State

Categories

Sub Categories

Click Here to Find Current Projects

List of Pipelines Projects in ACT


COTTER DAM
Civil Engineering (Pipelines) Addition project at Cotter Rd, Cotter River, ACT 2611. This type is Dam - Addns with State ownership. Proposed extensions to the Cotter Dam by building a new 88 metre dam wall to increase water capacity by approximately 20 times current capacity, construction of a pipeline to the Stromlo water treatment plant. Click for more details...

MURRUMBIDGEE RIVER PUMPS
Water Pumps New project In The Act Council Area. Installation of water pumps on the Murrumbidgee River near the Cotter Pump Station. Click for more details...

GOOGONG DAM PIPELINE - BLUE WATER ALLIANCE PROJECT - BWA
Pipeline New project In The Act Council Area. Construction & operation of a pipeline transferring up to 100ML/day from the Murrumbidgee River at Angle Crossing (ACT) to Burra Creek (NSW) near the Googong reservoir. The total length of the water pipeline is approximately 13km. The component of the project within NSW includes a pipeline from the ACT border to Burra Creek & a discharge point at Burra Creek. Construction of a combined intake/low lift & high lift pump station with associated electricity infrastructure (including cabling, equipment vault & substation). Construction of the pipeline from the intake/low lift pump station to the high lift pump station & from there to the ACT/NSW border with associated engineering control & operation devices. Re-alignment/upgrade of Angle Crossing Rd in the vicinity of the high lift pump station. Bulk earthworks relating to the preparation of the pump station construction areas, substation pad & road re-alignment of Angle Crossing Road. Permanent fencing at the high lift pump station & permanent marker signs along the pipeline Click for more details...

WATER SECURITY PROGRAM/BULK WATER ALLIANCE - BWA
Design Or Construction Services For Water Security Program New project In The Act Council Area. The ACT Government has recently agreed to recommended initiatives by ACTEW to secure water supply to the ACT & region. Major components of this program include: the enlargement of the existing Cotter Dam (ID920163); the Murrumbidgee to Googong Water Transfer Project (ID2206050) & the Googong Spillway Project (ID918116). All 3 projects will be through an alliance delivery model: the Bulk Water Alliance Click for more details...

MURRUMBIDGEE COUNTRY CLUB
A project in the ACT Within Act. Extension to a small existing pumphouse located at the dam on the 5th tee on the golf course. Installation of a new underground pipeline from the river to the pumphouse at the dam as well as a tie in pipeline from that dam to McQuoids Dam near the club house. Click for more details...

HUME PRIMARY MAIN
Private ownership Civil Engineering (Pipelines) project In The Act Council Area for New development. Construction of the Hume Primary main. Construct & operate a new primary regulating station, below ground high-pressure pipeline & associated infrastructure works. The high-pressure gas pipeline route extends from the Jerrabomberra POTS (an existing asset) north of Hindmarsh Dr, Symonston & runs generally within the Monaro Highway road reserve south to the PRS location. The proposed pipeline route also crosses several major roads, which will be underbored, including Hindmarsh Dr & the Monaro Hwy, some private access ways & includes potentially mature native trees, by micro-tunnelling or directional drilling. A 250 mm diameter (273 mm external diameter) pipeline is proposed, with a total length of approximately 5 km. The pipeline will be installed below ground, generally by standard trenching methods. The pipeline construction corridor will be approximately 12m wide, comprised of the pipeline trench, laydown for pipe lengths, spoil stockpiling & access for machinery Click for more details...

GUNGAHLIN SECONDARY MAINS EXTENSION
Gas Pipeline New project In The Act Council Area. Extension of the natural gas pipeline on the corner of Gundaroo Drive & Anthony Rolfe Drive Gungahlin, east along Gundaroo Dr & north along Horse Park Drive to the corner of Katherine Avenue. The total length is approx 2.9kms. Installation of 3 valves, tie-in to existing secondary steel mains & low pressure mains Click for more details...

HUME TO TUGGGERANONG PIPELINE - STAGE 2
Gas Pipeline project at Blk 4 Secn 288 Ashley Dr, Isabella Dr & Monaro Hwy, Gowrie, ACT 2904 In The Council Area Of Act of Local Govt. Installation of a new secondary gas main to connect the existing 300mm secondary steel main on the Monaro Highway to the 150 mm secondary steel main on Ashley Drive in Gowrie, to upgrade the gas supply network to the Tuggeranong Valley. The total length is 4.5 kilometre. Click for more details...

NARRABUNDAH TO HUME GAS PIPELINE
Civil Engineering (Pipelines) project In The Act Council Area of Gas Pipeline type. Construction of a new primary regulating station (PRS) a below ground high pressure gas pipeline & associated infrastructure between Symonston & Hume. A pig receiving facility will also be established within the PRS facility. The pig receiving facility enables cleaning, maintenance & inspection of the pipeline by receiving a device called pig & is pushed through the pipeline under pressure. The pipeline corridor will be approx 12m wide comprised of the pipeline trench, laydown for pipe lengths, spoil stockpiling & access for machinery. Click for more details...

PUBLIC WORKS SCULLIN
Sewer/Water Pipes project at 1-3 (Blks 27 & 28 Secn 43) Ross Smith Cr, Scullin, ACT 2614 in the Civil Engineering (Pipelines). Public Works installation of a stormwater sewer & water pipelines in Frewin Place & Chewings St Scullin Click for more details...

HACKETT TO AFP MAJURA PIPELINE
Secns 37 & 55 HACKETT & Blks 165, 48, 696, Majura, ACT 2609 Has Hackett To Afp Majura Pipeline currently at Construction stage. Proposed installation of 3,200 metres of new 100mm polyethylene gas main extension between the existing medium pressure line in Madigan Street, hackett & the AFP Training Complex in Majura. Click for more details...

MONCRIEFF SECONDARY GAS MAINS EXTENSION
Civil Engineering (Pipelines) project In The Act Council Area of Private ownership. Construction of a secondary gas pipeline along Horse Park Drive to support the new suburb of Moncrieff. Construction will include open trench to install 2.6 km of 200mm steel pipe. Click for more details...

Copyright © CoreLogic. All rights reserved. Powered by Cordell Connect