SANTOS CBU - SOUTH WEST QUEENSLAND/NORTHERN SOUTH AUSTRALIAN GAS FIELDS
Santos Cbu - South West Queensland/Northern South Australian Gas Fields is currently at the Construction stage, valued at about $ 50000000 it is The contract is for the provision of integrated engineering, procurement and construction services for Santos' Central Business Unit (CBU), which operates the oil and gas fields in northern South Australia and South West Queensland. The contract is a consolidation of services previously provided by a range of providers into a single contract. A potential of $20-$40 million per annum for and initial three years, with possible extensions up to eight years. Click for more details...

PEL106 COOPER BASIN JOINT VENTURE OIL & GAS PROJECT
Mining (Onshore - oil & gas) project In The Unincorporated Council Area of Resource - Oil/Gas type. A project based on the Brownlow Wet Gas Discovery located on the Beach Farmin block (PEL 106B) & which contains estimated 2C reserves of at least 2.8million barrels of oil equivalent (MMBOE) including 1.3million barrels (MMbbls) of liquid hydrocarbons (light oil, condensate & LPG). Canunda-1 produced over 12,000 barrels (bbls) of condensate & 63 million standard cubic feet (mmscf) of raw gas in extended production testing. Installation of surface production facilities at the Brownlow & Middleton discoveries & connection into the raw gas pipeline gathering system at the South Australian Cooper Basin Joint Venture (SACB) field. Follow up with a 5 wet gas exploration well campaign (Admella-1, Baird-1, Coolawang-1, Haslam-1, Southend-1). Click for more details...

PEL 103 - YARROW/FLAX
Mining (Onshore - oil & gas) project at Approx 80 km north north east of, Innamincka, SA 5731 of Resource - Gas type of New development. The well has confirmed the presence of oil through the structural saddle between the Flax and Juniper oilfields, at the same time lowering the lowest known oil level by some 24 metres. Fraccing of the higher basal Patchawarra sandstone had provided initial flowback of 200 barrels of fluid per day (150bbl oil and 50bbl frac fluid), with the well continuing to clean up. Click for more details...

PEL-92 - NAMUR SANDSTONE OIL PROJECT (FORMERLY PERLUBIE SOUTH)
Resource - Oil & Gas project at Cooper-Eromanga Basins, ., SA 5999 In The Council Area Of Various of Private. The preliminary evaluation of the logging program shows that Perlubie South-1 has intersected an oil column between 1 313 and 1 316 metres. The oil water contact appears to be very similar to that encountered in Perlubie-1, which lies just to the north. The logs show that the reservoir appears to be a similar high quality to other producing Namur oil reservoirs in the near vicinity. The recent drilling at Butlers-1 well has encountered oil shows. Click for more details...

PEL 115 - OIL & GAS RESOURCE - VENTURA
Mining (Onshore - oil & gas) project at Cooper Basin via, Innamincka, SA 5731 of Resource - Oil & Gas - Onshore type of New development. Prospects include Hornet and Ventura. PEL 115 covers 1,106 square kilometers on the south eastern edge of the Cooper Basin. Due to its location close to current producing fields, the block is broken up into six separate areas. The drill stem test at Ventura 1 is in response to good oil shows. Click for more details...

PEL 93 - WORRIOR - OIL/GAS RESOURCE
Mining (Onshore - oil & gas) project In The Unincorporated Council Area of Resource - Oil & Gas type. Resource estimate is 7.7 million barrels of oil and 4.8 billion cubic feet of gas. Worrior 3 is expected to spud October 10, 2005. Click for more details...

PEL 104 WESTERN FLANK JOINT VENTURE OIL PROJECT
Mining (Onshore - oil & gas) project at Cooper Basin via, Innamincka, SA 5731 of Resource - Oil type of New development. Investigation of 25 exploration targets identified from 3D seismic data in the channels sands of the Birkenhead Formation. A program to drill 6 exploration wells to increase 2P & 3P reserves as well as contribute to production. Click for more details...

COOPER BASIN - OIL & GAS
Mining (Onshore - oil & gas) New project at Cooper Basin via, Innamincka, SA 5731. This type is Exploration - Onshore with Private ownership. A draft environmental impact report on drilling & well operations and draft environmental impact report and draft statement of environmental objectives for production and processing operations. Click for more details...

PEL-27 - NAMPARA/COWRIE - OIL/GAS RESOURCE
Otway Basin 25 km north east of, Robe, SA 5276 Has Pel-27 - Nampara/Cowrie - Oil/Gas Resource currently at Exploration, Drilling, Survey & Assessment stage. The minimum work commitment for this permit year 4 (term 4) is for one exploration well at an indicative cost of $500,000. It is expected that a well will be drilled to test a Sawpit Sandstone objective. Click for more details...

PEL 106 - SMEGSY - GAS RESOURCE
Mining (Onshore - oil & gas) project In The Far North Council Area of Private ownership. Smegsy 1 has produced gas flows of up to 8 million cubic feet per day from two intervals within the lower Patchawarra formation. Click for more details...

SOUTH EAST SOUTH AUSTRALIA PIPELINE - POOLAIJELO TO LADBROKE GROVE
Natural Gas Pipeline New project In The Wattle Range Council Area. The pipeline will be 45 km long and 200 mm in diameter. Click for more details...

PADULLA PROJECT - OIL RESOURCE
A project in the SA Within Far North. Development will comprise one exploratory well and six appraisal and development wells and oilfield facilities. Click for more details...

WALLOWAY BASIN GAS PROJECT - STAGE 2 - COMMERCIAL PLANT
Mining (Onshore - oil & gas) project In The Orroroo/Carrieton Council Area of Private ownership. Stage 2 involves a plant to produce around 15PJ syngas a year for a 250MW power station. Click for more details...

PRL 15 - GROWLER - 5 OIL FIELD PRL 15
Currently at the Construction stage In Unincorporated is a project estimated to be $ 5000000. This project Observation shows that the target Birkhead Sandstone in side wall cores over the 17 metres gross interval from 1,732-1,749 metres to be of fair to good porosity in the oil zone. Highly productive Growler-3 oil zone production casing will now be run with Growler-5. Click for more details...

SNATCHER OIL & GAS PROJECT
Resource - Oil/Gas project at Cooper Basin via, Coober Pedy, SA 5723 in the Mining (Onshore - oil & gas). The prospect is situated on the Western Margin Oil Trend, with Snatcher-1 a test of whether oil can be stratigraphically trapped within seismically interpreted discrete sand bodies in channel systems present within the Jurassic Birkhead Formation. Click for more details...

PEL 91 COOPER BASIN JOINT VENTURE OIL PROJECT - BAUER FIELD
A project in the SA Within Unincorporated. A project thought to have recoverable reserves of 3.5 million barrels (MMbbl) making it one of the largest discoveries on the Western Flank Oil Fairway. The Bauer-1 well which encountered an oil column followed up with 3 appraisal well including the Bauer-3 well which was cased & suspended as a future production well. Initial surface production facilities expected to include gathering pipelines, dewatering & evaporation facilities, oil storage & crude load-out facilities. Lift pumping units to be installed subsequently as required to increase production. Initial production of 800 bbls per day expected to increase to 5000bbls a day. Initial oil transport by truck to the Moomba Crude Oil terminal until an export pipeline from the Bauer Facility to Lycium oil hub is constructed. Click for more details...