CAMDEN GAS PROJECT - STAGE 2
Gas Gathering System/Sales Line project at Approx 7 km south east of, Camden, NSW 2570 in the Mining (Onshore - oil & gas). Construction and operation of an underground gas gathering system. Construction of a sales line to the AGL main trunk line. Click for more details...

SANTOS CBU - SOUTH WEST QUEENSLAND/NORTHERN SOUTH AUSTRALIAN GAS FIELDS
Santos Cbu - South West Queensland/Northern South Australian Gas Fields is currently at the Construction stage, valued at about $ 50000000 it is The contract is for the provision of integrated engineering, procurement and construction services for Santos' Central Business Unit (CBU), which operates the oil and gas fields in northern South Australia and South West Queensland. The contract is a consolidation of services previously provided by a range of providers into a single contract. A potential of $20-$40 million per annum for and initial three years, with possible extensions up to eight years. Click for more details...

KOGAN NORTH PROJECT - COAL METHANE RESOURCE
Mining (Onshore - oil & gas) project at 40 km West of, Dalby, QLD 4405 of Gas Field type of New development. A 24 month, 5 well pilot has yielded rates up to 550 MMcf/d and has let to the certification of gas reserves of 83 PJ probable and 157 PJ possible at Kogan North. The development of this 35-35 well project will be for the purpose of supplying 4 PJ of gas per annum for 15 years to CS Energy's Swanbank 'E' power plant, located near Ipswich in Southeast Queensland. Click for more details...

PEL106 COOPER BASIN JOINT VENTURE OIL & GAS PROJECT
Mining (Onshore - oil & gas) project In The Unincorporated Council Area of Resource - Oil/Gas type. A project based on the Brownlow Wet Gas Discovery located on the Beach Farmin block (PEL 106B) & which contains estimated 2C reserves of at least 2.8million barrels of oil equivalent (MMBOE) including 1.3million barrels (MMbbls) of liquid hydrocarbons (light oil, condensate & LPG). Canunda-1 produced over 12,000 barrels (bbls) of condensate & 63 million standard cubic feet (mmscf) of raw gas in extended production testing. Installation of surface production facilities at the Brownlow & Middleton discoveries & connection into the raw gas pipeline gathering system at the South Australian Cooper Basin Joint Venture (SACB) field. Follow up with a 5 wet gas exploration well campaign (Admella-1, Baird-1, Coolawang-1, Haslam-1, Southend-1). Click for more details...

PEP-160 - OIL/GAS RESOURCE
Mining (Onshore - oil & gas) project at Victorian South Australian border in the Otway Basin, ., VIC 3999 of Resource - Oil & Gas - Onshore type of New development. Drilling is planned for early 2006 of Lindsay-1 exploration well to test the gas potential of the Pretty Hill Sandstone. Click for more details...

PEL-432 - PICKABOOBA GAS PROJECT
38 km southwest of, Casino, NSW 2470 Has Pel-432 - Pickabooba Gas Project currently at Early Planning stage. Pickabooba South-1 well will be drilled to 1150 metres depth to test a four way closed structural prospect with 35 PJ (2P) of recoverable gas. Primary target is an intra Ripley Road sandstone that flowed up to 460,000 cubic feet per day of high quality methane gas from Pickabooba-1. Click for more details...

CAMDEN GAS PEL2/PPL1/PPL2- BULLI/AMERICAN/BALGOWNIE/WONGAWILLI/TONGARRA/WOONONA
Resource - Gas - Onshore project at via, Kulnura, NSW 2250 in the Mining (Onshore - oil & gas). PPL-2 is a 21 year licence. 40 wells within stage 2 are planned by mid 2003 approx. Nine wells (Glenlee) are to be drilled before the end of December 2002. The remaining 31 wells to be drilled first half 2003. Stage 2 in total will comprise up to 100 vertical wells, a second treatment plant, all gas gathering lines and a steel gas sales line connecting Stage 2 to the main gas transmission lines. Click for more details...

WEST KIMBERLEY RESOURCE DEVELOPMENT STUDY
Private ownership Mining (Onshore - oil & gas) project In The Various Council Area for New development. Qualified consultants to provide services to undertake a "West Australian Resource Development Study" - a strategic infrastructure planning study identifying the long term requirements for multi-use industrial infrastructure, social infrastructure and associated services related to mineral and petroleum development in the West Kimberley. Click for more details...

OAK PARK PROJECT - GAS RESOURCE
New project of Mining (Onshore - oil & gas) project at 19km south of, Bacchus Marsh, VIC 3340. The pilot project comprises five wells into the Maddingley Brown Coal Seam (approx 17 metres thick). Includes four wells 300 metres apart surrounding a central well. Pumping of water from the central well is in progress, with reconfiguration of electrical and mechanical services in progress at the end of the September 2003 quarter to enable simultaneous pumping at optimal rates from each of the five wells. This should enable higher water production form each of the five wells, thus accelerating the onset of possible gas desorption. Click for more details...

PEL 115 - OIL & GAS RESOURCE - VENTURA
Mining (Onshore - oil & gas) project at Cooper Basin via, Innamincka, SA 5731 of Resource - Oil & Gas - Onshore type of New development. Prospects include Hornet and Ventura. PEL 115 covers 1,106 square kilometers on the south eastern edge of the Cooper Basin. Due to its location close to current producing fields, the block is broken up into six separate areas. The drill stem test at Ventura 1 is in response to good oil shows. Click for more details...

PEL 93 - WORRIOR - OIL/GAS RESOURCE
Mining (Onshore - oil & gas) project In The Unincorporated Council Area of Resource - Oil & Gas type. Resource estimate is 7.7 million barrels of oil and 4.8 billion cubic feet of gas. Worrior 3 is expected to spud October 10, 2005. Click for more details...

EPA 320 L11 JOINT VENTURE GAS PROJECT
Mining (Onshore - oil & gas) New project at 3 kms east of Beharra Spring via, Dongara, WA 6525. This type is Resource - Gas with Private ownership. The Hovea 8 & Jingemia 8 wells producing in the second quarter 2011. Redback South 1 well expected to be commissioned in the third quarter 2011. Planning underway for further well drilling & 2D & 3D seismic programs in late 2011/early 2012. Click for more details...

PEL 104 WESTERN FLANK JOINT VENTURE OIL PROJECT
Mining (Onshore - oil & gas) project at Cooper Basin via, Innamincka, SA 5731 of Resource - Oil type of New development. Investigation of 25 exploration targets identified from 3D seismic data in the channels sands of the Birkenhead Formation. A program to drill 6 exploration wells to increase 2P & 3P reserves as well as contribute to production. Click for more details...

EP389 GINGIN-1 & RED GULLY-1 OIL & GAS PROJECT
Mining (Onshore - oil & gas) New project at Straddling Brand Hwy north & south of, Gingin, WA 6503. This type is Resource - Oil/Gas - Onshore with Private ownership. Estimated total potential Recoverable Reserves are 172 to 190 billion cubic feet of gas & over 6 million barrels of oil & condensate. The main objective in the Gingin & Gingin West prospects are fluvial & continental sandstones of the Early Jurassic aged Cattamarra Coal Measures. Porosities in the Gingin-Bootine area vary from 6%-13% with permeabilities up to 112 millidarcies. This gas reservoir quality & the proximity to pipeline infrastructure & the markets makes for robust economics on gas discovery & any developments for natural gas, & also the value added component of generating electricity. Infrastructure to include a 3km export pipeline that will link up to the DBNGP, a gas & condensate plant, 30 man camp & earthworks. Click for more details...

BOWEN BASIN PROJECT ATP-564/PL94/ATP-602 - MUNGI
Mining (Onshore - oil & gas) project In The Mackay Regional Council Area of Resource - Coalbed Methane - Onshore type. The Mungi phase 1 development programme involves nine new wells plus two existing wells at the Mungi coalbed methane gas field in Queensland. Mungi 05-07 are drilled and awaiting completion. Mungi 09-13 are awaiting drilling. Click for more details...

ATP-574P - NORTH GILIGULGUL/PINELANDS
Mining (Onshore - oil & gas) project at Surat Basin north of, Miles, QLD 4415 of Resource - Coal Bed Methane type of New development. Drilling of Giligulgul North-1. This well is to test the Giligulgul prospect interpreteed from seimsic data to have the potential to contain up to 16 million barels of recoverble oil , if oil is present. Click for more details...

ATP-608P - ROOKWOOD - ONSHORE OIL/GAS RESOURCE
Atp-608p - Rookwood - Onshore Oil/Gas Resource is currently at the Construction stage, valued at about $ 10000000 it is Oil rate from Rookwood South 1 is 400 barrels per day. Rockwood East 1 has been completed as an oil producer. Click for more details...

L14 JINGEMIA OIL FIELD
Mining (Onshore - oil & gas) project In The Dandaragan Council Area of Private ownership. The project was estimated to have initially contained 12 million barrels of oil in place, with 4.6 million barrels produced to date. Click for more details...

L1/L2/EP413 - DENISON
Mining (Onshore - oil & gas) New project at Perth Basin near, Dongara, WA 6525. This type is Resource - Oil/Gas with Private ownership. The Denison D Seismic Survey will be conducted over petroleum tenements L1, L2, EP413 in the Perth Basin near Dongara. Click for more details...

ATP 676/PLA194 - KOGAN NORTH - CENTRAL GAS PROCESSING FACILITY
Mining (Onshore - oil & gas) project at Near, Chinchilla, QLD 4413 for New. Central gas processing facility will comprise dehydration, compressing and metering. An evaporation dam will be constructed. Pipeline for the project is 3 km long. Click for more details...

MEGASCOLIDES 1 - NARRACAN TROUGH - GAS RESOURCE
Mining (Onshore - oil & gas) New project at Hunter Road, Warragul, VIC 3820. This type is Resource - Coalbed Methane Gas with Private ownership. 2D sesmic survey will explore the Crayfish group level oil play to provide suitable areas for drilling in 2006. The Narracan trough is a black seam extending from near Warragul south to Coal Creek at Korumburra and to Wonthaggi. Megascolides 1 well is expected to be gas charged with CBM targets from 700 to 1100 metres and the conventional gas targets at depths of 1700 metres. Click for more details...

DEPARTMENT OF BUSINESS INDUSTRY AND RESOURCE CONSULTANCY
Mining (Onshore - oil & gas) project In The Barkly Shire Council Area of Petrological/Mineralogical/Analytical Services - Contract type. Panel contract for the provision of Petrological, Mineralogical and Analytical services for a period of 3 years. Click for more details...

CAMDEN GAS PROJECT - STAGE 2 - EL BETHEL
Currently at the Construction stage In Wollondilly is a project estimated to be $ 35000000. This project Construction and operation of 10 coal based methane gas wells, gas and water gathering system and access roads. Connecting the 10 new wells to the gas treatment plant through gas pipe lines. Click for more details...

DAANDINE GAS PROJECT - ATP790P/PLA230 - RESOURCE
Mining (Onshore - oil & gas) project at 40 Km West of, Dalby, QLD 4405 of Gas Field type of New development. Development comprises drilling targeting Walloon coal seams. Daandine-1 and 2 have successfully tapped into the coal seams. Daandine-3 will further drill to establish water production rates, pressure communications and aerial extent. The field is expected to supply the Power generation Plant 2.2 petajoules per annum. Click for more details...

CAMDEN GAS PROJECT - SPRING FARM/MENANGLE PARK - RESOURCE
Resource - Coal Base Methane New project In The Camden Council Area. Construction and operation of up 4 surface well locations at Spring Farm and up to 12 surface well locations at Menangle Park (to contain a variety of horizontal, directional and surface-in-seam wells); construction and use of access roads, a gas gathering system and water transport lines; connection of the wells to the Rosalind Park Gas Plant; and production of methane gas. Click for more details...

BLOODWOOD CREEK UCG POWER PROJECT
Mining (Onshore - oil & gas) project In The Western Downs Regional Council Area of Private ownership. A power plant project based on underground coal gas (UCG) with late 2009 certified syngas reserves of 11PJ at 1P (proven) level of certainty, 743.9PJ at 2P (proven + probable) & 1042.8PJ at 3P (proven + probable + possible). The 5MW proof-of-concept power station powered by 4 GEC Alsthom Ruston low emission engines to be connected via a 12.6km overhead line to the power grid in October 2011. Development of a commercial scale 20-25MW power station to follow. Click for more details...

JACARANDA RIDGE #2 PEL 255 PROJECT
A project in the VIC Within Otway Basin. Reserves report of 36 844 1P (proven) boe (barrel of oil equivalent), 131 000 2P (probable) boe and 280 655 3P (possible) boe. Click for more details...

GLADSTONE LIQUEFIED NATURAL GAS (GLNG) PROJECT
Mining (Onshore - oil & gas) New project at On, Curtis Island, QLD 4680. This type is Gas Field Development/Pipeline/Lng Plant with Private ownership. A project to develop gasfields in the Bowen & Surat Basins & then pipe gas to a processing plant on Curtis Island where 2 trains will produce 7.8 million tonnes per annum (Mtpa) of liquefied natural gas (LNG) for export. Click for more details...

GREATER GORGON GAS PROJECT - DOWNSTREAM PRE ASSEMBLY - PREASSEMBLED PIPERACKS P4
Mining (Onshore - oil & gas) project at Via, Barrow Island, WA 6712 for New. For the supply of pre-assembled piperacks. Click for more details...

NARRABRI COAL SEAM GAS MULTI LATERAL PILOT PROJECT PEL238
Currently at the Construction stage In Narrabri is a project estimated to be $ 25000000. This project At Bibblewindi, 2 adjacent twin-lateral pilots each with 3 vertical production wells plus 2 shield wells on each side of the multi-lateral pilots completed. Gas delivered to existing Wilga Park Power Station by flowlines. At Bibblewindi West, tri-lateral production pilot completed with installation of gas & water transfer lines nearing completion. Click for more details...

PL 16 SILVER SPRINGS UNDERGROUND GAS STORAGE PROJECT
Mining (Onshore - oil & gas) project In The Maranoa Regional Council Area of Private ownership. Reuse of the existing Silver Springs Processing Plant & now depleted, 1.5km deep Silver Springs/Renlim Field underground reservoir for temporary storage of up to 44billion standard cubic feet (Bscf) of gas as part of Queensland Gas Company's Queensland Curtis Liquified Natural Gas (QCLNG) project. Extension at the plant site of the the existing Berwyndale to Wallumbilla & Silver Springs pipelines (PPLs 123 & 4) for gas injection & later withdrawl using 4 refurbished wells & a new well along with an additional 5 monitoring wells. Initial gas injection planned from 2011-2013 & withdrawl expected 2014-2017. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - COMPRESSOR UNITS
Private ownership Mining (Onshore - oil & gas) project In The Western Downs Regional Council Area for New development. A contract to deliver multiple gas compressor units & process equipment for gas gathering infrastructure for the QCLNG project. Click for more details...

MORANBAH GAS PROJECT - WELL DRILLING CONTRACT
A project in the QLD Within Isaac Regional. A project to expand what is already one of the largest operating coal seam gas (CSG) project in Australia. 12 month contract with 1 year option for drilling vertical production wells. Click for more details...

GLADSTONE LIQUEFIED NATURAL GAS (GLNG) PROJECT - COAL SEAM GAS FIELDS - ACCOMMODATION PACKAGES
Gladstone Liquefied Natural Gas (Glng) Project - Coal Seam Gas Fields - Accommodation Packages is currently at the Construction stage, valued at about $ 10000000 it is For the provision of accommodation camps. Click for more details...

EPS 253 & 286 AMADEUS BASIN OIL & GAS PROJECT NOT PUBLISHED
Private ownership Mining (Onshore - oil & gas) project In The Alice Springs Town Council Area for New development. A project in the vicinity of conventional oil & gas discoveries. Click for more details...

ICHTHYS LNG PROJECT - ONSHORE - OPERATIONS CENTRE
Operations Centre project at Blaydin Point, Darwin, NT 0800 In The Council Area Of Darwin City of Private. For the construction of an operations complex area including operations office, central control building and fire station, training and canteen facility, warehouses, workshops laboratory, guardhouse and associated infrastructure. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - DRILLING RIG SUPPLY
Mining (Onshore - oil & gas) New project at Bowen & Surat Basins, ., QLD 4999. This type is Drilling Rig Supply Contract with Private ownership. Supply of a drilling rig (Rig 2) for 6 months with a 6 month extension option. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT EARTHWORKS
Well Head Siteworks/Roadworks project at Surat Basin via, Miles, QLD 4415 In The Council Area Of Western Downs Regional of Private. A 3 year contract for earthworks. To include clearing, grading & building well sites & roads. Click for more details...

ROY HILL IRON ORE PROJECT - INFRASTRUCTURE - PORT NON PROCESS - OVERHEAD CRANES
Mining (Onshore - oil & gas) project In The East Pilbara Council Area of Private ownership. For the provision of overhead cranes. Click for more details...

ROY HILL IRON ORE PROJECT - INFRASTRUCTURE - PORT NON PROCESS - PLUMBING DRAINAGE & HYDRAULICS
Plumbing/Drainage/Hydraulics project at 110km north of, Newman, WA 6753 In The Council Area Of East Pilbara of Private. For the provision of plumbing, drainage & hydraulics services. Click for more details...

ROY HILL IRON ORE PROJECT - INFRASTRUCTURE - RAIL NON PROCESS - COMPRESSED AIR
New project of Mining (Onshore - oil & gas) project at 110km north of, Newman, WA 6753. For the provision of compressed air. Click for more details...

ROY HILL IRON ORE PROJECT - INFRASTRUCTURE - RAIL NON PROCESS - MODULAR BUILDING
Mining (Onshore - oil & gas) project In The East Pilbara Council Area of Modular Buildings type. For the supply & installation of modular buildings. Click for more details...

ROY HILL IRON ORE PROJECT - INFRASTRUCTURE - RAIL NON PROCESS - OVERHEAD CRANES
Currently at the Construction stage In East Pilbara is a project estimated to be $ 10000000. This project For the provision of overhead cranes. Click for more details...

CHEVRON AUSTRALIA - OPERATIONS - GLOBAL QC & INSPECTION SERVICES
Global Qc/Inspection Services project at Various locations & on, Barrow Island, WA 6712 in the Mining (Onshore - oil & gas). For the provision of Global QC & Inspection services. Click for more details...

ARROW ENERGY CSG-LNG BOWEN BASIN GAS PROJECT
., ., QLD 4999 Has Arrow Energy Csg-Lng Bowen Basin Gas Project currently at Tenders & Building stage. For the provision of Air Receivers/Air Accumulators (CGPF & FCF) for Bowen Gas Project. Click for more details...

CHEVRON AUSTRALIA - OPERATIONS - VEHICLE LEASE & MAINTENANCE
New project of Mining (Onshore - oil & gas) project at On & off, Barrow Island, WA 6712. For the provision of Vehicle Lease & Maintenance for personnel transport provision including full fleet lease of light vehicles (consisting of standard work utilities & wagons), flatbed trucks & a minivan. Chevron also requires the Contractor to provide management & maintenance of these leased vehicles from an offsite location. Vehicle requirements for steady state operations are estimations only & are as follows: 1 of minivan; 53 of 4x4 dual cab; 7 of 4x4 wagon; & 2 of single cab flatbed trucks. Click for more details...

ATP852/ATP768 - QCLNG SURAT NORTH (CHARLIE) PROJECT - VESSEL INSPECTION
New project of Mining (Onshore - oil & gas) project at 20km North of, Wandoan, QLD 4419. For the provision of Pressure Vessel Inspection including all required material, equipment & personnel & provide all handover documents associated with this service for the Projects facilities. Internal Inspections: The successful service provider shall conduct internal inspections & record information about the condition of the internal surfaces, welds & process components of pressure equipment. This usually requires confined space vessel entry or visual inspections using equipment such as boroscopes, video scopes & cameras or alternatively ultrasonic or radiographic testing. External Inspections: The purpose of the external inspection is to detect anomalies or defects such as corrosion, leaks, bulging, signs of excessive heat or cold, or signs of cracking including comprehensive visual inspection, which may be supplemented by non-destructive examination methods such as dye penetrant, magnetic particle, ultrasonic & radiography inspection. The successful service providers personnel will be working in accordance with CPB Contractors site safety, environmental & quality management plans. Click for more details...

NORTHERN GAS PIPELINE WELDING ENGINEERING SERVICES
Mining (Onshore - oil & gas) project at Warrego & Mica Creek, ., NT 8999 for New. For the provision of welding engineering advice. Click for more details...

NORTHERN GAS PIPELINE - UNINTERRUPTIBLE POWER SUPPLY
Mining (Onshore - oil & gas) project for New development. For the provision of 2 24VDC Uninterruptible Power Supplies (UPS). Click for more details...

TUBRIDGI GAS STORAGE FACILITY
New project of Mining (Onshore - oil & gas) project at 30km from, Onslow, WA 6710. Works to include the construction of Western Australia's largest gas storage facility with a storage capacity of around 42PJ & daily injection & withdrawal rates of around 50TJ/day. Click for more details...