click for more details...

ANACONDA DRIVE WASTEWATER PUMP STATION
415v Diesel Generator For Wastewater Pump Station project at Anaconda Dr, Gosnells, WA 6110 In The Council Area Of Gosnells of State. Supply & delivery of 415V diesel generator for Anaconda Dr Wastewater Pump Station. Click for more details...

MARBLE BAR TEMPORARY DIESEL POWER STATION
Industrial (Oil refineries, Chemical Plants) project In The East Pilbara Council Area of Temporary Diesel-Fired Power Station type. Provision of temporary diesel-fired power station at Marble Bar. Click for more details...

MUJA POWER STATION 132 KV SWITCHYARD
Industrial (Oil refineries, Chemical Plants) project at Power House Rd, Collie, WA 6225 of Fabricated Steel Structures For Transformers (2) type of Addition development. Fabricated steel structures for Muja 132 Kv switchyard for MU814 & MU815 (transformers). Click for more details...

BLACKSTONE COMMUNITY
Industrial (Oil refineries, Chemical Plants) project In The Ngaanyatjarraku Council Area of State ownership. Works to comprise major upgrade to power supply at Blackstone Community. Contract length: 26 weeks. Click for more details...

BUNBURY AIRPORT
Industrial (Oil refineries, Chemical Plants) project at South Western Hwy, southeast of, Bunbury, WA 6230 for Supply & Install. Work comprises supply & installation of 27 Kva emergency generator at Bunbury Airport. Click for more details...

RIVERINA BIOFUELS
Factory - Stage 1 project at Wirraway Dr, Deniliquin, NSW 2710 in the Industrial (Oil refineries, Chemical Plants). Construction of a factory capable of producing 45 million litres of biodiesel using tallow & canola oils. Click for more details...

SOUTHERN OIL REFINERIES
Private ownership Industrial (Oil refineries, Chemical Plants) project In The Wagga Wagga Council Area for New development. Construction of a facility to re-refine used lubricating oils. Click for more details...

CALTEX CRUDE OIL STORAGE TANK (TANK 632)
New project of Industrial (Oil refineries, Chemical Plants) project at 2 (Lot 25) Solander St (DP776328), Kurnell, NSW 2231. Construction of a crude oil storage tank (Tank 632) with a capacity of approx 70-80 megalitres at the existing Kurnell refinery. Works include clearing of vegetation, levelling earthworks and excavation to establish level base & footings; modifications to existing stormwater system; installation of the tank foundation; construction of the tank, mixers & steam heaters; fitting of pedestrian access walkways & stairs to the tank; installation & connection of pipework from the existing piping system; and construction of bunds & a water drainage system. Click for more details...

AUSTRALIAN MARINE COMPLEX TRAINING MARINE COMPLEX OIL & GAS PROJECT - HENDERSON CHALLENGER TAFE
A project in the WA Within Cockburn. Works to comprise of installation of processing plant designed to mimic typical oil/gas/water separation plant for training at TAFE. Processing plant facilities will comprise vessels, pumps, pipe work, instrumentation & control systems. Click for more details...

VOPAK SITE B BULK LIQUIDS STORAGE EXPANSION
Industrial (Oil refineries, Chemical Plants) project In The Randwick Council Area of Storage Facility - Expansion type. Expansion of the Vopak Bulk Liquids Storage Facility to increase storage capacity by approximately 185,000 cubic metres. Components of the facility would include: 9 additional storage tanks; pipework and pumps; loading bays; wastewater teatment plant; and maintenance building. Click for more details...

BP REFINERY - CENTRAL CONTROL BUILDING
Private ownership Industrial (Oil refineries, Chemical Plants) project In The Kwinana Council Area for Addition development. Works to comprise of construction of 350 sq m extension to Central Control Building of which entire structure is to be blast proofed with fabricated precast panelling. Click for more details...

WASTE OIL TANK FARM & PRE-TREATMENT FACILITY
Tank Farm/Pretreatment Facility project at not yet detemined, Bomen, NSW 2650 In The Council Area Of Wagga Wagga of Private. Construction of a facility to store & initially treat used lubrication oil, prior to the oil being refined at the facility on the existing site. The wasted oil tank farm will be located at the rear of the existing refinery & tank farm & is expected to occupy an area of around 3000-4000sq m. The tank farm will comprise of approximately 8 tanks of 55kL to 555kL in size holding a total of 905kL or 815 tonnes of waste oil. Construction will include provision of a large concrete slab for the tanks with suitable footings, concrete bunding around the tanks, a separate bunded concrete slab with roofing component for the coolant & oil filter storage area, a small site office (prefabricated), a dust sealed access & parking area suitable for the proposed trucks, pumping equipment & plumbing, boiler unit, connection of power & other ancillary requirements. Click for more details...

ENERGY AUSTRALIA STORAGE FACILITY
Industrial (Oil refineries, Chemical Plants) project In The Muswellbrook Council Area of Storage Facility type. Construction of a new storage facility for fuel. Click for more details...

WORTH OIL RECYCLING MUD PROCESSING FACILITY
12 Blackman Cres, Windsor, NSW 2756 Has Worth Oil Recycling Mud Processing Facility currently at Planning stage. Construction of a weighbridge & Mud Processing Facility. Click for more details...

SHELL NEWCASTLE TERMINAL
Industrial (Oil refineries, Chemical Plants) New project at 5-7 (Lot 1) Chatham Rd (DP77996), Hamilton North, NSW 2292. This type is Bund Wall - Upgrade with Private ownership. Construction of a reinforced concrete replacement bund wall (Tank Farm A) Click for more details...

SHOALHAVEN STARCHES ETHANOL EXPANSION PROJECT
Shoalhaven Starches Ethanol Expansion Project is currently at the Construction stage, valued at about $ 200000000 it is Expansion of ethanol production facility. The project involves increasing the ethanol production rate of the plant up to 300 million litres a year; implementing a range of odour control measures on site; and upgrading, augmenting and using the existing infrastructure on site. The following additions and alterations are proposed to the existing factory site as part of the ethanol upgrade: the provision of an additional dryer for the starch/gluten plant; additional equipment and storage vessels for the ethanol plant including 3 additional fermenters, additional cooling towers and molecular sieves; upgrades to the Stillage Recovery Plant including 6 additional Dried Distillers Grains Syrup (DDGS) dryers; 10 decanters; chemical storage and two evaporators. The proposal also includes the installation of a DDGS Pellet Plant within this part of the site; & the establishment of a new packing plant, container loading area and a rail spur line. The establishment of this facility on the northern side of Bolong Road will require the provision of an overhead bridge structure to allow product and safe pedestrian movement across Bolong Rd. Approx areas are: starch dryer 700 sq m; gas-fired boiler 150sq m; extension to DDG: loadout 500sq m, evaporator 50sq m, bioscrubbers 200sq m, pellet plant 200sq m, DDGS dryers 2,400sq m, MCC room 375sq m; gas-fired co-generator Plant 1000sq m; chemical storage 150sq m; packing plant 3000sq m; fire services 200sq m; total Area 8,925 sq m. Additional carparking for 94 vehicles will be provided. Click for more details...

HANSON ROAD AUTOMOTIVE
A project in the VIC Within Hume. Installation of an underground 30KL LP gas vessel with associated dispensers and alterations to existing structure to develop three car wash bays. Click for more details...

GRAINCORP FLAMMABLE LIQUIDS STORAGE TANKS STAGES 1 & 2
Currently at the Construction stage In Brisbane City is a project estimated to be $ 5000000. This project Construction of additional bunded storage areas for flammable liquids. Stage 1: Construction of Bund 7 including 12 tanks. 2 storage tanks in Bund 9. Existing flammable tanks (T1 & T2) to be removed. New bunded area for container storage of flammable liquids. New fire pump shed. Stage 2: Removal of container storage in south western corner of site to allow for construction of Bund 11 providing 15 additional tanks. Additional tank to Bund 10. New loadout gantries between Bund 10 & 11, 7 & 8 & eastern side of Bund 3. Construction of new seal carpark for 35 cars. Click for more details...

MARSTEL TERMINALS PTY LTD
Marstel Terminals Pty Ltd is currently at the Construction stage, valued at about $ 1000000 it is Construction of eight 55KL tanks to store combustible liquids. Click for more details...

SPALDING AVENUE STORAGE
Oil Storage New project In The Brimbank Council Area. Construction of storage for non-hazardous synthetic oil. Click for more details...

ROBINVALE IRRIGATION SYSTEM PRESSURE VESSEL
Industrial (Oil refineries, Chemical Plants) project at Robinvale Irrigation District, Robinvale, VIC 3549 of Pressure Vessel - Design, Fabrication, Delivery type of New development. Detailed design, fabrication and delivery of a 92 kL pressure vessel. Click for more details...

CLYDE REFINERY CONVERSION PROJECT
9 Devon St, Rosehill, NSW 2142 Has Clyde Refinery Conversion Project currently at Construction stage. Conversation of the existing Shell Clyde Refinery to a finished petroleum products import, storage & distribution terminal including demolition of the redundant infrastructure Click for more details...

NYRSTAR SMELTER UPGRADE
Industrial (Oil refineries, Chemical Plants) project In The Port Pirie Council Area of Smelter - Upgrade type. Upgrade of existing lead smelter & transforming into an advanced poly-metallic processing & recovery metal bearing feed materials (including internal residues from Nyrstar's global network of zinc smelters & other ferrous metals). To include upgrade of acid plant. Click for more details...

BURRUP FERTILISERS TECHNICAL AMMONIUM NITRATE (TAN) PRODUCTION FACILITY PROJECT
Private ownership Industrial (Oil refineries, Chemical Plants) project In The City Of Karratha Council Area for New development. Works to include structural, mechanical, electrical & instrumentation installation for the Burrup technical ammonium nitrate production facility. Click for more details...

VIVA ENERGY PINKENBA TERMINAL LUBE STORAGE TANKS
New project of Industrial (Oil refineries, Chemical Plants) project at 213, 229, 295 & 385 Eagle Farm Rd, Pinkenba, QLD 4008. Construction of 7 x 200,000lt vertical storage tanks for oil lubricant. Construction of new loading gantry. Internal reconfiguration to storage systems in lubricants warehouse. Click for more details...