State

Categories

Sub Categories

Click Here to Find Current Projects

List of Open cut mining, Overburden, Draglines Projects in QLD


HAIL CREEK COAL PROJECT
Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines) project for New development. Package to include:Cranage for Dragline House Structure; 3 x 1 ton Electric Chain Hoist; 2 x 2 ton Wire Rope Winches; 2 x 303.75inch Double Girder Bridges; 1 x 186 inch Girder Bridge; and 2 x Electric Powered Under-hung Trolley Hoist. Click for more details...

KUNWARARA MAGNESITE OPERATIONS - KG2 EXTN
A project in the QLD Within Rockhampton Regional. Installation of a new crushing and screening circuit. Click for more details...

LAKE LINDSAY COAL PROJECT
New project of Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines) project at Approx 25 km from, Middlemount, QLD 4746. Overburden removal to commence July 2006; coal will be washed in existing washplant & construction on site will commence shortly. Production of export coking coal, & pulverised coal injection coal, expected to reach its peak in 2008. Coal to be hauled by truck or overland conveyor to German Creek. Blasting necessary prior to conventional truck and shovel strip mining. Dragline operations to 80 metres later in the mine life. Flood levee banks to be constructed parallel to Oaky Creek. Click for more details...

BURTON COAL OPERATIONS EXPANSION
Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines) project for New development. A terrace mining, truck & shovel open cut operation based on the Broadmeadows, Plumtree & Wallanbah pits. A project to increase production to over 2.5million tonnes per annum (Mtpa) through reopening of the original Burton pit including its deepening to 240m. Processing to continue through the existing central coal handling & preparation plant (CHPP) with 2 x 400tonnes per hour modules. Product coal trucked 36km south along the Mallawa haul road to a train loadout facility for export through the Dalrymple Bay Coal Terminal. Life-of-Mine (LoM) to be extended until 2016 while employing more than 500 people. Click for more details...

ROLLESTON COAL PROJECT - COAL HANDLING/INFRASTRUCTURE
Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines) New project at 16km west of, Rolleston, QLD 4702. This type is Crushing & Mine Site Infrastructure with Private ownership. Initial development will be for 6mtpa. Expansion to 8 mtpa allowed for. Click for more details...

ROLLESTON COAL PROJECT - STAGE TWO/STAGE THREE
Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines) project for New development. First production will of one million tonnes approx is expected in late 2005. Stage two to 8 mtpa will require only the purchase of an additional second hand dragline and some minor mobile plant. The crushing and mine site infrastructure for stage one will be sized to handle 8 mtpa.Stage two production levels are expected in 2008. The mine is expected to have a 20 year plus life and has further expansion potential to 12mtpa with additional minor capital. Click for more details...

ROLLESTON COAL PROJECT
Resource - Coal project at 16 km west of, Rolleston, QLD 4702 in the Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines). A large low ash thermal coal deposit. Coal does not require washing. Initial production of 1 million tpa expected in late 2005, with pmpta export and 2 mtpa domestic production expected in 2008. the project has further expansion potential to 12 mtpa approx with minor additional capital. A low strip ratio, high productivity dragline will be used. Coal to be railed to the port of Gladstone. Click for more details...

TWIN HILLS GOLD MINE - RESOURCE
Mine - Gold project at South of Charters Towers via, Homestead, QLD 4816 in the Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines). Resource estimate is 214,000 tonnes @ 10.9 g/t for 75,000 ounces of gold. Underground Area 1 of the mine has been mined out and Area 2 remains. In 2006, 36,574 tonnes @ 15 g/t has been mined. Click for more details...

TEXAS SILVER PROJECT - TWIN HILLS - RESOURCE
Currently at the Construction stage In Southern Downs Regional is a project estimated to be $ 20000000. This project Resource estimate is 44.5 million ounces of silver. Measured resource is 7.37 million ounces, Indicated resource is 13.15 million ounces and inferred is 23.98 million ounces. Click for more details...

TEXAS SILVER PROJECT - TWIN HILLS - MINING/CRUSHING
Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines) project for New development. The revised mine plan now incorporates the previous stage one and stage two. Click for more details...

LEICHHARDT COPPER OPERATION - MOUNT WATSON - RESOURCE
Leichhardt Copper Operation - Mount Watson - Resource is currently at the Tenders & Building stage, valued at about $ 40000000 it is Resource estimate is 8,030,000 tonnes @ 1.1% Cu. Measured resource is 910,000 tonnes @1.1%. Oxide copper will be mined from the project and hauled 25 kilometres to the Mount Cuthbert processing plant. Click for more details...

MOORVALE COAL PROJECT
Mining Contract project at 10 km south of Copabella mine Bowen Basin via, Nebo, QLD 4742 In The Council Area Of Isaac Regional of Private. Life of mine contract. (Approximately 10 years based on current knowledge of the resource). Click for more details...

NEWLANDS WOLLOMBI NO2 COAL OPERATIONS EXPANSION PROJECT
13 km west of, Glenden, QLD 4743 Has Newlands Wollombi No2 Coal Operations Expansion Project currently at Construction stage. Development into the western portion (77ha approx) of Wollombi Open Cut Mine mining lease (ML4761). Production is expected to be up to 2.5 million tonnes of coking coal per annum of Run of Mine (ROM) coal for nominal annual average of 1.9 Mtpa product coal. It is proposed to use an excavator and truck fleet combined with a dragline to produce high grade, medium volatile steaming coal & premium coking coal for the export market. Development to involve open cut mining, clearing of vegetation, topsoil removal and replacement, overburden stockpiling, coal extraction and final rehabilitation of disturbed areas. Coal is to be processed at the existing Newland's Coal Handling and Preparation plant and transported 200km via rail to the Abbot Point Bulkcoal Terminal for export. Click for more details...

BHP BILLITON MISUBISHI ALLIANCE (BMA) & BHP MITUSI (BMC) COAL OPERATIONS
Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines) project In The Mackay Regional Council Area of Private ownership. Mines owned by BHP Mitsui include South Walker Creek, Blackwater. BMA owned mines include Goonyella, Saraji, Peak Downs, Norwich Park, Gregory, Crinum, Blackwater. BMA also manages and markets coal for the BHP Mitsui mines. This stage two expansion will involve an increase in production capacity to 59Mtpa by second half 2006. This stage includes acquisition of additonal stripping and mining equipment. Further expansions in capacity are planned with an overall production capacity of around 100 million tonnes per annum by 2010. Click for more details...

BHP BILLITON MISUBISHI ALLIANCE (BMA)/BHP MITUSI (BMC) COAL OPS - SARAJI
Bhp Billiton Misubishi Alliance (Bma)/Bhp Mitusi (Bmc) Coal Ops - Saraji is currently at the Planning stage, valued at about $ 50000000 it is 32Mbcm of overburden stripping contracts. Click for more details...

WOLFRAM CAMP PROJECT - TUNGSTEN MOLYBDENUM & BISMUTH RESOURCE
Private ownership Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines) project In The Tablelands Regional Council Area for New development. Total resources in Wolfram Camp were increased by some 45% to 876,500 tonnes measured plus indicated @ 0.41% WO3 and 0.20%MoS2 and inferred is 211,500 tonnes @ 0.4%WO3 and 0.3%MoS2. Infrastructure to include processing plant, pipeline and electrical. Click for more details...

ENSHAM CENTRAL EXPANSION PROJECT - DRAGLINE 4
Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines) project at (Lot 34 Rp 864576) Duckponds Road, Emerald, QLD 4720 of Dragline 4 type of New development. The dragline will be a Bucyrus 8750 fifth model. It will be operated by DC electrics, carry a 159 YD3 (122 cubic metres) struck capacity bucket and have a rated suspended load (RSL) capacity of over 715,000 lbs (324,322 kgs). Click for more details...

PEAK DOWNS COAL OPERATIONS - PRE-STRIPPING CONTRACT
Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines) project at Peak Downs South of, Moranbah, QLD 4744 for New. Contract is an extension to current prestripping at the mine site. Click for more details...

CENTURY MINE EARTHWORKS/WASTE STRIPPING PROJECT
Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines) project In The Carpentaria Shire Council Area of Private ownership. Waste stripping of 36 million cubic metres of overburden to be removed over three years to support the stability of the pit walls. Click for more details...

CAMEBY DOWNS COAL PROJECT - MINING CONTRACT - OPEN CUT
Mining Contract - Open Cut - Stage 1 project at 17km northeast of, Miles, QLD 4415 In The Council Area Of Western Downs Regional of Private. Mining will commence in the northeast corner of the site & progress in a westerly & southwesterly direction using strip mining methods at a rate of 1.8Mtpa. Initial activities to include clearing vegetation, topsoil stripping & stockpiling, overburden removal from the initial area to be mined & storage of the overburden in permanent overburden dumps. Coal extraction using excavators & trucks & progressive rehabilitation of overburden emplacement areas. Construction of surface water management structures to manage the quality and quantity of surface waters on the site including diversions, drains & sediment control dams. Storage of coal rejects & tailings in an appropriately designed & engineered Tailings Dam. Loading of coal product into a dedicated rail loading facility for transport off-site to the Port of Brisbane. McMahon's stage1 contract includes planning, mine development, waste stripping, coal mining, coal preparation & train loading. Click for more details...

GOONYELLA RIVERSIDE COAL OPERATIONS - PRESTRIP CONTRACT (RV)
Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines) New project at Riverside mine site, 30 km north of, Moranbah, QLD 4744. This type is Prestrip Contract with Private ownership. For the provision of prestripping services. Click for more details...

MIDDLEMOUNT COAL OPERATIONS - STAGE 2 EXPANSION
Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines) project In The Isaac Regional Council Area of Operating Mine - Expansion type. A pulverised coal injection (PCI) & coking coal open cut mine based on an estimated resource of 122.6million tonnes (Mt). The stage 2 expansion project to increase production from 1.8million tonnes per year (Mtpa) to 5.4Mtpa of run-of-mine (RoM) coal for 23 years. Removal of overburden & coal to continue by conventional truck, shovel & excavator. To includes a 30kL/day package potable water treatment plant (WTP), a sewage treatment plant (STP), the 650m x 200m go line area (including office, crib facility, amenities, kitchen/dining area), flood protection levees & diversion of Roper Creek & Thirteen Mile Gully. Later upgrading of feed conveyors, coal stackers, screens, valves & control systems of the existing coal handling & preparation plant (CHPP) to increase capacity from 400 to 700 tonnes per hour (t/h) for 4Mt/y product coal. Extension of the existing vehicle workshop to include 4 additional covered & 2 outdoor bays with aprons. Additional 600,00l diesel & 1.2ML fuel storage facilities. Associated out-of-pit spoil dumps & additional haul/access roads. Possibility of a dragline & associated 200m x 200m construction pad. Later diversion of part of the Bingegang (Saraji) pipeline. Some of the additional 397 operational personnel expected to be accommodated in an extension to The MAC Middlemount village. Click for more details...

GOONYELLA RIVERSIDE BROADMEADOW COAL OPERATIONS EXPANSION - OPEN CUT EXTENSION
Operating Mine - Extn - Open Cut project at 30km north of, Moranbah, QLD 4744 in the Mining - Earthworks/Civil Engineering (Open cut mining, Overburden, Draglines). Contract for extension of the existing open cut to provide access to underground works. To include 8million cu m of earthworks & 12,000cu m of concrete works. Construction of associated infrastructure including access roads, dams & drainage, conveyor footings & gates. Click for more details...

ISAAC PLAINS COAL OPERATIONS - MINING SERVICES CONTRACT
Currently at the Construction stage In Isaac Regional is a project estimated to be $ 249000000. This project A 3 year mining services contract at a rate of 2.7 million tonnes (Mt) of run-of-mine (ROM) coal. To include dragline operations & supply & maintenance of mobile plant & equipment. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect