COFFS HARBOUR SEWERAGE - DEEP SEA RELEASE
Addition project of Civil Engineering (Pipelines) project at Woolgoolga &, Coffs Harbour, NSW 2450. Construction of 1.5 km long deep sea release pipeline. Click for more details...

WAUCHOPE PIPELINE
Currently at the Construction stage In Port Macquarie-Hastings is a project estimated to be $ 500000. This project Construction of replacement water pipeline Click for more details...

SYDNEY WATER PIPELINE
Civil Engineering (Pipelines) project In The Parramatta Council Area of Water Pipeline type. Construction of an above ground recycled water pipeline along an existing heritage listed Sydney Water corridor. Click for more details...

HUNTER WATER
Watermains - Replacement project at various within area of operations, ., NSW 2999 In The Council Area Of Various of State. Replacement of approx 2547 m x 100 mm & 950 m x 150 mm watermains. Click for more details...

JUICE TERMINALS PTY LTD DEVELOPMENT
Civil Engineering (Pipelines) project at Lot 101 Denison St (DP1008759) (known as 20 Newcastle Harbour), Carrington, NSW 2294 of Storage Units/Office type of New development. Construction of a facility to import and temporarily store frozen concentrated orange juice. The frozen concentrated juice would be delivered via ship unloaded into storage units via a dedicated pump line and then transported off site via road tanker for further processing. The components of the development are: . 11 Bilobe storage units (including stairs and platform for access) each with a height of 11.31 m . a 2 storey office building . refrigerated room for drum filling operation . paving of approximately 0.17ha (one third) of the site . pipeline extending from vessel to storage units for unloading of the frozen orange juice and . road receival and transfer of the frozen juice Click for more details...

SINGLETON DRAINAGE WORKS
Singleton Drainage Works is currently at the Construction stage, valued at about $ 1375000 it is Stormwater drainage system, upgrading of existing pipe network, installation of Caisson infiltration structures. Click for more details...

ORICA SITE REMEDIATION
16-20 Beauchamp Rd, Matraville, NSW 2036 Has Orica Site Remediation currently at Planning stage. Proposed staged hydraulic containment & ex-situ treatment of contaminated groundwater at the Botany Industrial Park & surrounding land, recommissioning & operation of a steam stripping unit located at the former Vinyl Plant in the Botany Industrial Park to treat extracted groundwater, construction & operation of an interim tanker loading facility to facilitate the transfer of extracted groundwater off-site, construction & operation of a transfer pipeline to facilitate the transfer to the steam stripping unit. Click for more details...

SCONE ABERDEEN WATER SUPPLY
A project in the NSW Within Upper Hunter. Construct a 16km pipeline of 500mm DICL & 600 dia. MSCL or equivalent from Glenbawn Dam to the existing Scone reservoirs including a new pumping station, all valves, pipework, fittings & associated works, such as buildings & civil works. Click for more details...

MARDI DAM
New project of Civil Engineering (Pipelines) project at Lot 1 Old Maitland Rd (DP 2111747), Mardi, NSW 2259. The Gosford Wyong Councils' Water Authority has identified the need to increase its capacity to deliver water from the Mardi Water Treatment Plant to its water distribution system. It is proposed to affect this increase in capacity by upgrading a number of components of its existing headwork system, including; (a) Spillway bridge, roadworks and Spillway; (b) New Transfer System from Mardi Dam to Mardi Water Treatment Plant: Including a new Inlet Tower, inlet channel, raw water pipeline, transfer pump station and associated works & (c) New High Lift Pump Station: Involving a new Pump Station at Mardi Water Treatment Plant to deliver treated water to the Gosford & Wyong Systems. Also includes High Voltage Power Ring Main and other associated works. (d) Mardi to Mangrove pump station. (e) Tuggerah diversion pipeline. Click for more details...

TABOURIE LAKE SEWERAGE SCHEME
Civil Engineering (Pipelines) project at from Burrill Lake to, Tabourie Lake, NSW 2539 for New. Scope of works includes construction of a sewer main from Tabourie Lake Village to the sewage pumping station SPS A including Tabourie Lake bridge crossing; construction of the sewage pumping station SPS A including all necessary infrastructure; construction of chemical dosing facilities at the sewage pumping station; construction of deodorisation bed frailties at the sewage pumping station; construciton of pressure/gravity main from sewage pumping station to Burrill Lake; Telemetry; completion of any design not completed; all necessary connection to existing infrastructures; any ancillary work required for a complete operating system; documentation including designs, Environmental Management Plan, Project OHS Management Plan, WAE drawings, QA documentation and Operations and Maintenance Manuals for the works; Provide video records of construction; testing, demonstration and commissioning of works; training of Shoalhaven Water Operators Click for more details...

GUNNEDAH COUNCIL AREA SEWER PIPELINES
Sewer Pipelines - Rehabilitation project at various within Gunnedah Shire Council areas, Gunnedah, NSW 2380 In The Council Area Of Gunnedah of Local Govt. Rehabilitation of sewer mains, installation of of structural liners within the existing sewer mains. Click for more details...

BEGA VALLEY SEWERAGE TREATMENT PLANT
Wolumia Village, Bega, NSW 2550 Has Bega Valley Sewerage Treatment Plant currently at Planning stage. Construction of a sewerage treatment plant to service the Wolumia Village, sewerage reticulation system, reuse of treated wastewater to irrigate the Recreation Reserve with surplus water to be piped to an existing water storage facility. Click for more details...

CENTRAL COAST WATER PIPELINE
Pipeline/Pump Stations (2) New project In The Wyong Council Area. Proposed construction of a 25 kilometre water pipeline & two pumping stations to transfer water from the Hunter Valley to the Central Coast. The pipeline will run next to the F3 from Sparks Rd, Warnervale and then on to the Hunter Valley. Click for more details...

SHOALHAVEN DAM TO WARRAGAMBA DAM
New project of Civil Engineering (Pipelines) project at from Shoalhaven River to, Warragamba, NSW 2752. Proposed construction of a 170 km water pipeline from the Shoalhaven River & Tallowa Dam to to Yass across the Great Dividing Range & pumping up to 300 billion litres of water a year inland Click for more details...

SCA BLUE MOUNTAINS STORAGES
Water Storages - Maintenance project at Cascade Dams Katoomba Greaves Creek Dam Medlow Bath Woodford Dam Woodford & Fish River Pipeline, Leura, NSW 2780 in the Civil Engineering (Pipelines). Single, long term contract for the provision of grounds, building & abutment & embankment maintenance services. Click for more details...

TWEED SHIRE COUNCIL
Civil Engineering (Pipelines) project for New development. Crossing of Cudgera Creek. Click for more details...

WATANOBBI/WARNERVALE ROADWORKS & PIPELINE - REFER TO ID 2205687
Civil Engineering (Pipelines) project In The Wyong Council Area of Local Govt ownership. Proposed construction of a link road & construction of a watermain from Mardi Dam to Sparks Rd, Warnervale. Click for more details...

MORGANS RD WEST REUSE PIPELINES
Civil Engineering (Pipelines) project In The Coffs Harbour Council Area of Reuse Pipelines type. Construction of approx 1166m of reclaimed water pipelines varying in size between 90mm to 200mm dia. Click for more details...

DUAL WATER SUPPLY SCHEME DOUBLE ENTRY REFER TO PROJECT ID 2173611
Dual Water Supply Scheme Double Entry Refer To Project Id 2173611 is currently at the Planning stage, valued at about $ 5000000 it is Construction of a dual water supply system, raw water pump system, rising main, water treatment plant, trunk main, pipelines. Click for more details...

NEW BRIGHTON GOLF CLUB DAM UPGRADE
A project in the NSW Within Liverpool. Proposed upgrade of existing dam & construction of a new irrigation dam & artificial wetland. Click for more details...

MUNMORAH GAS TURBINE FACILITY
Gas Turbine Facility project at Part Lot 61 DP1065038, Doyalson, NSW 2262 in the Civil Engineering (Pipelines). Proposed construction of a gas turbine facility to be built on the site of the existing Munmorah Power Station. The proposed development would include: four gas turbines with a combined power output of approximately 600MV; a back-start generator; distillate fuel & demineralised water storages; a gas compressor; an evaporative air cooling unit; and a gas supply pipeline. The open-cycle gas turbine facility and lateral gas pipeline would connect the gas turbine facility to the Sydney-Newcastle gas pipeline. The gas turbine facility would be operated as a peak-load power station, supplying electricity at short notice during periods of peak power demand. Power from the gas turbine facility would enter the grid via a new dedicated bay to be constructed adjacent to the existing switchyard. Click for more details...

COWRA WATER MAINS
Water Mains - Upgrade project at Kendal St, Brisbane St & Lachlan St, Cowra, NSW 2794 In The Council Area Of Cowra of Local Govt. Proposed replacement of existing water mains in & around Cowra CBD. Click for more details...

CONTINENTAL CARBON PLANT
Civil Engineering (Pipelines) project In The Sutherland Council Area of Private ownership. The proposed development involves alterations & additions to an existing carbon black plant and construction of an additional high pressure pipeline to provide heat and steam to the adjacent Caltex oil refinery. The proposal involves installation of new equipment including a waste gas boiler, bag filters & drying drum. In conjunction with the installation of the new equipment, it is proposed to incorporate some minor additions to the existing manufacturing building, to house the new equipment. In addition, it is proposed to duplicate the high pressure steam pipeline between the Continental carbon site and the Caltex oil refinery. Click for more details...

FINLEY WATER STORAGE
Water Storage Facility project at Riverina Hwy, Finley, NSW 2713 in the Civil Engineering (Pipelines). Design & construct a 5.7 ML water storage facility & associated pipe work. Click for more details...

SOUTH WESTERN SYDNEY SEWERAGE SCHEME DOUBLE ENTRY REFER TO PROJECT ID2211627
Between Liverpool & Ashfield, ., NSW 2999 Has South Western Sydney Sewerage Scheme Double Entry Refer To Project Id2211627 currently at Early Planning stage. Construction of a new pipeline between Liverpool & Ashfield Click for more details...

WESTERN SYDNEY RECYCLED WATER INITATIVE - REPLACEMENT FLOWS PROJECT
Currently at the Construction stage In Penrith is a project estimated to be $ 265000000. This project The Western Sydney Recycled Water Initiative - Replacement Flows Project, involves interconnection of three existing sewage treatment plants and treating the available effluent from these plants via a new advanced water treatment plant to replace the water that is currently released from Warragamba Dam for extraction and river health purposes. The project involves the construction and operation of the following key components: an advanced water treatment plant at St Marys sewage treatment plant; effluent transfer pipelines from Quakers Hill, Penrith and St Marys sewage treatment plants to the advanced water treatment plant; a brine transfer pipeline and pumping station for the transfer of brine from the advanced water treatment plant to a storage pond at Quakers Hill sewage treatment plant. This will connect with a pipeline which will transfer brine from the pond to the Northern Suburbs Ocean Outfall Sewer (NSOOS); balance storage tanks and effluent pumping stations at Penrith, Quakers Hill and St Marys sewage treatment plants; a recycled water pipeline for the transfer of treated recycled water (replacement flow) produced by the advanced water treatment plant to Penrith sewage treatment plant. The replacement flow is proposed to be discharged via the existing effluent outlet into Boundary Creek, which discharges into the Hawkesbury-Nepean River below Penrith Weir. Click for more details...

COLLARENEBRAI W & S
Pipeline - Upgrade project at Collarenebri, Collarenebri, NSW 2833 In The Council Area Of Walgett of State. Scope of work includes: supply & delivery of all materials, plant, equipment & labour for the completion of the upgrading of approximately 875 meters of raw water main pipeline. The works involve upgrading the existing DN40 PE raw water pipeline by installing new DN100 uPVC pipeline. The will include installation of new pipework & fittings, including insulation of air valve & hydrants, connection to the existing raw water main at both ends & other miscellaneous works. Click for more details...

AGL GAS PIPELINES
New project of Civil Engineering (Pipelines) project at Mackey Park, 1 Richardson Cr, Marrickville, NSW 2204. Installation of a 60 metre x 500mm steel gas main & connection to existing gas main. Installation of 150mm bypass line, pipe gauge receiver connection, pit & hardstand. Installation of safety valve & surround structure. Horizontal directional drilling under Cooks River. Installation of storage shed. Click for more details...

SYDNEY SEAWATER DESALINATION PLANT INFRASTRUCTURE
Currently at the Construction stage In Various is a project estimated to be $ 450000000. This project Construction of the water delivery pipeline for Sydney's desalination plant. The 18 kilometre pipeline will carry desalinated water from the Kurnell plant to the City Water Tunnel at Erskineville. The pipeline will run from Kurnell across Botany Bay & will pass through Kyeemagh, Tempe, St Peters, Alexandria & Erskineville Click for more details...

CUMBERLAND COUNTRY GOLF COURSE IRRIGATION PIPELINE
Civil Engineering (Pipelines) project at 246-248 Old Prospect Rd & other properties, Greystanes, NSW 2145 of Pipeline type of New development. Installation of 100mm irrigation pipeline & associated works within Lower Prospect Canal Reserve & other properties for the purpose of transporting irrigation water from an existing acquifier in the Boral Quarry to the Cumberland Country Golf Course. Connection points for branch lines to Gipps Rd Sporting Complex & Greystanes Sportsground via Hyland Rd & Bolaro Ave respectively are provided. Header tanks & a pumping station will be installed on Boral's property adjacent to the canal reserve Click for more details...

WESTERN SYDNEY RECYCLED WATER INITATIVE - REPLACEMENT FLOWS PROJECT
Consultancy For Contract Management Services project at Lot 1 Links Rd (DP223888, DP31810 & DP803832), St Marys, NSW 2760 in the Civil Engineering (Pipelines). The Project involves the construction and operation of an Advanced Water Treatment Plant (AWTP) and associated works. Existing tertiary effluent from St Marys, Penrith and Quakers Hill STPs will be transferred to and treated at an AWTP located at St Marys, producing up to 50 million litres per day of highly treated recycled water. The recycled water will be substituted, as replacement flows, for water that is currently released from Warragamba Dam for extraction and river health purposes. Click for more details...

COASTAL CARRIER SYSTEM
Local Govt ownership Civil Engineering (Pipelines) project In The Gosford Council Area for New development. Coastal Carrier System augmentation. Rehabilitate the major wastewater transfer system servicing Forresters Beach, Wamberal, Terrigal, North Avoca, Avoca & Kincumber. Construction of 6.5 kilometres of pipelines between North Avoca, Avoca & Kincumber to carry additional wstewater to Kincumber Wastewater Treatment Plant. The major wastewater pump stations at North Avoca & Kincumber will be revamped to improve the transport of wastewater to the treatment plant. We will also upgrade 2 minor pump stations in Avoca. Click for more details...

CAMELLIA & ROSEHILL RECYCLED WATER PROJECT
Camellia & Rosehill Recycled Water Project is currently at the Construction stage, valued at about $ 100000000 it is Construction & operation of recycled water scheme including a recycled water treatment plant, storage reservoirs, pumping stations. Pipeline connection to the Liverpool to Ashfield pipeline (LAP) ? the source of feed effluent for the recycled water treatment process. Distribution system including: an elevated surface reservoir at Woodville Golf Course on Barbers Road, Guildford & 2 surface reservoirs & 1 pumping station on the south-eastern corner of Durham Street & Grand Avenue, Rosehill. Approximately 20 kilometres of distribution pipeline. Click for more details...

WARRAGAMBA PIPELINE PAINTING
Civil Engineering (Pipelines) project at between Mamre & Ferrers Rd, Horsley Park, NSW 2164 of Pipeline - Painting type of New development. Scope of work includes: Sections of Pipeline No 1 & 2 between Mamre Rd & Ferrers Rd involves the repainting of pipeline, associated valves & structures. These works include but are not limited to: preparation of management plans; clearing of vegetation under the pipeline; removal of silt under the pipeline to make clearance for painting if required; preparation of pipelines including air valves, scour pipes, rocker plate assemblies & tie rods for painting; corrosion repairs to the pipelines & associated steel structures; repair of all anchor block penetrations after corrosion repairs have been completed & painting of pipelines including air valves, scour pipes, rocker plate assemblies & tie rods Click for more details...

ILUKA EBB TIDE RIVER RELEASE
Ebb Tide Release System project at Johnson St, Iluka, NSW 2466 in the Civil Engineering (Pipelines). Project will involve horizontal drilling & marine works for the Iluka Sewerage System to allow discretionary discharge to the Clarence River near Moriarty's Wall. Work comprises Connection to the recycled water transfer main (to be constructed by others) & extension of that main to the shoreline entry point of the submarine pipeline. A submarine pipeline by trenchless technology such as Horizontal directional drill (HDD) from the shoreline entry point to the diffuser location on the bed of the Clarence River. Diffuser structure including foundation, supporting & protective structures, pipework & fittings on the bed of the Clarence River. Appurtenances such as navigational marker buoy, marker posts, thrust block & related items. Click for more details...

MARSTEL TERMINALS BULK LIQUIDS STORAGE FACILITY
Civil Engineering (Pipelines) project at Lots 1 & 2 western end of former BHP steelworks site, Mayfield, NSW 2304 of Bulk Liquids Storage Facility type of New development. Development and operation of a bulk liquid fuel storage facility, comprising development of a tank farm with capacity to store diesel and biodiesel liquid fuel products; use of an existing ship berthing facility (Berth M4) to receive diesel fuel by sea; development of a pipeline to transport diesel fuel from this berthing facility to the tank farm; use of the existing road network to receive biofuels and to dispatch diesel and biodiesel; and development of ancillary services and infrastructure, including internal roads. excavation of areas for tank foundations; construction of reinforced concrete bund walls; preparation of the bund floor (excavation, backfilling with crushed rock, installation of liner, additional backfilling with crushed rock and priming/sealing); installation and diversion of services and infrastructure, including stormwater drainage lines; construction of internal roadways (excavation, compacting of road base; pouring of concrete pavement (reinforced) for main driveway; construction of a pipeline on existing supports to transfer materials between the berth and the storage facility; and - construction vehicle movements. Much of the material would be prefabricated and installed on site, particularly fuel facility components, thereby minimising the construction activities required on site. Proposed site structures include: 3 x diesel storage tanks (38 m diameter and 18 m high); 1 x biodiesel storage tank (8 m diameter and 12 m high); 1 x additive tank (3 m diameter x 6 m long); 1 x slops tank (2.6 m diameter x 4.5 m long); office and amenities (16 m x 9 m and 4 m high); truck loading gantry (33.5 m x 16.5 m and 6.5 m high); fire water storage tank (10.5 m diameter and 8.5 m high); firepump building (15.5 m x 5 m and 5.5 m high); workshop and MCC (10 m x 9 m and 5 m high). Click for more details...

FLOWERDALE AUGMENTATION
Currently at the Construction stage In Wagga Wagga is a project estimated to be $ 3000000. This project The design, construction & commissioning of a duplicate rising main to supplement the existing asbestos cement pipeline from the Flowerdale ump station to the Narrung Street Sewage Treatment Plant. Council?s reference design is a 3km (approx), DN450 duplicate rising main, including interconnections between the existing & new rising mains. Design, construction & commissioning of an effluent reuse (recycled water) pipeline from the Flowerdale PS to the Narrung Street STP. Council?s reference design is a 3km (approx), DN250 PE 16 reuse pipeline. Design, construction & commissioning of the augmentation of the Flowerdale PS, including auxiliary works such as pad-mounted power supply the removal of an existing pole-mounted transformer. The design, construction & commissioning of the effluent reuse pipeline is only an option at this stage & Council reserves the right to exclude it from the Project prior Click for more details...

MIRIAM SEWAGE PUMP STATION & PIPELINES
Currently at the Construction stage In Dubbo is a project estimated to be $ 4554000. This project Scope of works under this Contract consists of 3 Separable Portions. Separable Portion 1 (SP1) - Construction of Miriam SPS; the work includes supply & installation of two submersible Flygt Pumps (each 45 kW) mechanical electrical equipment, switchboards, telemetry, consumer mains ,connection to the local Authorities power supply, commissioning with potable water. Separable Portion 2 (SP2) - Construction of discharge rising main & gravity sewerage pipelines which consists of approximately 2019 metres of MDPE PN16 PE80 DN225 mm rising main inclusive of connection to existing sewer manhole & valve pit. Approximately 344 metres of DN225 mm PN6 PVC gravity sewer mains inclusive of 7 new manholes and 2 interception manholes. Approximately 805 metres of DN150 PN6 PVC gravity sewer mains inclusive of 17 new manholes & an under bore of railway between MH9 and MH8. The work includes testing & commissioning of the pipelines. Separable Portion 3 (SP3) - Construction by appropriate trenchless technology,approximately 546 metres of DN300 mm PN16 HDPE gravity pipelines inclusive of 6 new manholes. SP3 includes interconnection at MH22 and MH23.; works are at an average depth of 7.5m; the work also includes testing, commissioning. Click for more details...

EMU PLAINS PRIMARY MAINS EXTENSION
Civil Engineering (Pipelines) project at between Penrith &, Emu Plains, NSW 2750 of Gasline - Extn type of New development. The primary mains pipeline is approximately 3 kilometres in length & involves pipe laying, horizontal directional drilling across the Nepean River & a number of directional bores under creeks and rail lines. Work also includes the fabrication & installation of a pig receiving facility at the new Emu Plains Primary Regulating Station. Click for more details...

PORT BOTANY BLB2 TERMINAL
Civil Engineering (Pipelines) project at Fishburn Rd, Port Botany, NSW 2036 of Bulk Liquid Terminal type of New development. The BLB2 project comprises construction of a steel piled pier berth adjacent to the existing BLB1. Associated infrastructure such as marine loading arms, fire fighting equipment, onshore support facilities & pipelines from existing user sites to the new berth. BLB2 has been designed to accommodate 120,000 dead weight tonne vessels to a maximum of 270m length overall Click for more details...

CALTEX JET FUEL PIPELINE
Caltex Jet Fuel Pipeline is currently at the Construction stage, valued at about $ 24000000 it is Jet fuel pipeline upgrade. Project comprises work at both Kurnell Refinery & Banksmeadow Terminal. Works within the Kurnell Refinery includes: installation of 2 transfer pumps; installation of 2 coalescer filters & associated instruments; installation, modification & replacement of various valves, discharge piping & a flow control loop; installation of a pigging station to be located at the new pumps; replacement of the turbine flow meter; installation of cabling for the pumps, motors valves. Installation of the new jet fuel pipeline (KBL) from the proposed pumps to the edge of the refinery at gate 5; from here the new KBL would be installed close to the route of the existing KBL; the KBL would be installed along the wharf, up to the tie in point before the pipe submerges beneath Botany Bay. The works within Banksmeadow Terminal includes: installation of 2 booster pumps; installation of one coalescer filter & associated instruments; installation of 2 new variable speed pump drives; installation of motorised & isolation valves; modifications to booster pump suction & discharge pipework; installation of a power supply for the pumps & valves including an extension of the 11kV panel; modifications of the pigging stations & upgrading of the branch line into Banksmeadow to enable stripping transfers from Kurnell to Banksmeadow Click for more details...

SECONDARY STEEL MAINS
Steel Mains - Extns project at various locations throughout NSW, ., NSW 2999 in the Civil Engineering (Pipelines). Construction of 8 new secondary steel main 1050kPa extension constructed to AS 4645 at the following locations: Gosford - The Entrance; Oran Park; Orange; Dapto/Koonawarra; Glenmore Park; Griffith; Rouse Hill & Pemulwuy (Greystanes). The combined pipe quantities for the secondary steel mains extensions is approximately 11435 metres of 150mm secondary steel pipe, 10900 metres of 200mm secondary steel pipe, 600 metres of 160mm PE, installation of 7 Cocon regulators & 1 secondary meter set. Click for more details...

ALBURY RENEWABLE ENERGY FACILITY
Albury Renewable Energy Facility is currently at the Construction stage, valued at about $ 1850000 it is The project will be constructed on a hardstand area within the landfill boundary. The hardstand area will be approximately 27sq m x 25sq m. The Facility will comprises of 2 generator modules, 1 control room (including lunch room & toilet facilities), 1 storage container (20 foot lockable shipping container), ring main unit for connecting of the high voltage cabling. A covered & bunded storage area & pipework to deliver gas collected from the landfill. Construction works will be limited to excavation, preparations & pouring of concrete support structures for the generator module, control room, storage bund, storage container & safety shower. Pouring concrete paths & steps. Placing the necessary plant & equipment onto the concrete support structures. Connecting the existing landfill gas system to the AREF fuel supply line. Installing a sanitary septic system. Erection of a 2m high security fence. Carparking Click for more details...

MURRAY-DARLING BASIN
Stock/Domestic Water Reticulation Systems project at Murray Darling Basin, ., NSW 2999 In The Council Area Of Various of State. Scope of works may include combinations of pump stations, bores, piped reticulation systems, stock watering points, electrical controls and telemetry. The extent of reticulation systems may vary from about 20km to several hundred kilometres in total. Installation & construction of stock and domestic water supply reticulation system. Installation &/or construction of pipelines, valves, tanks, troughs and all associated equipment to ensure efficient operation & supply Click for more details...

MURRAY-DARLING BASIN
Murray Darling Basin, ., NSW 2999 Has Murray-Darling Basin currently at Planning stage. Scope of works may include combinations of pump stations, bores, piped reticulation systems, stock watering points, electrical controls & telemetry. The extent of reticulation systems may vary from about 20km to several hundred kilometres in total. Installation &/or construction of pipelines, valves, tanks, troughs & all associated equipment to ensure efficient operation & supply Click for more details...

JORDAN SPRINGS INFRASTRUCTURE
Jordan Springs Infrastructure is currently at the Construction stage, valued at about $ 4800000 it is Proposed infrastructure to comprise a gravity sewer pipeline which connects into the sewerage reticulation network for the Western Precinct & conveys sewage approx 1.45 kms where it will connect with Sydney Waters existing Werrington Carrier in the Central Precinct Click for more details...

MUNGYER WATER EFFIENCY SCHEME
Pipelines/Drainage New project In The Moree Plains Council Area. Mungyer Water Efficiency Scheme. Scope of work includes but not limited to: supply, install & maintain site water, sewer, phone & electricity for duration of contract. Supply, install, maintain & clean site accommodation, sanitation & other ancillary facilities. Construct & maintain access required to complete the works. Design, construct, maintain & removal of all temporary works to complete the works. Construct, maintain & removal of temporary security fencing where required. Boreheadworks ? supply & installation of pipework, fittings, valves & meters. Pipeline ? supply & installation of polyethylene pipe, including all necessary fittings, valves & tees. Supply & installation of water storage tanks, at various sites, including foundation preparation and inlet & outlet fittings. Click for more details...

NEARGO 2 WATER EFFICIENCY SCHEME
Civil Engineering (Pipelines) project at 70kms west of, Moree, NSW 2400 for New. Neargo 2 Water Efficiency Scheme. Scope of work includes but not limited to: supply, install & maintain site water, sewer, phone & electricity for duration of contract. Supply, install, maintain & clean site accommodation, sanitation & other ancillary facilities. Construct & maintain access required to complete the works. Design, construct, maintain & removal of all temporary works to complete the works. Construct, maintain & removal of temporary security fencing where required. Boreheadworks - supply & installation of pipework, fittings, valves & meters. Pipeline - supply & installation of polyethylene pipe, including all necessary fittings, valves & tees. Supply & installation of water storage tanks, at various sites, including foundation preparation and inlet & outlet fittings Click for more details...

UPPER HUNTER SHIRE WATER MAIN WORKS
New project of Civil Engineering (Pipelines) project at Various locations in, Aberdeen, NSW 2336. Replacement, installation & upgrades to several sections of watermains throughout the Upper Hunter municipality, including St Aubins & Main Sts in Scone, Gordon to St Hilliers Sts in Aberdeen and Mayne St in Murrurundi. Water mains will be of class 16 PVC-M, spigot & socket, rubber ring jointed pipe, with all fittings of cast or ductile iron, cement-lined. Water services shall be of single service drawn copper pipe. Click for more details...

ALEX AVENUE
Civil Engineering (Pipelines) project at Alex Ave, Schofields, NSW 2762 for New. The scope of work includes: laying 20m of DN100 SCL concrete encases water main. Laying 25m of DN100 oPVC PN16 water main. Associated adjustments. Click for more details...