DUCHESS OF YORK PROJECT - GOLD RESOURCE
60 km south east of, Kalgoorlie, WA 6430 Has Duchess Of York Project - Gold Resource currently at Exploration, Drilling, Survey & Assessment stage. During the quarter, Hampton carried out 2394 m of RAB bedrock drilling on a 200 x 50 m grid pattern plus 3 RC holes totalling 270 m. The main target zone covered by the RAB drilling extends southward from the Duchess of York prospect which is situated on top of an outcropping hill associated with intensely veined quartz prophyry. The zone covers a modest but distinct gold in soil auger drill anomaly and north trending lineaments interpreted from detailed aeromagnetics. Click for more details...

ARUNTA PROJECT
Mining (Open Cut) project at Via, Alice Springs, NT 0870 of Resource - Nickel/Copper type of New development. 4,637 sq km, including one granted EL of 1,523 sq km and 5 applications. Click for more details...

LEIGH CREEK PROJECT - DIAMOND RESOURCE
New project of Mining (Open Cut) project at Leigh Creek Coalfield 250km north of, Port Augusta, SA 5700. Flinders Diamonds Ltd are currently assessing the Leigh Creek Basins for diamonds by analogy with similar basins at Springfield and Boolcunda. A small exploration licence of 11 square kilometres has been applied for to cover the area around an anomalous drill hole. Click for more details...

WILCHERY HILL/GAWLER CRATON PROJECT - VALLEY DAM
Mining (Open Cut) project In The Port Augusta Council Area of Private ownership. The exploration licence covers the north-east margin of the Wilcherry Hill gravity and magnetic anomaly that is related to a Hiltaba Suite granite complex. The anomaly trends into the East Houlderoo gold anomaly on the Wilcherry Hill tenement. Pyrite-silica and silica-carbonate alteration with arsenipyrite has been intersected in air-core drilling and brecciated quartz veins carrying anomalous gold values have been mapped in outcrop. Click for more details...

COAL & ALLIED OPERATIONS
Airconditioner Maintenance For Mobile And Fixed Plant project at Various sites Hunter Valley via, Lemington, NSW 2330 in the Mining (Open Cut). Includes professional services for the safe and effective maintenance of air conditioners installed to mobile or fixed plant at the above locations. All works will comply to Coal and Allied safety and standards. The work required will involve planned maintenance, servicing and breakdown repairs. Coal & Allied operates open cut coal mines and coal preparation plants in the Hunter Valley, New South Wales, these being Mount thorley Operations, Hunter Valley Operations ( Howick Hunter Valley and lemington), Warkworth and Bengalla mines. Click for more details...

BOOTU CREEK MANGANESE MINE
Private ownership Mining (Open Cut) project In The Barkly Shire Council Area for New development. Resource estimate is 15.9 Million tonnes @ 25.2% Mn, with reserves at 7.2 Million tonnes @ 25% Mn. Production for 2006 was 868,677 tonnes @ 22.3% Mn. Infrastructure includes an open cut mine, processing plant, airstrip and tailings dam. Click for more details...

PANTON NORTH JOINT VENTURE PROJECT - NICKEL/COPPER RESOURCE
Resource - Nickel/Copper project at East Kimberley area via, Halls Creek, WA 6770 in the Mining (Open Cut). Previous drillhole has returned an intercept of 51 metres at 0.28% nickel and 0.14% copper from surface, including 15 metres @ 0.48% nickel and 0.2% copper from 18 metres. The Mabel Hill intrusion and the new zone to the north form a narrow and elongate pyroxenite-gabbro-norite igneous body. The intrusion is interpreted to represent a feeder conduit, analogous in style to the Sally Malay and Voisey's Bay intrusions and their associated nickel-copper-cobalt sulphide mineralisation. Results indicate the Mabel Hill intrusive is a fertile, nickel sulphide rich system. The known prospect area, where the intrusion crops out, displays broad by low grade nickel sulphide mineralisation. The prospective target zone may extend for up to 2 km to the north. Click for more details...

TRITTON COPPER PROJECT - MURRAWOMBIE - MINING/EARTHWORKS CONTRACTS
Private ownership Mining (Open Cut) project In The Bogan Council Area for New development. The construction of the box cut and the ROM development contract has been awarded to a local contractor ahead of full mobilisation to site later in February 2004 by the principal mining contractor. Click for more details...

MOUNT MULGINE WESTERN CORRIDOR PROJ - BLACK DOG/BOBBY MCGEE/PROMISES
Currently at the Early Planning stage In Yalgoo is a project estimated to be $ 5000000. This project The Bobby McGee prospect has attracted most attention following an intersection of 7 metres at 171g/t gold in earlier exploration. Additional drilling has been undertaken this quarter (March 2004) to test structural controls on the ore body. Click for more details...

MIKADO GOLD MINE - RESOURCE
Mining (Open Cut) project In The Laverton Council Area of Private ownership. Mining ceased at Mikado in late 2004 and has been under care and maintenance since then. Mine studies of the area will be carried in conjuction with the Brighstar Gold project which is located near the mine. Mining is planned to commence 2006. A resource of 529,582 at 3.81 g/t gold for a contained 71,000 ounces has now been defined. Click for more details...

MERLIN DIAMOND PROJECT - STAGE 1
Approx 200 km east of, Daly Waters, NT 0852 Has Merlin Diamond Project - Stage 1 currently at Construction stage. First ore is likely to be available from the pits during November 1998. Work on the tailings dam is expected to be completed within 10-11 weeks of commencement. Click for more details...

PUZZLE/NIAGARA - GOLD
Mining (Open Cut) project at Kookynie area approximately 50 km southeast of, Leonora, WA 6438 for New. ((Contract to also include tailings dam construction.)) Area considered to have potential for a large, low-grade shallow deposit. Total proven reserves for this project now total more than 1.17mt grading 2.85gpt gold. Encouraging results returned from first pass drilling on nearby Redbank prospect (Horizon). Mining contract to include the Niagara deposit approximately 10 km distant. Project does not require EPA assessment. Contract period of 2 years involving 4 million cu m of material with a strip ratio of 8:1 (500,000tpa) is envisaged. Click for more details...

FENDER - GOLD
Mining (Open Cut) project at Approximately 28 km northwest of, Cue, WA 6640 for New. Earlier reverse circulation drilling has delineated a strike of approximately 250m. Best results included 12m (from 68m) grading 5.4gpt gold. Ore is to be trucked to the nearby Big Bell Mine for treatment. Work to date has delineated reserves of 240,000t for this area which has a mine life of about 11-12 months. Click for more details...

NIMARY - GOLD
Mining (Open Cut) project In The Wiluna Council Area of Private ownership. Contract period of 2 (option 3) years envisaged during which time the first pit (Nimone/Two) is expected to be completed & the second open cut commenced. A strip ratio of 18.1:1 is anticipated for these mines. Diluted open pit reserve currently estimated at 3.4mt grading 6.35gpt gold. Nimone/Two has an initial planned depth of 110m, Nimthree 180m & Nimfour 150m. Mine site preparation, access & haul road construction, waste dumps & associated stockpiles & tailings dam to form part of this tender. Encouraging results from ongoing programme of deeper drilling including 11m grading 84.6gpt gold. Two new zones Nimsix & Nimseven have been identified. Click for more details...

MUD TANK VERMICULITE OPERATIONS
New project of Mining (Open Cut) project at Plenty Hwy 160 km northeast of, Alice Springs, NT 0870. An insitu resource of several million tonnes of vermiculite is indicated & a net saleable yield of 750,000t has been estimated. A mine life in excess of 20 years is currently envisaged. This contract to form a shallow gravel pit with extraction using a bulldozer for ore extraction. Minimal cartage required for this initial work. Click for more details...

RAVENSWORTH EAST COAL OPERATIONS
Mining (Open Cut) project for New development. The contract involves mining, coal beneficiation, stockpiling and loading of coal for both domestic and export markets.Planed production is 1.2 million tonnes per annum, with 600,000 tonnes per annum contracted to Macquarie Generation and the remainder to be sold to the export market. Click for more details...

DOBROYDE PROJECT - GOLD RESOURCE
Resource - Gold project at Near, Junee, NSW 2663 In The Council Area Of Junee of Private. Inferred gold resource of 1.2 million tonnes at 2.0g/t. Golden Cross is reviewing data to see if resource can be expanded. It appears that the zone may be open down plunge from a depth of 150 metres and a drill hole has been proposed to test this theory. Click for more details...

SOUTH WALKER COAL MINE
Coal Mine - Initial Development project at Approx 25 kms west south west of, Nebo, QLD 4742 in the Mining (Open Cut). Suitable for open pit mining with soft overburden and relatively low stripping ratios. Click for more details...

YARRABEE COAL OPERATIONS
Mining (Open Cut) New project at Near, Blackwater, QLD 4717. This type is Deposit - Coal with Private ownership. Production 1.2 million tonnes of coal last year. Click for more details...

ASHBURTON GOLD PROJECT - OLYMPUS & ZEUS
New project of Mining (Open Cut) project at Approx 60km west of, Paraburdoo, WA 6754. Some 49 000 ounces of gold remain in oxide/transition reserves at Mount Olympus, above some 490 000 ounces of gold in refractory sulphide resources. There are numerous gold prospects that have been outlined along a corridor approximately 150km long to the northwest of Mount Olympus. Click for more details...

FOSTERVILLE EAST JV GOLD PROJECT - RESOURCE
A project in the VIC Within Greater Bendigo. Infill drilling of the anomalous gold to 176ppb has intersected further anomalous gold (to 0.47g/t) and arsenic and antimony. Drilling approximately 7 km to the north also returned anomalous gold including 6 metres averaging 0.21g/t. Silver assays to 168g/t (5.4 ounces per tonne) have been reported from AC drilling at Muskerry East Prospect. Click for more details...

LOGANS JOINT VENTURE - YILMA
New project of Mining (Open Cut) project at 15 km north of, Widgiemooltha, WA 6443. The project from significant intercepts of 4 m composite samples, were 0.76 gpt/gold from 40 m to 44 m and 0.25 gpt/gold from 56 m to 60 m. Click for more details...

PINE CREEK GOLD OPERATIONS - BROCKS CREEK
Mining (Open Cut) project In The Katherine Town Council Area of Mine - Open Cut type. First mining to be based on the Alligator & Faded Lily deposits. Selective & bulk mining methods expected to be utilised on the areas which have an average strip ratio of 3.5:1. Total measured & indicated resource now stands 16.4mt grading 1.94gpt gold (uncut) with preliminary reserves of 6.1mt at 1.73gpt gold. A 750,000tpa-1mtpa operation is anticipated for this project which has as estimated mine life of 6-12 years. This contract will include run-of-mine (ROM) pad delivery & tailings dam construction. An additional low grade inpit reserve of 1.76mt at 0.65gpt gold has been advised for the Faded Lily/Aligator area. An initial contract period of 3 years involving 5 million bank cubic metres of material is proposed. Click for more details...

HEBBURN NO 2 COLLIERY - MINING & RECOVERY OF WASTE MATERIALS
Mining/Recovery Of Waste Materials project at Via, Cessnock, NSW 2325 In The Council Area Of Cessnock of Private. This tender includes the rehabilitation of the site. Click for more details...

MOUNT CRAWFORD PROJECT - GOLD RESOURCE
New project of Mining (Open Cut) project at Approximately 4 km northeast of, Laverton, WA 6440. A 28 hole Rotary Air Blast drilling programme for a total depth of 851m has been completed. Many of the drill holes intersected anomalous gold values and the anomaly defined by Oxania's earlier work has been shown to extend further to the south. Highest gold intersections include 4m at 0.20 g/t Au from 29m, 4m at 1.21 g/t Au from 28m and 9m at 0.78 g/t Au from 42m (incl. 2.86 g/t Au at 42-43m, and 2.09 g/t Au at 46-47m) Click for more details...

KINGSTON PROJECT - MONTEGO BAY
Mining (Open Cut) project at via, Stawell, VIC 3380 of Resource - Gold type of New development. RC drilling to test the Montego Bay prospect has been completed. This prospect was defined by soil, stream sediment and rock chip sampling and extends east-northeast from the historic Kingston mine. The surface gold anomaly is associated with a conspicuous east-northeast striking quartz-breccia ridge with a strike extent of about 500 m. The drilling programme comprised 1,706 m in 16 holes which tested approx 400 m of the strike extent of the surface anomaly. Click for more details...

BANNOCKBURN GOLD PROJECT - RESOURCE
Mining (Open Cut) project In The Leonora Council Area of Private ownership. SAM survey targeting Jungle Well. Scoping study revealed that the gold resource for Bannockburn was 7.93 million tonnes grading 1.92g/t gold containing 489,000 ounces. The study recommended a substantial drilling program. Click for more details...

WHIM CREEK COPPER PROJECT - MONS CUPRI
Renovations, Refurbishments etc. project of Mining (Open Cut) project at North West Hwy via, Whim Creek, WA 6718. The Whim Creek project is located between Karratha and Port Hedland in the Pilbara region of Western Australia. It conists of two deposits, Whim Creek and Mons Cupri approx 6 km apart. Both are mineable by conventional open cut methods. The feasibility study indicated a mine life of at least four years yielding a total of 51,000 tonnes of copper cathode. Click for more details...

HENTY GOLD OPERATIONS - MOUNT JULIA
Exploration Decline/Ramp Decline New project In The Zeehan Council Area. 15,000 -16,000 metres. It is anticipated that it will take 12 months approx to reach Mount Julia. Click for more details...

CHARBON COAL OPERATIONS - OPERATING MINE
Charbon Coal Operations - Operating Mine is currently at the Construction stage, valued at about $ 20000000 it is Developer is proposing to expand the open cut operations into stage 2 area of the mine. It will involve the production of 600,000 tonnes of coal per annum. The existing infrastructure at the mine will not be altered. Existing infrastructure includes a Coal Preperation Plant, stockpiles and transport infrastructure. Resource estimate is 7.1 Mt measured in-situ, 18.7 Mt indicated, 25.8 Mt recoverable, 5.8 Mt marketable. Click for more details...

HAZELWOOD COAL OPERATIONS - HAZELWOOD WEST
A project in the VIC Within La Trobe. International Power Hazelwood proposes to extend the Hazelwood Mine beyond the existing mining licence boundary, to allow continuation of the company's coal supply for the commercial operating life of the power station. Includes the extension of the mining licence to access the western part of the Morwell seam, diversion and restoration of the Morwell River, diversion and restoration of Eel Hole and Wilderness Creeks, as well as deviation of the Strzelecki Highway. More specifically the Strzelecki Highway will be raligned up to 1000 metres west of current alignment. Seven kilometres of the Morwell River will be relocated and rebuilt on a new alignment. The river will taken out of the concrete pipe and returned to a natural riverline environment. The Yinnar Driffield road will be upgraded to accommodate over dimensional 9 traffic. Marrets road and Brodribb road will be closed for parts of the construction period. Click for more details...

LAKE FROME JOINT VENTURE - URANIUM/COPPER RESOURCE
Resource - Uranium/Copper New project In The Far North Council Area. Geophysical surveys identified an additional structural target extending south from the Beverly mine into Lake Frome joint venture tenements. Click for more details...

HUNTLY BAUXITE OPERATIONS - YAMBA
Mining (Open Cut) project at North Spur Rd, Pinjarra, WA 6208 for New. There will be a shutdown period of 8 days following the relocation of the second crusher. Click for more details...

BULGA/WALLERAWANG COAL OPERATIONS
New project of Mining (Open Cut) project at South of, Singleton, NSW 2330. Part of contract let for whole of Oceanic coal operations. Various sites, hunter Valley area. Click for more details...

MUSGRAVE SUPERPROJECT - BENTLEY HILL - NICKEL RESOURCE
Mining (Open Cut) project at West Musgrave Ranges, ., WA 6999 for New. The airborne survey will collect approximately 11,000 line km of magnetic and radiometric data along survey lines spaced at approximately 400 m intervals and with an instrument height of approximately 80 m. The joint venture partners are exploring for nickel sulphides. Click for more details...

NIQUEST NICKEL/GOLD PROJECT - RESOURCE
Niquest Nickel/Gold Project - Resource is currently at the Exploration, Drilling, Survey & Assessment stage, valued at about $ 5000000 it is RAB drilling is designed to geochemically test the favourable basalt ultramafic contact at Hugo Nickel prospect. RAB drilling will also attempt to test the down plunge extent of the gold mineralisation at Lawsons. Follow up RC or Diamond drilling may follow. Click for more details...

NORNICO PROJECT - MOUNT GARNET SOUTH-RUDD CREEK - GOLD & PLATINUM RESOURCE
Nornico Project - Mount Garnet South-Rudd Creek - Gold & Platinum Resource is currently at the Exploration, Drilling, Survey & Assessment stage, valued at about $ 1000000 it is As previously reported, anomalous gold, platinum and palladium mineralisation intersected in hole RCRC-02 was contained within a zone of 20m of +0.14% zinc. The Company believes the presence of elevated zinc levels in hole RCRC-07 is encouraging and further work is required to adequately test the gold, platinum basemetal potential. Click for more details...

TREWILGA PROJECT - GOLD RESOURCE
A project in the NSW Within Parkes. Drilling will target the Great Britain mine prospect during April/May 2005. 350 metres of aircore and RC drilling will be carried out. Previous drilling encountered 38 metres at 0.44g/t gold. Click for more details...

WILLUGUDINNA HILL PROJECT - VARIOUS MINERALS RESOURCE
Willugudinna Hill Project - Various Minerals Resource is currently at the Exploration, Drilling, Survey & Assessment stage, valued at about $ 1000000 it is The drilling programmes are designed to investigate three priority targets considered to have potential for nickel/copper sulphide mineralisation similar to that at Voisey's Bay in Canada. Demonstrated potential exists within the Musgrave Province of South Australia for base metals (copper, lead, zinc), ferrous metals (chromium, nickel, vanadium, titanium) and uranium. Potential also exists for precious metals (platinum group metals, gold), precious stones (diamonds, rubies), heavy mineral sands and rare earths. The prospectivity of Proterozoic rocks is well recognised and, with the exception of those contained within the Musgrave Province, have generally been subject to intense exploration for a considerable period of time yielding a number of World Class mineral deposits. Click for more details...

MARILLANA CREEK MINE EXPANSION - YANDI - IRON ORE RESOURCE
Resource - Iron Ore project at 90 km north west of, Newman, WA 6753 In The Council Area Of East Pilbara of Private. Total resource body is estimated at 1420 million wet tonnes. Production is expected to increase from an existing 34 Mtpa to 45 Mtpa. Proposal for the expansion include, open cut mining of the overburden and ore, dewatering of the orebody during mining operations. Overburden will be placed in mine voids and out of pit storage areas. Infrastructure for the processing, loading and transportation of ore will be provided by two rail loading stockpiles/loops and railed from site to Port headland for shipping. Supply and distribution of power and raw materials will a be provided by on site diesel generators. Future power demands are expected to be met by the Newman gas fired station via connecting overhead transmission line. A new sewage facility known as Packsaddle Village Sewage Treatment Plant will be constructed. Existing infrastructure facilities at the mine site like main access roads, workshops, administration areas, accommodation village and airstrips will be used. When mining is completed rehabilation of the site area is to be carried out. Project life is expected to be 30 years. Click for more details...

WORSLEY ALUMINA EXPANSION EFFICIENCY & GROWTH PROJECT
Mining (Open Cut) project In The Collie Council Area of Mine Expansion/Refinery - Upgrade type. Development comprises two parts. Expansion of the existing bauxite mining activities and an upgrade of the refinery. Mining will expand into the Saddleback, Marradong, Hotham North, East Quindanning, Morgans, Hotham North Extension, Central and Brookton mining envelopes. Throughput will expand to 16.5 Mtpa. The expansion of mining activities will involve the addition of three new primary crushers and a new crushed ore stockpile will be needed next to the existing secondary crusher to provide extra surge material to feed the overland bauxite conveyor. Additional conveyors include a 34 km extension from the Hotham North mining envelope which will cross both the Albany Highway and the Wandering-North Bannister road, a 16 Km spur from the south east of the Central mining envelope to the Luptons mining envelope and lastly a 28 Km extension from the Central mining envelope to the Brookton mining envelope. Additional bauxite conveyors spurs and haul truck transport may be needed in the future. Refinery expansion will involve an increase in the Bauxite stockpile of 0.5 Mt. At the Milling and Digestion plant an additional mill, an additional desilication tank and eight new slurry heaters will be required. At the Seperation plant, an extension of the residue washing tanks and an expansion of capacity of the causticiser circuit. At the Calcination plant an additional gas fired calciner with bag house with a new hydrate filtration building. Addition of a coal-fired co-generation facility with bag house designed to produce 350 tonnes of steam per hour (equivalent to 204 Mw) and 35 Mw of electrical power. Click for more details...

BENGALLA COAL OPERATIONS - WANTANA EXPANSION
New project of Mining (Open Cut) project at Bengalla Rd, Muswellbrook, NSW 2333. Extension of mining operations into the Wantana Extension area. Minor only infrastructure modification required including extension of some buildings & carparking facilities, relocation of existing facilities within the workshop and hardstand area & relocation & construction of some in-pit facilities. Click for more details...

SOUTHERN CROSS GOLD OPERATIONS REGIONAL EXPANSION
Southern Cross Gold Operations Regional Expansion is currently at the Construction stage, valued at about $ 29000000 it is Initial drilling at the historic Copperhead gold mine targeted the largely unmined Western Lode as well as testing depth extensions of the previously mined Northern & Southern lodes. The Gold to be processed at the Marvel Loch gold processing plant. Click for more details...

MOUNT GARNET TIN & IRON PROJECT
Private ownership Mining (Open Cut) project In The Tablelands Regional Council Area for New development. A project covering the Gillian, Pinnacles & Windermere localities on the historic Herberton tin field. A tin resource estimate of 7.3million tonnes (Mt) with iron estimates of 3Mt @ 30.8% at Gillian, 1.87Mt at Pinnacles (Wafer) & 400,000t at Deadmans Gully (Windermere). A fluorite estimate also for Pinnacles (Hartog, Llashram, Sniska, Wafer) of 0.96Mt @ 15%. A scoping study envisaged 7.5years life-of-mine (LoM) for operations in the project area at a rate of 700,000tpa producing 236,600tpa of magnetite concentrate grading 65%. Click for more details...

PERCYVALE GOLD PROJECT
Mining (Open Cut) project for New development. Initial inferred gold resource containing 14 000 oz grading 4.1 g/t Au to 40m depth only. Click for more details...

RAPID GROWTH 6 IRON ORE PROJECT (RGP6)
Mining (Open Cut) project In The East Pilbara Council Area of Private ownership. The Rapid Growth Project 6 (RGP6) project aims to increase iron ore capacity installed in Western Australia to 240 million tonnes per annum (Mtpa) from the Rapid Growth Project 5 (RGP5) target of 205Mtpa. March 2011 financial approval for Jimblebar mine expansion (rail links, mining equipment, rolling stock for 35Mtpa capacity) & Port Hedland expansion (2 new berths & shiploaders, car dumper, connecting conveyor routes with associated rail works & rolling stock) as well as blending facilities in preparation for future growth beyond the inner harbour. Click for more details...

SAINT IVES GOLD OPERATIONS EXPANSION - LAKE LEFROY
Operating Mine - Expansion project at 20km southeast of, Kambalda, WA 6442 In The Council Area Of Coolgardie of Private. An open cut & underground mining operation based on June 2009 gold reserves of 5.6 million ounces contained in 30 million tonnes (Mt) of resources. A project to extend the Life-of-Mine (LOM) to 2014 by mining 778ha of saline Lake Lefroy & 22ha of riparian zone at the Pistol Club & Neptune localities. Continued use of central infrastructure including administration & engineering facilities, a 4.8Mtpa mill/CIP processing plant & a 2.3Mtpa heap leach processing plant with 3 associated 5.5Mt leach pads. New expansion infrastructure expected to include a fourth heap leach pad & a fourth tailings dam. Click for more details...

SHELL PRELUDE GAS FIELD - FLNG - MARINE STEAM BOILER
Private ownership Mining (Open Cut) project In The Broome Council Area for New development. For the provision of a marine steam boiler. Click for more details...

MCARTHUR RIVER BASE METALS OPERATIONS PHASE 3 EXPANSION
Operating Mine - Expn - Phase 3 project at 60km southwest of, Borroloola, NT 0854 in the Mining (Open Cut). A project to extend the existing pit to the east to cover 210ha (1750m x 1500m). Mining to 420m deep should increase mineable reserves from 54 million tonnes (Mt) to 115Mt. Expansion of the current fleet of rope shovels, hydraulic excavators & large haul trucks to increase the mining capacity from 2.5Mtpa to 5.5 Mtpa. Upgrade of the processing plant (expanded crushing facilities, additional grinding mills, flotation cells & thickeners) to produce up to 800,000tpa of bulk zinc/lead concentrate containing 368,000t zinc. New overburden emplacement facilities (OEF) to the east & south of the expanded pit as well as expansion of the existing North OEF from 375ha to 860ha & a height increase from 55m to 80m. Installation of a new water management dam with a low permeability liner & drainage to allow it to eventually be converted to Cell 4 of the tailings storage facility. Increase using the existing pipeline of gas fired power generation from 20MW to 45-40MW. Expansion of the permanent accommodation village by 30 then later 80 rooms. Construction of a 300 room temporary workers camp serviced by a packet sewerage treatment plant. Workforce to peak during construction at 930 & operationally at 735 permanent staff & contractors. Click for more details...

GOLDEN KING GOLD COPPER PROJECT
Addition project of Mining (Open Cut) project at 32km north of, Broken Hill, NSW 2880. A project located along strike of the historic Golden King Mine. Rock chip sampling preceded reverse circulation drilling to test multiple lodes hosted in a chlorite-altered corridor. A ground magnetic survey to detail lode outlines prior to follow up drilling. Click for more details...