State

Categories

Sub Categories

Click Here to Find Current Projects

List of Onshore - oil & gas Projects


CAMDEN GAS PROJECT - STAGE 2
Gas Gathering System/Sales Line project at Approx 7 km south east of, Camden, NSW 2570 in the Mining (Onshore - oil & gas). Construction and operation of an underground gas gathering system. Construction of a sales line to the AGL main trunk line. Click for more details...

ATP-691 - MEGAN/RYAN
A project in the QLD Within Not Yet Determined. Coal Core from Ryan 1 is undergoing desorption testing. Click for more details...

PEL106 COOPER BASIN JOINT VENTURE OIL & GAS PROJECT
Mining (Onshore - oil & gas) project In The Unincorporated Council Area of Resource - Oil/Gas type. A project based on the Brownlow Wet Gas Discovery located on the Beach Farmin block (PEL 106B) & which contains estimated 2C reserves of at least 2.8million barrels of oil equivalent (MMBOE) including 1.3million barrels (MMbbls) of liquid hydrocarbons (light oil, condensate & LPG). Canunda-1 produced over 12,000 barrels (bbls) of condensate & 63 million standard cubic feet (mmscf) of raw gas in extended production testing. Installation of surface production facilities at the Brownlow & Middleton discoveries & connection into the raw gas pipeline gathering system at the South Australian Cooper Basin Joint Venture (SACB) field. Follow up with a 5 wet gas exploration well campaign (Admella-1, Baird-1, Coolawang-1, Haslam-1, Southend-1). Click for more details...

MORANBAH COAL SEAM METHANE GAS PROJECT
Moranbah Coal Seam Methane Gas Project is currently at the Construction stage, valued at about $ 20000000 it is Now over 200 petajoules. Click for more details...

PEP-160 - OIL/GAS RESOURCE
Mining (Onshore - oil & gas) project at Victorian South Australian border in the Otway Basin, ., VIC 3999 of Resource - Oil & Gas - Onshore type of New development. Drilling is planned for early 2006 of Lindsay-1 exploration well to test the gas potential of the Pretty Hill Sandstone. Click for more details...

SANTOS CBU - SOUTH WEST QUEENSLAND/NORTHERN SOUTH AUSTRALIAN GAS FIELDS
Epc Contract New project In The Not Yet Determined Council Area. The contract is for the provision of integrated engineering, procurement and construction services for Santos' Central Business Unit (CBU), which operates the oil and gas fields in northern South Australia and South West Queensland. The contract is a consolidation of services previously provided by a range of providers into a single contract. A potential of $20-$40 million per annum for and initial three years, with possible extensions up to eight years. Click for more details...

PEL-432 - PICKABOOBA GAS PROJECT
38 km southwest of, Casino, NSW 2470 Has Pel-432 - Pickabooba Gas Project currently at Early Planning stage. Pickabooba South-1 well will be drilled to 1150 metres depth to test a four way closed structural prospect with 35 PJ (2P) of recoverable gas. Primary target is an intra Ripley Road sandstone that flowed up to 460,000 cubic feet per day of high quality methane gas from Pickabooba-1. Click for more details...

ATP-647P - MYALL CREEK
Mining (Onshore - oil & gas) project at Surat Basin, ., QLD 4999 for New. Myall Creek East 1 is located in Block 2656 of ATP 647P in the Surat Basin. The primary target of the well will be the Tinowan sandstone. Target depth 2,226 metres. Click for more details...

ATP-700P - STYX
Mining (Onshore - oil & gas) New project at Styx Basin via, Rockhampton, QLD 4700. This type is Resource - Oil & Gas - Onshore with Private ownership. An exploration core hole will be drilled on this block in associated with the planned Boyne River well. Click for more details...

CHINCHILLA CSM GAS DEVELOPMENT - PLA 185/ATP-676
Mining (Onshore - oil & gas) project In The Western Downs Regional Council Area of Development Agreement type. Arrow may supply 4 Peta Joules (PJ) per annum for 15 years to CS Energy, subject to the outcome of feasibility studies to be completed by December 2002. Click for more details...

OAK PARK PROJECT - GAS RESOURCE
New project of Mining (Onshore - oil & gas) project at 19km south of, Bacchus Marsh, VIC 3340. The pilot project comprises five wells into the Maddingley Brown Coal Seam (approx 17 metres thick). Includes four wells 300 metres apart surrounding a central well. Pumping of water from the central well is in progress, with reconfiguration of electrical and mechanical services in progress at the end of the September 2003 quarter to enable simultaneous pumping at optimal rates from each of the five wells. This should enable higher water production form each of the five wells, thus accelerating the onset of possible gas desorption. Click for more details...

PEL 115 - OIL & GAS RESOURCE - VENTURA
Mining (Onshore - oil & gas) project at Cooper Basin via, Innamincka, SA 5731 of Resource - Oil & Gas - Onshore type of New development. Prospects include Hornet and Ventura. PEL 115 covers 1,106 square kilometers on the south eastern edge of the Cooper Basin. Due to its location close to current producing fields, the block is broken up into six separate areas. The drill stem test at Ventura 1 is in response to good oil shows. Click for more details...

PEL 93 - WORRIOR - OIL/GAS RESOURCE
Mining (Onshore - oil & gas) project In The Unincorporated Council Area of Resource - Oil & Gas type. Resource estimate is 7.7 million barrels of oil and 4.8 billion cubic feet of gas. Worrior 3 is expected to spud October 10, 2005. Click for more details...

NORTHEAST NSW GAS RESOURCE STUDY
Northeast Nsw Gas Resource Study is currently at the Early Planning stage, valued at about $ 1000000 it is The study will report on the regional markets for this energy source, provide options to overcome physical and regulatory constraints to further exploration and address those significant factors that frustrate the servicing of potential markets in the Region. Eastern Star Gas owns PEL 238 which contains the only known gas resources in the region. Click for more details...

ATP-299 - TINTABURRA - OIL/GAS RESOURCE
Resource - Oil & Gas - Onshore project at Cooper-Eromanga Basin south west of, Quilpie, QLD 4480 in the Mining (Onshore - oil & gas). It will comprise 49 firm wells and 2 contingent wells. The Tintaburra block contains a resource of 84 million barrels of proved plus probale oil in place. Click for more details...

PEL-8/422/424 - DARLING BASIN - OIL/GAS RESOURCE
Mining (Onshore - oil & gas) project In The Cobar Council Area of Private ownership. Three large prospects have been delineated and drilling is planned subject to availability of an appropriate rig. Click for more details...

EP-390 OIL/GAS RESOURCE
Mining (Onshore - oil & gas) New project at Canning Basin, approx 100 km south of, Broome, WA 6725. This type is Resource - Oil & Gas - Onshore with Private ownership. Canning Basin. Exploration programme includes 35 km of seismic re-interpretation. Click for more details...

ATP-574P - NORTH GILIGULGUL/PINELANDS
Mining (Onshore - oil & gas) project at Surat Basin north of, Miles, QLD 4415 of Resource - Coal Bed Methane type of New development. Drilling of Giligulgul North-1. This well is to test the Giligulgul prospect interpreteed from seimsic data to have the potential to contain up to 16 million barels of recoverble oil , if oil is present. Click for more details...

ATP-608P - ROOKWOOD - ONSHORE OIL/GAS RESOURCE
Atp-608p - Rookwood - Onshore Oil/Gas Resource is currently at the Construction stage, valued at about $ 10000000 it is Oil rate from Rookwood South 1 is 400 barrels per day. Rockwood East 1 has been completed as an oil producer. Click for more details...

L1/L2/EP413 - DENISON
Mining (Onshore - oil & gas) New project at Perth Basin near, Dongara, WA 6525. This type is Resource - Oil/Gas with Private ownership. The Denison D Seismic Survey will be conducted over petroleum tenements L1, L2, EP413 in the Perth Basin near Dongara. Click for more details...

PEL 106 - SMEGSY - GAS RESOURCE
Mining (Onshore - oil & gas) project In The Far North Council Area of Private ownership. Smegsy 1 has produced gas flows of up to 8 million cubic feet per day from two intervals within the lower Patchawarra formation. Click for more details...

ATP 676/PLA194 - KOGAN NORTH - CENTRAL GAS PROCESSING FACILITY
Mining (Onshore - oil & gas) project at Near, Chinchilla, QLD 4413 for New. Central gas processing facility will comprise dehydration, compressing and metering. An evaporation dam will be constructed. Pipeline for the project is 3 km long. Click for more details...

ATP 676/PLA194 - KOGAN NORTH - COMPRESSORS SUPPLY
Atp 676/Pla194 - Kogan North - Compressors Supply is currently at the Construction stage, valued at about $ 3000000 it is Three compressor units. Click for more details...

SOUTH EAST SOUTH AUSTRALIA PIPELINE - POOLAIJELO TO LADBROKE GROVE
Natural Gas Pipeline New project In The Various Council Area. The pipeline will be 45 km long and 200 mm in diameter. Click for more details...

DAANDINE GAS PROJECT - ATP790P/PLA230 - RESOURCE
Mining (Onshore - oil & gas) project at 40 Km West of, Dalby, QLD 4405 of Gas Field type of New development. Development comprises drilling targeting Walloon coal seams. Daandine-1 and 2 have successfully tapped into the coal seams. Daandine-3 will further drill to establish water production rates, pressure communications and aerial extent. The field is expected to supply the Power generation Plant 2.2 petajoules per annum. Click for more details...

ATP 552 - BELLBIRD/BELLBIRD WEST - OIL & GAS RESOURCE
Mining (Onshore - oil & gas) project at Surat Basin near, Roma, QLD 4455 for New. ATP's 552/823P are approximately 5 km west of the Bellbird-1 well which flowed approximately 12 barrels of oil per day on test from tight Permian reservoirs when drilled in 1984. The prospects are located in the prospective oil-prone portion of the Surat Basin, approximately 12 km to the northeast of the Alton Oil Field. Click for more details...

WALLOWAY BASIN GAS PROJECT - STAGE 2 - COMMERCIAL PLANT
Mining (Onshore - oil & gas) project In The Orroroo/Carrieton Council Area of Private ownership. Stage 2 involves a plant to produce around 15PJ syngas a year for a 250MW power station. Click for more details...

CAMDEN GAS PROJECT - SPRING FARM/MENANGLE PARK - RESOURCE
Resource - Coal Base Methane New project In The Camden Council Area. Construction and operation of up 4 surface well locations at Spring Farm and up to 12 surface well locations at Menangle Park (to contain a variety of horizontal, directional and surface-in-seam wells); construction and use of access roads, a gas gathering system and water transport lines; connection of the wells to the Rosalind Park Gas Plant; and production of methane gas. Click for more details...

JACARANDA RIDGE #2 PEL 255 PROJECT
A project in the VIC Within Otway Basin. Reserves report of 36 844 1P (proven) boe (barrel of oil equivalent), 131 000 2P (probable) boe and 280 655 3P (possible) boe. Click for more details...

GLADSTONE LIQUEFIED NATURAL GAS (GLNG) PROJECT
Mining (Onshore - oil & gas) New project at On, Curtis Island, QLD 4680. This type is Gas Field Development/Pipeline/Lng Plant with Private ownership. A project to develop gasfields in the Bowen & Surat Basins & then pipe gas to a processing plant on Curtis Island where 2 trains will produce 7.8 million tonnes per annum (Mtpa) of liquefied natural gas (LNG) for export. Click for more details...

GREATER GORGON GAS PROJECT - DOWNSTREAM PRE ASSEMBLY - PREASSEMBLED PIPERACKS P4
Mining (Onshore - oil & gas) project at Via, Barrow Island, WA 6712 for New. For the supply of pre-assembled piperacks. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - FABRICATION OF DECK RODS
On, Barrow Island, WA 6712 Has Greater Gorgon Gas Project - Lng & Condensate Storage Tanks - Fabrication Of Deck Rods currently at Construction stage. For the fabrication of suspended deck hanger bars & support clips from free issue materials. Click for more details...

GREATER GORGON GAS PROJECT - LNG & CONDENSATE STORAGE TANKS - RESISTANCE TEMPERATURE DETECTORS
Mining (Onshore - oil & gas) project In The Ashburton Council Area of Private ownership. For the provision of resistance temperature detectors. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - COMPRESSOR UNITS
Private ownership Mining (Onshore - oil & gas) project In The Western Downs Regional Council Area for New development. A contract to deliver multiple gas compressor units & process equipment for gas gathering infrastructure for the QCLNG project. Click for more details...

MORANBAH GAS PROJECT - WELL DRILLING CONTRACT
A project in the QLD Within Isaac Regional. A project to expand what is already one of the largest operating coal seam gas (CSG) project in Australia. 12 month contract with 1 year option for drilling vertical production wells. Click for more details...

CHEVRON AUSTRALIA - OPERATIONS - COMMODITY CHEMICALS
Mining (Onshore - oil & gas) project at On, Barrow Island, WA 6712 for New. For the supply of commodity chemicals. Click for more details...

ARROW ENERGY CSG-LNG PROJECT - WELLHEAD SKID FABRICATION
Wellhead Skid Fabrication project at Bowen & Surat Basins, ., QLD 4999 in the Mining (Onshore - oil & gas). A contract for the fabrication & delivery of 54 wellhead skids from supplied designs & intended for a 20 year operational life. To include activities up to pre-commissioning. Click for more details...

ROY HILL IRON ORE PROJECT - INFRASTRUCTURE - PORT NON PROCESS - COMMUNICATION & DATA
A project in the WA Within East Pilbara. For the provision of communication & data services. Click for more details...

ROY HILL IRON ORE PROJECT - INFRASTRUCTURE - PORT NON PROCESS - PLUMBING DRAINAGE & HYDRAULICS
Plumbing/Drainage/Hydraulics project at 110km north of, Newman, WA 6753 In The Council Area Of East Pilbara of Private. For the provision of plumbing, drainage & hydraulics services. Click for more details...

ROY HILL IRON ORE PROJECT - INFRASTRUCTURE - RAIL NON PROCESS - MODULAR BUILDING
Mining (Onshore - oil & gas) project In The East Pilbara Council Area of Modular Buildings type. For the supply & installation of modular buildings. Click for more details...

ROY HILL IRON ORE PROJECT - INFRASTRUCTURE - RAIL NON PROCESS - OVERHEAD CRANES
Currently at the Construction stage In East Pilbara is a project estimated to be $ 10000000. This project For the provision of overhead cranes. Click for more details...

ROY HILL IRON ORE PROJECT - NON-PROCESS INFRASTRUCTURE - MINE SERVICES BUILDINGS - SECURITY SERVICES
A project in the WA Within East Pilbara. For the provision of security services. Click for more details...

QCLNG OPERATIONS - HARDWARE & INDUSTRIAL CONSUMABLES SUPPLIER
Mining (Onshore - oil & gas) project at Suppy bases at CHINCHILLA & GLADSTONE, ., QLD 4999 of Hardware/Tools/Industrial Consumables type of New development. Ongoing contract for a single generalist supplier of workshop & hardware items. Click for more details...

CHEVRON AUSTRALIA - OPERATIONS - GLOBAL QC & INSPECTION SERVICES
Global Qc/Inspection Services project at Various locations & on, Barrow Island, WA 6712 in the Mining (Onshore - oil & gas). For the provision of Global QC & Inspection services. Click for more details...

CHEVRON AUSTRALIA - OPERATIONS - VEHICLE LEASE & MAINTENANCE
New project of Mining (Onshore - oil & gas) project at On & off, Barrow Island, WA 6712. For the provision of Vehicle Lease & Maintenance for personnel transport provision including full fleet lease of light vehicles (consisting of standard work utilities & wagons), flatbed trucks & a minivan. Chevron also requires the Contractor to provide management & maintenance of these leased vehicles from an offsite location. Vehicle requirements for steady state operations are estimations only & are as follows: 1 of minivan; 53 of 4x4 dual cab; 7 of 4x4 wagon; & 2 of single cab flatbed trucks. Click for more details...

RED GULLY GAS CONDENSATE FACILITY - OPERATIONS & MAINTENANCE CONTRACT
Private ownership Mining (Onshore - oil & gas) project In The Gingin Council Area for Addition development. For the provision of operations & maintenance services to the Red Gully gas-condensate facility - further contract for 2 years. Click for more details...

NORTHERN GAS PIPELINE AIR IMPACT ASSESSMENT
Mining (Onshore - oil & gas) New project at Warrego (NT) - Mount Isa (QLD), ., NT 8999. This type is Consultancy - For Air Impact Assessment with State ownership. Provision of consultancy services for air impact assessment for the 623km Northern Gas Pipeline. To include prediction of air impacts & comparison to the National Environment Protection Measure. Click for more details...

ATP852/ATP768 - QCLNG SURAT NORTH (CHARLIE) PROJECT - VESSEL INSPECTION
New project of Mining (Onshore - oil & gas) project at 20km North of, Wandoan, QLD 4419. For the provision of Pressure Vessel Inspection including all required material, equipment & personnel & provide all handover documents associated with this service for the Projects facilities. Internal Inspections: The successful service provider shall conduct internal inspections & record information about the condition of the internal surfaces, welds & process components of pressure equipment. This usually requires confined space vessel entry or visual inspections using equipment such as boroscopes, video scopes & cameras or alternatively ultrasonic or radiographic testing. External Inspections: The purpose of the external inspection is to detect anomalies or defects such as corrosion, leaks, bulging, signs of excessive heat or cold, or signs of cracking including comprehensive visual inspection, which may be supplemented by non-destructive examination methods such as dye penetrant, magnetic particle, ultrasonic & radiography inspection. The successful service providers personnel will be working in accordance with CPB Contractors site safety, environmental & quality management plans. Click for more details...

ATP852/ATP768 - QCLNG SURAT NORTH (CHARLIE) PROJECT - NON DESTRUCTIVE TESTING
Non Destructive Testing New project In The Western Downs Regional Council Area. For the provision of Non-Destructive Testing including all required material, equipment & personnel & provide all handover documents associated with this service for the Projects facilities. The NDT will be predominately in-situ non-destructive examination of both welded structural steel & pressure pipes. (incl. reporting). The successful service providers personnel will be working in accordance with CPB Contractors site safety, environmental & quality management plans. The provision of all equipment/material required to complete Non-Destructive Testing. The equipment/test equipment shall be calibrated to ISO 9001 requirements for Management & Calibration of Test Equipment & the NATA standards & the delivery of Quality Management Plans for Oil & Gas Non Destructive Testing scopes that meet BS RN ISO 9001:2008 (Quality Management Systems Requirements). The delivery of services that comply with the following standards ASME B31.3 ? Process Piping, ASME V ? Non-Destructive Examination, ASME VIII ? Pressure Vessels, ASME IX ? Welding & brazing qualifications, AS1554 ? Structural & Steel Welding (All Sections), AS4041 ? Pressure Piping, AS4037 ? Pressure Equipment, Examination & testing AS4458 ? Pressure Equipment ? Manufacture, AS3992 ? Boilers & pressure vessels ? Welding & brazing qualification - The execution of Non-Destructive Testing (NDT) scopes of work for the Oil & Gas industry over the last 5 years. AS3998 ? Non-Destructive Testing ? Qualification & Certification of Personnel. ISO9712 ? Non-Destructive Testing ? Qualification and Certification of NDT Personnel - The execution off all relevant QA & Completion documentation including (but not limited to) Inspection & Test Checksheets (ITC?s), Inspection & Test Plans (ITP?s), verification Inspection & Test Records (ITR?s) & MDR. Click for more details...

GARBUTT DEPOT REDEVELOPMENT STAGE 2
Depot - Redevelopment - Stage 2 project at Dalrymple Rd (Lot 426, SP250843 & Lot 285, SP101947), Garbutt, QLD 4814 in the Mining (Onshore - oil & gas). Stage 2 of redevelopment works to the existing Ergon Energy oil handling facility depot at Garbutt. Works to occur over 3 sub-stages. Stage 2a & 2b - complete refurbishment of building 3 to include construction of staff amenities, lobby & reception area, work stations, workshop areas, offices, meeting rooms, quiet rooms, training rooms, utility rooms, breakout room with coffee station, kitchen & staff cafe, communications room, video editing suite, testing laboratories, first aid room, storage, mail room, hazardous materials storage & packing bay. Extension of existing mezzanine & installation of new lift, construction of additional wash bay & oil handling facility to provide 2 x 24000L tanks, pumps, hazardous substances enclosures & heavy & light fleet vehicle parking. To include construction of new internal roadways & demolition of canteen amenities building, 5 x underground storage tanks, bunded area & B14 awning. Stage 2c - demolition of buildings 5, 6, 7, 9, 10, 11, 14 & carports, 15, shed, demountable & existing gate house. Concrete pavements & pathways, carpet, glass doors, window blinds & black aluminium spike fencing. Associated electrical works, earthworks, stormwater draining, civil works & car parking. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect