DENMAN WATER SUPPLY
Civil Engineering (Pipelines) project In The Muswellbrook Council Area of Local Govt ownership. Augmentation of Denman Water Supply stage 2. Construction of new river intake structure & a high lift submersible pump station. Click for more details...

JERRABOMBERRA WATER MAIN
Civil Engineering (Pipelines) project In The Queanbeyan Council Area of Water Main - Augmentation type. Augmentation of the water main system in Jerrabomberra. The project involves installation of 3.2 km of new DICL water mains in Jerrabomberra. These will range in size from 100mm to 450mm. Click for more details...

YENDA & STANDBRIDGE PUMP STATIONS/PIPELINES
Consultancy For Design - Pump Stations/Pipelines project at Yenda &, Stanbridge, NSW 2705 In The Council Area Of Leeton of State. Detailed designs of pumped pressurised supply systems in the Yenda & Stanbridge areas located within a 30 kilometre radius of the City of Griffith. Requirements as follows: preparation of designs & specifications for interconnecting pump stations & their control systems. Design check of Optimised pipe diameter & preparation of pipe longitudinal profiles. Preparation of a schedule of supply system pipe & pump materials requirements & engineers estimate. Preparation of materials specifications of all items (pipes, pipe specials, valves, control equipments, pumps, filtration units, metering & data logging). Preparation of pipe, pump, filtration, outlet & valve installation specifications. Preparation of tender document for the construction of the high pressure system. Provision of operator training & an Operation & Maintenance Manual. Oversight of defects liability period. The design will include comprehensive pump station, pipeline & outlet detail based on criteria provided by Murrumbidgee Irrigation. Click for more details...

BURRUP FERTILISERS AMMONIA PLANT PROJECT
Civil Engineering (Pipelines) project at Btwn King Bay & Hearson Cove, Burrup Peninsula nr, Karratha, WA 6714 of Ammonia Plant type of New development. Ammonia plant comprising: 2,200 t per day production of liquid ammonia from natural gas; power plant consisting of 20 MW steam turbines & 2 x gas-fired auxiliary boilers; 2 x vent stacks where gases, excluding ammonia, will be vented with steam during normal operating conditions, start-up & upset conditions; 2 x 40,000 t atmospheric pressure, double-walled, double-integrity cryogenic ammonia storage tanks, complete with flare stack; closed circuit seawater-freshwater cooling system & single seawater cooling tower; supply of 74 TJ/day of natural gas from Dampier to Bunbury Natural Gas Pipeline (pipeline to be below ground, 1.3 km in length & constructed by Apache Energy); supply of seawater & freshwater via thermal desalination plant proposed by Water Corporation; demineralisation water plant; wastewater treatment plant; ammonia loading & recirculation facilities for Dampier Public Wharf; associated support facilities. Click for more details...

AUSTRALIND WATER PIPELINE & PUMPING STATION
Civil Engineering (Pipelines) project at From Australind to Brunswick Junction via Victoria Rd, Burekup &, Roelands, WA 6226 of Water Pipeline/Pump Station type of New development. Construction of new pipeline to Brunswick Junction, Burekup & Roelands that will deliver water from Australind. Works will include construction of 700 mm nominal diameter pipeline (approximately 1.2 km long), 200 mm nominal diameter pipeline (approximately 12.8 km long) & associated works, including valves, meters & concrete pits. Pipelines will generally be below-ground & constructed using open trench excavation, which will be backfilled & restored. Project will also include booster pump station. Click for more details...

WATER CORPORATION - EPC SERVICES
State ownership Civil Engineering (Pipelines) project In The Various Council Area for New development. Panel of prime contractors for provision of engineering design, procurement & construction (EPC) services to Water Corporation. Click for more details...

WATER CORPORATION - STAINLESS STEEL REPAIR CLAMPS
Stainless Steel Repair Clamps - Supply & Delivery To Various Locations project at Within State of Western Australia, ., WA 6999 In The Council Area Of Various of State. Supply & delivery of stainless steel repair clamps for waterwork pipes for three-year period. Click for more details...

DALYELLUP - WATER SUPPLY IMPROVEMENTS
Civil Engineering (Pipelines) New project at Minninup Rd, Dalyellup, within council area of Shire of, Capel, WA 6271. This type is 6 Ml Storage Tank/Transfer Pump Station/Pipelines with State ownership. It is proposed to construct new ground level storage tank of 6 ML capacity & wall height of 11 m, new transfer & delivery pipelines from existing delivery pipeline to new ground level storage tank, new transfer pump station to transfer water from existing water treatment plant to new ground level storage tank & install new control cable from new transfer pump station to new ground level storage tank. Click for more details...

ALBANY - WATER SUPPLY IMPROVEMENTS
Civil Engineering (Pipelines) project at Mount Melville, Melville Dr, Albany, WA 6330 for New. Works comprise design & construction of 25 ML steel tank & associated pipework at Mount Melville. Click for more details...

CITY OF ROCKINGHAM - PIPELINES, DRAINAGE PRODUCTS & ASSOCIATED WORKS
Civil Engineering (Pipelines) project at Within council area of City of, Rockingham, WA 6168 for New. Works comprise period installation of pipelines, drainage products & associated works. Click for more details...

CARNARVON INFILL SEWERAGE PROGRAMME
Reticulation Area SC1A (Part), C2 & C7, Carnarvon, WA 6701 Has Carnarvon Infill Sewerage Programme currently at Construction stage. Works comprise construction of gravity sewers, pressure main & vacuum sewers for Reticulation Area Carnarvon SC1A (part), C2 & C7. Click for more details...

GERALDTON PORT ENHANCEMENT PROJECT
A project in the WA Within City Of Greater Geraldton. Geraldton Port Authority is currently upgrading its facilities at Geraldton Port to provide unloading of fuel tanker ships at Berth 6. Works comprise design & construction of approximately 270 m to 370 m of 300NB & 150NB pipelines & wharf termination point. Click for more details...

KANGAROO VALLEY SEWERAGE SCHEME
Local Govt ownership Civil Engineering (Pipelines) project In The Shoalhaven Council Area for New development. Construction of a pressure sewer system, treatment facility, reclaimed water storage & associated works to serve Kangaroo Valley. Click for more details...

SCONE ABERDEEN WATER SUPPLY
A project in the NSW Within Upper Hunter. Construct a 16km pipeline of 500mm DICL & 600 dia. MSCL or equivalent from Glenbawn Dam to the existing Scone reservoirs including a new pumping station, all valves, pipework, fittings & associated works, such as buildings & civil works. Click for more details...

MELBOURNE WATER OVERFLOW IMPROVEMENT WORKS
A project in the VIC Within Yarra Ranges. Melbourne Water is seeking tenders for the construction of overflow improvement works to the Frogley, Cresswell, Plantes Hill, Yarrambat and Yarra Glen service reservoirs, comprising steel pipework and general drainage upgrade. Click for more details...

MORTLAKE GAS FIRED POWER STATION
Gas Fired Power Station project at Connewarren Ln, Mortlake, VIC 3272 In The Council Area Of Moyne of Private. Construction of a natural gas-fired power station at a site 12km west of Mortlake. It will be constructed on approximately 20 hectares of land with an extensive buffer zone around it. Properties surrounding the proposed site are large landholdings, with the nearest resident approximately 2km from the site. The area is used for grazing land and timber plantations. The 550 megawatt power station will be built adjacent to the existing Moorabool to Heywood 500kv high voltage transmission line with possible further works to follow. The plant will be supplied with natural gas via a 83km dedicated underground natural gas transmission pipeline from the new gas processing plant being built near Port Campbell, as part of the offshore Otway Gas Project. Click for more details...

DROUGHT RELIEF STRATEGY - PERTH SEAWATER DESALINATION INTEGRATION
Major Thrust Borings For Pipelines (2) project at Beneath four locations at Kwinana to Alcoa Railway, Rockingham Rd, Midland to Kwinana Railway & Kwinana Fwy, ., WA 6999 in the Civil Engineering (Pipelines). Tenders are planned to be invited for thrust boring works required for Perth Seawater Desalination Project. Perth Desalination Integration Project includes several new pipelines. Two pipelines related to Contract RI-05-11972 are DN1200 from Perth Seawater Desalination Plant (adjacent to Kwinana Power Station) to Thomsons Reservoir & DN1400 from Thomsons Reservoir to proposed new Nicholson Rd Pump Station. This pre-qualification covers four major thrust borings required on sections of these two pipelines & are DN1200 under Kwinana to Alcoa Railway, DN1200 under Rockingham Rd, DN1200 under Midland to Kwinana Railway & DN1400 under Kwinana Fwy. Click for more details...

BEGA VALLEY TANTAWANGLO WATER SUPPLY
New project of Civil Engineering (Pipelines) project at from Bega Valley borefield to Yellow Pinch Dam, Bega, NSW 2550. COnstruction of pipeline from Yellow Pinch Dam to Bega Valley borefield. Click for more details...

REHABILITATION OF TONKIN DRAINAGE PIPELINES
Renovations, Refurbishments etc. project of Civil Engineering (Pipelines) project at various within Canterbury City Council areas, Canterbury, NSW 2193. Rehabilitation of various drainage pipelines utilising "No Dig" technology. Click for more details...

WOMARDEN DN90 PE WATER SUPPLY MAIN
Womarden Dn90 Pe Water Supply Main is currently at the Construction stage, valued at about $ 281000 it is Construction of DN90 PE water supply main. Click for more details...

DROUGHT RELIEF STRATEGY - PERTH DESALINATION INTEGRATION
Dn1200 Trunk Main New project In The Various Council Area. Works to comprise of construction of DN1200 trunk main (approximately 10 km in length) from Perth Seawater Desalination Plant to Thomsons Reservoir. Mains to be constructed in Sintakote mild steel cement-lined pipe (supplied by Water Corporation, except for welded specials for bends & tees). Click for more details...

KWINANA BULK JETTY - BERTH NO. 3
Pipeline & Changeover Manifold - Installation Supply & Install project In The Kwinana Council Area. Works to comprise of installation of new pipeline & changeover manifold at Kwinana Bulk Jetty, Berth No. 3. Click for more details...

GOONDICUM PIPELINE PROJECT (MONTO)
Pipeline/Pump Station New project In The North Burnett Regional Council Area. Construction/testing approx 35 km DN300 DI & 355 OD PE pipeline, including pipeline structures, pump station/control building civil works, steel storage & break pressure tanks, using Principal-supplied pipes/fittings/valves. Click for more details...

TWENTY SIXTH AVE GAS CONTROL FACILITY
Civil Engineering (Pipelines) project for New development. Construction of a gas control facility and pipelines. Click for more details...

WESTERN SYDNEY RECYCLED WATER INITATIVE - REPLACEMENT FLOWS PROJECT
Consultancy For Contract Management Services project at Lot 1 Links Rd (DP223888, DP31810 & DP803832), St Marys, NSW 2760 in the Civil Engineering (Pipelines). The Project involves the construction and operation of an Advanced Water Treatment Plant (AWTP) and associated works. Existing tertiary effluent from St Marys, Penrith and Quakers Hill STPs will be transferred to and treated at an AWTP located at St Marys, producing up to 50 million litres per day of highly treated recycled water. The recycled water will be substituted, as replacement flows, for water that is currently released from Warragamba Dam for extraction and river health purposes. Click for more details...

KINGS PARK AND BOTANIC GARDENS - BORE PUMP
New project of Civil Engineering (Pipelines) project at Fraser Av, West Perth, WA 6005. Works to comprise KP3/07 bore pipelines, conduits & cabling to irrigation system no 1 storage pond at Kings Park. Click for more details...

