List of Onshore processing facilities Projects in VIC


BASSGAS PROJECT - YOLLA/WHITE IBIS
Bassgas Project - Yolla/White Ibis is currently at the Construction stage, valued at about $ 400000000 it is Off-shore platform 135 km north of Burnie, undersea pipeline & on-shore treatment facilities. The construction timetable is as follows: 75MMSCFD onshore gas plant near Lang Lang construction to commence first quarter 2003; 32km onshore pipelines construction to commence third quarter 2003: 147 km sub-sea pipelines construction to commence first quarter 2004; offshore production platform platform installation first quarter installation. The offshore platform will be constructed in South Easet Asia and transported to Bass Strait. Construction of the gas plant located near Lang Lang in south-eastern Victoria will commence in late January 2003. Click for more details...

MINERVA GAS PROJECT
Onshore Facilities project at Brumby's Rd, Port Campbell, VIC 3269 In The Council Area Of Colac-Otway of Private. The gas plant will have a gross design production capacity of 150 terajoules of gas per day (TJ/d). Approximately 600 barrels (gross) of stabilised condensate will also be produced per day at initial gas sales rates. Click for more details...

GAS PROCESSING PLANT - REGIONAL VICTORIA
Operation/Maintenance/Engineering Support Contract New project In The Not Yet Determined Council Area. Natural gas and associated liquids will be piped from the offshore fields to an onshore gas processing plant where gas will be treated and exported into an installed pipeline grid with liquids removed and sold. To be a continuous operation requiring production operations, maintenance management as well as operations engineering support. Minimum manning principles shall apply with an appropriate level of staff skilling. It is preferred the the same company provide core operations and maintenance, however, alliance arrangements will be considered. Contract may be up to five years plus extensions. The contractor will be responsible for the following: operation and maintenance of unmanned offshore platform/pipeline/onshore plant; establishing and implementing maintenance management system and operational procedures and for providing competent operation and maintenance staff, including all training requirements. The asset design life is 30 years. Maximum plant throughput is 205 Tj per day. Liquids produced include condensate, propane and autogas. Expressions of interest should include the following: company profile; contact detiails of principal or designate; HSE philosophy; capability to operate and maintain a medium sized natural gas processing plant and offshore facilities; capability to provide technical and engineering support; previous industry experience; brief overview of how such an operation would be established by your company; capability to establish operations and maintenance sytems at the development phase; capability to manage industrial harmony in Australia, including examples which demonstrate understanding and management of employee relations issues in Australia. Click for more details...

SEA GAS PIPELINE
Private ownership Oil & Gas (Onshore processing facilities) project In The Corangamite Council Area for New development. At Tugs. Click for more details...

KIPPER UNIT JOINT VENTURE GAS PROJECT
Resource - Gas - Offshore New project In The Gippsland Basin Council Area. The Kipper Gas Field is estimated to contain 620billion cubic feet (Bcf) of recoverable gas & 30million barrels (MMbl) of condensate/liquefied petroleum gas (LPG). Initial development includes 2 subsea gas wells along with 4 subsea coolers. Recovered gas to be piped through existing infrastructure via the West Tuna Platform to the onshore Esso & BHP Billiton processing facilities at Longford. Click for more details...

PATRICIA BALEEN GAS PROJECT
Currently at the Construction stage In Gippsland Basin is a project estimated to be $ 20000000. This project The offshore Baleen-3 development well has been completed as a future gas producer and flowed 764,600 cubic metres of gas per day through a 51mm surface choke. The offshore Patricia-2 development well has been completed as a future gas producer and flowed 790,000 cubic metres of gas per day through a 51mm choke. Click for more details...

SANTOS GAS OPERATIONS - COASTAL LOGISTICS CONTRACT
Various Sites around Australia, ., VIC 3999 Has Santos Gas Operations - Coastal Logistics Contract currently at Tenders & Building stage. Services will include road and fixed installations linkages from Brisbane, through south-eastern Victoria, including Melbourne, Sale and Portland, inwards and outwards from Santos Adelaide hub and support up and down the coast from Perth to Dampier, extending at times to Darwin. Click for more details...

SANTO GAS OPERATIONS - CENTRAL LOGISTICS SERVICES
Santo Gas Operations - Central Logistics Services is currently at the Tenders & Building stage, valued at about $ 100000000 it is To provide general line haul services ex Adelaide and Brisbane to the Cooper Basin, Port Bonython, Eastern Queensland and Mereenie (N.T) operations as well as the inter-field and intra-field services in the Cooper Basin, Eastern Queensland and Mereenie (N.T) operations. Services include bulk crude oil haulage, coated and bare line pipe haulage, foodstuffs haulage, water haulage and other transport services supporting the operating environment. It excludes transport services from coastal or capital cities areas to the Santos key supply points of Brisbane and Adelaide. Click for more details...

SOLE GAS PLANT EXTENSION - DOUBLE ENTRY REFER ID 955674
Private ownership Oil & Gas (Onshore processing facilities) project In The East Gippsland Council Area for New development. Extension to an existing gas plant. The existing plant produces 43 terjoules per annum with potential to expand to 75 terjoules per annum. Click for more details...

PATRICIA-BALEEN GAS PLANT UPGRADE
Oil & Gas (Onshore processing facilities) project for New development. For the upgrade to the existing Patricia-Baleen Gas Plant. The works include: installation of a condensate separation and stabilisation system, installation of condensate storage tanks and truck load-out facility, installation of hydrocarbon dew point control facilities for the gas, reconfiguration of the existing compressors to increase compression capacity, upgrade to the sales gas dehydration system to accommodate higher gas rates and minimise glycol carryover, installation of monoethylene glycol (MEG) storage and injection facilities to prevent hydrate formation in the offshore pipeline and selected plant process locations, and associated MEG regeneration facilities. Installation of a corrosion inhibitor injection system for the offshore pipeline, installation of a hot oil heater and hot oil circulation system to provide process heat to the processing facilities, installation of a n"off-gas" compressor to recycle gas vented from the condensate stabilisation system to eliminate operations flaring. Installation of new flare systems and removal of existing flare system, modifications to the drainage system, including a new API Separator and extension of the storm water system. Installation of a water vaporiser to dispose of excess produced water that cannot be reused or naturally evaporates. Modifications to various plant utilities, namely, the fuel gas system, odourisation system, compressed air system and plant process control system. Upgrade of the fire and gas protection facilities including installation of fixed firewater pumps and foam systems. Exte4nsion of office facilities and installation of a laboratory, and the construction of a new workshop/warehouse facility. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect