State

Categories

Sub Categories

Click Here to Find Current Projects

List of Onshore - oil & gas Projects


SANTOS CBU - SOUTH WEST QUEENSLAND/NORTHERN SOUTH AUSTRALIAN GAS FIELDS
Santos Cbu - South West Queensland/Northern South Australian Gas Fields is currently at the Construction stage, valued at about $ 50000000 it is The contract is for the provision of integrated engineering, procurement and construction services for Santos' Central Business Unit (CBU), which operates the oil and gas fields in northern South Australia and South West Queensland. The contract is a consolidation of services previously provided by a range of providers into a single contract. A potential of $20-$40 million per annum for and initial three years, with possible extensions up to eight years. Click for more details...

PEL106 COOPER BASIN JOINT VENTURE OIL & GAS PROJECT
Mining (Onshore - oil & gas) project In The Unincorporated Council Area of Resource - Oil/Gas type. A project based on the Brownlow Wet Gas Discovery located on the Beach Farmin block (PEL 106B) & which contains estimated 2C reserves of at least 2.8million barrels of oil equivalent (MMBOE) including 1.3million barrels (MMbbls) of liquid hydrocarbons (light oil, condensate & LPG). Canunda-1 produced over 12,000 barrels (bbls) of condensate & 63 million standard cubic feet (mmscf) of raw gas in extended production testing. Installation of surface production facilities at the Brownlow & Middleton discoveries & connection into the raw gas pipeline gathering system at the South Australian Cooper Basin Joint Venture (SACB) field. Follow up with a 5 wet gas exploration well campaign (Admella-1, Baird-1, Coolawang-1, Haslam-1, Southend-1). Click for more details...

ATP 560P - UTOPIA - OIL & GAS PROJECT
A project in the QLD Within Quilpie Shire. Drilling will target Utopia-5 and Utopia-6. Utopia oil field at present produces 35.4 barrels of oil per day. Resource estimate is 2.86 million barrels of recoverable reserves. Click for more details...

ATP-647P - MYALL CREEK
Mining (Onshore - oil & gas) project at Surat Basin, ., QLD 4999 for New. Myall Creek East 1 is located in Block 2656 of ATP 647P in the Surat Basin. The primary target of the well will be the Tinowan sandstone. Target depth 2,226 metres. Click for more details...

PL 192 (ATP-471) - MYALL BLOCK - CHURCHIE GAS PROJECT
Mining (Onshore - oil & gas) project at Surat Basin south east of, Roma, QLD 4455 for New. Churchie 4 is located on the producing Churchie gas field and is flowing at 7 million cubic feet per day through a 1 inch choke. This follows earlier discoveries at Churchie 2 and 3. The rig was at a total depth of 2123 metres on 8 January 2004 and the well was being prepared for rig release. The Churchie 4 results increase P reserves, which are the basis for marketing the gas. Click for more details...

WEST KIMBERLEY RESOURCE DEVELOPMENT STUDY
Private ownership Mining (Onshore - oil & gas) project In The Various Council Area for New development. Qualified consultants to provide services to undertake a "West Australian Resource Development Study" - a strategic infrastructure planning study identifying the long term requirements for multi-use industrial infrastructure, social infrastructure and associated services related to mineral and petroleum development in the West Kimberley. Click for more details...

DEPARTMENT OF INDUSTRY & RESOURCES
Mining (Onshore - oil & gas) project at Canning Basin, ., WA 6999 for New. Seismic Reprocessing Services and a Hydrocarbon Prospectivity Appraisal in the onshore Canning Basin. Click for more details...

PEL 93 - WORRIOR - OIL/GAS RESOURCE
Mining (Onshore - oil & gas) project In The Unincorporated Council Area of Resource - Oil & Gas type. Resource estimate is 7.7 million barrels of oil and 4.8 billion cubic feet of gas. Worrior 3 is expected to spud October 10, 2005. Click for more details...

PEP-163 OIL & GAS RESOURCE
Mining (Onshore - oil & gas) project In The Greater Geelong Council Area of Private ownership. This permit has an area of approximately 2,923 square kilometres stretching from Geelong to Aireys Inlet including all of the Bellarine Peninsula. Click for more details...

PEL 104 WESTERN FLANK JOINT VENTURE OIL PROJECT
Mining (Onshore - oil & gas) project at Cooper Basin via, Innamincka, SA 5731 of Resource - Oil type of New development. Investigation of 25 exploration targets identified from 3D seismic data in the channels sands of the Birkenhead Formation. A program to drill 6 exploration wells to increase 2P & 3P reserves as well as contribute to production. Click for more details...

EP389 GINGIN-1 & RED GULLY-1 OIL & GAS PROJECT
Mining (Onshore - oil & gas) New project at Straddling Brand Hwy north & south of, Gingin, WA 6503. This type is Resource - Oil/Gas - Onshore with Private ownership. Estimated total potential Recoverable Reserves are 172 to 190 billion cubic feet of gas & over 6 million barrels of oil & condensate. The main objective in the Gingin & Gingin West prospects are fluvial & continental sandstones of the Early Jurassic aged Cattamarra Coal Measures. Porosities in the Gingin-Bootine area vary from 6%-13% with permeabilities up to 112 millidarcies. This gas reservoir quality & the proximity to pipeline infrastructure & the markets makes for robust economics on gas discovery & any developments for natural gas, & also the value added component of generating electricity. Infrastructure to include a 3km export pipeline that will link up to the DBNGP, a gas & condensate plant, 30 man camp & earthworks. Click for more details...

EP-390 OIL/GAS RESOURCE
Mining (Onshore - oil & gas) New project at Canning Basin, approx 100 km south of, Broome, WA 6725. This type is Resource - Oil & Gas - Onshore with Private ownership. Canning Basin. Exploration programme includes 35 km of seismic re-interpretation. Click for more details...

TIPTON WEST PROJECT - ATP-683P - GAS RESOURCE
20 Km South of, Dalby, QLD 4405 Has Tipton West Project - Atp-683p - Gas Resource currently at Construction stage. A 75 well drilling program is in progress as part of the initial 10 PJ pa development program. Resource estimate for probable reserves is 99 PJ and proven reserves is 25 PJ. Click for more details...

MELBOURNE TROUGH COALBED METHANE GAS PROJECT - COBBLEDICK/POINT COOK/PORTHEATH
Mining (Onshore - oil & gas) New project at 18km south of Bacchus Marsh, Oak Park, VIC 3046. This type is Resource - Coalbed Methane Gas with Private ownership. The Victorian Department of Natural Resources and Environment has granted the necessary approval for Eastern Star Gas to commence its 5 well coalbed methane pilot production trial in the Melbourne Trough brown coals. The planned Oak Park pilot production trial is designed to test whether the Maddingly seam in EL 4507 is capable of producing significant volumes of gas at commercially viable rates. Wells will be drilled into the target seam on each corner of a 300m by 300m square, with a fifth well drilled in the centre of the square. An electric submersible pump will be installed in each well and operated continuously for an initial six month period with the aim of preferentially de-watering the area surrounding the central well. Water production and any gas production will be monitored regularly during the initial six month pilot production trial. Click for more details...

CS ENERGY
Mining (Onshore - oil & gas) project In The Maranoa Regional Council Area of Gas Supply Contract type. An early delivery of 3 terrajoules per day will take plane in June, July, August and December 2004. Substantial delivery of 3PJ each year will begin in April 2005. The contract is for five years. Ther amount of gas can be increased by mutual consent to 4PJ per year. Click for more details...

L1/L2/EP413 - DENISON
Mining (Onshore - oil & gas) New project at Perth Basin near, Dongara, WA 6525. This type is Resource - Oil/Gas with Private ownership. The Denison D Seismic Survey will be conducted over petroleum tenements L1, L2, EP413 in the Perth Basin near Dongara. Click for more details...

PEL 106 - SMEGSY - GAS RESOURCE
Mining (Onshore - oil & gas) project In The Far North Council Area of Private ownership. Smegsy 1 has produced gas flows of up to 8 million cubic feet per day from two intervals within the lower Patchawarra formation. Click for more details...

CONDAMINE POWER STATION PROJECT - GAS FIRED
Gas Fired Power Station project at Warrego Hwy, 8Km east of, Miles, QLD 4415 In The Council Area Of Western Downs Regional of Private. A proposed 135 Mw combined cycle gas turbine base load power station, connecting into the Chinchilla substation. Click for more details...

PL 18 - YELLOWBANK CREEK - OIL/GAS RESOURCE
Resource - Oil/Gas project at Bowen-Surat Basin, ., QLD 4999 In The Council Area Of Not Yet Determined of Private. Yellowbank Creek 4 is located on the western side of the producing Yellowbank Creek field. The well is expected to be quickly brought on line, due to existing infrastructure. Production likely late 2004. Click for more details...

ATP 676/PLA194 - KOGAN NORTH - CENTRAL GAS PROCESSING FACILITY
Mining (Onshore - oil & gas) project at Near, Chinchilla, QLD 4413 for New. Central gas processing facility will comprise dehydration, compressing and metering. An evaporation dam will be constructed. Pipeline for the project is 3 km long. Click for more details...

ATP 676/PLA194 - KOGAN NORTH - COMPRESSORS SUPPLY
Atp 676/Pla194 - Kogan North - Compressors Supply is currently at the Construction stage, valued at about $ 3000000 it is Three compressor units. Click for more details...

CAMDEN GAS PROJECT - STAGE 2 EXTENSION DAM
Private ownership Mining (Onshore - oil & gas) project In The Camden Council Area for New development. Construction of an earth dam at the MT1 gas well site. The footprint of the dam will be 60mx60m long and 60mx60m wide. The connection of 15 existing coal seam methane wells to the existing Stage 2 project. Click for more details...

SOUTH EAST SOUTH AUSTRALIA PIPELINE - POOLAIJELO TO LADBROKE GROVE
Natural Gas Pipeline New project In The Various Council Area. The pipeline will be 45 km long and 200 mm in diameter. Click for more details...

QSN LINK GAS PIPELINE
Private ownership Mining (Onshore - oil & gas) project In The Not Yet Determined Council Area for New development. The QSN Link pipeline will extend south-west from the Ballera Gas facility in Queensland. It will pass approximately 7km to the south of Innamincka in South Australia and terminate at the Moomba plant. The pipeline will be some 180km in length, with approximately 90km in Queensland and 91.5km in South Australia. The pipeline will be typical of a modern, small to medium diameter gas transmission pipeline. Final design parameters are yet to be determined, but it is likely to involve the following infrastructure: a buried, high pressure, steel, natural gas pipeline, with a diameter in the order of 400mm, an inlet station at Ballera, above ground facilities at intervals along the pipeline include a mid-line mainline valve, cathodic protection systems and marker signs and an outlet delivery station at Moomba. The construction workforce will be accommodated in temporary camps and at local accommodation. two preliminary campsite locations have been selected which will accommodate a single camp that will be mobilised from one location to the other during the construction phase of the project. construction depots will be used primarily for equipment storage and will typically be co-located with the construction camps. Facilities and equipment stored at the construction depots may include: site office and administration centre, construction vehicles, diesel fuel and lubricants, vehicle maintenance equipment, sand bags, sediment fencing, star droppers and wooden stakes and pipe wrapping and joint coating materials. When the utility is no longer required, the pipeline will be decommissioned in accordance with the regulatory requirements and accepted environmental best practices at the time. currently decommissioning procedures require the removal of all above ground infrastructure and the restoration of associated disturbed areas. Click for more details...

BLOODWOOD CREEK UCG POWER PROJECT
Mining (Onshore - oil & gas) project In The Western Downs Regional Council Area of Private ownership. A power plant project based on underground coal gas (UCG) with late 2009 certified syngas reserves of 11PJ at 1P (proven) level of certainty, 743.9PJ at 2P (proven + probable) & 1042.8PJ at 3P (proven + probable + possible). The 5MW proof-of-concept power station powered by 4 GEC Alsthom Ruston low emission engines to be connected via a 12.6km overhead line to the power grid in October 2011. Development of a commercial scale 20-25MW power station to follow. Click for more details...

PRL 15 - GROWLER - 5 OIL FIELD PRL 15
Currently at the Construction stage In Unincorporated is a project estimated to be $ 5000000. This project Observation shows that the target Birkhead Sandstone in side wall cores over the 17 metres gross interval from 1,732-1,749 metres to be of fair to good porosity in the oil zone. Highly productive Growler-3 oil zone production casing will now be run with Growler-5. Click for more details...

