State

Categories

Sub Categories

Click Here to Find Current Projects

List of Onshore - oil & gas Projects


KOGAN NORTH PROJECT - COAL METHANE RESOURCE
Mining (Onshore - oil & gas) project at 40 km West of, Dalby, QLD 4405 of Gas Field type of New development. A 24 month, 5 well pilot has yielded rates up to 550 MMcf/d and has let to the certification of gas reserves of 83 PJ probable and 157 PJ possible at Kogan North. The development of this 35-35 well project will be for the purpose of supplying 4 PJ of gas per annum for 15 years to CS Energy's Swanbank 'E' power plant, located near Ipswich in Southeast Queensland. Click for more details...

ATP-691 - MEGAN/RYAN
A project in the QLD Within Not Yet Determined. Coal Core from Ryan 1 is undergoing desorption testing. Click for more details...

MORANBAH COAL SEAM METHANE GAS PROJECT
Moranbah Coal Seam Methane Gas Project is currently at the Construction stage, valued at about $ 20000000 it is Now over 200 petajoules. Click for more details...

PEP-160 - OIL/GAS RESOURCE
Mining (Onshore - oil & gas) project at Victorian South Australian border in the Otway Basin, ., VIC 3999 of Resource - Oil & Gas - Onshore type of New development. Drilling is planned for early 2006 of Lindsay-1 exploration well to test the gas potential of the Pretty Hill Sandstone. Click for more details...

SANTOS CBU - SOUTH WEST QUEENSLAND/NORTHERN SOUTH AUSTRALIAN GAS FIELDS
Epc Contract New project In The Not Yet Determined Council Area. The contract is for the provision of integrated engineering, procurement and construction services for Santos' Central Business Unit (CBU), which operates the oil and gas fields in northern South Australia and South West Queensland. The contract is a consolidation of services previously provided by a range of providers into a single contract. A potential of $20-$40 million per annum for and initial three years, with possible extensions up to eight years. Click for more details...

ATP 560P - UTOPIA - OIL & GAS PROJECT
A project in the QLD Within Quilpie Shire. Drilling will target Utopia-5 and Utopia-6. Utopia oil field at present produces 35.4 barrels of oil per day. Resource estimate is 2.86 million barrels of recoverable reserves. Click for more details...

ATP-647P - MYALL CREEK
Mining (Onshore - oil & gas) project at Surat Basin, ., QLD 4999 for New. Myall Creek East 1 is located in Block 2656 of ATP 647P in the Surat Basin. The primary target of the well will be the Tinowan sandstone. Target depth 2,226 metres. Click for more details...

CAMDEN GAS PEL2/PPL1/PPL2- BULLI/AMERICAN/BALGOWNIE/WONGAWILLI/TONGARRA/WOONONA
Resource - Gas - Onshore project at via, Kulnura, NSW 2250 in the Mining (Onshore - oil & gas). PPL-2 is a 21 year licence. 40 wells within stage 2 are planned by mid 2003 approx. Nine wells (Glenlee) are to be drilled before the end of December 2002. The remaining 31 wells to be drilled first half 2003. Stage 2 in total will comprise up to 100 vertical wells, a second treatment plant, all gas gathering lines and a steel gas sales line connecting Stage 2 to the main gas transmission lines. Click for more details...

PL 192 (ATP-471) - MYALL BLOCK - CHURCHIE GAS PROJECT
Mining (Onshore - oil & gas) project at Surat Basin south east of, Roma, QLD 4455 for New. Churchie 4 is located on the producing Churchie gas field and is flowing at 7 million cubic feet per day through a 1 inch choke. This follows earlier discoveries at Churchie 2 and 3. The rig was at a total depth of 2123 metres on 8 January 2004 and the well was being prepared for rig release. The Churchie 4 results increase P reserves, which are the basis for marketing the gas. Click for more details...

PEL 115 - OIL & GAS RESOURCE - VENTURA
Mining (Onshore - oil & gas) project at Cooper Basin via, Innamincka, SA 5731 of Resource - Oil & Gas - Onshore type of New development. Prospects include Hornet and Ventura. PEL 115 covers 1,106 square kilometers on the south eastern edge of the Cooper Basin. Due to its location close to current producing fields, the block is broken up into six separate areas. The drill stem test at Ventura 1 is in response to good oil shows. Click for more details...

PEL 93 - WORRIOR - OIL/GAS RESOURCE
Mining (Onshore - oil & gas) project In The Unincorporated Council Area of Resource - Oil & Gas type. Resource estimate is 7.7 million barrels of oil and 4.8 billion cubic feet of gas. Worrior 3 is expected to spud October 10, 2005. Click for more details...

EPA 320 L11 JOINT VENTURE GAS PROJECT
Mining (Onshore - oil & gas) New project at 3 kms east of Beharra Spring via, Dongara, WA 6525. This type is Resource - Gas with Private ownership. The Hovea 8 & Jingemia 8 wells producing in the second quarter 2011. Redback South 1 well expected to be commissioned in the third quarter 2011. Planning underway for further well drilling & 2D & 3D seismic programs in late 2011/early 2012. Click for more details...

COOPER BASIN - OIL & GAS
Mining (Onshore - oil & gas) New project at Cooper Basin via, Innamincka, SA 5731. This type is Exploration - Onshore with Private ownership. A draft environmental impact report on drilling & well operations and draft environmental impact report and draft statement of environmental objectives for production and processing operations. Click for more details...

EP389 GINGIN-1 & RED GULLY-1 OIL & GAS PROJECT
Mining (Onshore - oil & gas) New project at Straddling Brand Hwy north & south of, Gingin, WA 6503. This type is Resource - Oil/Gas - Onshore with Private ownership. Estimated total potential Recoverable Reserves are 172 to 190 billion cubic feet of gas & over 6 million barrels of oil & condensate. The main objective in the Gingin & Gingin West prospects are fluvial & continental sandstones of the Early Jurassic aged Cattamarra Coal Measures. Porosities in the Gingin-Bootine area vary from 6%-13% with permeabilities up to 112 millidarcies. This gas reservoir quality & the proximity to pipeline infrastructure & the markets makes for robust economics on gas discovery & any developments for natural gas, & also the value added component of generating electricity. Infrastructure to include a 3km export pipeline that will link up to the DBNGP, a gas & condensate plant, 30 man camp & earthworks. Click for more details...

ATP-299 - TINTABURRA - OIL/GAS RESOURCE
Resource - Oil & Gas - Onshore project at Cooper-Eromanga Basin south west of, Quilpie, QLD 4480 in the Mining (Onshore - oil & gas). It will comprise 49 firm wells and 2 contingent wells. The Tintaburra block contains a resource of 84 million barrels of proved plus probale oil in place. Click for more details...

BOWEN BASIN PROJECT ATP-564/PL94/ATP-602 - MUNGI
Mining (Onshore - oil & gas) project In The Mackay Regional Council Area of Resource - Coalbed Methane - Onshore type. The Mungi phase 1 development programme involves nine new wells plus two existing wells at the Mungi coalbed methane gas field in Queensland. Mungi 05-07 are drilled and awaiting completion. Mungi 09-13 are awaiting drilling. Click for more details...

ATP-608P - ROOKWOOD - ONSHORE OIL/GAS RESOURCE
Atp-608p - Rookwood - Onshore Oil/Gas Resource is currently at the Construction stage, valued at about $ 10000000 it is Oil rate from Rookwood South 1 is 400 barrels per day. Rockwood East 1 has been completed as an oil producer. Click for more details...

TIPTON WEST PROJECT - ATP-683P - GAS RESOURCE
20 Km South of, Dalby, QLD 4405 Has Tipton West Project - Atp-683p - Gas Resource currently at Construction stage. A 75 well drilling program is in progress as part of the initial 10 PJ pa development program. Resource estimate for probable reserves is 99 PJ and proven reserves is 25 PJ. Click for more details...

L14 JINGEMIA OIL FIELD
Mining (Onshore - oil & gas) project In The Dandaragan Council Area of Private ownership. The project was estimated to have initially contained 12 million barrels of oil in place, with 4.6 million barrels produced to date. Click for more details...

CS ENERGY
Mining (Onshore - oil & gas) project In The Maranoa Regional Council Area of Gas Supply Contract type. An early delivery of 3 terrajoules per day will take plane in June, July, August and December 2004. Substantial delivery of 3PJ each year will begin in April 2005. The contract is for five years. Ther amount of gas can be increased by mutual consent to 4PJ per year. Click for more details...

BP REFINERY - BULWER ISLAND
Gas - Supply project at Tingira St, Pinkenba, QLD 4008 in the Mining (Onshore - oil & gas). 15 PJ of gas over 5 years. Click for more details...

PL 18 - YELLOWBANK CREEK - OIL/GAS RESOURCE
Resource - Oil/Gas project at Bowen-Surat Basin, ., QLD 4999 In The Council Area Of Not Yet Determined of Private. Yellowbank Creek 4 is located on the western side of the producing Yellowbank Creek field. The well is expected to be quickly brought on line, due to existing infrastructure. Production likely late 2004. Click for more details...

ATP 676/PLA194 - KOGAN NORTH - CENTRAL GAS PROCESSING FACILITY
Mining (Onshore - oil & gas) project at Near, Chinchilla, QLD 4413 for New. Central gas processing facility will comprise dehydration, compressing and metering. An evaporation dam will be constructed. Pipeline for the project is 3 km long. Click for more details...

ATP 768P - POLARIS OIL & GAS PROJECT
Mining (Onshore - oil & gas) New project at Surat Basin Via, Moura, QLD 4718. This type is Resource - Oil/ Gas with Private ownership. Drilling to target the Triassic aged Clematis Sandstone. The program will include up to 12 wells. The program is designed to confirm the net coal, gas content, permeability and productivity of both the Juandah and Taroom coal seams. These two coal sequences form the Walloon Coal Measures in South-East Queensland. Click for more details...

MEGASCOLIDES 1 - NARRACAN TROUGH - GAS RESOURCE
Mining (Onshore - oil & gas) New project at Hunter Road, Warragul, VIC 3820. This type is Resource - Coalbed Methane Gas with Private ownership. 2D sesmic survey will explore the Crayfish group level oil play to provide suitable areas for drilling in 2006. The Narracan trough is a black seam extending from near Warragul south to Coal Creek at Korumburra and to Wonthaggi. Megascolides 1 well is expected to be gas charged with CBM targets from 700 to 1100 metres and the conventional gas targets at depths of 1700 metres. Click for more details...

DEPARTMENT OF BUSINESS INDUSTRY AND RESOURCE CONSULTANCY
Mining (Onshore - oil & gas) project In The Barkly Shire Council Area of Petrological/Mineralogical/Analytical Services - Contract type. Panel contract for the provision of Petrological, Mineralogical and Analytical services for a period of 3 years. Click for more details...

SOUTH EAST SOUTH AUSTRALIA PIPELINE - POOLAIJELO TO LADBROKE GROVE
Natural Gas Pipeline New project In The Various Council Area. The pipeline will be 45 km long and 200 mm in diameter. Click for more details...

CAMDEN GAS PROJECT - STAGE 2 - EL BETHEL
Currently at the Construction stage In Wollondilly is a project estimated to be $ 35000000. This project Construction and operation of 10 coal based methane gas wells, gas and water gathering system and access roads. Connecting the 10 new wells to the gas treatment plant through gas pipe lines. Click for more details...

ATP 552 - BELLBIRD/BELLBIRD WEST - OIL & GAS RESOURCE
Mining (Onshore - oil & gas) project at Surat Basin near, Roma, QLD 4455 for New. ATP's 552/823P are approximately 5 km west of the Bellbird-1 well which flowed approximately 12 barrels of oil per day on test from tight Permian reservoirs when drilled in 1984. The prospects are located in the prospective oil-prone portion of the Surat Basin, approximately 12 km to the northeast of the Alton Oil Field. Click for more details...

OTWAY BASIN PILOT PROJECT - PILOT PLANT
Mining (Onshore - oil & gas) project at 2 km west of, Curdie Vale, VIC 3268 for New. The CO2 source for the project will be natural gas with a high CO2 content. The CO2 will be separated and compressed, transported by pipeline and then selectively injected into storage horizons potentially ranging in depth from below 1000 metres to almost 2000 metres. Extensive modelling and monitoring programmes will be a major part of this project, to ensure that the movement of CO2 can be predicted and to assess different monitoring technologies. Click for more details...

BONAPARTE GAS PIPELINE
J/V - Private & Govt ownership Mining (Onshore - oil & gas) project In The Coomalie Community Council Area for New development. To construct a gas pipeline from the Blacktip Gas Plant near Wadeye (Port Keats) to meet the existing Amadeus to Darwin Gas Pipeline on Ban Ban Springs Station in the Northern Territory. The pipeline will follow a route of approximately 275km and will initially be capable of delivering 30 petajoules per year. Click for more details...

CAMDEN GAS PROJECT - SPRING FARM/MENANGLE PARK - RESOURCE
Resource - Coal Base Methane New project In The Camden Council Area. Construction and operation of up 4 surface well locations at Spring Farm and up to 12 surface well locations at Menangle Park (to contain a variety of horizontal, directional and surface-in-seam wells); construction and use of access roads, a gas gathering system and water transport lines; connection of the wells to the Rosalind Park Gas Plant; and production of methane gas. Click for more details...

SNATCHER OIL & GAS PROJECT
Resource - Oil/Gas project at Cooper Basin via, Coober Pedy, SA 5723 in the Mining (Onshore - oil & gas). The prospect is situated on the Western Margin Oil Trend, with Snatcher-1 a test of whether oil can be stratigraphically trapped within seismically interpreted discrete sand bodies in channel systems present within the Jurassic Birkhead Formation. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT
Mining (Onshore - oil & gas) project for New development. QCLNG is a project to develop coal seam gas (CSG) fields in the Surat & Bowen Basins, pipe gas to a processing plant to be built on Curtis Island & then export product liquefied natural gas (LNG) by ship. Phase 1 to be constructed to include 2 LNG processing trains with a combined capacity of up to 8.5million tonnes per annum (Mtpa) along with associated gas wells, field facilities & pipelines. Some 820 operational personnel & over 5000 construction personnel expected. Workers accommodation to be required in the Gladstone region (250 approx dwellings) & Western Downs area (280 approx dwellings). Click for more details...

PL 16 SILVER SPRINGS UNDERGROUND GAS STORAGE PROJECT
Mining (Onshore - oil & gas) project In The Maranoa Regional Council Area of Private ownership. Reuse of the existing Silver Springs Processing Plant & now depleted, 1.5km deep Silver Springs/Renlim Field underground reservoir for temporary storage of up to 44billion standard cubic feet (Bscf) of gas as part of Queensland Gas Company's Queensland Curtis Liquified Natural Gas (QCLNG) project. Extension at the plant site of the the existing Berwyndale to Wallumbilla & Silver Springs pipelines (PPLs 123 & 4) for gas injection & later withdrawl using 4 refurbished wells & a new well along with an additional 5 monitoring wells. Initial gas injection planned from 2011-2013 & withdrawl expected 2014-2017. Click for more details...

MORANBAH GAS PROJECT - WELL DRILLING CONTRACT
A project in the QLD Within Isaac Regional. A project to expand what is already one of the largest operating coal seam gas (CSG) project in Australia. 12 month contract with 1 year option for drilling vertical production wells. Click for more details...

PEL 91 COOPER BASIN JOINT VENTURE OIL PROJECT - BAUER FIELD
A project in the SA Within Unincorporated. A project thought to have recoverable reserves of 3.5 million barrels (MMbbl) making it one of the largest discoveries on the Western Flank Oil Fairway. The Bauer-1 well which encountered an oil column followed up with 3 appraisal well including the Bauer-3 well which was cased & suspended as a future production well. Initial surface production facilities expected to include gathering pipelines, dewatering & evaporation facilities, oil storage & crude load-out facilities. Lift pumping units to be installed subsequently as required to increase production. Initial production of 800 bbls per day expected to increase to 5000bbls a day. Initial oil transport by truck to the Moomba Crude Oil terminal until an export pipeline from the Bauer Facility to Lycium oil hub is constructed. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - TRAIN 2
Mining (Onshore - oil & gas) project In The Gladstone Regional Council Area of Private ownership. Construction of a second 4.5 million tonne per annum (Mtpa) liquefied natural gas (LNG) processing train. Further Bowen & Surat Basin gas field development to provide 1000 wells for the first 2 trains. Click for more details...

ICHTHYS LNG PROJECT - ONSHORE - OPERATIONS CENTRE
Operations Centre project at Blaydin Point, Darwin, NT 0800 In The Council Area Of Darwin City of Private. For the construction of an operations complex area including operations office, central control building and fire station, training and canteen facility, warehouses, workshops laboratory, guardhouse and associated infrastructure. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - PROCESSING FACILITIES
Mining (Onshore - oil & gas) project for New development. Construction of the balance of 12 field compressor stations (FCS) & 3 central processing plants (CPP). Each FCS will need up to 7ha & will include a flare, up to 8 screw compressors, a water management system including a pond as well as a substation/switchyard if connected to the grid instead of being powered by decentralised gas fired turbines. Associated infrastructure to include access tracks, warehouses, construction camps, operations camps, offices & telecommunication services. Each CPP to need up to 19ha & will include a flare, a tri-ethylene glycol (TEG) unit per compressor, plant gas inlet & export systems, drainage, gas or grid power supply, storage for air, nitrogen, water, chemical & lube oil, office & workshop buildings, switch gear & instrument rooms & access roads. Water separated at the well heads will be gathered separately into ponds/tanks prior to treatment & reuse. Click for more details...

ICHTHYS GAS PROJECT - OFFSHORE - GAS EXPORT PIPELINE - CYCLONE PROOFING SERVICES
Landfall site, Darwin, NT 0800 Has Ichthys Gas Project - Offshore - Gas Export Pipeline - Cyclone Proofing Services currently at Construction stage. Design & installation of cyclone proofing items for the offshore Gas Export Pipeline (GEP) Wet Buckle Dewatering, Flooding, Cleaning, Gauging & Hydrotesting Spread. Click for more details...

ROY HILL IRON ORE PROJECT - INFRASTRUCTURE - PORT NON PROCESS - COMMUNICATION & DATA
A project in the WA Within East Pilbara. For the provision of communication & data services. Click for more details...

ROY HILL IRON ORE PROJECT - INFRASTRUCTURE - PORT NON PROCESS - OVERHEAD CRANES
Mining (Onshore - oil & gas) project In The East Pilbara Council Area of Private ownership. For the provision of overhead cranes. Click for more details...

ROY HILL IRON ORE PROJECT - INFRASTRUCTURE - PORT NON PROCESS - PLUMBING DRAINAGE & HYDRAULICS
Plumbing/Drainage/Hydraulics project at 110km north of, Newman, WA 6753 In The Council Area Of East Pilbara of Private. For the provision of plumbing, drainage & hydraulics services. Click for more details...

ROY HILL IRON ORE PROJECT - INFRASTRUCTURE - RAIL NON PROCESS - FUEL & LUBE
Private ownership Mining (Onshore - oil & gas) project In The East Pilbara Council Area for New development. For the provision of fuel & lube. Click for more details...

ROY HILL IRON ORE PROJECT - INFRASTRUCTURE - RAIL NON PROCESS - MODULAR BUILDING
Mining (Onshore - oil & gas) project In The East Pilbara Council Area of Modular Buildings type. For the supply & installation of modular buildings. Click for more details...

ICHTHYS LNG PROJECT - OPERATIONS - FLANGE MANAGEMENT SERVICES
Mining (Onshore - oil & gas) project In The Darwin City Council Area of Private ownership. For the provision of Flange Management Service for Ichthys Operations. To include but is not limited to the provision of - A flexible, scalable, & modular flange management service to meet the requirements of day to day operations & maintenance, campaign maintenance & shutdown work scopes, across both offshore & onshore facilities. Provision of competent service technicians to perform bolted flange disassembly & assembly. Provision of appropriate resources & support services for day to day operations & maintenance, shutdown & campaign scopes of work, both offshore & onshore. Coordination & development of flange assembly work packs & check sheets. Provision of engineering & technical support for flange assembly & related equipment. Provision of personnel & equipment to complete onsite flange machining. Provision of hire equipment, equipment repair & calibration services to support Company requirements. Click for more details...

NORTHERN GAS PIPELINE ACOUSTIC INVESTIGATION
Mining (Onshore - oil & gas) project for New development. Provision of consultancy services for acoustic investigation for the 623km Northern Gas Pipeline. To include prediction of noise levels from the proposed pipeline, specification of noise management levels & provision of noise mitigation strategies. Click for more details...

GARBUTT DEPOT REDEVELOPMENT STAGE 2
Depot - Redevelopment - Stage 2 project at Dalrymple Rd (Lot 426, SP250843 & Lot 285, SP101947), Garbutt, QLD 4814 in the Mining (Onshore - oil & gas). Stage 2 of redevelopment works to the existing Ergon Energy oil handling facility depot at Garbutt. Works to occur over 3 sub-stages. Stage 2a & 2b - complete refurbishment of building 3 to include construction of staff amenities, lobby & reception area, work stations, workshop areas, offices, meeting rooms, quiet rooms, training rooms, utility rooms, breakout room with coffee station, kitchen & staff cafe, communications room, video editing suite, testing laboratories, first aid room, storage, mail room, hazardous materials storage & packing bay. Extension of existing mezzanine & installation of new lift, construction of additional wash bay & oil handling facility to provide 2 x 24000L tanks, pumps, hazardous substances enclosures & heavy & light fleet vehicle parking. To include construction of new internal roadways & demolition of canteen amenities building, 5 x underground storage tanks, bunded area & B14 awning. Stage 2c - demolition of buildings 5, 6, 7, 9, 10, 11, 14 & carports, 15, shed, demountable & existing gate house. Concrete pavements & pathways, carpet, glass doors, window blinds & black aluminium spike fencing. Associated electrical works, earthworks, stormwater draining, civil works & car parking. Click for more details...

TUBRIDGI GAS STORAGE FACILITY
New project of Mining (Onshore - oil & gas) project at 30km from, Onslow, WA 6710. Works to include the construction of Western Australia's largest gas storage facility with a storage capacity of around 42PJ & daily injection & withdrawal rates of around 50TJ/day. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect