State

Categories

Sub Categories

Click Here to Find Current Projects

List of Other mining services Projects



CURTIS ISLAND LNG (QCLNG) PROJECT - GAS FIELD DEVELOPMENT - BUS SERVICES
Non-Construction Items (Other mining services) project In The Various Council Area of Private ownership. 2 year contract for bus/coach transfers between airports, towns, camps & sites in areas around Chinchilla, Condamine, Dalby, Roma & Wandoan. To include small (13-24 persons), medium (24+ persons) & large (48-57 persons) vehicles with air conditioning & seat belts. Regular liaison with the QGC Site Travel department & flight operators. Click for more details...

GREATER GORGON GAS PROJECT - LNG JETTY & MARINE STRUCTURES - BRINE OUTFALL PIPING FOR HEAVY LIFT FACILITY
Private ownership Non-Construction Items (Other mining services) project In The Ashburton Council Area for New development. For the supply & fabrication of brine outfall piping for heavy lift facility. To include: pipe works, pipe supports, & emergency escape access platform & ladders. Click for more details...

GREATER GORGON GAS PROJECT - OPERATIONS - QA/QC AND LIFTING INSPECTION SERVICES
Qa/Qc And Lifting Inspection Services project at On, Barrow Island, WA 6712 In The Council Area Of Ashburton of Private. For the provision of QA/QC management and inspection services. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - STORAGE & FIELD ERECTED CONDENSATE TANKS - BOOMLIFTS & TELEHANDLERS
Non-Construction Items (Other mining services) project for New development. For the supply of materials handling equipment (Boomlifts & Telehandlers). Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - STORAGE & FIELD ERECTED CONDENSATE TANKS - COMPRESSORS
New project of Non-Construction Items (Other mining services) project at Vicinity of, Onslow, WA 6710. For the supply of compressors. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - STORAGE & FIELD ERECTED CONDENSATE TANKS - ALIMAK LIFTS
Alimak Lifts project at Vicinity of, Onslow, WA 6710 In The Council Area Of Ashburton of Private. For the supply of Alimak lifts. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - JOHN HOLLAND PERMANENT BUILDINGS - CRANE HIRE
Vicinity of, Onslow, WA 6710 Has Wheatstone Development Project - John Holland Permanent Buildings - Crane Hire currently at Construction stage. For the supply & installation of crane hire. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - OFFSHORE PLATFORM HOOK-UP & COMMISSIONING - ROPE ACCESS & SCAFFOLDING
Private ownership Non-Construction Items (Other mining services) project In The Ashburton Council Area for New development. For the provision of rope access & scaffolding supply & services. Click for more details...

ICHTHYS GAS PROJECT - MAIN CIVIL WORK (CVL3) - TEMPORARY WORKS DESIGN REV1 CONSULTANCIES
Ichthys Gas Project - Main Civil Work (Cvl3) - Temporary Works Design Rev1 Consultancies is currently at the Construction stage, valued at about $ 250000 it is For the provision of Temporary Works Design along with Construction Methodologies associated with CVL3 Main Civil Works project on the Ichthys Project Onshore LNG facilities. Click for more details...

ICHTHYS GAS PROJECT - OFFSHORE - GAS EXPORT PIPELINE - CYCLONE PROOFING SERVICES
Landfall site, Darwin, NT 0800 Has Ichthys Gas Project - Offshore - Gas Export Pipeline - Cyclone Proofing Services currently at Construction stage. Design & installation of cyclone proofing items for the offshore Gas Export Pipeline (GEP) Wet Buckle Dewatering, Flooding, Cleaning, Gauging & Hydrotesting Spread. Click for more details...

ICHTHYS LNG PROJECT - ONSHORE - GAS EXPORT PIPELINE - HYDROSTATIC TESTING AND PRE-COMMISSIONING
Non-Construction Items (Other mining services) New project at Blaydin Point via, Darwin, NT 0800. This type is Hydrostatic Testing/Pre-Commissioning with Private ownership. For the provision of hydrostatic testing & pre-commissioning. Click for more details...

ROY HILL IRON ORE PROJECT - INFRASTRUCTURE - PORT NON PROCESS - COMMUNICATION & DATA
A project in the WA Within East Pilbara. For the provision of communication & data services. Click for more details...

ROY HILL IRON ORE PROJECT - INFRASTRUCTURE - PORT NON PROCESS - PLUMBING DRAINAGE & HYDRAULICS
Plumbing/Drainage/Hydraulics project at 110km north of, Newman, WA 6753 In The Council Area Of East Pilbara of Private. For the provision of plumbing, drainage & hydraulics services. Click for more details...

ROY HILL IRON ORE PROJECT - INFRASTRUCTURE - RAIL NON PROCESS - FUEL & LUBE
Private ownership Non-Construction Items (Other mining services) project In The East Pilbara Council Area for New development. For the provision of fuel & lube. Click for more details...

ROY HILL IRON ORE PROJECT - INFRASTRUCTURE - RAIL NON PROCESS - MODULAR BUILDING
Non-Construction Items (Other mining services) project In The East Pilbara Council Area of Modular Buildings type. For the supply & installation of modular buildings. Click for more details...

ROY HILL IRON ORE PROJECT - GENERAL - TRAINING SIMULATORS
Non-Construction Items (Other mining services) project at 110km North of, Newman, WA 6753 of Training Simulators type of New development. For the provision of training simulators for mining. Click for more details...

APLNG LNG PLANT - FREIGHT FORWARD & LOGISTICS
New project of Non-Construction Items (Other mining services) project at At, Curtis Island, QLD 4680. For the provision of freight forwarding & logistic services. Click for more details...

APLNG LNG PLANT - GARDENING & GROUNDS MAINTENANCE
A project in the QLD Within Gladstone Regional. For the provision of gardening & grounds maintenance services. Click for more details...

APLNG LNG PLANT - IT SOFTWARE
Non-Construction Items (Other mining services) project In The Gladstone Regional Council Area of It Software - Staff/Change type. For the provision of information technology software including for management of change & staff & shift rostering. Click for more details...

APLNG LNG PLANT - LIFTING EQUIPMENT TESTING & INSPECTION SERVICES
Non-Construction Items (Other mining services) project In The Gladstone Regional Council Area of Testing & Inspection - Lifting Equipment type. For the provision of testing & inspection services for lifting equipment. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - ONSHORE LNG PLANT - CHEMICAL CLEANING
Non-Construction Items (Other mining services) project In The Ashburton Council Area of Private ownership. For the provision of chemical cleaning activities for ISBL (Train 1 & Train 2). Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - ONSHORE LNG PLANT - HYDROLYSING SERVICES
Non-Construction Items (Other mining services) project at Vicinity of, Onslow, WA 6710 for New. For the provision of Hydrolysing/Aquamilling Services. Click for more details...

ICHTHYS LNG PLANT - ONSHORE MECHANICAL WORKS - MEC 2 - SUPPLY & INSTALLATION OF GROUT
Grout - Supply & Installation New project In The Darwin City Council Area. For the supply & installation of grout. Click for more details...

ROY HILL IRON ORE PROJECT - PKG 3 - PORT LANDSIDE - EPC CONTRACT
Epc Contract project at Boodarie Industrials Estate, Southwest of, Port Hedland, WA 6721 In The Council Area Of Port Hedland of Private. For the provision of EPC services consisting of all SMPE&I for installation of the Train unloading systems, multiple conveyor systems including transfer stations & rescreening buildings, installation of stockyard Stackers & Reclaimers and all other services required. Click for more details...

ROY HILL IRON ORE PROJECT - PKG 3 & 4 - PORT LANDSIDE & PORT MARINE - CONVEYOR BELT INSTALL & SPLICE SERVICES
New project of Non-Construction Items (Other mining services) project at Boodarie Industrials Estate, SW of, Port Hedland, WA 6721. For the provision of conveyor belt install & splice services. Click for more details...

CHEVRON AUSTRALIA - OPERATIONS - PLATFORM SUPPLY VESSELS
Non-Construction Items (Other mining services) project for New development. For the provision of Platform Supply Vessels. Click for more details...

ICHTHYS LNG PROJECT - ONSHORE FACILITIES - MECHANICAL WORKS (MEC-1) - GROUTING SERVICES
Non-Construction Items (Other mining services) project at Blaydin Point, via, Darwin, NT 0800 for New. For the provision of grouting services. Click for more details...

ICHTHYS LNG PROJECT - ONSHORE FACILITIES - MECHANICAL WORKS (MEC-1) - LUBE OIL FLUSHING
Lube Oil Flushing project at Blaydin Point, via, Darwin, NT 0800 in the Non-Construction Items (Other mining services). For the provision of pop testing. Click for more details...

GREATER GORGON GAS PROJECT - MECHANICAL ELECTRICAL & INSTRUMENTATION - LOAD TESTING ON BWI
On, Barrow Island, WA 6712 Has Greater Gorgon Gas Project - Mechanical Electrical & Instrumentation - Load Testing On Bwi currently at Tenders & Building stage. For the provision of Load Testing of Cranes, Davit Arms & Monorails on BWI. Click for more details...

GREATER GORGON GAS PROJECT - MECHANICAL ELECTRICAL & INSTRUMENTATION - DESICCANT LOADING
Currently at the Tenders & Building stage In Ashburton is a project estimated to be $ 2500000. This project For the provision of desiccant loading. Click for more details...

CHEVRON AUSTRALIA - OPERATIONS - BARROW ISLAND SPARSE 3D SEISMIC SERVICES
Non-Construction Items (Other mining services) project at On, Barrow Island, WA 6712 of Sparse 3d Seismic Services type of New development. For the provision of Sparse 3D Seismic Services on Barrow Island. Contractor to acquire & process seismic data on Barrow Island (BWI) to provide time-lapse images of the subsurface area expected to contain injected CO2 gas. Provide technical support, resources & equipment for a time-lapse seismic program. Supply a new 2000-3000 channel cable-less seismic acquisition system & a new or as new articulated 30,000kg (66,000lb) Vibroseis vehicle suitable for off-road terrain with limited access. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - ONSHORE LNG PLANT - UNMANNED AERIAL VEHICLE (UAV) SURVEY SERVICES
Vicinity of, Onslow, WA 6710 Has Wheatstone Development Project - Onshore Lng Plant - Unmanned Aerial Vehicle (Uav) Survey Services currently at Tenders & Building stage. For the provision of Unmanned Aerial Vehicle (UAV) Survey Services. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - ONSHORE LNG PLANT PROCUREMENT - MOBILE WORK PLATFORMS
Non-Construction Items (Other mining services) project at Vicinity of, Onslow, WA 6710 of Mobile Work Platforms type of New development. For the provision of mobile work platforms. Click for more details...

SURAT NORTH UPSTREAM QCLNG PROJECT PHASE II
Currently at the Tenders & Building stage In Gladstone Regional is a project estimated to be $ 2000000. This project For the provision of Plumbing Services for the Surat North Upstream QCLNG Project Phase II. Click for more details...

SURAT NORTH UPSTREAM QCLNG PROJECT PHASE II
., Curtis Island, QLD 4680 Has Surat North Upstream Qclng Project Phase Ii currently at Tenders & Building stage. For the provision of Offsite Bussing Services for the Surat North Upstream QCLNG Project Phase II. Click for more details...

SURAT NORTH UPSTREAM QCLNG PROJECT PHASE II
Non-Construction Items (Other mining services) New project at ., Curtis Island, QLD 4680. This type is Surveying with Private ownership. For the provision of Surveying Services for the Surat North Upstream QCLNG Project Phase II. Click for more details...

SURAT NORTH UPSTREAM QCLNG PROJECT PHASE II
Test & Tagging project at ., Curtis Island, QLD 4680 In The Council Area Of Gladstone Regional of Private. For the provision of Test & tagging Services for the Surat North Upstream QCLNG Project Phase II. Click for more details...

SURAT NORTH UPSTREAM QCLNG PROJECT PHASE II
Non-Construction Items (Other mining services) project In The Gladstone Regional Council Area of Pond Liners type. For the provision of Pond Liners for Surat North Upstream QCLNG Project Phase 2. Click for more details...

SURAT NORTH UPSTREAM QCLNG PROJECT PHASE II
Non-Construction Items (Other mining services) project at ., Curtis Island, QLD 4680 for New. For the provision of Non Destructive Weld Testing for the Surat North Upstream QCLNG Project Phase 2. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - ONSHORE LNG PLANT CONTRACTS - MARINE GENERAL SERVICES
Currently at the Construction stage In Ashburton is a project estimated to be $ 10000000. This project For the provision of marine general services including: Maintenance on navigational aids. Maintenance on marine infrastructure (such as fenders). Diving Works. Minor maintenance dredging (i.e. sweeping or plough works, backhoe dredging, small size trailer suction hopper dredge etc). Crew transfer vessel. Line boat services. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - ONSHORE LNG PLANT - CONSTRUCTION GENERAL SERVICES NO 4
New project of Non-Construction Items (Other mining services) project at Vicinity of, Onslow, WA 6710. For the provision of Construction General Services No 4 including Construction & maintenance of road structures, Dewatering & drainage, Dust control, Erection & relocation of portable facilities & ablutions, Site traffic control, Transport of potable water, Install & maintain temporary construction electrical power distribution system, Install, maintain & operate sewage & water treatment facilities, Fuel management, General housekeeping & waste cleanup, Support personnel, Equipment support, Construction & maintenance of temporary facilities, Install & pressure test underground piping systems, Underground duct bank & cabling, Miscellaneous concrete works, Management of acid sulfate soils (ASS) encountered during work activities, Weather protection & clean up, Environmental maintenance, Information services & technology support, & other services as required. Click for more details...

BAUXITE HILLS BAUXITE DSO PROJECT - MINE & BARGE LOADING INFRASTRUCTURE
35km North of, Mapoon, QLD 4876 Has Bauxite Hills Bauxite Dso Project - Mine & Barge Loading Infrastructure currently at Construction stage. Barge loading facility on the Skardon River for the Bauxite Hills DSO Project. Vessels of between 60,000 to 80,000 t each will be loaded at the transhipment anchorage site. Vessels will be loaded in approximately four to six days with barges having a capacity of between 3500 - 6500t. Mine infrastructure Area (MIA) to include the run of mine (ROM) stockpile, bauxite stockpiles, barge loading, conveyor load point, earthmoving equipment hard park, administration offices, workshops & fuelling facilities. Raw & potable water supply from great artesian basin & shallow alluvial aquifers. Sewage treatment plant. Power requirements sourced from onsite generators located within the MIA. Click for more details...

NORTH WEST SHELF SUBSEA TIEBACK PROGRAM (GWF PH 2) - SUPPLY OF SUBSEA XT FRAMES & TUBING HEAD FRAMES
Currently at the Construction stage In Carnarvon Basin is a project estimated to be $ 5000000. This project For the provision of Subsea XT Frames & Tubing Head Frames. Click for more details...

AMRUN (SOUTH OF EMBLEY) BAUXITE PROJECT - CONSTRUCTION SURVEY
Non-Construction Items (Other mining services) project for New development. For the provision of construction surveys at the mine site. Quality verification surveys. Establishment of control points or benchmarks. Clearing & grubbing set outs/pegging & Levels of all features where applicable, including invert levels of drains, sewers, puts, embedded item locations & other features. As-constructed surveys/verification. RTK (Real Time Kinematic) GNSS (Global Navigation Satellite System) ground surveying over the general project site with data to be provided in Company specified formats with coding lists supplied with data. These include, but may not be limited to inroads (company specific software). Microstation. Maintaining the Digital Terrain Model (DTM). Support of company construction team in monitoring excavation, trenching & backfill permitting requirements. Support of company construction team in monitoring utility avoidance programs. Perform monthly construction quantity calculations (including identifying cut & fill volumes of various types of earthworks, areas of surface treatment, or concrete quantities & submit data to the company in a format suitable for verification of process claims by other contractors & progressing reporting. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - ONSHORE LNG PLANT PROCUREMENT - TRUCK SCALE
Currently at the Tenders & Building stage In Ashburton is a project estimated to be $ 500000. This project For the provision of Truck Scale. Click for more details...

CHEVRON AUSTRALIA - OPERATIONS - HOSE MANAGEMENT
Hose Management project at Various locations incl Wheatstone Project Onslow, Wheatstone Offshore Platform & Gorgon LNG Plant on, Barrow Island, WA 6712 In The Council Area Of Ashburton of Private. For the provision of hose management services. Click for more details...

WHEATSTONE DEVELOPMENT PROJECT - ONSHORE & INFRASTRUCTURE - PINDAN - OFFICE HIRE
Office Hire project at Barrarda Estate, Onslow, WA 6710 In The Council Area Of Ashburton of Private. For the provision of Office Hire including transportable crib room & toilet block including cyclonic tie downs. Click for more details...

LORENA JOINT VENTURE GOLD OPERATIONS RECOMMENCEMENT - MOBILE MINERAL PROCESSING PLANT
Non-Construction Items (Other mining services) project for New development. For the supply, commissioning & operation of a mobile mineral processing plant. Units to be constructed off-site & transported to site fully commissioned. Click for more details...

AMRUN (SOUTH OF EMBLEY) BAUXITE PROJECT - ARTESIAN BORES
Artesion Bores New project In The Weipa Shire Council Area. For the supply & delivery of all materials including casing & screens, drilling fluids & chemicals, grout & cements, hangers, packers & seals, headworks & associated pipe fittings & valves. To include: Supply of all materials & labour, excluding concrete for associated concrete slabs. Construct concrete slabs at six bore sites. Installation of isolating valve, blind plate, & bore casing. Supply & installation of temporary silt traps, oil traps, drilling fluid, bunds/tanks & all other environmental measures required by Environmental Protection Agency & the Company. All testing & reporting for verification of compliance to specifications. Supply of technical drawings, documents, as-built information & drilling logs. Supply of documentation required by the Company for statutory licences & approvals. Site clean-up & labelling of bore, including clean-up & disposal of any spills. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect