MEEKATHARRA GOLD OPERATIONS - ROCK LEE
Resource - Gold project at 6 km north of the Bluebird plant via, Meekatharra, WA 6642 In The Council Area Of Meekatharra of Private. At Rock Lee, the results of five confirmatory and six infill RC drillholes in the central part of the BIF-associated deposit, which had a listed gold resource of 100,000 tonnes at 2.8 g/t (9,900 oz) deposit, included a number of good intercepts, including 6 m at 19.86 g/t. An OBM resource was subsequently estimated at 373,000 tonnes at 1.32 g/t (15,800 oz), and Whittle optimised reserve calculated at 37,000 tonnes at 1.62 g/t (1,900 oz). Click for more details...

REPUBLICAN GOLD/NICKEL PROJECT
Currently at the Exploration, Drilling, Survey & Assessment stage In Coolgardie is a project estimated to be $ 1000000. This project Equinox has completed a mobile metal ion soil sampling programme. Click for more details...

VIVIEN GOLD OPERATIONS RECOMMENCEMENT
Mine - Recommencement project at Straddling Agnew Sandstone Rd 10km SW of, Leinster, WA 6437 in the Mining (Open Cut). A project located on the site of former underground & open cut operations based on an upgraded resource estimate of 451 000 tonnes at 7.6 g/t gold for 109 000 ounces gold. Click for more details...

EGERTON GOLD PROJECT - RESOURCE
Mining (Open Cut) project at Gaskoyne region, 235 km northwest of, Meekatharra, WA 6642 for New. Resource estimate is 116,400 tonnes @ 6.4 g/t for 23,811 ounces of gold. Metallurgical test reveal that by gravity concentration 42% of the gold can be extracted from the ore and with vat leaching a further 53.5% of gold can be extracted. The total recovery is estimated to be 95.5% of gold from the ore. Test work is continuing. Click for more details...

BONNIEVALE PROJECT
New project of Mining (Open Cut) project at 10km north of, Coolgardie, WA 6429. Retrieval of the tailings and rehabilitation of the site will now be undertaken in-house. Historical gold mining and treatment has resulted in an estimated 10,000 tonnes of tailings being retained on the lease. Approximately half of the tailings are now contained within a vat having been partially leached; the remainder are in 1.5 metres high mounds. auger samples were analysed for gold using an aqua-regia digestion. From this work it is estimated that 4,500 tonnes at 0.7g/t gold is within the vat and 5500 tonnes at 1.3g/t gold remains un-retained in mounds. The bulk sampling was analysed using a cyanide leach method. It returned similar grades to the auger sampling for the tailings in the mounds, however the grades within the vat averaged 0.4g/t gold. Click for more details...

KOOLYANOBBING IRON ORE OPERATIONS - EXPANSION
Mining (Open Cut) project for New development. To lift production to approx 8 million tonnes. An interim production upgrade to 6mtpa from 1 January 2005 has also been announced. Cost estimates include $5.5 million for pre-stripping and mine development. Click for more details...

BLACK SWAN NICKEL OPERATIONS - BLACK SWAN DISSEMINATED
Mining (Open Cut) project In The Kalgoorlie-Boulder Council Area of Private ownership. Includes development and ore production at a rate of 450,000 tpa in stage one, with a potential increase to one million tpa in stage two. Click for more details...

MOUNT ELIZABETH PROJECT
Currently at the Exploration, Drilling, Survey & Assessment stage In Wyndham-E Kimberley is a project estimated to be $ 5000000. This project The WA Government has granted EL 80/2459 to Austar for a term of 5 years. A Prospectus for an IPO of Austar (to be re-named Brilliant Diamonds Ltd), is in the coarse of preparation. Click for more details...

WELD RANGE NICKEL PROJECT
A project in the WA Within Cue. Towards the surface, the geology has been dispersed by weathering & its character altered. Click for more details...

RADIO GOLD PROJECT - RESOURCE
A project in the WA Within Yilgarn. All succesSful RC holes intersected the primary mineralisation zone. A review of the project to determine thE potential for an economic ore body below the existing mine will be undertaken when bulk leach assays are received. Click for more details...

GOLDEN WEB - GOLD
A project in the WA Within Coolgardie. Results from earlier drill work include 8m (from 40m) grading 12.0gpt gold. A resource of about 150,000t grading 4.5gpt gold has been identified (to 45m) which is essentially supergene enrichment. Contract period of approximately 6 months is envisaged & will involve haulage of ore to Norris plant 4 km distant. Following purchase of the Norris project total reserves for area now stand at 670,000t grading 3.98gpt gold. The 350,000tpa oxide processing plant will be utilised for this project. Minimal plant modifications only (less than $50,000) & no additional infrastructure required for this site. Additional drilling is planned for the area. Stage 1 open pit designed to mine a reserve of 177,000t at 3.1gpt gold (to 50m). Click for more details...

JAGUAR - GOLD
Mining (Open Cut) New project at Approximately 11 km southwest of, Southern Cross, WA 6426. This type is Mine - Open Cut with Private ownership. Gold values occur within an 800m mineralised zone. Results to date include 15m (from 25m) grading 5.42gpt gold. Mining reserve between 40,000t & 50,000t has been estimated for this deposit. Contract period of 3 to 4 months is envisaged. Click for more details...

MARVEL LOCH GOLD OPERATIONS
Currently at the Construction stage In Yilgarn is a project estimated to be $ 15000000. This project New mine plan recently devised which requires a cutback of the northern wall & the northwest corner of the existing pit. This project does not require EPA assessment. Contract period of one year involves associated drilling, blasting & stoping as required. Development of some new pits expected to be included in this contract. Click for more details...

JUBILEE GOLD OPERATIONS - MOUNT MARTIN
Mine - Open Cut project at Approximately 37 km southeast of, Kalgoorlie, WA 6430 In The Council Area Of Kalgoorlie-Boulder of Private. Tender to involve 521,000t of ore & about 6.9mt of waste (strip ratio of 13.1:1). An open cut operation extending over approximately 18 months with mining to a depth of 150m is envisaged. Click for more details...

CORK TREE WELL PROJECT
Mining (Open Cut) project In The Laverton Council Area of Resource - Gold type. Cork Tree well open pits were mined from 1985 to 1988. current inferred resource estimates total 243,000 tonnes at 2.2g/t gold. Additional ground has been applied for the cover cross cutting structures and potentially localising mineralisation in other prospective lithologies to the east and west. Click for more details...

NICOLSON'S FIND/PALM SPRINGS - GOLD
Currently at the Construction stage In Halls Creek is a project estimated to be $ 4000000. This project Contract to involve crushing 1mt of ore & carry out trial mining on one satellite deposit. 2 additional gyratory crushers to be provided in order to improve production size & throughput rates. Nicholson's Find ore to be trucked to Palm Springs via Great Northern Hwy (78 km journey). Followup drilling to be undertaken in area. Click for more details...

HILL 50 GOLD OPERATIONS - MILKY WAY/TITAN
Mining Contract project at West of, Mount Magnet, WA 6638 in the Mining (Open Cut). Open cut mining contract. Click for more details...

NORTH WIDGIEMOOLTHA GOLD PROJECT - RESOURCE
North Widgiemooltha Gold Project - Resource is currently at the Early Planning stage, valued at about $ 1000000 it is This area is similar to that of the Spargoville area to the north and consists of komatite ultramafic and basaltic units overlain by volcaniclasic and sedimentary rocks with minor dolerite, felsic and pegmatite intrusives. The Spargos Reward Shear, a reidel fault between the regional Kunanalling and Zuleika shear zones extends south from the Wattle Dam area through the North Widgiemooltha project area. A number of gold deposits, workings and occurrences are located along or inproximity to this shear and are defined by anomalous gold in soils. Click for more details...

QUARTZ CIRCLE PROJECT
A project in the WA Within East Pilbara. Drill testing of the large electrical target outlined by the Mimdas geophysical system is planned, subject to access. Click for more details...

YANDICOOGINA IRON ORE OPERATIONS
A project in the WA Within East Pilbara. Expansion to 36 million tpa .Some conveyor work involved. Flow modifications. A current project to increase output to 24 million tonnes per annum is nearing completion. Click for more details...

ASHBURTON GOLD PROJECT - OLYMPUS & ZEUS
New project of Mining (Open Cut) project at Approx 60km west of, Paraburdoo, WA 6754. Some 49 000 ounces of gold remain in oxide/transition reserves at Mount Olympus, above some 490 000 ounces of gold in refractory sulphide resources. There are numerous gold prospects that have been outlined along a corridor approximately 150km long to the northwest of Mount Olympus. Click for more details...

MONTI CRISTO GOLD PROJECT
Resource - Gold project at 30 km SE of, Yalgoo, WA 6635 in the Mining (Open Cut). Rab drilling to assess all targets is to follow the initial phase of field exploration. This project complements Thundelarra's other nearby gold projects. Click for more details...

MUNGARI WEST PROJECT - WHITE FOIL
18 km northeast of, Coolgardie, WA 6429 Has Mungari West Project - White Foil currently at Construction stage. Resource of 11.8 million tonnes at 2.42g/t gold for 915,000 ounces of gold. Click for more details...

MOUNT ELSIE PROJECT - GOLD RESOURCE
Currently at the Exploration, Drilling, Survey & Assessment stage In East Pilbara is a project estimated to be $ 10000000. This project A 1000 RC programme is planned to follow up intersections including 6m of 7.3g/t Au from 4m and 3m at 7.2g/t from 12m at the T4 prospect. Click for more details...

CHRISTMAS FLAT PROJECT
A project in the WA Within Kalgoorlie-Boulder. A gold/arsenic/tungsten anomaly with a strike length of 1,500 m. Click for more details...

ROWES FIND GOLD PROJECT
Rowes Find Gold Project is currently at the Planning stage, valued at about $ 15000000 it is These areas have potential to add mill feed to the Aldiss gold project. Resource estimate of 161 493 tonnes at 3.53g/t gold for 18 328 ounces gold. Click for more details...

WHITEHEADS PROJECT - HAYES NEW FIND/PAIN KILLER/MONKLAND
Mining (Open Cut) project for New development. 3 areas of shallow oxide gold mineralisation were previously outlined by RAB drilling at Hayes New Find. The eastern area measures 600 metres by 400 metres and strikes parallel to stratigraphy and is open to the south and east. The central area occurs adjacent to a line of old workings and measures 600 metres by 100 metres and is open to the north and south. A western area is smaller, but generally has higher grades and thickness and measures 400 metres by 100 metres and is open to the south. Click for more details...

SHELL LAKES PROJECT - DIAMOND RESOURCE
A project in the WA Within Not Yet Determined. First pass aircore drilling to test for kimberlite pipes completed. 1,444 metres, including 586 metres of diamond core. All drill holes intersected interpreted intrusive rocks of ultramafic composition, commonly associated with kimberlitic pipes. Results from laboratory analysis will determine specific rock types, chemical compositions and diamond potential. Click for more details...

BUNGALBIN GOLD OPERATIONS
New project of Mining (Open Cut) project at Approximately 50 km north of, Kalgoorlie, WA 6430. Proposal to comprise a vertical shaft, headframe, skip haulage & level development mining. Click for more details...

BURBANKS GOLD PROJECT - RESOURCE
Mining (Open Cut) project In The Coolgardie Council Area of Private ownership. Indicated and inferred resource estimate is 517,000 tonnes at 4.5 grams per tonne gold for a total of 74,000 ounces. Underground diamond drilling will focus on extensions to the Wahloo Shoot and to upgrade the resource estimate to indicated category. Click for more details...

KATHLEEN VALLEY GOLD PROJECT
A project in the WA Within Leonora. A project with an upgraded resource estimate of 1,814 million tonnes (Mt) @ 2.8 g/t for 163,000 contained ounces. Click for more details...

MOUNT CRAWFORD PROJECT - GOLD RESOURCE
New project of Mining (Open Cut) project at Approximately 4 km northeast of, Laverton, WA 6440. A 28 hole Rotary Air Blast drilling programme for a total depth of 851m has been completed. Many of the drill holes intersected anomalous gold values and the anomaly defined by Oxania's earlier work has been shown to extend further to the south. Highest gold intersections include 4m at 0.20 g/t Au from 29m, 4m at 1.21 g/t Au from 28m and 9m at 0.78 g/t Au from 42m (incl. 2.86 g/t Au at 42-43m, and 2.09 g/t Au at 46-47m) Click for more details...

RAINBOW PROJECT
Mining (Open Cut) project at Approximately 4 km north of, Coolgardie, WA 6429 of Resource - Gold type of New development. Results from latest reverse circulation drilling included 5m (from 15m) grading 3.4gpt gold (Croesus No: 5 prospect). Click for more details...

GREENBUSHES TANTALUM OPERATIONS - CORNWALL & SPODUMENE PITS
Mining (Open Cut) project for New development. Hard rock open cut contract of 8.5 Mt. Includes waste stripping, earthworks & drill & blast. Also likely to include unspecified additional work as required on day rates. Click for more details...

NIFTY COPPER OPERATIONS - SULPHIDE DEVELOPMENT
Private ownership Mining (Open Cut) project In The East Pilbara Council Area for New development. Construction of unknown number of offices. Click for more details...

MEEKATHARRA GOLD OPERATIONS - LUKES JUNCTION
Resource - Gold project at 10 km north of Bluebird plant via, Meekatharra, WA 6642 In The Council Area Of Meekatharra of Private. A re-assessment of this deposit which previously held an Indicated resource of 370,000 tonnes at 1.6 g/t (18,000 oz), suggested the possibility of economically recovering around 87,000 tonnes of oxide material at a grade of 2.0 g/t. 20 infill RC holes were subsequently drilled, giving significant intercepts. An OBM was subsequently constructed which contained 430,000 tonnes at 1.6 g/t (22,000 oz). Click for more details...

DEFLECTOR COPPER GOLD PROJECT - OPEN CUT MINING CONTRACT
Via Geraldton Mt Magnet Rd 60km SE of, Mullewa, WA 6630 Has Deflector Copper Gold Project - Open Cut Mining Contract currently at Construction stage. For the provision of a mining contract for Deflector Copper Gold Project. Click for more details...

BHP BILLITON IRON ORE OPERATIONS - ASSET DEVELOPMENT PROJECTS
Bhp Billiton Iron Ore Operations - Asset Development Projects is currently at the Early Planning stage, valued at about $ 20000000 it is Part of a proposed additional expansion to meet increased demand, involving engineering works and capital investment of 2-3 billion $AU over the next five years. The feasibility study is being undertaken by MPDJV (Mine & Port Joint Venture). Click for more details...

MOUNT ELVIRIE GOLD/BASE METALS/PGE PROJECT - RESOURCE
Mount Elvirie Gold/Base Metals/Pge Project - Resource is currently at the Exploration, Drilling, Survey & Assessment stage, valued at about $ 5000000 it is The follow up sampling produced results of 8.48g/t AU and 9.28g/t AU at E77/1044. At E29/496 moderately anomalous nickel and copper values of up to 2400ppm and 900ppm were found. Click for more details...

ELLENDALE DIAMOND PROJECT - CENTRAL RECONNAISSANCE PROJECT - DIAMOND RESOURCE
Mining (Open Cut) New project at Approx 130 km south east of, Derby, WA 6728. This type is Resource - Diamonds with Private ownership. Re-evaluation fo the central areas of the Ellendale lamproite field is a cornerstone of the exploration programme. Most of the area was previously explored with older technology. There has been significant technological advances to assist in attaining more accurate results. Click for more details...

CENTRAL NORSEMAN GOLD OPERATIONS - NEW CHUM - RESOURCE
Mining (Open Cut) project at Via, Norseman, WA 6443 for New. Resource estimate of an indicated and inferred mineral resource of 318,000 tonnes @ 1.98g/t for 20,000 ounces of gold. Geological mapping and interpretation has identified new targets for drilling. Open pit mining will be the preferred method because the ore is located at shallow levels. Mining design planning is in progress as well necessary government regulatory approvals. Click for more details...

GELORUP LIMESTONE QUARRY - RESOURCE
Mining (Open Cut) New project at (Lots 313-317) Harewoods Road, Gelorup, WA 6230. This type is Resource - Limestone with Private ownership. Sanstone and limestone will be extracted from the site. Click for more details...

KOOLAN ISLAND PROJECT - MINING/CRUSHING CONTRACT
Private ownership Mining (Open Cut) project In The Derby-W Kimberley Council Area for New development. Approximately 61 million bcm of ore and waste will be mined in the five year contract. Click for more details...

MOUNT NEWMAN IRON ORE OPERATIONS - OREBODY 25 EXTENSION - RESOURCE
Mining (Open Cut) New project at 8 Km North east of, Newman, WA 6753. This type is Resource - Iron Ore with Private ownership. Development comprises increasing ore production from approximately 7 Mtpa to 8 Mtpa. Mining will continue and be extended in Pits 1 and 3 into approved areas and in the case of Pit 3 below the water table. Overburden Storage Areas (OSA) and low grade ore stockpiles will be extended as well the progressive development of new OSA's and the placement of overburden in existing and new mined out pits. Haul roads and light vehicle access roads will be constructed to open pits, OSA's and mine infrastructure. Click for more details...

FORRESTANIA NICKEL PROJECT - SPOTTED QUOLL
Mining (Open Cut) New project at Approximately 80km East of, Hyden, WA 6359. This type is Resource - Nickel with Private ownership. The prospect contains approximately 545 600 tonnes of ore averaging 6.3% Nickel; current estimates set the open pit mine-life at four years. The waste dump will be designed for 16 million tonnes of waste rock. Ore will be trucked via upgraded established roads to Flying Fox. Likely infrastructure to include: pit and pit access, ROM, waste dump, settling pond(s), administration building(s), lay-down, haul road, pipeline and power. Mine dewatering pipelines consisting of 450 mm HDPE buried to a depth in excess of 300 mm, parallel to the haul road, will convey mine water to established mine dewatering infrastructure at the Flying Fox mine. Click for more details...

NORTH DARLING RANGE JOINT VENTURE BAUXITE PROJECT
Mining (Open Cut) project In The Gingin Council Area of Resource - Bauxite type. Inferred resource of 18.2 million tonnes @ 43.1% Total AI2O3, 31.6% Available AI2O3 and 3.2% Reactive SiO2. Field verification by the Company confirms extensive bauxite laterites within its tenements. The bauxite laterites are largely preserved on plateaus and form outcropping ridges. The historical drilling has identified bauxite mineralisation from surface to a maximum depth of 12 metres. The bauxite laterites are commonly 2 to 3 metres in thickness and overlie a distinguishable saprolite weathered zone. Click for more details...

LAKE NERRAMYNE ATTAPULGITE OPERATIONS
Mining (Open Cut) project In The City Of Greater Geraldton Council Area of Mining Contract - Open Pit type. An attapulgite (Fuller's Earth) mine based on a 21.5 x 5km deposit with 4 million tonnes (Mt) of measured reserves & inferred reserves of 10 Mt. The mine plan anticipates 28.000 billion cubic metres (BCM) to be recovered, followed by rehabilitation. From inception in 1980 the operations have been conducted as intermittent campaign mining. The most recent mining commenced February 2010. Click for more details...

ROY HILL IRON ORE PROJECT - GENERAL - EARTHMOVING TYRE & ENGINEERING CONSULTANCY SERVICES
Mining (Open Cut) project at Approx 110km North of, Newman, WA 6753 for New. For the provision of earthmoving tyre & engineering consultancy services. Click for more details...

ANDY WELL GOLD PROJECT - OPEN PIT MINING
Approx 45km North of, Meekatharra, WA 6642 Has Andy Well Gold Project - Open Pit Mining currently at Construction stage. For the provision of open pit mining and civil earthworks services. Click for more details...

CANNON GOLD PROJECT
A project in the WA Within Kalgoorlie-Boulder. Planned contract mining over 3 years for 484,000t to be treated off site for 68,200 ounces (oz) of gold. Open cut operations followed by underground workings via a portal & decline from the footwall of the open pit. Ore is to be processed at Metals X Ltd Jubilee Mill. Click for more details...