WATER CORPORATION - EPC SERVICES
State ownership Civil Engineering (Pipelines) project In The Various Council Area for New development. Panel of prime contractors for provision of engineering design, procurement & construction (EPC) services to Water Corporation. Click for more details...

SERPENTINE TO CANNING TRUNK LINK MAIN
Civil Engineering (Pipelines) project at Within Perth southern metropolitan region, ., WA 6999 of Pressure & Flow Regulating Valves For Dn1400 Trunk Link Main type of New development. Supply & delivery of pressure & flow regulating valves for Serpentine to Canning Trunk Link Main. Click for more details...

KWINANA WATER RECLAMATION PROJECT
Civil Engineering (Pipelines) project In The Kwinana Council Area of State ownership. It is proposed to further treat secondary waste water from Woodman Point Wastewater Treatment Plant to quality suitable for use as high grade industrial processing water by industries in Kwinana industrial area (to include Hismelt, Tiwest, CSBP & Edison Mission Energy). Proposal includes construction of reverse osmosis treatment plant on BP's site in Kwinana, together with connecting pipelines to Kwinana industries initially taking around 6 ML/day of industrial wastewater from specified participating industries that presently discharge into Cockburn Sound back into Sepia Depression Ocean Outlet for discharge 4 km offshore. Click for more details...

FRANKLAND SPRINGS ESTATE
A project in the WA Within Cockburn. As part of infrastructure works for new Frankland Springs subdivision, it is necessary to extend major sewer infrastructure, comprising approximately 500 m of 750 mm diameter main sewer, 25 m of 600 mm diameter main sewer & 217 m of 375 mm diameter main sewer. Click for more details...

WALPOLE WASTEWATER TREATMENT PLANT
A project in the WA Within Manjimup. It is proposed to construct effluent storage dam of approximately 40,000 cu m capacity, new effluent pump station on existing wastewater treatment plant site & DN 150 effluent pipeline between storage dam & pump station. Construction of effluent pipeline through National Parks will be restricted to existing fire breaks (subject to easement approval) & will be open trench excavation, which will be backfilled & restored. Click for more details...

GERALDTON PORT ENHANCEMENT PROJECT
A project in the WA Within City Of Greater Geraldton. Geraldton Port Authority is currently upgrading its facilities at Geraldton Port to provide unloading of fuel tanker ships at Berth 6. Works comprise design & construction of approximately 270 m to 370 m of 300NB & 150NB pipelines & wharf termination point. Click for more details...

MACEDON TRANSFER PIPELINE -SECTION A
Civil Engineering (Pipelines) project In The Macedon Ranges Council Area of Manufacture, Supply And Delivery type. Tenders are invited for the manufacture, supply and delivery of 2600m of 225mm series 2 RRJ CL9 and CL12 PVC pipe, for the Macedon Transfer Pipeline -Section A. Click for more details...

BAYONET HEAD - INFILL SEWERAGE PROGRAMME UPGRADE
Civil Engineering (Pipelines) project In The Albany Council Area of State ownership. Works comprise construction of gravity sewers for Reticulation Areas Bayonet Head 3D & 6B. Approximate lengths: Gravity sewers - 3,586 m x 150 mm & 1m x 225 mm; by trenchless techniques - 501 m x 150 mm. Click for more details...

WATER SUPPLY PIPELINE DUPLICATION
Civil Engineering (Pipelines) project In The Hume Council Area of Melbourne To Sunbury type. Installation and commissioning of approximately 6200m of DN450 PN20 DICL (Separable Portion A) and/or 4,100m of DN450 PN35 DICL and 200m 502/5 MSCL (Separable Portion B) pressure pipeline, to augment the Rosslynne water supply system. Western Water will supply majority of pipes, valves and fittings. Click for more details...

BEACHLANDS WATER MAINS & SG-10 SEWER PUMPING MAIN
Civil Engineering (Pipelines) project at Not disclosed within area of, Beachlands, WA 6530 for New. Works involve construction of water mains & SG-10 Sewer Pumping Main. Click for more details...

MUNMORAH GAS TURBINE FACILITY
Gas Turbine Facility project at Part Lot 61 DP1065038, Doyalson, NSW 2262 in the Civil Engineering (Pipelines). Proposed construction of a gas turbine facility to be built on the site of the existing Munmorah Power Station. The proposed development would include: four gas turbines with a combined power output of approximately 600MV; a back-start generator; distillate fuel & demineralised water storages; a gas compressor; an evaporative air cooling unit; and a gas supply pipeline. The open-cycle gas turbine facility and lateral gas pipeline would connect the gas turbine facility to the Sydney-Newcastle gas pipeline. The gas turbine facility would be operated as a peak-load power station, supplying electricity at short notice during periods of peak power demand. Power from the gas turbine facility would enter the grid via a new dedicated bay to be constructed adjacent to the existing switchyard. Click for more details...

KIMBERLEY TO PERTH WATER SUPPLY - CONSULTANCY SERVICES
Civil Engineering (Pipelines) project at From Fitzroy River (Kimberley) to South West & Goldfields, ., WA 6999 of Water Transportation - Consultancy Services type of New development. Consultancy services to review proposals for transportation of water from Kimberley to State's South West & Goldfields. Click for more details...

TWENTY SIXTH AVE GAS CONTROL FACILITY
Civil Engineering (Pipelines) project for New development. Construction of a gas control facility and pipelines. Click for more details...

SUMMERS STREET & CLAISEBROOK ROAD SEWER MAIN
Currently at the Construction stage In Perth is a project estimated to be $ 111000. This project All works include but are not limited to: construction & backfill of 150 mm diameter gravity sewer using trenchless technology; excavation removal & disposal of all obsolete bleow ground sewer services & associated fittings; removal, stockpiling & shredding of vegetation, disposal of rubbish, fences, debris & other deleterious material; reinstatement of road pavement, kerb & footpaths damaged; disposal of surplus material off site; serrin out, construction & testing of sewer pipes, manholes & fittings; quality testing & commsissioning as required. Click for more details...

QUINNS MAIN SEWER
Quinns Main Sewer is currently at the Construction stage, valued at about $ 20000000 it is Construction of 2000 mm diameter sewer approx 4200 m in length & associated manholes. Proposed works will be by combination of tunneling using state-of-the-art tunneling technologies & open trench excavation, which will be backfilled & restored. Click for more details...

SULPHUR ROAD CONSTRUCTION - CIVIL WORKS
State ownership Civil Engineering (Pipelines) project In The Kwinana Council Area for New development. Works to comprise bulk earthworks, removal of unsuitable material, stripping, stockpiling & re-spreading topsoil. Construction of siteworks, roadworks, supply & laying road pavement & construction of kerbs. Construction of stormwater drainage pipelines & structures & construction of sewerage pressure main pipelines. Lay cable for Western Power underground electrical power supply, including installation of standard street lights & preparation of padmount sites including installation of culvert foundations. Construction of concrete paths within road reserves & other such works as shown on drawings & specifications. Click for more details...

SHEPPARTON AND CENTRAL GOULBURN MODERNISATION PROJECTS
Civil Engineering (Pipelines) project for New development. Goulburn-Murray Water seeks Expressions of Interest from companies or consortia to create an alliance to plan, consult, design construct and commission two major projects for Shepparton Modernisation Project and Central Goulburn 1,2,3 & 4 Modernisation Project. The successful consortia will have a capacity to manage a project alliance and an affinity with Goulburn Murray Waters culture, demonstrated irrigation design capability, robust construction capability and a commitment to safety and community consultation. Click for more details...

KIMBERLEY PARK WATER PIPELINE AUGMENTATIONS DMA 1 2 & 3
Kimberley Park Water Pipeline Augmentations Dma 1 2 & 3 is currently at the Construction stage, valued at about $ 2000000 it is Construction of 1,400m of pipeline augmentations for DMA 1,2 and 3, ranging in diameter from 100mm to 300mm in existing urban landscapes. Click for more details...

WARRAGAMBA PIPELINE PAINTING
Civil Engineering (Pipelines) project at between Mamre & Ferrers Rd, Horsley Park, NSW 2164 of Pipeline - Painting type of New development. Scope of work includes: Sections of Pipeline No 1 & 2 between Mamre Rd & Ferrers Rd involves the repainting of pipeline, associated valves & structures. These works include but are not limited to: preparation of management plans; clearing of vegetation under the pipeline; removal of silt under the pipeline to make clearance for painting if required; preparation of pipelines including air valves, scour pipes, rocker plate assemblies & tie rods for painting; corrosion repairs to the pipelines & associated steel structures; repair of all anchor block penetrations after corrosion repairs have been completed & painting of pipelines including air valves, scour pipes, rocker plate assemblies & tie rods Click for more details...

BUTLER, NOWERGUP & CARABOODA PIPELINE - CARABOODA/NEERABUP WATER SUPPLY SYSTEM
State ownership Civil Engineering (Pipelines) project In The Wanneroo Council Area for New development. Works will include a 1200mm diameter water pipeline to connect the Carabooda tank site to the integrated water supply network. Click for more details...

LOGAN WATER INFRASTRUCTURE PLANNING & DELIVERY
Water Infrastructure project at ., Logan Central, QLD 4114 In The Council Area Of Logan City of Local Govt. Logan Water Infrastructure Planning & Delivery Program Alliance Agreement. Work includes pipelines, pump stations, reservoirs, treatment plants, acces roads, electrical & mechanical works & ancillary projects. Click for more details...

SUNRAYSIA MODERNISATION PROJECT
Sunraysia Irrigation districts Merbein, Red Cliffs &, Mildura, VIC 3500 Has Sunraysia Modernisation Project currently at Construction stage. Renewal of main infrastructure in Sunraysia Irrigation Districts Merbein, Central Mildura and Red Cliffs. All Districts Focus ? Package 6 works total $120.3 million. Merbein Works total $44.2 million will include; Upgrade Merbein Pump Station for Low Pressure Pipeline Supply; Merbein Standpipe; Merbein Low Pressure Pipeline and Channel Decommission Stage 1 to Spur 11/2; Irrigation metering program Merbein District; D&S Metering Merbein District Sub. Red Cliffs Works total $39.4 million will include: Red Cliffs PS Upgrade; Red Cliffs Low Pressure Pipeline and Channel Decommission Stage 1 to Relift PS B&C; Irrigation metering program Red Cliffs District; D & S Metering Red Cliffs District. Mildura Works total $36.7 million will include: Mildura Central and Mid Areas PS Upgrade; Benetook PS Upgrade; K Area Relift PS; K Area Low Pressure Supply Pipeline; Upgrade C Section and Decommission Pipes in Urban area; Irrigation Metering Program Mildura District; D & S Metering Mildura District. Click for more details...

BROOKDALE RESIDENTIAL SUBDIVISION/LAND DEVELOPMENT REMAINING STAGES
Civil Engineering (Pipelines) project In The Armadale Council Area of Private ownership. Remaining stages to the residential subdivision to include the construction of civil works & services for approximately 2835 residential lots, which will include land development comprising residential dwellings, pump stations, water mains, sewer mains, pipelines, etc. Click for more details...

GRAMPIANS WATER (GWM WATER) CONSULTANCY SERVICES
A project in the VIC Within Various. GWM seeks consultants to provide a wide range of design and technical services to support its Headworks management programs. Expressions of interest are invited from suitable qualified and experience organisations interested in providing the required services over a three year period. A number of specialist services such as hydrology, hydraulic engineering, seismic analysis, risk assessment, project planning and environmental planning will be required to be provided by the consultant(s) over the contract period. The provision of the consulting service is to commence in July 2010. Click for more details...

PORT BOTANY BLB2 TERMINAL
Civil Engineering (Pipelines) project at Fishburn Rd, Port Botany, NSW 2036 of Bulk Liquid Terminal type of New development. The BLB2 project comprises construction of a steel piled pier berth adjacent to the existing BLB1. Associated infrastructure such as marine loading arms, fire fighting equipment, onshore support facilities & pipelines from existing user sites to the new berth. BLB2 has been designed to accommodate 120,000 dead weight tonne vessels to a maximum of 270m length overall Click for more details...

SNAKE VALLEY WASTEWATER TREATMENT PLANT
Civil Engineering (Pipelines) project In The Pyrenees Council Area of Wastewater Treatment Plant type. The project includes the construction of a wastewater treatment plant for the Snake Valley Sewerage Scheme. The construction includes excavation of approx 22,000 cubic meters of material to construct lagoons, placement of rock beaching, pipe works, access track and associated works. Click for more details...

CAPE YORK REGIONS REDEVELOPMENT PLAN
Currently at the Construction stage In Weipa Shire is a project estimated to be $ 260500000. This project The Cape York Regions Redevelopment Plan of works jointly funded by the Australian & Queensland Governments to upgrade critical infrastructure on Cape York Peninsula. The package consists of 3 sub-programs. Program one - Works to progressively seal sections of the Peninsula Developmental Road. Program two - Sealing works on the Endeavour Valley Road through to Hope Vale. Program three - Priority community infrastructure works identified by the Cape Indigenous Mayors Alliance. Click for more details...

ATCO GAS AUSTRALIA - GAS MAINS & PRE-LAID SERVICES
Civil Engineering (Pipelines) project at Various locations within, ., WA 6999 for New. Works to include laying of Gas Mains & Pre-laid svcs in common trench subdivisions. Click for more details...

PENINSULA ECO PROJECT RETICULATION
Pressure Sewer Reticulation project at Rye to, Portsea, VIC 3944 In The Council Area Of Mornington Peninsula of State. South East Water is rolling out the Peninsula ECO Project, a three stage project which will deliver significant improvements to public health and the environment. The first stage of the project requires the construction of approximately 230 kilometres of pressure sewer reticulation from Rye to Portsea. They are seeking to appoint two experienced contractors/proponents, which can demonstrate previous experience in construction of pressure sewer projects and can deliver on the key objectives of the Peninsula ECO Project ? Reticulation. Click for more details...

AMAROO BRANCH SEWER
From Malcolm Creek Branch Sewer to Lockerbie Branch Sewer Donnybrook & English Rd, Whittlesea, VIC 3757 Has Amaroo Branch Sewer currently at Construction stage. Construction main sewarage pipelines forming Amaroo Branch Sewer. The scope includes: approx. 7.8 km of main sewers 1575mm dia, tunnelled creek crossings; Donnybrook Road, Craigieburn Road East, Summerhill Road, Hume Freeway, pipelines for future connections, pipelines under Melbourne-Sydney Railway line for future sewer connections to the west. The sewer will connect the existing Malcolm Creek Branch Sewer to the proposed Lockerbie Branch Sewer, Donnybrook and English Road intersection. Once completed, the Amaroo sewer will also provide sewage to the proposed Kalkallo Recycled Water Treatment Plant. The sewer will transfer surplus sewage flows (flows not required to supply recycled water to nearby developments) to the Craigieburn Sewage Treatment Plant. Click for more details...

TANUNDA DISTRIBUTION NETWORK GAS PIPELINE
Civil Engineering (Pipelines) project at ., Tanunda, SA 5352 for New. Construction of a distribution network to deliver natural gas to Tanunda which includes the construction of a 2 km high pressure gas lateral off the Moomba to Adelaide Pipeline. Click for more details...

NARRABUNDAH TO HUME GAS PIPELINE
Civil Engineering (Pipelines) project In The Act Council Area of Gas Pipeline type. Construction of a new primary regulating station (PRS) a below ground high pressure gas pipeline & associated infrastructure between Symonston & Hume. A pig receiving facility will also be established within the PRS facility. The pig receiving facility enables cleaning, maintenance & inspection of the pipeline by receiving a device called pig & is pushed through the pipeline under pressure. The pipeline corridor will be approx 12m wide comprised of the pipeline trench, laydown for pipe lengths, spoil stockpiling & access for machinery. Click for more details...

BALLARAT SOUTH WASTEWATER TREATMENT PLANT AUGMENTATION WORKS
Renovations, Refurbishments etc. project of Civil Engineering (Pipelines) project at Hummfray St South, Ballarat, VIC 3350. Construction of a 42 m diameter clarifier and associated works including earthworks, piling, concrete, hydraulic, mechanical, electrical and controls, pipework, pits, pumps and valves, roadways, drainage and walkways. Click for more details...

RUPANYUP PRESSURE SEWER SYSTEM SITE PROPERTY WORKS
A project in the VIC Within Yarriambiack. Construction of site property works. Works include the installation of approx 230 sewerage pump well systems, connection to the electrical switchboard and all ancillary works to connect to existing boundary kit assemblies. Click for more details...

CITY OF WHITEHORSE SERVICE LOCATING, STORMWATER PIPE LINING AND DRAINAGE REHABILITATION
City Of Whitehorse Service Locating, Stormwater Pipe Lining And Drainage Rehabilitation is currently at the Construction stage, valued at about $ 2500000 it is The provision of service locating, stormwater pipe lining and drainage rehabilitation services. The majority of the work will be for the rehabilitation of Council drains in easements and to a lesser extent in the road reserve. Click for more details...

CHAMPION LAKES - WATER TRANSFER PIPELINE WORKS
Civil Engineering (Pipelines) project at Champion Lakes, Lake Rd, Champion Lakes, WA 6111 for New. Works to include supply, installation & commissioning of water transfer pipeline on the International Rowing Course at Champion Lakes comprising of: connection to the existing CL2 groundwater bore pipeline, actuated control valve & interconnection into the existing PLC controller & poly water transfer pipeline from the water compound to the drainage basin. Click for more details...

EUMUNGERIE WATER SUPPLY SCHEME
A project in the NSW Within Dubbo. Construction of water supply scheme consisting of 3 separable portions: construction of pipelines along Mogriguy Rd from Brockhurst to Eumungerie & within Mogriguy & Eumungerie villages, design & construction of reservoir & chlorination system on Mogriguy Rd opposite Kyarra Dr way & design & construction of Brocklehurst pumping station at Brocklehurst within the Wambiana St Reserve. Scope of work includes :Separable Portion 1 - Construction of Pipelines, rising main from Brocklehurst Pumping Station to Eumungerie Reservoir, reticulation main from Eumungerie Reservoir to the Eumungerie town, reticulation main from Eumungerie Reservoir to the Mogriguy village, reticulation network within Eumungerie, reticulation network within Mogriguy. Separable Portion 2 - Design and Construction package of Reservoir and Chlorination System including design and Construction of a 100 kL reservoir at approximately 16.6 km from Brocklehurst Pumping Station, design and construction/Installation of a chlorination system at the reservoir site, civil works at the reservoir site include inlet, outlet pipelines from the reservoir, scour/overflow pipeline from the reservoir to drainage outlet, access road, fencing and gates, scour/overflow discharge outlet, concrete pits for magflow meters, chlorination injection point and isolation valves. Separable Portion 3 - Design and Construction package of Brocklehurst Pumping Station including design and construction of Brocklehurst pumping station, civil works at the pumping station site include suction and delivery pipe lines, connection to existing retic-mains; concrete pit for magflow meter and isolation valves, provision of power supply to the Pumping Station & associated electrical and mechanical works. . Click for more details...

NORTH WARRANDYTE SPS738 PUMP STATION
New project of Civil Engineering (Pipelines) project at Various locations within the Municipality of, Greensborough, VIC 3088. S4 CONSTRUCTION PANEL ONLY. The suburb of North Warrandyte is located approximately 25km north-east of the Melbourne Central Business District (CBD). The area contains approximately 1000 properties which form part of the Yarra Valley Water (YVW) Backlog Sewerage scheme. The North Warrandyte scheme has been separated into several construction packages, those being: Package A ? Reticulation (70% complete); Package B ? Reticulation (90% complete); Package C ? Reticulation (90% complete); SPS738 Rising Main Construction (60% complete); SPS738 Pump Station Construction; Yarra River Siphon Construction. This tender relates to the construction of the SPS738 Pump Station. This project includes (but is not limited to) the construction of the following: Pump station site including access track & site drainage; Pump wet well (3.5m diameter, 10m deep) & Emegency Relief Structure; Installation of pumpsets & associated equipment, pipework, & fittings; Connection to the existing inlet MH & rising main. Click for more details...

BELLBIRD PARK RECLAIMED WATER IRRIGATION CONSTRUCTION
A project in the VIC Within Baw Baw. Reclaimed water irrigation construction at Bellbird Park, Drouin. The works involve the supply of all necessary labour, plant, equipment, materials & expertise for the set out & construction of various pipe works, pump stations, irrigation systems, subsoil drainage & storage structures, electrical & control systems works. Click for more details...

MEMERAMBI ROAD & DRAINAGE WORKS
Civil Engineering (Pipelines) project In The South Burnett Regional Council Area of Roadworks/Drainage type. Construction of roadworks & stormwater infrastructure in the township of Memerambi, on the Bunya highway north of Kingaroy. Works to include earthworks, road construction & sealing, installation of stormwater drainage including pipelines & swales, construction of a stormwater detention basin, sediment control devices, turfing & rehabilitation. Associated civil works Click for more details...

GLEN AYR DRIVE SEWER PIPELINE
Civil Engineering (Pipelines) project In The Tweed Council Area of Local Govt ownership. Construction of approximately 360m of DN225 gravity sewer at Glen Ayr Drive, Banora Point. To include erosion & sedimentation control, testing, commissioning, gravity sewer, maintenance holes & concrete encasement of pipelines. Associated landscaping. Click for more details...

LANCASTER STREET DRAINAGE WORKS STAGE 2
Local Govt ownership Civil Engineering (Pipelines) project In The Glen Eira Council Area for New development. Lancaster Street Drainage Works Stage 2. Requirement: removal & replacement of 545 m of 75 - 150 mm thick concrete paving, 15 lin m of concrete kerb & channel, 130 tonnes of new asphalt, 19 In No New drainage pits, Alter 5 In No drainage pits, 11 lin m of 225 mm DIA RCP, 11 lin m of Twin 300 mm DIA RCP, 49 lin m of 375 mm DIA RCP, 75 lin m of 450 mm DIA RCP, 11 lin m of 600 mm DIA RCP, 3 lin m of 750 mm DIA RCP, 6 lin m of 1200 mm DIA RCP, 47 lin m of 1500 mm DIA RCP, 74 lin m of 1800 mm DIA RCP, inclusive of drainage excavation & the removal & reinstatement of raised pavement road hump. Click for more details...

GARDEN AVENUE DRAINAGE WORKS
Drainage Works New project In The Glen Eira Council Area. Garden Avenue Drainage Works. Requirement: removal & replacement of 71 5m of 75 - 150 mm thick concrete paving, 37 lin m of bluestone kerb & channel, 63 lin m of concrete kerb & channel, 72 tonnes of new asphalt, 50 sqm supply & spread topsoil, 26 In No new drainage pits, alter 8 In No drainage pits, 43 lin m of 300 mm DIA RCP, 9 lin m of 375 mm DIA RCP, 223 lin m of 600 mm DIA RCP, 119 lin m of 750 mm DIA RCP, 76 lin m of 900 mm DIA RCP, inclusive of drainage excavation. Click for more details...

2016 WINTER WORKS CONSTRUCTION OF PIPELINES - GMW PACKAGE 2
A project in the VIC Within Greater Shepparton. Construction of pipelines, associated works & decommissioning of channels during the 2016 Winter Works program. As part of the GMW Connections Project, it is required that 3 pipelines totalling 7 km ranging from DN50 to DN710 HDPE to be constructed. Other additional works include 1 km of on farm channel / pipeline construction & 7 km of irrigation channel decommissioning. Click for more details...

WARRNAMBOOL WTP PIPE WORK REFURBISHMENT RELINING OF PIPES
Civil Engineering (Pipelines) project at ., Warrnambool, VIC 3280 for New. Refurbishment of raw water & filtered water pipelines at the Warrnambool Water Treatment Plant. Works include the supply of all materials, plant & labour necessary for: Safe entry to the nominated pipelines. Cleaning off existing surfaces in preparation for coating. Weld mild steel patches on as necessary to cover pinholes or deeper rusted areas. Coat the prepared internal surfaces. The pipelines to be refurbished are: Raw Water Suction Inlet; Raw Water Pump Station Suction & Discharge Manifolds; Raw Water Delivery Pipeline; Filtered Water Delivery Pipeline. Click for more details...

ABERDEEN, JAMES, PIER AND STIRLING STREETS STORM WATER PIPES
Local Govt ownership Civil Engineering (Pipelines) project In The Perth Council Area for New development. Rehabilitation of Storm Water Pipes on Aberdeen, James, Pier & Stirling Streets. Click for more details...

WELLARD STREET SEWER MAIN CONNECTION
Civil Engineering (Pipelines) project for New development. Civil Works for the construction of New Sewer Main Connection From Newton Street, Spearwood to Operations Centre, 52-54 Wellard Street, Bibra Lake. Scope of works include but are not limited to, Pipework-Supply & Construction of approximately 1,120m DN225 SN8 PVC-U Gravity Pipework, including the supply & installation of all pipe fittings, bends, & marker posts. Access Chambers, Maintenance Shafts & Property Connections (Supply & Installation). Pipe Jacking-Thrust Boring-To align the new sewer inside a DN375 Reinforced Concrete (RC) sleeve underneath the existing freight rail corridor & Stock Road to Brookfield Rail & Main Roads Western Australia (MRWA) requirements respectively, including all temporary works, liaison & associated approvals from relevant stakeholders. Pipe Jacking-Thrust Boring-To align the new sewer inside a DN375 RC sleeve underneath a section of Lot 50 in Howson Way and past the existing Western Power assets in Howson Way (HV power transmission pole and stay wires). Relocation of Any Existing Infrastructure (e.g. soakwells) adversely affected by the works. All Associated Testing, Commissioning & Connections-To the existing access chamber outside the Newton Street WWPS at 18.05 AHD, to enable live operation of the sewer. Reinstatement of lots, road surface & the road reserve to the satisfaction of the Principal & associated lot owners. As-Constructed Drawings & Documentation/Records in accordance with the Water Corporation of WA's requirements (Completion & provision of to the Principal). Click for more details...

MACALISTER IRRIGATION DISTRICT SOUTHERN TINAMBA PIPELINE
Civil Engineering (Pipelines) project In The Wellington Council Area of State ownership. Proposed construction of Southern Tinamba Pipeline & balancing storage, as part of the Macalister Irrigation District upgrade. Hybrid pipeline/channel is preferred option. Works will include conversion of 85km of manually operated earthern irrigation channel to 38km of pipe & 32km of automated channel. Click for more details...

FISH RIVER WATER SUPPLY
Civil Engineering (Pipelines) project at Junction Rd, Duckmaloi, NSW 2787 for New. Construction for the replacement of a section Stage 2 pipeline - separable Portion 1 is approximately 1.8 kms & separable Portion 2 is approximately 1 km with OD914 mm pipe Click for more details...

MV 27A/5 PIPELINE INCLUDING ON FARM WORKS
Mv 27a/5 Pipeline Including On Farm Works is currently at the Construction stage, valued at about $ 800000 it is Construction of a backbone pipeline, road culverts, meters and On-Farm works. Click for more details...