State

Categories

Sub Categories

Click Here to Find Current Projects

List of Onshore - oil & gas Projects


CAMDEN GAS PROJECT - STAGE 2
Gas Gathering System/Sales Line project at Approx 7 km south east of, Camden, NSW 2570 in the Mining (Onshore - oil & gas). Construction and operation of an underground gas gathering system. Construction of a sales line to the AGL main trunk line. Click for more details...

ATP-691 - MEGAN/RYAN
A project in the QLD Within Not Yet Determined. Coal Core from Ryan 1 is undergoing desorption testing. Click for more details...

MORANBAH COAL SEAM METHANE GAS PROJECT
Moranbah Coal Seam Methane Gas Project is currently at the Construction stage, valued at about $ 20000000 it is Now over 200 petajoules. Click for more details...

PEL 103 - YARROW/FLAX
Mining (Onshore - oil & gas) project at Approx 80 km north north east of, Innamincka, SA 5731 of Resource - Gas type of New development. The well has confirmed the presence of oil through the structural saddle between the Flax and Juniper oilfields, at the same time lowering the lowest known oil level by some 24 metres. Fraccing of the higher basal Patchawarra sandstone had provided initial flowback of 200 barrels of fluid per day (150bbl oil and 50bbl frac fluid), with the well continuing to clean up. Click for more details...

ATP-647P - MYALL CREEK
Mining (Onshore - oil & gas) project at Surat Basin, ., QLD 4999 for New. Myall Creek East 1 is located in Block 2656 of ATP 647P in the Surat Basin. The primary target of the well will be the Tinowan sandstone. Target depth 2,226 metres. Click for more details...

CAMDEN GAS PEL2/PPL1/PPL2- BULLI/AMERICAN/BALGOWNIE/WONGAWILLI/TONGARRA/WOONONA
Resource - Gas - Onshore project at via, Kulnura, NSW 2250 in the Mining (Onshore - oil & gas). PPL-2 is a 21 year licence. 40 wells within stage 2 are planned by mid 2003 approx. Nine wells (Glenlee) are to be drilled before the end of December 2002. The remaining 31 wells to be drilled first half 2003. Stage 2 in total will comprise up to 100 vertical wells, a second treatment plant, all gas gathering lines and a steel gas sales line connecting Stage 2 to the main gas transmission lines. Click for more details...

DEPARTMENT OF INDUSTRY & RESOURCES
Mining (Onshore - oil & gas) project at Canning Basin, ., WA 6999 for New. Seismic Reprocessing Services and a Hydrocarbon Prospectivity Appraisal in the onshore Canning Basin. Click for more details...

EPA 320 L11 JOINT VENTURE GAS PROJECT
Mining (Onshore - oil & gas) New project at 3 kms east of Beharra Spring via, Dongara, WA 6525. This type is Resource - Gas with Private ownership. The Hovea 8 & Jingemia 8 wells producing in the second quarter 2011. Redback South 1 well expected to be commissioned in the third quarter 2011. Planning underway for further well drilling & 2D & 3D seismic programs in late 2011/early 2012. Click for more details...

PEL 104 WESTERN FLANK JOINT VENTURE OIL PROJECT
Mining (Onshore - oil & gas) project at Cooper Basin via, Innamincka, SA 5731 of Resource - Oil type of New development. Investigation of 25 exploration targets identified from 3D seismic data in the channels sands of the Birkenhead Formation. A program to drill 6 exploration wells to increase 2P & 3P reserves as well as contribute to production. Click for more details...

NORTHEAST NSW GAS RESOURCE STUDY
Northeast Nsw Gas Resource Study is currently at the Early Planning stage, valued at about $ 1000000 it is The study will report on the regional markets for this energy source, provide options to overcome physical and regulatory constraints to further exploration and address those significant factors that frustrate the servicing of potential markets in the Region. Eastern Star Gas owns PEL 238 which contains the only known gas resources in the region. Click for more details...

COOPER BASIN - OIL & GAS
Mining (Onshore - oil & gas) New project at Cooper Basin via, Innamincka, SA 5731. This type is Exploration - Onshore with Private ownership. A draft environmental impact report on drilling & well operations and draft environmental impact report and draft statement of environmental objectives for production and processing operations. Click for more details...

ATP-613 - GREGORY CREEK/SUSAN RIVER
Currently at the Exploration, Drilling, Survey & Assessment stage In Fraser Coast Regional is a project estimated to be $ 20000000. This project Gregory-3 was scheduled to spud 24 March 2003 approx and has a proposed total depth of 3200 metres, and will be drilled with air to minimize potential gas flow. Click for more details...

EP389 GINGIN-1 & RED GULLY-1 OIL & GAS PROJECT
Mining (Onshore - oil & gas) New project at Straddling Brand Hwy north & south of, Gingin, WA 6503. This type is Resource - Oil/Gas - Onshore with Private ownership. Estimated total potential Recoverable Reserves are 172 to 190 billion cubic feet of gas & over 6 million barrels of oil & condensate. The main objective in the Gingin & Gingin West prospects are fluvial & continental sandstones of the Early Jurassic aged Cattamarra Coal Measures. Porosities in the Gingin-Bootine area vary from 6%-13% with permeabilities up to 112 millidarcies. This gas reservoir quality & the proximity to pipeline infrastructure & the markets makes for robust economics on gas discovery & any developments for natural gas, & also the value added component of generating electricity. Infrastructure to include a 3km export pipeline that will link up to the DBNGP, a gas & condensate plant, 30 man camp & earthworks. Click for more details...

ATP-299 - TINTABURRA - OIL/GAS RESOURCE
Resource - Oil & Gas - Onshore project at Cooper-Eromanga Basin south west of, Quilpie, QLD 4480 in the Mining (Onshore - oil & gas). It will comprise 49 firm wells and 2 contingent wells. The Tintaburra block contains a resource of 84 million barrels of proved plus probale oil in place. Click for more details...

BOWEN BASIN PROJECT ATP-564/PL94/ATP-602 - MUNGI
Mining (Onshore - oil & gas) project In The Mackay Regional Council Area of Resource - Coalbed Methane - Onshore type. The Mungi phase 1 development programme involves nine new wells plus two existing wells at the Mungi coalbed methane gas field in Queensland. Mungi 05-07 are drilled and awaiting completion. Mungi 09-13 are awaiting drilling. Click for more details...

PEL-27 - NAMPARA/COWRIE - OIL/GAS RESOURCE
Otway Basin 25 km north east of, Robe, SA 5276 Has Pel-27 - Nampara/Cowrie - Oil/Gas Resource currently at Exploration, Drilling, Survey & Assessment stage. The minimum work commitment for this permit year 4 (term 4) is for one exploration well at an indicative cost of $500,000. It is expected that a well will be drilled to test a Sawpit Sandstone objective. Click for more details...

L14 JINGEMIA OIL FIELD
Mining (Onshore - oil & gas) project In The Dandaragan Council Area of Private ownership. The project was estimated to have initially contained 12 million barrels of oil in place, with 4.6 million barrels produced to date. Click for more details...

MELBOURNE TROUGH COALBED METHANE GAS PROJECT - COBBLEDICK/POINT COOK/PORTHEATH
Mining (Onshore - oil & gas) New project at 18km south of Bacchus Marsh, Oak Park, VIC 3046. This type is Resource - Coalbed Methane Gas with Private ownership. The Victorian Department of Natural Resources and Environment has granted the necessary approval for Eastern Star Gas to commence its 5 well coalbed methane pilot production trial in the Melbourne Trough brown coals. The planned Oak Park pilot production trial is designed to test whether the Maddingly seam in EL 4507 is capable of producing significant volumes of gas at commercially viable rates. Wells will be drilled into the target seam on each corner of a 300m by 300m square, with a fifth well drilled in the centre of the square. An electric submersible pump will be installed in each well and operated continuously for an initial six month period with the aim of preferentially de-watering the area surrounding the central well. Water production and any gas production will be monitored regularly during the initial six month pilot production trial. Click for more details...

BP REFINERY - BULWER ISLAND
Gas - Supply project at Tingira St, Pinkenba, QLD 4008 in the Mining (Onshore - oil & gas). 15 PJ of gas over 5 years. Click for more details...

PL 18 - YELLOWBANK CREEK - OIL/GAS RESOURCE
Resource - Oil/Gas project at Bowen-Surat Basin, ., QLD 4999 In The Council Area Of Not Yet Determined of Private. Yellowbank Creek 4 is located on the western side of the producing Yellowbank Creek field. The well is expected to be quickly brought on line, due to existing infrastructure. Production likely late 2004. Click for more details...

ATP 676/PLA194 - KOGAN NORTH - CENTRAL GAS PROCESSING FACILITY
Mining (Onshore - oil & gas) project at Near, Chinchilla, QLD 4413 for New. Central gas processing facility will comprise dehydration, compressing and metering. An evaporation dam will be constructed. Pipeline for the project is 3 km long. Click for more details...

ATP 676/PLA194 - KOGAN NORTH - COMPRESSORS SUPPLY
Atp 676/Pla194 - Kogan North - Compressors Supply is currently at the Construction stage, valued at about $ 3000000 it is Three compressor units. Click for more details...

ATP 768P - POLARIS OIL & GAS PROJECT
Mining (Onshore - oil & gas) New project at Surat Basin Via, Moura, QLD 4718. This type is Resource - Oil/ Gas with Private ownership. Drilling to target the Triassic aged Clematis Sandstone. The program will include up to 12 wells. The program is designed to confirm the net coal, gas content, permeability and productivity of both the Juandah and Taroom coal seams. These two coal sequences form the Walloon Coal Measures in South-East Queensland. Click for more details...

CAMDEN GAS PROJECT - STAGE 2 EXTENSION DAM
Private ownership Mining (Onshore - oil & gas) project In The Camden Council Area for New development. Construction of an earth dam at the MT1 gas well site. The footprint of the dam will be 60mx60m long and 60mx60m wide. The connection of 15 existing coal seam methane wells to the existing Stage 2 project. Click for more details...

SOUTH EAST SOUTH AUSTRALIA PIPELINE - POOLAIJELO TO LADBROKE GROVE
Natural Gas Pipeline New project In The Various Council Area. The pipeline will be 45 km long and 200 mm in diameter. Click for more details...

CAMDEN GAS PROJECT - STAGE 2 - EL BETHEL
Currently at the Construction stage In Wollondilly is a project estimated to be $ 35000000. This project Construction and operation of 10 coal based methane gas wells, gas and water gathering system and access roads. Connecting the 10 new wells to the gas treatment plant through gas pipe lines. Click for more details...

DAANDINE GAS PROJECT - ATP790P/PLA230 - RESOURCE
Mining (Onshore - oil & gas) project at 40 Km West of, Dalby, QLD 4405 of Gas Field type of New development. Development comprises drilling targeting Walloon coal seams. Daandine-1 and 2 have successfully tapped into the coal seams. Daandine-3 will further drill to establish water production rates, pressure communications and aerial extent. The field is expected to supply the Power generation Plant 2.2 petajoules per annum. Click for more details...

ATP 552 - BELLBIRD/BELLBIRD WEST - OIL & GAS RESOURCE
Mining (Onshore - oil & gas) project at Surat Basin near, Roma, QLD 4455 for New. ATP's 552/823P are approximately 5 km west of the Bellbird-1 well which flowed approximately 12 barrels of oil per day on test from tight Permian reservoirs when drilled in 1984. The prospects are located in the prospective oil-prone portion of the Surat Basin, approximately 12 km to the northeast of the Alton Oil Field. Click for more details...

BONAPARTE GAS PIPELINE
J/V - Private & Govt ownership Mining (Onshore - oil & gas) project In The Coomalie Community Council Area for New development. To construct a gas pipeline from the Blacktip Gas Plant near Wadeye (Port Keats) to meet the existing Amadeus to Darwin Gas Pipeline on Ban Ban Springs Station in the Northern Territory. The pipeline will follow a route of approximately 275km and will initially be capable of delivering 30 petajoules per year. Click for more details...

JACARANDA RIDGE #2 PEL 255 PROJECT
A project in the VIC Within Otway Basin. Reserves report of 36 844 1P (proven) boe (barrel of oil equivalent), 131 000 2P (probable) boe and 280 655 3P (possible) boe. Click for more details...

GLADSTONE LIQUEFIED NATURAL GAS (GLNG) PROJECT
Mining (Onshore - oil & gas) New project at On, Curtis Island, QLD 4680. This type is Gas Field Development/Pipeline/Lng Plant with Private ownership. A project to develop gasfields in the Bowen & Surat Basins & then pipe gas to a processing plant on Curtis Island where 2 trains will produce 7.8 million tonnes per annum (Mtpa) of liquefied natural gas (LNG) for export. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - INSTRUMENTS
A project in the WA Within Ashburton. For the provision of instruments & connections. Click for more details...

ATP 1056P TAIPAN JOINT VENTURE OIL & GAS PROJECT
Currently at the Exploration, Drilling, Survey & Assessment stage In Bulloo Shire is a project estimated to be $ 5000000. This project A project located south of Jackson. Drilling of 4 exploration wells (Andromedae-1, Braford-1, Rani-1 & Triangulum-1) may be followed by 3 more. Click for more details...

GLADSTONE LIQUEFIED NATURAL GAS (GLNG) PROJECT - COAL SEAM GAS FIELDS - ACCOMMODATION PACKAGES
Gladstone Liquefied Natural Gas (Glng) Project - Coal Seam Gas Fields - Accommodation Packages is currently at the Construction stage, valued at about $ 10000000 it is For the provision of accommodation camps. Click for more details...

EPS 253 & 286 AMADEUS BASIN OIL & GAS PROJECT NOT PUBLISHED
Private ownership Mining (Onshore - oil & gas) project In The Alice Springs Town Council Area for New development. A project in the vicinity of conventional oil & gas discoveries. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - DRILLING RIG SUPPLY
Mining (Onshore - oil & gas) New project at Bowen & Surat Basins, ., QLD 4999. This type is Drilling Rig Supply Contract with Private ownership. Supply of a drilling rig (Rig 2) for 6 months with a 6 month extension option. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT EARTHWORKS
Well Head Siteworks/Roadworks project at Surat Basin via, Miles, QLD 4415 In The Council Area Of Western Downs Regional of Private. A 3 year contract for earthworks. To include clearing, grading & building well sites & roads. Click for more details...

CHEVRON AUSTRALIA - OPERATIONS - COMMODITY CHEMICALS
Mining (Onshore - oil & gas) project at On, Barrow Island, WA 6712 for New. For the supply of commodity chemicals. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - PROCESSING FACILITIES
Mining (Onshore - oil & gas) project for New development. Construction of the balance of 12 field compressor stations (FCS) & 3 central processing plants (CPP). Each FCS will need up to 7ha & will include a flare, up to 8 screw compressors, a water management system including a pond as well as a substation/switchyard if connected to the grid instead of being powered by decentralised gas fired turbines. Associated infrastructure to include access tracks, warehouses, construction camps, operations camps, offices & telecommunication services. Each CPP to need up to 19ha & will include a flare, a tri-ethylene glycol (TEG) unit per compressor, plant gas inlet & export systems, drainage, gas or grid power supply, storage for air, nitrogen, water, chemical & lube oil, office & workshop buildings, switch gear & instrument rooms & access roads. Water separated at the well heads will be gathered separately into ponds/tanks prior to treatment & reuse. Click for more details...

ICHTHYS GAS PROJECT - OFFSHORE - GAS EXPORT PIPELINE - CYCLONE PROOFING SERVICES
Landfall site, Darwin, NT 0800 Has Ichthys Gas Project - Offshore - Gas Export Pipeline - Cyclone Proofing Services currently at Construction stage. Design & installation of cyclone proofing items for the offshore Gas Export Pipeline (GEP) Wet Buckle Dewatering, Flooding, Cleaning, Gauging & Hydrotesting Spread. Click for more details...

ROY HILL IRON ORE PROJECT - INFRASTRUCTURE - PORT NON PROCESS - COMMUNICATION & DATA
A project in the WA Within East Pilbara. For the provision of communication & data services. Click for more details...

ROY HILL IRON ORE PROJECT - INFRASTRUCTURE - RAIL NON PROCESS - FUEL & LUBE
Private ownership Mining (Onshore - oil & gas) project In The East Pilbara Council Area for New development. For the provision of fuel & lube. Click for more details...

ROY HILL IRON ORE PROJECT - INFRASTRUCTURE - RAIL NON PROCESS - OVERHEAD CRANES
Currently at the Construction stage In East Pilbara is a project estimated to be $ 10000000. This project For the provision of overhead cranes. Click for more details...

CHEVRON AUSTRALIA - OPERATIONS - GLOBAL QC & INSPECTION SERVICES
Global Qc/Inspection Services project at Various locations & on, Barrow Island, WA 6712 in the Mining (Onshore - oil & gas). For the provision of Global QC & Inspection services. Click for more details...

ARROW ENERGY CSG-LNG BOWEN BASIN GAS PROJECT
., ., QLD 4999 Has Arrow Energy Csg-Lng Bowen Basin Gas Project currently at Tenders & Building stage. For the provision of Air Receivers/Air Accumulators (CGPF & FCF) for Bowen Gas Project. Click for more details...

CHEVRON AUSTRALIA - OPERATIONS - VEHICLE LEASE & MAINTENANCE
New project of Mining (Onshore - oil & gas) project at On & off, Barrow Island, WA 6712. For the provision of Vehicle Lease & Maintenance for personnel transport provision including full fleet lease of light vehicles (consisting of standard work utilities & wagons), flatbed trucks & a minivan. Chevron also requires the Contractor to provide management & maintenance of these leased vehicles from an offsite location. Vehicle requirements for steady state operations are estimations only & are as follows: 1 of minivan; 53 of 4x4 dual cab; 7 of 4x4 wagon; & 2 of single cab flatbed trucks. Click for more details...

NORTHERN GAS PIPELINE ACOUSTIC INVESTIGATION
Mining (Onshore - oil & gas) project for New development. Provision of consultancy services for acoustic investigation for the 623km Northern Gas Pipeline. To include prediction of noise levels from the proposed pipeline, specification of noise management levels & provision of noise mitigation strategies. Click for more details...

NORTHERN GAS PIPELINE AIR IMPACT ASSESSMENT
Mining (Onshore - oil & gas) New project at Warrego (NT) - Mount Isa (QLD), ., NT 8999. This type is Consultancy - For Air Impact Assessment with State ownership. Provision of consultancy services for air impact assessment for the 623km Northern Gas Pipeline. To include prediction of air impacts & comparison to the National Environment Protection Measure. Click for more details...

NORTHERN GAS PIPELINE WELDING ENGINEERING SERVICES
Mining (Onshore - oil & gas) project at Warrego & Mica Creek, ., NT 8999 for New. For the provision of welding engineering advice. Click for more details...

NORTHERN GAS PIPELINE - UNINTERRUPTIBLE POWER SUPPLY
Mining (Onshore - oil & gas) project for New development. For the provision of 2 24VDC Uninterruptible Power Supplies (UPS). Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect