JANEFIELD FLOW CONTROL FACILITY
Flow Control Facility project at 15c Kurronjong View (Lot C), Mill Park, VIC 3082 in the Civil Engineering (Pipelines). Construction of a new flow control facility. Click for more details...

APOLLO BAY RECLAIMED WATER PIPELINE
A project in the VIC Within Colac-Otway. Works include supply and delivery of approximately 1650 metres of 300 and 250mm pressure pipe, valves and fittings. Click for more details...

HANNA STREET MAIN DRAIN
Civil Engineering (Pipelines) project at Arthur Street between Queen Road $ Queens Lane, Albert Park, VIC 3206 for New. The Rehabilitation of Hanna Street Main Drain in Arthur Street between Queens Road and Queens Lane, Albert Park. The work involves the replacement of approximately 55 metres of the existing concrete roof slab and associated works. Click for more details...

WIMMERA MALLEE PIPELINE PROJECT SUPPLY SYSTEM 1 & 7
A project in the VIC Within Horsham. The Wimmera Mallee Pipeline Project is one of the largest water infrastructure projects in Australia. The project will provide a reliable, higher quality water supply to farms and towns across the Grampians Wimmera Mallee Regions and return up to 83,000ML of water savings to government for environmental purposes. Click for more details...

BELLARINE TRANSFER MAIN DUPLICATION - STAGE 3
Civil Engineering (Pipelines) project for New development. Supply, delivery and unloading of pipes and associated fittings. Click for more details...

OUYEN WATER SUPPLY PIPELINE
Water Supply Pipeline project at Between Ouyen and Kulwin, Ouyen, VIC 3490 In The Council Area Of Mildura of Local Govt. Construction of approximately 200 kilometres of water supply pipes in diameters ranging from 200mm to 50mm in the Ouyen east area in northwest Victoria. Click for more details...

YARROWEYAH WATER RETICULATION PIPELINE NETWORK
Currently at the Tenders & Building stage In Moira is a project estimated to be $ 300000. This project The works of this contract comprise the construction of approx. 1.6km of pipe network consisting of 150mm and 100mm nominal diameter water reticulation pipelines. The project includes supply and installation of all pipes, valves and fittings and includes bored road crossings and provision of house service connections. The works are located in the township of Yarroweyah in northern Victoria. Click for more details...

MELBOURNE WATER OVERFLOW IMPROVEMENT WORKS
A project in the VIC Within Yarra Ranges. Melbourne Water is seeking tenders for the construction of overflow improvement works to the Frogley, Cresswell, Plantes Hill, Yarrambat and Yarra Glen service reservoirs, comprising steel pipework and general drainage upgrade. Click for more details...

MARYBOROUGH WASTEWATER REUSE SCHEME
Supply And Installation Of Pipeline New project In The Central Goldfields Council Area. The supply and installation of approximately 8,450 metres of DN300 and 580 metres of DN200 mains. Click for more details...

DRAFFINS ROAD WATER SUPPLY PIPELINE
Civil Engineering (Pipelines) project for New development. Use and Development of a utility installation (water supply pipeline). Click for more details...

WATER SUPPLY PIPELINE DUPLICATION
Civil Engineering (Pipelines) project In The Hume Council Area of Melbourne To Sunbury type. Installation and commissioning of approximately 6200m of DN450 PN20 DICL (Separable Portion A) and/or 4,100m of DN450 PN35 DICL and 200m 502/5 MSCL (Separable Portion B) pressure pipeline, to augment the Rosslynne water supply system. Western Water will supply majority of pipes, valves and fittings. Click for more details...

SWAN HILL ETHANOL PLANT
Civil Engineering (Pipelines) project In The Swan Hill Council Area of Ethanol Plant type. Staged project. Stage 1 - major earthworks. Stage 2 - concrete works. Stage 3 - tank fabrication and supply, following with structural steel and pipework. Construction of a new ethanol plant which will convert over 300,000 tonnes of cereal grains (corn, barley, wheat and sorghum) to fuel ethanol and high protein starch feed co-product. The fuel ethanol product is planned to be sold into the Australian liquid transport industry and marketed as a blend with petrol (gasoline). Click for more details...

THE GOLDFIELDS SUPERPIPE BALLARAT LINK
The Goldfields Superpipe Ballarat Link is currently at the Construction stage, valued at about $ 45000000 it is Pipeline construction. North section - 38.5 kilometre stretch from Lake Eppalock to the Loddon River. South section 48.5 kilometres from the Loddon River to the White Swan Reservoir. Click for more details...

JAYCO DEVELOPMENT SITE SEWER RETICULATION PROJECT
Civil Engineering (Pipelines) project In The Greater Dandenong Council Area of Private ownership. Expressions of Interests are invited from suitably qualified contractors for construction of approximately 1600 linear meters of deep sewer reticulation, incorporating 225,375,450 & 600 DIA pipe and associated structures. Click for more details...

MCMANUS ROAD ASPHALT PLANT
Currently at the Construction stage In Greater Geelong is a project estimated to be $ 4000000. This project Construction of a asphalt plant. Steel structure. To include feed conveyor, bins, burners, storage stormwater pipework, pumps and landscaping. Click for more details...

SUTHERLANDS ROAD WATER PIPELINE
Sutherlands Road, Riddells Creek, VIC 3431 Has Sutherlands Road Water Pipeline currently at Construction stage. Installation of a water pipeline. Click for more details...

NORTH EAST WATERWATCH PROGRAM EVALUATION & STRATEGIC PLAN
Civil Engineering (Pipelines) project In The Various Council Area of State ownership. North East Waterwatch Program evaluation and development of a three year strategic plan (2009-2011). Click for more details...

GREEN GULLY RESERVE IRRIGATION SYSTEM
Civil Engineering (Pipelines) project at Green Gully Reserve, Green Gully Rd, Keilor Downs, VIC 3038 of Irrigation System type of New development. Design and construct a booster pump station, including pumps, housing, associated pipe work, treatment measures connections and flow meters to irrigate 5 existing and two proposed sports grounds at Green Gully Reserve in Keilor Downs. The construction of the irrigation system upgrades will be considered as provisional items with the total number of grounds selected being at the discretion of Council. The overall scheme involves the diversion and treatment of stormwater from one Melbourne Water stormwater drain, Kealba Park Main Drain, and one Brimbank City Council stormwater drain, Green Gully Close Main Drain located at Green Gully Reserve. Click for more details...

NORTHERN VICTORIA IRRIGATION RENEWAL PROJECT (NVIRP)
Civil Engineering (Pipelines) project In The Campaspe Council Area of Panel Of Multi Disciplined Irrigation Contractors type. NVIRP is looking to setup a panel of appropriately qualified contractors who have expreience in the following areas: direct suction lines; removal of existing regulators and private occupation crossings; removal and reinstatement of redundant irrigation Dethridge wheels; decommissioning of spur channels; installation of mag flow meters on existing installations; small scale civil works; access tracks; fencing; survey works and asbestos removal. The works will be conducted throughout Central Goulburn, Pyramid-Boort, Rochester, Murray Valley and Torrumbarry. Click for more details...

AVALON AIRPORT RUNWAY UPGRADE
Civil Engineering (Pipelines) Addition project at Beach Rd, cnr Pousties Rd, Avalon, VIC 3212. This type is Runway - Upgrade with J/V - Private & Govt ownership. Upgrade to the Avalon airport to include taxiway and apron extensions including (4) new aircraft tarmac aprons including one for a 747, upgrade of the below ground fuel lines to increase the fuel holding capacity and external electric light and power upgrades. Click for more details...

BARWON WATER ALLIANCE COLAC PIPELINE REPLACEMENT HORIZONTAL DIRECTIONAL DRILLING
Barwon Water Alliance Colac Pipeline Replacement Horizontal Directional Drilling is currently at the Construction stage, valued at about $ 500000 it is Supply, installation by horizontal directional drilling, and commissioning of approximately 292m of 500mm diameter (SDR11) polyethylene pipe. Click for more details...

ELWOOD PARK PIPELINE
Pipeline New project In The Port Phillip Council Area. Construction of a re-cycled water pipeline from Elwood Park to Elsternwick Park. Click for more details...

ROBINVALE IRRIGATION SYSTEM PRESSURE VESSEL
Civil Engineering (Pipelines) New project at Robinvale Irrigation District, Robinvale, VIC 3549. This type is Pressure Vessel - Installation And Site Works with State ownership. Works involve the onsite installation of a 92 kL Pressure Vessel, pipeline connections and access platforms. Click for more details...

KNIGHT STREET STORMWATER DRAINAGE
Civil Engineering (Pipelines) project at Knight St between Wyndham St and The Boulevard outfall, Shepparton, VIC 3630 for New. Construction of an upgraded stormwater system in Knight Street, Shepparton. Works include removal of existing brick barrel drain, excavate, lay and backfill concrete pipes (located at Council's Doyles Road Complex, Orrvale), supply and install GPT outfall structure with beaching, connections to existing network, re-instatement of road pavement, nature strips, levee bank and liaison with the service authorities. Click for more details...

BUNDALONG WATER RETICULATION NETWORK
Civil Engineering (Pipelines) project In The Moira Council Area of Reticulation Network type. Construction and commission a dual supply reticulation network for Bundalong, including connection to the existing reticulation network. Click for more details...

BARWON WATER COLAC WATER SUPPLY UPGRADE
Gerangamete Treatment Plant, Murroon, VIC 3243 Has Barwon Water Colac Water Supply Upgrade currently at Construction stage. The project will involve constructing a new off-take from the Wurdee Boluc Channel, near Muroon & the existing Barwon Downs Bore field Pipeline; pump station at the Gerangamete Treatment Plant, Barwon Downs; & an 11 km pipeline from there to the existing Colac supply pipeline. While the supplementary supply would normally be sourced from the Wurdee Boluc channel, water also could be accessed from the bore field under extreme dry conditions as a further security measure. Click for more details...

GOLDEN PLAINS FOOD PRECINCT WATER INFRASTRUCTURE STAGE 1
Civil Engineering (Pipelines) project at West of Lethbridge, Lethbridge, VIC 3332 for New. Golden Plains Food Precinct Water Infrastructure Stage 1. Construction of a water delivery pipeline, consisting of 5 km of 225 mm mains pipe plus 3 km of 100 mm pipe, and pump station to supply 3,000 hectare food production and employment precinct. Click for more details...

WERRIBEE IRRIGATION DISTRICT STAGE 1 4/1 PIPELINE
New project of Civil Engineering (Pipelines) project at ., Werribee, VIC 3030. Construction of the WID 4/1 pipeline. The project involves removal of approximately 6km of existing channel and the construction of a new pipeline ranging from 300mm to 600mm. This work will save 600 ML of water each year and replace 6km of old channel; it also includes the upgrading of 17 outlets. Werribee Irrigation District works will replace the existing concrete channel system with a gravity pipeline. Click for more details...

STRATFORD SUPPLY CHANNEL LEAKAGE PROJECT
Channel Leakage Project New project In The Wellington Council Area. The Stratford Supply channel is a 10 km spur channel supplied from the Main Northern Channel; its efficiency is very poor due to very high localised losses from an elevated concrete flume at the end of the channel. Five options to stop the leakage have been developed. Click for more details...

ROCHESTER WATER RECLAMATION PLANT
Reclamation Plant - Upgrade project at Singer Rd, Rochester, VIC 3561 In The Council Area Of Campaspe of State. Rochester Water Reclamation Plant upgrade. The plant treats sewage in a lagoon based plant followed by on-site reuse of the treated effluent. The Rochester plant is to be upgraded to a membrane bioreactor plant to produce higher grade effluent which will be piped 11km to the Singers Road reuse scheme around 7km north of Rochester, for irrigation supply to dairy farms in the area. Click for more details...

AMAROO BRANCH SEWER
From Malcolm Creek Branch Sewer to Lockerbie Branch Sewer Donnybrook & English Rd, Whittlesea, VIC 3757 Has Amaroo Branch Sewer currently at Construction stage. Construction main sewarage pipelines forming Amaroo Branch Sewer. The scope includes: approx. 7.8 km of main sewers 1575mm dia, tunnelled creek crossings; Donnybrook Road, Craigieburn Road East, Summerhill Road, Hume Freeway, pipelines for future connections, pipelines under Melbourne-Sydney Railway line for future sewer connections to the west. The sewer will connect the existing Malcolm Creek Branch Sewer to the proposed Lockerbie Branch Sewer, Donnybrook and English Road intersection. Once completed, the Amaroo sewer will also provide sewage to the proposed Kalkallo Recycled Water Treatment Plant. The sewer will transfer surplus sewage flows (flows not required to supply recycled water to nearby developments) to the Craigieburn Sewage Treatment Plant. Click for more details...

SWAN HILL MODERNIZATION PROJECT
Pipes/Irrigation New project In The Swan Hill Council Area. Swan Hill Modernisation Project. The first stage will include the lowering the operating level of the Little Murray Weir and Weir pool and pumping water from the Little Murray River to the No 9 Channel. Second stage is decommissioning 9.6km of the No 9 Channel within the Swan Hill Precinct. Replacing channel with walking tracks and bike paths. Constructing pipelines and channels to connect the northern section of No 9 Channel to No 10 Channel and maintaining irrigation supply with delivery via the No 10 pump station. Addition of 4 Pump stations; Pental Island Road, Werril Street, Moore Lane and Lake Road. Click for more details...

BALLARAT SOUTH WASTEWATER TREATMENT PLANT AUGMENTATION WORKS
Renovations, Refurbishments etc. project of Civil Engineering (Pipelines) project at Hummfray St South, Ballarat, VIC 3350. Construction of a 42 m diameter clarifier and associated works including earthworks, piling, concrete, hydraulic, mechanical, electrical and controls, pipework, pits, pumps and valves, roadways, drainage and walkways. Click for more details...

LANDSBOROUGH PIPELINE PROJECT WATER PUMP STATION/TANKS AND CONTROLS
Landsborough Pipeline Project Water Pump Station/Tanks And Controls is currently at the Construction stage, valued at about $ 1000000 it is Supply and installation of a water transfer pump station and tank with all associated controls for the Landsborough Valley Pipeline Project. The scope of work includes: supply and construction of a pump station building, fabrication and installation of pump station inlet and outlet plumbing, supply and installation of pumps, supply and installation of one 500kL water storage tank, fabrication and installation of tank inlet and outlet plumbing, supply, installation and connection of all electrical works and instrumentation, installation of controls for the water transfer system including remote telemetry, commissioning of the entire water transfer system. The pump station site is in Stawell and the tank site is in the Landsborough Valley. Click for more details...

AMPOL PETROLEUM PIPE BRIDGE
New project of Civil Engineering (Pipelines) project at 411 Douglas Pde, Spotswood, VIC 3015. Construction of a pipe bridge. Click for more details...

GLENELG SHIRE COUNCIL GEOTHERMAL PIPE REPLACEMENT WORKS
Civil Engineering (Pipelines) New project at ., Portland, VIC 3305. This type is Geothermal Pipe - Replacement with Local Govt ownership. Geothermal pipe replacement works in Portland. Click for more details...

ACACIA ESTATE STAGE 1 CRANBOURNE SOUTH BRANCH SEWER
Craig Rd Botanic Village, Cranbourne South, VIC 3977 Has Acacia Estate Stage 1 Cranbourne South Branch Sewer currently at Construction stage. Construction of approximately 820 m of 300 mm & 375 mm dia PVC sewers (>5.0m depth) at Acacia Estate, Craig Road Botanic Village. Click for more details...

BELLBIRD PARK RECLAIMED WATER IRRIGATION CONSTRUCTION
A project in the VIC Within Baw Baw. Reclaimed water irrigation construction at Bellbird Park, Drouin. The works involve the supply of all necessary labour, plant, equipment, materials & expertise for the set out & construction of various pipe works, pump stations, irrigation systems, subsoil drainage & storage structures, electrical & control systems works. Click for more details...

LEAKES ROAD 450 MM WATER MAIN CONSTRUCTION
Water Main Construction project at Leakes Rd, Rockbank, VIC 3335 In The Council Area Of Melton of State. Construction of water main works along Leakes Rd, Rockbank. Works include: Supply & installation of 5,250 m of pipework (consisting of 560 OD PE, OD406 MSCL, OD508 MSCL, OD648 MS, DN450 DICL pipelines). Trenchless construction including under the Ballarat Railway Line, Leakes Rd, Western Highway, Kororoit Creek, Melton Highway. Supply & construction of scour valve installations, hydrant installations, stop valve installations & thrust restraints. Cathodic protection works. Click for more details...

HARCOURT RURAL MODERNISATION PROJECT RETICULATION PIPEWORK CONSTRUCTION
Harcourt Rural Modernisation Project Reticulation Pipework Construction is currently at the Construction stage, valued at about $ 3000000 it is The completion of the polyethylene reticulation pipeline & associated fittings/customer connections for the Harcourt Rural Modernisation Project. Click for more details...

WIMMERA MALLEE PIPELINE EXTENSIONS - PELLA & QUAMBATOOK NORTH
New project of Civil Engineering (Pipelines) project at Pella & north of, Quambatook, VIC 3540. Construction of extensions to the Wimmera Mallee Pipeline network to supply raw water to rural customers. The works are in two separate rural areas: Pella area (west of Rainbow) & north of Quambatook. The works include: supply & installation of 64 kilometres of 90 & 63 OD polyethylene pipeline, supply & installation of associated valves & fittings & the installation of customer tappings & water meter assemblies. Click for more details...

SMYTHESDALE LANDFILL WETLAND CONSTRUCTION
Civil Engineering (Pipelines) project for New development. Construction of the Southern Water Treatment (aprox 2,400 sqm) at the Smythesdale Landfill & the supply & installation of water pipe & pumping equipment for conveying water from an existing pondage to the inlet to the new wetland. Click for more details...

GMW CONNECTIONS PROJECT - PIPELINE CONSTRUCTION & DECOMISSIONING OF CHANNELS
Civil Engineering (Pipelines) project at Central Goulburn & Rochester Irrigation Areas &, Woorinen, VIC 3589 of Pipeline & Channel Works type of New development. As part of the GMW Connections Project, it is required that 3 pipelines totalling 2.5 kms ranging from DN500 to DN630 HDPE be constructed in the Central Goulburn & Rochester Irrigation Areas. In addition 1.5 km of DN150 UPVC RRJ Pipe & 2.3 km of DN63 HDPE Pipe are also to be constructed in Woorinen. Click for more details...

RIVERSIDE & CURETON AVS WATER MAIN CONSTRUCTION
Water Main Construction project at Riverside & Cureton Avs, Mildura, VIC 3500 in the Civil Engineering (Pipelines). Riverside Avenue & Cureton Avenue DN300 water main construction. PART A: Pipeline construction works for Riverside Avenue Water Main, approximately 1360 m of DN300 PVC-O Series 2 pipework from Sixteenth Street to Seventeenth Street. PART B: Pipeline construction works for Cureton Avenue Water Main, approximately 1025 m of DN300 PVC-O Series 2 pipework along Cureton Avenue from Seventh Street to Cowra Avenue. Click for more details...

STATION ROAD WATER MAIN REPLACEMENT
Station Rd, Sunbury, VIC 3429 Has Station Road Water Main Replacement currently at Construction stage. Construction of Station Road, Melton Water Main Replacement - construction of approximately 527 metres of replacement 300 mm diameter PVC-M main between McKenzie Street & Barries Road. Click for more details...

ORBOST WASTEWATER TREATMENT PLANT & BRUCE'S TRACK REUSE FACILITY BIOSOLIDS BUND
143 Mitchells Rd, Newmerella & 115 Bruce Rd, Nungurner, VIC 3909 Has Orbost Wastewater Treatment Plant & Bruce's Track Reuse Facility Biosolids Bund currently at Construction stage. Orbost Wastewater Treatment Plant (WWTP) & Bruce?s Track Reuse Facility Biosolids Bund Construction Project. The major components of the contract works include: Separable portion A: earthworks & HDPE lining of an existing bunded area at Bruce?s Track Reuse Facility (approximately 3,500 cubic meters), & associated under- drainage. Separable portions B & C: Construction of two clay-lined drying bunds (of approximately 7,750 cubic meters & 4,400 cubic meters volume), & associated under-drainage at the Orbost WWTP. Click for more details...

2016 WINTER WORKS CONSTRUCTION OF PIPELINES - GMW PACKAGE 2
A project in the VIC Within Greater Shepparton. Construction of pipelines, associated works & decommissioning of channels during the 2016 Winter Works program. As part of the GMW Connections Project, it is required that 3 pipelines totalling 7 km ranging from DN50 to DN710 HDPE to be constructed. Other additional works include 1 km of on farm channel / pipeline construction & 7 km of irrigation channel decommissioning. Click for more details...

RIDGE RESERVOIR OUTFALL PIPELINE
Civil Engineering (Pipelines) project for New development. Ridge Reservoir Outfall Pipeline. Click for more details...

LAKE FYANS WATER MAIN REPLACEMENT
Currently at the Construction stage In Northern Grampians is a project estimated to be $ 350000. This project Lake Fyans Water Mains Replacement. Supply & construction of up to 3.8 kilometres of water main pipeline near Lake Fyans. The work site is located 14 kilometres south-west of Stawell in Western Victoria. The scope of works includes, supply, construct & commission 2,200 metres of DN375 PN20 PVC pipe. Supply, construct & commission 1,600 metres of DN450 PN20 PVC pipe. Click for more details...

WY YUNG TO SARSFIELD TRANSFER MAIN REALIGNMENT
New project of Civil Engineering (Pipelines) project at 217 Bullumwaal Rd, Wy Yung, VIC 3875. Realignment of approximately 500m of the existing Wy Yung to Sarsfield Transfer Main, Bairnsdale. The major components of the work include supply, installation & commissioning of approximately 500m new OD560 HDPE potable water transfer main pipework, valves, fittings & ancillaries. Trenchless installation of sleeved pipework under Bullumwaal Road. Reconnection of new pipework at the intersection of Bullumwaal Road & Eastwood Road. Click for more details...