List of Pipelines Projects in WA


AUSTRALIND - EATON WATER MAIN
Civil Engineering (Pipelines) New project at Beneath Collie River btwn Australind & Eaton, ., WA 6999. This type is Dn600 Pe Horizontal Directional Drilling Crossing - Design & Construction with State ownership. It is proposed to install 600 mm diameter PE water pipeline beneath Collie River Between Australind & Eaton. Pipe is to be bored under river bed. Click for more details...

BURRUP FERTILISERS AMMONIA PLANT PROJECT
Civil Engineering (Pipelines) project at Btwn King Bay & Hearson Cove, Burrup Peninsula nr, Karratha, WA 6714 of Ammonia Plant type of New development. Ammonia plant comprising: 2,200 t per day production of liquid ammonia from natural gas; power plant consisting of 20 MW steam turbines & 2 x gas-fired auxiliary boilers; 2 x vent stacks where gases, excluding ammonia, will be vented with steam during normal operating conditions, start-up & upset conditions; 2 x 40,000 t atmospheric pressure, double-walled, double-integrity cryogenic ammonia storage tanks, complete with flare stack; closed circuit seawater-freshwater cooling system & single seawater cooling tower; supply of 74 TJ/day of natural gas from Dampier to Bunbury Natural Gas Pipeline (pipeline to be below ground, 1.3 km in length & constructed by Apache Energy); supply of seawater & freshwater via thermal desalination plant proposed by Water Corporation; demineralisation water plant; wastewater treatment plant; ammonia loading & recirculation facilities for Dampier Public Wharf; associated support facilities. Click for more details...

DAMPIER PORT BULK LIQUIDS BERTH (BLB) PROJECT
Private ownership Civil Engineering (Pipelines) project In The City Of Karratha Council Area for Addition development. Additional facilities to be constructed to enable accommodation of increased port traffic to service new fertiliser & gas to liquids projects on Burrup Peninsula. New multi-user bulk cargo export berth is being constructed to service liquids tankers & bulk solid cargo vessels. Dredging work of up to 4.5 million cu m of sediments is also being undertaken. Click for more details...

DROUGHT RELIEF STRATEGY - GROUNDWATER BORE COLLECTOR PIPELINES & PRODUCTION BORE
Civil Engineering (Pipelines) project at Alexander Heights, Marangaroo, Girrawheen, Koondoola, Balga & Mirrabooka, ., WA 6999 of Groundwater Bore Collector Pipelines & Production Bores type of New development. Construction of various below-ground collector pipelines, groundwater production bores & associated works. Click for more details...

AUGUSTA GOLF CLUB PIPELINE/IRRIGATION
Civil Engineering (Pipelines) New project at Reserve 24816 Caves Rd, Augusta, WA 6290. This type is Pipeline/Irrigation - Stage 2 with Private ownership. It is proposed to install grey water irrigation piping from Gloucester Park to the Golf Course. Click for more details...

GREAT SOUTHERN TOWNS WATER SUPPLY IMPROVEMENT PROGRAMME - DATATINE PIPELINE
State ownership Civil Engineering (Pipelines) project In The Various Council Area for Addition development. Works comprise trench excavation & associated works for Datatine Pipeline Extension in Shires of Dumbleyung & Katanning. Click for more details...

INFILL SEWERAGE PROGRAMME UPGRADE - EATON
Civil Engineering (Pipelines) project In The Dardanup Council Area of Gravity Sewers/Pumping Station/Pressure Main type. Works comprise construction of gravity sewers, pumping station & pressure main for Reticulation Areas Eaton 1J & 2H. Click for more details...

ESPERANCE PRESSURE MAIN, PUMP STATION, STORAGE TANK & INFILTRATION PONDS
Civil Engineering (Pipelines) project for New development. Construction of pressure main (of over 5 km in length) which will run from existing on Goldfields Rd, via Daw Dr & Wylie Bay Rd to existing wastewater treatment plant no. 2, temporary storage tank & pumping station at corner of Goldfields Rd & Daw Dr & three infiltration ponds at wastewater treatment plant no. 2. Click for more details...

BASSENDEAN PRESSURE MAIN
Pressure Main - Extension Addition project In The Bassendean Council Area. Works comprise construction of pressure main extension to Bassendean Pump Stations 1 & 2. Click for more details...

DROUGHT RELIEF STRATEGY - SAMSON BROOK PIPEHEAD DAM
Civil Engineering (Pipelines) project at Approximately 7 km downstream of existing Samson Dam, Waroona, WA 6215 of Pipehead Dam - Main Contract type of New development. Construction of pipehead dam approximately 7 km below existing Samson Dam, which will store about 300 megalitres of water & replace an existing structure at same site that currently supplies Waroona townsite. Dam would have 15 - 25 m high wall & dosing plant is also to be constructed. Water would be connected to Stirling Trunk Main via 11.5 km of 900 mm pipe. Click for more details...

SERPENTINE TO CANNING TRUNK LINK MAIN
Civil Engineering (Pipelines) project at Within Perth southern metropolitan region, ., WA 6999 of Pressure & Flow Regulating Valves For Dn1400 Trunk Link Main type of New development. Supply & delivery of pressure & flow regulating valves for Serpentine to Canning Trunk Link Main. Click for more details...

WATER CORPORATION - STAINLESS STEEL REPAIR CLAMPS
Stainless Steel Repair Clamps - Supply & Delivery To Various Locations project at Within State of Western Australia, ., WA 6999 In The Council Area Of Various of State. Supply & delivery of stainless steel repair clamps for waterwork pipes for three-year period. Click for more details...

SPALDING INFILL SEWERAGE PROGRAMME
A project in the WA Within City Of Greater Geraldton. Works comprise construction of gravity sewers, pumping station & pressure main for Reticulation Area Spalding S3. Click for more details...

INFILL SEWERAGE PROGRAMME UPGRADE - THORNLIE & WESTFIELD
A project in the WA Within Various. Works comprise construction of gravity sewers for Reticulation Areas Thornlie 12D & Westfield 4V. Approximate lengths: Gravity sewers - 229 m x 150 mm & 72 m x 225 mm; by trenchless techniques - 96 m x 150 mm. Click for more details...

CARNARVON INFILL SEWERAGE PROGRAMME
Reticulation Area SC1A (Part), C2 & C7, Carnarvon, WA 6701 Has Carnarvon Infill Sewerage Programme currently at Construction stage. Works comprise construction of gravity sewers, pressure main & vacuum sewers for Reticulation Area Carnarvon SC1A (part), C2 & C7. Click for more details...

TWO PEOPLES BAY DISTRIBUTION PIPELINE
Civil Engineering (Pipelines) project In The Albany Council Area of State ownership. It is proposed to construct underground PVC water distribution main extending along Lower King Rd & Nanarup Rd from approximately corner of Lower King Rd & Elizabeth St at Lower King to south side of Kalgan River. Click for more details...

GERALDTON PORT ENHANCEMENT PROJECT
A project in the WA Within City Of Greater Geraldton. Geraldton Port Authority is currently upgrading its facilities at Geraldton Port to provide unloading of fuel tanker ships at Berth 6. Works comprise design & construction of approximately 270 m to 370 m of 300NB & 150NB pipelines & wharf termination point. Click for more details...

SERPENTINE TO CANNING TRUNK LINK MAIN
Civil Engineering (Pipelines) project at Within Perth southern metropolitan region, ., WA 6999 of Butterfly Valves For Dn1400 Trunk Link Main type of Supply & Install development. Supply & delivery of manually & electrically actuated butterfly valves for Serpentine to Canning Trunk Link Main. Click for more details...

SYNTROLEUM SYNTHETIC HYDROCARBONS PROJECT - BURRUP PENINSULA (GAS TO LIQUID)
Plant For Natural Gas To Liquids Conversion (Synthetic Hydrocarbons) New project In The City Of Karratha Council Area. 10,000 - 11,500 nominal barrels per day gas to liquids plant for production of natural gas into ultra-clean, high performance & sulphur-free synthetic products such as lubricants, industrial fluids & paraffins, as well as synthetic transportable fuels, using Fischer-Tropsch technology. Click for more details...

WOOLNOUGH WATER PIPELINE
A project in the WA Within Collie. Supply, installation & commissioning of 630 mm poly water pipeline to run water 1.7 km from Griffin Coal Mines to Muja Power Station in Collie Basin. Click for more details...

ALKIMOS WASTEWATER TREATMENT PLANT
Civil Engineering (Pipelines) project for New development. It is proposed to develop Quinns Sewer Main (stage 1), Alkimos Wastewater Treatment Plant (stage 2) & ocean outlet (stage 3) at Alkimos. Click for more details...

HALCYON WAY, POPLAR AVENUE & FORREST ROAD PUMP STATION, PRESSURE & SEWER MAINS
New project of Civil Engineering (Pipelines) project at Halcyon Cr, Poplar Av & Forrest Rd, Margaret River, WA 6285. Works comprise construction of Type 90 sewer pump station & 2,190 m of DN250 pressure main & DN375 sewer main in Halcyon Cr, Poplar Av & Forrest Rd. Click for more details...

MUNGULLAH POWER STATION (CARNARVON)
Civil Engineering (Pipelines) project In The Carnarvon Council Area of Power Station - Epc/Bop Contract type. Works may include the construction & operation of a new gas turbine & diesel power station with a combination of 6 diesel & 7 gas fuelled generators with approx capacity of 1.8 MW to replace the existing facility located in Iles Road, East Carnarvon. Proposed construction may occur in three major stages as follows: site works, transmission line to connect the new power station with the substation at the existing power station site 2010/2011, first phase of power generating plant: supply, delivery, installation, supervision & commissioning of 5 diesel reciprocating engines with approx capacity btwn 1.6MW - 1.8 MW, gas pipeline to be installed & connected to the CPS, second phase of generating plant: supply, delivery, installation, supervision & commissioning of 3 gas reciprocating engines with approx capacity btwn 1.2MW - 1.6 MW, third phase of power generating plant: Supply, delivery, installation, supervision & commissioning of 4 gas reciprocating engines with approx capacity 1.8 MW. Supply, delivery, installation, supervision & commissioning of 1 diesel reciprocating engine with approx capacity 1.8 MW. Iles Rd power station to be decommissioned. Click for more details...

ASHBY WATER DISTRIBUTION MAIN
Water Distribution Main - Supply & Installation Supply & Install project In The Wanneroo Council Area. Works involve supply & installation of DN375 PVC/MISCL water main & associated fittings approximately 1,600 m in length. Click for more details...

PORT OF WYNDHAM - WATER MAINS
Civil Engineering (Pipelines) project at Within Port of Wyndham, Wyndham, WA 6740 for Supply & Install. Works involve upgrading of existing water distribution mains within Port of Wyndham, primarily consists of supply, lay & installation of approximately 1,250 m of PVC pipe on land, supply & installation of some 670 m of ductile iron pipe under Wyndham Jetty deck. Click for more details...

HARVEY IRRIGATION DISTRICT PIPE REPLACEMENT PROGRAM - STAGE 1
Civil Engineering (Pipelines) Renovations, Refurbishments etc. project at Various locations in & around townsite of, Harvey, WA 6220. This type is Irragation Piping - Supply & Installation - Stage 1 with Local Govt ownership. Harvey Water intends to commence major program of replacing irrigation channels with piping in Harvey Irrigation District, this will be stage 1 of 4 stage project. Work to comprise of welding approximately 20 km of MDPE pipe ranging in size from 280 mm to 1,200 mm & associated fittings using butt fusion method, install associated isolation, scour & air release valves in pipeline, carry out required earthworks to make way for installation of pipeline & associated infrastructure below ground, to pressure test & commission completed pipeline as per project specification & all of pipe required for project will be sourced, purchased & delivered to site by Harvey Water. Click for more details...

RACECOURSE DAM TO HAMPDEN TRANSFER STATION - EFFLUENT LINE
Civil Engineering (Pipelines) project for Renovations, Refurbishments etc. development. Works to comprise of replacement of treated effluent main from Racecourse Dam pump station to Hampden Transfer Station. Click for more details...

KALGOORLIE-BOULDER GRAVITY SEWERS
New project of Civil Engineering (Pipelines) project at Various areas within City of, Kalgoorlie, WA 6430. Replacement of approx 1500 lineal metres of sewer main at 4 locations within City of Kalgoorlie-Boulder. Click for more details...

SUMMERS STREET & CLAISEBROOK ROAD SEWER MAIN
Currently at the Construction stage In Perth is a project estimated to be $ 111000. This project All works include but are not limited to: construction & backfill of 150 mm diameter gravity sewer using trenchless technology; excavation removal & disposal of all obsolete bleow ground sewer services & associated fittings; removal, stockpiling & shredding of vegetation, disposal of rubbish, fences, debris & other deleterious material; reinstatement of road pavement, kerb & footpaths damaged; disposal of surplus material off site; serrin out, construction & testing of sewer pipes, manholes & fittings; quality testing & commsissioning as required. Click for more details...

DROUGHT RELIEF STRATEGY - SOUTHERN SEAWATER DESALINATION PROJECT
Reverse Osmosis Desalination Plant - Design/Construct/Operate & Maintain New project In The Harvey Council Area. As part of its drought contingency planning, Water Corporation is proposing development of seawater desalination plant, similar to Kwinana Plant. New plant will be powered by renewable energy & provide at least 45 gigalitres of water per year into integrated water supply system, with potential to increase to 100 gigalitres. The plant will include an offshore seawater intake structure, a supply pipeline, a reverse water treatment plant powered by renewable energy and an offshore brine discharge pipeline. Click for more details...

CLYDESDALE ROAD (SOUTH COAST HIGHWAY) - WATER MAIN INSTALLATION
Civil Engineering (Pipelines) project at Along South Coast Hwy, Mckail, WA 6330 for New. Works comprise installation of approx 2.36 km of water main, consisting steel & PVC main, along South Coast Hwy. Click for more details...

SULPHUR ROAD CONSTRUCTION - CIVIL WORKS
State ownership Civil Engineering (Pipelines) project In The Kwinana Council Area for New development. Works to comprise bulk earthworks, removal of unsuitable material, stripping, stockpiling & re-spreading topsoil. Construction of siteworks, roadworks, supply & laying road pavement & construction of kerbs. Construction of stormwater drainage pipelines & structures & construction of sewerage pressure main pipelines. Lay cable for Western Power underground electrical power supply, including installation of standard street lights & preparation of padmount sites including installation of culvert foundations. Construction of concrete paths within road reserves & other such works as shown on drawings & specifications. Click for more details...

KINGS PARK AND BOTANIC GARDENS - BORE PUMP
New project of Civil Engineering (Pipelines) project at Fraser Av, West Perth, WA 6005. Works to comprise KP3/07 bore pipelines, conduits & cabling to irrigation system no 1 storage pond at Kings Park. Click for more details...

WUNGONG DN1400 TRANSFER MAINS PROJECT
Transfer Mains Project - Stage 3 project at Approx 13.4 km from Mitchell St & South West Hwy to Connell Av, Martin, WA 6110 In The Council Area Of Gosnells of State. Works to involve provision of approximately 25 km of new DN1400 pipe work to transfer bulk water between sources & storages within south eastern suburbs of Perth. Project will be developed in three stages, & much of project´s infrastructure will be new works except for existing valve complexes. Works will involve excavation of trench for most of length of pipeline route, laying of pipeline, connections to existing valve complexes & post construction rehabilitation. Stage 3 (approx 13.4 km) extending from cnr Mitchell St & South West Hwy in Wungong to Connell Av in Martin. Click for more details...

SHIRE OF WYNDHAM - EAST KIMBERLEY RETICULATION INFRASTRUCTURE
Civil Engineering (Pipelines) project In The Wyndham-E Kimberley Council Area of Local Govt ownership. Works to comprise design & construction of a reticulation mainline on Weaber Plain Rd; reticulation services for Pindan Park, Rotary Centenary Park, Victoria Hwy & Casuarina Wy; & an upgrade for the pump station at Lily Creek Lagoon. Click for more details...

MAIN ROADS WA - SEWERAGE CONNECTION
Main Roads Wa - Sewerage Connection is currently at the Tenders & Building stage, valued at about $ 44000 it is Works to comprise extn of existing wastewater infrastructure to services Main Roads Land. Click for more details...

WATER CORPORATION INFILL SEWERAGE WORKS
Civil Engineering (Pipelines) project at Various locations in the council area of, Quinns Rocks, WA 6030 for New. Works to comprise construction of infill sewerage in the Quinns Rocks area to include constructing below ground sewerage pipelinines & a number of low pressure mains throughout the area. Click for more details...

HORSLEY ROAD RESERVOIR PUMPING STATION/PIPELINES
Civil Engineering (Pipelines) project In The Denmark Council Area of Pumping Station/Pipelines type. Works may comprise construction of a below ground pumping station, Horsley Rd, 1100 m of 375 pipeline 1300 m of 500 mm pipeline, 145 m of 400 mm pipeline & 710 m of 375 mm pipeline. The locations of the proposed pipelines are in reserves of South Coast Hwy, Hardy St, Smith St, Kearsley Rd, shire reserves, private land & existing easements. Click for more details...

CITY OF BUNBURY - CREEK STREET UNDERGROUND DRAINAGE PIPES RELINING
New project of Civil Engineering (Pipelines) project at Along a section of Creek St, Bunbury, WA 6230. Works to comprise relining of underground drainage pipes along a section of Creek St, Bunbury. Click for more details...

KING CREEK DRAIN REALIGNMENT PROJECT STAGE 2
New project of Civil Engineering (Pipelines) project at Located btwn Throssell & Wellington Sts, Northam, WA 6401. Works will include the construction of the King Creek Drain Realignment Project Stage 2. Click for more details...

ONLSOW AIRPORT WATER MAIN
Civil Engineering (Pipelines) project at Located 5 km from Township, Onslow, WA 6710 of Water Main - Diversion - Supply & Install type of New development. To include the supply & installation of approx 2,470metres of 250mm PVC, to include all bends, valves, fittings & materials as required. Works also comprise of testing of the completed pipeline to Water Corporation requirements. Click for more details...

GOLDFIELDS & AGRICULTURAL WATER SUPPLY PIPELINE
Pipeline - Refurbishment project at Approx 17km of the Goldfields & Agricultural Water Supply pipeline near, Southern Cross, WA 6426 in the Civil Engineering (Pipelines). Works to include the refurbishment of approx 17km of the Goldfields pipeline near Southern Cross. The contractor to provide personnel, plant & site operations. Click for more details...

PILBARA ENERGY PIPELINE (PEPL) RELOCATION
Civil Engineering (Pipelines) project at Boodarie Pastoral Station 11km southwest of, Port Hedland, WA 6721 for New. Reburial at 9m deep of a 670m section of the existing pipeline to enable construction of the proposed Roy Hill haul railway. To include upgrade of the access track, clearing & establishment of a contractor's equipment laydown area. Temporary site facilities to include cyclone rated site offices/crib huts (up to 4 buildings each 6m x 3m), amenities, light vehicle parking area, fuel tank & security. Click for more details...

SOUTH WEST INSTITUTE OF TECHNOLOGY - H-BLOCK
State ownership Civil Engineering (Pipelines) project In The Bunbury Council Area for New development. Works to include the installation of gas reticulation to H-Block. Click for more details...

ATCO GAS AUSTRALIA - GAS MAINS & PRE-LAID SERVICES
Civil Engineering (Pipelines) project at Various locations within, ., WA 6999 for New. Works to include laying of Gas Mains & Pre-laid svcs in common trench subdivisions. Click for more details...

CHAMPION LAKES - WATER TRANSFER PIPELINE WORKS
Civil Engineering (Pipelines) project at Champion Lakes, Lake Rd, Champion Lakes, WA 6111 for New. Works to include supply, installation & commissioning of water transfer pipeline on the International Rowing Course at Champion Lakes comprising of: connection to the existing CL2 groundwater bore pipeline, actuated control valve & interconnection into the existing PLC controller & poly water transfer pipeline from the water compound to the drainage basin. Click for more details...

RAY FINLAYSON SPORTING COMPLEX - ELEMENT 3
A project in the WA Within Kalgoorlie-Boulder. Works to include the construction of sports fileds, field furniture, installation of floodlighting, effluent pipelines & associated works within the Sporting Complex. Click for more details...

DENMARK WATER TREATMENT PLANT WORKS
Denmark Water Treatment Plant Works is currently at the Construction stage, valued at about $ 2000000 it is Works to include the installation of a new 3.4 km pipeline to be constructed between the Denmark River Dam & Quickup Dam, a 700m extension to the existing pipeline & reverse osmosis desalination units at the Denmark Water Treatment Plant. Click for more details...

THOMAS STREET/PLAIN STREET/NELSON CRESCENT - STORM WATER PIPES WORKS
Civil Engineering (Pipelines) project at Thomas & Plain Sts & Nelson Cr, Perth, WA 6000 of Storm Water Pipes - Rehabilitation type of Renovations, Refurbishments etc. development. Works to include the rehabilitation of the storm water pipes on Thomas & Plain Sts & Nelson Cr. Click for more details...

ALKIMOS & EGLINTON - WATER MAIN WORKS
New project of Civil Engineering (Pipelines) project at Along Marmion Av, from Shorehave Blvd to Cinnabar Dr, Wanneroo, WA 6065. Works to include the construction of 1.3km of water main along Marmion Av between Shorehaven Blvd & Cinnabar Dr for the provision of water for the suburbs of Alkimos & Eglinton. Click for more details...