NARRABRI COAL SEAM GAS MULTI LATERAL PILOT PROJECT PEL238
Currently at the Construction stage In Narrabri is a project estimated to be $ 25000000. This project At Bibblewindi, 2 adjacent twin-lateral pilots each with 3 vertical production wells plus 2 shield wells on each side of the multi-lateral pilots completed. Gas delivered to existing Wilga Park Power Station by flowlines. At Bibblewindi West, tri-lateral production pilot completed with installation of gas & water transfer lines nearing completion. Click for more details...

SNATCHER OIL & GAS PROJECT
Resource - Oil/Gas project at Cooper Basin via, Coober Pedy, SA 5723 in the Mining (Onshore - oil & gas). The prospect is situated on the Western Margin Oil Trend, with Snatcher-1 a test of whether oil can be stratigraphically trapped within seismically interpreted discrete sand bodies in channel systems present within the Jurassic Birkhead Formation. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - COMPRESSOR UNITS
Private ownership Mining (Onshore - oil & gas) project In The Western Downs Regional Council Area for New development. A contract to deliver multiple gas compressor units & process equipment for gas gathering infrastructure for the QCLNG project. Click for more details...

MORANBAH GAS PROJECT - WELL DRILLING CONTRACT
A project in the QLD Within Isaac Regional. A project to expand what is already one of the largest operating coal seam gas (CSG) project in Australia. 12 month contract with 1 year option for drilling vertical production wells. Click for more details...

PEL 91 COOPER BASIN JOINT VENTURE OIL PROJECT - BAUER FIELD
A project in the SA Within Unincorporated. A project thought to have recoverable reserves of 3.5 million barrels (MMbbl) making it one of the largest discoveries on the Western Flank Oil Fairway. The Bauer-1 well which encountered an oil column followed up with 3 appraisal well including the Bauer-3 well which was cased & suspended as a future production well. Initial surface production facilities expected to include gathering pipelines, dewatering & evaporation facilities, oil storage & crude load-out facilities. Lift pumping units to be installed subsequently as required to increase production. Initial production of 800 bbls per day expected to increase to 5000bbls a day. Initial oil transport by truck to the Moomba Crude Oil terminal until an export pipeline from the Bauer Facility to Lycium oil hub is constructed. Click for more details...

GLADSTONE LIQUEFIED NATURAL GAS (GLNG) PROJECT - COAL SEAM GAS FIELDS - ACCOMMODATION PACKAGES
Gladstone Liquefied Natural Gas (Glng) Project - Coal Seam Gas Fields - Accommodation Packages is currently at the Construction stage, valued at about $ 10000000 it is For the provision of accommodation camps. Click for more details...

ICHTHYS LNG PROJECT - ONSHORE - OPERATIONS CENTRE
Operations Centre project at Blaydin Point, Darwin, NT 0800 In The Council Area Of Darwin City of Private. For the construction of an operations complex area including operations office, central control building and fire station, training and canteen facility, warehouses, workshops laboratory, guardhouse and associated infrastructure. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT EARTHWORKS
Well Head Siteworks/Roadworks project at Surat Basin via, Miles, QLD 4415 In The Council Area Of Western Downs Regional of Private. A 3 year contract for earthworks. To include clearing, grading & building well sites & roads. Click for more details...

CHEVRON AUSTRALIA - OPERATIONS - COMMODITY CHEMICALS
Mining (Onshore - oil & gas) project at On, Barrow Island, WA 6712 for New. For the supply of commodity chemicals. Click for more details...

SANTOS COOPER BASIN HEAVY WORKOVER SERVICES
Well Overhaul Contract project at Cooper Basin via, Thargomindah, QLD 4492 In The Council Area Of Bulloo Shire of Private. A 2 year contract with 2 x 1 year extension options to workover gas well in the Cooper Basin. Click for more details...

ICHTHYS LNG PROJECT - ONSHORE - GAS EXPORT PIPELINE - HYDROSTATIC TESTING AND PRE-COMMISSIONING
Mining (Onshore - oil & gas) New project at Blaydin Point via, Darwin, NT 0800. This type is Hydrostatic Testing/Pre-Commissioning with Private ownership. For the provision of hydrostatic testing & pre-commissioning. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - AGGREGATES
New project of Mining (Onshore - oil & gas) project at Around DALBY to DINGO, ., QLD 4999. As support for well engineering operations, supply & haul/deliver rock, armour rock/spalls, aggregate, roadbases, select fill & concrete products in an area from around Dalby in the south to Dingo in the north. Click for more details...

ROY HILL IRON ORE PROJECT - INFRASTRUCTURE - PORT NON PROCESS - COMMUNICATION & DATA
A project in the WA Within East Pilbara. For the provision of communication & data services. Click for more details...

ROY HILL IRON ORE PROJECT - INFRASTRUCTURE - PORT NON PROCESS - MODULAR BUILDINGS
Modular Buildings project at 110km north of, Newman, WA 6753 in the Mining (Onshore - oil & gas). For the provision of modular buildings. Click for more details...

ROY HILL IRON ORE PROJECT - INFRASTRUCTURE - PORT NON PROCESS - OVERHEAD CRANES
Mining (Onshore - oil & gas) project In The East Pilbara Council Area of Private ownership. For the provision of overhead cranes. Click for more details...

ROY HILL IRON ORE PROJECT - INFRASTRUCTURE - RAIL NON PROCESS - COMPRESSED AIR
New project of Mining (Onshore - oil & gas) project at 110km north of, Newman, WA 6753. For the provision of compressed air. Click for more details...

ROY HILL IRON ORE PROJECT - INFRASTRUCTURE - RAIL NON PROCESS - OVERHEAD CRANES
Currently at the Construction stage In East Pilbara is a project estimated to be $ 10000000. This project For the provision of overhead cranes. Click for more details...

ROY HILL IRON ORE PROJECT - INFRASTRUCTURE - RAIL NON PROCESS - WASTE WATER TREATMENT
Roy Hill Iron Ore Project - Infrastructure - Rail Non Process - Waste Water Treatment is currently at the Construction stage, valued at about $ 10000000 it is For the provision of waste water treatment. Click for more details...

PL65 GILMORE GAS FIELD LNG PROJECT
A project in the QLD Within Quilpie Shire. Construction of a 56,000tpa liquefied natural gas (LNG) plant adjacent the existing Gilmore gas plant. Click for more details...

CHEVRON AUSTRALIA - OPERATIONS - GLOBAL QC & INSPECTION SERVICES
Global Qc/Inspection Services project at Various locations & on, Barrow Island, WA 6712 in the Mining (Onshore - oil & gas). For the provision of Global QC & Inspection services. Click for more details...

ICHTHYS LNG PROJECT - OPERATIONS - FLANGE MANAGEMENT SERVICES
Mining (Onshore - oil & gas) project In The Darwin City Council Area of Private ownership. For the provision of Flange Management Service for Ichthys Operations. To include but is not limited to the provision of - A flexible, scalable, & modular flange management service to meet the requirements of day to day operations & maintenance, campaign maintenance & shutdown work scopes, across both offshore & onshore facilities. Provision of competent service technicians to perform bolted flange disassembly & assembly. Provision of appropriate resources & support services for day to day operations & maintenance, shutdown & campaign scopes of work, both offshore & onshore. Coordination & development of flange assembly work packs & check sheets. Provision of engineering & technical support for flange assembly & related equipment. Provision of personnel & equipment to complete onsite flange machining. Provision of hire equipment, equipment repair & calibration services to support Company requirements. Click for more details...

RED GULLY GAS CONDENSATE FACILITY - OPERATIONS & MAINTENANCE CONTRACT
Private ownership Mining (Onshore - oil & gas) project In The Gingin Council Area for Addition development. For the provision of operations & maintenance services to the Red Gully gas-condensate facility - further contract for 2 years. Click for more details...

NORTHERN GAS PIPELINE ACOUSTIC INVESTIGATION
Mining (Onshore - oil & gas) project for New development. Provision of consultancy services for acoustic investigation for the 623km Northern Gas Pipeline. To include prediction of noise levels from the proposed pipeline, specification of noise management levels & provision of noise mitigation strategies. Click for more details...

NORTHERN GAS PIPELINE WELDING ENGINEERING SERVICES
Mining (Onshore - oil & gas) project at Warrego & Mica Creek, ., NT 8999 for New. For the provision of welding engineering advice. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect