CAMDEN GAS PROJECT - STAGE 2
Gas Gathering System/Sales Line project at Approx 7 km south east of, Camden, NSW 2570 in the Mining (Onshore - oil & gas). Construction and operation of an underground gas gathering system. Construction of a sales line to the AGL main trunk line. Click for more details...

PEL106 COOPER BASIN JOINT VENTURE OIL & GAS PROJECT
Mining (Onshore - oil & gas) project In The Unincorporated Council Area of Resource - Oil/Gas type. A project based on the Brownlow Wet Gas Discovery located on the Beach Farmin block (PEL 106B) & which contains estimated 2C reserves of at least 2.8million barrels of oil equivalent (MMBOE) including 1.3million barrels (MMbbls) of liquid hydrocarbons (light oil, condensate & LPG). Canunda-1 produced over 12,000 barrels (bbls) of condensate & 63 million standard cubic feet (mmscf) of raw gas in extended production testing. Installation of surface production facilities at the Brownlow & Middleton discoveries & connection into the raw gas pipeline gathering system at the South Australian Cooper Basin Joint Venture (SACB) field. Follow up with a 5 wet gas exploration well campaign (Admella-1, Baird-1, Coolawang-1, Haslam-1, Southend-1). Click for more details...

PEL 103 - YARROW/FLAX
Mining (Onshore - oil & gas) project at Approx 80 km north north east of, Innamincka, SA 5731 of Resource - Gas type of New development. The well has confirmed the presence of oil through the structural saddle between the Flax and Juniper oilfields, at the same time lowering the lowest known oil level by some 24 metres. Fraccing of the higher basal Patchawarra sandstone had provided initial flowback of 200 barrels of fluid per day (150bbl oil and 50bbl frac fluid), with the well continuing to clean up. Click for more details...

ATP-647P - MYALL CREEK
Mining (Onshore - oil & gas) project at Surat Basin, ., QLD 4999 for New. Myall Creek East 1 is located in Block 2656 of ATP 647P in the Surat Basin. The primary target of the well will be the Tinowan sandstone. Target depth 2,226 metres. Click for more details...

ATP-700P - STYX
Mining (Onshore - oil & gas) New project at Styx Basin via, Rockhampton, QLD 4700. This type is Resource - Oil & Gas - Onshore with Private ownership. An exploration core hole will be drilled on this block in associated with the planned Boyne River well. Click for more details...

CHINCHILLA CSM GAS DEVELOPMENT - PLA 185/ATP-676
Mining (Onshore - oil & gas) project In The Western Downs Regional Council Area of Development Agreement type. Arrow may supply 4 Peta Joules (PJ) per annum for 15 years to CS Energy, subject to the outcome of feasibility studies to be completed by December 2002. Click for more details...

PL 192 (ATP-471) - MYALL BLOCK - CHURCHIE GAS PROJECT
Mining (Onshore - oil & gas) project at Surat Basin south east of, Roma, QLD 4455 for New. Churchie 4 is located on the producing Churchie gas field and is flowing at 7 million cubic feet per day through a 1 inch choke. This follows earlier discoveries at Churchie 2 and 3. The rig was at a total depth of 2123 metres on 8 January 2004 and the well was being prepared for rig release. The Churchie 4 results increase P reserves, which are the basis for marketing the gas. Click for more details...

DEPARTMENT OF INDUSTRY & RESOURCES
Mining (Onshore - oil & gas) project at Canning Basin, ., WA 6999 for New. Seismic Reprocessing Services and a Hydrocarbon Prospectivity Appraisal in the onshore Canning Basin. Click for more details...

OAK PARK PROJECT - GAS RESOURCE
New project of Mining (Onshore - oil & gas) project at 19km south of, Bacchus Marsh, VIC 3340. The pilot project comprises five wells into the Maddingley Brown Coal Seam (approx 17 metres thick). Includes four wells 300 metres apart surrounding a central well. Pumping of water from the central well is in progress, with reconfiguration of electrical and mechanical services in progress at the end of the September 2003 quarter to enable simultaneous pumping at optimal rates from each of the five wells. This should enable higher water production form each of the five wells, thus accelerating the onset of possible gas desorption. Click for more details...

PEL 115 - OIL & GAS RESOURCE - VENTURA
Mining (Onshore - oil & gas) project at Cooper Basin via, Innamincka, SA 5731 of Resource - Oil & Gas - Onshore type of New development. Prospects include Hornet and Ventura. PEL 115 covers 1,106 square kilometers on the south eastern edge of the Cooper Basin. Due to its location close to current producing fields, the block is broken up into six separate areas. The drill stem test at Ventura 1 is in response to good oil shows. Click for more details...

PEL-27 - NAMPARA/COWRIE - OIL/GAS RESOURCE
Otway Basin 25 km north east of, Robe, SA 5276 Has Pel-27 - Nampara/Cowrie - Oil/Gas Resource currently at Exploration, Drilling, Survey & Assessment stage. The minimum work commitment for this permit year 4 (term 4) is for one exploration well at an indicative cost of $500,000. It is expected that a well will be drilled to test a Sawpit Sandstone objective. Click for more details...

TIPTON WEST PROJECT - ATP-683P - GAS RESOURCE
20 Km South of, Dalby, QLD 4405 Has Tipton West Project - Atp-683p - Gas Resource currently at Construction stage. A 75 well drilling program is in progress as part of the initial 10 PJ pa development program. Resource estimate for probable reserves is 99 PJ and proven reserves is 25 PJ. Click for more details...

L1/L2/EP413 - DENISON
Mining (Onshore - oil & gas) New project at Perth Basin near, Dongara, WA 6525. This type is Resource - Oil/Gas with Private ownership. The Denison D Seismic Survey will be conducted over petroleum tenements L1, L2, EP413 in the Perth Basin near Dongara. Click for more details...

PL 18 - YELLOWBANK CREEK - OIL/GAS RESOURCE
Resource - Oil/Gas project at Bowen-Surat Basin, ., QLD 4999 In The Council Area Of Not Yet Determined of Private. Yellowbank Creek 4 is located on the western side of the producing Yellowbank Creek field. The well is expected to be quickly brought on line, due to existing infrastructure. Production likely late 2004. Click for more details...

MEGASCOLIDES 1 - NARRACAN TROUGH - GAS RESOURCE
Mining (Onshore - oil & gas) New project at Hunter Road, Warragul, VIC 3820. This type is Resource - Coalbed Methane Gas with Private ownership. 2D sesmic survey will explore the Crayfish group level oil play to provide suitable areas for drilling in 2006. The Narracan trough is a black seam extending from near Warragul south to Coal Creek at Korumburra and to Wonthaggi. Megascolides 1 well is expected to be gas charged with CBM targets from 700 to 1100 metres and the conventional gas targets at depths of 1700 metres. Click for more details...

SOUTH EAST SOUTH AUSTRALIA PIPELINE - POOLAIJELO TO LADBROKE GROVE
Natural Gas Pipeline New project In The Wattle Range Council Area. The pipeline will be 45 km long and 200 mm in diameter. Click for more details...

SOUTH EAST SOUTH AUSTRALIA PIPELINE - POOLAIJELO TO LADBROKE GROVE
Natural Gas Pipeline New project In The Various Council Area. The pipeline will be 45 km long and 200 mm in diameter. Click for more details...

EP430 GASCOYNE SUB BASIN - OIL RESOURCE
Mining (Onshore - oil & gas) project In The Carnarvon Council Area of Private ownership. A survey is planned for the Lake Macleod prospect with estimated potential recoverable oil reserves in the order of 150 million barrels. Click for more details...

CAMDEN GAS PROJECT - STAGE 2 - EL BETHEL
Currently at the Construction stage In Wollondilly is a project estimated to be $ 35000000. This project Construction and operation of 10 coal based methane gas wells, gas and water gathering system and access roads. Connecting the 10 new wells to the gas treatment plant through gas pipe lines. Click for more details...

OTWAY BASIN PILOT PROJECT - PILOT PLANT
Mining (Onshore - oil & gas) project at 2 km west of, Curdie Vale, VIC 3268 for New. The CO2 source for the project will be natural gas with a high CO2 content. The CO2 will be separated and compressed, transported by pipeline and then selectively injected into storage horizons potentially ranging in depth from below 1000 metres to almost 2000 metres. Extensive modelling and monitoring programmes will be a major part of this project, to ensure that the movement of CO2 can be predicted and to assess different monitoring technologies. Click for more details...

PADULLA PROJECT - OIL RESOURCE
A project in the SA Within Far North. Development will comprise one exploratory well and six appraisal and development wells and oilfield facilities. Click for more details...

BONAPARTE GAS PIPELINE
J/V - Private & Govt ownership Mining (Onshore - oil & gas) project In The Coomalie Community Council Area for New development. To construct a gas pipeline from the Blacktip Gas Plant near Wadeye (Port Keats) to meet the existing Amadeus to Darwin Gas Pipeline on Ban Ban Springs Station in the Northern Territory. The pipeline will follow a route of approximately 275km and will initially be capable of delivering 30 petajoules per year. Click for more details...

CAMDEN GAS PROJECT - RAZORBACK WELLS - RESOURCE
Resource - Coal Bed Methane project at Finns Rd & Woodbridge Rd, Camden Park, NSW 2568 In The Council Area Of Wollondilly of Private. To construct nine coal seam gas wells including gas gathering systems and access roads. The wells will be connected to the Rosalind Park Gas Plant for production. Click for more details...

QSN LINK GAS PIPELINE
Private ownership Mining (Onshore - oil & gas) project In The Not Yet Determined Council Area for New development. The QSN Link pipeline will extend south-west from the Ballera Gas facility in Queensland. It will pass approximately 7km to the south of Innamincka in South Australia and terminate at the Moomba plant. The pipeline will be some 180km in length, with approximately 90km in Queensland and 91.5km in South Australia. The pipeline will be typical of a modern, small to medium diameter gas transmission pipeline. Final design parameters are yet to be determined, but it is likely to involve the following infrastructure: a buried, high pressure, steel, natural gas pipeline, with a diameter in the order of 400mm, an inlet station at Ballera, above ground facilities at intervals along the pipeline include a mid-line mainline valve, cathodic protection systems and marker signs and an outlet delivery station at Moomba. The construction workforce will be accommodated in temporary camps and at local accommodation. two preliminary campsite locations have been selected which will accommodate a single camp that will be mobilised from one location to the other during the construction phase of the project. construction depots will be used primarily for equipment storage and will typically be co-located with the construction camps. Facilities and equipment stored at the construction depots may include: site office and administration centre, construction vehicles, diesel fuel and lubricants, vehicle maintenance equipment, sand bags, sediment fencing, star droppers and wooden stakes and pipe wrapping and joint coating materials. When the utility is no longer required, the pipeline will be decommissioned in accordance with the regulatory requirements and accepted environmental best practices at the time. currently decommissioning procedures require the removal of all above ground infrastructure and the restoration of associated disturbed areas. Click for more details...

BLOODWOOD CREEK UCG POWER PROJECT
Mining (Onshore - oil & gas) project In The Western Downs Regional Council Area of Private ownership. A power plant project based on underground coal gas (UCG) with late 2009 certified syngas reserves of 11PJ at 1P (proven) level of certainty, 743.9PJ at 2P (proven + probable) & 1042.8PJ at 3P (proven + probable + possible). The 5MW proof-of-concept power station powered by 4 GEC Alsthom Ruston low emission engines to be connected via a 12.6km overhead line to the power grid in October 2011. Development of a commercial scale 20-25MW power station to follow. Click for more details...

TALINGA DEVELOPMENT PROJECT
Mining (Onshore - oil & gas) project In The Western Downs Regional Council Area of Resource - Coal Seam Gas type. The project involves transitioning the existing pilot trial of 12 wells to production of up to 90TJ/day of coal seam gas, which will contribute to the supply of gas to the Darling Downs Power Station. The development will involve installing coal seam gas wells at a spacing of between 750m and 1000m; associated gas and water gathering systems, a gas plant, a produced water treatment facility, evaporation ponds, offices, storage areas, workshops, camp and gravel pits. Based on current well production predictions, this equates to the installation of approximately 100 coal seam gas wells. This project will incorporate a water treatment facility to significantly reduce the evaporation pond surface area down to approximately 170ha. The water treatment facility will employ an integrated membrane system, including reverse osmosis, to achieve an 85% desalination recovery and create a freshwater resource. The freshwater will be discharged to the Condamine River catchment until higher level beneficial used, such as industrial, urban or agricultural use, can be implemented. Click for more details...

GREATER GORGON GAS PROJECT - DOWNSTREAM PRE ASSEMBLY - PREASSEMBLED PIPERACKS P4
Mining (Onshore - oil & gas) project at Via, Barrow Island, WA 6712 for New. For the supply of pre-assembled piperacks. Click for more details...

TALINGA DEVELOPMENT PROJECT STAGE 1 - CIVIL WORKS
Mining (Onshore - oil & gas) project In The Western Downs Regional Council Area of Private ownership. Stage 1 - Civil Works involves earthmoving, hydraulic & civil works up to the completion of the slab & sub-structure. The pipe-laying & superstructure of the facility will be further stages with the pipework to be completed by a specialist company. Click for more details...

NARRABRI COAL SEAM GAS MULTI LATERAL PILOT PROJECT PEL238
Currently at the Construction stage In Narrabri is a project estimated to be $ 25000000. This project At Bibblewindi, 2 adjacent twin-lateral pilots each with 3 vertical production wells plus 2 shield wells on each side of the multi-lateral pilots completed. Gas delivered to existing Wilga Park Power Station by flowlines. At Bibblewindi West, tri-lateral production pilot completed with installation of gas & water transfer lines nearing completion. Click for more details...

SNATCHER OIL & GAS PROJECT
Resource - Oil/Gas project at Cooper Basin via, Coober Pedy, SA 5723 in the Mining (Onshore - oil & gas). The prospect is situated on the Western Margin Oil Trend, with Snatcher-1 a test of whether oil can be stratigraphically trapped within seismically interpreted discrete sand bodies in channel systems present within the Jurassic Birkhead Formation. Click for more details...

PL 16 SILVER SPRINGS UNDERGROUND GAS STORAGE PROJECT
Mining (Onshore - oil & gas) project In The Maranoa Regional Council Area of Private ownership. Reuse of the existing Silver Springs Processing Plant & now depleted, 1.5km deep Silver Springs/Renlim Field underground reservoir for temporary storage of up to 44billion standard cubic feet (Bscf) of gas as part of Queensland Gas Company's Queensland Curtis Liquified Natural Gas (QCLNG) project. Extension at the plant site of the the existing Berwyndale to Wallumbilla & Silver Springs pipelines (PPLs 123 & 4) for gas injection & later withdrawl using 4 refurbished wells & a new well along with an additional 5 monitoring wells. Initial gas injection planned from 2011-2013 & withdrawl expected 2014-2017. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - INSTRUMENTS
A project in the WA Within Ashburton. For the provision of instruments & connections. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - COMPRESSOR UNITS
Private ownership Mining (Onshore - oil & gas) project In The Western Downs Regional Council Area for New development. A contract to deliver multiple gas compressor units & process equipment for gas gathering infrastructure for the QCLNG project. Click for more details...

PEL 91 COOPER BASIN JOINT VENTURE OIL PROJECT - BAUER FIELD
A project in the SA Within Unincorporated. A project thought to have recoverable reserves of 3.5 million barrels (MMbbl) making it one of the largest discoveries on the Western Flank Oil Fairway. The Bauer-1 well which encountered an oil column followed up with 3 appraisal well including the Bauer-3 well which was cased & suspended as a future production well. Initial surface production facilities expected to include gathering pipelines, dewatering & evaporation facilities, oil storage & crude load-out facilities. Lift pumping units to be installed subsequently as required to increase production. Initial production of 800 bbls per day expected to increase to 5000bbls a day. Initial oil transport by truck to the Moomba Crude Oil terminal until an export pipeline from the Bauer Facility to Lycium oil hub is constructed. Click for more details...

ICHTHYS LNG PROJECT - ONSHORE - OPERATIONS CENTRE
Operations Centre project at Blaydin Point, Darwin, NT 0800 In The Council Area Of Darwin City of Private. For the construction of an operations complex area including operations office, central control building and fire station, training and canteen facility, warehouses, workshops laboratory, guardhouse and associated infrastructure. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - DRILLING RIG SUPPLY
Mining (Onshore - oil & gas) New project at Bowen & Surat Basins, ., QLD 4999. This type is Drilling Rig Supply Contract with Private ownership. Supply of a drilling rig (Rig 2) for 6 months with a 6 month extension option. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT EARTHWORKS
Well Head Siteworks/Roadworks project at Surat Basin via, Miles, QLD 4415 In The Council Area Of Western Downs Regional of Private. A 3 year contract for earthworks. To include clearing, grading & building well sites & roads. Click for more details...

SANTOS COOPER BASIN HEAVY WORKOVER SERVICES
Well Overhaul Contract project at Cooper Basin via, Thargomindah, QLD 4492 In The Council Area Of Bulloo Shire of Private. A 2 year contract with 2 x 1 year extension options to workover gas well in the Cooper Basin. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - PROCESSING FACILITIES
Mining (Onshore - oil & gas) project for New development. Construction of the balance of 12 field compressor stations (FCS) & 3 central processing plants (CPP). Each FCS will need up to 7ha & will include a flare, up to 8 screw compressors, a water management system including a pond as well as a substation/switchyard if connected to the grid instead of being powered by decentralised gas fired turbines. Associated infrastructure to include access tracks, warehouses, construction camps, operations camps, offices & telecommunication services. Each CPP to need up to 19ha & will include a flare, a tri-ethylene glycol (TEG) unit per compressor, plant gas inlet & export systems, drainage, gas or grid power supply, storage for air, nitrogen, water, chemical & lube oil, office & workshop buildings, switch gear & instrument rooms & access roads. Water separated at the well heads will be gathered separately into ponds/tanks prior to treatment & reuse. Click for more details...

ICHTHYS LNG PROJECT - ONSHORE - GAS EXPORT PIPELINE - HYDROSTATIC TESTING AND PRE-COMMISSIONING
Mining (Onshore - oil & gas) New project at Blaydin Point via, Darwin, NT 0800. This type is Hydrostatic Testing/Pre-Commissioning with Private ownership. For the provision of hydrostatic testing & pre-commissioning. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - AGGREGATES
New project of Mining (Onshore - oil & gas) project at Around DALBY to DINGO, ., QLD 4999. As support for well engineering operations, supply & haul/deliver rock, armour rock/spalls, aggregate, roadbases, select fill & concrete products in an area from around Dalby in the south to Dingo in the north. Click for more details...

ROY HILL IRON ORE PROJECT - INFRASTRUCTURE - PORT NON PROCESS - COMMUNICATION & DATA
A project in the WA Within East Pilbara. For the provision of communication & data services. Click for more details...

ROY HILL IRON ORE PROJECT - INFRASTRUCTURE - RAIL NON PROCESS - COMPRESSED AIR
New project of Mining (Onshore - oil & gas) project at 110km north of, Newman, WA 6753. For the provision of compressed air. Click for more details...

ROY HILL IRON ORE PROJECT - INFRASTRUCTURE - RAIL NON PROCESS - MODULAR BUILDING
Mining (Onshore - oil & gas) project In The East Pilbara Council Area of Modular Buildings type. For the supply & installation of modular buildings. Click for more details...

QCLNG OPERATIONS - HARDWARE & INDUSTRIAL CONSUMABLES SUPPLIER
Mining (Onshore - oil & gas) project at Suppy bases at CHINCHILLA & GLADSTONE, ., QLD 4999 of Hardware/Tools/Industrial Consumables type of New development. Ongoing contract for a single generalist supplier of workshop & hardware items. Click for more details...

CHEVRON AUSTRALIA - OPERATIONS - VEHICLE LEASE & MAINTENANCE
New project of Mining (Onshore - oil & gas) project at On & off, Barrow Island, WA 6712. For the provision of Vehicle Lease & Maintenance for personnel transport provision including full fleet lease of light vehicles (consisting of standard work utilities & wagons), flatbed trucks & a minivan. Chevron also requires the Contractor to provide management & maintenance of these leased vehicles from an offsite location. Vehicle requirements for steady state operations are estimations only & are as follows: 1 of minivan; 53 of 4x4 dual cab; 7 of 4x4 wagon; & 2 of single cab flatbed trucks. Click for more details...

RED GULLY GAS CONDENSATE FACILITY - OPERATIONS & MAINTENANCE CONTRACT
Private ownership Mining (Onshore - oil & gas) project In The Gingin Council Area for Addition development. For the provision of operations & maintenance services to the Red Gully gas-condensate facility - further contract for 2 years. Click for more details...

NORTHERN GAS PIPELINE AIR IMPACT ASSESSMENT
Mining (Onshore - oil & gas) New project at Warrego (NT) - Mount Isa (QLD), ., NT 8999. This type is Consultancy - For Air Impact Assessment with State ownership. Provision of consultancy services for air impact assessment for the 623km Northern Gas Pipeline. To include prediction of air impacts & comparison to the National Environment Protection Measure. Click for more details...

NORTHERN GAS PIPELINE WELDING ENGINEERING SERVICES
Mining (Onshore - oil & gas) project at Warrego & Mica Creek, ., NT 8999 for New. For the provision of welding engineering advice. Click for more details...

NORTHERN GAS PIPELINE - UNINTERRUPTIBLE POWER SUPPLY
Mining (Onshore - oil & gas) project for New development. For the provision of 2 24VDC Uninterruptible Power Supplies (UPS). Click for more details...