CAMDEN GAS PROJECT - STAGE 2
Gas Gathering System/Sales Line project at Approx 7 km south east of, Camden, NSW 2570 in the Mining (Onshore - oil & gas). Construction and operation of an underground gas gathering system. Construction of a sales line to the AGL main trunk line. Click for more details...

PEL-432 - PICKABOOBA GAS PROJECT
38 km southwest of, Casino, NSW 2470 Has Pel-432 - Pickabooba Gas Project currently at Early Planning stage. Pickabooba South-1 well will be drilled to 1150 metres depth to test a four way closed structural prospect with 35 PJ (2P) of recoverable gas. Primary target is an intra Ripley Road sandstone that flowed up to 460,000 cubic feet per day of high quality methane gas from Pickabooba-1. Click for more details...

CAMDEN GAS PEL2/PPL1/PPL2- BULLI/AMERICAN/BALGOWNIE/WONGAWILLI/TONGARRA/WOONONA
Resource - Gas - Onshore project at via, Kulnura, NSW 2250 in the Mining (Onshore - oil & gas). PPL-2 is a 21 year licence. 40 wells within stage 2 are planned by mid 2003 approx. Nine wells (Glenlee) are to be drilled before the end of December 2002. The remaining 31 wells to be drilled first half 2003. Stage 2 in total will comprise up to 100 vertical wells, a second treatment plant, all gas gathering lines and a steel gas sales line connecting Stage 2 to the main gas transmission lines. Click for more details...

NORTHEAST NSW GAS RESOURCE STUDY
Northeast Nsw Gas Resource Study is currently at the Early Planning stage, valued at about $ 1000000 it is The study will report on the regional markets for this energy source, provide options to overcome physical and regulatory constraints to further exploration and address those significant factors that frustrate the servicing of potential markets in the Region. Eastern Star Gas owns PEL 238 which contains the only known gas resources in the region. Click for more details...

PEL-8/422/424 - DARLING BASIN - OIL/GAS RESOURCE
Mining (Onshore - oil & gas) project In The Cobar Council Area of Private ownership. Three large prospects have been delineated and drilling is planned subject to availability of an appropriate rig. Click for more details...

CAMDEN GAS PROJECT - STAGE 2 EXTENSION DAM
Private ownership Mining (Onshore - oil & gas) project In The Camden Council Area for New development. Construction of an earth dam at the MT1 gas well site. The footprint of the dam will be 60mx60m long and 60mx60m wide. The connection of 15 existing coal seam methane wells to the existing Stage 2 project. Click for more details...

CAMDEN GAS PROJECT - STAGE 2 EXTENSION
Mining (Onshore - oil & gas) New project at Approximately 7 km south east of, Camden, NSW 2570. This type is Resource - Coal Bed Methane with Private ownership. The connection of 6 existing coal seam methane gas wells to the Stage 2 Gas Treatment Plant and the operation of the gas gathering system and the production of methane gas from the 6 existing wells. Click for more details...

CAMDEN GAS PROJECT STAGE 2 - SUGARLOAF FARM EXTENSION
Resource - Coal Bed Methane project at Menangle Road, Gilead, NSW 2560 In The Council Area Of Campbelltown of Private. A two drilling programme will intersect the Bulli, Balgownie and Wongawilli coal seams. Development includes the construction and drilling of seven wells, the construction and operation of the gas gathering system and access roads, the connection of the wells to the stage 2 treatment plant and the operation and production of methane gas from the wells. Click for more details...

CAMDEN GAS PROJECT - STAGE 2 - EL BETHEL
Currently at the Construction stage In Wollondilly is a project estimated to be $ 35000000. This project Construction and operation of 10 coal based methane gas wells, gas and water gathering system and access roads. Connecting the 10 new wells to the gas treatment plant through gas pipe lines. Click for more details...

CAMDEN GAS PROJECT - RAZORBACK WELLS - RESOURCE
Resource - Coal Bed Methane project at Finns Rd & Woodbridge Rd, Camden Park, NSW 2568 In The Council Area Of Wollondilly of Private. To construct nine coal seam gas wells including gas gathering systems and access roads. The wells will be connected to the Rosalind Park Gas Plant for production. Click for more details...

CAMDEN GAS PROJECT - SPRING FARM/MENANGLE PARK - RESOURCE
Resource - Coal Base Methane New project In The Camden Council Area. Construction and operation of up 4 surface well locations at Spring Farm and up to 12 surface well locations at Menangle Park (to contain a variety of horizontal, directional and surface-in-seam wells); construction and use of access roads, a gas gathering system and water transport lines; connection of the wells to the Rosalind Park Gas Plant; and production of methane gas. Click for more details...

NARRABRI COAL SEAM GAS MULTI LATERAL PILOT PROJECT PEL238
Currently at the Construction stage In Narrabri is a project estimated to be $ 25000000. This project At Bibblewindi, 2 adjacent twin-lateral pilots each with 3 vertical production wells plus 2 shield wells on each side of the multi-lateral pilots completed. Gas delivered to existing Wilga Park Power Station by flowlines. At Bibblewindi West, tri-lateral production pilot completed with installation of gas & water transfer lines nearing completion. Click for more details...