State

Categories

Sub Categories

Click Here to Find Current Projects

List of Onshore processing facilities Projects


DEPARTMENT OF INDUSTRY & RESOURCES
Oil & Gas (Onshore processing facilities) project for New development. A consultancy study of "Energy for Minerals Development in the South West Coast Region of Western Australia". Click for more details...

SANTOS CBU - SOUTH WEST QUEENSLAND/NORTHERN SOUTH AUSTRALIAN GAS FIELDS
Santos Cbu - South West Queensland/Northern South Australian Gas Fields is currently at the Construction stage, valued at about $ 50000000 it is The contract is for the provision of integrated engineering, procurement and construction services for Santos' Central Business Unit (CBU), which operates the oil and gas fields in northern South Australia and South West Queensland. The contract is a consolidation of services previously provided by a range of providers into a single contract. A potential of $20-$40 million per annum for and initial three years, with possible extensions up to eight years. Click for more details...

VARANUS ISLAND GAS EXPANSION PROJECT
Oil & Gas (Onshore processing facilities) project at Varanus Island, ., WA 6999 for New. An expansion of capacity from 100Tj/d to around 220 Tj/d. To include a new sales gas compressor, new gas processing train, new stabilisation train and upgrade of existing trains and compressors. Click for more details...

BASSGAS PROJECT - YOLLA/WHITE IBIS
Bassgas Project - Yolla/White Ibis is currently at the Construction stage, valued at about $ 400000000 it is Off-shore platform 135 km north of Burnie, undersea pipeline & on-shore treatment facilities. The construction timetable is as follows: 75MMSCFD onshore gas plant near Lang Lang construction to commence first quarter 2003; 32km onshore pipelines construction to commence third quarter 2003: 147 km sub-sea pipelines construction to commence first quarter 2004; offshore production platform platform installation first quarter installation. The offshore platform will be constructed in South Easet Asia and transported to Bass Strait. Construction of the gas plant located near Lang Lang in south-eastern Victoria will commence in late January 2003. Click for more details...

ATP-592 - DURHAM RANCH PROJECT
Oil & Gas (Onshore processing facilities) project for New development. Likely to include some steelwork/fabrication. Click for more details...

SANTOS CBU - SOUTH WEST QUEENSLAND/NORTHERN SOUTH AUSTRALIAN GAS FIELDS
Epc Contract New project In The Not Yet Determined Council Area. The contract is for the provision of integrated engineering, procurement and construction services for Santos' Central Business Unit (CBU), which operates the oil and gas fields in northern South Australia and South West Queensland. The contract is a consolidation of services previously provided by a range of providers into a single contract. A potential of $20-$40 million per annum for and initial three years, with possible extensions up to eight years. Click for more details...

PORT HEDLAND LNG PLANT
Via, Port Hedland, WA 6721 Has Port Hedland Lng Plant currently at Early Planning stage. The Kimberley Power proposal involved the establishment of an LNG Plant in Port Hedland and the supply of LNG as the primary fuel to be used in new gas fired power plants in each of the above towns. Click for more details...

TELFER PROJECT
Oil & Gas (Onshore processing facilities) project In The Port Hedland Council Area of Gas Comresor Station/Vent/Offices type. Includes a storage room, control room, workshop,equipment room, foyer, kitchen and toilets, vent stack (5 metres high), turbines, scraper launcher, and other equipment for operation of the gas pipeline. The carpark and manouvering area will be sealed and includes four designated carparking spaces. Click for more details...

CAMDEN GAS PEL2/PPL1/PPL2- BULLI/AMERICAN/BALGOWNIE/WONGAWILLI/TONGARRA/WOONONA
Resource - Gas - Onshore project at via, Kulnura, NSW 2250 in the Oil & Gas (Onshore processing facilities). PPL-2 is a 21 year licence. 40 wells within stage 2 are planned by mid 2003 approx. Nine wells (Glenlee) are to be drilled before the end of December 2002. The remaining 31 wells to be drilled first half 2003. Stage 2 in total will comprise up to 100 vertical wells, a second treatment plant, all gas gathering lines and a steel gas sales line connecting Stage 2 to the main gas transmission lines. Click for more details...

LNG TRAIN 4 EXPANSION - TRUNKLINE SYSTEM EXPANSION (TSEP)
Rock Dumping project at Burrup Peninsula, Dampier, WA 6713 in the Oil & Gas (Onshore processing facilities). Involves the placement of 450,000 cubic metres approx of locally quarried rock on the trunkline to stabilise it on the seabed. The rock will be placed over the trunkline for the first 30 km from shore, as well as around the concrete gravity anchors in the deepwater section. Australian-based crews will be used on board the specialist vessels, SSDV Jan Steen and FFPV Rocky Giant as well as onshore to load rock on board the vessels. Click for more details...

CHINCHILLA CSM GAS DEVELOPMENT - PLA 185/ATP-676
Oil & Gas (Onshore processing facilities) project In The Western Downs Regional Council Area of Development Agreement type. Arrow may supply 4 Peta Joules (PJ) per annum for 15 years to CS Energy, subject to the outcome of feasibility studies to be completed by December 2002. Click for more details...

EAST SPAR GAS OPERATIONS
Oil & Gas (Onshore processing facilities) project at Approximately 160 km west of, Dampier, WA 6713 of Field Development - Flame Detection Equipment type of New development. Supply of flame & gas detection equipment for new gas field development. Click for more details...

MINERVA GAS PROJECT
Onshore Facilities project at Brumby's Rd, Port Campbell, VIC 3269 In The Council Area Of Colac-Otway of Private. The gas plant will have a gross design production capacity of 150 terajoules of gas per day (TJ/d). Approximately 600 barrels (gross) of stabilised condensate will also be produced per day at initial gas sales rates. Click for more details...

WEST KIMBERLEY RESOURCE DEVELOPMENT STUDY
Private ownership Oil & Gas (Onshore processing facilities) project In The Various Council Area for New development. Qualified consultants to provide services to undertake a "West Australian Resource Development Study" - a strategic infrastructure planning study identifying the long term requirements for multi-use industrial infrastructure, social infrastructure and associated services related to mineral and petroleum development in the West Kimberley. Click for more details...

VARANUS ISLAND GAS EXPANSION PROJECT
Oil & Gas (Onshore processing facilities) project In The Offshore Council Area of Compressor Station Packaging type. Includes installation. Click for more details...

VARANUS ISLAND GAS EXPANSION PROJECT
Gas Processing Train project at Varanus Island, ., WA 6999 In The Council Area Of Offshore of Private. Train 3. Click for more details...

GAS PROCESSING PLANT - REGIONAL VICTORIA
Operation/Maintenance/Engineering Support Contract New project In The Not Yet Determined Council Area. Natural gas and associated liquids will be piped from the offshore fields to an onshore gas processing plant where gas will be treated and exported into an installed pipeline grid with liquids removed and sold. To be a continuous operation requiring production operations, maintenance management as well as operations engineering support. Minimum manning principles shall apply with an appropriate level of staff skilling. It is preferred the the same company provide core operations and maintenance, however, alliance arrangements will be considered. Contract may be up to five years plus extensions. The contractor will be responsible for the following: operation and maintenance of unmanned offshore platform/pipeline/onshore plant; establishing and implementing maintenance management system and operational procedures and for providing competent operation and maintenance staff, including all training requirements. The asset design life is 30 years. Maximum plant throughput is 205 Tj per day. Liquids produced include condensate, propane and autogas. Expressions of interest should include the following: company profile; contact detiails of principal or designate; HSE philosophy; capability to operate and maintain a medium sized natural gas processing plant and offshore facilities; capability to provide technical and engineering support; previous industry experience; brief overview of how such an operation would be established by your company; capability to establish operations and maintenance sytems at the development phase; capability to manage industrial harmony in Australia, including examples which demonstrate understanding and management of employee relations issues in Australia. Click for more details...

SEA GAS PIPELINE
Private ownership Oil & Gas (Onshore processing facilities) project In The Corangamite Council Area for New development. At Tugs. Click for more details...

MOOMBA GAS OPERATIONS
Oil & Gas (Onshore processing facilities) project at Via, Innamincka, SA 5731 for New. The Moomba Gas Facility (Liquids Recovery Section) was damaged in a gas leak and fire on 1 January 2004. Initial investigation has pointed to a failure of a heat exchanger inlet nozzle as the source of the gas release. Findings from an independent metallurgical laboratory study have confirmed that the failure of the heat exchanger inlet nozzle (which led to the fire) was due to Liquid Metal Embrittlement of the train B aluminium cold box by elemental mercury. Further investigations are in progress to determine if any other factors could have contributed. Re-instatement plans included procurement of new cold boxes and associated facilities. Click for more details...

CAMDEN GAS - PEL2/PPL1/PPL2 - STAGE 2
Currently at the Construction stage In Campbelltown is a project estimated to be $ 45000000. This project The planned treatment plant in stage 2 has been designed to initially process 40 million cubic feet of gas per day. This new plant will be able to handle several times the volume of gas delivered from the existing Ray Beddoe Treatment Plant. It will be tied into the main north-south gas transmission lines that feed the broader Sydney residential and industrial market. Click for more details...

MEREENIE OIL/GAS FIELD
Oil & Gas (Onshore processing facilities) project In The Alice Springs Town Council Area of Private ownership. The original gas plant was constructed in 1987 & upgraded in 1995. Click for more details...

METHANEX AUSTRALIA PROJECT
Oil & Gas (Onshore processing facilities) New project at King Bay-Hearson's Cove Industrial Precinct, Burrup Peninsula, Dampier, WA 6713. This type is Methanol Plant with Private ownership. A 1.3 million tonne per year methanol project, as the first stage of a planned Asia Pacific hub. This was a reduction in capacity of about 35% compared to the original project plan of 2 million tonnes per annum. Click for more details...

PATRICIA BALEEN GAS PROJECT
Currently at the Construction stage In Gippsland Basin is a project estimated to be $ 20000000. This project The offshore Baleen-3 development well has been completed as a future gas producer and flowed 764,600 cubic metres of gas per day through a 51mm surface choke. The offshore Patricia-2 development well has been completed as a future gas producer and flowed 790,000 cubic metres of gas per day through a 51mm choke. Click for more details...

METHANEX SYNGAS GAS TO LIQUIDS (GTL) FACILITY
Oil & Gas (Onshore processing facilities) project In The Darwin City Council Area of Synthesis Gas Generation Facility type. Proposed large-scale synthesis gas (syngas) generation facility. Syngas can be used as a feedstock to produce a variety of chemicals and fuels. Methanex is exploring product and technology options for this proposed syngas project including methanol, hydrogen and gas-to-liquids. Methanex, with the cooperation of the Northern Australia Gas Venture (NAGV), is also seeking downstream customers for methanol for production of ethylene and propylene, and for hydrogen to production of ammonia. Click for more details...

PEAT EXPORT COMPRESSOR STATION
Currently at the Construction stage In Western Downs Regional is a project estimated to be $ 500000. This project To supply and install the interconnecting pipework for the compressor station on the Peat Lateral Gas Pipeline that is currently under construction for connection to the Roma to Brisbane Gas Pipeline. Click for more details...

LNG TRAIN 4 EXPANSION
Oil & Gas (Onshore processing facilities) project In The City Of Karratha Council Area of Electrical/Instrumentation Works - On Plot type. Includes all above ground electrical and instrumentation work Click for more details...

NORTH WEST SHELF LNG TRAIN 5 EXPANSION - LNG TRAIN
Lng Facilities - Expansion project at Burrup Peninsula north of, Dampier, WA 6713 in the Oil & Gas (Onshore processing facilities). The 5th LNG Train will be 4.2 mtpa. The expansion involves the construction of an Acid Gas Removal Unit, 3rd Fractioned Unit, 2 GT Power Generators (70 MW), 3rd Boil Off Gas Compressor, Brownfield tie-ins and piping. This will include the relocation of existing plant buildings and services. Construction and removal of temporary facilities will also be involved. Click for more details...

MONDARRA GAS STORAGE FACILITY - EXPANSION
Expansion Of Facilities project at North of, Perth, WA 6000 In The Council Area Of Perth of Private. Includes an additional gas storage well, additional gas processing and compression facilities, and debottlenecking of intrastructure. Click for more details...

NORTH WEST SHELF LNG TRAIN 5 PROJECT - SITE PREPARATION/TEMPORARY FACILITIES
Oil & Gas (Onshore processing facilities) project at Burrup Peninsula north of, Dampier, WA 6713 of Site Preperation/Temporary Facilities Services Contract - Erect type of New development. The contract involves the re-routing of existing roads near the site, the construction of new roads, rundown and drainage culverts. The provision of bulk earthworks. Removal of redundant process plant and structures on the site, the relocation of plant services and utilities. Installation of temporary facilities including security and safety infrastructure, offices, crib rooms and ablution areas. Click for more details...

NORTH WEST SHELF LNG TRAIN 5 PROJECT - STEEL FABRICATION SERVICES CONTRACT
Oil & Gas (Onshore processing facilities) New project at Burrup Peninsula north of, Dampier, WA 6713. This type is Steel Fabrication Services Contract with Private ownership. 13,574 tonnes of structural steel will be used in the project. Click for more details...

PNG GAS PROJECT - PIPELINE FEED CONTRACT - RESOURCE
Png Gas Project - Pipeline Feed Contract - Resource is currently at the Planning stage, valued at about $ 25000000 it is Tender is for the Australian component of the project. FEED program will involve engineering design, route selection, regulatory and financial viability assessments, environmental and native title processes. The pipeline width will be 22 inches and approx 2020km in length. Pipeline from PNG/Australia maritime border through Cape York to Townsville off-take is approx 1220 km. From Townsville off-take to Gladstone is 700 km. A further 100 km from the Townsville off-take to Townsville. Click for more details...

PILBARA LNG PROCESSING FACILITY
New project of Oil & Gas (Onshore processing facilities) project at Reserve 19291, 4.5 Km South West of, Onslow, WA 6710. To construct a 6 Mt LNG Plant. A materials offloading facilities site is being investigated along Beadon Creek. The facility will comprise a new wharf and hard stand area for the unloading of equipment and plant modules. Click for more details...

WICKHAM POINT HELIUM PLANT - GHE STORAGE TANK "A" (VERTICLE W/SADDLES)
Wickham Point Helium Plant - Ghe Storage Tank "a" (Verticle W/Saddles) is currently at the Construction stage, valued at about $ 2000000 it is For the provision of a 30,000 US gallon (136,000 litre) verticle storage vessel "A" with saddles rated for 300 psig. Click for more details...

WICKHAM POINT HELIUM PLANT - GHE STORAGE TANK "B"
Oil & Gas (Onshore processing facilities) project at Wickham Point, Darwin, NT 0909 of 136,000 Lt Ghe Storage Tank "b" (Vertical W/Saddles) type of New development. For the provision of a 30,000 US gallon (136,000 litre) verticle storage vessel "B" with saddles rated for 300 psig. Click for more details...

CAMDEN GAS PROJECT - STAGE 2 - EL BETHEL
Currently at the Construction stage In Wollondilly is a project estimated to be $ 35000000. This project Construction and operation of 10 coal based methane gas wells, gas and water gathering system and access roads. Connecting the 10 new wells to the gas treatment plant through gas pipe lines. Click for more details...

PADULLA PROJECT - OIL RESOURCE
A project in the SA Within Far North. Development will comprise one exploratory well and six appraisal and development wells and oilfield facilities. Click for more details...

TIPTON WEST GAS PROJECT - GAS COMPRESSING FACILITY/PIPELINES
Tipton West Gas Project - Gas Compressing Facility/Pipelines is currently at the Construction stage, valued at about $ 31000000 it is To construct a Gas Compressing facility and surface gathering network and associated pipelines. Six Compressors have been ordered from Universal Compression in the United States of America. Click for more details...

SOLE GAS PLANT EXTENSION - DOUBLE ENTRY REFER ID 955674
Private ownership Oil & Gas (Onshore processing facilities) project In The East Gippsland Council Area for New development. Extension to an existing gas plant. The existing plant produces 43 terjoules per annum with potential to expand to 75 terjoules per annum. Click for more details...

PLUTO LNG PLANT PROJECT - MAIN CRYOGENIC HEAT EXCHANGER (MCHE)
Burrup Peninsula Via, Roebourne, WA 6718 Has Pluto Lng Plant Project - Main Cryogenic Heat Exchanger (Mche) currently at Construction stage. Main Cryogenic Heat Exhanger. Tpe: Spiral Wound. Material of construction: Aluminium. Design Temp: 65/-175 deg. C, Heat Load approx 49 Mw. Click for more details...

PLUTO LNG PLANT PROJECT - REFRIGERANT COMPRESSORS
A project in the WA Within City Of Karratha. Liquefaction 1400 Unit. Mixed / Propane Refrigerant Compressors. Type : Centrifugal Compressors and associated packages. Material of construction : 3.5% Nickel. Compressor Ratings 37-72 MW, Capacity 58-243 Km3/hr. This is a major proprietary equipment package within the Train. Full String testing required in the Main Equipment Suppliers Workshop. Click for more details...

PLUTO LNG PLANT PROJECT - GAS TURBINE GENERATORS
Gas Turbine Generators project at Burrup Peninsual Via, Roebourne, WA 6718 in the Oil & Gas (Onshore processing facilities). Power Generation & Distribution. Unit 4000 Gas Turbine Generators. Type : GTGs and associated packages. Frame 6 or equivalent: Approx Rating 42 MW (ISO). This is a major proprietary equipment package. Opportunities exist for the following key sub packaged items: Filter Housing,Turbine Bleed Duct, Inlet Duct, Outlet Duct, Walkways & Ladders, Mineral Oil Console, Oil Cooler. Click for more details...

KARRATHA GAS PLANT LIQUEFIED NATURAL GAS PRODUCTION CAPACITY PROJECT
Private ownership Oil & Gas (Onshore processing facilities) project In The City Of Karratha Council Area for New development. Work will comprise: alterations to the LNG storage and loading system; modifying the Fin Fans; installing a Boil-Off Gas (BOG) Liquefaction Unit; installing an Inlet Air Chilling (IAC) Package; installing four Gas Engines; installing a 6th Stabiliser Unit. Click for more details...

CAMDEN GAS PROJECT - SPRING FARM/MENANGLE PARK - RESOURCE
Resource - Coal Base Methane New project In The Camden Council Area. Construction and operation of up 4 surface well locations at Spring Farm and up to 12 surface well locations at Menangle Park (to contain a variety of horizontal, directional and surface-in-seam wells); construction and use of access roads, a gas gathering system and water transport lines; connection of the wells to the Rosalind Park Gas Plant; and production of methane gas. Click for more details...

SASOL PROJECT - GAS TO LIQUIDS PLANT
New project of Oil & Gas (Onshore processing facilities) project at Wheatstone Gas Field, 85km Northwest of, Barrow Island, WA 6712. Plans are for a 25 million tonne per annum Liquified Natural Gas & Domestic Gas Complex. Click for more details...

PATRICIA-BALEEN GAS PLANT UPGRADE
Oil & Gas (Onshore processing facilities) project for New development. For the upgrade to the existing Patricia-Baleen Gas Plant. The works include: installation of a condensate separation and stabilisation system, installation of condensate storage tanks and truck load-out facility, installation of hydrocarbon dew point control facilities for the gas, reconfiguration of the existing compressors to increase compression capacity, upgrade to the sales gas dehydration system to accommodate higher gas rates and minimise glycol carryover, installation of monoethylene glycol (MEG) storage and injection facilities to prevent hydrate formation in the offshore pipeline and selected plant process locations, and associated MEG regeneration facilities. Installation of a corrosion inhibitor injection system for the offshore pipeline, installation of a hot oil heater and hot oil circulation system to provide process heat to the processing facilities, installation of a n"off-gas" compressor to recycle gas vented from the condensate stabilisation system to eliminate operations flaring. Installation of new flare systems and removal of existing flare system, modifications to the drainage system, including a new API Separator and extension of the storm water system. Installation of a water vaporiser to dispose of excess produced water that cannot be reused or naturally evaporates. Modifications to various plant utilities, namely, the fuel gas system, odourisation system, compressed air system and plant process control system. Upgrade of the fire and gas protection facilities including installation of fixed firewater pumps and foam systems. Exte4nsion of office facilities and installation of a laboratory, and the construction of a new workshop/warehouse facility. Click for more details...

TALINGA DEVELOPMENT PROJECT
Oil & Gas (Onshore processing facilities) project In The Western Downs Regional Council Area of Resource - Coal Seam Gas type. The project involves transitioning the existing pilot trial of 12 wells to production of up to 90TJ/day of coal seam gas, which will contribute to the supply of gas to the Darling Downs Power Station. The development will involve installing coal seam gas wells at a spacing of between 750m and 1000m; associated gas and water gathering systems, a gas plant, a produced water treatment facility, evaporation ponds, offices, storage areas, workshops, camp and gravel pits. Based on current well production predictions, this equates to the installation of approximately 100 coal seam gas wells. This project will incorporate a water treatment facility to significantly reduce the evaporation pond surface area down to approximately 170ha. The water treatment facility will employ an integrated membrane system, including reverse osmosis, to achieve an 85% desalination recovery and create a freshwater resource. The freshwater will be discharged to the Condamine River catchment until higher level beneficial used, such as industrial, urban or agricultural use, can be implemented. Click for more details...

GREATER GORGON GAS PROJECT - DOWNSTREAM PRE ASSEMBLY - PREASSEMBLED PIPERACKS P4
Oil & Gas (Onshore processing facilities) project at Via, Barrow Island, WA 6712 for New. For the supply of pre-assembled piperacks. Click for more details...

AUSTRALIA PACIFIC LNG (APLNG) PROJECT - LNG PLANT - CIVIL & CONCRETE WORKS
New project of Oil & Gas (Onshore processing facilities) project at South of Laird Point, Curtis Island, QLD 4680. Civil & concrete services associated with installation of 2 x 160,000 cubic metre capacity liquefied natural gas (LNG) tanks. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect