CLONCURRY SHIRE COUNCIL - DAJARRA WATER SUPPLY
Civil Engineering (Pipelines) project at ., Dajarra, QLD 4825 for New. Supply, installation and commissioning of approx 870 m x 150 mm dia water pipe and associated civil works. Click for more details...

GOLD COAST CITY COUNCIL
Consultancy For Project Management - Pipeline New project In The Gold Coast City Council Area. Consultants experienced in Project Management in Water & Wastewater Industry will be required to support the Project Director & project manage a consortiumof specialist consultants to be appointed to undertake the Project Business Case Study. The study, incuding approvals, is scheduled to be completed by August 2005. Click for more details...

SUNWATER - BURDEKIN TO MORANBAH PIPELINE
Civil Engineering (Pipelines) project In The Burdekin Shire Council Area of State ownership. Supply & Install & commission three 3.3kv submersible centrifugal Pumpsets, motors & six 11kv horizontal double suction centrifugal Pumpsets including associated pipework and valves, control and communications equipment and cabling over four sites. Click for more details...

SUNWATER - MORANBAH PIPELINE EASTERN EXTENSION
Pumps/Motors/Valves/Switchgear For Pipeline Supply & Install project In The Isaac Regional Council Area. Supply, install, commission: 415 V horizontal multistage centrifugal pumpsets (3) including associated pipework & valves, flowmeters; electrical installation including transformer, switchgear, control equipment & cabling at Pump Station, plus magnetic flowmeters (7) & valves along the proposed pipeline. Click for more details...

BRAEMAR GAS PIPELINE
Civil Engineering (Pipelines) project In The Western Downs Regional Council Area of Private ownership. Construction & operation of gas pipeline to link into the proposed Braemar 450 MW gas-fired power station. Pipeline to commence from compressor station on the Roma to Brisbane pipeline & traverses approx 85 km to the Braemar Power Station location. Work to include a link to existing AGL compressor station; 85 km high pressure gas pipeline that will require the clearing of an easement to facilitate construction (25 m width); temporary facilities that include work areas, stockpile sites & vehicle turnarounds & "turkey's nexts"; access tracks for the ROW; crossings over streams, roads & major infrastructure corridors with methods depending on environmental factors & geotechnical constraints but will be primarily by open trenching. Click for more details...

SOUTHERN REGIONAL WATER PIPELINE
Civil Engineering (Pipelines) project In The Not Yet Determined Council Area of State ownership. Design supply & construction of 9.1 km x 1085 mm dia, 15.5 km x 960 mm dia & 86.6 km x 800 mm dia water pipelines. Design supply & construction of 3 pump stations at Bundamba, Swanbank & Chambers Flat, 2 balance tanks at North Beaudesert (30ML) & Stapylton (10ML) & design & construction of 6 major river crossings including the Brisbane River. Click for more details...

GOLD COAST CITY COUNCIL STORMWATER DRAIN RELINING PERIOD CONTRACT
Civil Engineering (Pipelines) project for New development. To undertake the rehabilitation of up to nine stormwater drains as and when required during the remainder of the financial year ending 30 June 2006. Click for more details...

SOUTHERN REGIONAL WATER PIPELINE PROJECT / MAINTENANCE OPERATIONS PACKAGE
Civil Engineering (Pipelines) project In The Not Yet Determined Council Area of Pipeline - Operation/Maintenance type. The pipeline includes two reservoirs & up to 15 off-takes supplying potable water to Ipswich, Beaudeset, Logan & Gold Coast through approx 100 km of trunk water main. Operations & maintenance project to be structured as an alliance with the skills of the partners covering the tasks: manage, operate & maintain the entire southern regional water pipeline, including operations & planned, preventative, responsive & corrective maintenance; meet the customer service standards including water quality; provide 24 hour customer contact services; manage community relations; implement emergency response planning, HACCP, HAZOPS, etc; procurement of materials & spares; provide, maintain & operate a secure store; provide & implement a computerised maintenance management system; asset management services; provision & management of the related IT systems & telecommunication systems; management & maintenance of SCADA & control systems; laboratory services; & revenue services. Click for more details...

QUILPIE SHIRE COUNCIL CCTV SURVEY FOR SEWER MAINS
Civil Engineering (Pipelines) New project at ., Quilpie, QLD 4480. This type is Cctv Of Sewer Mains with Local Govt ownership. The cleaning and CCTV survey of a 10km of sewer mains (100-225mm dia) in the town of Quilpie. Click for more details...

WESTERN CORRIDOR RECYCLED WATER SCHEME EAST PIPELINE
Civil Engineering (Pipelines) project In The Ipswich City Council Area of Pipeline type. For the construction of the East Pipeline for the SEQWater Recycled Water Scheme. Click for more details...

QUEENSLAND ALUMINA RED MUD DAM REDEVELOPMENT
Dam/Pipeline/Roadworks/Processing Plant project at ., Boyne Island, QLD 4680 in the Civil Engineering (Pipelines). Containment walls, processing plant, roads & pipes. Click for more details...

GOONDICUM PIPELINE PROJECT (MONTO)
Pipeline/Pump Station New project In The North Burnett Regional Council Area. Construction/testing approx 35 km DN300 DI & 355 OD PE pipeline, including pipeline structures, pump station/control building civil works, steel storage & break pressure tanks, using Principal-supplied pipes/fittings/valves. Click for more details...

EASTERN INTERCONNECTOR PIPELINE STAGE 2
via Mount Cotton, Gramzow & West Mount Cotton Roads to, Logan City Bc, QLD 4114 Has Eastern Interconnector Pipeline Stage 2 currently at Construction stage. Construction of a water pipeline and pumping facilities to link Heninemann Road Reservoir at Mt Cotton to Kimberley Park Reservoir in Logan City. Click for more details...

KIMBERLEY PARK WATER PIPELINE AUGMENTATIONS DMA 1 2 & 3
Kimberley Park Water Pipeline Augmentations Dma 1 2 & 3 is currently at the Construction stage, valued at about $ 2000000 it is Construction of 1,400m of pipeline augmentations for DMA 1,2 and 3, ranging in diameter from 100mm to 300mm in existing urban landscapes. Click for more details...

CITECT SCADA PROJECT CONTROL SYSTEM UPGRADE
., Collinsville, QLD 4804 Has Citect Scada Project Control System Upgrade currently at Construction stage. Upgrading existing water pipeline control system includes: design, configuration, integration, programming, testing, commissioning new RTU and PLC equipment (including communications network), developing and integrating new Citect SCADA project. Click for more details...

AWOONGA CALLIDE PIPELINE
Civil Engineering (Pipelines) project for New development. All activities associated with supply fabrication, programming, installation of new radio telemetry, LAN, Next G infrastructure, replacement PLC and SCADA equipment. Click for more details...

TOOWOOMBA PIPELINE PROJECT
Civil Engineering (Pipelines) New project at Wivenhoe Dam to Lake Cressbrook, ., QLD 4999. This type is Water Pipeline with State ownership. An 40km underground pipeline from Wivenhoe Dam to Lake Cressbrook to supply 14,200 million litres of water a year. Click for more details...

LOGAN WATER INFRASTRUCTURE PLANNING & DELIVERY
Water Infrastructure project at ., Logan Central, QLD 4114 In The Council Area Of Logan City of Local Govt. Logan Water Infrastructure Planning & Delivery Program Alliance Agreement. Work includes pipelines, pump stations, reservoirs, treatment plants, acces roads, electrical & mechanical works & ancillary projects. Click for more details...

EAGLE FARM TO PINKENBA PIPELINE
Fuel Pipeline project at Eagle Farm to, Pinkenba, QLD 4008 in the Civil Engineering (Pipelines). 350 diameter steel fuel pipeline. Click for more details...

BRISBANE AIRPORT NEW PARALLEL RUNWAY (NPR) - SITE WORKS
New project of Civil Engineering (Pipelines) project at Airport Dr, Brisbane Airport, QLD 4007. Site preparation to include filling with 16 million cubic metres of sand dredged & brought from Middle Banks, Moreton Bay by a dredger. The fill to be pumped to the runway site via a 6km pipeline from a mooring and pump-out facility to be established at Luggage Point. Also to include clearing of 300ha land for site. Click for more details...

KENYA TO CHINCHILLA WEIR WATER PIPELINE (QCLNG WATER TREATMENT PROJECT)
Civil Engineering (Pipelines) project for New development. 20 km underground pipeline. Click for more details...

BRISBANE AIRPORT NEW PARALLEL RUNWAY (NPR) - SITE WORKS
Civil Engineering (Pipelines) project In The Brisbane City Council Area of Private ownership. Construction of major drainage channels including Kedron Brook Floodway Drain (KBFD), site preparation for NPR construction facilities, relocation of services to Brisbane Airport. Click for more details...

MILES SEWERAGE NETWORKS UPGRADE (WORK PACKAGE 2)
Pump Stations/Rising Mains/Pipework - For Sewerage Upgrade New project In The Western Downs Regional Council Area. Miles Sewerage Network Upgrade Works Package 2. Works to include pump stations, rising mains & associated pipework at Miles. Click for more details...

TOWNSVILLE RING ROAD STAGE 4 WATER & SEWERAGE PIPELINE RELOCATIONS
Civil Engineering (Pipelines) project In The Townsville City Council Area of State ownership. Construction of the Water & Sewerage Pipeline relocation required for the Townsville Ring Road stage 4. Works to include approximately 1.5km DN80 welded steel pipeline, pipeline road & rail crossings & other miscellanous pipeline works. Click for more details...

CHINCHILLA WATER NETWORK
Pipelines New project In The Western Downs Regional Council Area. Upgrade of Chinchilla Water Network raw water & transfer mains. Construction of 3,817m raw water pipeline from the existing river intake on the Condamine River to a proposed water treatment plant located on Aerodrome Road. Construction of 3,944m transfer main from the proposed water treatment plant located on Aerodrome Road to the Low Level Reservoir complex on Colamba Street. Installation of stop valves, air valves & scour valves. Associated civil works. Click for more details...

SPARKES HILL - GREEN HILL PIPELINE
Various locations including Enoggera, Stafford, Chapel Hill, Mitchelton &, Keperra, QLD 4054 Has Sparkes Hill - Green Hill Pipeline currently at Construction stage. Design & construction of pipeline from Sparkes Hill to Green Hill. To include design, supply & install 715m DN300 water main from Stewart Road to Victoria Street, Ashgrove. 980m DN600 trunk water main from Lloyd Street to Pickering Street, Enoggera. Decommission redundant sections of DN600 trunk water main at Wardell & Pickering Street, Enoggera. Click for more details...

MOUNT CROSBY EASTBANK WATER TREATMENT PLANT PIPE RELOCATION
State ownership Civil Engineering (Pipelines) project In The Brisbane City Council Area for New development. Inspection repairs & recoating of the pipelines sections located from the Mount Crosby Eastbank Water Treatment Plant (WTP) to Cameron's Creek & the exposed above ground 1050mm & 1500mm rising mains & equipment located between Aramara Road & Kangaroo Gully Road at Anstead. Click for more details...

GOLD COAST CITY COUNCIL STORMWATER RELINING PROJECT 2015-16
A project in the QLD Within Gold Coast City. Stormwater pipe relining for various locations within Gold Coast City Council including Runaway Bay, Bundall, Mermaid Waters, Coombabah, Arundel, Broadbeach Waters, Paradise Point, Main Beach, Nerang, Labrador, Hollywell & Biggera Waters. Click for more details...

BARDSLEY AVENUE MICROTUNNELLING
Bardsley Ave - Logan Rd, Greenslopes, QLD 4120 Has Bardsley Avenue Microtunnelling currently at Construction stage. Microtunnelling at Bardsley Avenue to Logan Road, Greenslopes for the installation of approximately 34m of 1200mm pipe. Works to include excavation for jacking pit. Telling & pipe jacking at diameter of 1200mm. Open trench pipeline to 375mm diameter class 2 reinforced concrete pipes. Connection of pipe to existing manhole structure. Construction of 2 x 1500mm manhole structures. Supply & installation of steel plate at end of each pipe stub. Click for more details...

WALLUMBILLA BORE 3 BOREHOLE DRILLING & CONSTRUCTION
Civil Engineering (Pipelines) project In The Maranoa Regional Council Area of Local Govt ownership. Construction of Town Bore 3 at Wallumbilla. To include drilling, casing, cementing, developing & testing of 1 town water production bore. Click for more details...

MANOOKA DRIVE WATER PIPELINE REPLACEMENT
Water Pipeline - Replacement project at Manooka Dr, Cannonvale, QLD 4802 In The Council Area Of Whitsunday Regional of Local Govt. Replacement water pipeline approximately 800 metres in length with 100mm dia mains on Manooka Drive, Cannonvale. Associated civil, road & environmental works. Click for more details...

AGNES WATERS TRUNK WATER MAIN STAGE 1
Civil Engineering (Pipelines) project for New development. Construction of 375 DICL trunk water main from Agnes Waters Water Treatment Plant to Agnes Waters High Level Reservoir. To include supply & installation of 1.366km of DN375 DCIL PN20 (RRJ) Pipe, associated valves, pipework fittings & the realignment of a 65.549m section of DN150 gravity sewer. Click for more details...

SURF STREET & DOWLING DRIVE STORMWATER UPGRADE
Civil Engineering (Pipelines) project In The Gold Coast City Council Area of Local Govt ownership. Project 1 to include the construction of stormwater upgrade at Surf Street, Mermaid Beach. Project 2 to include the construction of stormwater upgrade at Dowling Drive, Southport. Environmental rehabilitation. Associated civil works. Click for more details...

JACOBS WELL CHANNEL NORTH MAINTENANCE DREDGING 2015
New project of Civil Engineering (Pipelines) project at Jacobs Well North, Jacobs Well, QLD 4208. Dredging works at Jacobs Well Main Channel North. To include maintenance dredging of Dredge Area A & C of the Main Channel North. Disposal of spoil within the land based stockpile site. Installation of an underbore pipeline beneath Harbour Boulevard for the dredge discharge pipeline. Associated civil works. Click for more details...

MEMERAMBI ROAD & DRAINAGE WORKS
Civil Engineering (Pipelines) project In The South Burnett Regional Council Area of Roadworks/Drainage type. Construction of roadworks & stormwater infrastructure in the township of Memerambi, on the Bunya highway north of Kingaroy. Works to include earthworks, road construction & sealing, installation of stormwater drainage including pipelines & swales, construction of a stormwater detention basin, sediment control devices, turfing & rehabilitation. Associated civil works Click for more details...

OTRANTO AVENUE & BULCOCK STREET DRAINAGE & GROSS POLLUTANT TRAP WORKS
A project in the QLD Within Sunshine Coast Regional. Supply & installation of stormwater pipes, pits & a Gross Pollutant Trap (GPT) along Otranto Avenue, Bulcock Street, & Bulcock Esplanade Caloundra. To include pot holing existing drainage pipes, excavation, connection of existing pits to new pipe network, demolition & reinstallation of revetment wall, installation of a Gross Pollutant Trap, diversion chamber, weir & connections, re-instatement of pavements. Associated civil works. Click for more details...

CALOUNDRA & KAWANA ISLAND SEWER RISING MAINS
Caloundra & Kawana Island Sewer Rising Mains is currently at the Construction stage, valued at about $ 15000000 it is Design & construction of 2 sewer rising mains. SPS-LMT002 rising main (Nicklin Way, Caloundra) to include approximately 2,470m of OD900mm PE100 sewer raising main. Approximately 1,520m to be Horizontal Directional Drilling. Construction over two sections along the Nicklin Way, located at Sugarbag Road (990m) & Seagull Avenue (530m) & two, 60m micro-tunnels under Caloundra Road. SPS-MTN036 rising main (Kawana Way, Kawana Island) to include approximately 3,260m of OD900mm PE100 rising main from north of the Mooloolah River through to the Kawana Sewage Treatment Plant. Construction of four sections of Horizontal Directional Drilling approximately 1,690ms, 890m & a 350m drill under separate sections of Mooloolah River & a 75m microtunnel under Kawana Way. Separable Portion 1 - Design Development & Construction. Separable Portion 2 - Construction of design works. Click for more details...

BRUCE HIGHWAY WATER PIPELINE RELOCATION
Civil Engineering (Pipelines) project for New development. Water pipeline relocation between Robert to Foster Road (ch 76.016 - 77.938km) on the Bruce Highway. Click for more details...

TARA BOREHOLE DRILLING & CONSTRUCTION
Civil Engineering (Pipelines) project at Located Within, Tara, QLD 4421 for New. Drilling & construction of a borehole located within Tara. Click for more details...

CHINCHILLA WASTE WATER TREATMENT PLANT
Civil Engineering (Pipelines) project for New development. Construction of a portable water treatment plant. Construction of 8 kilometres of pipeline. Click for more details...

NORTHERN PIPELINE INTERCONNECTOR TO BOUNDARY ROAD RESERVOIR PIPELINE
Civil Engineering (Pipelines) project In The Moreton Bay Regional Council Area of Private ownership. Construction of a DN600 pipeline from Northern Pipeline Interconnector to Boundary Road Reservoir. To include construction of an offtake facility from the Northern Pipeline Interconnector (NPI) with connections to both the DN750 & DN500 pipelines to supply the Boundary Road reservoir. Construction of a DN600 pipeline from the Northern Pipeline Interconnector offtake to Boundary Road reservoir site & the connection of the new pipeline to existing 18ML & 32ML reservoirs. Civil works for the Boundary Road reservoir chemical dosing. Click for more details...

GLADSTONE BENARABY ROAD - ERGON DEPOT CONNECTION
Local Govt ownership Civil Engineering (Pipelines) project In The Gladstone Regional Council Area for New development. Construction of the Gladstone-Benaraby Road Pipeline - Ergon Depot Connection. Install a new DN150 & DN200 water main that links the existing DN 100 AC main that runs down the services road to the Ergon Depot and the existing DN 200 water main that runs along Gladstone-Benaraby Road before turning to Whiting Street. Scope of work includes: installation of approximately 4m of 150DN DICL pipeline including associated trench stops. Installation of approximately 436m of 200DN PE100 PN16 pipeline including associated trench stops & bulk heads. Protection of existing underground, aboveground and overhead services including ergon powerpole in vicinity of works. Liaison with existing services providers. Liaison and coordination with Council for connections to existing pipeline. Contractor to do Southern connection. GRC direct labour to do Northern Connection. Click for more details...

PEAK DOWNS HIGHWAY & GIBSONS RD
Civil Engineering (Pipelines) project at Peak Downs Highway & Gibsons Rd, Mackay, QLD 4740 of Raw Water Pipeline - Relocation type of New development. Relocation of approximately 2.5km of raw water pipelines Click for more details...