DENMAN WATER SUPPLY
Civil Engineering (Pipelines) project In The Muswellbrook Council Area of Local Govt ownership. Augmentation of Denman Water Supply stage 2. Construction of new river intake structure & a high lift submersible pump station. Click for more details...

BROKE WATER SUPPLY
Civil Engineering (Pipelines) project In The Singleton Council Area of Water Supply Pipeline type. Extension of water supply to Broke township. Click for more details...

JERRABOMBERRA WATER MAIN
Civil Engineering (Pipelines) project In The Queanbeyan Council Area of Water Main - Augmentation type. Augmentation of the water main system in Jerrabomberra. The project involves installation of 3.2 km of new DICL water mains in Jerrabomberra. These will range in size from 100mm to 450mm. Click for more details...

BUNDANOON SEWERAGE AUGMENTATION
Bundanoon Sewerage Augmentation is currently at the Early Planning stage, valued at about $ 3000000 it is Proposed upgrading of the Bundanoon sewerage system including a new aeration tank, chemical phosphorous removal facilities, tertiary filtration & ultraviolet light disinfection. Provision of an effluent storage & pipeline to allow reuse of approximately 40% of the effluent volume estimated to be produced in 2031. Release of the excess higher quality effluent into Reedy Creek. Click for more details...

EPA MINOR CIVIL WORKS
various btwn Camden & Windsor, ., NSW 2999 Has Epa Minor Civil Works currently at Tenders & Building stage. Installation/construction of various nutrient reduction measures in western Sydney between Camden & Windsor. Typical work requires small dam construction, trenched pipe installation, concreting, minor electrical installation & pump installation. Click for more details...

WATERSIDE GREEN
Waterside Green is currently at the Planning stage, valued at about $ 20000000 it is Construction of Lakes 1 to 5 interconnected & to run in a northerly direction through the site. Work includes rehabilitation of wetland, associated lateral water bodies, earthworks, mechanical infrastructure, landscaping & macrophyte planting. Aeration & water reticulation structures & equipment will be installed together with gross pollutant traps at inlets to lakes. 19 lakes, landscaping soft & Hard. Click for more details...

TOWRADGI CREEK PEDESTRIAN BRIDGE
Civil Engineering (Pipelines) project at from Towradgi Park to Lake Pde,, Towradgi, NSW 2518 of Bridge/Pipeline type of New development. Reconstruction of pedestrian bridge, construction of a waste water pipeline under the western edge of the footbridge. Click for more details...

MURRUMBIDGEE IRRIGATION
Currently at the Construction stage In Griffith is a project estimated to be $ 700000. This project Construction of pressurised pipeline systems for supply of irrigation water. Work includes: Lateral 16 System pump station & approximately 2.2 km of pipeline ranging up to 450 22 dia (M1031); lateral 13a system & approximately 1.1km of pressurised pipeline ranging up to 375 mm dia. (M1032). Click for more details...

SHANNON CREEK STORAGE FACILITY & ASSOCIATED WORKS
New project of Civil Engineering (Pipelines) project at Shannon Creek 9 km west of, Coutts Crossing, NSW 2460. 30,000 megalitre dam, pump stations, pipelines, roads and electrical sub-stations. Work includes construction of storage embankment & associated intake works, spillway & destratification system, pumping station, pipeworks, telecommunications & power & access road to storage site. The dam wall will be 47 m high & 400 m long with widths varying from 6 m at top of wall to 270 m at base. Click for more details...

TAREE & WINGHAM EFFLUENT MANAGEMENT SCHEMES
State ownership Civil Engineering (Pipelines) project In The Various Council Area for New development. Construction of Taree & Wingham Effluent Management Schemes. The work includes pumping stations, pipelines, storage dams etc. Click for more details...

MILTON/ULLADULLA SEWERAGE AUGMENTATION
Civil Engineering (Pipelines) project In The Shoalhaven Council Area of Local Govt ownership. Design development & construction of sewage treatment plant, sewage pumping station U6, pipelines & ocean releade extension. Click for more details...

GRAYS HILL TO MANILDRA PIPELINE
Currently at the Tenders & Building stage In Cabonne is a project estimated to be $ 740000. This project Construction of new pipeline. Click for more details...

SINGLETON DRAINAGE WORKS
Singleton Drainage Works is currently at the Construction stage, valued at about $ 1375000 it is Stormwater drainage system, upgrading of existing pipe network, installation of Caisson infiltration structures. Click for more details...

CESSNOCK SEWERAGE TREATMENT PLANT
A project in the NSW Within Cessnock. The establishment of a tertiary treatment plant & associated equipment to remove algal cells, other suspended solids, soluble phosphorus & faecal coliforms from the effluent discharged from the existing maturation ponds. Tertiary treatment will enable the plant to comply with suspended solids, algal cell, faecal coliform & phosphorus requirements. The work required under the contract includes: completion of detailed design (as the Contract nominates some equipment & designs); construction; testing, commissioning & process proving; provison of work as executed information, operation & maintenance manuals, & operator training. Design & construction is required for the following: pond pumping station. Pipework & headwalls to enable recirculation of final pond effluent to pond one. 12 ML/day tertiary flotation plant (DAF, IAF or DAF/IAF Hybrid), including polymer dosing system. Dosing pumps & pipework to allow transfer of chemical from the existing chemical dosing facility to the tertiary flotation plant. Approx 455m of sludge return pipeline, sludge lances & sludge storage tank. UV disinfection cell. Effluent quality sampling & flow monitoring infrastructure for EPA licence data collection. building/enclosure. Approx 325m of DN200 reclaimed water pipeline including a 10kL storage tank & duty pump. Approx 525m extension of DN80 watermain & installation of RPZD & flowmeter. Electrical works including conduits & electrical pits. Associated process instrumentation & control equipment including PLC/SCADA control. Site runoff & sediment control. Construction only of the following is required: 2 reinforced concrete causeways between maturation ponds. Approx 240m of pond wall rehabilitation (Type 1: Reno Mattress or Type 2: Rip Rap). Approx 1820 sq m of access road for the tertiary treatment plant. Click for more details...

TABOURIE LAKE SEWERAGE SCHEME
Civil Engineering (Pipelines) project at from Burrill Lake to, Tabourie Lake, NSW 2539 for New. Scope of works includes construction of a sewer main from Tabourie Lake Village to the sewage pumping station SPS A including Tabourie Lake bridge crossing; construction of the sewage pumping station SPS A including all necessary infrastructure; construction of chemical dosing facilities at the sewage pumping station; construction of deodorisation bed frailties at the sewage pumping station; construciton of pressure/gravity main from sewage pumping station to Burrill Lake; Telemetry; completion of any design not completed; all necessary connection to existing infrastructures; any ancillary work required for a complete operating system; documentation including designs, Environmental Management Plan, Project OHS Management Plan, WAE drawings, QA documentation and Operations and Maintenance Manuals for the works; Provide video records of construction; testing, demonstration and commissioning of works; training of Shoalhaven Water Operators Click for more details...

ORICA BOTANY GROUNDWATER REMEDIATION
Orica Botany Groundwater Remediation is currently at the Planning stage, valued at about $ 5000000 it is Installation of approximately 40 wells, construction of underground pipeline, installation of permanent power supply for the extraction wells. Click for more details...

GUNNEDAH COUNCIL AREA SEWER PIPELINES
Sewer Pipelines - Rehabilitation project at various within Gunnedah Shire Council areas, Gunnedah, NSW 2380 In The Council Area Of Gunnedah of Local Govt. Rehabilitation of sewer mains, installation of of structural liners within the existing sewer mains. Click for more details...

BEGA VALLEY SEWERAGE TREATMENT PLANT
Wolumia Village, Bega, NSW 2550 Has Bega Valley Sewerage Treatment Plant currently at Planning stage. Construction of a sewerage treatment plant to service the Wolumia Village, sewerage reticulation system, reuse of treated wastewater to irrigate the Recreation Reserve with surplus water to be piped to an existing water storage facility. Click for more details...

SOUTH NOWRA TRUNK MAIN
Pipeline New project In The Shoalhaven Council Area. Proposed construction of approximately 910 metres of 200 mm diameter water trunk main. Click for more details...

SHOALHAVEN DAM TO WARRAGAMBA DAM
New project of Civil Engineering (Pipelines) project at from Shoalhaven River to, Warragamba, NSW 2752. Proposed construction of a 170 km water pipeline from the Shoalhaven River & Tallowa Dam to to Yass across the Great Dividing Range & pumping up to 300 billion litres of water a year inland Click for more details...

WATANOBBI/WARNERVALE ROADWORKS & PIPELINE - REFER TO ID 2205687
Civil Engineering (Pipelines) project In The Wyong Council Area of Local Govt ownership. Proposed construction of a link road & construction of a watermain from Mardi Dam to Sparks Rd, Warnervale. Click for more details...

NEW BRIGHTON GOLF CLUB DAM UPGRADE
A project in the NSW Within Liverpool. Proposed upgrade of existing dam & construction of a new irrigation dam & artificial wetland. Click for more details...

MUNMORAH GAS TURBINE FACILITY
Gas Turbine Facility project at Part Lot 61 DP1065038, Doyalson, NSW 2262 in the Civil Engineering (Pipelines). Proposed construction of a gas turbine facility to be built on the site of the existing Munmorah Power Station. The proposed development would include: four gas turbines with a combined power output of approximately 600MV; a back-start generator; distillate fuel & demineralised water storages; a gas compressor; an evaporative air cooling unit; and a gas supply pipeline. The open-cycle gas turbine facility and lateral gas pipeline would connect the gas turbine facility to the Sydney-Newcastle gas pipeline. The gas turbine facility would be operated as a peak-load power station, supplying electricity at short notice during periods of peak power demand. Power from the gas turbine facility would enter the grid via a new dedicated bay to be constructed adjacent to the existing switchyard. Click for more details...

BUNGUNYAH-KORALEIGH IRRIGATION TRUST PIPELINE
Bungunyah - Koraleigh, Koraleigh, NSW 2735 Has Bungunyah-Koraleigh Irrigation Trust Pipeline currently at Planning stage. Preparation of an Irrigation District Business Plan. The Business Plan will be used by the Department of Infrastructure, Planning & Natural Resources & the Bungunyah-Koraleigh Irrigation Trust to determine if it is economically viable to proceed to undertake the upgrading of the Irrigation Delivery System to a piped system & if it is possible to make the expected water savings. Click for more details...

WORRIGEE DRAINAGE
Drainage project at Worrigee Rd, Worrigee, NSW 2540 in the Civil Engineering (Pipelines). Swale diversion drain & piping of open drain. Click for more details...

MINCHINBURY/EASTERN CREEK RESERVOIR
Civil Engineering (Pipelines) project at off Wonderland Drive, Eastern Creek, NSW 2766 of Steel Reservoir type of New development. Supply, construct & commisssion the new 40ml steel water reservoir & associated pipe work & valves in accordance with the design drawings. Click for more details...

CONTINENTAL CARBON PLANT
Civil Engineering (Pipelines) project In The Sutherland Council Area of Private ownership. The proposed development involves alterations & additions to an existing carbon black plant and construction of an additional high pressure pipeline to provide heat and steam to the adjacent Caltex oil refinery. The proposal involves installation of new equipment including a waste gas boiler, bag filters & drying drum. In conjunction with the installation of the new equipment, it is proposed to incorporate some minor additions to the existing manufacturing building, to house the new equipment. In addition, it is proposed to duplicate the high pressure steam pipeline between the Continental carbon site and the Caltex oil refinery. Click for more details...

TOMAGO TRUNKMAIN UPGRADE OVER ASH ISLAND
Currently at the Construction stage In Newcastle is a project estimated to be $ 7000000. This project The project involves the decommissioning and replacement of an existing underground 900mm water trunkmain (DN 900) with a new 1350mm underground trunkmain (DN 1350) along approximately 3k of Ash Island. The project site is comprised of: construction zone ? a 20 metre corridor along the three km length of the trunkmain, and a site compound area (approximately 13.61 hectares within the City Farm area managed by the Kooragang Wetland Rehabilitation Project). The compound area consists of the ASS remediation and disposal area, a site office and soil stockpiling area; and disturbance zone ? a 15 metre corridor located within the construction zone west from Ramsar Road, which includes the centreline of the proposed route and the proposed vegetation clearance area required for construction. The construction zone would be delineated and temporarily fenced during the construction period so as to confine construction activities within the designated area. The zone does not pass through the Kooragang Nature Reserve (KNR, now known as Hunter Wetlands National Park) but lies 10-15 m from the KNR boundary in the northern section and 20-30 m from the KNR boundary in the southern section of the proposed route. The proposal would involve disturbance of a total area of 18.64 ha (5.03 ha within the disturbance zone and 13.61 ha within the compound area), the majority of which is cleared pasture/grassland. Only one ha of this is SEPP 14 wetland areas. The Proponent proposes to rehabilitate and restore all areas impacted during construction, including areas adjacent to the construction zone. Click for more details...

NEPEAN RIVER PUMP AND PIPELINE
Civil Engineering (Pipelines) project In The Penrith Council Area of Private ownership. The proposal involves the construction and operation of a pump and pipeline to extract water from the Nepean River to facilitate the initial filling and long term water supply of the Penrith lakes. The intake structure and pipework will comprise twin 630mm diameter pipelines submerged in a minimum of 2 metres of water beneath the riverbed of the Nepean River. the pump station will be built into the eastern bank of the Nepean River approx 110 metres upstream of the Penrith weir. The pump station will be constructed below ground with the roof structure and the wall adjacent to the Nepean River the only parts visible above ground. The control building will be co-located with the existing public amenity building to the west of existing carpark. The control building will be approx 75sq m in area. A constructed wetland and quarantine lake will comprise 2 components of a multiple barrier approach that the Nepean River water will pass through prior to being discharged into the scheme. Click for more details...

WOLLONGONG SEWAGE TREATMENT PLANT
Wollongong Sewage Treatment Plant is currently at the Construction stage, valued at about $ 3400000 it is Construction of a recycled water plant at Wollongong STP consisting of UV plant & Chlorine Contact Tank plus delivery pipelines. Click for more details...

MANILDRA PARK BULK LIQUIDS STORAGE & BIODIESEL PRODUCTION FACILITY
Currently at the Construction stage In Newcastle is a project estimated to be $ 32000000. This project Construction and operation of a marine fuel storage and distribution, and biodiesel production facility and associated infrastructure. The proposal will be undertaken in 3 distinct phases. Phase 1 involves refurbishing the 2 existing storage tanks, construction of pipeline & operating fuel receival & distribution facilities at the berth, construction of a road tanker loading bay & construction of amenities & service buildings. Under this phase the storage capacity is approx 51 ML. Phase 2 involves the construction of 3 additional fuel storage tanks. Associated with the increased storage capacity, is an increase in distribution volumes to service local land based bulk diesel users. Under this phase, the storage capacity is increased by approx 9 ML, taking the total storage capacity to approx 60 ML. Phase 3 involves the construction of a biodiesel production facility with a production capacity of approx 60 ML per year. The distribution of biodiesel will utilise the marine & road distribution infrastructure constructed as part of Phase 1. Under this phase, the construction of a 5 ML tank increases the total storage capacity to approx 65 ML. Click for more details...

GUNNEDAH BASIN GAS PIPELINE PROJECT
Narrabi to Wilga Park Power Station, ., NSW 2999 Has Gunnedah Basin Gas Pipeline Project currently at Construction stage. A high pressure gas transmission pipeline to be constructed from the Narrabi to Wilga Power Station. Click for more details...

BACKWASH WATER PIPELINE
Civil Engineering (Pipelines) New project at ., Dubbo, NSW 2830. This type is Pipeline with Local Govt ownership. Supply & construction of a 2.9 kilometre PVC pipeline, comprising 445m of 200mm diameter, 1477mm of 150mm diameter, 642m of 100mm diameter & 346mm of 80mm diameter. (Tenderers are not to rely on these quantities, but are to determine quantities for themselves) Click for more details...

CAMELLIA & ROSEHILL RECYCLED WATER PROJECT
Camellia & Rosehill Recycled Water Project is currently at the Construction stage, valued at about $ 100000000 it is Construction & operation of recycled water scheme including a recycled water treatment plant, storage reservoirs, pumping stations. Pipeline connection to the Liverpool to Ashfield pipeline (LAP) ? the source of feed effluent for the recycled water treatment process. Distribution system including: an elevated surface reservoir at Woodville Golf Course on Barbers Road, Guildford & 2 surface reservoirs & 1 pumping station on the south-eastern corner of Durham Street & Grand Avenue, Rosehill. Approximately 20 kilometres of distribution pipeline. Click for more details...

TAREE & WINGHAM EFFLUENT MANAGEMENT SCHEMES
Civil Engineering (Pipelines) project at within the Taree area, Taree, NSW 2430 of On Farm Irrigation Pipelines - Stage 2 type of New development. Stage 2 consists of 7 rural properties. Click for more details...

HIGHLANDS SOURCE PROJECT
Civil Engineering (Pipelines) project at ., Goulburn, NSW 2580 for New. Construction of 81 kilometres of DN300/375 DICL trunk water main located between Wingecarribee Reservoir & the Goulburn Water Treatment Plant & associated pump station & ancillary works. The project is to secure a sustainable water supply for the City of Goulburn by providing initally 5ML/day of raw water from the Wingecarribee Reservoir. The pipeline capacity will be 7.5ML/day to enable future augmentations Click for more details...

MARSTEL TERMINALS BULK LIQUIDS STORAGE FACILITY
Civil Engineering (Pipelines) project at Lots 1 & 2 western end of former BHP steelworks site, Mayfield, NSW 2304 of Bulk Liquids Storage Facility type of New development. Development and operation of a bulk liquid fuel storage facility, comprising development of a tank farm with capacity to store diesel and biodiesel liquid fuel products; use of an existing ship berthing facility (Berth M4) to receive diesel fuel by sea; development of a pipeline to transport diesel fuel from this berthing facility to the tank farm; use of the existing road network to receive biofuels and to dispatch diesel and biodiesel; and development of ancillary services and infrastructure, including internal roads. excavation of areas for tank foundations; construction of reinforced concrete bund walls; preparation of the bund floor (excavation, backfilling with crushed rock, installation of liner, additional backfilling with crushed rock and priming/sealing); installation and diversion of services and infrastructure, including stormwater drainage lines; construction of internal roadways (excavation, compacting of road base; pouring of concrete pavement (reinforced) for main driveway; construction of a pipeline on existing supports to transfer materials between the berth and the storage facility; and - construction vehicle movements. Much of the material would be prefabricated and installed on site, particularly fuel facility components, thereby minimising the construction activities required on site. Proposed site structures include: 3 x diesel storage tanks (38 m diameter and 18 m high); 1 x biodiesel storage tank (8 m diameter and 12 m high); 1 x additive tank (3 m diameter x 6 m long); 1 x slops tank (2.6 m diameter x 4.5 m long); office and amenities (16 m x 9 m and 4 m high); truck loading gantry (33.5 m x 16.5 m and 6.5 m high); fire water storage tank (10.5 m diameter and 8.5 m high); firepump building (15.5 m x 5 m and 5.5 m high); workshop and MCC (10 m x 9 m and 5 m high). Click for more details...

EMU PLAINS PRIMARY MAINS EXTENSION
Civil Engineering (Pipelines) project at between Penrith &, Emu Plains, NSW 2750 of Gasline - Extn type of New development. The primary mains pipeline is approximately 3 kilometres in length & involves pipe laying, horizontal directional drilling across the Nepean River & a number of directional bores under creeks and rail lines. Work also includes the fabrication & installation of a pig receiving facility at the new Emu Plains Primary Regulating Station. Click for more details...

NORTH WEST GROWTH CENTRE - PACKAGE 2
State ownership Civil Engineering (Pipelines) project In The Various Council Area for New development. Construction & operation of drinking water & wastewater infrastructure to service the North West Growth Centre second release precincts (Box Hill, Box Hill Industrial & Schofields). Construction of new trunk lines for drinking water & wastewater. New pumping station. New reservoir site. Drinking water will comprises approximately 14 km of pipelines; 2 x storage reservoirs, including one surface reservoir & one elevated reservoir (Box Hill Reservoir); 2 x water pumping stations (Nelson Water Pumping Station & Box Hill Reservoir) & ancillary works. Wastewater infrastructure comprises approximately 10 km of pipelines to transfer wastewater to Riverstone Wastewater Treatment Plant and Rouse Hill Water Recycling plant & ancillary works Click for more details...

PORT BOTANY BLB2 TERMINAL
Civil Engineering (Pipelines) project at Fishburn Rd, Port Botany, NSW 2036 of Bulk Liquid Terminal type of New development. The BLB2 project comprises construction of a steel piled pier berth adjacent to the existing BLB1. Associated infrastructure such as marine loading arms, fire fighting equipment, onshore support facilities & pipelines from existing user sites to the new berth. BLB2 has been designed to accommodate 120,000 dead weight tonne vessels to a maximum of 270m length overall Click for more details...

SECONDARY STEEL MAINS
Steel Mains - Extns project at various locations throughout NSW, ., NSW 2999 in the Civil Engineering (Pipelines). Construction of 8 new secondary steel main 1050kPa extension constructed to AS 4645 at the following locations: Gosford - The Entrance; Oran Park; Orange; Dapto/Koonawarra; Glenmore Park; Griffith; Rouse Hill & Pemulwuy (Greystanes). The combined pipe quantities for the secondary steel mains extensions is approximately 11435 metres of 150mm secondary steel pipe, 10900 metres of 200mm secondary steel pipe, 600 metres of 160mm PE, installation of 7 Cocon regulators & 1 secondary meter set. Click for more details...

MURRAY-DARLING BASIN
Consultancy For Survery & Design - Stock/Domestic Water Reticulation Systems project at Murray Darling Basin, ., NSW 2999 in the Civil Engineering (Pipelines). Scope of works may include combinations of pump stations, bores, piped reticulation systems, stock watering points, electrical controls & telemetry. The extent of reticulation systems may vary from about 20km to several hundred kilometres in total. The works to be undertaken as part of this tender include (but are not limited to): Review of available system documentation & ensuring appropriate and sufficient information is available to begin system design work. Liaison with land owners to ascertain detail on issues such as watering sites, pump locations and sizes, tank sites & other related information required in site design. Undertake surveys of proposed pipelines, including stock watering points. Identification of any cultural heritage issues that may or will affect system construction & proposed solutions. Identification of any environmental issues that may affect construction & proposed solutions. Click for more details...

ORANGE AIRPORT DIVERSION
Civil Engineering (Pipelines) project In The Orange Council Area of Pipeline - Relocation type. Proposal includes the relocation of approximately 2 kilometres of an existing gas pipeline, operating between Brown's Creek & Orange to facilitate an extension to the existing runway for the aerodrome. The pipeline diversion will involve a full pipeline construction involving easement stripping Click for more details...

HUNTINGWOOD WASTEWATER MAIN
Currently at the Construction stage In Blacktown is a project estimated to be $ 1200000. This project Construction of 724m DN225 & 192m DN300 sewer main works in the Huntingwood area. The pipeline commences corner of Honeman Close/Great Western Highway & traverses along Honeman Close, crossing Reservoir Rd & along Boiler Close. Click for more details...

SYDNEY WATER CORPORATION RESERVOIRS & PUMPING
Civil Engineering (Pipelines) New project at various location in NSW, ., NSW 2999. This type is Reservoirs/Pump Stations - Repairs with State ownership. Painting and relining water storage reservoirs, painting above ground pipelines, water and sewerage pumping stations, metalwork repairs to reservoirs & pipelines. Scope of work includes: Water Storage Reservoirs (surface, buried & elevated); Clean (water blast), prepare (including lead paint removal) & paint external walls (concrete & steel). Clean (including remove bitumen or other lining), prepare (grit blast or mechanical tool) & reline internal walls & floors including sealing of floor joints. Replacement of internal items (ladders, platforms, hand railing, outlet screens, inlet nozzles) with Fibreglass Reinforced Plastic (FRP) or approved materials. Repainting roofs beams & purlins. Steelwork repairs & replacement including:- existing access frames & covers; external ladders & handrails; roof beams & purlins; roof sheeting & roof walkway. Sewage & Water Pumping Stations (Dry Well & Wet Well) - various items including but not limited to: large dry well walls and floor, internal access stairs/ladders, electric motors, electrical control panels, pumps, valves, pipework, overhead hoist beam, external surfaces of the building etc. Treatment Plants - painting of pumps, pipework, valves, platforms, handrails, underground passages, frames or structures, buildings & other items associated with the plant. External pipelines - pipelines of varying diameters. Work involves but is not limited to: surface preparation (may include lead paint removal) & painting of pipeline, main valves, surface offtakes & bridges & repairs to pipe wall thickness & support saddles where required. Click for more details...

MURRUMBIDGEEE IRRIGATION PIPELINE
Pipeline project at in, Hanwood, NSW 2680 In The Council Area Of Griffith of Private. Design, supply & construciton of a gravity pipeline to replace 2 existing concrete channels (length 2873m) & associated farm outlets in Hanwood Click for more details...

EUMUNGERIE WATER SUPPLY SCHEME
A project in the NSW Within Dubbo. Construction of water supply scheme consisting of 3 separable portions: construction of pipelines along Mogriguy Rd from Brockhurst to Eumungerie & within Mogriguy & Eumungerie villages, design & construction of reservoir & chlorination system on Mogriguy Rd opposite Kyarra Dr way & design & construction of Brocklehurst pumping station at Brocklehurst within the Wambiana St Reserve. Scope of work includes :Separable Portion 1 - Construction of Pipelines, rising main from Brocklehurst Pumping Station to Eumungerie Reservoir, reticulation main from Eumungerie Reservoir to the Eumungerie town, reticulation main from Eumungerie Reservoir to the Mogriguy village, reticulation network within Eumungerie, reticulation network within Mogriguy. Separable Portion 2 - Design and Construction package of Reservoir and Chlorination System including design and Construction of a 100 kL reservoir at approximately 16.6 km from Brocklehurst Pumping Station, design and construction/Installation of a chlorination system at the reservoir site, civil works at the reservoir site include inlet, outlet pipelines from the reservoir, scour/overflow pipeline from the reservoir to drainage outlet, access road, fencing and gates, scour/overflow discharge outlet, concrete pits for magflow meters, chlorination injection point and isolation valves. Separable Portion 3 - Design and Construction package of Brocklehurst Pumping Station including design and construction of Brocklehurst pumping station, civil works at the pumping station site include suction and delivery pipe lines, connection to existing retic-mains; concrete pit for magflow meter and isolation valves, provision of power supply to the Pumping Station & associated electrical and mechanical works. . Click for more details...

ST HELENA TRUNK MAIN CORROSION REPAIRS - STAGE 1
Civil Engineering (Pipelines) project for Renovations, Refurbishments etc. development. corrosion repairs at 26 elevated sections of the 525mm St Helena Trunk Main. Click for more details...

GLEN AYR DRIVE SEWER PIPELINE
Civil Engineering (Pipelines) project In The Tweed Council Area of Local Govt ownership. Construction of approximately 360m of DN225 gravity sewer at Glen Ayr Drive, Banora Point. To include erosion & sedimentation control, testing, commissioning, gravity sewer, maintenance holes & concrete encasement of pipelines. Associated landscaping. Click for more details...

BURWOOD COURT HOUSE
State ownership Civil Engineering (Pipelines) project In The Burwood Council Area for New development. Replace the waterproof membrane on the existing concrete roof, re-seal the central glass pyramid glazing, repair or replace all flashings to achieve a waterproof covering to the court house. Repair internal finishes damaged by water penetration. Click for more details...