State

Categories

Sub Categories

Click Here to Find Current Projects

List of Onshore - oil & gas Projects in QLD


KOGAN NORTH PROJECT - COAL METHANE RESOURCE
Mining (Onshore - oil & gas) project at 40 km West of, Dalby, QLD 4405 of Gas Field type of New development. A 24 month, 5 well pilot has yielded rates up to 550 MMcf/d and has let to the certification of gas reserves of 83 PJ probable and 157 PJ possible at Kogan North. The development of this 35-35 well project will be for the purpose of supplying 4 PJ of gas per annum for 15 years to CS Energy's Swanbank 'E' power plant, located near Ipswich in Southeast Queensland. Click for more details...

ATP-691 - MEGAN/RYAN
A project in the QLD Within Not Yet Determined. Coal Core from Ryan 1 is undergoing desorption testing. Click for more details...

MORANBAH COAL SEAM METHANE GAS PROJECT
Moranbah Coal Seam Methane Gas Project is currently at the Construction stage, valued at about $ 20000000 it is Now over 200 petajoules. Click for more details...

SANTOS CBU - SOUTH WEST QUEENSLAND/NORTHERN SOUTH AUSTRALIAN GAS FIELDS
Epc Contract New project In The Not Yet Determined Council Area. The contract is for the provision of integrated engineering, procurement and construction services for Santos' Central Business Unit (CBU), which operates the oil and gas fields in northern South Australia and South West Queensland. The contract is a consolidation of services previously provided by a range of providers into a single contract. A potential of $20-$40 million per annum for and initial three years, with possible extensions up to eight years. Click for more details...

ATP 560P - UTOPIA - OIL & GAS PROJECT
A project in the QLD Within Quilpie Shire. Drilling will target Utopia-5 and Utopia-6. Utopia oil field at present produces 35.4 barrels of oil per day. Resource estimate is 2.86 million barrels of recoverable reserves. Click for more details...

ATP-647P - MYALL CREEK
Mining (Onshore - oil & gas) project at Surat Basin, ., QLD 4999 for New. Myall Creek East 1 is located in Block 2656 of ATP 647P in the Surat Basin. The primary target of the well will be the Tinowan sandstone. Target depth 2,226 metres. Click for more details...

ATP-700P - STYX
Mining (Onshore - oil & gas) New project at Styx Basin via, Rockhampton, QLD 4700. This type is Resource - Oil & Gas - Onshore with Private ownership. An exploration core hole will be drilled on this block in associated with the planned Boyne River well. Click for more details...

CHINCHILLA CSM GAS DEVELOPMENT - PLA 185/ATP-676
Mining (Onshore - oil & gas) project In The Western Downs Regional Council Area of Development Agreement type. Arrow may supply 4 Peta Joules (PJ) per annum for 15 years to CS Energy, subject to the outcome of feasibility studies to be completed by December 2002. Click for more details...

PL 192 (ATP-471) - MYALL BLOCK - CHURCHIE GAS PROJECT
Mining (Onshore - oil & gas) project at Surat Basin south east of, Roma, QLD 4455 for New. Churchie 4 is located on the producing Churchie gas field and is flowing at 7 million cubic feet per day through a 1 inch choke. This follows earlier discoveries at Churchie 2 and 3. The rig was at a total depth of 2123 metres on 8 January 2004 and the well was being prepared for rig release. The Churchie 4 results increase P reserves, which are the basis for marketing the gas. Click for more details...

ATP-613 - GREGORY CREEK/SUSAN RIVER
Currently at the Exploration, Drilling, Survey & Assessment stage In Fraser Coast Regional is a project estimated to be $ 20000000. This project Gregory-3 was scheduled to spud 24 March 2003 approx and has a proposed total depth of 3200 metres, and will be drilled with air to minimize potential gas flow. Click for more details...

ATP-299 - TINTABURRA - OIL/GAS RESOURCE
Resource - Oil & Gas - Onshore project at Cooper-Eromanga Basin south west of, Quilpie, QLD 4480 in the Mining (Onshore - oil & gas). It will comprise 49 firm wells and 2 contingent wells. The Tintaburra block contains a resource of 84 million barrels of proved plus probale oil in place. Click for more details...

BOWEN BASIN PROJECT ATP-564/PL94/ATP-602 - MUNGI
Mining (Onshore - oil & gas) project In The Mackay Regional Council Area of Resource - Coalbed Methane - Onshore type. The Mungi phase 1 development programme involves nine new wells plus two existing wells at the Mungi coalbed methane gas field in Queensland. Mungi 05-07 are drilled and awaiting completion. Mungi 09-13 are awaiting drilling. Click for more details...

ATP-574P - NORTH GILIGULGUL/PINELANDS
Mining (Onshore - oil & gas) project at Surat Basin north of, Miles, QLD 4415 of Resource - Coal Bed Methane type of New development. Drilling of Giligulgul North-1. This well is to test the Giligulgul prospect interpreteed from seimsic data to have the potential to contain up to 16 million barels of recoverble oil , if oil is present. Click for more details...

ATP-608P - ROOKWOOD - ONSHORE OIL/GAS RESOURCE
Atp-608p - Rookwood - Onshore Oil/Gas Resource is currently at the Construction stage, valued at about $ 10000000 it is Oil rate from Rookwood South 1 is 400 barrels per day. Rockwood East 1 has been completed as an oil producer. Click for more details...

TIPTON WEST PROJECT - ATP-683P - GAS RESOURCE
20 Km South of, Dalby, QLD 4405 Has Tipton West Project - Atp-683p - Gas Resource currently at Construction stage. A 75 well drilling program is in progress as part of the initial 10 PJ pa development program. Resource estimate for probable reserves is 99 PJ and proven reserves is 25 PJ. Click for more details...

CS ENERGY
Mining (Onshore - oil & gas) project In The Maranoa Regional Council Area of Gas Supply Contract type. An early delivery of 3 terrajoules per day will take plane in June, July, August and December 2004. Substantial delivery of 3PJ each year will begin in April 2005. The contract is for five years. Ther amount of gas can be increased by mutual consent to 4PJ per year. Click for more details...

BP REFINERY - BULWER ISLAND
Gas - Supply project at Tingira St, Pinkenba, QLD 4008 in the Mining (Onshore - oil & gas). 15 PJ of gas over 5 years. Click for more details...

CONDAMINE POWER STATION PROJECT - GAS FIRED
Gas Fired Power Station project at Warrego Hwy, 8Km east of, Miles, QLD 4415 In The Council Area Of Western Downs Regional of Private. A proposed 135 Mw combined cycle gas turbine base load power station, connecting into the Chinchilla substation. Click for more details...

PL 18 - YELLOWBANK CREEK - OIL/GAS RESOURCE
Resource - Oil/Gas project at Bowen-Surat Basin, ., QLD 4999 In The Council Area Of Not Yet Determined of Private. Yellowbank Creek 4 is located on the western side of the producing Yellowbank Creek field. The well is expected to be quickly brought on line, due to existing infrastructure. Production likely late 2004. Click for more details...

ATP 676/PLA194 - KOGAN NORTH - CENTRAL GAS PROCESSING FACILITY
Mining (Onshore - oil & gas) project at Near, Chinchilla, QLD 4413 for New. Central gas processing facility will comprise dehydration, compressing and metering. An evaporation dam will be constructed. Pipeline for the project is 3 km long. Click for more details...

ATP 676/PLA194 - KOGAN NORTH - COMPRESSORS SUPPLY
Atp 676/Pla194 - Kogan North - Compressors Supply is currently at the Construction stage, valued at about $ 3000000 it is Three compressor units. Click for more details...

ATP 768P - POLARIS OIL & GAS PROJECT
Mining (Onshore - oil & gas) New project at Surat Basin Via, Moura, QLD 4718. This type is Resource - Oil/ Gas with Private ownership. Drilling to target the Triassic aged Clematis Sandstone. The program will include up to 12 wells. The program is designed to confirm the net coal, gas content, permeability and productivity of both the Juandah and Taroom coal seams. These two coal sequences form the Walloon Coal Measures in South-East Queensland. Click for more details...

DAANDINE GAS PROJECT - ATP790P/PLA230 - RESOURCE
Mining (Onshore - oil & gas) project at 40 Km West of, Dalby, QLD 4405 of Gas Field type of New development. Development comprises drilling targeting Walloon coal seams. Daandine-1 and 2 have successfully tapped into the coal seams. Daandine-3 will further drill to establish water production rates, pressure communications and aerial extent. The field is expected to supply the Power generation Plant 2.2 petajoules per annum. Click for more details...

ATP 552 - BELLBIRD/BELLBIRD WEST - OIL & GAS RESOURCE
Mining (Onshore - oil & gas) project at Surat Basin near, Roma, QLD 4455 for New. ATP's 552/823P are approximately 5 km west of the Bellbird-1 well which flowed approximately 12 barrels of oil per day on test from tight Permian reservoirs when drilled in 1984. The prospects are located in the prospective oil-prone portion of the Surat Basin, approximately 12 km to the northeast of the Alton Oil Field. Click for more details...

QSN LINK GAS PIPELINE
Private ownership Mining (Onshore - oil & gas) project In The Not Yet Determined Council Area for New development. The QSN Link pipeline will extend south-west from the Ballera Gas facility in Queensland. It will pass approximately 7km to the south of Innamincka in South Australia and terminate at the Moomba plant. The pipeline will be some 180km in length, with approximately 90km in Queensland and 91.5km in South Australia. The pipeline will be typical of a modern, small to medium diameter gas transmission pipeline. Final design parameters are yet to be determined, but it is likely to involve the following infrastructure: a buried, high pressure, steel, natural gas pipeline, with a diameter in the order of 400mm, an inlet station at Ballera, above ground facilities at intervals along the pipeline include a mid-line mainline valve, cathodic protection systems and marker signs and an outlet delivery station at Moomba. The construction workforce will be accommodated in temporary camps and at local accommodation. two preliminary campsite locations have been selected which will accommodate a single camp that will be mobilised from one location to the other during the construction phase of the project. construction depots will be used primarily for equipment storage and will typically be co-located with the construction camps. Facilities and equipment stored at the construction depots may include: site office and administration centre, construction vehicles, diesel fuel and lubricants, vehicle maintenance equipment, sand bags, sediment fencing, star droppers and wooden stakes and pipe wrapping and joint coating materials. When the utility is no longer required, the pipeline will be decommissioned in accordance with the regulatory requirements and accepted environmental best practices at the time. currently decommissioning procedures require the removal of all above ground infrastructure and the restoration of associated disturbed areas. Click for more details...

BLOODWOOD CREEK UCG POWER PROJECT
Mining (Onshore - oil & gas) project In The Western Downs Regional Council Area of Private ownership. A power plant project based on underground coal gas (UCG) with late 2009 certified syngas reserves of 11PJ at 1P (proven) level of certainty, 743.9PJ at 2P (proven + probable) & 1042.8PJ at 3P (proven + probable + possible). The 5MW proof-of-concept power station powered by 4 GEC Alsthom Ruston low emission engines to be connected via a 12.6km overhead line to the power grid in October 2011. Development of a commercial scale 20-25MW power station to follow. Click for more details...

TALINGA DEVELOPMENT PROJECT
Mining (Onshore - oil & gas) project In The Western Downs Regional Council Area of Resource - Coal Seam Gas type. The project involves transitioning the existing pilot trial of 12 wells to production of up to 90TJ/day of coal seam gas, which will contribute to the supply of gas to the Darling Downs Power Station. The development will involve installing coal seam gas wells at a spacing of between 750m and 1000m; associated gas and water gathering systems, a gas plant, a produced water treatment facility, evaporation ponds, offices, storage areas, workshops, camp and gravel pits. Based on current well production predictions, this equates to the installation of approximately 100 coal seam gas wells. This project will incorporate a water treatment facility to significantly reduce the evaporation pond surface area down to approximately 170ha. The water treatment facility will employ an integrated membrane system, including reverse osmosis, to achieve an 85% desalination recovery and create a freshwater resource. The freshwater will be discharged to the Condamine River catchment until higher level beneficial used, such as industrial, urban or agricultural use, can be implemented. Click for more details...

TALINGA DEVELOPMENT PROJECT STAGE 1 - CIVIL WORKS
Mining (Onshore - oil & gas) project In The Western Downs Regional Council Area of Private ownership. Stage 1 - Civil Works involves earthmoving, hydraulic & civil works up to the completion of the slab & sub-structure. The pipe-laying & superstructure of the facility will be further stages with the pipework to be completed by a specialist company. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT
Mining (Onshore - oil & gas) project for New development. QCLNG is a project to develop coal seam gas (CSG) fields in the Surat & Bowen Basins, pipe gas to a processing plant to be built on Curtis Island & then export product liquefied natural gas (LNG) by ship. Phase 1 to be constructed to include 2 LNG processing trains with a combined capacity of up to 8.5million tonnes per annum (Mtpa) along with associated gas wells, field facilities & pipelines. Some 820 operational personnel & over 5000 construction personnel expected. Workers accommodation to be required in the Gladstone region (250 approx dwellings) & Western Downs area (280 approx dwellings). Click for more details...

PL 16 SILVER SPRINGS UNDERGROUND GAS STORAGE PROJECT
Mining (Onshore - oil & gas) project In The Maranoa Regional Council Area of Private ownership. Reuse of the existing Silver Springs Processing Plant & now depleted, 1.5km deep Silver Springs/Renlim Field underground reservoir for temporary storage of up to 44billion standard cubic feet (Bscf) of gas as part of Queensland Gas Company's Queensland Curtis Liquified Natural Gas (QCLNG) project. Extension at the plant site of the the existing Berwyndale to Wallumbilla & Silver Springs pipelines (PPLs 123 & 4) for gas injection & later withdrawl using 4 refurbished wells & a new well along with an additional 5 monitoring wells. Initial gas injection planned from 2011-2013 & withdrawl expected 2014-2017. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - COMPRESSOR UNITS
Private ownership Mining (Onshore - oil & gas) project In The Western Downs Regional Council Area for New development. A contract to deliver multiple gas compressor units & process equipment for gas gathering infrastructure for the QCLNG project. Click for more details...

MORANBAH GAS PROJECT - WELL DRILLING CONTRACT
A project in the QLD Within Isaac Regional. A project to expand what is already one of the largest operating coal seam gas (CSG) project in Australia. 12 month contract with 1 year option for drilling vertical production wells. Click for more details...

GLADSTONE LIQUEFIED NATURAL GAS (GLNG) PROJECT - COAL SEAM GAS FIELDS - ACCOMMODATION PACKAGES
Gladstone Liquefied Natural Gas (Glng) Project - Coal Seam Gas Fields - Accommodation Packages is currently at the Construction stage, valued at about $ 10000000 it is For the provision of accommodation camps. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - TRAIN 2
Mining (Onshore - oil & gas) project In The Gladstone Regional Council Area of Private ownership. Construction of a second 4.5 million tonne per annum (Mtpa) liquefied natural gas (LNG) processing train. Further Bowen & Surat Basin gas field development to provide 1000 wells for the first 2 trains. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - DRILLING RIG SUPPLY
Mining (Onshore - oil & gas) New project at Bowen & Surat Basins, ., QLD 4999. This type is Drilling Rig Supply Contract with Private ownership. Supply of a drilling rig (Rig 2) for 6 months with a 6 month extension option. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT EARTHWORKS
Well Head Siteworks/Roadworks project at Surat Basin via, Miles, QLD 4415 In The Council Area Of Western Downs Regional of Private. A 3 year contract for earthworks. To include clearing, grading & building well sites & roads. Click for more details...

SANTOS COOPER BASIN HEAVY WORKOVER SERVICES
Well Overhaul Contract project at Cooper Basin via, Thargomindah, QLD 4492 In The Council Area Of Bulloo Shire of Private. A 2 year contract with 2 x 1 year extension options to workover gas well in the Cooper Basin. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - PROCESSING FACILITIES
Mining (Onshore - oil & gas) project for New development. Construction of the balance of 12 field compressor stations (FCS) & 3 central processing plants (CPP). Each FCS will need up to 7ha & will include a flare, up to 8 screw compressors, a water management system including a pond as well as a substation/switchyard if connected to the grid instead of being powered by decentralised gas fired turbines. Associated infrastructure to include access tracks, warehouses, construction camps, operations camps, offices & telecommunication services. Each CPP to need up to 19ha & will include a flare, a tri-ethylene glycol (TEG) unit per compressor, plant gas inlet & export systems, drainage, gas or grid power supply, storage for air, nitrogen, water, chemical & lube oil, office & workshop buildings, switch gear & instrument rooms & access roads. Water separated at the well heads will be gathered separately into ponds/tanks prior to treatment & reuse. Click for more details...

CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - AGGREGATES
New project of Mining (Onshore - oil & gas) project at Around DALBY to DINGO, ., QLD 4999. As support for well engineering operations, supply & haul/deliver rock, armour rock/spalls, aggregate, roadbases, select fill & concrete products in an area from around Dalby in the south to Dingo in the north. Click for more details...

PL65 GILMORE GAS FIELD LNG PROJECT
A project in the QLD Within Quilpie Shire. Construction of a 56,000tpa liquefied natural gas (LNG) plant adjacent the existing Gilmore gas plant. Click for more details...

QCLNG OPERATIONS - WELL SITE CONTROLS INSTRUMENTATION & AUTOMATION
A project in the QLD Within Various. For the provision of well site controls, instrumentation & automation services. Click for more details...

QCLNG OPERATIONS - HARDWARE & INDUSTRIAL CONSUMABLES SUPPLIER
Mining (Onshore - oil & gas) project at Suppy bases at CHINCHILLA & GLADSTONE, ., QLD 4999 of Hardware/Tools/Industrial Consumables type of New development. Ongoing contract for a single generalist supplier of workshop & hardware items. Click for more details...

ATP852/ATP768 - QCLNG SURAT NORTH (CHARLIE) PROJECT - VESSEL INSPECTION
New project of Mining (Onshore - oil & gas) project at 20km North of, Wandoan, QLD 4419. For the provision of Pressure Vessel Inspection including all required material, equipment & personnel & provide all handover documents associated with this service for the Projects facilities. Internal Inspections: The successful service provider shall conduct internal inspections & record information about the condition of the internal surfaces, welds & process components of pressure equipment. This usually requires confined space vessel entry or visual inspections using equipment such as boroscopes, video scopes & cameras or alternatively ultrasonic or radiographic testing. External Inspections: The purpose of the external inspection is to detect anomalies or defects such as corrosion, leaks, bulging, signs of excessive heat or cold, or signs of cracking including comprehensive visual inspection, which may be supplemented by non-destructive examination methods such as dye penetrant, magnetic particle, ultrasonic & radiography inspection. The successful service providers personnel will be working in accordance with CPB Contractors site safety, environmental & quality management plans. Click for more details...

GARBUTT DEPOT REDEVELOPMENT STAGE 2
Depot - Redevelopment - Stage 2 project at Dalrymple Rd (Lot 426, SP250843 & Lot 285, SP101947), Garbutt, QLD 4814 in the Mining (Onshore - oil & gas). Stage 2 of redevelopment works to the existing Ergon Energy oil handling facility depot at Garbutt. Works to occur over 3 sub-stages. Stage 2a & 2b - complete refurbishment of building 3 to include construction of staff amenities, lobby & reception area, work stations, workshop areas, offices, meeting rooms, quiet rooms, training rooms, utility rooms, breakout room with coffee station, kitchen & staff cafe, communications room, video editing suite, testing laboratories, first aid room, storage, mail room, hazardous materials storage & packing bay. Extension of existing mezzanine & installation of new lift, construction of additional wash bay & oil handling facility to provide 2 x 24000L tanks, pumps, hazardous substances enclosures & heavy & light fleet vehicle parking. To include construction of new internal roadways & demolition of canteen amenities building, 5 x underground storage tanks, bunded area & B14 awning. Stage 2c - demolition of buildings 5, 6, 7, 9, 10, 11, 14 & carports, 15, shed, demountable & existing gate house. Concrete pavements & pathways, carpet, glass doors, window blinds & black aluminium spike fencing. Associated electrical works, earthworks, stormwater draining, civil works & car parking. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect