BROKE WATER SUPPLY
Civil Engineering (Pipelines) project In The Singleton Council Area of Water Supply Pipeline type. Extension of water supply to Broke township. Click for more details...

YENDA & STANDBRIDGE PUMP STATIONS/PIPELINES
Consultancy For Design - Pump Stations/Pipelines project at Yenda &, Stanbridge, NSW 2705 In The Council Area Of Leeton of State. Detailed designs of pumped pressurised supply systems in the Yenda & Stanbridge areas located within a 30 kilometre radius of the City of Griffith. Requirements as follows: preparation of designs & specifications for interconnecting pump stations & their control systems. Design check of Optimised pipe diameter & preparation of pipe longitudinal profiles. Preparation of a schedule of supply system pipe & pump materials requirements & engineers estimate. Preparation of materials specifications of all items (pipes, pipe specials, valves, control equipments, pumps, filtration units, metering & data logging). Preparation of pipe, pump, filtration, outlet & valve installation specifications. Preparation of tender document for the construction of the high pressure system. Provision of operator training & an Operation & Maintenance Manual. Oversight of defects liability period. The design will include comprehensive pump station, pipeline & outlet detail based on criteria provided by Murrumbidgee Irrigation. Click for more details...

WATER CORPORATION - EPC SERVICES
State ownership Civil Engineering (Pipelines) project In The Various Council Area for New development. Panel of prime contractors for provision of engineering design, procurement & construction (EPC) services to Water Corporation. Click for more details...

APOLLO BAY RECLAIMED WATER PIPELINE
A project in the VIC Within Colac-Otway. Works include supply and delivery of approximately 1650 metres of 300 and 250mm pressure pipe, valves and fittings. Click for more details...

GREAT SOUTHERN TOWNS' WATER SUPPLY PIPELINE
Great Southern Towns' Water Supply Pipeline is currently at the Construction stage, valued at about $ 50000 it is Works comprise welding repairs to Great Southern towns' water supply pipeline. Click for more details...

BREEN'S IRRIGATION PIPELINE
Civil Engineering (Pipelines) project for New development. For the supply, delivery and installation at the Shepparton WMF of approximately 700 metres of NB400 HDPE pipeline. Detail of the scope of work is included in the tender documentation. Click for more details...

INFILL SEWERAGE PROGRAMME UPGRADE - THORNLIE & WESTFIELD
A project in the WA Within Various. Works comprise construction of gravity sewers for Reticulation Areas Thornlie 12D & Westfield 4V. Approximate lengths: Gravity sewers - 229 m x 150 mm & 72 m x 225 mm; by trenchless techniques - 96 m x 150 mm. Click for more details...

WATER CORPORATION - DN100 TO DN1400 STEEL PIPE
Civil Engineering (Pipelines) project In The Various Council Area of Dn100 To Dn1400 Steel Pipe - Supply & Delivery To Various Locations type. Supply & delivery of DN100 to DN1400 steel pipe for five year period. Click for more details...

TWO PEOPLES BAY DISTRIBUTION PIPELINE
Civil Engineering (Pipelines) project In The Albany Council Area of State ownership. It is proposed to construct underground PVC water distribution main extending along Lower King Rd & Nanarup Rd from approximately corner of Lower King Rd & Elizabeth St at Lower King to south side of Kalgan River. Click for more details...

PENGUIN TO ULVERSTONE SEWER & PUMP STATION
Pipeline project at Not known Penguin &, Ulverstone, TAS 7315 in the Civil Engineering (Pipelines). Construction of approx 11.5 klms of pipeline from Penguin to Ulverstone. Click for more details...

BANKSIA GROVE BOOSTER PUMP STATION AND PRESSURE MAIN
Currently at the Construction stage In Wanneroo is a project estimated to be $ 500000. This project Works comprise construction of booster pump station & pressure main. Click for more details...

17TH STREET - SUPPLY & DELIVERY OF PIPES
Local Govt ownership Civil Engineering (Pipelines) project In The Mildura Council Area for New development. Tenders are invited by the First Mildura Irrigation Trust for the Supply and delivery of pipes and fittings. The FMIT is converting it's current 17th street earthen channel to a high pressure pipeline. Pipe diameters range from 150mm to 750mm (approx 20,000 metres). Click for more details...

ORIENT POINT WATER SUPPLY
Currently at the Early Planning stage In Shoalhaven is a project estimated to be $ 180000. This project Proposed construction of a centralised pumping station, extension of the 250mm main line. Click for more details...

DRAFFINS ROAD WATER SUPPLY PIPELINE
Civil Engineering (Pipelines) project for New development. Use and Development of a utility installation (water supply pipeline). Click for more details...

BAYONET HEAD - INFILL SEWERAGE PROGRAMME UPGRADE
Civil Engineering (Pipelines) project In The Albany Council Area of State ownership. Works comprise construction of gravity sewers for Reticulation Areas Bayonet Head 3D & 6B. Approximate lengths: Gravity sewers - 3,586 m x 150 mm & 1m x 225 mm; by trenchless techniques - 501 m x 150 mm. Click for more details...

MILDURA SEWER REHABILITATION WORKS
Currently at the Tenders & Building stage In Mildura is a project estimated to be $ 300000. This project Rehabilitation of approximately 1600 metres of various sized sewer mains which includes AC, EW amd RC pipe material located in MIldura, Victoria. Works are to also include jet cleaning, CCTV survey and reinstatement of property connections. Click for more details...

NEW BRIGHTON GOLF CLUB DAM UPGRADE
A project in the NSW Within Liverpool. Proposed upgrade of existing dam & construction of a new irrigation dam & artificial wetland. Click for more details...

BEACHLANDS WATER MAINS & SG-10 SEWER PUMPING MAIN
Civil Engineering (Pipelines) project at Not disclosed within area of, Beachlands, WA 6530 for New. Works involve construction of water mains & SG-10 Sewer Pumping Main. Click for more details...

BUNGUNYAH-KORALEIGH IRRIGATION TRUST PIPELINE
Bungunyah - Koraleigh, Koraleigh, NSW 2735 Has Bungunyah-Koraleigh Irrigation Trust Pipeline currently at Planning stage. Preparation of an Irrigation District Business Plan. The Business Plan will be used by the Department of Infrastructure, Planning & Natural Resources & the Bungunyah-Koraleigh Irrigation Trust to determine if it is economically viable to proceed to undertake the upgrading of the Irrigation Delivery System to a piped system & if it is possible to make the expected water savings. Click for more details...

KIMBERLEY TO PERTH WATER SUPPLY - CONSULTANCY SERVICES
Civil Engineering (Pipelines) project at From Fitzroy River (Kimberley) to South West & Goldfields, ., WA 6999 of Water Transportation - Consultancy Services type of New development. Consultancy services to review proposals for transportation of water from Kimberley to State's South West & Goldfields. Click for more details...

SOUTHERN REGIONAL WATER PIPELINE
Civil Engineering (Pipelines) project In The Not Yet Determined Council Area of State ownership. Design supply & construction of 9.1 km x 1085 mm dia, 15.5 km x 960 mm dia & 86.6 km x 800 mm dia water pipelines. Design supply & construction of 3 pump stations at Bundamba, Swanbank & Chambers Flat, 2 balance tanks at North Beaudesert (30ML) & Stapylton (10ML) & design & construction of 6 major river crossings including the Brisbane River. Click for more details...

LIVERPOOL STP AMPLIFICATION STAGE 5B
Liverpool Ashfield Pipeline project at Ashfield to, Liverpool, NSW 2170 in the Civil Engineering (Pipelines). Construction of 24kms of steel cement lined pipeline, amplification works & major pumping stations at Liverpool & Fairfield. Major pumping stations will be designed & constructed at Liverpool Sewage Treatment Plant & Fairfield Storm Sewage Treatment Plant. The new pipeline, approximately one metre in diameter, will extend from the Liverpool Sewage Treatment Plant to Ashfield, where it will connect to the Western Branch Main Sewer Click for more details...

TOMAGO TRUNKMAIN UPGRADE OVER ASH ISLAND
Currently at the Construction stage In Newcastle is a project estimated to be $ 7000000. This project The project involves the decommissioning and replacement of an existing underground 900mm water trunkmain (DN 900) with a new 1350mm underground trunkmain (DN 1350) along approximately 3k of Ash Island. The project site is comprised of: construction zone ? a 20 metre corridor along the three km length of the trunkmain, and a site compound area (approximately 13.61 hectares within the City Farm area managed by the Kooragang Wetland Rehabilitation Project). The compound area consists of the ASS remediation and disposal area, a site office and soil stockpiling area; and disturbance zone ? a 15 metre corridor located within the construction zone west from Ramsar Road, which includes the centreline of the proposed route and the proposed vegetation clearance area required for construction. The construction zone would be delineated and temporarily fenced during the construction period so as to confine construction activities within the designated area. The zone does not pass through the Kooragang Nature Reserve (KNR, now known as Hunter Wetlands National Park) but lies 10-15 m from the KNR boundary in the northern section and 20-30 m from the KNR boundary in the southern section of the proposed route. The proposal would involve disturbance of a total area of 18.64 ha (5.03 ha within the disturbance zone and 13.61 ha within the compound area), the majority of which is cleared pasture/grassland. Only one ha of this is SEPP 14 wetland areas. The Proponent proposes to rehabilitate and restore all areas impacted during construction, including areas adjacent to the construction zone. Click for more details...

COLLARENEBRAI W & S
Pipeline - Upgrade project at Collarenebri, Collarenebri, NSW 2833 In The Council Area Of Walgett of State. Scope of work includes: supply & delivery of all materials, plant, equipment & labour for the completion of the upgrading of approximately 875 meters of raw water main pipeline. The works involve upgrading the existing DN40 PE raw water pipeline by installing new DN100 uPVC pipeline. The will include installation of new pipework & fittings, including insulation of air valve & hydrants, connection to the existing raw water main at both ends & other miscellaneous works. Click for more details...

AGL GAS PIPELINES
New project of Civil Engineering (Pipelines) project at Mackey Park, 1 Richardson Cr, Marrickville, NSW 2204. Installation of a 60 metre x 500mm steel gas main & connection to existing gas main. Installation of 150mm bypass line, pipe gauge receiver connection, pit & hardstand. Installation of safety valve & surround structure. Horizontal directional drilling under Cooks River. Installation of storage shed. Click for more details...

MARDI DAM TO MANGROVE CREEK DAM PIPELINE - LINK PROJECT
Mardi Dam To Mangrove Creek Dam Pipeline - Link Project is currently at the Construction stage, valued at about $ 64156000 it is Construction of a pipeline from Mardi Dam to Mangrove Creek Dam approximately 21 kms away. Scope of works includes: Wyong River Off-take Structure - A new water off-take, near the site of the existing structure, capable of extracting up to 500ML/day from the lower Wyong River. Wyong River Off-take Pumping Station - A new pumping station to extract water through the Wyong River Off-take Structure, with an installed capacity of 320ML/day. Wyong River to Mardi Dam Rising Main - A new rising main, approx 2.6km long & 1000mm diameter, to transfer water from the lower Wyong River to Mardi Dam. Mardi Dam Inlet Upgrade - A new inlet to Mardi Dam to take the flow from both the Wyong River to Mardi Dam Rising Main & from the Mardi to Mangrove Transfer Rising Main. Mardi to Mangrove Transfer Pumping Station - new pumping station to pump water from Mardi Dam, through the Mardi to Mangrove Transfer Rising Main, to Mangrove Creek Dam at a rate of up to 160ML/day. Mardi to Mangrove Transfer Rising Main - A new pipeline, approx 19km long & 1000mm diameter, linking the end of the existing Bunning Creek Tunnel (which leads to Mangrove Creek Dam) with Mardi Dam. It will have a capacity of 160ML/day and will permit flow in either direction according to operational needs. Mangrove Creek Dam Outlet Structure - Modifications to the existing outlet structure in the Boomerang Creek arm of Mangrove Creek Dam to allow it to operate as an inlet/outlet structure. Lower Wyong Weir & Fishway - Modifications to the existing weir & fishway (downstream of the Wyong River Off-Take Structure) Click for more details...

CLYDESDALE ROAD (SOUTH COAST HIGHWAY) - WATER MAIN INSTALLATION
Civil Engineering (Pipelines) project at Along South Coast Hwy, Mckail, WA 6330 for New. Works comprise installation of approx 2.36 km of water main, consisting steel & PVC main, along South Coast Hwy. Click for more details...

NORTH EAST WATERWATCH PROGRAM EVALUATION & STRATEGIC PLAN
Civil Engineering (Pipelines) project In The Various Council Area of State ownership. North East Waterwatch Program evaluation and development of a three year strategic plan (2009-2011). Click for more details...

ILUKA EBB TIDE RIVER RELEASE
Ebb Tide Release System project at Johnson St, Iluka, NSW 2466 in the Civil Engineering (Pipelines). Project will involve horizontal drilling & marine works for the Iluka Sewerage System to allow discretionary discharge to the Clarence River near Moriarty's Wall. Work comprises Connection to the recycled water transfer main (to be constructed by others) & extension of that main to the shoreline entry point of the submarine pipeline. A submarine pipeline by trenchless technology such as Horizontal directional drill (HDD) from the shoreline entry point to the diffuser location on the bed of the Clarence River. Diffuser structure including foundation, supporting & protective structures, pipework & fittings on the bed of the Clarence River. Appurtenances such as navigational marker buoy, marker posts, thrust block & related items. Click for more details...

MARSTEL TERMINALS BULK LIQUIDS STORAGE FACILITY
Civil Engineering (Pipelines) project at Lots 1 & 2 western end of former BHP steelworks site, Mayfield, NSW 2304 of Bulk Liquids Storage Facility type of New development. Development and operation of a bulk liquid fuel storage facility, comprising development of a tank farm with capacity to store diesel and biodiesel liquid fuel products; use of an existing ship berthing facility (Berth M4) to receive diesel fuel by sea; development of a pipeline to transport diesel fuel from this berthing facility to the tank farm; use of the existing road network to receive biofuels and to dispatch diesel and biodiesel; and development of ancillary services and infrastructure, including internal roads. excavation of areas for tank foundations; construction of reinforced concrete bund walls; preparation of the bund floor (excavation, backfilling with crushed rock, installation of liner, additional backfilling with crushed rock and priming/sealing); installation and diversion of services and infrastructure, including stormwater drainage lines; construction of internal roadways (excavation, compacting of road base; pouring of concrete pavement (reinforced) for main driveway; construction of a pipeline on existing supports to transfer materials between the berth and the storage facility; and - construction vehicle movements. Much of the material would be prefabricated and installed on site, particularly fuel facility components, thereby minimising the construction activities required on site. Proposed site structures include: 3 x diesel storage tanks (38 m diameter and 18 m high); 1 x biodiesel storage tank (8 m diameter and 12 m high); 1 x additive tank (3 m diameter x 6 m long); 1 x slops tank (2.6 m diameter x 4.5 m long); office and amenities (16 m x 9 m and 4 m high); truck loading gantry (33.5 m x 16.5 m and 6.5 m high); fire water storage tank (10.5 m diameter and 8.5 m high); firepump building (15.5 m x 5 m and 5.5 m high); workshop and MCC (10 m x 9 m and 5 m high). Click for more details...

EMU PLAINS PRIMARY MAINS EXTENSION
Civil Engineering (Pipelines) project at between Penrith &, Emu Plains, NSW 2750 of Gasline - Extn type of New development. The primary mains pipeline is approximately 3 kilometres in length & involves pipe laying, horizontal directional drilling across the Nepean River & a number of directional bores under creeks and rail lines. Work also includes the fabrication & installation of a pig receiving facility at the new Emu Plains Primary Regulating Station. Click for more details...

PORT BOTANY BLB2 TERMINAL
Civil Engineering (Pipelines) project at Fishburn Rd, Port Botany, NSW 2036 of Bulk Liquid Terminal type of New development. The BLB2 project comprises construction of a steel piled pier berth adjacent to the existing BLB1. Associated infrastructure such as marine loading arms, fire fighting equipment, onshore support facilities & pipelines from existing user sites to the new berth. BLB2 has been designed to accommodate 120,000 dead weight tonne vessels to a maximum of 270m length overall Click for more details...

ROBINVALE IRRIGATION SYSTEM PRESSURE VESSEL
Civil Engineering (Pipelines) New project at Robinvale Irrigation District, Robinvale, VIC 3549. This type is Pressure Vessel - Installation And Site Works with State ownership. Works involve the onsite installation of a 92 kL Pressure Vessel, pipeline connections and access platforms. Click for more details...

SWAN REACH PASKEVILLE PIPELINE HIGH VOLTAGE SWITCHBOARD REPLACEMENT NOT PUBLISHED
Civil Engineering (Pipelines) project In The Copper Coast Council Area of State ownership. Replacement of high voltage switchboards & upgrade of control systems on the Swan Reach Paskerville Pipeline. Click for more details...

NARRABUNDAH TO HUME GAS PIPELINE
Civil Engineering (Pipelines) project In The Act Council Area of Gas Pipeline type. Construction of a new primary regulating station (PRS) a below ground high pressure gas pipeline & associated infrastructure between Symonston & Hume. A pig receiving facility will also be established within the PRS facility. The pig receiving facility enables cleaning, maintenance & inspection of the pipeline by receiving a device called pig & is pushed through the pipeline under pressure. The pipeline corridor will be approx 12m wide comprised of the pipeline trench, laydown for pipe lengths, spoil stockpiling & access for machinery. Click for more details...

NEARGO WATER EFFICIENCY SCHEME
Civil Engineering (Pipelines) New project at 70kms west of, Moree, NSW 2400. This type is Pipelines/Drainage with State ownership. Neargo Water Efficiency Scheme. Scope of work includes but not limited to: supply, install & maintain site water, sewer, phone & electricity for duration of contract. Supply, install, maintain & clean site accommodation, sanitation & other ancillary facilities. Construct & maintain access required to complete the works. Design, construct, maintain & removal of all temporary works to complete the works. Construct, maintain & removal of temporary security fencing where required. Boreheadworks - supply & installation of pipework, fittings, valves & meters. Pipeline - supply & installation of polyethylene pipe, including all necessary fittings, valves & tees. Supply & installation of water storage tanks, at various sites, including foundation preparation and inlet & outlet fittings. Click for more details...

WIRRABARA COMMUNITY WASTEWATER MANAGEMENT SYSTEM
Local Govt ownership Civil Engineering (Pipelines) project In The Mount Remarkable Council Area for New development. Tenders are invited for the design & construction of the wastewater treatment plant (WWTP) for the Wirrabara Community Wastewater Management System. The following list indicates the main elements of the Works sufficient to ensure that the Tenderer is aware of the cope of the Tender. It does not detail duties, actions or items of supply on minor works which are self-evident or inherent to the satisfactory completion of the scheme as described in the tender documents. The tender as detailed below shall comprise the whole of the Wastewater Treatment Plant (WWTP) for the Wirrabara Community Wastewater Management System (CWMS), including labour & materials necessary to execute the Works described in this specification & shown on the drawings, including any obvious items for the property completion of the work comprising: Preliminaries: 1) All site establishment costs; 2) Obtaining all licenses & payment of fees where required for conduct of the Works & compliance with all regulations relating to the Works; 3) Provision for quality control & assurance, environmental controls & traffic management; 4) All setting out of the Works, including locating services, temporary bench marks, etc; 5) Service locating & depthing; 6) Compaction testing & air testing; 7) Provision for all site security; 8) The transportation of all personnel, plant & materials to & from the site; 9) Provision of temporary site accommodation if required; 10) Provision of all personnel, facilities & amenities for the administration of the Works of the scheme; 11) Provision of office facilities for the Superintendents Representative for the duration of the Works; 12) As constructed drawings; 13) Operations Manuals; 14) Practical Completion inspections & End of Defects Inspections; 15) Site Meetings. Wastewater Treatment Plant - An extended aeration or other approved WWTP & sludge dewatering, as specified to treat the types & volumes of wastewater(s) to the minimum standard specified. Site Security Fence - Around the perimeter of the WWTP site. Civil Works - Site works, bunding, drainage, hardstands as required to install & access the plant & access road to the pad. Not bulk earthworks for lagoon by others. Control Shed - Supply & Installation of a colorbond shed to house filter, disinfection equipment, control panels, spare parts, distribution boards etc., required for the WWTP. The control shed shall contain one roller door & two personal access doors. Internal thermal insulation & roof ventilation (whirly bird) shall be provided. Chlorine Disinfection Systems: Supply, installation & commissioning of a packaged chlorine disinfection system within the treatment station to achieve a Class B water quality in accordance with the South Australian Recycled Water Guidelines issued by the South Australian Department of Health & Ageing (DHA) & Environment Protection Authority (EPA). Ancillary Works - All associated pipework, fittings, electrical reticulation, control, monitoring & alarm systems, telecommunication facilities & other items as required for the complete & full operation of the treatment facilities as specified herein & as required for the particular facilities as proposed by the Tenderer. Power Supply - The Tenderer shall be responsible for engaging SA Power Networks (SAPN) to connect single phase power to the site. Note that three phase power supply will not be available. Pipework - The Tenderer shall supply & install all valves & pipework from the interface with the collection network civil contractor as shown on the drawings. Refer to supplied drawing for extent of Tender. Click for more details...

EUMUNGERIE WATER SUPPLY SCHEME
A project in the NSW Within Dubbo. Construction of water supply scheme consisting of 3 separable portions: construction of pipelines along Mogriguy Rd from Brockhurst to Eumungerie & within Mogriguy & Eumungerie villages, design & construction of reservoir & chlorination system on Mogriguy Rd opposite Kyarra Dr way & design & construction of Brocklehurst pumping station at Brocklehurst within the Wambiana St Reserve. Scope of work includes :Separable Portion 1 - Construction of Pipelines, rising main from Brocklehurst Pumping Station to Eumungerie Reservoir, reticulation main from Eumungerie Reservoir to the Eumungerie town, reticulation main from Eumungerie Reservoir to the Mogriguy village, reticulation network within Eumungerie, reticulation network within Mogriguy. Separable Portion 2 - Design and Construction package of Reservoir and Chlorination System including design and Construction of a 100 kL reservoir at approximately 16.6 km from Brocklehurst Pumping Station, design and construction/Installation of a chlorination system at the reservoir site, civil works at the reservoir site include inlet, outlet pipelines from the reservoir, scour/overflow pipeline from the reservoir to drainage outlet, access road, fencing and gates, scour/overflow discharge outlet, concrete pits for magflow meters, chlorination injection point and isolation valves. Separable Portion 3 - Design and Construction package of Brocklehurst Pumping Station including design and construction of Brocklehurst pumping station, civil works at the pumping station site include suction and delivery pipe lines, connection to existing retic-mains; concrete pit for magflow meter and isolation valves, provision of power supply to the Pumping Station & associated electrical and mechanical works. . Click for more details...

GIPPSLAND WATER PIPELINE CONSTRUCTION FOR SWOP REPLACEMENT STAGE 2
State ownership Civil Engineering (Pipelines) project In The La Trobe Council Area for New development. Construction of pipeline for SWOP Replacement, Stage Two. Click for more details...

WALLUMBILLA BORE 3 BOREHOLE DRILLING & CONSTRUCTION
Civil Engineering (Pipelines) project In The Maranoa Regional Council Area of Local Govt ownership. Construction of Town Bore 3 at Wallumbilla. To include drilling, casing, cementing, developing & testing of 1 town water production bore. Click for more details...

AGNES WATERS TRUNK WATER MAIN STAGE 1
Civil Engineering (Pipelines) project for New development. Construction of 375 DICL trunk water main from Agnes Waters Water Treatment Plant to Agnes Waters High Level Reservoir. To include supply & installation of 1.366km of DN375 DCIL PN20 (RRJ) Pipe, associated valves, pipework fittings & the realignment of a 65.549m section of DN150 gravity sewer. Click for more details...

COBAR WATER BOARD - TWIN PIPELINES
Civil Engineering (Pipelines) project In The Cobar Council Area of Pipelines/Pump Station - Replacement type. Project comprises 4 sections. Nyngan to Cobar Pipeline including surge tank sites; Cobar storages; Nyngan Pump Station & Hermidale Pump Station. Nyngan - Cobar pipeline - part replacement - construction of a 29.4 km long 375 mm nominal diameter (DN375) ductile iron cement lined (DICL) pipeline from Nyngan Pump Station (PS) to Hermidale, including: supply & installation of cross connections between the new DN375 pipeline & existing DN375 & DN300 pipelines; supply & installation of air valves, scour & isolation valves including valve pits, surface boxes, discharge pipes; construction of thrust blocks & anchor blocks for bends, tees, tapers & valves; supply & installation of the pipeline connection at the Nyngan PS including all necessary valves, pipework, flow meter, pigging pits; construction of 2 pigging pits for the existing DN375 pipeline at Hermidale Pump station; transfer of existing service connections (11) from the 300 mm pipeline to the new pipeline & all associated works related to the pipeline such as concrete encasements, supports, marker posts & other minor works necessary for the proper completion & functioning of the pipeline. Nyngan Pump station - upgrade works - design & construct - 2 x 450 mm diameter x 6 m deep bores with PVC casings & sealed bottoms; 300 mm inlet pipe from the inlet channel to the bores with an inlet screen & a stop board; two submersible turbine pumps (pot type bore pumps), one duty & one standby, to operate in parallel with other existing main pump(s) at this pumping station; bore pump delivery pipework including valves & a flow meter (associated with the bore pumps); connection of the bore pumping system to the existing Nyngan pumps delivery pipework; instrumentation for the new pumping system such as pressure transmitters, level transmitters in the bores, pressure gauges; variable speed drives (VSD) with associated electrical switchgear for the new pumps & control system & calibration of existing two sets of DN 300 and DN 375 flow meters. Hermidale pump station - upgrade works - design/construct - three flow meters with necessary pipework including locating existing pipelines; two vertical multi-stage centrifugal type jacking pumps, one duty & one standby to operate in parallel with other main pump(s) at this pumping station; a building for jacking pumps; suction & delivery pipework including valves & a flow meter associated with the jacking pumps; connection of the new jacking pumping system to the existing Hermidale pumps suction an delivery pipework; instrumentation for the new pumping system such as pressure transmitters, pressure gauges for the jacking pumps delivery as well as a level sensor inside the balance tank to control the new pumps; Variable Speed Drives (VSD) with associated electrical switchgear for the new pumps & control system; modification to the ventilation ducts & louvres in the existing pump station building to suit the construction & operation of the proposed jacking pump building. Improvements to surge tanks along to Nyngan to Cobar pipeline - modification to the existing pipework including replacement of all above-ground pipework and valves at the Mount Boppy Surge tank; provision of a level sensor (for monitoring of water level) in Mount Boppy surge tank with necessary electrical & telemetry works; modification to the existing inlet pipework for surge tanks at chainages 44.41 km and 16.7 km. Improvements to control valves at Cobar staorages - installation of 2 sets of electrically actuated valves with necessary pipework including: pits, pressure transmitters (one on each rising main feeding to Cobar inground storage tank), power supply, electrical & telemetry works; locating & cutting the existing pipes and construction of a pit & cover for each; an isolation valve on the upstream side of the each valve outside the pit is also to be provided. telemetr Click for more details...

RIVERSIDE & CURETON AVS WATER MAIN CONSTRUCTION
Water Main Construction project at Riverside & Cureton Avs, Mildura, VIC 3500 in the Civil Engineering (Pipelines). Riverside Avenue & Cureton Avenue DN300 water main construction. PART A: Pipeline construction works for Riverside Avenue Water Main, approximately 1360 m of DN300 PVC-O Series 2 pipework from Sixteenth Street to Seventeenth Street. PART B: Pipeline construction works for Cureton Avenue Water Main, approximately 1025 m of DN300 PVC-O Series 2 pipework along Cureton Avenue from Seventh Street to Cowra Avenue. Click for more details...

TARA BOREHOLE DRILLING & CONSTRUCTION
Civil Engineering (Pipelines) project at Located Within, Tara, QLD 4421 for New. Drilling & construction of a borehole located within Tara. Click for more details...

NAMBROK-DENISON & HEART SYSTEMS PIPELINE REPLACEMENT
State ownership Civil Engineering (Pipelines) project In The Wellington Council Area for New development. Installation of DN 450, 500 & 630 HDPE pipelines to replace existing channels, including installation electromagnetic flowmeters & isolation valves. Click for more details...

GLADSTONE BENARABY ROAD - ERGON DEPOT CONNECTION
Local Govt ownership Civil Engineering (Pipelines) project In The Gladstone Regional Council Area for New development. Construction of the Gladstone-Benaraby Road Pipeline - Ergon Depot Connection. Install a new DN150 & DN200 water main that links the existing DN 100 AC main that runs down the services road to the Ergon Depot and the existing DN 200 water main that runs along Gladstone-Benaraby Road before turning to Whiting Street. Scope of work includes: installation of approximately 4m of 150DN DICL pipeline including associated trench stops. Installation of approximately 436m of 200DN PE100 PN16 pipeline including associated trench stops & bulk heads. Protection of existing underground, aboveground and overhead services including ergon powerpole in vicinity of works. Liaison with existing services providers. Liaison and coordination with Council for connections to existing pipeline. Contractor to do Southern connection. GRC direct labour to do Northern Connection. Click for more details...

FISH RIVER WATER SUPPLY
Civil Engineering (Pipelines) project at Junction Rd, Duckmaloi, NSW 2787 for New. Construction for the replacement of a section Stage 2 pipeline - separable Portion 1 is approximately 1.8 kms & separable Portion 2 is approximately 1 km with OD914 mm pipe Click for more details...

LAKE FYANS WATER MAIN REPLACEMENT
Currently at the Construction stage In Northern Grampians is a project estimated to be $ 350000. This project Lake Fyans Water Mains Replacement. Supply & construction of up to 3.8 kilometres of water main pipeline near Lake Fyans. The work site is located 14 kilometres south-west of Stawell in Western Victoria. The scope of works includes, supply, construct & commission 2,200 metres of DN375 PN20 PVC pipe. Supply, construct & commission 1,600 metres of DN450 PN20 PVC pipe. Click for more details...

FERNLEIGH ROAD STORMWATER DRAIN
Civil Engineering (Pipelines) project at Fernleigh Rd, Wagga Wagga, NSW 2650 of Drain - Refurbishment/ Installation type of New development. Refurbishment to the stormwater drain and a trickle flow installation, including the removal of current vegetation overgrowth, the removal of wings attached to the existing under road culverts on Fernleigh Rd, the construction of new wings and associate apron including the first of five pits and grate for nuisance water intake and the installation of Dia Vinidex StormPRO. Click for more details...

LOWER MURRAY WATER
Civil Engineering (Pipelines) project In The Various Council Area of Pipelines type. Construction of irrigation pipelines in the four pumped irrigation districts of Merbein, Red Cliffs, Robinvale & Mildura, the Millewa rural district & some areas of the waterworks district of Yelta. Click for more details...