CAMELLIA & ROSEHILL RECYCLED WATER PROJECT
Camellia & Rosehill Recycled Water Project is currently at the Construction stage, valued at about $ 100000000 it is Construction & operation of recycled water scheme including a recycled water treatment plant, storage reservoirs, pumping stations. Pipeline connection to the Liverpool to Ashfield pipeline (LAP) ? the source of feed effluent for the recycled water treatment process. Distribution system including: an elevated surface reservoir at Woodville Golf Course on Barbers Road, Guildford & 2 surface reservoirs & 1 pumping station on the south-eastern corner of Durham Street & Grand Avenue, Rosehill. Approximately 20 kilometres of distribution pipeline. Click for more details...

SOUTHERN SEAWATER DESALINATION PROJECT - BINNINGUP TO HARVEY WATER PIPELINE
Civil Engineering (Pipelines) project In The Harvey Council Area of Water Pipeline type. Construction of 1400 mm diameter buried pipeline to be located within road reserves and private land as part of Desalination Project. Click for more details...

SUTHERLANDS ROAD WATER PIPELINE
Sutherlands Road, Riddells Creek, VIC 3431 Has Sutherlands Road Water Pipeline currently at Construction stage. Installation of a water pipeline. Click for more details...

BURSWOOD PARK GOLF COURSE
State ownership Civil Engineering (Pipelines) project In The Victoria Park Council Area for New development. Work to include the supply & installation of a water transfer pipline, transfering the water supply from lake 3 to lake 1. Click for more details...

BARWON WATER ALLIANCE COLAC PIPELINE REPLACEMENT SECTION 10 & 11
New project of Civil Engineering (Pipelines) project at ., Colac, VIC 3250. Construction of approximately 285m of DN600 MSCL pipe. Approximately 100m is to be directional drilled at a grade of 44%. The remaining 185m is to be installed by open trenching. Click for more details...

SHIRE OF MOUNT MAGNET ROADWORKS
Civil Engineering (Pipelines) project for New development. Works to include the re-sheeting of 17km of gravel roads & including reinstatement of floodways & surface drains. Click for more details...

MURRAY-DARLING BASIN
Stock/Domestic Water Reticulation Systems project at Murray Darling Basin, ., NSW 2999 In The Council Area Of Various of State. Scope of works may include combinations of pump stations, bores, piped reticulation systems, stock watering points, electrical controls and telemetry. The extent of reticulation systems may vary from about 20km to several hundred kilometres in total. Installation & construction of stock and domestic water supply reticulation system. Installation &/or construction of pipelines, valves, tanks, troughs and all associated equipment to ensure efficient operation & supply Click for more details...

GOLDEN PLAINS FOOD PRECINCT WATER INFRASTRUCTURE STAGE 1
Civil Engineering (Pipelines) project at West of Lethbridge, Lethbridge, VIC 3332 for New. Golden Plains Food Precinct Water Infrastructure Stage 1. Construction of a water delivery pipeline, consisting of 5 km of 225 mm mains pipe plus 3 km of 100 mm pipe, and pump station to supply 3,000 hectare food production and employment precinct. Click for more details...

WERRIBEE IRRIGATION DISTRICT STAGE 1 4/1 PIPELINE
New project of Civil Engineering (Pipelines) project at ., Werribee, VIC 3030. Construction of the WID 4/1 pipeline. The project involves removal of approximately 6km of existing channel and the construction of a new pipeline ranging from 300mm to 600mm. This work will save 600 ML of water each year and replace 6km of old channel; it also includes the upgrading of 17 outlets. Werribee Irrigation District works will replace the existing concrete channel system with a gravity pipeline. Click for more details...

PENINSULA ECO PROJECT RETICULATION
Pressure Sewer Reticulation project at Rye to, Portsea, VIC 3944 In The Council Area Of Mornington Peninsula of State. South East Water is rolling out the Peninsula ECO Project, a three stage project which will deliver significant improvements to public health and the environment. The first stage of the project requires the construction of approximately 230 kilometres of pressure sewer reticulation from Rye to Portsea. They are seeking to appoint two experienced contractors/proponents, which can demonstrate previous experience in construction of pressure sewer projects and can deliver on the key objectives of the Peninsula ECO Project ? Reticulation. Click for more details...

WATER MAIN RENEWAL M102 NORTH ESSENDON - FOOTSCRAY
A project in the VIC Within Maribyrnong. Design and construction of M102 North Essendon - Totenham water main renewal. Renewal of existing water supply pipelines to reduce the risk of major pipe burst and associated interruption to supply, water loss and other costs. Click for more details...

SWAN HILL MODERNIZATION PROJECT
Pipes/Irrigation New project In The Swan Hill Council Area. Swan Hill Modernisation Project. The first stage will include the lowering the operating level of the Little Murray Weir and Weir pool and pumping water from the Little Murray River to the No 9 Channel. Second stage is decommissioning 9.6km of the No 9 Channel within the Swan Hill Precinct. Replacing channel with walking tracks and bike paths. Constructing pipelines and channels to connect the northern section of No 9 Channel to No 10 Channel and maintaining irrigation supply with delivery via the No 10 pump station. Addition of 4 Pump stations; Pental Island Road, Werril Street, Moore Lane and Lake Road. Click for more details...

PRINCES WHARF 3, HOBART REMEDIATION WORKS PROJECT
Civil Engineering (Pipelines) project for New development. CSIRO through this RFT is seeking responses from suitably qualified and experienced service providers for the provision of construction services to remediate CSIRO?s existing Princes 3 Wharf, Hobart as described in this Statement of Requirements including all Annexures, this includes but is not limited to: a. provide all equipment, labour, plant and access required in order to undertake structural repairs to the concrete elements of the wharf that have corroded to the situation of cracking and spalling and may incur reduced structural capacity if not remediated. Remediation is to be by way of removing and replacing unsuitable concrete and corroded steel reinforcement. Remediated areas are to include installation of patch repair sacrificial anodes b. provide and install an Impressed Current Cathodic Protection (ICCP) system to selected elements of the wharf where deemed necessary to mitigate future degradation c. provide and install preventative treatment to selected elements of the wharf where deemed necessary to mitigate future degradation. Preventative treatments include installation of patch repair sacrificial anodes and silane coating d. removal and disposal of redundant fire services pipe underneath the wharf 3. Click for more details...

PROOF & EXPERIMENTAL ESTABISHMENT (P&EE) WATER INFRASTRUCTURE WORKS
Civil Engineering (Pipelines) project In The Wakefield Council Area of Water Supply Pipeline type. The construction of a new buried water supply pipeline from the South Australian Water Main on Port Wakefield Road to the Port Wakefield Proof & Experimental Establishment Base on Proof Range Road. The scope includes: a new buried transfer main along Port Wakefield Road & Proof Range Road including all works necessary to complete the construction installation, testing & commissioning of the pipeline, valves, fittings, ancillaries, thrust blocks & supports, backfill & reinstatement. Approx 6.9 km of buried DN100 PN16 meter polyvinyl chloride (mPVC) transfer main with rubber ring joints; approx 300 m of buried DN63 PE100 PN12.5 high density polyethylene (HDPE) with electrofusion jointing for the branch offtake to environmental Testing Facility (ETF) from the new transfer main. Decommissioning of redundant water supply infrastructure & disinfection treatment facilities following commissioning of the new water supply. Click for more details...

BYFORD ROAD RESERVES - WATER MAIN PIPELINE WORKS
Water Main project at Various road reserves along South Western Hwy & roads within, Byford, WA 6201 in the Civil Engineering (Pipelines). Works to include the construction of a new 4km length pipeline within road reserves located along South Western Hwy & various other roads within the City of Armadale & Shire of Serpentine-Jarrahdale to include the use of trenchless technology to minimise traffic & environmental impacts at major road crossings at Wungong Brk & South Western Hwy for the provision of more consistent water pressure to Byford. Click for more details...

WEST WERRIBEE DUAL WATER SUPPLY PIPELINE - PACKAGE 3D
New project of Civil Engineering (Pipelines) project at West Werribee, Werribee, VIC 3030. Construction of approximately 310 m of 600 mm diameter MSCL pipes in West Werribee. Click for more details...

WIMMERA MALLEE PIPELINE EXTENSIONS - PELLA & QUAMBATOOK NORTH
New project of Civil Engineering (Pipelines) project at Pella & north of, Quambatook, VIC 3540. Construction of extensions to the Wimmera Mallee Pipeline network to supply raw water to rural customers. The works are in two separate rural areas: Pella area (west of Rainbow) & north of Quambatook. The works include: supply & installation of 64 kilometres of 90 & 63 OD polyethylene pipeline, supply & installation of associated valves & fittings & the installation of customer tappings & water meter assemblies. Click for more details...

SMYTHESDALE LANDFILL WETLAND CONSTRUCTION
Civil Engineering (Pipelines) project for New development. Construction of the Southern Water Treatment (aprox 2,400 sqm) at the Smythesdale Landfill & the supply & installation of water pipe & pumping equipment for conveying water from an existing pondage to the inlet to the new wetland. Click for more details...

BENDIGO GROUNDWATER PROJECT - GROUNDWATER PIPELINE EAGLEHAWK
Currently at the Construction stage In Greater Bendigo is a project estimated to be $ 2000000. This project Design & construction of dual 5km pressure mains for the transfer of treated groundwater (DN200) & brine (DN90) between Lake Neangar, Eaglehawk & the Bendigo Water Reclamation Plant, Epsom. Click for more details...

CALOUNDRA & KAWANA ISLAND SEWER RISING MAINS
Caloundra & Kawana Island Sewer Rising Mains is currently at the Construction stage, valued at about $ 15000000 it is Design & construction of 2 sewer rising mains. SPS-LMT002 rising main (Nicklin Way, Caloundra) to include approximately 2,470m of OD900mm PE100 sewer raising main. Approximately 1,520m to be Horizontal Directional Drilling. Construction over two sections along the Nicklin Way, located at Sugarbag Road (990m) & Seagull Avenue (530m) & two, 60m micro-tunnels under Caloundra Road. SPS-MTN036 rising main (Kawana Way, Kawana Island) to include approximately 3,260m of OD900mm PE100 rising main from north of the Mooloolah River through to the Kawana Sewage Treatment Plant. Construction of four sections of Horizontal Directional Drilling approximately 1,690ms, 890m & a 350m drill under separate sections of Mooloolah River & a 75m microtunnel under Kawana Way. Separable Portion 1 - Design Development & Construction. Separable Portion 2 - Construction of design works. Click for more details...

STOCKS ROAD DRAINAGE IMPROVEMENTS
Stocks Rd, Mount Waverley, VIC 3149 Has Stocks Road Drainage Improvements currently at Construction stage. Construction of approximately 170 m of drainage pipes & pits & associated concrete paving & asphalt works at Stocks Road, Mount Waverley. Click for more details...

MILDURA RUARL CITY COUNCIL STORMWATER PIPE REPLACEMENTS
Civil Engineering (Pipelines) project In The Mildura Council Area of Stormwater Pipe - Replacement type. Stormwater pipe replacement at various locations. Click for more details...

TRARALGON SEWER RETICULATION/ WET WEATHER RELIEVER PIPE
Grubbs Ave, Traralgon, VIC 3844 Has Traralgon Sewer Reticulation/ Wet Weather Reliever Pipe currently at Construction stage. Traralgon Sewer Reticulation Grubb Ave - Wet Weather Reliever Pipe. Click for more details...

MV 27A/5 PIPELINE INCLUDING ON FARM WORKS
Mv 27a/5 Pipeline Including On Farm Works is currently at the Construction stage, valued at about $ 800000 it is Construction of a backbone pipeline, road culverts, meters and On-Farm works. Click for more details...